WORKSHEET DRILLING REPORT


Project PT Adaro Jasabara Indonesia
Site Tanjung ( Kal - Sel )
Rig : DBM 240 - 01 Periode 01 s/d 15 Juni 2019
Open Hole HQ Size Open Hole HQ Size (60 °) Partly Coring HQ Size Partly Coring HQ Size (60 °) Full Coring Vertical Full Coring 60 ° Drilling SPT Moving Aktive Passive Lonterm
Running INSTAL
Date Shift Hole No. 0 - 100 Meter 110 - 200 Meter 201 - 300 Meter 310 - 400 Meter 0 - 100 Meter 110 - 200 Meter 210 - 300 Meter 0 - 100 Meter 110 - 200 Meter 210 - 300 Meter 310 - 350 Meter 0 - 100 Meter 110 - 200 Meter 210 - 300 Meter 0 - 100 Meter 110 - 200 Meter 210 - 300 Meter 310 - 350 Meter 0 - 100 Meter 110 - 200 Meter 210 - 300 Meter 0-20 20-50 Manual Standby Standby Standby Remarks
UDS
From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total From To Total Test Test (M) ( Hours ) ( Hours ) ( Day ) PVC

01/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

02/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

03/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

04/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

05/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

06/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

07/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

08/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

09/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

10/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

11/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

12/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

13/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

14/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

15/06/2019 Day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

TOTAL 0 Open Hole HQ : 0.00 Open Hole HQ : 0.00 Open Hole HQ 0.00 Open Hole HQ 0.00 Open Hole HQ 0.00 Open Hole HQ 0.00 Open Hole HQ : 0.00 Coring HQ : 0.00 Coring HQ : 0.00 Coring HQ : 0.00 Coring HQ : 0.00 Coring HQ : 0.00 Coring HQ : 0.00 Coring HQ : 0.00 Full Coring HQ : 0.00 Full Coring HQ : 0.00 Full Coring HQ : 0.00 Full Coring HQ : 0.00 Full Coring HQ 0.00 Full Coring HQ : 0.00 0.00 0.00 0 0:00 0:00 0 0 0

Balikpapan, 16 Juni 2019


Prepared by, Checked by, Approved by, Approved by,

Winarto B. Yomar Simon Achmad Faisal Yari Widiyanto


Administrator Pengawas Operasional Exploration Geologist Geology Section Head
PT. DBM PT. DBM PT. AJI PT. LSA
Drilling Report : DBM Cortech
Open Hole HQ Open Hole HQ (60 °) Partly Coring HQ
UNIT HOLE NO. 0-100 101-200 201-300 301-400 0-100 101-200 201-300 0-100 101-200 201-300
(M) (M) (M) (M) (M) (M) (M) (M) (M) (M)

DBM Cortech

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grand total 0.00 0.00

Balikpapan, 16 Juni 2019


Prepared by, Checked by,

Winarto B. Yomar Simon


Administrator Pengawas Operasional
PT. DBM PT. DBM
SUMMARY MONTHLY DRILLING REPORT
Site Tanjung ( Kal - Sel )

Partly Coring HQ (60 °) Full Cor HQ Full Cor HQ (60 °) Drilling SPT Moving Standby
301-350 0-100 101-200 201-300 0-100 101-200 201-300 301-350 0-100 101-200 201-300 0-20 20-50 Manual Aktive
(M) (M) (M) (M) (M) (M) (M) (M) (M) (M) (M) Test Test (M) Hours

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0:00
0.00 0.00 0.00 0.00 0.00 0 0:00

Approved by,

Achmad Faisal
Exploration Geologist
PT. AJI
Periode 01 s/d 15 Juni 2019
Standby Longterm Running
Instal PVC
Passive Standby UDS REMARKS
Hours Day Test (M)

0:00 0 0.00 0
0:00 0 0.00

Approved by,

Yohanes Mahendro
KTT PT. LSA
Balangan Coal