First: Cable Sizing

Input Data
system = 3
( U ) No Load Voltage
o = 415
Power Factor ( P.F ) = 0.80
Rated Voltage ( Vn ) = 400
Ampient Temperature = 25
Max.conductor Temperature = 90
Route length of Cable ( L ) = 100
Load Power ( PL ) = 75,500
Rated Current ( I L ) = PL / ( √3 x Vn x PF ) = 136
Cable selection is: 1 x ( 4 Core x 70
Cable Ampacity = Iz = 213 A

INSTALLATION METHOD INSTALLATION DETAILS


Multi-Core Cable No Adjacent Circuit

In The Ground Dry Soil

In Conduit

Calculation & formula


Air Temperature factor = 0.96
Grouping Factor = 0.90
Rated current of Cable = 213
O.CF = 1.25
De- rated current of Cable = Air Temp. factor x
Grouping Factor x Rated current of Cable = 184

De-rated current of cable > Rated Current ( I L ) x O.C.F

184 A > 170 A

Second: Voltage Drop Calculations


AC Resistance of Cable ( RAC ) = 0.321
inductance of Cable ( X ) = 0.08
P.F = cos(φ) = 0.80
Sin (φ) = 0.600
( V D ) Voltage drop of cable ( L ) per Amp. Per legnth = √3 × ( R
(AC)90°×cos(φ) + X × sin(φ) )
= 0.53 V/Amp/Km

(VD Cable) Voltage drop of cable ( L ) = (V D x I L


= 7.20

( V D% ) = (V D cable *100 / V n) = 1.80

1.80 % < 2.5 %

Third: C.B selection

Rated Current ( I L ) = PL / ( √3 x Vn x PF ) = 136


Cable Ampacity = Iz = 213
Three pole rated current = A
( I L ) ≤ Three pole rated current ≤ (Iz)
phase
V

V


m
Watt
A
mm² )

Ω/Km
Ω/Km

= √3 × ( R

V/Amp/Km

(V D x I L x L)
V

A
A

z)
S. No Cross Section Current

1 1.5 19.5
2 2.5 27
3 4 36
4 6 48
5 10 63
6 16 85
7 25 112
8 35 138
9 50 168
10 70 213
11 95 258
12 120 299
13 150 344
14 185 392
15 240 461
16 300 530
S. No Temperatures derating factor

1 10 1.15
2 15 1.12
3 20 1.08
4 25 1.04
5 30 1
6 35 0.96
7 40 0.91
8 45 0.87
9 50 0.82
10 55 0.76

Unburid Circuit

S. No Temperatures derating factor

1 10 1.07
2 15 1.04
3 20 1
4 25 0.96
5 30 0.93
6 35 0.89
7 40 0.85
8 45 0.8
9 50 0.76
10 55 0.71
1 Insaultated Conductor
2 Single-Core Cable
3 Multi-Core Cable

1 Embedded in structure
2 In Accessible Building Void
3 In Cable Chanel
4 In not Accessible Building Void
5 In The Ground
6 Overhead
7 Surface Mounted

S. No Method of Installation derating factor

1 In Conduit 0.9
2 Conduit installed in thermal installation material 0.77
3 Cables Installed directly in thermal installation materials 0.7
4 Construction cavities and closed cable trenchs 0.95
5 Surface Mounted on Ceiling 0.95
6 placed in earthenware ducts; in conduits or in decorative Moulding 0.8
7 On Cable Ladder Or Perforated Cable Tray 1
8 1

S. No Method of Installation derating factor

1 Unburied Circuit 1
2 Very wet soil 1.21
3 Wet Soil 1.13
4 Damp Soil 1.05
5 Dry Soil 1
6 Very Dray Soil 0.86
1 Cables Insta 0.7
S. No Method of Installation derating factor

1 No Adjacent Circuit 1
2 1 Adjacent Circuit 0.8
3 2 Adjacent Circuit 0.7
4 3 Adjacent Circuit 0.65
5 4 Adjacent Circuit 0.6
6 5 Adjacent Circuit 0.57
7 6 Adjacent Circuit 0.54
4 10 5 1 1 5 13 3
Temp CSA Ins Meth 1 Ins Meth 2 Ins Det1 Ins Det2 C.B

S. No rating amp

1 10
2 16
3 20
4 25
5 30
6 40
7 50
8 60
9 80
10 100
11 125
12 160
13 200
14 250
15 320
16 400
17 500
18 630
19 800