You are on page 1of 67

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL

DISTRICT / CITY / MUNICIPALITY

LAND USE AND ZONING

LINE AND GRADE

ARCHITECTURAL

P E R S P E C T I V E
T A B L E O F C O N T E N T S
ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL MECHANICAL
A-1 PERSPECTIVE S-1 GENERAL CONSTRUCTION NOTES, SPECIFICATIONS AND DESIGN CRITERIA P-1 GROUND FLOOR PLAN (SEWER & DRAINAGE LINE LAYOUT) E-1 GROUND FLOOR LIGHTING LAYOUT (OPTION -1) M-1 GROUND FLOOR VENTILATION AND CEILING FAN LAYOUT
TABLE OF CONTENTS S-2 GENERAL CONSTRUCTION NOTES, SPECIFICATIONS AND DESIGN CRITERIA SECOND FLOOR PLAN(SEWER & DRAINAGE LINE LAYOUT) SECOND FLOOR LIGHTING LAYOUT SECOND FLOOR VENTILATION AND CEILING FAN LAYOUT
A-2 GROUND FLOOR PLAN S-3 FOUNDATION PLAN (OPTION 1 - ADAPTABLE TO OPTION 3) E-2 ROOF DECK POWER LAYOUT SCHEDULE OF EQUIPMENT
SECOND FLOOR PLAN SECOND FLOOR FRAMING PLAN P-1a GROUND FLOOR PLAN (SEWER & DRAINAGE LINE LAYOUT) GROUND FLOOR POWER LAYOUT (OPTION - 1) MISCELLANEOUS DETAILS
SCHEDULE OF FLOOR FINISHES S-4 TYPICAL DETAIL OF FOOTINGS SECOND FLOOR PLAN(SEWER & DRAINAGE LINE LAYOUT) E-3 SCHEDULE OF LIGHTING FIXTURES AND LAMPS
SCHEDULE OF WALL FINISHES WALL TO TIE BEAM CONNECTION DETAILS (WITH HOME ECONOMICS ROOM - OPTION - 2) RISER DIAGRAM OPTION - 2
STRUCTURAL
A-2a GROUND FLOOR PLAN (WITH HOME ECONOMICS ROOM) DETAIL OF WALL FOOTING P-1b PLUMBING NOTES SECOND FLOOR POWER LAYOUT
GROUND FLOOR PLAN (WITH COMPUTER ROOM) SCHEDULE OF FOOTING TIE BEAMS (EXPOSURE D & B) ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT) E-4 GENERAL NOTES M-2 GENERAL NOTES
SCHEDULE OF FLOOR FINISHES SCHEDULE OF FOOTING (EXPOSURE D & B) P-1c PLUMBING LEGENDS ELECTRICAL SYMBOLS LEGEND
SCHEDULE OF WALL FINISHES DETAIL SECT. OF RC RAMP, DETAIL SECT. OF STAIR ON FILL ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) SCHEDULE OF LOADS GROUND FLOOR VENTILATION AND CEILING FAN LAYOUT
A-2b GROUND FLOOR PLAN (WITH SCIENCE LABORATORY ROOM) DETAIL PLAN OF STF-1 P-1d GROUND FLOOR (SEWER LINE & DRAINAGE LAYOUT) E-5 GROUND FLOOR LIGHTING LAYOUT (WITH HOME ECONOMICS ROOM OPTION -2) SECOND FLOOR VENTILATION AND CEILING FAN LAYOUT
SCHEDULE OF FLOOR FINISHES S-5 SCHEDULE OF COLUMNS (EXPOSURE D & B) GROUND FLOOR (WATER & FIRE LINE LAYOUT) GROUND FLOOR POWER LAYOUT (WITH HOME ECONOMICS ROOM OPTION -2) M-3 SCHEDULE OF EQUIPMENT
SCHEDULE OF WALL FINISHES DETAILS OF HANDWASH (WITH SCIENCE LABORATORY ROOM - OPTION 4) E-6 GENERAL NOTES MISCELLANEOUS DETAILS
A-3 ROOF DECK FLOOR PLAN (SHOWING PARTIAL PLAN OF ROOF) DETAILS OF LAVATORY HANDWASH P-1e PLUMBING NOTES ELECTRICAL SYMBOLS
ROOF PLAN DETAIL OF CONC. SEATING ISOMETRIC DIAGRAM (WATER LINE LAYOUT) SCHEDULE OF LIGHTING FIXTURES AND LAMPS OPTION - 3
A-4 GROUND FLOOR REFLECTED CEILING PLAN (ADAPTABLE TO OPTION 2 & 3) DETAIL SECTION OF CANOPY P-1f PLUMBING NOTES ELECTRICAL RISER DIAGRAM
SECOND FLOOR REFLECTED CEILING PLAN TYPICAL GIRDER /BEAM DETAILS ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) E-7 GROUND FLOOR LIGHTING LAYOUT (WITH COMPUTER LABORATORY ROOM OPTION -3) M-4 GENERAL NOTES
SCHEDULE OF CEILING FINISHES S-6 SCHEDULE OF BEAMS AND GIRDERS (EXPOSURE D) P-2 ROOF PLAN(DRAINAGE LAYOUT) GROUND FLOOR POWER LAYOUT (WITH COMPUTER LABORATORY ROOM OPTION -3 ) LEGEND
A-4a GROUND FLOOR REFLECTED CEILING PLAN (OPTION - 4) SCHEDULE OF BEAMS AND GIRDERS (EXPOSURE B) ROOF DECK FLOOR PLAN (SEWER & DRAINAGE LINE LAYOUT) E-8 GENERAL NOTES GROUND FLOOR VENTILATION AND CEILING FAN LAYOUT
DETAIL OF CEILING AIR - VENT S-7 END WALL DETAIL P-3 GROUND FLOOR PLAN (WATER & FIRE LINE LAYOUT) ELECTRICAL SYMBOLS SECOND FLOOR VENTILATION AND CEILING FAN LAYOUT
A-5 FRONT ELEVATION ROOF FRAMING DETAIL SECOND FLOOR PLAN(WATER FIRE LINE LAYOUT) SCHEDULE OF LOADS M-5 SCHEDULE OF EQUIPMENT
REAR ELEVATION DETAIL OF R.C. GUTTER P-4 ROOF DECK FLOOR PLAN (WATER & FIRE LINE LAYOUT) SCHEDULE OF LIGHTING FIXTURES AND LAMPS MISCELLANEOUS DETAILS
WALL FINISH SCHEDULE DETAIL OF PLANTED COLUMN (PC-1) PLUMBING NOTES ELECTRICAL RISER DIAGRAM SANITARY
A-6 LONGITUDINAL SECTION S-8 DETAIL ELEVATION OF TRUSS-1 PLUMBING LEGENDS E-9 GROUND FLOOR LIGHTING LAYOUT (WITH SCIENCE LABORATORY ROOM OPTION -4) OPTION - 4
LEFT SIDE ELEVATION DETAIL OF ROOF BEAM ALONG GRIDLINE 1&13 P-5 ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) GROUND FLOOR POWER LAYOUT (WITH SCIENCE LABORATORY ROOM OPTION -4)
RIGHT SIDE ELEVATION REFERENCE WELD DETAIL P-6 ISOMETRIC DIAGRAM (DRAINAGE LINE LAYOUT) E-10 GENERAL NOTES M-6 GENERAL NOTES
CROSS SECTION SCHEDULE OF MEMBERS AND WELDS P-7 ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT) ELECTRICAL SYMBOLS LEGEND
SCHEDULE OF WALL FINISHES SPOT DETAIL (MEDIA AGUA) P-8 PLAN & DETAIL OF CATCH BASIN SCHEDULE OF LOADS GROUND FLOOR VENTILATION AND CEILING FAN LAYOUT
A-7 DETAIL BAY ELEVATION S-9 DETAIL SECTIONS, CONNECTIONS AND ANCHORAGES OF TRUSS MEMBERS PLAN & DETAIL OF SEPTIC TANK SCHEDULE OF LIGHTING FIXTURES AND LAMPS SECOND FLOOR VENTILATION AND CEILING FAN LAYOUT
DETAIL BAY SECTION @FRONT S-10 DETAIL ELEVATION OF TRUSS 2 SCHEDULE OF SLAB REINFORCEMENT ELECTRICAL RISER DIAGRAM M-7 SCHEDULE OF EQUIPMENT
DETAIL BAY SECTION @REAR DETAIL CONNECTION AND SPACING OF J-BOLT P-9 DETAIL OF CISTERN TANK MISCELLANEOUS DETAILS
DETAIL SECTION (R.C. GUTTER) ISOMETRIC VIEW OF CONNECTION OF ROOFING TO PURLINS
DETAIL SECTION OF CORRIDOR RAILING S-11 FRAMING PLAN OF STAIR @ SECOND FLOOR LEVEL OPTION - 1
SPOT DETAIL (MEDIA AGUA) FRAMING PLAN OF STAIR @ ROOF DECK LEVEL
DETAIL SECTION OF CORRIDOR RAILING (GROUND) STAIR DETAIL FROM 2ND FLOOR TO ROOF DECK FP-1 GROUND FLOOR FE AND FHC LAYOUT
A-8 DETAIL OF MAIN ENTRANCE DETAIL PLAN OF LINTEL BEAM SECOND FLOOR FE AND FHC LAYOUT
DETAIL SECTION OF MAIN ENTRANCE DETAIL PLAN OF STAIRWAY COLUMN SCHEDULE OF EQUIPMENT
TYPICAL DETAIL SECTION OF SERVICE ENTRANCE DETAILED SLEVATION OF STAIR MISCELLANEOUS DETAILS
TYPICAL DETAIL SECTION OF SIDE ENTRANCE
TYPICAL SPOT DETAIL SECTION OF STAIR STEPS OPTION - 2 ELECTRICAL
A-9 TYPICAL DETAIL PLAN OS STAIRS
TYPICAL DETAIL PLAN OF STAIRS (TO DECK FLOOR) FP-2 GROUND FLOOR FE AND FHC LAYOUT
TYPICAL SECTION OF STAIRS SECOND FLOOR FE AND FHC LAYOUT
TYPICAL SECTION OF STAIRS (TO DECK FLOOR) SCHEDULE OF EQUIPMENT
DETAIL SECTION OF STAIR LANDING MISCELLANEOUS DETAILS
DETAIL SECTION OF STAIR LANDING (TO DECK ROOF)
TYPICAL SECTION OF STAIR STEPS OPTION - 3
A-9R TYPICAL DETAIL OF CORRIDOR RAILING ( FRONT RAILING).
TYPICAL DETAIL OF CORRIDOR RAILING ( SIDE RAILING). FP-3 GROUND FLOOR FE AND FHC LAYOUT
TYPICAL DETAIL SECTION OF STAIR. SECOND FLOOR FE AND FHC LAYOUT
TYPICAL DETAIL SECTION OF STAIR STEPS. SCHEDULE OF EQUIPMENT
DETAIL SECTION OF CONCRETE BENCH MISCELLANEOUS DETAILS
A-10 DETAIL OF ELEVATION OF RAMP
DETAIL SECTION OF RAMP OPTION - 4
DETAIL SECTION OF RAMP
SPOT DETAIL SECTION OF RAMP FLOORING FP-4 GROUND FLOOR FE AND FHC LAYOUT
TYPICAL DETAIL OF RAMP RAILINGS SECOND FLOOR FE AND FHC LAYOUT
TYPICAL DETAIL OF HAND WASHING COUNTER SCHEDULE OF EQUIPMENT MECHANICAL
TYPICAL SECTION DETAIL OF HAND WASHING COUNTER MISCELLANEOUS DETAILS
A-11 DOORS AND WINDOWS SCHEDULE
A-12 DETAIL OF CORRIDOR RAILINGS LOCATED ALONG GRID-1 & 13, GRID- A OF 2ND FLOOR OPTION - 1,2,3 & 4
DETAIL OF WINDOW GRILLE FOR W-2
A-13 DETAIL PLAN OF FEMALE & PWD TOILET @ GROUND WP-1 SCHEDULE OF EQUIPMENTS
FRONT, DET. PLAN OF MALE TOILET & PWD TOILET @ ISOMETRIC DIAGRAM OF WATER PUMPING SYSTEM
GROUND FLOOR, SCHEDULE OF FINISHES, MISCELLANEOUS DETAILS
DETAIL SECTIONS OF FEMALE & PWD TOILET,
DETAIL SECTIONS OF MALE & PWD TOILET
A-14 DETAIL PLAN OF FEMALE & PWD TOILET @ SECOND
FRONT, DET. PLAN OF MALE TOILET & PWD TOILET @
GROUND FLOOR, SCHEDULE OF FINISHES,
DETAIL SECTIONS OF FEMALE & PWD TOILET,
DETAIL SECTIONS OF MALE & PWD TOILET
A-15 DETAIL OF BLACKBOARD

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: ARCHITECTURAL CONCEPT: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PERSPECTIVE
MODIFIED STANDARD DPWH - DEPED TABLE OF CONTENTS CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-1
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1575 3425
3425 1575

EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1


W-1 W-1 W-1 R
W-1 W-1 W-1 W-1 W-1 W-1 W-1
W-3 W-4 W-4 W-3

C
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
4 STO. HE IWF-1
IWF-2
3150

3150
A-6 IWF-1 IWF-1
FL-3
BD-1 BD-1 D-3a BD-1 BD-1
IWF-2 SHE IWF-1 IWF-1 IWF-1 IWF-1 IWF-2
FL-3 D-2 D-2
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING EWF-1 EWF-1 FL-1 FL-1 FL-1 FL-1 FL-1 EWF-1 EWF-1
LANDING
EWF-1 R R EWF-1 EWF-1
EWF-1
EWF-1 EWF-1
9500

9500
3850

3850
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1

D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
EWF-1a D-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 EWF-1a
D-2
2500

2500
W-2 C O R R I D O R C O R R I D O R C O R R I D O R
EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1
R FL-2 FL-2 FL-2
FD FD FD FD FD ELEV. 3450.00 mm FD FD FD FD FD FD FD FD
A
R

EWF-1a EWF-1a
EWF-1a R
EWF-1a
EWF-1a

3
A-6
2 SECOND FLOOR PLAN
SCALE 1: 100 M.
A-2
LEGEND: SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES :
NOTE: R
REVISION OF DRAWING DETAILS (1/23/2018)
MARK WALL DESCRIPTION MARK WALL DESCRIPTION
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL (FROM 150 mm THK. CHB RAILING TO REINFORCED 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT CONCRETE BENCH) ADAPTING THE PROPOSED DEPED PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
FL - 1 EWF - 1 PAINTED FINISH
DESIGN. (PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE - REVISION OF CORRIDOR RAILING AT SECOND AND
(SUBMIT COLOR SCHEMES FOR APPROVAL)
USED AS ALTERNATE ROOFING MATERIALS). THIRD FLOOR ADAPTING THE PROPOSED DEPED DESIGN. PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. EWF - 1a PLASTER PAINTED FINISH
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
MEMBRANE WATER PROOFING (SUBMIT COLOR SCHEMES FOR APPROVAL)
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED
DESIGN 100 mm THK. RC PARAPET WITH PLAIN CEMENT PLASTER PAINTED
FL - 3 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH R EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF HE AND SHE TOILET LAYOUT AT GROUND AND
SECOND FLOOR ADAPTING THE LAYOUT OF MODIFIED
STANDARD THREE (3) AND FOUR (4) STOREY SCHOOL BUILDING
100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK. FL - 4 NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES IWF - 1 PLASTER PAINTED FINISH
CHB TO 100 mm THK. REINFORCED CONCRETE
(SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF TOILET'S WALL & FLOOR FINISHES
- (IWF-2) FROM 200 X 200mm VIT. GLAZED WALL TILES FINISH 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
TO 300 X 300mm VIT. GLAZED WALL TILES FINISH IWF - 2 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
- (FL-3) FROM 200 X 200 mm VIT. UNGLAZED TILES FLOOR FINISH
TO 300 X 300mm VIT. UNGLAZED TILES FLOOR FINISH - TYPICAL ON ALL TOILET WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3125 1875 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1875 3125

1050 400 400 1050


EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1

IWF-2 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-4 W-3 IWF-2
W-3 W-4
C
IWF-2 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
1 PWD PWD
IWF-2
3150

3150
A-6 IWF-1
BD-1 BD-1 D-3 D-3
HE BD-1
SHE IWF-1 IWF-1 IWF-1 IWF-1 FL-3
HANDWASHING

HANDWASHING
FL-3 D-2
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

EWF-1
LANDING FL-1 FL-1 FL-1 FL-1 FL-1 EWF-1 LANDING EWF-1
EWF-1
EWF-1 R R

EWF-1
9500

9500
3850

3850
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
HANDWASHING

HANDWASHING
EWF-1

R
STO. STO.
D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
D-3a W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 D-3a
EWF-1 EWF-1
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
EWF-1 EWF-1 EWF-1
R FL-2 ELEV. 300.00 mm FL-2 FL-2

A 300
1200

1200
SLOPE 1:12 UP UP SLOPE 1:12
RAMP UP REINFORCED CONCRETE BENCH WITH PLAIN RAMP UP EWF-1
150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH) ELEV. 0.00 mm
LINE OF CANOPY ABOVE CEMENT PLASTER PAINTED FINISH
AT 600 mm HIGH WITH PLAIN CEMENT PLASTER PAINTED
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL) 9000
(1 @ 900 mm, 1@ 700 mm
9550 HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C
1500 3600 3600 1500
- TYPICAL TO OTHER SIDE 1 GROUND FLOOR PLAN (OPTION - 1) SIDE ( SEE DETAIL)
SCALE 1: 100 M.
4 A-2
A-6

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR PLAN CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM FLOOR FINISH SCHEDULE LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-2
BUILDINGS DIVISION WALL FINISH SCHEDULE JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3125 1875 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1875 3125

1150 250 250 1150


EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1

IWF-2 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-4 W-3 IWF-2
W-3 W-4
C
IWF-2 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
1 PWD PWD
IWF-2

3150

3150
A-6
BD-1 BD-1 D-3 D-3
IWF-1 HE BD-1
SHE COMPUTER ROOM
IWF-1 IWF-1 IWF-1 FL-3

HANDWASHING

HANDWASHING
FL-3 D-2
FL-1
CLASS ROOM CLASS ROOM CLASS ROOM
7000

EWF-1
LANDING FL-1 FL-1 FL-1 EWF-1 LANDING EWF-1
EWF-1
EWF-1 R R

EWF-1
9500

9500
3850

3850
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
HANDWASHING

HANDWASHING
EWF-1

R
STO. STO.
D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
D-3a W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 D-3a
EWF-1 EWF-1
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
EWF-1 EWF-1 EWF-1
R FL-2 ELEV. 300.00 mm FL-2 FL-2

300
1200

1200
SLOPE 1:12 UP UP SLOPE 1:12
RAMP UP REINFORCED CONCRETE BENCH WITH PLAIN RAMP UP EWF-1
150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH) ELEV. 0.00 mm
LINE OF CANOPY ABOVE CEMENT PLASTER PAINTED FINISH
AT 600 mm HIGH WITH PLAIN CEMENT PLASTER PAINTED
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL) 9000
(1 @ 900 mm, 1@ 700 mm
9550 HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C
- TYPICAL TO OTHER SIDE
1500 3600
2 GROUND FLOOR PLAN (WITH COMPUTER ROOM - OPTION - 3) SIDE ( SEE DETAIL)
3600 1500

SCALE 1: 100 M.
4 A-2a
A-6
LEGEND: SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES :
NOTE: R
REVISION OF DRAWING DETAILS (1/23/2018)
MARK WALL DESCRIPTION MARK WALL DESCRIPTION
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL (FROM 150 mm THK. CHB RAILING TO REINFORCED 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
CONCRETE BENCH) ADAPTING THE PROPOSED DEPED PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT FL - 1 EWF - 1 PAINTED FINISH
DESIGN. (PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3)
USED AS ALTERNATE ROOFING MATERIALS). PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS. PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL EWF - 1a PLASTER PAINTED FINISH
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED MEMBRANE WATER PROOFING (SUBMIT COLOR SCHEMES FOR APPROVAL)
DESIGN
- REVISION OF HE AND SHE TOILET LAYOUT AT GROUND AND 100 mm THK. RC PARAPET WITH PLAIN CEMENT PLASTER PAINTED
SECOND FLOOR ADAPTING THE LAYOUT OF MODIFIED FL - 3 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH R EWF - 2
STANDARD THREE (3) AND FOUR (4) STOREY SCHOOL BUILDING FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK.
CHB TO 100 mm THK. REINFORCED CONCRETE 100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
FL - 4 NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES IWF - 1 PLASTER PAINTED FINISH
- REVISION OF TOILET'S WALL & FLOOR FINISHES
- (IWF-2) FROM 200 X 200mm VIT. GLAZED WALL TILES FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
TO 300 X 300mm VIT. GLAZED WALL TILES FINISH
- (FL-3) FROM 200 X 200 mm VIT. UNGLAZED TILES FLOOR FINISH 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
TO 300 X 300mm VIT. UNGLAZED TILES FLOOR FINISH IWF - 2 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
- TYPICAL ON ALL TOILET WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3125 1875 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1875 3125

1150 250 325 1075


EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1

IWF-2 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-4 W-3 IWF-2
W-3 W-4
C
REF
IWF-2 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
1 PWD PWD
IWF-2
3150

3150
A-6 KITCHEN
BD-1 D-3 IWF-1 D-3
BD-1
HE BD-1
SHE IWF-1 IWF-1 IWF-1 FL-3
HANDWASHING

HANDWASHING
FL-3 DRY WALL (low partition) - 1200 mm HIGH D-2
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

EWF-1
LANDING FL-1 FL-1 FL-1 FL-1 EWF-1 LANDING EWF-1
EWF-1
EWF-1 R R

DINING AREA EWF-1


9500

9500
3850

3850
HOME ECONOMICS ROOM IWF-1 IWF-1 IWF-1 IWF-1
HANDWASHING

HANDWASHING
EWF-1
FL-1
STO. R IWF-1 STO.
D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
D-3a W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 D-3a
EWF-1 EWF-1
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
EWF-1 EWF-1 EWF-1
R FL-2 ELEV. 300.00 mm FL-2 FL-2

A
300
1200

1200
SLOPE 1:12 UP UP SLOPE 1:12
RAMP UP REINFORCED CONCRETE BENCH WITH PLAIN RAMP UP EWF-1
150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH) ELEV. 0.00 mm
LINE OF CANOPY ABOVE CEMENT PLASTER PAINTED FINISH
AT 600 mm HIGH WITH PLAIN CEMENT PLASTER PAINTED
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL) 9000
(1 @ 900 mm, 1@ 700 mm
9550 HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C
1500 3600 3600 1500
- TYPICAL TO OTHER SIDE

4
1 GROUND FLOOR PLAN(WITH HOME ECONOMICS ROOM - OPTION - 2) SIDE ( SEE DETAIL)

SCALE 1: 100 M.
A-6 A-2a

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN (WITH HOME ECONOMICS ROOM)
MODIFIED STANDARD DPWH - DEPED GROUND FLOOR PLAN (WITH COMPUTER ROOM) CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM FLOOR FINISH SCHEDULE LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A - 2a
BUILDINGS DIVISION WALL FINISH SCHEDULE JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
LEGEND: SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES :
NOTE: REVISION OF DRAWING DETAILS (1/23/2018)
R MARK WALL DESCRIPTION MARK WALL DESCRIPTION
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL (FROM 150 mm THK. CHB RAILING TO REINFORCED 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
CONCRETE BENCH) ADAPTING THE PROPOSED DEPED PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT FL - 1 EWF - 1 PAINTED FINISH
DESIGN. (PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE - REVISION OF CORRIDOR RAILING AT SECOND AND
(SUBMIT COLOR SCHEMES FOR APPROVAL)
USED AS ALTERNATE ROOFING MATERIALS). THIRD FLOOR ADAPTING THE PROPOSED DEPED DESIGN. PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL EWF - 1a PLASTER PAINTED FINISH
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN MEMBRANE WATER PROOFING (SUBMIT COLOR SCHEMES FOR APPROVAL)
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED
DESIGN 100 mm THK. RC PARAPET WITH PLAIN CEMENT PLASTER PAINTED
FL - 3 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH R EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF HE AND SHE TOILET LAYOUT AT GROUND AND
SECOND FLOOR ADAPTING THE LAYOUT OF MODIFIED
STANDARD THREE (3) AND FOUR (4) STOREY SCHOOL BUILDING
100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK. FL - 4 NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES IWF - 1 PLASTER PAINTED FINISH
CHB TO 100 mm THK. REINFORCED CONCRETE
(SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF TOILET'S WALL & FLOOR FINISHES
- (IWF-2) FROM 200 X 200mm VIT. GLAZED WALL TILES FINISH 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
TO 300 X 300mm VIT. GLAZED WALL TILES FINISH IWF - 2 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
- (FL-3) FROM 200 X 200 mm VIT. UNGLAZED TILES FLOOR FINISH
TO 300 X 300mm VIT. UNGLAZED TILES FLOOR FINISH - TYPICAL ON ALL TOILET WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3125 1875 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1875 3125

1150 250 325 1075


EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1

IWF-2 W-1a W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-4 W-3 IWF-2
W-3 W-4 W-4
C
(low partition) - 1800 mm HIGH

1200
1200

IWF-2 IWF-1 IWF-1 IWF-1 IWF-1


SHO.
1 PWD IWF-1 PWD
DRY WALL

IWF-2
3150

3150
A-6
BD-1 D-3 IWF-1 D-3
BD-1
HE BD-1
SHE LOCKERS
&
IWF-1 IWF-1 IWF-1 FL-3
HANDWASHING

HANDWASHING
FL-3 D-2
DRESSING RM. D-2a
CLASS ROOM CLASS ROOM CLASS ROOM
7000

EWF-1 LANDING SCIENCE LABORATORY ROOM FL-1 FL-1 FL-1 EWF-1 LANDING EWF-1
EWF-1
EWF-1 R
FL-1 R
D-2
EWF-1
9500

9500
3850

3850
3500

IWF-1 IWF-1 IWF-1 IWF-1


HANDWASHING

HANDWASHING
EWF-1

STO. R IWF-1 STO.


