You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

DPWH
MUNICIPALITY OF LAL-LO, CAGAYAN

OFFICE OF THE BUILDING OFFICIAL

BUILDING OFFICIAL

LAND USE & ZONING

LINE & GRADE

RGN RGN
ARCHITECTURAL

PERSPECTIVE VIEWS
1 1 : 100

PROPOSED SITE STRUCTURAL

1 2 3 4 5 6

28125 ELECTRICAL

B PLUMBING
17038

16963

ROOF DECK

MECHANICAL
D

E
28125

STREET FIRE DEPARTMENT


SITE DEVELOPMENT PLAN LOCATION MAP
2 1 : 150
3 N T S

ARCHITECT: PROJECT TITLE: DESIGNED BY: RGN PREPARED BY: CHECKED BY: SUBMITTED BY: NOTED BY: OFFICE: SHEET CONTENTS: SHEET NO.:
REPUBLIC OF THE PHILIPPINES
DRAWN BY: RGN PERSPECTIVE VIEWS
SUPREME COURT OF THE PHILIPPINES SITE DEVELOPMENT PLAN
PADRE FAURA ST., COR. TAFT AVE., ERMITA , MANILA LOCATION MAP
A1
CONSTRUCTION OF HALL OF JUSTICE DATE: OFFICE ON THE HALLS OF JUSTICE
NOTE: PRC NO: VALIDITY: MARIA REGINA ADORACION
THESE DRAWINGS ARE INSTRUMENT OF SERVICE AND PROPERTY OF THE
IAPOA NO: AR. RICHARD G. NICOLAS AR. ARVIN M. NATIVIDAD ENGR. RAMIR SA. RABOLAR FILOMENA M. IGNACIO 7TH FLOOR CENTENNIAL BLDG. SUPREME COURT
SUPREME COURT OF THE PHILIPPINES ASSUCH IT MUST NOT BE REPRODUCED OR CHECKED BY: PADRE FAURA ST. COR. TAFT AVE., ERMITA MANILA
COPIED IN PART OR IN WHOLE WITHOUT THE SPECIFIC PERMISSION. ALL
DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. PTR NO: ISSUED ON:
BUILDING INSPECTOR
OFFICE ON THE HALLS OF JUSTICE
ARCHITECT III
OFFICE ON THE HALLS OF JUSTICE
ENGINEER III
OFFICE ON THE HALLS OF JUSTICE
CHIEF OF OFFICE
OFFICE ON THE HALLS OF JUSTICE 1 34
ISSUED AT: TIN: LOCATION: KAPATAGAN, LANAO DEL NORTE DATE: SUPREME COURT SUPREME COURT SUPREME COURT SUPREME COURT REMARKS: DATE:

IMPORTANT NOTES: 1. NO ALTERATIONS IN PLANS & SPECIFICATIONS SHALL BE MADE


WITHOUT THE PRIOR APPROVAL OF THE OWNER'S REPRESENTATIVE.
2. IF ANY CASE THE CONSTRUCTION METHOD USED BY THE CONTRACTOR CONTRADICT TO THE DESIGN BEING
DRAWN ON PLANS, THE FINAL DECISION OF THE OWNER'S REPRESENTATIVE MUST BE IMPLEMENTED.
3. IN CASE OF DICREPANCY IN THE FIGURE OR DRAWING. THE MATTER SHALL BE SUBMITTED IMMEDIATELY TO
THE OWNER'S REPRESENTATIVE BEFORE ANY ADJUSTMENT SHALL BE MADE BY THE CONTRACTOR.
5. CONTRACTOR SHOULD PROVIDE PROJECT SITE ENGINNER AND/OR
ARCHITECT WHO WILL BE RESPONSIBLE FOR THE ENTIRE DURATION OF THE
BID DOCUMENTS
4. ANY VIOLATION OF THIS INSTRUCTION SHALL BE CORRECTED AT THE EXPENSE OF THE CONTRACTOR. PROJECT.

You might also like