NOTE:

1. USE 2" x 6" WOODEN KING POST & TOP CHORD.


2. USE 2 - 2" x 6" WOODEN BOTTOM CHORD.
3. USE 2" x 4" WEB MEMBER & WOOD BLOCKS. GENERAL CONSTRUCTION NOTES:
4. USE 1" x12" WOODEN FASCIA BOARD.
5. USE 2-25mm Ø LONG ANCHOR BOLTS W/ 14 THK. A. GENERAL
x 75 mm FLAT BAR. 1. GENERAL TYPICAL DETAILS SHALL BE APPLIED TO ALL STRUCTURAL WORK UNLESS
6. VERIFY ARCHITECTURAL AND STRUCTURAL DIMENSION. OTHERWISE SHOWN OR SPECIFIED ON THE DRAWINGS.
ACTUAL DIMENSION PRIOR TO FABRICATION. LOCATION 28 DAYS STRENGTH AGGREGATE SIZE (MAX.) MAX SLUMP
SLAB -ON GRADE (S.O.G.) 2,500 PSI
RAFTER : 2" x 6" ALL STRUCTURAL PARTS 3,000 PSI
RAFTER SPACING : 1.20m B. CONCRETE & REINFORCEMENT
PURLINS : 2" x 2" 1. ALL MATERIALS AND WORKMANSHIP OF SUCH SHALL CONFIRM TO THE LATEST EDITION
PURLINS SPACING : 0.60m OF THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES AND THE REQUIREMENT OF
THE AMERICAN CONCRETE INSTITUTE CODE (ACI 318).
RAFTERS 2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF
TWENTY-EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE OF AGGREGATES AND
3 PCS PURLINS SLUMP AS FOLLOWS:
RUNNING PARALLEL 3. ALL STRUCTURAL REINFORCING BARS SHALL BE GRADE 33 OR HIGHER #10MMØ
TO HIP TEMPERATURE BARS SHALL BE USED ON ALL CONCRETE SLABS.
4. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCEMENT STEEL AS FOLLOWS:
HIP RAFTER
OR TRUSS PURLINS SUSPENDED SLAB - 43" OR 19MM
SLAB ON GRADE - 1 12" OR 38MM
BEAM STIRRUPS & COLUMN LATERAL TIES - 1 12 OR 38MM
2" x 2" CLEATS WHERE CONCRETE IS EXPOSED TO EARTH
BUT POURED AGAINST FORMS - 2" OR 50MM
WHERE CONCRETE EXPOSED IS EXPOSED DEPOSITED
DIRECTLY AGAINST EARTH - 3" OR 75MM
5. SPLICES SHALL BE SECURELY WIRED AND SHALL BE STAGGERED WHENEVER POSSIBLE.
6. ALL ANCHOR BOLTS TO DOWEL INSERTS SHALL BE PROPERLY SECURED IN PLACE
PRIOR TO POURINGOF CONCRETE.
7. ALL CONCRETE SHALL BE KEPT MOIST FOR MINIMUM OF SEVEN (7) CONSECUTIVE DAYS
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING
COMPOUNDS OR OTHER APPROVED METHODS.
C. MASONRY
1. PROVIDE 1-10MMØ CORR. RSB AT CORNERS OR INTERSECTIONS OF CHB WALLS.
ROOF FRAMING1:100MTS
SCALE
PLAN 2. LINTEL BEAMS SHALL BEAR AT LEAST SIX INCHES OR 150MM ON EACH SIDE OF THE
CHB WALLS.
3. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL BE SOLIDLY FILLED WITH
CONCRETE GROUT.
D. FOUNDATION
1. FOUNDATION IS DESIGNED FOR AN ASSUMED ALLOWABLE SOIL BEARING CAPACITY OF
2000 PSF.
10mm Ø VERT. BAR SPA @ 0.80m 2. FOUNDATION SHALL REST ON NATURAL SOIL UNLESS OTHERWISE NOTED BY THE
& 10mm Ø HOR. BAR @ EVERY
3RD LAYER OF 4" THK CHB ARCHITECT/ENGINEER.
3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER THE FOOTING EXCAVATION HAS
BEEN COMPLETED AND PRIOR TO CONCRETING TO FIRM UP THE DESIGN SOIL BEARING

0.20 0.20
Natural Grade line CAPACITY.

2-10 mm Ø LONGITUDINAL BAR


W/ 10mm TRANSVERSAL BAR
SPA. @ 0.20m O.C.

NGL

0.80
50mm THK. COMPACTED
0.20

GRAVEL BED
0.15

0.20

0.20

WALL FOOTING DETAILS


SCALE NTS
COLUMN FOOTING DETAILS
SCALE NTS

CIVIL ENGINEER PROJECT TITLE/LOCATION OWNER SHEET TITLE SHEET NO.


PTR NO. 0994229 JAN 9,2019 PERSPECTIVE
PRC NO. 0085411
PROPOSED SINGLE STOREY RESIDENTIAL BUILDING SITE DEVELOPMENT PLAN S-2
JUL 6,2021
TIN NO. 907388664 LOCATION MAP 5 06
TABLE OF CONTENTS