D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
D-3a W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 D-3a
EWF-1 EWF-1
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
EWF-1 EWF-1 EWF-1
1500 2250 R FL-2 ELEV. 300.00 mm FL-2 FL-2

300
1200

1200
SLOPE 1:12 UP UP SLOPE 1:12
RAMP UP REINFORCED CONCRETE BENCH WITH PLAIN RAMP UP EWF-1
150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH) ELEV. 0.00 mm
LINE OF CANOPY ABOVE CEMENT PLASTER PAINTED FINISH
AT 600 mm HIGH WITH PLAIN CEMENT PLASTER PAINTED
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL) 9000
(1 @ 900 mm, 1@ 700 mm
9550 HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C
1500 3600 3600 1500
- TYPICAL TO OTHER SIDE SIDE ( SEE DETAIL)

4
A-6 1 GROUND FLOOR PLAN(WITH SCIENCE LABORATORY ROOM - OPTION - 4)
SCALE 1: 100 M.
A-2b

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN (WITH SCIENCE LABORATORY ROOM)
MODIFIED STANDARD DPWH - DEPED FLOOR FINISH SCHEDULE CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM WALL FINISH SCHEDULE LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A - 2b
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END
FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500
OF 0.43 - 0.45 mm THK.
400
EWF-2 EWF-2 EWF-2 REINFORCED CONCRETE GUTTER EWF-2 EWF-2
0.50mm THK. PREFORMED G.I. ROOFING SHEET (PROVIDE INTEGRAL MEMBRANE WATERPROOFING)
(RIDGE ROLL)

RD RD RD RD

1100
ELEV. 6600.00 mm RD RD RD RD RD RD RD RD RD RD RD ELEV. 6600.00 mm

4100
DECK ROOF DECK ROOF
3100

3100
3150
FL-2a FL-2a

RD RD RD RD

400

400
7000

1650
9500

9500
3850

0.40 mm THK. PRE-PAINTED & PREFORMED G.I. 0.60 mm THK. (BASE METAL THICKNESS)
FLASHING SHEET WITH TOTAL COATED PREFORMED AND PRE-PAINTED RIDGE ROLL

6400
THICKNESS OF 0.43 - 0.45 mm THK.

4750
2500

A
RD RD RD RD RD RD RD RD RD RD RD RD RD

150 mm THK. CHB END WALL WITH PLAIN CEMENT


PLASTER PAINTED FINISH (TYPICAL TO OTHER SIDE) REINFORCED CONCRETE GUTTER
R
EWF-2 (PROVIDE INTEGRAL MEMBRANE WATERPROOFING) EWF-2 EWF-2
REINFORCED CONCRETE GUTTER 0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL THICKNESS OF 0.43 - 0.45 mm THK.

2 ROOF PLAN (PROVIDE INTEGRAL MEMBRANE WATERPROOFING) (WITH PAINT) CORRUGATED G.I. SHEET ROOFINGS.

SCALE 1: 100 M.
A-3 SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES :
NOTE: MARK WALL DESCRIPTION MARK WALL DESCRIPTION
LEGEND:
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT FL - 1 EWF - 1 PAINTED FINISH
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
R REVISION OF DRAWING DETAILS (1/23/2018) (PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
(SUBMIT COLOR SCHEMES FOR APPROVAL)
USED AS ALTERNATE ROOFING MATERIALS). - ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL EWF - 1a PLASTER PAINTED FINISH
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. DESIGN
MEMBRANE WATER PROOFING (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK.
CHB TO 100 mm THK. REINFORCED CONCRETE 100 mm THK. RC PARAPET WITH PLAIN CEMENT PLASTER PAINTED
- REVISION OF TOILET'S WALL & FLOOR FINISHES FL - 3 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH R EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
- (IWF-2) FROM 200 X 200mm VIT. GLAZED WALL TILES FINISH
TO 300 X 300mm VIT. GLAZED WALL TILES FLOOR FINISH
- (FL-3) FROM 200 X 200 mm VIT. UNGLAZED TILES FINISH 100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
TO 300 X 300mm VIT. UNGLAZED TILES FLOOR FINISH FL - 4 NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES IWF - 1 PLASTER PAINTED FINISH
(SUBMIT COLOR SCHEMES FOR APPROVAL)
200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
IWF - 2 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
- TYPICAL ON ALL TOILET WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
475 5000 9000 9000 9000 9000 9000 5000 475
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

EWF-2 400 EWF-2 EWF-2 REINFORCED CONCRETE GUTTER EWF-2 400 EWF-2
0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL THICKNESS OF 0.43 - 0.45 mm THK. (PROVIDE INTEGRAL MEMBRANE WATERPROOFING)
(WITH PAINT) CORRUGATED G.I. SHEET ROOFINGS.
1100

1100
ELEV. 6600.00 mm RD RD RD RD RD RD RD ELEV. 6600.00 mm
BUILDING LINE BELOW
C
4250

DECK ROOF DECK ROOF


3150

FL-2a EWF-1 FL-2a


EWF-1 100 mm HIGH DOOR
THRESHOLD
LINE OF ROOF EAVES ABOVE LINE OF ROOF EAVES ABOVE

800
SD-1 SD-1
400

400
7000

EWF-1a
100 mm HIGH DOOR
EWF-1 THRESHOLD
9500

9500
3850

IWF-1 IWF-1
IWF-1a

B
2500

IWF-1 IWF-1

A BUILDING LINE BELOW


1100

1100
RD RD RD RD RD RD RD

R
EWF-2 EWF-2 EWF-2

1 ROOF DECK FLOOR PLAN(SHOWING PARTIAL PLAN OF ROOF)


SCALE 1: 100 M.
A-3

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROOF DECK FLOOR PLAN (SHOWING PARTIAL PLAN OF ROOF)
MODIFIED STANDARD DPWH - DEPED ROOF PLAN CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-3
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1575 3425
3425 1575 600 X 600 mm MANHOLE OPENING WITH 4.5 mm THK, FIBER CEMENT
CEILING BOARD REMOVABLE COVER (PAINTED)

1150
CL- 2 CL- 2 CL- 2 CL- 2 CL- 2
C

CL- 1

3150

3150
CL- 1 CL- 1

CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 CL- 1
7000

BOTTOM STAIR WELL STAIR WELL BOTTOM


OF BEAM OF BEAM
9500

9500
3850

3850
CL- 1 CL- 1

B
2500

2500
CL- 1 CL- 1 CL- 1

375
1150

CL- 2 CL- 2 CL- 2 CL- 2 CL- 2

1200 FROM 25 X 50 mm WOOD FRAME WITH 25 X 25 mm WOOD CEILING AIR-VENT


AND STAINLESS STEEL WIRE MESH SCREEN, TYPICAL (SEE DETAIL)

2 SECOND FLOOR REFLECTED CEILING PLAN


SCALE 1: 100 M.
A-4

SCHEDULE OF CEILING FINISHES :


NOTE: MARK WALL DESCRIPTION REMARKS
LEGEND: LEGEND:
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL 4.5 mm THICK FIBER CEMENT CEILING BOARD ON METAL FURRING USE 0.60 mm THK. X 19 mm X 50 mm X 5000 mm DOUBLE
REVISION ON SCHEDULE OF CEILING FINISHES AND CEILING FRAME. PROVIDE 8MM THICK ROOF INSULATION WITH FURRING CHANNELS AT 400 mm ON CENTER WITH
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT R REVISION OF DRAWING DETAILS (1/23/2018) R1 TWO(2) LAYERS POLYETHYLINE BUBBLED FILM BONDED/LAMINATED
DESCRIPTIONS (6/25/2018) CL - 1 0.60 mm THK. X 12 mm X 38 mm X 5000 mm CARRYING
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE BETWEEN BY ALUMINUM FOIL RADIENT BARRIERS (REFER TO CHANNELS AT 1200 mm ON CENTER AND ROD
USED AS ALTERNATE ROOFING MATERIALS). - ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN CL-1 - 4.5 mm THICK FIBER CEMENT CEILING BOARD WITH PAINTED FINISH MANUFACTURERS' SPECIFICATIONS JOINER(HANGERS/SUPPORTS) AT 1200 mm ON CENTER,
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED R1
ON METAL FURRING CEILING FRAME. PROVIDE 8 mm THICK ROOF SHORTER SPAN
DESIGN
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. INSULATION WITH TWO(2) LAYERS POLYETHYLINE BUBBLED FILM 4.5 mm THK. FIBER CEMENT CEILING BOARD WITH PAINTED
- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN BONDED/LAMINATED BETWEEN BY ALUMINUM FOIL RADIENT BARRIERS
BREAKER) ABOVE WINDOW (W-1) AT REAR. CL - 2 FINISH ON METAL FURRING CEILING FRAMES. PROVIDE
(REFER TO MANUFACTURERS' SPECIFICATIONS)
WOODEN CEILING VENTILATION (SEE DETAIL)
ADDITIONAL SCHEDULE OF CEILING FINISHES
EXPOSED R. C. UNDER SLABS WITH PLAIN EXISTING ROOF BEAMS & R.C. GUTTERS
CL - 3 CEMENT PLASTER PAINTED FINISH
CL-1a - 4.5 mm THICK FIBER CEMENT CEILING BOARD WITH PAINTED FINISH
ON METAL FURRING CEILING FRAME
(ADAPT REMARKS SPECIFICATION)

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3125 1875 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1875 3125

C C

CL- 1a CL- 1a
3150

3150
R1 R1

CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3
CL- 1a CL- 1a
R1 R1
7000

STAIR WELL STAIR WELL


CL- 3
9500

9500
CL- 3
3850

3850
CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3
CL- 3 CL- 3

B B
2500

2500
CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3
CL- 3

A A

R
9550

GROUND FLOOR REFLECTED CEILING PLAN (Option - 1)


1 (ADAPTABLE TO OPTION -2 & 3)
SCALE 1: 100 M.
A-4
REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:
PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR REFLECTED CEILING PLAN
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR REFLECTED CEILING PLAN CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM SCHEDULE OF CEILING FINISHES LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-4
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1200

1200 FROM 25 X 50 mm WOOD FRAME


13 50 25 STAINLESS STEEL WIRE MESH SCREEN
CEILING HANGER/SUPPORT AT 1200 mm O.C.
25

25
FROM 25 X 50 mm WOOD FRAME

50

50
375
325
13 13
25 X 25 mm WOOD CEILING AIR-VENT @ 25
50 mm O. C., TYPICAL 25 25

25
1200
4.5 nn THK. FIBER CEMENT CEILING BOARD WITH
25 X 25 mm WOOD CEILING AIRVENT at 50 mm O. C., TYPICAL
25 25 PAINTED FINISH ON METAL FURRING CEILING FRAMES
STAINLESS STEEL WIRE MESH SCREEN, TYPICAL SECTION
PLAN
2 DETAIL OF CEILING AIR-VENT
A-4a SCALE 1: 20 M.

SCHEDULE OF CEILING FINISHES :


MARK WALL DESCRIPTION REMARKS

4.5 mm THICK FIBER CEMENT CEILING BOARD ON METAL FURRING USE 0.60 mm THK. X 19 mm X 50 mm X 5000 mm DOUBLE

NOTE: LEGEND: LEGEND: CEILING FRAME. PROVIDE 8MM THICK ROOF INSULATION WITH FURRING CHANNELS AT 400 mm ON CENTER WITH
CL - 1 TWO(2) LAYERS POLYETHYLINE BUBBLED FILM BONDED/LAMINATED 0.60 mm THK. X 12 mm X 38 mm X 5000 mm CARRYING
BETWEEN BY ALUMINUM FOIL RADIENT BARRIERS (REFER TO CHANNELS AT 1200 mm ON CENTER AND ROD
REVISION ON SCHEDULE OF CEILING FINISHES AND
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL R REVISION OF DRAWING DETAILS (1/23/2018) R1 DESCRIPTIONS (6/25/2018) MANUFACTURERS' SPECIFICATIONS R1 JOINER(HANGERS/SUPPORTS) AT 1200 mm ON CENTER,
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT SHORTER SPAN
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN CL-1 - 4.5 mm THICK FIBER CEMENT CEILING BOARD WITH PAINTED FINISH 4.5 mm THK. FIBER CEMENT CEILING BOARD WITH PAINTED
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED ON METAL FURRING CEILING FRAME. PROVIDE 8 mm THICK ROOF CL - 2 FINISH ON METAL FURRING CEILING FRAMES. PROVIDE
USED AS ALTERNATE ROOFING MATERIALS). DESIGN
INSULATION WITH TWO(2) LAYERS POLYETHYLINE BUBBLED FILM WOODEN CEILING VENTILATION (SEE DETAIL)
- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN BONDED/LAMINATED BETWEEN BY ALUMINUM FOIL RADIENT BARRIERS
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. BREAKER) ABOVE WINDOW (W-1) AT REAR. (REFER TO MANUFACTURERS' SPECIFICATIONS) EXPOSED R. C. UNDER SLABS WITH PLAIN EXISTING ROOF BEAMS & R.C. GUTTERS
CL - 3 CEMENT PLASTER PAINTED FINISH
ADDITIONAL SCHEDULE OF CEILING FINISHES

CL-1a - 4.5 mm THICK FIBER CEMENT CEILING BOARD WITH PAINTED FINISH
ON METAL FURRING CEILING FRAME
(ADAPT REMARKS SPECIFICATION)

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3125 1875 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1875 3125

R1

C C
CL- 1a CL- 1a
CL- 1a R1 CL- 1a
3150

3150
R1
R1 R1
CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3
7000

STAIR WELL STAIR WELL


CL- 3
9500

9500
CL- 3
3850

3850
CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3
CL- 3 CL- 3

B B
2500

2500
CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3 CL- 3
CL- 3

A A

9550

1 GROUND FLOOR REFLECTED CEILING PLAN (OPTION -4)


SCALE 1: 100 M.
A-4a

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR REFLECTED CEILING PLAN
MODIFIED STANDARD DPWH - DEPED (WITH SCIENCE LABORATORY ROOM) CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM DETAIL OF CEILING AIR-VENT LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A -4a
BUILDINGS DIVISION
WALL FINISH SCHEDULE JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL THICKNESS


OF 0.43 - 0.45 mm THK. (WITH PAINT) CORRUGATED G.I. SHEET
ROOFING 9300 0.60 mm THK. (BASE METAL THICKNESS)
TOP LINE OF PARAPET 150 2000 5000 2000 150 PREFORMED AND PRE-PAINTED RIDGE ROLL
600

APEX LINE OF TRUSS


150 mm THK. CHB END WALL WITH PLAIN CEMENT
PLASTER PAINTED FINISH (TYPICAL TO OTHER SIDE)
3150

200
200
0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END
TOP LINE OF ROOF BEAM/ FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS

600 800
DECK ROOF FLOOR LEVEL OF 0.43 - 0.45 mm THK.

1400
R

CEILING LINE/CORRIDOR F F F F F F F F F F F F F F F F F F F F

D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 EWF-1
3150

EWF-2 D-4 D-3a D-3a D-4


9750

19 mm SQUARE BARS (PAINTED FINISH) FULLY WELDED


(GRILLE SUPPORT FRAME)

1500
SECOND/CORRIDOR FLOOR LINE 20 X 20 mm GROOVE LINES

600
R

F F F F F F F F F F F F F F F F F F F F
(1 @ 900 mm, 1@ 700 mm
EWF-1a HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
3150

R
D-3a D-3 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-3 D-3a
SIDE ( SEE DETAIL)
R

750
GROUND/CORRIDOR FLOOR LINE

200
300

FINISH GRADE LINE


EWF-1 EWF-1
1200 1500 3600 300 REINFORCED CONCRETE BENCH WITH PLAIN REINFORCED CONCRETE CANOPY WITH PLAIN CEMENT PLASTER 300 3600 1500 1200
CEMENT PLASTER PAINTED FINISH PAINTED FINISH
18000 9000 18000

(1 @ 900 mm, 1@ 700 mm 150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH)
HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C
AT 600 mm HIGH WITH PLAIN CEMENT PLASTER PAINTED
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
LEGEND:
SIDE ( SEE DETAIL) - TYPICAL TO OTHER SIDE
R REVISION OF DRAWING DETAILS (1/23/2018) SCHEDULE OF WALL FINISHES :
1 FRONT ELEVATION NOTE: - REVISION OF CORRIDOR RAILING AT GROUND FLOOR
(FROM 150 mm THK. CHB RAILING TO REINFORCED MARK WALL DESCRIPTION
SCALE 1: 100 M. CONCRETE BENCH) ADAPTING THE PROPOSED DEPED
A-5 - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL DESIGN. 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT - REVISION OF CORRIDOR RAILING AT SECOND AND EWF - 1 PAINTED FINISH
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE THIRD FLOOR ADAPTING THE PROPOSED DEPED DESIGN. (SUBMIT COLOR SCHEMES FOR APPROVAL)
USED AS ALTERNATE ROOFING MATERIALS). - REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS. EWF - 1a PLASTER PAINTED FINISH
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK.
CHB TO 100 mm THK. REINFORCED CONCRETE
100 mm THK. RC PARAPET WITH PLAIN CEMENT PLASTER PAINTED
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED
DESIGN
100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN IWF - 1 PLASTER PAINTED FINISH
BREAKER) ABOVE WINDOW (W-1) AT REAR.
(SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF TOILET'S WALL & FLOOR FINISHES
- (IWF-2) FROM 200 X 200mm VIT. GLAZED WALL TILES FINISH 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
TO 300 X 300mm VIT. GLAZED WALL TILES FINISH IWF - 2
- (FL-3) FROM 200 X 200 mm VIT. UNGLAZED TILES FLOOR FINISH (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
TO 300 X 300mm VIT. UNGLAZED TILES FLOOR FINISH - TYPICAL ON ALL TOILET WALLS

13 12 11 10 9 8 7 6 5 4 3 2 1
55000
5000 9000 9000 9000 9000 9000 5000
0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL THICKNESS
OF 0.43 - 0.45 mm THK. (WITH PAINT) CORRUGATED G.I. SHEET 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500
ROOFING 0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END
TOP LINE OF PARAPET FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS
OF 0.43 - 0.45 mm THK.
600

APEX LINE OF TRUSS


150 mm THK. CHB END WALL WITH PLAIN CEMENT
PLASTER PAINTED FINISH (TYPICAL TO OTHER SIDE)
3150

R
D-5 D-5
TOP LINE OF ROOF BEAM/
DECK ROOF FLOOR LEVEL

CEILING LINE/CORRIDOR F F F F F F F F 100 mm X 50 mm THK. PRE-CAST MOULDINGS WITH


PAINTED FINISH (ALL-AROUND)
3150
9750

EWF-1
W-3 W-4 W-4 W-3

1475
925
SECOND/CORRIDOR FLOOR LINE R
EWF-1

F F F F F F F F
3150

W-3 W-4 W-4 W-3

1475
925
GROUND/CORRIDOR FLOOR LINE
300

FINISH GRADE LINE


EWF-1 EWF-1 EWF-1 EWF-1

2 REAR ELEVATION
SCALE 1: 100 M.
A-5

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FRONT ELEVATION
MODIFIED STANDARD DPWH - DEPED REAR ELEVATION CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM SCHEDULE OF WALL FINISHES LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-5
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
C B A A B C C B A

0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END


0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS 0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL
THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT) 150 mm THK. CHB END WALL WITH PLAIN CEMENT OF 0.43 - 0.45 mm THK. 4200 THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT)
CORRUGATED G.I. SHEET ROOFING PLASTER PAINTED FINISH 1100 400 1100 CORRUGATED G.I. SHEET ROOFING

3 00
3 00

300

300
3 00

300
0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END TOP LINE OF PARAPET TOP LINE OF PARAPET 950 950
FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS 3400 3400

600

600

600
OF 0.43 - 0.45 mm THK.

1100 1100 APEX LINE OF TRUSS 1100 1100 APEX LINE OF TRUSS 100 mm X 50 mm THK. PRE-CAST MOULDINGS WITH
PAINTED FINISH (ALL-AROUND)
100 mm X 50 mm THK. PRE-CAST MOULDINGS WITH
3150

3152

3150
R
PAINTED FINISH (ALL-AROUND)
R

S E E T R U S S

400
TOP LINE OF ROOF BEAM/ D E T A I L
EWF-2 TOP LINE OF ROOF BEAM/ DECK ROOF FLOOR LEVEL DECK ROOF FLOOR LEVEL DECK ROOF

500

1400
1400

1400
450
19 mm SQUARE BARS (PAINTED FINISH) FULLY
EWF-2 CEILING LINE/CORRIDOR CEILING LINE/TOILET (GRILLE SUPPORT FRAME)
1000 IWF-2 W-3 EWF-1

3150
3150

3150
LANDING R
1000
19 mm SQUARE BARS (PAINTED FINISH) FULLY
9750

9750

9750

2600
EWF-1 EWF-1

1000 500
D-2 D-4

1800
(GRILLE SUPPORT FRAME)

1575
600 300

1500
EWF-1a
SECOND/CORRIDOR FLOOR LINE R SECOND/CORRIDOR FLOOR LINE SHE
CORRIDOR

700

700
R R

CEILING LINE/TOILET
20 X 20 mm GROOVE LINES
R
20 X 20 mm GROOVE LINES
W-3
LANDING R
3150

3150

3150
R.C. MEDIA AGUA
REINFORCED CONCRETE CANOPY WITH PAINTED

2600
REINFORCED CONCRETE CANOPY WITH PAINTED WITH PAINTED FINISH EWF-1
FINISH D-2 FINISH

1575
1500
SHE
1000

1000
GROUND/CORRIDOR FLOOR LINE GROUND/CORRIDOR FLOOR LINE STORAGE RM.
700

700

400
CORRIDOR RAMP
300

300

300
FINISH GRADE LINE FINISH GRADE LINE
6525 2100 2100 6525
3150 3700 1200
7000 2500 1400 1400 2500 7000 (1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ LANDING
7000 2500 1600
FLOOR LEVEL)
(1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ LANDING FLOOR LEVEL) STEEL VERTICAL PIPE RAILING - ( SEE DETAIL)
2 LEFT SIDE ELEVATION - TYPICAL ON BOTH SIDE ( SEE DETAIL) 3 RIGHT SIDE ELEVATION 4 CROSS SECTION
SCALE 1: 100 M. SCALE 1: 100 M. SCALE 1: 100 M.
A-6 A-6 A-6
SCHEDULE OF WALL FINISHES :
NOTE: MARK WALL DESCRIPTION
LEGEND:
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT EWF - 1 PAINTED FINISH
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
R REVISION OF DRAWING DETAILS (1/23/2018) (SUBMIT COLOR SCHEMES FOR APPROVAL)
USED AS ALTERNATE ROOFING MATERIALS). - REVISION OF CORRIDOR RAILING AT SECOND 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
ADAPTING THE PROPOSED DEPED DESIGN. EWF - 1a PLASTER PAINTED FINISH
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. - ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN (SUBMIT COLOR SCHEMES FOR APPROVAL)
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED
DESIGN 100 mm THK. RC PARAPET WITH PLAIN CEMENT PLASTER PAINTED
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK. EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
CHB TO 100 mm THK. REINFORCED CONCRETE
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK.
CHB TO 100 mm THK. REINFORCED CONCRETE.
100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
IWF - 1 PLASTER PAINTED FINISH
- REVISION OF TOILET'S WALL & FLOOR FINISHES (SUBMIT COLOR SCHEMES FOR APPROVAL)
- (IWF-2) FROM 200 X 200mm VIT. GLAZED WALL TILES FINISH
TO 300 X 300mm VIT. GLAZED WALL TILES FINISH 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
- (FL-3) FROM 200 X 200 mm VIT. UNGLAZED TILES FLOOR FINISH IWF - 2
TO 300 X 300mm VIT. UNGLAZED TILES FLOOR FINISH (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
- TYPICAL ON ALL TOILET WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500
400 400
TOP LINE OF PARAPET
600

