The document is a bill of materials and cost estimate for building a wall separator at a vocational high school. It includes 15 items with quantities, unit prices, item totals, and a grand total cost of RP 11,265,000. The major materials are lightweight brick, rebar, sand, cement, wood boards, and a prefabricated steel and door set. Labor costs for installation are also included.
The document is a bill of materials and cost estimate for building a wall separator at a vocational high school. It includes 15 items with quantities, unit prices, item totals, and a grand total cost of RP 11,265,000. The major materials are lightweight brick, rebar, sand, cement, wood boards, and a prefabricated steel and door set. Labor costs for installation are also included.
The document is a bill of materials and cost estimate for building a wall separator at a vocational high school. It includes 15 items with quantities, unit prices, item totals, and a grand total cost of RP 11,265,000. The major materials are lightweight brick, rebar, sand, cement, wood boards, and a prefabricated steel and door set. Labor costs for installation are also included.