You are on page 1of 1

L.

J Steel Works and Aluminum Glass

SCOPE OF WORK CONTRACT

April 23, 2019

To: Ms. Susana Sage / Mr. John Sage


#596 Dr. Pacifico Marcos St.
Banker’s Village II , Caloocan City

SCOPE OF WORK:
10 WORKING DAYS
WITH 1 YEAR WARRANTY
LABOR & MATERIALS
FABRICATION & INSTALLATION
DELIVERIES & SITE

Window grills 8 pcs


Aircon grills 1pc
Painting 1stndCoating primer
Painting 2 Coating black w/ installation
Materials Prescription:
a. 1 1/2 “ x ¼ “ Flat bar
b. 12mm diameter Plain round bar
c. Wrought Iron Decorative
SIZE VARIETY UNIT PRICE TOTAL
1.30 x 1.60 1 10,250 10,250
1.60 x 1.25 1 7,000 7,000
1.95 x .80 1 7,000 7,000
1.00 x 1.30 4 4,750 19,000
1.30 x 1.30 1 7,000 7,000
0.50 x .40 1 1,500 1,500
51,750

TERMS OF PAYMENT 50% DOWN PAYMENT


BALANCE AS FULLY PAID AFTER FINISHING INSTALLATION

Materials & Labor Cost : P51,750


Painting Cost : P3,000
Delivers : P2,000
TOTAL : P56,750

CONFORME:
JOSEFINO SISON _________________________________________

Contructor Signature Over Printed Name

You might also like