0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END


APEX LINE OF TRUSS FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS
0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL OF 0.43 - 0.45 mm THK.
THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT)
3150

R
CORRUGATED G.I. SHEET ROOFING
EWF-2
TOP LINE OF ROOF BEAM/ S E E T R U S S D E T A I L
600 800

600 800
DECK ROOF FLOOR LEVEL DECK ROOF DECK ROOF

1400
CEILING LINE/TOILET F F F F F F

W-3 W-3
3150

IWF-1
9750

2600

2600
BD-1 D-3a

1800
BD-1 BD-1 BD-1 BD-1

1500
EWF-1
SECOND/CORRIDOR FLOOR LINE SHE D-2 W-1 CLASSROOM W-1 W-1 CLASSROOM W-1 W-1 CLASSROOM W-1 W-1 CLASSROOM W-1 W-1 CLASSROOM W-1 D-2 HE
550

550
CEILING LINE/TOILET F F F F F F

W-3 W-3
3150

2600

IWF-2

2600
D-3 D-3

1800
BD-1 BD-1 BD-1

1500
700300

GROUND/CORRIDOR FLOOR LINE SHE CLASSROOM CLASSROOM HE


1000

W-1 CLASSROOM W-1 W-1 W-1 W-1 W-1 W-1 CLASSROOM W-1 W-1 CLASSROOM W-1
300

FINISH GRADE LINE

300 X 300 mm VITRIFIED GLAZED TILE COUNTER TOP FINISH 1000 5000 9000 9000 9000 9000 9000 5000 1000 300 X 300 mm VITRIFIED GLAZED TILE COUNTER TOP FINISH
(HAND WASH COUNTER) (HAND WASH COUNTER)
- SIZE & OR COLOR FOR APPROVAL BY THE END-USER 400 400 - SIZE & OR COLOR FOR APPROVAL BY THE END-USER
EWF-1 IWF-1 IWF-1 IWF-1 EWF-1

1 LONGITUDINAL SECTION
SCALE 1: 100 M.
A-6

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LEFT SIDE ELEVATION
MODIFIED STANDARD DPWH - DEPED RIGHT SIDE ELEVATION CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM CROSS SECTION LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-6
BUILDINGS DIVISION LONGITUDINAL SECTION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING SCHEDULE OF WALL FINISHES CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
REINFORCED CONCRETE GUTTER A 0.40mm THK. PRE-PAINTED
A C 125 150 125
(PROVIDE WATER -BASED WATERPROOFING) AND PREFORMED G.I. END REINFORCED CONCRETE BENCH WITH PLAIN
FLASHING G.I. SHEET WITH CEMENT PLASTER PAINTED FINISH
TOTAL COATED THICKNESS
100 mm X 50 mm THK. PRE-CAST MOULDINGS 1200
OF 0.43 - 0.45 mm THK. 150

100
WITH PAINTED FINISH 100 950
- TOP & BOTTOM OF PARAPET (ALL-AROUND) STEEL C - PURLINS SPACED 50 50
19 mm SQUARE BAR WITH
@ 600 mm O.C. 50 REINFORCED CONCRETE COLUMN WITH PLAIN
PAINTED FINISH
(REFER TO STRUCTURAL) CEMENT PLASTER PAINTED FINISH
100 mm THK. R.C. PARAPET WITH PLAIN (RAILING GRILLE FRAME)
CEMENT PLASTER PAINTED FINISH - EWF-2 - (TYPICAL ON SECOND PAINTED FINISH FULLY
ANGULAR STEEL TRUSSES 150 mm THK. CHB EXTERIOR WALL RAILING

500
(PROVIDE 25 mm SQUARE WATER DRIP MOULD) FLOOR CORRIDOR) WELDED ON 19 mm SQUARE

600
800

150
(REFER TO STRUCTURAL) SEE DETAIL BAR BRACKET WITH PLAIN CEMENT PLASTER PAINTED FINISH - EWF-1a
R.C. MEDIA AGUA WITH

500
400

425
- (TYPICAL ON (SUBMIT COLOR SCHEMES FOR APPROVAL)
PAINTED FINISH

77 300

600
TOP LINE OF ROOF BEAM/ 12
SECOND FLOOR CORRIDOR)

300
1400
DECK ROOF FLOOR LEVEL PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER

123
100
SEE DETAIL

200

175
- FL -2
150 MM THK. CHB EXTERIOR CLASSROOM FLOOR

1500
400
WALL RAILING WITH LEVEL GROUND FLOOR LINE (CORRIDOR)

600
350

900
900
PLAIN CEMENT PLASTER

1100

19
1000 mm O.C. (OVER FLOW PIPE) REINFORCED CONCRETE BEAM PAINTED FINISH
WITH PLAIN CEMENT 100 -EWF-1A CORRIDOR FLOOR

600
PLASTER PAINTED FINISH LEVEL
PLAIN CEMENT FLOOR

75
4.5 mm THK. FIBER CEMENT CEILING BOARD

150

300
PAINTED FINISH ON METAL FURRING CEILING SECOND FLOOR LINE FINISH WITH FLOOR
NAILERS (CORRIDOR) HARDENER

600
EXPOSED REINFORCED REINFORCED CONCRETE BEAM NATURAL GRADE LINE
4 DETAIL SECTION (R.C. GUTTER) (PROVIDE WATER DRIP MOULD) CONCRETE BEAM/S &
UNDER SLAB WITH PAINTED
WITH PLAIN CEMENT PLASTER PROVIDE 20 mm SQUARE
GROOVE LINE (DRIP MOULD)
PAINTED FINISH
A-7 SCALE 1: 30 M. FINISH (REFER TO STRUCTURAL FOR BEAM'S SIZES)
150 CRASH GRAVELED STONE

LEGEND: NOTE:
REVISION OF DRAWING DETAILS (1/23/2018)
DETAIL SECTION OF DETAIL SECTION OF CORRIDOR RAILING
R - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK. AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT 5 CORRIDOR RAILING 6 SPOT DETAIL (MEDIA AGUA) 7 (AT GROUND FLOOR)
CHB TO 100 mm THK. REINFORCED CONCRETE ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
- REVISION OF CORRIDOR RAILING AT USED AS ALTERNATE ROOFING MATERIALS). A-7 SCALE 1: 30 M.
A-7 SCALE 1: 25 M. A-7 SCALE 1 : 10 M.
ADAPTING THE PROPOSED DEPED DESIGN.
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR - FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS.
(FROM 150 mm THK. CHB RAILING TO REINFORCED
CONCRETE BENCH) ADAPTING THE PROPOSED DEPED
DESIGN.
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3)
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN
BREAKER) ABOVE WINDOW (W-1) AT REAR.

9 10 11 A B C
9000
4500 4500
0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL
2 THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT)
A-7 CORRUGATED G.I. SHEET ROOFING
100 mm THK. R.C. PARAPET WITH PLAIN
CEMENT PLASTER PAINTED FINISH - EWF-2
APEX LINE OF TRUSS
REINFORCED CONCRETE GUTTER
1100 2500 (PROVIDE WATER BASE WATERPROOFING)
100 mm X 50 mm THK. PRE-CAST MOULDINGS WITH
PAINTED FINISH (ALL-AROUND) 0.40mm THK. PRE-PAINTED AND PREFORMED
4
G.I. END FLASHING SHEET WITH TOTAL
A-7 COATED THICKNESS OF 0.43 - 0.45 mm THK.

R 0.40 mm THK. (BASE METAL THICKNESS) R


3200

100 mm THK. R.C. PARAPET WITH PLAIN WITH TOTAL THICKNESS OF 0.43 - 0.45 mm
CEMENT PLASTER PAINTED FINISH - EWF-2 THK. (WITH PAINT) CORRUGATED G.I. SHEET
(PROVIDE 25 mm SQUARE WATER DRIP MOULD) ROOFING

4.5 mm THK. FIBER CEMENT CEILING BOARD


PAINTED FINISH ON METAL FURRING CEILING
800

800
TOP LINE OF ROOF BEAM/
DECK ROOF FLOOR LEVEL NAILERS

300
1400

1400

1400
300
600

431
450
600

600
CEILING LINE CEILING LINE
F F F F F F 4.5 mm THK. FIBER CEMENT CEILING BOARD
PAINTED FINISH ON METAL FURRING CEILING 150 mm THK. CHB INTERIOR WALL WITH
R NAILERS R PLAIN CEMENT PLASTER PAINTED FINISH
W-2 W-2 150 mm THK. CHB EXTERIOR WALL

2700
3150

- IWF-1 W-1
W-2 WITH PLAIN CEMENT PLASTER
19 mm SQUARE BAR WITH PAINTED FINISH PAINTED FINISH - EWF-1
600

600

600
PLAIN CEMENT FLOOR FINISH WITH FLOOR
900

(RAILING GRILLE FRAME)


(TYPICAL ON SECOND FLOOR CORRIDOR)
PARTIAL PART HARDENER (PROVIDE 6mm GROOVES PARTIAL PART
1500
300

300

300
@ 1000 mm O.C. BOTH WAYS) - FL-1
SEE DETAIL OF OF

2100

900
400
CLASSROOM FLOOR

600
SECOND FLOOR LINE (CORRIDOR) CORRIDOR CLASSROOM LEVEL CLASSROOM
1200

1200

19
600

75
150
EXPOSED REINFORCED CONCRETE BEAM R
EXPOSED REINFORCED CONCRETE
WITH PAINTED FINISH BEAM/S & UNDER SLAB WITH PAINTED
F F F F F F R R.C. MEDIA AGUA WITH
FINISH PAINTED FINISH

W-2 W-1 150 mm THK. CHB EXTERIOR WALL


W-2 W-2 150 mm THK. CHB INTERIOR WALL WITH
3150
1950

2550

PLAIN CEMENT PLASTER PAINTED FINISH WITH PLAIN CEMENT PLASTER


REINFORCED CONCRETE BENCH WITH PLAIN - IWF-1 PAINTED FINISH - EWF-1
CEMENT PLASTER AND PAINTED FINISH
R
PARTIAL PART PARTIAL PART
OF OF

500 100

900
CLASSROOM FLOOR
600

600

600
R GROUND FLOOR LINE (CORRIDOR) CORRIDOR CLASSROOM LEVEL CLASSROOM
300

300

19
NATURAL GRADE LINE

4500 4500 150 mm THK. CHB EXTERIOR WALL WITH


PLAIN CEMENT FLOOR FINISH WITH FLOOR
PLAIN CEMENT PLASTER PAINTED FINISH
9000 HARDENER (PROVIDE 6mm GROOVES
- EWF-1a 2700
@ 1000 mm O.C. BOTH WAYS)
(SUBMIT COLOR SCHEMES FOR APPROVAL) 2500 -FL-1

DETAIL BAY ELEVATION DETAIL BAY SECTION DETAIL BAY SECTION


1 @ FRONT, ALONG GRID-A, BETWEEN GRIDS 9 - 11 2 @ FRONT, BETWEEN GRIDS 10-11, ALONG GRIDS A & B) 3 @ REAR, BETWEEN GRIDS 10 -11, ALONG GRID C)
A-7 SCALE 1: 50 M. A-7 SCALE 1: 50 M. A-7 SCALE 1: 50 M.

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL BAY ELEVATION
MODIFIED STANDARD DPWH - DEPED DETAIL BAY SECTION @FRONT CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM
DETAIL BAY SECTION @REAR
DETAIL SECTION (R.C. GUTTER)
LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-7
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING DETAIL SECTION OF CORRIDOR RAILING CHECKED: SIGNED B 19 67
SPOT DETAIL (MEDIA AGUA) OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
DETAIL SECTION OF CORRIDOR RAILING (GROUND) ARCHITECT IV TECHNICAL SERVICES, DPWH
LEGEND:
1 13 R REVISION OF DRAWING DETAILS (1/23/2018)
A B 19 mm SQUARE BAR WITH PAINTED FINISH
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN
(RAILING GRILLE FRAME)
1200 2500 ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED
- (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR) DESIGN
1000 SEE DETAIL 150 mm THK. CHB EXTERIOR WALL
WITH PLAIN CEMENT PLASTER PAINTED - REVISION OF CORRIDOR RAILING AT SECOND AND
R R REINFORCED CONCRETE COLUMN WITH THIRD FLOOR ADAPTING THE PROPOSED DEPED DESIGN.
FINISH - EWF-1
PAINTED FINISH
(SUBMIT COLOR SCHEMES FOR APPROVAL) - REVISION OF CORRIDOR RAILING AT GROUND FLOOR
(REFER TO STRUCTURAL FOR COLUMN SIZES) PARTIAL PART (FROM 150 mm THK. CHB RAILING TO REINFORCED
150 mm THK. CHB EXTERIOR WALL CONCRETE BENCH) ADAPTING THE PROPOSED DEPED
RAILING WITH PLAIN CEMENT PLASTER WELDED ON 19 mm SQUARE BAR BRACKET EMBEBBED 5
A-10
OF DESIGN.
PAINTED FINISH - EWF-1a PARTIAL PART ON CHB WALL GROUND FLOOR LINE CORRIDOR - REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3)

150 mm = 300 mm
- (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR)

2 - RISERS @
OF (CORRIDOR) PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
SEE DETAIL

800
GROUND FLOOR

600
LINE (CORRIDOR) CLASSROOM

100
NATURAL GRADE LINE
NOTE:

600
EXPOSED REINFORCED CONCRETE BEAM PLAIN CEMENT FLOOR FINISH WITH FLOOR
WITH PAINTED FINISH - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA
300 HARDENER - FL -2
25 X 25 mm GROOVE WATER DRIP MOULD BOARDS OR COASTAL AREAS PRONE TO CORROSION ON
G.I. ROOFING, CORRUGATED ASPHALT ROOFING SHEETS
150 mm THK. CHB EXTERIOR WALL W-2 150 mm THK. CHB INTERIOR WALL WITH (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
3150

WITH PLAIN CEMENT PLASTER PAINTED


FINISH - EWF-1
PLAIN CEMENT PLASTER PAINTED FINISH
- IWF-1 4 TYP. DETAIL SECTION OF SERVICE ENTRANCE USED AS ALTERNATE ROOFING MATERIALS).
(SUBMIT COLOR SCHEMES FOR APPROVAL) SCALE 1: 50 M. - FOR COLUMNS AND BEAMS SIZES REFER TO
PARTIAL PART A-8 STRUCTURAL SHOP DRAWINGS.
5
A-10 OF

800
GROUND FLOOR LINE 150 mm = 300 mm
CORRIDOR CLASSROOM
2 - RISERS @

(CORRIDOR) PLAIN CEMENT FLOOR FINISH WITH


FLOOR HARDENER
300

- FL -2 300
GROUND FLOOR LINE (CORRIDOR)
NATURAL GRADE LINE
6 mm THK. NON-SKID METAL
NOSING STRIP (SUBMIT SAMPLE) REINFORCED CONCRETE STAIR

150
PLAIN CEMENT FLOOR FINISH WITH FLOOR
PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER (PROVIDE 6mm GROOVES
300 2700

300
HARDENER - FL -2 @ 1000 mm O.C. BOTH WAYS) - FL -1
3000 CRASH GRAVELED STONE

150
NATURAL GRADE LINE
3 DETAIL SECTION OF MAIN ENTRANCE
A-8 SCALE 1: 50 M. TYP. SPOT DETAIL SECTION OF STAIR STEP
5 (WITH NON - SKID NOSING STRIP)
A-8 SCALE 1 : 10 M.

6 7 3
8
A-10 4
R
A-10

B A
2025
REINFORCED CONCRETE CANOPY WITH PLAIN
700

CEMENT PLASTER PAINTED FINISH

150 mm THK. CHB EXTERIOR WALL RAILING


F F F F
WITH PLAIN CEMENT PLASTER PAINTED FINISH REINFORCED CONCRETE COLUMN WITH PAINTED FINISH
- EWF-1a (REFER TO STRUCTURAL FOR COLUMN SIZES)
150 mm THK. CHB EXTERIOR WALL WITH PLAIN
CEMENT PLASTER PAINTED FINISH - EWF-1 (1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ LANDING FLOOR LEVEL)
(SUBMIT COLOR SCHEMES FOR APPROVAL)
PAINTED FINISH - ( SEE DETAIL)
REINFORCED CONCRETE BENCH WITH PLAIN
W-2 W-2
CEMENT PLASTER PAINTED FINISH
CLASSROOM FLOOR GROUND FLOOR 100 mm THK. CHB EXTERIOR WALL WITH PLAIN
CORRIDOR
300 mm = 300 mm

LEVEL

600
CEMENT PLASTER PAINTED FINISH - EWF-1

300 mm = 300 mm
C O R R I D O R LINE (CORRIDOR)
2 - RISERS @

GROUND FLOOR LINE (CORRIDOR)

900

2 - RISERS @

100 700
19
300

300

300
NATURAL GRADE LINE NATURAL GRADE
2500 1400
150 mm THK. CHB EXTERIOR WALL RAILING
LINE DETAILED ELEVATION THRU - A
4500 4500 WITH PLAIN CEMENT PLASTER PAINTED FINISH
- EWF-1a 1 13 2 12
9000 (SUBMIT COLOR SCHEMES FOR APPROVAL)

DETAILED ELEVATION 1000 5000


PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
(PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS) 300
- (FL-1)
PLAIN CEMENT FLOOR FINISH WITH
FLOOR HARDENER
D-3a - FL -2
R 150 mm THK. CHB EXTERIOR WALL WITH PLAIN
PARTIAL PART OF CLASSROOM ELEV. 319.00 mm
CEMENT PLASTER PAINTED FINISH - EWF-1 B

SEE DETAILED ELEVATION


FL-1 (SUBMIT COLOR SCHEMES FOR APPROVAL)
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C
- TYPICAL TO OTHER SIDE
B 19 mm DROP 19 mm DROP
REINFORCED CONCRETE BENCH WITH PLAIN

2500
2020
LINE OF 150 mm THK. CHB EXTERIOR WALL RAILING
WITH PLAIN CEMENT PLASTER PAINTED FINISH
UP PARTIAL PART OF CORRIDOR CEMENT PLASTER AND PAINTED FINISH
- EWF-1a LINE OF 150 mm THK. CHB EXTERIOR WALL WITH
(SUBMIT COLOR SCHEMES FOR APPROVAL) 1350 PLAIN CEMENT PLASTER PAINTED FINISH
50 50 50 50
2500

- EWF-1a
950 900 470 1500 150 150 1500 470 900 950 ELEV. 300.00 mm (SUBMIT COLOR SCHEMES FOR APPROVAL)
A

125
A
(1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ LANDING FLOOR LEVEL)
ELEV. 300.00 mm
200

1600
- TYPICAL ON BOTH SIDE ( SEE DETAIL) 1

1200

1200
A RAMP UP A-10
300

REINFORCED CONCRETE BENCH WITH PLAIN


1200

ELEV. 0.00 mm CEMENT PLASTER PAINTED FINISH


UP UP
ELEV. 0.00 mm
PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 100
- FL -2 GROOVE LINES
LINE OF CANOPY ABOVE
- FL -4 1500 3600 300 DETAILED PLAN
275 9000 275

9550 TYP. DETAIL OF SERVICE ENTRANCE


2 (@ BOTH SIDE ALONG GRIDS 1 & 13, SHOWING RAMP)
1 DETAIL OF MAIN ENTRANCE (@ FRONT, ALONG GRID - A)
SCALE 1: 50 M.
A-8 SCALE 1: 50 M. A-8

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL OF MAIN ENTRANCE
MODIFIED STANDARD DPWH - DEPED DETAIL SECTION OF MAIN ENTRANCE CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM TYPICAL DETAIL SECTION OF SERVICE ENTRANCE LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-8
BUILDINGS DIVISION TYPICAL DETAIL SECTION OF SIDE ENTRANCE JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING TYPICAL SPOT DETAIL SECTION OF STAIR STEPS CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
100 150 100

(FULLY WELDED ON STEEL BAR RAILING) 7 0 LEGEND: NOTE:


A-1
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA
R REVISION OF DRAWING DETAILS (1/23/2018)
BOARDS OR COASTAL AREAS PRONE TO CORROSION ON
- REVISION OF STAIR RAILING FROM GROUND FLOOR TO G.I. ROOFING, CORRUGATED ASPHALT ROOFING SHEETS
WITH EPOXY PAINTED FINISH THIRD FLOOR, ADAPTING THE PROPOSED DEPED DESIGN. (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE

900
PLAIN CEMENT FLOOR FINISH (FULLY WELDED ON STEEL USED AS ALTERNATE ROOFING MATERIALS).
WITH FLOOR HARDENER BAR RAILING)
- FOR COLUMNS AND BEAMS SIZES REFER TO
6 mm THK. NON-SKID METAL STRUCTURAL SHOP DRAWINGS.
NOSING STRIP (SEE DETAIL)
LANDING 19 mm G.I. BAR RAILING
REINFORCED CONCRETE STAIR

175
(FULLY WELDED TYPICAL) 300 300
(SEE STRUCTURAL DETAIL)

175
75 75 75 75 75 75 75 75

100
900

75
175
175
TYP.DETAIL SECTION 12mm G.I. BAR VERTICAL

350
175
REINFORCED RAILING WITH EPOXY PAINTED FINISH 7
CONCRETE 1250 ( FULLY WELDED ON HANDRAIL ) A-1
OF STAIR LANDING 0

(TYPICAL DEPTH)
LANDING SLAB 5 10

175
300

75
100 mm
(EXPOSED UNDER SLAB A-10
WITH PAINTED FINISH) A-9 SCALE 1 : 15 M.

