Mengetahui
Kepala DTA Miftahul Fallah
M. RIDWANULLAH
NO URAIAN
PEKERJAAN PERSIAPAN
1. DOKUMENTASI/PERSIAPAN
I
2. PENGUKURAN
JUMLAH
MATERIAL
1. BATU KALI
2. PASIR
3. BATA MERAH
4. SPLIT
5. SEMEN
7. KAWAT
II 8. PAKU 5, 7, 10, 12
9. GENTING
10. KERAMIK
11. KAYU KUSEN
12. BEGISTING
13. CAT
14. PINTU JADI
JUMLAH
TENAGA KERJA
3. PEKERJAAN LAIN
III
III
4. TENAGA MANDOR
5. DOKUMEN AKHIR
JUMLAH
100000000
12,000,000
500,000
600,000
2,400,000
4,800,000
9,375,000
2,880,000
15,600,000
360,000
8,800,000
5,200,000
2,700,000
11,400,000
176,615,000 176,515,000
-100,000
JUMLAH
VOLUME HARGA JUMLAH
RATA2
Rp.
2 Pkt Rp. 500.000
250.000
Rp.
2 Pkt Rp. 600.000
300.000
Rp. 1.100.000
Rp.
20 m3 Rp. 2.400.000
120.000
Rp.
32 m3 Rp. 4.800.000
150.000
Rp.
16 m3 Rp. 2.880.000
180.000
Rp.
4 m3 2.500.000 Rp. 10.000.000
Rp.
4 m3 1.300.000 Rp. 5.200.000
Rp.
3 Ember 25 kg Rp. 600.000
200.000
Rp.
2 Pintu 1.350.000 Rp. 2.700.000
Rp. 85.515.000
Rp.
2 Pkt Rp. 500.000
250.000
Rp. 89.900.000
Rp.
400,000
10,500,000
10,000,000
600,000
21,500,000
20,400,000
31,200,000 0
26,400,000
500,000
21500000
78,500,000 78500000
1E+08