You are on page 1of 6

DATA SISWA KELAS I

DTA MIFTAHUL FALAH CIASAHAAN CIMANDIRI


KECAMATAN PANGGARANGAN
JENIS
NO INDUK NAMA SISWA KELAS KELAMIN TEMPAT TGL LAHIR ORANG TUA ALAMAT

1 111 NIA I P LEBAK, 12-07-2011 SAPARUDIN SRIMANIK


2 112 NOPITA ANDIRIANSYAH I P LEBAK, 18-08-2011 HENDI SRIMANIK
2 113 REYA NOVILA I P LEBAK, 21-11-2000 ENGKOS SRIMANIK
3 114 ANDIKA PEBRI I L LEBAK, 03-02-2011 SAMSUL MARIP CIASAHAN
3 115 ADE LIA RAHAYU I P LEBAK, 05-03-2011 AAN SRIMANIK
4 116 ROHMATULLAH I L LEBAK, 22-04-2012 UUH CISAHAN
4 117 DESNIS I L LEBAK, 07-01-2011 AGUS SRIMANIK
5 118 ROVIANSYAH I L LEBAK, 10-10-2010 KOSIM SRIMANIK
5 119 USEP I L LEBAK, 10-07-2010 AYUT CIASAHAN
6 120 REPANUDIN I L LEBAK, 15-01-2012 SARIPUDIN CIASAHAN
6 121 ZEA I L LEBAK, 09-08-2011 DARBA MUTIARA
7 122 IKBAL I L LEBAK, 18-02-2013 HERMAT MUTIARA
7 123 KIKI I L LEBAK, 09-06-2010 SUMA MUTIARA
8 124 REPALDI I L LEBAK, 07-09-2010 ADANG CIASAHAN
8 125 ILHAM I L LEBAK, 03-06-2013 UES MUTIARA
9 126 ANGEL I P LEBAK, 05-07-2010 UJANG MUTIARA
9 127 KHOIRUDIN I L LEBAK, 07-06-2012 ALAN MUTIARA
10 128 RAHMANUDIN S I L LEBAK, 19-04-2013 ROHMAN MUTIARA
10 129 SASKIA I P LEBAK, 05-07-2011 HANTO SRIMANIK
11 130 NARTI I P LEBAK, 02-08-2010 MANO SRIMANIK

Mengetahui
Kepala DTA Miftahul Fallah

M. RIDWANULLAH
NO URAIAN

PEKERJAAN PERSIAPAN

1.     DOKUMENTASI/PERSIAPAN
I
2.     PENGUKURAN

JUMLAH

MATERIAL

1.     BATU KALI

2.     PASIR

3.     BATA MERAH

4.     SPLIT

5.     SEMEN

6.     BESI 08, 10, 12

7.     KAWAT

II 8.     PAKU 5, 7, 10, 12

9.     GENTING

10.  KERAMIK

11.  KAYU KUSEN

12.  BEGISTING

13.  CAT

14.  PINTU JADI

JUMLAH

TENAGA KERJA

1.     TENAGA TUKANG (2 ORANG)

2.     TENAGA LADEN (4 ORANG)

3.     PEKERJAAN LAIN
III
III

4.     TENAGA MANDOR

5.     DOKUMEN AKHIR

JUMLAH

JUMLAH SUB TOTAL

100000000
12,000,000
500,000
600,000
2,400,000
4,800,000
9,375,000
2,880,000
15,600,000
360,000
8,800,000
5,200,000
2,700,000
11,400,000

176,615,000 176,515,000
-100,000
JUMLAH
VOLUME HARGA JUMLAH
RATA2

Rp.
2 Pkt Rp. 500.000
250.000
Rp.
2 Pkt Rp. 600.000
300.000

Rp. 1.100.000

Rp.
20 m3 Rp. 2.400.000
120.000
Rp.
32 m3 Rp. 4.800.000
150.000

12500 Bh Rp. 750 Rp. 9.375.000

Rp.
16 m3 Rp. 2.880.000
180.000

240 Pc Rp. 65.000 Rp. 15.600.000

160 Lt Rp. 75.000 Rp. 12.000.000

20 kg Rp. 18.000 Rp. 360.000

20 kg Rp. 15.000 Rp. 300.000

7000 Bh Rp. 1.500 Rp. 10.500.000

160 Dus Rp. 55.000 Rp. 8.800.000

Rp.
4 m3 2.500.000 Rp. 10.000.000

Rp.
4 m3 1.300.000 Rp. 5.200.000
Rp.
3 Ember 25 kg Rp. 600.000
200.000
Rp.
2 Pintu 1.350.000 Rp. 2.700.000

Rp. 85.515.000

240 Hari Rp. 85.000 Rp. 20.400.000

480 Hari Rp. 65.000 Rp. 31.200.000

480 Hari Rp. 55.000 Rp. 26.400.000


120 Hari Rp. 95.000 Rp. 11.400.000

Rp.
2 Pkt Rp. 500.000
250.000

Rp. 89.900.000

Rp.
400,000
10,500,000
10,000,000
600,000
21,500,000

20,400,000
31,200,000 0
26,400,000
500,000
21500000
78,500,000 78500000
1E+08

You might also like