TYP. DETAIL SECTION WITH EPOXY PAINTED FINISH

175
(FULLY WELDED ON STEEL
BAR RAILING)
1 13 2 12 8 (STEPS GOING TO DECK ROOF) 6 mm THK. NON-SKID METAL
A-9 SCALE 1 : 15 M.
250 250 250 250 250
NOSING STRIP (SEE DETAIL)

REINFORCED CONCRETE STAIR


1 13 (SEE STRUCTURAL DETAIL)

900
175
5000
1200 2250 12 mm G.I. BAR RAILING
WITH EPOXY PAINTED FINISH

175
( FULLY WELDED ON HANDRAIL )

175
9
A-10

(TYPICAL DEPTH)
175
(FULLY WELDED ON STEEL BAR RAILING)
(FULLY WELDED ON 19 mm

100 mm
BAR VERTICAL RAILING TYPICAL) 6

175
A-9

2100
12mm G.I. BAR VERTICAL 100 mm HIGH
RAILING (FULLY WELDED TYPICAL) DOOR THRESHOLD 19 mm G.I. BAR VERTICAL
RAILING (FULLY WELDED ON HANDRAIL)
TYP. DETAIL SECTION
50 50 50 50 50
(TYPICAL STAIR STEPS)

975
TOP LINE OF ROOF BEAM 7

900
36 LANDING
35 PLAIN CEMENT FLOOR FINISH 300 300 300 300 300
9-RISERS @ 175 mm

34
A-9 SCALE 1 : 15 M.
100

WITH FLOOR HARDENER


33
2100

= 1575 mm

32
31
30 B
LANDING
900

29
8-TREADS @ 300 mm = 2400 mm
28 REINFORCED CONCRETE
LANDING LANDING SLAB 8-TREADS @ 250 mm
TOP LINE OF PARAPET
300

(EXPOSED UNDER SLAB = 2000 mm


WITH PAINTED FINISH) 2

600
A-10
6
A-9 APEX LINE OF TRUSS

8-TREADS @ 250 mm
1250 = 2000 mm
DETAIL SECTION OF STAIR LANDING
TYP. DETAILED SECTION OF STAIR (TO DECK ROOF)

300
400 1250
4 6 (TO DECK ROOF FLOOR)

3150
S E E T R U S S

300
A-9 SCALE 1 : 50 M A-9 SCALE 1 : 15 M.
D E T A I L
1 13 1 13
1 13 1 13 2 12 TOP LINE OF ROOF BEAM/
DECK ROOF FLOOR LEVEL
34

9 RISERS @ 175 mm
33
3250 3250
32

2100

= 1575 mm
1575 1575 1575 1575 1000 8 TREADS @ 250 mm = 2000 mm 1000 8 TREADS @ 250 mm = 2000 mm 1675

18 RISERS @175 mm = 3150 mm


31
100

1575
100 870 30
(FULLY WELDED ON 12 mm 29
BAR RAILING TYPICAL) 28
HANDWASHING

LINE OF ROOF EAVES ABOVE 27


26

3150
300 25

9750
(FULLY WELDED ON 19 mm (FULLY WELDED ON 12mm

9 RISERS @ 175 mm
24
BAR RAILING TYPICAL) BAR RAILING TYPICAL) 23
LANDING

= 1575 mm
18 RISERS @175 mm = 3150 mm
23
1300

1300

LANDING 22
1350

LANDING
1000

1000

1000
FL-2
R R
FL-2
LANDING
FL-2 DN PARTIAL PART
21
20 PARTIAL PART
28 29 30 31 32 33 34 35 36 SECOND/CORRIDOR
27 FLOOR LINE OF 19 OF
9 9
775 8 TREADS @ 250 mm = 2000 mm

775 8 TREADS @ 250 mm = 2000 mm


TOILET 18 CORRIDOR
10 26
8 10 17
8 -TREADS @300 mm = 2400 mm

8 -TREADS @300 mm = 2400 mm

9 RISERS @ 175 mm
25 16
11
3650

7 7 11
3775

15
3800

24

= 1575 mm

18 RISERS @175 mm = 3150 mm


12 12 14
6 6 23 13
HANDWASHING

5 13 13 22 12
5
2300

900
11

2675
4 14 14 21
4 10 R
(FULLY WELDED ON 12mm
20 9

3150
3 15 BAR RAILING TYPICAL)
STO. 3
19
8

9 RISERS @ 175 mm
2 16 7
2
6

= 1575 mm
1 17 5
75

1575
4
B B
100
18
100 DN B B 5 3

900
PARTIAL PART A-9 2 PARTIAL PART
1575 1675 970 475 1375 OF 1 OF
GROUND/CORRIDOR FLOOR LINE TOILET STORAGE ROOM CORRIDOR
PARTIAL PART OF PARTIAL PART OF 1000 2350 1000 3450

300
CORRIDOR CORRIDOR
FL-1 FL-1
FINISH GRADE LINE

DETAILED PLAN OF STAIRS DETAILED PLAN OF STAIRS


@GROUND FLOOR LEVEL @SECOND FLOOR LEVEL TYPICAL DETAIL PLAN OF STAIRS 7
A-9

1 TYPICAL DETAIL PLAN OF STAIRS 2 (TO DECK ROOF FLOOR) 3 TYPICAL DETAIL SECTION OF STAIRS
A-9 SCALE 1 : 50 M
A-9 SCALE 1 : 50 M A-10 SCALE 1 : 50 M

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TYPICAL DETAIL PLAN OS STAIRS
MODIFIED STANDARD DPWH - DEPED TYPICAL DETAIL PLAN OF STAIRS (TO DECK FLOOR) CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM
TYPICAL SECTION OF STAIRS
TYPICAL SECTION OF STAIRS (TO DECK FLOOR)
LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-9
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING DETAIL SECTION OF STAIR LANDING CHECKED: SIGNED B 19 67
DETAIL SECTION OF STAIR LANDING (TO DECK ROOF) OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
TYPICAL SECTION OF STAIR STEPS ARCHITECT IV TECHNICAL SERVICES, DPWH
LEGEND:
R SECOND REVISION ON THE DRAWING DETAILS (4/30/2018) 125 150 REINFORCED CONCRETE BENCH WITH PLAIN
CEMENT PLASTER PAINTED FINISH
1. CORRIDOR RAILINGS
-FROM RECTANGULAR ZOCALO TO TRAPEZOIDAL ZOCALO
-FROM 600 mm TO 300 mm HEIGHT OF LOWER ZOCALO FROM THE CORRIDOR FINISH FLOOR LINE REINFORCED CONCRETE COLUMN WITH PLAIN
CEMENT PLASTER PAINTED FINISH

2. STAIR RAILINGS 150 mm THK. CHB EXTERIOR WALL RAILING AT

100
600 mm HIGH (BELOW R.C. BENCH) WITH PLAIN
-FROM DECORATIVE RAILINGS TO PLAIN VERTICAL RAILINGS CEMENT PLASTER PAINTED FINISH
(SUBMIT COLOR SCHEMES FOR APPROVAL)

400
3.CONCRETE BENCH AT GROUND FLOOR PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER

300
-FROM 600 mm BENCH TOP HEIGHT TO 400 mm BENCH TOP HEIGHT - FL -2

GROUND FLOOR LINE (CORRIDOR)

300
NATURAL GRADE LINE
2500

CRASH GRAVELED STONE

DETAIL SECTION OF CONCRETE BENCH


5 RAILING (GROUND FLOOR CORRIDOR)
PLAIN CEMENT FLOOR FINISH A-9R SCALE 1 : 10 M.
WELDED ON 19 mm SQUARE BAR BRACKET
- (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR) WITH FLOOR HARDENER (FL-2)

WITH PAINTED FINISH


(FULLY WELDED ON STEEL B
BAR RAILING)
6 mm THK. NON-SKID METAL
1500

1500
NOSING STRIP (SEE DETAIL)
8-TREADS @ 300 mm = 2400 mm

600
150 mm THK. CHB EXTERIOR WALL RAILING REINFORCED CONCRETE STAIR
WITH PLAIN CEMENT PLASTER PAINTED FINISH (SEE STRUCTURAL DETAIL) 8-TREADS @ 250 mm
900

900
175
- EWF-1a = 2000 mm
12 mm BAR VERTICAL RAILING

300
300
WITH EPOXY PAINTED FINISH

175
2ND & 3RD FINISH FLOOR

300
( FULLY WELDED ON HANDRAIL )
LINE (CORRIDOR)

175
APEX LINE OF TRUSS

(TYPICAL DEPTH)
175
300 300

100 mm
175
ELEVATION

3200
50 50 50 50 50

300 300 300 300 300


2025 1250

4 TYP. DETAIL SECTION OF STAIR STEPS TOP LINE OF ROOF BEAM/


DECK ROOF FLOOR LINE
PARTIAL PART
1000
TYP. DETAIL OF CORRIDOR RAILING A-9R SCALE 1 : 15 M.
OF DECK ROOF

9-RISERS @ 175 mm
(SIDE RAILING)

425
2

2100

18 - RISERS @ 175 mm = 3150 mm


= 1575 mm
CEILING LINE

1575
A-9R SCALE 1: 20 M.

R
LANDING 45

3150
44

9-RISERS @ 175 mm
(FULLY WELDED ON 19 mm D-2 43
2 BAR VERTICAL RAILING TYPICAL) 42

= 1575 mm
18-RISERS @ 175 mm = 3150 mm
41
1250 40
39
PARTIAL

900

900
PARTIAL 38
PART OF 37 PART OF
SECOND FLOOR LINE (CORRIDOR) 18 CORRIDOR
FEMALE T&B
17

9-RISERS @ 175 mm
425
16

19
19 mm SQUARE BAR WITH PAINTED FINISH 15

18 - RISERS @ 175 mm = 3150 mm


= 1575 mm
(RAILING GRILLE FRAME) 14
CEILING LINE
- (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR) 13
600

4
12 A-9R
12 mm G.I. BAR VERTICAL

900
11
RAILING (FULLY WELDED TYPICAL) 10
200

LANDING 9

3150
8

9-RISERS @ 175 mm
D-2 7
6

= 1575 mm
5

1575
600

600
4
3
PARTIAL

900
PARTIAL 2
PART OF 1 PART OF
GROUND FLOOR LINE (CORRIDOR) STORAGE ROOM CORRIDOR
FEMALE T&B
SECOND & THIRD FLOOR LINE 150 mm THK. CHB EXTERIOR WALL RAILING

300
(CORRIDOR LEVEL) WITH PLAIN CEMENT PLASTER PAINTED FINISH

19
300

300

- EWF-1a NATURAL GRADE LINE

1250 8-TREADS @ 300 mm = 2400 mm


200 300 300 200 3650

ELEVATION 400 3700 REINFORCED CONCRETE BEAM WITH PLAIN CEMENT


PLASTER PAINTED FINISH
3 TYPICAL DETAIL SECTION OF STAIR
A-9R SCALE 1 : 50 M

(PROVIDE WATER DRIP MOULD)

1 TYP. DETAIL OF CORRIDOR RAILING (FRONT RAILING)


A-9R SCALE 1: 20 M.

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
(SUPPLEMENTAL DETAILS) TYPICAL DETAIL OF CORRIDOR RAILING ( FRONT RAILING). CADD: SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN MODIFIED STANDARD DPWH - DEPED TYPICAL DETAIL OF CORRIDOR RAILING ( SIDE RAILING).
TYPICAL DETAIL SECTION OF STAIR. GILDA P. CARMONA
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
A - 9R
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) TYPICAL DETAIL SECTION OF STAIR STEPS.
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
DETAIL SECTION OF CONCRETE BENCH CHECKED: SIGNED
OIC,-UNDERSECRETARY FOR B 19 67
BONIFACIO DRIVE PORT AREA, MANILA CLASSROOM SCHOOL BUILDING MARYLENE C. SISON
ARCHITECT IV
CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD
TECH'L.SERVICES, DPWH
SECRETARY, DEP ED
1 13 2 12
150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
PAINTED FINISH - EWF-1
(SUBMIT COLOR SCHEMES FOR APPROVAL)
C - PROVIDE WATER FAUCET AS SHOWN B
5000 (900 mm HIGH FROM FINISH
7000 FLOOR LINE-LANDING)
300 X 300 mm VITRIFIED GLAZED TILE HAND WASHING BACK
FLASH FINISH
(1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ 7
LANDING FLOOR LEVEL) FULLY WELDED ON 150 mm THK. CHB EXTERIOR WALL WITH
(SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
- TYPICAL TO OTHER SIDE
A-11 R FULLY WELDED

D-3a
PLAIN CEMENT PLASTER PAINTED FINISH
RAILING - TYPICAL ON BOTH SIDE ( SEE DETAIL) D-3 - EWF-1a
12 mm BAR VERTICAL RAILING
(SUBMIT COLOR SCHEMES FOR APPROVAL)

200
REINFORCED CONCRETE

300
600 200
HAND WASHING

900
PLATFORM SINK LEVEL
GROUND FLOOR LINE (CORRIDOR)

900

1000
100 SPOT DETAIL 3
300

700
600
HAND WASHING
PLATFORM FLOOR
NATURAL GRADE LINE 8 (TYP. HANDRAIL)
100

1200 1500 3600 300 LEVEL

100
NON - SKID CEMENT FLOOR FINISH WITH 6mm
A-10 SCALE 1:5 M.
NATURAL GRADE LINE
GROOVE LINES HAND WASHING PLATFORM (REINFORCED CONCRETE SLAB)
WITH PLAIN CEMENT FLOOR FINISH PROVIDE FLOOR HARDENER

1 DETAIL ELEVATION OF RAMP O.C. WITH EPOXY PAINTED FINISH


- ( SEE DETAIL)
150 mm THK. CHB WITH VITRIFIED GLAZED TILE WALL FINISH
- HAND WASHING LAVATORY SUPPORT (TYPICAL)
1613 1612 1612
- FL - 2

1613
SCALE 1: 50 M.
CL
A-10 6450

300 X 300 mm VITRIFIED GLAZED TILE HAND WASHING COUNTER TOP FINISH

1 13 2 12 DETAILED ELEVATION (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) 350
- TYPICAL TO OTHER SIDE
12 mm G.I. BAR RAILING 175 175
(FULLY WELDED ON HANDRAIL)
C B
6 mm THK. NON-SKID
7000 METAL NOSING STRIP
5000 (SUBMIT SAMPLE)
300 X300 mm VITRIFIED GLAZED TILE HAND WASHING BACK 3150 3850
FLASH FINISH
(SIZE & OR COLOR FOR APPROVAL BY THE END-USER) 1075 150 mm THK. CHB (BROKEN LINE BELOW)
- TYPICAL TO OTHER SIDE - HAND WASHING SINK SUPPORT (TYPICAL)

100
(1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ REINFORCED
LANDING FLOOR LEVEL) FULLY WELDED ON SUPPORT EMBEDDED ON CHB RAILING SPACED CONCRETE STAIR
@ 1050 mm O.C - TYPICAL TO OTHER SIDE
RAILING - TYPICAL ON BOTH SIDE ( SEE DETAIL)
PIPE CHASE
PARTIAL PART OF FEMALE TOILET PARTIAL PART OF STAIR
D-3a D-3
1200
SPOT DETAIL 1

275
9 (NON - SKID NOSING STRIP)
100 600 200

1
900
700

A-10
600
SCALE 1:5 M.
GROUND FLOOR LINE (CORRIDOR)
100

400

400
FD HANDWASHING COUNTER FD
300

NATURAL GRADE LINE CL


100

300 X300 mm VITRIFIED GLAZED TILE HAND WASHING COUNTER TOP FINISH
4 100 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
A-11 - TYPICAL TO OTHER SIDE
100 1500 3600 300 - PROVIDE WATER FAUCET AS SHOWN

1000
250
NON - SKID CEMENT FLOOR FINISH WITH 6 mm
HORIZONTAL GROOVE LINES O.C. WITH EPOXY PAINTED FINISH H A N D W A S H I N G A R E A 100
2 DETAIL SECTION OF RAMP - ( SEE DETAIL) R 2-19 mm G.I. BAR VERTICAL RAILING
(FULLY WELDED ON HANDRAIL)
SCALE 1: 50 M.
A-10 HAND WASHING PLATFORM (REINFORCED CONCRETE SLAB) 6 mm THK. NON-SKID
WITH PLAIN CEMENT FLOOR FINISH PROVIDE FLOOR HARDENER METAL NOSING STRIP
DETAILED PLAN - FL - 2 (SUBMIT SAMPLE)
6450
(1 @ 900 mm, 1@ 700 mm 19 mm G.I. BAR VERTICAL
HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON RAILING EMBEDDED ON REINFORCED
SUPPORT EMBEDDED ON CHB RAILING SPACED 6 TYPICAL DETAIL OF HAND WASHING COUNTER CONCRETE STAIR

100
- TYPICAL ON BOTH SIDE ( SEE DETAIL) 5 @ 1050 mm O.C - TYPICAL TO OTHER SIDE
A-11 A-10 SCALE 1: 30 M.
REINFORCED
150

CONCRETE STAIR
900
750

GROUND FLOOR LINE (CORRIDOR) (1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ LANDING FLOOR LEVEL)
100

SPOT DETAIL 2
300

NATURAL GRADE LINE 10 (NON - SKID NOSING STRIP)


200

NON - SKID CEMENT FLOOR FINISH 125 150 150 mm THK. CHB EXTERIOR WALL RAILING 1 13 A-10 SCALE 1:5 M.

100 1200 100 WITH PLAIN CEMENT PLASTER PAINTED FINISH RAMP THRESHOLD WITH PLAIN CEMENT PLASTER PAINTED FINISH 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
- EWF-1a (100 mm HIGH FROM RAMP FLOOR FINISH) PAINTED FINISH - EWF-1
900

(SUBMIT COLOR SCHEMES FOR APPROVAL) 400


(SUBMIT COLOR SCHEMES FOR APPROVAL)
FULLY WELDED - PROVIDE WATER FAUCET AS SHOWN
150 300 LEGEND:
DETAIL SECTION OF RAMP 200 X 200 mm VITRIFIED GLAZED TILE HAND WASHING COUNTER TOP FINISH
900

3
700

(SIZE & OR COLOR FOR APPROVAL BY THE END-USER)


RAILING SPACED AT 600 mm O. C. - TYPICAL TO OTHER SIDE
A-10 SCALE 1: 50 M. FULLY WELDED - TYPICAL ON BOTH SIDE (SEE DETAIL) 25 300 X 300 mm VITRIFIED GLAZED TILE HAND
WASHING BACK FLASH FINISH
R REVISION OF DRAWING DETAILS (1/23/2018)
(SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
PORCH FINISH FLOOR LEVEL - REVISION OF STAIR RAILING FROM GROUND FLOOR TO
100

- TYPICAL TO OTHER SIDE


THIRD FLOOR, ADAPTING THE PROPOSED DEPED DESIGN.
PARTIAL PART

300
100

19mm/VARIABLE
OF TOILET
300

100
19mm/VARIABLE

200
NOTE:

1000
NON - SKID CEMENT FLOOR FINISH
WITH 6 mm HORIZONTAL GROOVE 150 mm THK. CHB WITH VITRIFIED GLAZED TILE WALL

700
6

600
LINES 6 mm THK. FINISH - HAND WASHING SINK SUPPORT (TYPICAL)

500
6 - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA
GROOVE LINE NATURAL GRADE LINE HAND WASHING PLATFORM
FLOOR LEVEL BOARDS OR COASTAL AREAS PRONE TO CORROSION ON

100
6

G.I. ROOFING, CORRUGATED ASPHALT ROOFING SHEETS


NON - SKID CEMENT FLOOR FINISH WITH 6 mm NATURAL GRADE LINE
HORIZONTAL GROOVE LINES
(3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
USED AS ALTERNATE ROOFING MATERIALS).
REINFORCED CONCRETE SLAB
HAND WASHING PLATFORM (REINFORCED CONCRETE SLAB) - FOR COLUMNS AND BEAMS SIZES REFER TO
WITH PLAIN CEMENT FLOOR FINISH PROVIDE FLOOR HARDENER 1000 475 STRUCTURAL SHOP DRAWINGS.
- FL - 2
100

4 SPOT DETAIL SECTION OF RAMP FLOORING 5 TYP. DETAIL OF RAMP RAILINGS 7 TYP. DETAIL SECTION OF HAND WASHING COUNTER
A-10 SCALE 1:10 M. A-10 SCALE 1:15 M. A-10 SCALE 1: 30 M.

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL OF ELEVATION OF RAMP
MODIFIED STANDARD DPWH - DEPED DETAIL SECTION OF RAMP CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM
DETAIL SECTION OF RAMP
SPOT DETAIL SECTION OF RAMP FLOORING
LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A - 10
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING TYPICAL DETAIL OF RAMP RAILINGS CHECKED: SIGNED B 19 67
TYPICAL DETAIL OF HAND WASHING COUNTER OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
TYP. SECTION DETAIL OF HAND WASHING COUNTER ARCHITECT IV TECHNICAL SERVICES, DPWH
900 TAG NO. TAG NO. TAG NO.
3 EQUAL PARTS
200 200 200 D-1 D-3a = 2700 W-1a
800

300

300
DESCRIPTION DESCRIPTION DESCRIPTION

KD & TERMITE TREATED HOLLOW CORE FLUSH

150
CASEMENT WINDOW W/
PANEL DOOR (SWING DOOR SWING TYPE WITH 6mm CLEAR GLASS ON
825
TYPE) W/ FIXED GLASS LOUVERS ON 50 x 150mm STEEL FRAMING
TRANSOM ABOVE ON WOODEN/ STEEL DOOR

1200
& FIXED GLASS
50 x 150mm WOODEN/ JAMBS/ FRAMES COM- TRANSOM
2400

STEEL JAMBS/ FRAMES PLETE w/ HARDWARE (PROVIDE WINDOW

2150
2100

2100
150

w/ LEVER TYPE DOOR ACCESSORIES, CYLIN- GRILLE INSIDE, REFER


KNOB 600
DRICAL DOOR KNOB EQ EQ EQ EQ EQ EQ TOO MANUFACTURER'S
SPECS.)
825

1035

1035
2 SETS 1 SETS

300

900
20 SETS LOCATION:
CLASSROOM GROUND/CORRIDOR CLASSROOM

300
FLOOR LINE LOCATION: FLOOR LINE LOCATION: FLOOR LINE SCIENCE LAB.
150

325 275
ROOM TOILET
CLASSROOMS STORAGE ROOM (OPTION - 4)
TAG NO. TAG NO. TAG NO.
2 EQUAL PARTS
D-2 SD-1
= 1500
W-2
800
800

300
DESCRIPTION DESCRIPTION F F DESCRIPTION
500
HHOLLOW CORE FLUSH STEEL DOOR FRAME
TYPE SWING DOOR ON SWING DOOR W/ FIXED "
JALOUSIE WINDOW w/
50 x 150mm WOODEN/ Z -TYPE" LOUVERS
6mm THK. CLEAR GLASS

1600
STEEL JAMB W/ MARINE (AS SHOWN)
BLADES ON WOODEN/
PLYWOOD FACING BOTH (SEE MANUFACTURERS
STEEL JAMBS/ FRAMES
SIDES COMPLETE w/ SPECS.)
w/ STEEL FRAMING GRILL
2150
2100

1900
2050
HARDWARE AND
ON THE OUTER- SIDE
ACCESSORIES W/ LEVER
TYPE DOOR KNOB

935
1035

800
6 SETS 2 SETS R
CLASSROOM DECK ROOF TRESHHOLD CLASSROOM
20 SETS
FLOOR LINE LOCATION: FLOOR LINE LOCATION: FLOOR LINE LOCATION:

100
HE/SHE TOILETS,
STAIRDOOR TO R.D. DECK ROOF CLASSROOMS
TAG NO. TAG NO. 3 EQUAL PARTS TAG NO.
D-2a BD-1 = 1800 W-3
800

300
DESCRIPTION DESCRIPTION F F F DESCRIPTION

HOLLOW CORE FLUSH 600 BAR DOOR (SWING TYPE)

900
TYPE SWING DOOR ON ON 50 x 150mm WOODEN/
AWNING WINDOW W/

600
50 x 150mm WOODEN/ STEEL DOOR JAMBS/
6mm THK. CLEAR GLASS
STEEL JAMB W/ MARINE FRAMES w/ MARINE
PANE ON STEEL FRAME
PLYWOOD FACING BOTH PLYWOOD (TWO FACE)
& w/ FIXED GLASS
SIDES COMPLETE w/ COMPLETE w/ HARDWARE
TRANSOM ABOVE
2150
2100

HARDWARE AND & ACCESSORIES w/


1300

ACCESSORIES W/ LEVER DOOR BOLT


1500

1500
TYPE DOOR KNOB
1035

1 SET 13 SETS 4 SETS


CORRIDOR TOILET TOILET
200

FLOOR LINE LOCATION: FLOOR LINE LOCATION: FLOOR LINE LOCATION:


OPTION - 4 MALE/FEMALE
LOCKER(SCIENCE LAB.) HE/SHE TOILETS HE,SHE TOILETS
TAG NO. 4 EQUAL PARTS TAG NO. TAG NO.
600
D-3 = 3600 W-1 W-4

300
900 F
300

DESCRIPTION DESCRIPTION DESCRIPTION

900
HOLLOW CORE FLUSH CASEMENT WINDOW W/
LEGEND:

600
TYPE SWING DOOR ON 6mm CLEAR GLASS ON AWNING WINDOW W/
50 x 150mm WOODEN/ STEEL FRAMING 6mm THK. CLEAR GLASS R REVISION OF DRAWING DETAILS (1/23/2018)
STEEL JAMB w/ MARINE
1200

& FIXED GLASS PANE ON STEEL FRAME - REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3)
PLYWOOD (TWO FACE) TRANSOM PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS
& w/ FIXED GLASS
COMPLETE w/ (PROVIDE WINDOW TRANSOM ABOVE
2150
2100

HARDWARE GRILLE INSIDE, REFER


AND ACCESSORIES EQ EQ EQ EQ EQ EQ EQ EQ TOO MANUFACTURER'S
PROVIDE KICK PLATE w/ SPECS.) 1600 DOORS AND WINDOWS SCHEDULE
800
NOTE: NOTE: 4 SETS 1
1035

LEVER TYPE DOOR KNOB


900

LOCATION: A-11 SCALE 1 : 25 M


2 SET 20 SETS HE,SHE & PWD
SCIENCE LABORATORY ROOM = 19 SETS
100 300

GROUND/CORRIDOR CLASSROOM TOILET SCIENCE LABORATORY ROOM = 5 SETS


FLOOR LINE LOCATION: FLOOR LINE OPTION - 4 LOCATION: FLOOR LINE OPTION - 4 TOILETS,SCIENCE
LAB. ROOM TOILET
PWD TOILETS CLASSROOMS (OPTION-4)

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DOORS AND WINDOWS SCHEDULE
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A - 11
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
19 mm SQUARE BAR WITH PAINTED FINISH
B A
LEGEND: (RAILING GRILLE FRAME)
- (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR) 2500 1700 75 75
SEE DETAIL
100 1500 100
R REVISION ON THE DRAWING DETAILS (1/23/2018)
150 mm THK. CHB EXTERIOR WALL RAILING
PARTIAL PART OF CORRIDOR 428 422 422 428
- REVISION OF CORRIDOR RAILING AT SECOND AND WITH PLAIN CEMENT PLASTER PAINTED FINISH 800 800
(TYPICAL @ 2nd & 3rd) 217 211 211 211 211 211 211 217
THIRD FLOOR ADAPTING THE PROPOSED DEPED DESIGN. - EWF-1a

50
13 175 150 100 50 150 150
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3)

100

100

100
50

125
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.

