The school development plan outlines 5 requirements for GKPS 112/DB including constructing a boundary wall, white washing the building, hiring a sweeper, general repair and maintenance, and purchasing stationary. The total estimated cost is 485,000 with NSB funds of 75,633 available, leaving an additional 409,367 required.
The school development plan outlines 5 requirements for GKPS 112/DB including constructing a boundary wall, white washing the building, hiring a sweeper, general repair and maintenance, and purchasing stationary. The total estimated cost is 485,000 with NSB funds of 75,633 available, leaving an additional 409,367 required.
The school development plan outlines 5 requirements for GKPS 112/DB including constructing a boundary wall, white washing the building, hiring a sweeper, general repair and maintenance, and purchasing stationary. The total estimated cost is 485,000 with NSB funds of 75,633 available, leaving an additional 409,367 required.
SCHOOL NAME GKPS 112/DB EMIS CODE 31240426 DISTRICT BAHAWALPUR TEHSIL YAZMAN MARKAZ TAILWALA (W) UC NAME CHAK 108/DB UC NO# 75 SCHOOL SR NO REQUIREMENTS/PLAN PRIORTY NO# QUANTITY ESTIMATED COST RESPOSIBILTY S 1 BOUNDARY WALL 1 400*5 FEET 400,000 2 WHITE WASH BUILDING 3 40,000 3 HIRING OF SWEEPER 2 1 30,000 4 REPAIR & MAINT. 4 10,000 5 STATIONARY ETC. 5 5,000 TOTAL ESTIMATED EXPENDITURES 485,000 NSB FUNDS AVAILABLE 75,633 ADDITIONAL FUNDS REQUIRED 409,367
Don Casey's Complete Illustrated Sailboat Maintenance Manual: Including Inspecting the Aging Sailboat, Sailboat Hull and Deck Repair, Sailboat Refinishing, Sailbo