1
12 mm SQUARE BAR WINDOW GRILLE
NOTE:

119

119
50
FRAME WITH PAINTED FINISH

50

300
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA

100
BOARDS OR COASTAL AREAS PRONE TO CORROSION ON

602
119

119
G.I. ROOFING, CORRUGATED ASPHALT ROOFING SHEETS
(3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE

119
USED AS ALTERNATE ROOFING MATERIALS). - (TYPICAL ON SECOND CORRIDOR)

- FOR COLUMNS AND BEAMS SIZES REFER TO 600 600

119
STRUCTURAL SHOP DRAWINGS. 19 mm SQUARE BAR BRACKET SUPPORT FULLY WELDED
ON G.I. PIPE HANDRAIL SPACE AT 600 mm O.C. PLAN
- (TYPICAL ON SECOND FLOOR CORRIDOR) B A

119
12 mm SQUARE BAR DOWEL
2500 (WINDOW GRILLE SUPPORT)

119
100 EMBEDDED ON CHB WALL SPACED
AS SHOWN

1600

1800

1800
596
119
119

1300
119
WELDED ON 19 mm SQUARE BAR BRACKET
- (TYPICAL ON SECOND FLOOR CORRIDOR)

119
600

119
190 100

1500
300

119

602
150 mm THK. CHB EXTERIOR WALL RAILING

119
WITH PLAIN CEMENT PLASTER PAINTED FINISH

900
- EWF-1a

600

600
50 50

125
100

100

100
2ND FINISH FLOOR
100 100 100 100
LINE (CORRIDOR)

50
100 100 100 100

428 422 422 428


20mm SQUARE GROOVE LINE WITH PAINTED FINISH 525 600 LINE OF WINDOW GRILE (W-2)
600

800 900 800 850 850 DETAILED SECTION THRU A

ELEVATION DETAILED ELEVATION 3 TYP. DETAIL OF WINDOW GRILLE FOR W-2


SCALE 1: 10 M.
A-15

2
PARTIAL PART OF CORRIDOR @ 2nd & 3rd FLOOR
900 900
150
50
100 50 150
TYP. DETAIL OF CORRIDOR RAILING (FRONT RAILING)
2 ALONG GRID A (TYPICAL @ 2nd FLOOR)
A-15 SCALE 1: 20 M.
400

A
19 mm SQUARE BAR BRACKET (HANDRAIL SUPPORT)
WITH PAINTED FINISH FULLY WELDED ON G.I. PIPE 19 mm SQUARE BAR WITH PAINTED FINISH 150
HANDRAIL SPACE AT 600 mm O.C. (RAILING GRILLE FRAME) 50 50
- (TYPICAL ON SECOND)
- (TYPICAL ON SECOND FLOOR CORRIDOR) 2 250 600 600 600 600 600 600 250
50
PLAN

150
19 mm SQUARE BAR WITH PAINTED FINISH

400
(RAILING GRILLE FRAME) WITH PAINTED FINISH

425
- (TYPICAL ON SECOND) - (TYPICAL ON SECOND FLOOR CORRIDOR)
600

600
300
19 mm SQUARE BAR BRACKET

123
200

200

175
WITH PAINTED FINISH
(HANDRAIL SUPPORT) FULLY WELDED
ON G.I. PIPE HANDRAIL SPACE AT

1500
300
600 mm O.C. AND EMBEDDED ON
WELDED ON 19 MM SQUARE BAR BRACKET

900
CHB WALL
- (TYPICAL ON SECOND FLOOR CORRIDOR)

1100

100
- (TYPICAL ON SECOND FLOOR CORRIDOR)
900

900
50
150 mm THK. CHB EXTERIOR WALL RAILING 50 PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
2ND FLOOR LINE WITH PLAIN CEMENT PLASTER PAINTED FINISH
(CORRIDOR) 1500
- EWF-1a

20mm SQUARE GROOVE LINE WITH PAINTED FINISH


700 700 TYPICAL DETAIL SECTION THRU - X

600

450
ELEVATION
600

900 2700 REINFORCED CONCRETE BEAM WITH PLAIN CEMENT


PLASTER PAINTED FINISH

EXPOSED REINFORCED CONCRETE BEAM/S &


UNDER SLAB WITH PAINTED FINISH

4500 (PROVIDE WATER DRIP MOULD)


150

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL OF CORRIDOR RAILINGS LOCATED
MODIFIED STANDARD DPWH - DEPED ALONG GRID-1 & 13, GRID- A OF 2ND FLOOR CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM
DETAIL OF WINDOW GRILLE FOR W-2 LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A - 12
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
SCHEDULE OF FINISHES
FLOOR FINISH DESCRIPTION: COUNTERTOP DESCRIPTION: FACIAL MIRROR DESCRIPTION: 1 2 C C
FL - 3 200mmX200mm VITRIFIED UNGLAZED TILES CT-1 100mm THK. CHB. COUNTERTOP FM - 1 2000mmx550mmx3mm THK. FACIAL MIRROR 5000 3275
(SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
R IN 200mmX200mm VITRIFIED IN ALUMINUM FRAMING 3275
GLAZED TILES 375 2575 100 1700 2975 100
FM - 2 500mmX600mmX3mm THK. TILTED FIX FACIAL 1175 100 1800 150
WALL FINISH DESCRIPTION: GRAB BAR DESCRIPTION: MIRROR IN ALUMINUM FRAMING SUBMIT 275 475 900 900 850 850 1350 1025 600
IWF - 1 100 mm THK./ 150 mm THK. CHB INTERIOR WALL GB - 1 SAMPLE FOR ARCHITECTS APPROVAL
13
WITH PLAIN CEMENT CAPPING EQ. EQ. EQ. EQ. 750 390 460 13 1225 400 600
A-16
PLASTER PAINTED FINISH GB - 2 100 A-16 100
GRAB BAR 100 100
(SUBMIT COLOR SCHEMES FOR APPROVAL) FINISH CEILING HT.
FINISH CEILING HT. FINISH CEILING HT.
200mm X 200 mm VITRIFIED GLAZED TILE WALL CEILING DESCRIPTION:
IWF - 2 CF - 1
FINISH R CF - 1 4.5mm THK. FIBER CEM. BOARD CEILING CF - 1
CF - 1

1100
800

800
(SIZE & OR COLOR FOR APPROVAL BY THE (PAINTED) IN 12mmx38mmx5mmx0.80mm F F F F IWF - 1
END-USER) THK. METAL FURRING CHANNEL FRAMING W-3 IWF - 1
- TYPICAL ON ALL TOILET WALLS SPACED @ EVERY 400mm O.C. W-3 W-4 IWF - 1 IWF - 2

300

300
2600

700
IWF - 2

300
2600

2600
D-2

200 550
LEGEND: FM - 2 IWF - 2

150
1500
GB - 1

1800

1800
PWD TOILET

1350
BD-1

1600
BD-1

1500

1500
200

1050
14 GB - 2 HE TOILET
R SHE TOILET

750
REVISION OF DRAWING DETAILS (1/23/2018) GB - 2 A-16
550 CT-1
CORRIDOR

850
- REVISION OF TOILET'S WALL & FLOOR FINISHES CORRIDOR FINISH FLOOR LINE CORRIDOR

400
SLOPE
PWD TOILET

200

200
- (IWF-2) FROM 200 X 200mm VIT. GLAZED WALL TILES FINISH FINISH FLOOR LINE FINISH FLOOR LINE

150
281
TOI. FIN. FLOOR LINE OPEN
TO 300 X 300mm VIT. GLAZED WALL TILES FINISH 1 2

281
- (FL-3) FROM 200 X 200 mm VIT. UNGLAZED TILES FLOOR FINISH TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE
FINISH GRADE LINE
TO 300 X 300mm VIT. UNGLAZED TILES FLOOR FINISH 5000 FINISH GRADE LINE FINISH GRADE LINE
75 375 2575 1700
SECTION - 1 (PWD & FEMALE TOILET) SECTION - 5 (PWD TOILET) SECTION - 9 (MALE TOILET)
NOTE:
275 475 900 900 850 850
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA
BOARDS OR COASTAL AREAS PRONE TO CORROSION EQ. EQ. EQ. EQ. 750 390 460
ON G.I. ROOFING, CORRUGATED ASPHALT ROOFING 2 1 12 13 C
100 100 100 EQ. EQ.
SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE 5000 5000
FIBRES CAN BE USED AS ALTERNATE ROOFING GB - 1 150 1500 100 3250 150 100 1700 100 2575 375 3275
75
MATERIALS). 3200 795 850 1625 100 800 275 150 1800 100 1175
5 6 7
- FOR COLUMNS AND BEAMS SIZES REFER TO A-16 A-16 A-16 1200 2000 700 390 460
STRUCTURAL SHOP DRAWINGS. GB - 2
CEMENT MORTAR PLASTERING WITH
W-3 W-4 VITRIFIED CERAMIC TILES FINISH

C FINISH CEILING HT. FINISH CEILING HT.

290
100
500

1800 CF - 1
600

CF - 1
PIPESLOP SINK F F F F
CF - 1

1000
300 300

1100

1100

1100
600 600
100

CHASE
1375

750
IWF - 1
1500

W-4 W-3

2100
1800

100
IWF - 1
PART OF HANDWASHING

675

IWF - 1

300
775

PWD TOILET
EQ. EQ.
2375

BD-1 ELEV. 281.00 mm

2600

2600

2600
200 550
3 D-3 FM - 1 CT-1
200

FM - 2

760
3275

3275

600

600
2975

100

650
A-16 FL - 3 D-2
BD-1 GB - 1 IWF - 2

1800
BD-1

150

150
1500

1500

1500

1500

1500
100
FL - 3

300
850

4 RAMP PWD TOILET SHE TOILET PWD TOILET HE TOILET PWD TOILET
SHE TOILET 19mm IWF - 2 GB - 1
D-3 IWF - 2

850
A-16 DN.

750

750
ELEV. 281.00 mm DROP
OPEN CORRIDOR CORRIDOR

400
1175
FINISH FLOOR LINE FINISH FLOOR LINE

150
SLOPE
600

CT-1

281
281

281
D-2 CORRIDOR TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE
ELEV. 300.00 mm
FINISH GRADE LINE FINISH GRADE LINE
PART OF STAIR
SECTION - 2 (PWD & FEMALE TOILET) SECTION - 6 (PWD & MALE TOILET) SECTION -10 (PWD TOILET)
100

300 600 600 300

100 1800 100 950 250

2000 1200
C 13 12 C
3200
3275 5000 100 150
150 3250 100 1500 150
2975 100 150 3250 1600 150
3500 1650 2375 600 3200
1500 850 2000 1200
DET. PLAN OF FEMALE & PWD TOILET @ GROUND FLOOR CF - 1
950
FINISH CEILING HT. FINISH CEILING HT.

1375 100 1800 100


IWF - 1
12 13
800

1000

1000
600 775 300 300
1100 600 600
500 CF - 1
5000 300
IWF - 1
2200

100 100 GB - 2
2600

2600
550

550
1700 2575 375 75 FM - 1 D-3

750
D-2
IWF - 2 IWF - 2
1100

200

200
275

1600

1500
850 850 1625 800 PWD TOILET

300
SHE TOILET CT-1 HE TOILET CT-1
100 100 GB - 1

850

850
460 390 750 675

550
SLOP CORRIDOR OPEN CORRIDOR
400

200
SINK OPEN FINISH FLOOR LINE FINISH FLOOR LINE
12 11 10
281

281
A-16 A-16 A-16 TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE
FINISH GRADE LINE FINISH GRADE LINE
W-4 W-3
C SECTION - 3 (FEMALE TOILET) SECTION - 7 (MALE & TOILET)
150

290

PIPE
1225

1350

CHASE
750

C C
2100

1800

550

8 100
PWD TOILET 600 2375 2975
A-16 FL - 3
200

100

ELEV. 281.00 mm
760
3275

3275

600 1025 1350


2975

FL - 3 850 1500
400

SLOP SINK
HANDWASHING

9 600 400 1225


1025

HE TOILET 100 1375


100

A-16 ELEV. 281.00 mm


RAMP
600

DN. 19mm
DROP FINISH CEILING HT. FINISH CEILING HT.
1175

200

D-3 200
600

D-2 CT-1

800
CF - 1
800

CF - 1
900

IWF - 1
CORRIDOR
100

300
IWF - 1
300

ELEV. 300.00 mm W-3


300 600 600 300

2600
2600

450
D-2
650

IWF - 2 IWF - 2

200
250 100 100

1800
950 1800
1800

BD-1 BD-1

1500
1500

1500

1200 2000 CT-1 HE TOILET CT-1

850
850

100 150
SHE TOILET CORRIDOR
1500 3250
3200 CORRIDOR

200
FINISH FLOOR LINE
200

OPEN FINISH FLOOR LINE OPEN


281

TOI. FIN. FLOOR LINE


281

1650 3500 TOI. FIN. FLOOR LINE


FINISH GRADE LINE FINISH GRADE LINE

DET. PLAN OF MALE & PWD TOILET @ GROUND FLOOR SECTION - 4 (FEMALE TOILET) SECTION - 8 (MALE TOILET)

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DET. PLAN OF FEMALE & PWD TOILET @ GROUND
MODIFIED STANDARD DPWH - DEPED FRONT, DET. PLAN OF MALE TOILET & PWD TOILET @ CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM GROUND FLOOR, SCHEDULE OF FINISHES, GINO PAOLO L. VILLANUEVA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A -13
BUILDINGS DIVISION DET. SECTIONS OF FEMALE & PWD TOILET, JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING DET. SECTIONS OF MALE & PWD TOILET CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
SCHEDULE OF FINISHES
FLOOR FINISH DESCRIPTION: COUNTERTOP DESCRIPTION: FACIAL MIRROR DESCRIPTION: 1 2 12 13 C
FL - 3 200mmX200mm VITRIFIED UNGLAZED TILES CT-1 100mm THK. CHB. COUNTERTOP FM - 1 2000mmx550mmx3mm THK. FACIAL MIRROR 5000 5000 3275
(SIZE & OR COLOR FOR APPROVAL BY THE END-USER) IN 200mmX200mm VITRIFIED
R IN ALUMINUM FRAMING 150
GLAZED TILES
FM - 2 500mmX600mmX3mm THK. TILTED FIX FACIAL 450 3125 100 1200 4425 450 3125
WALL FINISH DESCRIPTION: GRAB BAR DESCRIPTION: MIRROR IN ALUMINUM FRAMING SUBMIT
IWF - 1 GB - 1 SAMPLE FOR ARCHITECTS APPROVAL
275 942 100 942 100 942 190 4235 100 275 1825 100 1150
100 mm THK./ 150 mm THK. CHB INTERIOR WALL
WITH PLAIN CEMENT CAPPING 100 EQ. EQ. EQ. EQ. EQ. EQ. 1935 100 2150 1350 475
PLASTER PAINTED FINISH GB - 2
(SUBMIT COLOR SCHEMES FOR APPROVAL) GRAB BAR 1000 100 1000 600
CEILING DESCRIPTION: FINISH CEILING HT. FINISH CEILING HT. FINISH CEILING HT.
IWF - 2 200mm X 200 mm VITRIFIED GLAZED TILE WALL
FINISH R CF - 1 4.5mm THK. FIBER CEM. BOARD CEILING CF - 1 CF - 1
300

800
(SIZE & OR COLOR FOR APPROVAL BY THE

800
(PAINTED) IN 12mmx38mmx5mmx0.80mm

800
F F F F F F F F CF - 1

1100
END-USER) THK. METAL FURRING CHANNEL FRAMING
- TYPICAL ON ALL TOILET WALLS SPACED @ EVERY 400mm O.C. W-3 W-4 W-4 W-3
IWF - 1 300

300

300
300
IWF - 1

225 75
IWF - 1

300

1050 300
2600

2600
2600
2600
LEGEND: IWF - 2 D-2

1100
1800
1100

1800
1800

1350
1500
BD-1 BD-1 BD-1 BD-1 BD-1 IWF - 2

1500
550

1500

150 1050
STORAGE IWF - 2
R REVISION OF DRAWING DETAILS (1/23/2018) SHE TOILET HE TOILET HE TOILET
IWF - 1

400
- REVISION OF TOILET'S WALL & FLOOR FINISHES CORRIDOR

400
CORRIDOR CORRIDOR

200

200

200
150
- (IWF-2) FROM 200 X 200mm VIT. GLAZED WALL TILES FINISH 1 2 FINISH FLOOR LINE FINISH FLOOR LINE OPEN FINISH FLOOR LINE
TO 300 X 300mm VIT. GLAZED WALL TILES FINISH TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE
- (FL-3) FROM 200 X 200 mm VIT. UNGLAZED TILES FLOOR FINISH
5000 TYP. SECOND - THIRD FLOOR
TO 300 X 300mm VIT. UNGLAZED TILES FLOOR FINISH TYP. SECOND - THIRD FLOOR

NOTE:
450 3125 100 1200 SECTION - 1 (STORAGE & FEMALE TOILET) SECTION - 5 (MALE TOILET) SECTION - 9 (MALE TOILET)
275 942 100 942 100 942 TYPICAL @ SECOND AND THIRD FLOOR
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA 100 EQ. EQ. EQ. EQ. EQ. EQ.
BOARDS OR COASTAL AREAS PRONE TO CORROSION 600 100
ON G.I. ROOFING, CORRUGATED ASPHALT ROOFING 1 2 13 12
SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE 5000 5150 100 400 100
FIBRES CAN BE USED AS ALTERNATE ROOFING 150 1200 475 3150 150 3420 1730 16 369 16
MATERIALS).
- FOR COLUMNS AND BEAMS SIZES REFER TO 100 175 1150 2000 3225 100 1480 150
5 6
STRUCTURAL SHOP DRAWINGS. A-17 A-17 200 100 600 600 100 2000 1225
W-3
IWF - 1
300 300 100 1800 100
W-4

150
FINISH CEILING HT. FINISH CEILING HT.
C
300 600 600 300
F CF - 1

1000

1000

1100
PIPE
1175
1050
1225

CHASE CF - 1
IWF - 1

1875
STORAGE

1975
IWF - 1

100
ELEV. (SEE ELEV.)
175

2600
2600

550
450
FL - 2
100

FM - 1 FM - 1
3
3275

3275
2975
3025

BD-1 BD-1 BD-1


275

IWF - 2
400

D-3a

400 450200
200
A-17 FL - 3

1600
1600
IWF - 2
100

1500

1500
1000

100
CT-1 CT-1

140
SHE TOILET HE TOILET
600

850

850
4 SHE TOILET
1600

ELEV. (SEE ELEV.) 19mm


A-17 D-3a OPEN CORRIDOR OPEN CORRIDOR
DROP
FINISH FLOOR LINE FINISH FLOOR LINE

1010
D-2
600

CT-1 TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE


CORRIDOR TYP. SECOND - THIRD FLOOR
ELEV. (SEE ELEV.) TYP. SECOND - THIRD FLOOR

300 600
PART OF STAIR
600 300 SECTION - 2 (STORAGE & FEMALE TOILET) SECTION - 6 (MALE TOILET)
100 1800 100

2000 1175 200


300
100
C C
3150 1200 3275 3275
150 150
3250 100 1500 150 2975 100 2975 150
3400 1750 100 1000
1225 600 1145 1825
5150 880 265 450 1375

DET. PLAN OF FEMALE @ SECOND FLOOR FINISH CEILING HT. FINISH CEILING HT.

1000 100
100 1225

650 350
CF - 1
800

1000

1000
12 13 CF - 1
W-3
300

5000 IWF - 1
IWF - 1
2600

2600
850 200 550

550
4425 450 1175 BD-1 BD-1 150 600
D-2 IWF - 2 300 300
1175

200
1800

1200

190 100

1600

1600
4235 275 IWF - 2 225 75
1500

1500
CT-1
1935 100 2150 SHE TOILET HE TOILET

850
CT-1
100
300

1000 1000 CORRIDOR CORRIDOR

200
OPEN FINISH FLOOR LINE OPEN FINISH FLOOR LINE
EQ. EQ. EQ. EQ. TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE

11 10 9 TYP. SECOND - THIRD FLOOR TYP. SECOND - THIRD FLOOR


A-17 A-17 A-17
W-4 W-3 SECTION - 3 (FEMALE TOILET) SECTION - 7 (MALE TOILET)
150

C
C
300

C
600

PIPE
300

1050

1175
1225
1400

CHASE 150 2970 100


2975
1825

HE TOILET 1175 600 600 600


7
450 100

ELEV. (SEE ELEV.)


A-17 1600 1375
BD-1 BD-1
100

14 600
3275

3275
2970

2975
600

600 1000 100 1225 A-16


265 450

8 600 400
FINISH CEILING HT.
100

A-17 FL - 3 FINISH CEILING HT. 300


600

19mm 300 13 75 175 50


1150

800
A-16

1000
DROP D-2 CF - 1
880

300
1000
600

1000

CT-1
W-3 CF - 1

300
100

IWF - 1

300
2600

200 550
2600

550

300 IWF - 2
2500

600 600 300 IWF - 1


CORRIDOR 1175 1800

1350
ELEV. (SEE ELEV.)

1600
100
200

100 CT-1
1500
1800 IWF - 2

1050
1600

550
1500

BD-1 HE TOILET
450

1225 2000 CT-1

850
SHE TOILET
850

150 100 CORRIDOR


1480 3225

200
150
FINISH FLOOR LINE
400

CORRIDOR OPEN
OPEN FINISH FLOOR LINE
1730 3420 TOI. FIN. FLOOR LINE
TOI. FIN. FLOOR LINE
TYP. SECOND - THIRD FLOOR
SECTION - 8 (MALE TOILET)
DET. PLAN OF MALE & PWD TOILET @ SECOND FLOOR SECTION - 4 (FEMALE TOILET) TYPICAL @ SECOND AND THIRD FLOOR

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DET. PLAN OF FEMALE & PWD TOILET @ SECOND
MODIFIED STANDARD DPWH - DEPED FRONT, DET. PLAN OF MALE TOILET & PWD TOILET @ CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM GROUND FLOOR, SCHEDULE OF FINISHES, GINO PAOLO L. VILLANUEVA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A - 14
BUILDINGS DIVISION DET. SECTIONS OF FEMALE & PWD TOILET, JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING DET. SECTIONS OF MALE & PWD TOILET CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
3
6 mm THK. MARINE
PLYWOOD TOP COVER
4800 50 19 X 50 mm WOOD
BLACKBOARD EDGE
2400 2400 FRAMING
50 50 6 X 1200 X 2400 mm LAWANIT BLACKBOARD
50 19 (PAINTED-DEPED SPECS.)

50 X 50 mm VERTICAL AND HORIZONTAL


SECONDARY WOODEN FRAMES, SPACED
AS SHOWN

19 X 50 mm WOOD
1200

BLACKBOARD EDGE
FRAMING 19 X 50 mm WOOD
BLACKBOARD EDGE

1200
1294
FRAMING
12 mm THK. SOLID WOOD CHALK DUST

247
CATCHER (PAINTED-DEPED SPECS.)

50
125
88
63

63
SECONDARY = 750 H
ELEMENTARY = 650 H

25

75
50
VERIFY HEIGHT

6 X 1200 X 2400 mm LAWANIT

25

125

SECONDARY = 750 H
ELEMENTARY = 650 H
BLACKBOARD (PAINTED-DEPED SPECS.)

VERIFY HEIGHT
12
12 mm THK. PULL-OUT CHALK
150
100
MESH SCREEN 12 mm THK. SOLID WOOD CHALK SPECS.) 12 mm THK. PULL-OUT CHALK
DUST CATCHER (PAINTED-DEPED 150 mm THK. CHB 150
CLASSROOM FINISH FLOOR LINE WALL MESH SCREEN
CLASSROOM FINISH FLOOR LINE

319
ELEVATION (FRONT VIEW) 100
50 X 50 mm HORIZONTAL SECONDARY
50
WOODEN FRAMES, SPACED AS SHOWN

6 X 1200 X 2400 mm LAWANIT BLACKBOARD

SECTION (SIDE VIEW) (PAINTED-DEPED SPECS.)

50 X 50 mm VERTICAL AND HORIZONTAL 19 X 50 mm WOOD BLACKBOARD EDGE FRAMING


SECONDARY WOODEN FRAMES, SPACED
AS SHOWN 4900

2450 2450

88 25
50 X 75 mm VERTICAL 50 X 75 mm VERTICAL
MAIN WOODEN FRAME MAIN WOODEN FRAME 50 X 75 mm VERTICAL MAIN WOODEN FRAME
81

125
112
2400 600 600 600 600 50 6 mm THK. MARINE
150 mm THK. CHB 50
PLYWOOD BACKING
WALL

3 138
82 69

100
12 mm THK. PULL-OUT CHALK DUST BOX 12 mm THK. PULL-OUT CHALK DUST BOX
150

19

19
31
150
81

SCREEN

IN
12 mm THK. PULL-OUT 12 mm THK. SOLID WOOD CHALK DUST 6 X 1200 X 2400 mm LAWANIT 19 X 50 mm WOOD
150 CHALK DUST BOX WITH 10 X CATCHER (PAINTED-DEPED SPECS.) BLACKBOARD (PAINTED-DEPED SPECS.) BLACKBOARD EDGE 150 mm THK. CHB
WALL
FRAMING

DETAIL SECTION (CHALK DUST BOX)

PLAN (SECTIONAL VIEW)

50 X 50 mm VERTICAL AND HORIZONTAL


SECONDARY WOODEN FRAMES, SPACED AS
SHOWN

4900 50 X 75 mm VERTICAL MAIN WOODEN


6 mm THK. MARINE FRAME
PLYWOOD TOP COVER
2450 2450

75
2400 600 600 600 600 50
150 mm THK. CHB 50
WALL

6 mm THK. MARINE PLYWOOD


3 BACKING
68

100

12 mm THK. X 100 mm SOLID WOOD CHALK DUST


150

31

CATCHER (PAINTED-DEPED SPECS.)


38

12 mm THK. X 25 mm SOLID WOOD CHALK DUST


CHALK DUST BOX WITH 10 X 12 mm THK. SOLID WOOD CHALK SPECS.) 19 X 50 mm WOOD BLACKBOARD EDGE FRAMING CATCHER SIDING (PAINTED-DEPED SPECS.)
150 10 mm S/S MESH SCREEN DUST CATCHER (PAINTED-DEPED
6 X 1200 X 2400 mm LAWANIT BLACKBOARD (PAINTED-DEPED
PLAN (TOP VIEW) SPECS.)

12 mm THK. PULL-OUT CHALK DUST BOX

1 DETAIL OF BLACKBOARD 12 mm THK. WOOD CHALK DUST BOX HOUSING


A-14 SCALE 1: 20 m
SCREEN CHALK DUST BOX DETAIL (ISOMETRIC VIEW)

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL OF BLACKBOARD
MODIFIED STANDARD DPWH - DEPED DETAIL SECTION OF BLACKBOARD CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM
DETAIL SECTION (CHALK DUST BOX)
CHALK DUST BOX DETAIL (ISOMETRIC VIEW)
LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A - 15
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
GENERAL CONSTRUCTION NOTES
GENERAL NOTES NOTES ON CONCRETE MIXES & PLACING
1. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT 3. IF SLABS AR E REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED
1.0 STANDARDS AND REFERENCES
(28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMP AS FOLLOWS. BELOW THOSE ALONE THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN FOR
THE FOLLOWING SHALL GOVERN THE DESIGN FABRICATION AND CONSTRUCTION OF THE PROJECT.
MAX. SIZE OF REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMN STRIPS
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (N.S.C.P 2015) VOL. 1, SEVENTH EDITION. LOCATION 28 DAYS STRENGTH MAX SLUMP SHALL NOT BE MORE THAN ONE AND A HALF ( 1 21 ) SLAB THICKNESS.
AGGREGATE
2.0 DESIGN CRITERIA ALL OTHERS, INCLUDING 20 mm 100mm 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION AND
4000 PSI (27.6 MPa)
2.1 LOADINGS SHALL NOT BE LESS THAN 0.0025 X GROSS-SECTIONAL AREA (Ag) OF THE SLAB.

CONF. REINF.
SUSPENDED SLABS JOINT HOOP SPACE @ "2Sh" WHEN
COLUMNS 4000 PSI (27.6 MPa) 20 mm 100mm ( SEE SCHEDULE BELOW)
A. DEAD LOAD THERE ARE BEAMS HAVING WIDTH OF
4000 PSI (27.6 MPa) 20 mm 100mm

D JOINT REINF. D
CONCRETE 23.56 kN/m 3 BEAMS AT LEAST ONE-HALF THE COLUMN
SLAB ON FILL 2500 PSI (17.5 MPa) 20 mm 100mm SCHEDULE OF MINIMUM SLAB REINFORCEMENT WIDTH & DEPTHS NOT LESS THAN
STEEL 76.93 kN/m3
THREE QUARTERS OF THE DEEPEST
150 mm THK. CHB WALL 2.73 kPa 2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. MINIMUM TEMPERATURE BARS BEAM THAT FRAME INTO FOUR

CONF. REINF.
100 mm THK. CHB WALL 2.11 kPa SUSPENDED SLABS 20mm 100 mm SIDES OF THE COLUMN. ALL OTHER
B. LIVE LOAD SLAB ON GRADE 40mm 125 mm CONDITIONS USE HOOPS @ "Sh" CENTERS.

Sh
WALLS ABOVE THE GRADE 25mm
ROOF 1.00 kPa 150 mm
BEAM STIRRUPS AND COLUMN TIES 40mm

COLUMN TIES AS
CLASSROOMS 1.90 kPa

PER SCHEDULE
WHERE CONCRETE IS EXPOSED TO 175 mm
TOILETS 1.90 kPa FOR COL. BAR SPLICES SEE TABLE
EARTH BUT POURED AGAINST FORMS 200 mm OF MIN. LAP SPLICE LENGTH OF
CORRIDORS ABOVE, STAIRS 3.80 kPa 50mm
WHERE CONCRETE IS DEPOSITED COLUMN REINFORCEMENT
CORRIDORS ON GROUND 4.80 kPa 75mm
DIRECTLY AGAINST EARTH

CONF. REINF.
C. WIND LOAD AT 250mm O.C. EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME SHALL
NOT BE LESS THAN 3.65 METER APART.

Sh
BUILDING CATEGORY = 1 (ESSENTIAL FACILITIES) 3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSISITON WITHOUT SEGREGATION. RE-HANDLING

D JOINT REINF. D
OPTION 1 OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES , BUCKETS OR WHEELBARROWS, 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB ( TWO ADJACENT DISCONTINUOES EDGES) NOTE:
OPTION 2
EXPOSURE CAT. (FLAT UNOBSTRUCTED AREAS AND/OR (URBAN OR SUBURBAN AREAS WITH NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM HOPPERS TO BUIGGIES, AS SHOWN BELOW. ALL CONCRETE REINF. DETAIL SHOULD
D NEAR BODIES OF WATER) B NUMEROUS CLOSELY SPACED OBSTRUCTIONS) BE DONE IN ACCORDANCE WITH ACI
WIND VELOCITY WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT EXCEED SIX (6) METERS 7. CONCRETE SLAB REINFORCEMENT BE PROPERLY SUPPORTED WITH 10mm STEEL CHAIR
V=340 KPH V=270 KPH DETAILING MANUAL (LATEST EDITION)

CONF. REINF.
IN AGGREGATE LENGTH. OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS.
P = qh [(GCpf)-(GCpi)] (DESIGN WIND PRESSURE)
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS UNLESS
WHERE: qh = VELOCITY PRESSURE (kPa) AUTHORIZED IN WRITING DESIGNER AND ONLY FOR UNUSUAL CONDITIONS WHERE VIBRATIONS
GCpf = EXTERNAL PRESSURE COFFECIENT ARE EXTREMELY DIFFICULT TO ACCOMPLISH. MID-DEPTH OF SLAB
GCpf = INTERNAL PRESSURE COFFECIENT
5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED & SECURED TYPICAL COLUMN ELEV. SHOWING
D. SEISMIC LOAD IN PLACE PRIOR TO PLACING OF CONCRETE. DOWN INTO EDGE BEAM. EXTENDED AT EACH CORNER DOWELS AND TIES SPACING
Cvl W (DESIGN BASE SHEAR) 6. ALL CONCRETE SHALL BE KEPT MOST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS IMMEDIATELY BARS MIN. OF 1,200 (4'-0") INTO BARS. BOTT. BARS
V=
RT AFTER POURING BY THE USE O WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER
APPROVED METHODS.
Vmax = 2.50CaI W

400
Vmin = 0.11 CalW
RT 7. STRIPPING OF FORMS AND SHORES: LAP SPLICE LENGTH:
Vmin = 0.80 ZNvI W (ZONE 4) FOUNDATION 24 HOURS AT ANY LEVEL NO MORE THAN
R

0
SLAB ALTERNATE BARS SHOULD BE

60
SUSPENDED SLAB EXCEPT WHEN 8 DAYS 38mm

0
WHERE: W = TOTAL DEAD LOAD OPENING CLEAR SPLICED. MIN. DISTANCE BET.

60
ADDITIONAL LOADS ARE IMPOSED
T = NATURAL PERIOD = Ct (h) 21 DAYS TWO ADJACENT BARS SPLICES
WALLS SHALL BE 600mm.
WHERE: C = NUMERICAL COEFFICIENT

CONF. REINF. TIES LAT. TIES H (CLEAR HEIGHT OF COL.)


400
BEAMS 14 DAYS
h = BUILDING HEIGHT 21 DAYS L
COLUMNS
I = IMPORTANCE FACTOR = 1.50
IN TWO WAY SLAB EXTEND

WITHIN CENTER
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE

HALF OF "H"
R = NUMERICAL FACTOR = 8.50 BARS UP TO BEAM SUPPORT

60
SEISMIC COEFFICIENT Cv = 0.44 Nv CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE

0
0.25L
POURING FOR APPROVAL. OMIT TRIMMER BARS WHERE
Ca = 0.64 Nv OPENING IS FRAMED BY BEAM TOP BARS @ SUPPORT (CONT.)
NEAR SOURCE FACTOR (5 km) Nv = 1.6 9. THE CONTRACTOR SHALL FURNISH AND MAITAIN ADEQUATE FORMS AND SHORINGS UNTIL THE TYPICAL CORNER SLAB DETAIL REQ'D. BOTT. BARS @ SUPPORT
Na = 1.2 CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH. TYPICAL SLAB

JT. REINF.
Z = SEISMIC ZONE = 0.40 (ZONE 4) OPENING DET.
S = SOIL TYPE = D
NOTES ON FOOTINGS
2.2 DESIGN STRESSES 1. FOOTINGS ARE DESIGNED FOR AN ALLOWANCE SOIL BEARING PRESSURE OF 96 KPa (2000psf).
CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING ,THE ACTUAL SOIL CONDITIONS
NOTES ON COLUMNS 0.165L SPLICE BOTTOM BARS
A. CONCRETE COMPRESSIVE STRENGTH @ 28 DAYS: AT MID SPAN
a. FOOTINGS, COLUMNS, BEAMS AND SLABS f'c = 27.6 MPa (4,000 psi) UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE DEPOSITING CONCRETE. 1. PROVIDE EXTRA SETS OF TIES AT 100 O.C. FOR TIED COLUMN REINFORCEMENT ABOVE 0.22L EXTRA TOP BARS
b. SLAB ON FILL f'c = 17.5 MPa (2,500 psi) 2. FOOTING SHALL REST AT LEAST 1500mm BELOW NATURAL GRADE LINE UNLESS OTHERWISE AND BELOW BEAM-COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF CONNECTION @ SUPPORT
C. SLAB f'c = 27.6 MPa (4,000 psi) INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL EQUAL TO GREATER OF THE OVERALL THICKNESS OF COLUMN, 1/6 THE CLEAR HEIGHT OF
3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE 75mm CLEAR FOR CONCRETE COLUMN OR 450mm.
B. REINFORCING STEEL BARS
DEPOSITED THE GROUND AND 50mm FOR CONCRETE DEPOSITED AGAINST A FORMWORK.
a. FOR BARS 16mm AND GREATER (INTERMEDIATE GRADE DEFORMED BAR) fy = 414 MPa (60,000 psi) 2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST TYP. DETAIL OF COL. LAP SPLICE
4. IN CASES WHERE THE SOIL CONDITION IS SUCH THAT THE MINIMUM ALLOWABLE SOIL PRESSURE
b. FOR BARS LESS THAN 16mm (STRUCTURAL GRADE DEFORMED BAR) fy = 275 MPa (40,000 psi) MONOLITHICALLY WIT HTHE CORE WITH A MINIMUM THICKNESS OF 40mm AND NOT LESS
OF 96KPa (2000 psf) CAN NOT BE ATTAINED AT A PRACTICAL DEPTHS THE USE OF MICROPILES ,
C. STRUCTURAL STEEL ASTM-A36
BORED PILES, OR DRIVEN PILES MAY BE ADOPTED IN LIEU OF STANDARD ISOLATED FOOTINGS. THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS. & EXT. GIRDER TO COL. CONNECT.
FOR TRUSSES, BRACINGS , & STRUTS fy = 248 MPa (36,000 psi) 3. WHERE COLUMNS CHANGE IN SIZE ,VERTICAL REINFORCEMENT SHALL BE OFFSET AT A
D. PURLINS SLOPE MONOLITHICALLY WITH THE CORE WITH MINIMUM THICKNESS OF 40mm AND
COLD FORMED LIGHT fy = 248 MPa (36,000 psi) NOTES ON REINFORCEMENT NOT LESS THAN 40 TIMES THE MAXIMUM SIZE COARSE AGGREGATE IN MILLIMETERS
E. MASONRY UNIT (CHB)
NON - LOADING BEARING CHB WALLS fm' = 3.45 MPa (500 psi)
1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD STRENGTH OF REINFORCING BARS SHALL BE: 4. UNLESS OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR VERTICAL COLUMN NOTES ON BEAMS AND GIRDERS
A. FOOTINGS , FOOTING BEAMS AND GIRDERS fy = 414 MPa ( 60,000 psi ) REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND
F. WELDS E - 60XX ELECTRODE
B. COLUMNS AND SHEAR WALLS fy = 414 MPa ( 60,000 psi ) THE SPLICE LENGTH SHALL BE LESS THAN 40 BAR DIAMETERS. WELDING OR APPROVED 1. UNLESS, OTHERWISE NOTED IN PLANS , CAMBER ALL BEAMS AND GIRDER AT
G. STRUCTURAL BOLTS ASTM- A307 a. Ft = 96.60 mPa (14, 000 psi) fy = 414 MPa ( 60,000 psi )
C. BEAMS AND GIRDER
b. Fv= 69.00 mPa (10, 000 psi) MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS
3.0 IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN. D. NON-LOAD BEARING WALL PARTITIONS ,BEDDED SLABS , FLOOR & ROOF SLABS, THE CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER
PARAPETS ,CATCH BASIN,SIDE WALK fy = 275 MPa ( 40,000 psi ) ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES
DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTIONS PURPOSES BETWEEN THESE WELDS OR SPLICES OF ADJACENT BARS IS NOT LESS THAN 600mm. BUT IN NO CASE LESS THAN 20 mm FOR EVERY 3.0 M OF FREE SPAN.
2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE WITH THE ASTM A-706
4.0 IN REFERENCES TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS IN FLOOR 2. TYPICAL BARS BENDING AND CUTTING DETAILS FOR BEAMS SHALL BE AS
BARS SMALLER THAN 10mm MAY BE PLAIN.
SLABS , OPENINGS IN THE WALLS AND SLABS , INTERIOR PARTITIONS , LOCATIONS OF DRAINS ETC. 3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE w/ TABLE B SHOWN IN FIG. B-1
5.0 IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS AND ELEVATIONS BETWEEN THE (TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWNON DRAWINGS , SPLICES SHALL BE H
STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE CONTRACTORS SHALL NOTIFY BOTH THE STAGGERED WHENEVER POSSIBLE.
6.0 ALL CONCRETEENGINEER
STRUCTURAL WORKS ANDANDCONCRETE REINFORCEMENTS SHALL BE DONE IN ACCORDANCE WITH THE
ARCHITECTS. CROSS-TIE
NOTES ON CONCRETE SLABS

350mm. MAX.
ACI.318-14M BUILDING CODE REQUIREMENT AND ALL STRUCTURAL STEEL WORKS ACCORDING WITH THE L1 L2
WITH THE AISC-05 IN SOFAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING CODE REQUIREMENT. 1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM THE TOP OF SLAB. 1
L1 3
1
L1 3 L2 3
1 1
L2 3
7.0 ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC REFERS TO AMERICAN INSTITUTE OF STEEL 2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS ELEVETED SLAB SHALL BE CUT AS FOLLOWS:

10

H
dm
CONSTRUCTION AND ASTM REFERS TO AMERICAN SOCIETY FOR TESTING MATERIALS.

in.
8.0 CONSTURCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR
BENT BAR
NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
L1 L2 1 1 1 1
9.0 SHOP DRAWING WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, MISCELLANEOUS L1 5 L1 5 L2 5 L2 5
L1/4 L1/4 L2/4 TOP BARS
IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS APPROVAL BEFORE FABRICATION. TOP BAR WEB BARS
10. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEUOS CURBS, SILLS , STOOLS EQUIPMENT AND BOTTOM BARS
MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL , ELECTRICAL AND MECHANICAL DRAWINGS. FIGURE B-1
11. ALL RESULTS OF THE MATERIAL TESTING FOR CONCRETE, REINFORCING BARS & STRUCTURAL STEEL MUST
BE NOTED & APPROVED BY THE MATERIALS ENGINEER/STRUCTURAL DESIGNER. BOTTOM BAR

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DESIGN CRITERIA ENGINEER II

MODIFIED STANDARD DPWH - DEPED GENERAL CONSTRUCTION NOTES CADD: SIGNED


BUREAU OF DESIGN TWO (2) STOREY, TEN (10) MARK ANTHONY H. AGUSTIN
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-1
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING
ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED
OIC, UNDERSECRETARY FOR
B 11 67
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
GENERAL CONSTRUCTION NOTES
TABLE 'A' TABLE 'B'
REINFORCING CONCRETE LINTEL BEAMS IN NOTES ON STIRUPS
TENSION BARS COMPRESSION BARS CONCRETE BLOCK WALLS SEE CONSTRUCTION NOTES
FOR MASONRY WALL REIN-
1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS

550
TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) FORCEMENTS (TYPICAL) OTHERWISE PERMITTED BY THE STRUCTURAL ENGINEER.

550
FIN. FLR. LVL.
LINTELS IN BLOCK WALLS

VARIES
2. AS SHOWN IN THE DESIGN DRAWINGS OR
BAR SIZES fc`= 20.7MPa(300psi) fc`= 27.6 MPa (4000psi) BAR SIZES fc`= 20.7MPa(300psi) fc`= 27.6 MPa (4000psi)
CLEAR TOTAL MIN. HEIGHT OF REINFORCEMENT
PERMITTED BY THE STRUCTURAL ENGINEER.
(DEFORMED MM)
EMBEDMENT LAPPED EMBEDMENT LAPPED (DEFORMED MM)
EMBEDMENT LAPPED EMBEDMENT LAPPED NAT. GRD. LVL.
SPAN LENGTH fc' LINTEL DOWEL BARS TO MATCH 3. TIES & CLOSE STIRRUPS MUST BE AT 135.
CHB VERTICAL BARS 550

600 (MIN.)
300 300 300 300 225 300 200 300 (L) (L+0.40M) (MPa) (mm) BOTTOM TOP STIRRUPS 550
300 300 300 300 275 300 250 300 180 DEG. HOOKS
@ 300 O.C.

250
1.20 M 1.60 M 200
Dbar
300 400 300 400 350 400 325 400 1.50 M 1.90 M 14.0 200 TYPICAL CONNECTION DETAIL

D+12db
400 550 350 500 450 500 475 500 1.80 M 2.20 M 200

550 550
OF R.C. WALL AT CORNERS
600 800 750 550 625 625 400
2.10 M 2.50 M 250
750 1000 650 850 625 675 625 675 2.40 M 2.90 M 17.0 250 4db OR 65mm
950 1300 850 1100 700 775 700 775 2.70 M 3.10 M 250
DOWEL TO MATCH
NOTES ON WELDS
3.00 M 3.40 M 300
90 DEG. HOOKS
NOTES: NOTES: CHB VERT. BARS 1. USE E60xx ELECTRODES FOR ALL MEMBERS WELDED. Dbar
1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 3.30 M 3.70 M 20.0 300
2. NOT MORE THAN 33% OF THE BARS SHALL BE 2. NOT MORE THAN 33% OF THE BARS SHALL BE 3.60 M 4.00 M 300 300 2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS

L
SPLICED WITHIN THE REQUIRED LAP LENGTH SPLICED WITHIN THE REQUIRED LAP LENGTH OTHERWISE SHOWN OR DETAILED IN THE DRAWINGS.

12db
(TYP.)

DOWEL
3. VALUES GIVEN ABOVE CAN ALSO BE USED FOR COLUMNS

400
12 THK. EXPANSION JOINT
FIN. FLR. LVL.
WITH MASTIC FILLER
NOTES ON STRUCTURAL STEEL D

250
1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS
3. IF THE BEAM REINFORCING BARS END IN A WALL, THE CLEAR DISTANCE FROM THE BAR TO THE FARTHER FACE OF THE STRUCTURE SHALL COMPLY WITH ALL THE PERTINENT PROVISION OF AISC

(DOWEL)
MAIN BAR END HOOKS
WALL IS NOT LESS THAN 25mm. EMBEDMENT LENGTH SHALL BE SHOWN IN A TABLE 'A' FOR TENSION BARS AND TABLE 'B'

400
CHB WALL 400 SPECIFICATION FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL (ALL GRADES)
FOR COMPRESSION BARS UNLESS UNLESS SPECIFIED IN PLAN. TOP BARS AND SHALL NOT BE SPLICED WITHIN THE FOR SIZE AND SPACING STEEL FOR BUILDING LATEST EDITION. BAR SIZE DIAMETER
COLUMN OR TWO STIRRUPS SHALL BE PROVED AT ALL SPLICES. OF HOR. & VERT. BARS (DEFORMED) (mm)
FOR SIZE AND SPACING SEE CONSTRUCTION NOTES. 2. ALL STRUCTURAL STEEL SHAPES SHALL CONFORM TO ASTM A36 STRUCTURAL D+2db L L
4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USED 25mm BAR SEPARATORS SPACED AT 1.0M ON OF HOR. & VERT. BARS DOWEL TO MATCH STEEL UNLESS OTHERWISE INDICATED. 60 75 125 150
SEE CONSTRUCTION NOTES. CHB VERT. BARS
ON CENTER ON NO CASE SHALL THERE BE THAN TWO (2) SEPARATORS BETWEEN LAYERS OF BARS 3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE 75 100 150 200
CHB WALL WHERE DEPRESSED
5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES SHALL BE AS SHOWN IN FIGURE B-2 300 SLAB OCCURS MEMBERS CONNECTED.
95 125 175 250
UNLESS ELSEWHERE. (TYP.) 4. UNLESS OTHERWISE SPECIFIED ALL WELDING RODS SHALL CONFORM WITH

DOWEL
CORNER WALL OPENING OR END WALL

400
115 150 200 300
E60 ELECTRODES.
FIN. FLR. LVL. 5. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS. 150 200 230 450

250
240 300 350 550
MAIN REINFORCEMENT MAIN REINFORCEMENT
CHB WALL R.C. COLUMN OR WALL NOTES ON EMBBED PIPES 300 335 450 600
t OR 1/4 D

t OR 1/4 D

SLEEVES FOR UTILITY 400


t

SLEEVES FOR UTILITY


t

DOWEL BARS TO MATCH 1. ALL EMBEDED PIPES FOR UTILITIES ETC. THAT PASS THRU BEAMS SHALL NOT
PIPES MAX. 1/5 D PIPES MAX. 1/5 D CHB HOR. BARS
D

12 THK. EXPANSION JOINT EXCEED 100mm IN DIAMETER OR 1/3 BEAM DETPH WHICHEVER IS LESS, UNLESS
WITH MASTIC FILLER 12 THK. EXPANSION JOINT TYPICAL CHB FOOTING DETAILS OTHERWISE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER.
WITH MASTIC FILLER
EACH SIDE OF SLEEVES EACH SIDE OF SLEEVES ( WHERE APPLICABLE ) 2. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY. 135 DEG. HOOKS

L
3. NO PIPES SHALL BE EMBEDDED IN COLUMNS.

(DOWEL)
LE
400
TYP. DET. FOR SLEEVES TYP. DET. FOR SLEEVES FOR SIZE AND SPACING
THRU CONCRETE BEAM THRU CONCRETE BEAM OF HOR. & VERT. BARS NOTES ON CONSTRUCTION JOINTS IN CONCRETE D
SEE CONSTRUCTION NOTES. 400

6d
1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE

b
FIG. B-2 FIG. B-3 (DOWEL)

VERIFY DEPRESSION
30 BAR DIA. 30 BAR DIA. SHALL BE CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED SHEAR
INTERSECTION WALL INTERSECTING R.C. COLUMN OR WALL (min.) (min.) KEY SHALL BE PROVIDE AT THE JOINT. L1

D=FOR BEAM
t=FOR SLAB
L
MAIN REINFORCEMENTS TO BE
6. WHEN A BEAM CROSSES A GIRDER , REST BEAM ON TOP OF GIRDER BARS, BEAM REINFORCING BARS SHALL BE TYPICAL CONNECTION DETAIL OF MASONRY WALL CONTINUOUS (TOP & BOTT. BARS)
SYMMETRICAL ABOUT THE CENTER LINE WHENEVER POSSIBLE. MAIN REINFORCEMENTS WHERE JOINTS IS AT POINT OF
TO BE CONTINUOUS STRESS, PROVIDE SHEAR RODS
7. GENERALLY, NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING STRESSES OCCUR, SPLICES WITH ENGINEERS APPROVAL STIRRUP AND THE TIE HOOKS
(ALL GRADES)
WHERE SO PERMITTED SHALL BE INDICATED IN TABLE 'A' AND 'B'. WELDED SPLICES SHALL DEVELOP IN TENSION AT D=FOR BEAM
200 (MIN) 200 (MIN)
LEAST 125% OF THE SPLICED YIELD STRENGTH OF THE BAR NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION @ 300 O.C. BAR SIZE DIAMETER
2t=FOR SLAB
50 (DEFORMED) (mm) D+2db L L
IS ALLOWED TO BE SPLICED THEREIN. (MIN.) (MIN.)
30 BAR DIA. (min.) 40

D/3
40 125 85 100
@ 150 O.C. TYPICAL DETAIL FOR BEAM

D/3
t/3 t/3

D
t/3
50 165 115 115

D/3
OR SLAB CHANGE SOFFIT SLAB 65 200 140 150
NOTES ON CONCRETE HOLLOW BLOCKS WALLS CHB WALL FOR SIZE AND SPACING
OF HOR. & VERT. BARS
BEAM
115 300 165 300
1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCKS SHALL BE REINFORCED SEE CONSTRUCTION NOTES
OPENING TYPICAL SLAB & BEAM 150 335 230 405
AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCK REINFORCEMENT. BARS TYPICAL (DOWEL)
400
DOWEL BARS TO MATCH
CHB VERT. BARS
CONSTRUCTION JOINT DET.
WHERE CONCRETE HOLLOW BLOCK TERMINATES AND AT EVERY 3.0M LENGTH OF CONCRETE HOLLOW BLOCK NOTES ON CONCRETE WALLS
200

WALLS UNLESS NOTED IN STRUCTURAL PLANS. FIN. FLR. LVL.


1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL
REINFORCEMENT UNLESS OTHERWISE INDICATED IN THE PLANS.
NOTE:
ELEVATION SECTION PROVIDE THESE ADDITIONAL BARS FOR
ALL OPENINGS PLUS BARS (NOT
NOTES ON CONCRETE HOLLOW BLOCKS WALLS REINFORCEMENTS TYP. DET. OF LINTEL BEAM AT CHB WALL OPENING REINFORCEMENT SHOWN) PARALLEL TO SIDE OF OPENING
WALL VERTICAL
THICKNESS EQUAL TO THE NUMBER OF TERMINATED
BLOCK THICKNESS REINFORCEMENT NOTES HORIZONTAL VERTICAL REMARKS SECTION BARS AT OPENING
HORIZONTAL LAPPED A. MINIMUM LAPS AT SPLICE= 0.25 M 100mm HORIZONTAL BARS SEE ARCHITECTURAL & MECHANICAL
AT CENTERS VERTICAL VER. BARS
125mm PLANS FOR SLAB OPENING LOCATION.
75 mm B. PROVIDE RIGHT ANGLED REINFORCEMENT DOWEL BARS TO BARS STAGGED OUT
AT CORNERS 0.92 m LONG FLR. SLAB OR BEAM MATCH VERT. BARS 150mm HOR. BARS
125 mm
C.WHERE CHB OR CER. BLK. WALL DOWELS
(DOWEL)

DOOR
150mm WITH THE SAME SIZE AS VER. OR HOR. REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL EXCEPT FOR
1. ALL JOINTS AND CELLS
400

REINFORCEMENT SHALL BE PROVIDED OPENING


VERIFY ARCHITECTURAL

200 mm CONTAINING REINFORCING WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL BE PROVIDED AND FOR
BARS SHALL BE FILLED EXPOSED FACES OF FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm CLEAR.
WITH CONCRETE GROUT. 38mm CLEAR WINDOW
2. FOR REINFORCEMENTS SEE 2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES WHEN NECESSARY OPENING
CONSTRUCTION NOTES. STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL ENDS VERTICAL AND HORIZONTAL BARS
SHALL BE SPLICED BY LAPPING A DISTANCE EQUAL TO 30 DIAMETERS AND WIRED SECURELY WITH 16 G.I. WIRE
(DOWEL)

PROVIDED THAT SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST 1.50M O.C.
400

FOR FLOOR SLAB ONLY


3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER SHALL BE REINFORCED
TYP. EXTERIOR WDW. & DOOR OPENING
TYP. SECTION OF MASONRY A U-FORM LIKE STIRRUPS AND SPACED ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED.
PARTITION REINFORCEMENTS

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL CONSTRUCTION NOTES ENGINEER II

MODIFIED STANDARD DPWH - DEPED CADD: SIGNED


BUREAU OF DESIGN TWO (2) STOREY, TEN (10) MARK ANTHONY H. AGUSTIN
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-2
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING
ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED
OIC, UNDERSECRETARY FOR
B 11 67
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED APPROVED: CONCURRED:
PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FOUNDATION PLAN ENGINEER II
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR FRAMING PLAN
DRAWN/AUTOCAD:
SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE

BUREAU OF DESIGN TWO (2) STOREY, TEN (10) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE BOD
S-3
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED:
ENGINEER II JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
11 67
SIGNED B
KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER IN CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES, DPWH SECRETARY, DEPED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER IV
with 10mm

300 200mm O.C.

100
2 DET. PLAN OF STF-1
S-4 SCALE 1:20 M

HORZ. BARS

100mm THK. CHB FOR INT. WALL

200
FFL

100 100 100


100mm THK. WELL-COMPACTED GRAVEL FILL

100 300 100

4 DETAIL OF WF-1
S-4 SCALE 1:20 M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED APPROVED: CONCURRED:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TYPICAL DETAIL OF FOOTINGS ENGINEER II
MODIFIED STANDARD DPWH - DEPED WALL TO TIE BEAM CONNECTION DETAILS DRAWN/AUTOCAD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE

BUREAU OF DESIGN TWO (2) STOREY, TEN (10) DETAIL OF WALL FOOTING
SCHEDULE OF FOOTING TIE BEAMS (EXPOSURE D & B)
MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE BOD
S-4
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING SCHEDULE OF FOOTING (EXPOSURE D & B) CHECKED:
ENGINEER II JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
11 67
DETAIL SECT. OF RC RAMP, DETAIL SECT. OF STAIR
SIGNED B
KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER IN CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES, DPWH SECRETARY, DEPED
BONIFACIO DRIVE PORT AREA, MANILA ON FILL, DETAIL PLAN OF STF-1 ENGINEER IV
SCHEDULE OF SLABS
REINFORCING BARS
MARK THICKNESS REMARKS
PARALLEL TO PARALLEL TO
LONG SPAN SHORT SPAN

S-1 100mm+FIN. UP 2 OUT OF 3 @ L/4 FROM UP 2 OUT OF 3 @ L/4 FROM TWO - WAY
FACE OF SUPPORT FACE OF SUPPORT

S-2 100mm+FIN. UP 2 OUT OF 3 @ L/4 FROM UP 2 OUT OF 3 @ L/4 FROM TWO - WAY
FACE OF SUPPORT FACE OF SUPPORT

S-3 100mm+FIN. UP 2 OUT OF 3 @ L/4 FROM ONE - WAY


@ 250mm O.C. FACE OF SUPPORT

S-4 120mm+FIN. UP 2 OUT OF 3 @ L/4 FROM UP 2 OUT OF 3 @ L/4 FROM TWO- WAY
FACE OF SUPPORT FACE OF SUPPORT

1 13

400 A

100 300
25
150mm THK. CHB. WALL
400 A
150 1200

SPACED AS SHOWN
BARS SPACE AS SHOWN

200
25 75
(ANCHORED TO COLUMNS)

100 100
100mm THK. BARS @ 250mm O.C.

100
600
500
150mm THICK R.C. WALL

400

400
CONC. PLATFORM
FINISH FLOOR LINE CORRIDOR
FINISH FLOOR LN.
BARS @ 250mm O.C.
G-2 B-2

300

200
VARIES
100mm THK. WELL
FINISH GRADE LN.
COMPACTED GRAVEL FILL
FINISH GRADE LINE

300
HORZ. BARS @ EVERY 3rd LAYER
DETAIL SECTION OF CANOPY
4 OF MAIN ENTRANCE R

FTB FTB S-5 SCALE 1:20M


DETAIL SECTION A-A

2 DETAILS OF LAVATORY (HANDWASH) 3 DETAIL OF CONC. SEATING R

S-5 SCALE 1:20 M S-5 SCALE 1:20M

C B

7000
1613 1613

@ 250mm O.C.

LONGITUDINAL BARS 150mm THICK CONC. WALL


150mm THICK CONCRETE WALL (SEE SECTION A-A)

CONC. PLATFORM
FINISH FLOOR LINE

FINISH GRADE LINE

WF-1 WF-1 WF-1 WF-1 WF-1


100mm THK. WELL COMPACTED
200mm EACH FACE GRAVEL FILL

A
5 DETAILS OF HAND WASH
S-5 SCALE 1:20 M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED RECOMMENDING APPROVAL: APPROVED: CONCURRED:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SCHEDULE OF COLUMNS (EXPOSURE D & B) ENGINEER II
MODIFIED STANDARD DPWH - DEPED DETAILS OF HANDWASH DRAWN/AUTOCAD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE

BUREAU OF DESIGN TWO (2) STOREY, TEN (10) DETAILS OF LAVATORY HANDWASH
DETAIL OF CONC. SEATING
MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE BOD
S-5
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING DETAIL SECTION OF CANOPY
CHECKED:
ENGINEER II JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
11 67
TYPICAL GIRDER /BEAM DETAILS SIGNED B
KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER IN CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES, DPWH SECRETARY, DEPED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER IV
REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED APPROVED: CONCURRED:
PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SCHEDULE OF BEAMS AND GIRDERS (EXPOSURE D) ENGINEER II
MODIFIED STANDARD DPWH - DEPED SCHEDULE OF BEAMS AND GIRDERS (EXPOSURE B) DRAWN/AUTOCAD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE

BUREAU OF DESIGN TWO (2) STOREY, TEN (10) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE BOD
S-6
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED:
ENGINEER II JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
11 67
SIGNED B
KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER IN CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES, DPWH SECRETARY, DEPED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER IV
REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED APPROVED: CONCURRED:
PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS END WALL DETAIL ENGINEER II

MODIFIED STANDARD DPWH - DEPED ROOF FRAMING DETAIL DRAWN/AUTOCAD: SIGNED


BUREAU OF DESIGN TWO (2) STOREY, TEN (10) DETAIL OF R.C. GUTTER
DETAIL OF PLANTED COLUMN (PC-1)
MARK ANTHONY H. AGUSTIN
ENGINEER II
APPROVED WITH SIGNATURE
JOSEPHINE P. ISTURIS
SEE COVER SHEET FOR SIGNATURE

LEA N. DELFINADO
SEE COVER SHEET FOR SIGNATURE

GILBERTO S. REYES
SEE COVER SHEET FOR SIGNATURE

LEONOR M. BRIONES
BOD
S-7
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 11 67
KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD OIC, UNDERSECRETARY FOR TECHNICAL SERVICES, DPWH SECRETARY, DEPED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER IV
1 13
C
R SCHEDULE OF MEMBERS AND WELDS R
SCHEDULE OF MEMBERS AND WELDS
(EXPOSURE D AND V=340KPH) (EXPOSURE B AND V=270KPH)
525 SIZE OF WELDS SIZE OF WELDS
150mm THK CHB WALL TRUSS MEMBERS TRUSS MEMBERS
ANCHORED TO BEAM MARK LENGTH, mm REMARKS MARK LENGTH, mm REMARKS
CLASSROOM FLOOR LINE SIZES THICKNESS SIZES THICKNESS
WITH 10mm TRANSVERSE BARS L1 L2 L3 L1 L2 L3
SPACED @250mm O.C.
A 2 s - 100 x 100 x 6.35 6.35mm FULL WELD A 2 s - 75 x 75 x 6.35 6.35mm FULL WELD

150
DECK ROOF FLOOR LEVEL
2 s - 65 x 65 x 6.35 6.35mm 2 s - 50 x 50 x 6.35 6.35mm

75
B FULL WELD B FULL WELD

600
2 SPOT DETAIL (MEDIA AGUA) R L1
RG-2/RB1A 150mm THK CHB WALL 6mm GUSSET Typical
S-8 SCALE 1:20 M
ANCHORED TO BEAM STITCH WELD

L3
TRUSS MEMBER
L2

400 150

2 REFERENCE WELD DETAIL


3 DETAIL OF ROOF BEAM ALONG GRIDLINE 1 & 13 S-8 SCALE 1:10M

S-8 SCALE 1:20 M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED APPROVED: CONCURRED:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL ELEVATION OF TRUSS-1 ENGINEER II
MODIFIED STANDARD DPWH - DEPED DETAIL OF ROOF BEAM ALONG GRIDLINE 1&13 DRAWN/AUTOCAD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) REFERENCE WELD DETAIL MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-8
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING SCHEDULE OF MEMBERS AND WELDS
SPOT DETAIL (MEDIA AGUA) CHECKED:
ENGINEER II JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
11 67
SIGNED B
KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD OIC, UNDERSECRETARY FOR TECHNICAL SERVICES, DPWH SECRETARY, DEPED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER IV
W.M.

W.M.
W.M.

150

400
250

400
6mm THICK
GUSSET , T.C.
TYPICAL

300
T.C. 6mm THICK T.C.

250

250
GUSSET ,
TYPICAL
W.M.
B.C. B.C. W.M.
W.M. W.M.
W.M.
200 200
2 DETAIL 2 3 DETAIL 3 4 DETAIL 4
SCALE 1:10 M SCALE 1:10 M
S-9 S-9 SCALE 1:10 M
S-9
1 DETAIL 1 FULL 6mm 50 100
SCALE 1:10 M WELD
S-9
A C

FULL 6mm 50 100


6mm WELD T.C.
TYP.

50
50 100
6mm
FULL TYP.
WELD 6mm

50 50
10mm THICK STEEL ,
T.C. FULL
25mm THK. LEVELING GROUT
10mm THICK STEEL , WELD 6mm
25mm THK. LEVELING GROUT W/ STANDARD TURN-BUCKLE
W/ STANDARD TURN-BUCKLE
6mm THK. GUSSET
AT APEX OF TRUSS ALONG GRID LINE A & C
200 x 300 x 12mm THICK STEEL 300 x 300 x 16mm THK. STEEL BASE , W/ 2 -
BASE
RB-3 EACH SIDE
300mm
LONG ANCHOR BOLTS 7 DETAIL CONN. OF CROSS-BRACING
SCALE 1:10 M
S-9

125
150
125 x 125 x 50 x 6mm STEEL JOINT
ELEVATION CONNECTOR, FULL WELD TO TOP CHORD
30 30 150 x 150 x 6mm SPLICE
PLATE CONNECTOR (FULL
WELD) STAGGERED
RB-1 LC PURLINS LC PURLINS
ROO

50 50 25
R. C. G U T T E R FIN

150

150
G
RB-3

T.C.

300 T.C. BOLTS W/ STD. NUTS


STAGGERED
&
50 200 50 NUTS & WASHERS, SPACED AS SHOWN WASHERS, SPACED AS SHOWN
200 IN BETWEEN TRUSSES
50 100 50
FULL WELD FULL WELD
8 DETAIL CONN. OF PURLIN TO TOP CHORD
S-9 SCALE 1:10 M
9 DETAIL OF PURLIN SPLICE
50

SCALE 1 :10 M
BOTTOM CHORD S-9

.12mm
300
300

STANDARD NUT & WASHER


50

200 x 300 x 12mm THICK STEEL


300 x 300 x 12mm THK. STEEL BASE , W/

50
BASE
300mm
LONG ANCHOR BOLTS EACH SIDE

LC
. PURLINS

P L A N P L A N

5 DETAIL OF TRUSS ANCHORAGE 6 DETAIL OF TRUSS ANCHORAGE


SCALE 1:10 M S-9 SCALE 1:10M
10 DET. CONN. OF PURLIN TO SAG ROD
S-9
S-9 SCALE 1:10M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED APPROVED: CONCURRED:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL SECTIONS, CONNECTIONS & ENGINEER II

MODIFIED STANDARD DPWH - DEPED ANCHORAGES OF TRUSS MEMBERS DRAWN/AUTOCAD: SIGNED


BUREAU OF DESIGN TWO (2) STOREY, TEN (10) MARK ANTHONY H. AGUSTIN
ENGINEER II
APPROVED WITH SIGNATURE
JOSEPHINE P. ISTURIS
SEE COVER SHEET FOR SIGNATURE

LEA N. DELFINADO
SEE COVER SHEET FOR SIGNATURE

GILBERTO S. REYES
SEE COVER SHEET FOR SIGNATURE

LEONOR M. BRIONES
BOD
S-9
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 11 67
KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD OIC, UNDERSECRETARY FOR TECHNICAL SERVICES, DPWH SECRETARY, DEPED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER IV
J -BOLTS @
EVERY 3RD CORR. 0.49 mm (BMT) LONGSPAN
.PRE-PAINTED CORR. ROOFING
(0.50 mm TCT)

2-1/2

19mm CORR. (MIN)


SIDE LAP
.LC PURLIN

LC PURLIN PANEL 1 PANEL 2

2 J-BOLT SPACING
S-10 SCALE 1:10M 3 ROOF PANEL SIDE LAP DETAIL
S-10 SCALE 1:10M

4 ROOFING FIXER
S-10 NOT TO SCALE
5 ISOMETRIC VIEW OF CONNECTION OF ROOFING TO PURLINS
S-10 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED APPROVED: CONCURRED:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL ELEVATION OF TRUSS 2 ENGINEER II
MODIFIED STANDARD DPWH - DEPED DETAIL CONNECTION AND SPACING OF J-BOLT DRAWN/AUTOCAD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) ISOMETRIC VIEW OF CONNECTION OF ROOFING TO PURLINS MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S - 10
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED:
ENGINEER II JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
11 67
SIGNED B
KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD OIC, UNDERSECRETARY FOR TECHNICAL SERVICES, DPWH SECRETARY, DEPED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER IV
1 13

1075 8-250 THREADS @2000

15
0
SPACED AS SHOWN ROOF DECK

250
RCB-2

1575

175
LANDING

RC WALL

8-200mm @ 1575
FROM LANDING TO ROOF DECK FLOOR LINE

2ND FLOOR LINE

G-1C B
1 2
3800
5000
8-200mm THREADS @ 2000
1000 800
1100

150mm THK. RC WALL W/


BARS @ 150 mm O.C.

LANDING
SPACED AS SHOWN
B-1
250

1100
STAIRWELL

175
RC WALL

1575
3800

G-1C G-1C
STAIRWELL TOP & BOTTOM BARS

2ND FLOOR LINE

0
15
B
B-1
FROM SECOND FLOOR LINE TO LANDING G-3

3 FRAMING PLAN OF STAIR @ SECOND FLOOR LEVEL


S-11 SCALE 1:40 M
STAIR DETAIL FROM 2ND FLOOR TO ROOF DECK
2
SCALE 1:20 M
S-11

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED APPROVED: CONCURRED:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: SET NO. SHEET NO.
LUVINCCI D. TAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FRAMING PLAN OF STAIR @ SECOND FLOOR LEVEL ENGINEER II
MODIFIED STANDARD DPWH - DEPED FRAMING PLAN OF STAIR @ ROOF DECK LEVEL DRAWN/AUTOCAD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) STAIR DETAIL FROM 2ND FLOOR TO ROOF DECK MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S - 11
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING DETAIL PLAN OF LINTEL BEAM
CHECKED:
ENGINEER II JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
11 67
DETAIL PLAN OF STAIRWAY COLUMN SIGNED B
BONIFACIO DRIVE PORT AREA, MANILA DETAILED SLEVATION OF STAIR KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD OIC, UNDERSECRETARY FOR TECHNICAL SERVICES, DPWH SECRETARY, DEPED
ENGINEER IV
REPUBLIC OF THE PHILIPPINES
DESIGNED: SIGNED
PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
GROUND FLOOR (SEWER LINE & DRAINAGE LAYOUT)
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
SECOND FLOOR (SEWER LINE and DRAINAGE LAYOUT) SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD P-1
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED 15 67
PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
B
BONIFACIO DRIVE
ARCHITECT IV
1 2 3 4 5 6 7 8 9 10 11 12 13

(PERPORATED PIPE)

C GV

GV

HANDWASHING
GV GV GV
LAV LAV
WC WC WC WC WC WP2
HB
PWD KS
PWD HB

HB KITCHEN HB HB WP1
HB
HE HB
SHE
HB GV HB HB HB LECTURE AREA CLASS ROOM CLASS ROOM CLASS ROOM HB HB HB GV
HB

HANDWASHING
SEE MECHANICAL PLAN HB HB CISTERN
FHC LANDING LANDING FHC
CONCRETE PLATFORM

CONCRETE PLATFORM
HB HB
DINING AREA Liters
LIVING AREA HOME ECONOMIC ROOM

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
HB HB

HB HB

HB HB
STO. STO.
HB HB

B
25 mm DROP
UP UP

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
SLOPE 1:12 SLOPE 1:12
RAMP UP UP UP RAMP UP
LINE OF CANOPY ABOVE

LEGEND:
REVISION OF DRAWING DETAILS (1/23/2018)
GROUND FLOOR PLAN (WATER & FIRE LINE LAYOUT)
R 1 (WITH HOME ECONOMICS ROOM - OPTION - 2)
- ADDITIONAL DETAIL OF CISTERN TANK.
- ADDITIONAL PLUMBING LAYOUTS FOR HOME R
SCALE 1: 100 M.
ECONOMICS ROOM AND SCIENCE LABORATORY ROOM. P-1a
- ADDITIONAL CANOPY DRAIN AT SECOND FLOOR PLAN.
- REVISION OF FEMALE COMFORT ROOM AT SECOND
FLOOR LEFT WING, ADAPTING THREE (3) AND FOUR (4)
STOREY, SCHOOL BUILDING TOILET LAYOUT.

1 2 3 4 5 6 7 8 9 10 11 12 13

TO NEAREST SEWER LINE


(VERIFY SITE CONDITION)

(TYPICAL)
SEPTIC VAULT
(SEE DETAIL) (TYPICAL)

CO CO
CB CB CB CB CB CB CB CB CB CB CB CB
CO CO

C CO
CO CO CO
GT UD
FD FD FD FD LAV WC FD
SD
WC WC WC WC FD WC
PWD UD
PWD KS
KITCHEN FD
CB
SD HE SD CB
FD
SHE
FD
SD SD
HANDWASHING

HANDWASHING
CO LECTURE AREA CLASS ROOM CLASS ROOM CLASS ROOM CO
LANDING LANDING
CONCRETE PLATFORM

CONCRETE PLATFORM
SD
DINING AREA SD

LIVING AREA HOME ECONOMIC ROOM


BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
SD SD

STO. STO.
CB CO CO CB
B
25 mm DROP
UP UP

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A CB CB CB CB CB CB CB CB CB CB
CB CB
UP UP
RAMP UP SLOPE 1:12
SLOPE 1:12 RAMP UP
LINE OF CANOPY ABOVE

TO NEAREST DRAINAGE OUTLET


GROUND FLOOR PLAN (SEWER LINE & DRAINAGE LAYOUT) TO NEAREST DRAINAGE OUTLET
(VERIFY SITE CONDITION) 1 (WITH HOME ECONOMICS ROOM - OPTION - 2) (VERIFY SITE CONDITION)
R
SCALE 1: 100 M.
P-1a

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED GROUND FLOOR (SEWER LINE & DRAINAGE LAYOUT) CADD:
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) GROUND FLOOR (WATER & FIRE LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1a
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 67
BONIFACIO DRIVE PORT AREA, MANILA HOME ECONOMICS ROOM LAYOUT (OPTION 2) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
LEGEND:
REVISION OF DRAWING DETAILS (1/23/2018)
R
- ADDITIONAL ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT)

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED CADD:
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
PLUMBING NOTES SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1b
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 67
BONIFACIO DRIVE PORT AREA, MANILA HOME ECONOMICS ROOM LAYOUT (OPTION 2) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
PLUMBING LEGEND:
CD CORRIDOR DRAIN PVCSP POLYVINYL CHLORIDE SOIL PIPE (SERIES 1000)
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
CO CLEAN OUT
PVCSS POLYVINYL CHLORIDE SOIL STACK (SERIES 1000)
CV CHECK VALVE (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

FD FLOOR DRAIN PVCVP POLYVINYL CHLORIDE VENT PIPE (SERIES 600)


(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
FDC FIRE DEPARTMENT CONNECTION
PVCVS POLYVINYL CHLORIDE VENT STACK (SERIES 600)
FHC FIRE HOSE CABINET (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

HB HOSE BIBB PVCVTR POLYVINYL CHLORIDE VENT THROUGH ROOF (SERIES 600)
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
G.I GALVANIZED IRON
PVCWP POLYVINYL CHLORIDE WASTE PIPE (SERIES 1000)
GT GREASE TRAP (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

GV GATE VALVE RD ROOF DRAIN

LAV LAVATORY SD SINK DRAIN

KS KITCHEN SINK UD URINAL DRAIN

MH MANHOLE WC WATER CLOSET

PPRC CWL POLYPROPYLENE RANDOM COPOLYMER COLD WATER LINE, TYPE 3, PN 20 WM WATER METER
(ISO 15874 / JOINING BY SOCKET FUSION)

PPRC CWR POLYPROPYLENE RANDOM COPOLYMER COLD WATER RISER, TYPE 3, PN 20


(ISO 15874 / JOINING BY SOCKET FUSION)

PVCDP POLYVINYL CHLORIDE DRAIN PIPE (SERIES 1000)


(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

PVCDS POLYVINYL CHLORIDE DOWNSPOUT (SERIES 1000)


(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

R
1 ISOMETRIC DIAGRAM (SEWER LINE LAYOUT)
SCALE NTS.
P-1e

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED CADD:
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
PLUMBING LEGENDS SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1c
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 67
BONIFACIO DRIVE PORT AREA, MANILA HOME ECONOMICS ROOM LAYOUT (OPTION 2) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
1 2 3 4 5 6 7 8 9 10 11 12 13

(PERPORATED PIPE)

C
HB GV GV
GV GV GV
LAV LAV
LAV LAV LAV LAV LAV LAV LAV
WC WC WC SHO
WC WC
HB WP2
HB
PWD

DRY WALL
PWD HE WP1
HB HB HB

HB HB
SHE LOCKERS
&
HB GV HB HB HB
DRESSING RM. CLASS ROOM CLASS ROOM CLASS ROOM HB HB HB GV
HB

SEE MECHANICAL PLAN HB CISTERN


HB
FHC LANDING SCIENCE LABORATORY ROOM LANDING FHC
HB

CONCRETE PLATFORM
HB
Liters

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
HB HB
CONCRETE PLATFORM
HANDWASHING

HB HB

HB HB
STO. STO.
HB HB

B
UP UP

UP C O R R I D O R C O R R I D O R C O R R I D O R UP SEE MECHANICAL PLAN

A
RAMP UP UP UP RAMP UP
LINE OF CANOPY ABOVE

LEGEND:
REVISION OF DRAWING DETAILS (1/23/2018)
GROUND FLOOR PLAN (WATER & FIRE LINE LAYOUT)
R 2 (WITH SCIENCE LABORATORY ROOM - OPTION - 4)
- ADDITIONAL DETAIL OF CISTERN TANK.
R
SCALE 1: 100 M.
- ADDITIONAL PLUMBING LAYOUTS FOR HOME
ECONOMICS ROOM AND SCIENCE LABORATORY ROOM.
P-1d
- ADDITIONAL CANOPY DRAIN AT SECOND FLOOR PLAN.
- REVISION OF FEMALE COMFORT ROOM AT SECOND
FLOOR LEFT WING, ADAPTING THREE (3) AND FOUR (4)
STOREY, SCHOOL BUILDING TOILET LAYOUT.

1 2 3 4 5 6 7 8 9 10 11 12 13

TO NEAREST SEWER LINE


(VERIFY SITE CONDITION)

(TYPICAL)
SEPTIC VAULT
(SEE DETAIL) (TYPICAL)

CO CO

CB CB CB CB CB CB CB CB CB CB CB CB
CO CO

C CO
CO
SHO.
CO CO
CO UD
FD FD FD FD LAV WC FD
SD LAV LAV LAV LAV LAV LAV LAV SD
WC WC WC FD WC WC
FD
PWD
DRY WALL

PWD
HE FD
SD SD CB
CB
FD
SHE LOCKERS
& FD
SD SD
DRESSING RM.
CO CLASS ROOM CLASS ROOM CLASS ROOM CO
LANDING SCIENCE LABORATORY ROOM LANDING

CONCRETE PLATFORM
SD SD

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
CONCRETE PLATFORM
HANDWASHING

SD SD

STO. STO.
CB CO CO CB
B
UP UP

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A CB CB CB CB CB CB CB CB CB CB
CB CB
UP UP
RAMP UP RAMP UP
LINE OF CANOPY ABOVE

TO NEAREST DRAINAGE OUTLET GROUND FLOOR PLAN (SEWER LINE & DRAINAGE LAYOUT) TO NEAREST DRAINAGE OUTLET
(VERIFY SITE CONDITION) (WITH SCIENCE LABORATORY ROOM - OPTION - 4)
1 (VERIFY SITE CONDITION)
R
SCALE 1: 100 M.
P-1d

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED GROUND FLOOR (SEWER LINE & DRAINAGE LAYOUT) CADD:
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) GROUND FLOOR (WATER & FIRE LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1d
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 9 59
BONIFACIO DRIVE PORT AREA, MANILA SCIENCE LABORATORY RM. LAYOUT (OPTION 4) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED PLUMBING NOTES CADD:
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) ISOMETRIC DIAGRAM (WATER LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
BOD
P - 1e
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 9 59
BONIFACIO DRIVE PORT AREA, MANILA SCIENCE LABORATORY RM. LAYOUT (OPTION 4) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
PLUMBING LEGEND:
CD CORRIDOR DRAIN PVCSP POLYVINYL CHLORIDE SOIL PIPE (SERIES 1000)
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
CO CLEAN OUT
PVCSS POLYVINYL CHLORIDE SOIL STACK (SERIES 1000)
CV CHECK VALVE (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

FD FLOOR DRAIN PVCVP POLYVINYL CHLORIDE VENT PIPE (SERIES 600)


(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
FDC FIRE DEPARTMENT CONNECTION
PVCVS POLYVINYL CHLORIDE VENT STACK (SERIES 600)
FHC FIRE HOSE CABINET (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

HB HOSE BIBB PVCVTR POLYVINYL CHLORIDE VENT THROUGH ROOF (SERIES 600)
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
G.I GALVANIZED IRON
PVCWP POLYVINYL CHLORIDE WASTE PIPE (SERIES 1000)
GT GREASE TRAP (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

GV GATE VALVE RD ROOF DRAIN

LAV LAVATORY SD SINK DRAIN

KS KITCHEN SINK UD URINAL DRAIN

MH MANHOLE WC WATER CLOSET

PPRC CWL POLYPROPYLENE RANDOM COPOLYMER COLD WATER LINE, TYPE 3, PN 20 WM WATER METER
(ISO 15874 / JOINING BY SOCKET FUSION)

PPRC CWR POLYPROPYLENE RANDOM COPOLYMER COLD WATER RISER, TYPE 3, PN 20


(ISO 15874 / JOINING BY SOCKET FUSION)

PVCDP POLYVINYL CHLORIDE DRAIN PIPE (SERIES 1000)


(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

PVCDS POLYVINYL CHLORIDE DOWNSPOUT (SERIES 1000)


(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

LEGEND:
REVISION OF DRAWING DETAILS (1/23/2018)
R
- ADDITIONAL ISOMETRIC DIAGRAM (SEWER LINE LAYOUT)

REPUBLIC OF THE PHILIPPINES DESIGNED: SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED PLUMBING LEGENDS CADD:
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
BOD
P - 1f
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 9 59
BONIFACIO DRIVE PORT AREA, MANILA SCIENCE LABORATORY RM. LAYOUT (OPTION 4) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
ROOF PLAN (DRAINAGE LAYOUT) SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
ROOF DECK FLOOR PLAN (SEWER LINE and DRAINAGE
LAYOUT)
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD P-2
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED 15 67
PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
B
BONIFACIO DRIVE
ARCHITECT IV
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
GROUND FLOOR PLAN (WATER & FIRE LINE LAYOUT)
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
SECOND FLOOR (WATER & FIRE LINE LAYOUT) SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD P-3
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED 15 67
PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
B
BONIFACIO DRIVE
ARCHITECT IV
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ROOF DECK FLOOR PLAN (WATER & FIRE SIGNED
CADD:
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
LINE LAYOUT)
PLUMBING NOTES
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD P-4
BUILDINGS DIVISION PLUMBING LEGENDS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED 15 67
PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
B
BONIFACIO DRIVE
ARCHITECT IV
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
ISOMETRIC DIAGRAM (SEWER LINE LAYOUT)
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD P-5
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED 15 67
PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
B
BONIFACIO DRIVE
ARCHITECT IV
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
ISOMETRIC DIAGRAM (DRAINAGE LINE LAYOUT)
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD P-6
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED 15 67
PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
B
BONIFACIO DRIVE
ARCHITECT IV
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT) CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD P-7
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED 15 67
PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
B
BONIFACIO DRIVE
ARCHITECT IV
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
PLAN AND DETAIL OF CATCH BASIN
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
PLAN AND DETAIL OF SEPTIC TANK
SCHEDULE OF SLAB REINFORCEMENT
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD P-8
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED 15 67
PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
B
BONIFACIO DRIVE
ARCHITECT IV
8000 8000
3000 5000 FROM GA. 16 STAINLESS 3000 5000

FROM GA. 16 STAINLESS STEEL


SHEET PLASTER MANHOLE COVER
(LEAKPROOFED) WITH HINGES &
800
2000 2000 2000 2000
800
STEEL SHEET PLASTER
MANHOLE COVER
(LEAKPROOFED) WITH
HINGES & PROTECTIVE
800
2000
300
2000
300 300
2000
300
2000

800 LEGEND:
100 600 100 100 600 100 100 600 100 100 600 100
PROTECTIVE LOCK, TYPICAL LOCK, TYPICAL
LONG TOP & BOTTOM
REVISION OF DRAWING
3 5
BARS; TYPICAL
R DETAILS (1/23/2018)

100 600 100

100 600 100

100 600 100

100 600 100


P-10 P-10
- ADDITIONAL DETAIL OF
800

800

800

800
100 mm THK. CHB LEAN CISTERN TANK.
OUTER TOP SLAB - PROVIDE
NON-TOXIC WATERPROOFING
CISTERN & VERT. BARS AT 600 mm
LONG TOP & BOTTOM
BARS; TYPICAL - ADDITIONAL PLUMBING
ON CENTERS, TYPICAL
LAYOUTS FOR HOME
3000

3600

3000
(ALL AROUND)
CTS1 CTS1 CTS1 CTS1 ECONOMICS ROOM AND

CBT1

CBT1

CBT1
CONCRETE BEAM SUPPORT
100 mm THK. CHB LEAN WALL WITH SCIENCE LABORATORY ROOM.
600 mm ON CENTERS, - ADDITIONAL CANOPY DRAIN
TYPICAL (ALL AROUND)
AT SECOND FLOOR PLAN.
TO MOTOR PUMP
- REVISION OF FEMALE
100 mm THK 100 mm THK
+ WATERPROOFING TO JOCKEY PUMP/ FIRE PUMP + WATERPROOFING PROVIDE 3-PLY MEMBRANE CTS1: T = 150mm + FIN. + W.P. (TWO WAY)
COMFORT ROOM AT SECOND
7
6 WATERPROOFING BETWEEN
LEAN WALLS AND EXTERIOR P-10
FLOOR LEFT WING, ADAPTING
P-10
SIDE OF R.C. WALL OF CISTERN THREE (3) AND FOUR (4) STOREY,
PLAN (TOP VIEW) CISTERN TANK SCHOOL BUILDING TOILET LAYOUT.
R
1 PLAN (TOP VIEW) CISTERN TANK R
4
P-10 SCALE 1:50 M. P-10 SCALE 1:50 M.

8000 8000
3000 5000 2000 2000 2000 2000
800 800 800 800
100 300 300 300 100 600 320
100 600 100 100 600 100
FROM GA. 16 STAINLESS STEEL 320
BARS, TYPICAL MANHOLE
SHEET PLASTER MANHOLE COVER MANHOLE
(LEAKPROOFED) WITH HINGES &
PROTECTIVE LOCK, TYPICAL
100 600 100

100 600 100

500

500
400

400

400
CTB1 CTB1 CTB1
800

800
CISTERN
FROM GA. 16 STAINLESS STEEL
SHEET PLASTER MANHOLE COVER REST @ 100 mm O.C.
OUTER TOP SLAB - PROVIDE PROVIDE NON-TOXIC CTS1: T = 150mm + FIN. + W.P. (TWO WAY)
EPOXY WATERPROOFING (LEAKPROOFED) WITH HINGES &
NON-TOXIC WATERPROOFING SPACED @ 250 mm O.C.,

3520
2500
@ ALL INTERIOR WALLS, PROTECTIVE LOCK, TYPICAL 1 @ 50, 6 @ 100, REST @ 200
EACH FACE, STAGGERED

2150
3000

3320
TOP & BOTTOM SLABS mm O.C.
100 mm THK. CHB LEAN WALL WITH PIPE WITH 100 mm THK. GRAVEL
FILL ALL AROUND (TYPICAL) @ 250 mm O.C. EACHWAY SPACED @ 200 mm O.C.,
CONCRETE BEAM 600 mm ON CENTERS, EACH FACE, TYPICAL
FLOAT VALVE 30
SUPPORT TYPICAL (ALL AROUND) SUMP PIT 0
@ 250 mm O.C. EACHWAY
SUMP PIT

300
PROVIDE 3-PLY MEMBRANE 100 mm THICK
PIPE, SCH. 40 WATERPROOFING BETWEEN WELL-COMPACTED GRAVEL FILL
LEAN WALLS AND EXTERIOR

+ WATERPROOFING
SIDE OF R.C. WALL OF CISTERN

100 mm THK.
100 mm THK TO MOTOR PUMP TO JOCKEY PUMP/ FIRE PUMP 100 mm THK
+ WATERPROOFING + WATERPROOFING 100 mm THK. LEAN CONCRETE SLAB PROVIDE 3-PLY MEMBRANE
100 mm THK. WATERPROOFING BETWEEN
+ WATERPROOFING LEAN WALLS AND EXTERIOR
SIDE OF R.C. WALL OF CISTERN

R
2 PLAN (BOTTOM VIEW) CISTERN TANK R
5 LONGITUDINAL SECTION OF CISTERN
P-10 SCALE 1:50 M. P-10 SCALE 1:50 M.

FROM GA. 16 STAINLESS OUTER TOP SLAB - PROVIDE 3000 3600


STEEL SHEET PLATE 8000 800 800
NON - TOXIC WATERPROOFING
MANHOLE COVER 2000 2000 2000 2000 100 600 100 300 100 600 100 300
(LEAKPROOFED) WITH HINGES 800 800 FROM GA. 16 STAINLESS STEEL 200 200
& LOCK, TYPICAL 300 300 300 OUTER TOP SLAB - PROVIDE
100 100 100 600 100 SHEET PLATE MANHOLE COVER CTS1: T = 150mm + FIN. + W.P. (TWO WAY)
MH NON - TOXIC WATERPROOFING
(LEAKPROOFED) WITH HINGES
320 320 MANHOLE
& LOCK, TYPICAL LINE OF BEAM
CONCRETE BEAM SUPPORT (SLAB)
MH MH
500 300

300

300
BOT. LINE OF SLAB (CTS1)

400

500

500
400

400

400

OUT
450

450
FIN. GRADE LINE FIN. GRADE LINE
500

500

500
BOT. LINE OF BEAM (CTB1)

250
PROVIDE 3-PLY MEMBRANE
WATERPROOFING BETWEEN STEEL LADDER RUNGS STEEL LADDER RUNGS
LEAN WALLS AND EXTERIOR CISTERN @ 300 mm O.C. @ 300 mm O.C. CISTERN SPACED @ 250 mm O.C.,
@ 200 mm O.C. EACH FACE,
3520

SCH. 40 TO MOTOR PUMP EACH FACE, STAGGERED


2500

2500

2500
1500

1500
SIDE OF R.C. WALL OF CISTERN CONCRETE BEAM PVC WATER STOP CONCRETE SUPPORT

3070

3070
SUPPORT PROVIDE NON-TOXIC EPOXY 400 FLOAT VALVE TYPICAL
3320

(TYP. @ ALL SIDES) PVC WATER STOP PROVIDE NON-TOXIC EPOXY


275

WATERPROOFING @ ALL INTERIOR PVC WATER STOP

275
(TYP. @ ALL SIDES) WATERPROOFING @ ALL INTERIOR
WALLS, TOP & BOTTOM SLABS WALLS, TOP & BOTTOM SLABS (TYP. @ ALL SIDES)
1 % SLOPE
PERPORTED PIPE WITH
650

1 % SLOPE

650
30 TOWARDS SUMP PIT 100 mm THK. GRAVEL PERPORTED PIPE WITH SPACED @ 250 mm O.C.

500
TOWARDS SUMP PIT 300
0 FILL ALL AROUND (TYPICAL) OPEN PIPE WITH 100 mm THK. GRAVEL EACHWAY PIPE WITH 100 mm THK. GRAVEL
100 mm THK GRAVEL
FILL ALL AROUND (TYPICAL) FILL ALL AROUND (TYPICAL)
300

300

300
FILL ALL AROUND
280

PIPE WITH 100 mm THK. GRAVEL SUMP PIT


(TYPICAL)
300

FILL ALL AROUND (TYPICAL)


COMPACTED PROVIDE 3-PLY MEMBRANE
+ WATERPROOFING

GRAVEL FILL WATERPROOFING BETWEEN


100 mm THK.

100mm THK COMPACTED LEAN WALLS AND EXTERIOR SIDE PROVIDE 3-PLY MEMBRANE
100 mm THK. LEAN 100 mm THK. LEAN
GRAVEL FILL PROVIDE 3-PLY MEMBRANE CONCRETE SLAB OF R.C. WALL OF CISTERN WATERPROOFING BETWEEN
CONCRETE SLAB SPACED @ 250 mm O.C.
100 mm THK. 100 mm THK. LEAN CONCRETE SLAB WATERPROOFING BETWEEN (REFER TO STRUC'L DET.) LEAN WALLS AND EXTERIOR SIDE
100 mm THK 100 mm THK EACHWAY OF R.C. WALL OF CISTERN
+ WATERPROOFING 300 600 300 LEAN WALLS AND EXTERIOR
SIDE OF R.C. WALL OF CISTERN + WATERPROOFING 300 3000 300 + WATERPROOFING 300 3000 300

R
3 LONGITUDINAL SECTION OF CISTERN R
6 TRANSVERSE SECTION OF CISTERN TRANSVERSE SECTION OF CISTERN
P-10 SCALE 1:50 M. P-10 SCALE 1:50 M. SCALE 1:50 M.

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
DETAIL OF CISTERN TANK SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P-9
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 67
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR LIGHTING LAYOUT (OPTION - 1)
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR LIGHTING LAYOUT CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-1
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 67
VINCENT A. BERAN OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROOF DECK POWER LAYOUT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED GROUND FLOOR POWER LAYOUT (OPTION - 1) CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-2
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 67
VINCENT A. BERAN OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SCHEDULE OF LIGHTING FIXTURES AND LAMPS
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ELECTRICAL RISER DIAGRAM CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) SECOND FLOOR POWER LAYOUT MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-3
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 67
VINCENT A. BERAN OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ELECTRICAL SYMBOLS CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) SCHEDULE OF LOADS MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-4
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 67
VINCENT A. BERAN OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR LIGHTING LAYOUT (WITH HOME
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ECONOMICS ROOM - OPTION - 2) CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
GROUND FLOOR POWER LAYOUT (WITH HOME MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-5
BUILDINGS DIVISION
ECONOMICS ROOM - OPTION - 2)
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 67
VINCENT A. BERAN OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ELECTRICAL SYMBOLS CADD: SIGNED APPROVED WITH SIGNATURE
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) SCHEDULE OF LOADS MARU BRYAN T. ZAPLAN
ENGINEER II
BOD
E-6
SCHEDULE OF LIGHTING FIXTURES AND LAMPS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CHECKED: SIGNED 10 67
PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING ELECTRICAL RISER DIAGRAM
VINCENT A. BERAN CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B
BONIFACIO DRIVE TECHNICAL SERVICES, DPWH
ENGINEER III
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR LIGHTING LAYOUT (WITH COMPUTER
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LABORATORY ROOM - OPTION - 3) CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
GROUND FLOOR POWER LAYOUT (WITH COMPUTER MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-7
BUILDINGS DIVISION
LABORATORY ROOM - OPTION - 3)
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 67
VINCENT A. BERAN OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ELECTRICAL SYMBOLS CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) SCHEDULE OF LOADS MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-8
BUILDINGS DIVISION
SCHEDULE OF LIGHTING FIXTURES AND LAMPS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING ELECTRICAL RISER DIAGRAM CHECKED: SIGNED B 10 67
VINCENT A. BERAN OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR LIGHTING LAYOUT (WITH SCIENCE
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LABORATORY ROOM - OPTION - 4) CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10)
SECOND FLOOR POWER LAYOUT (WITH SCIENCE MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-9
BUILDINGS DIVISION
LABORATORY ROOM - OPTION - 4)
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 67
VINCENT A. BERAN OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ELECTRICAL SYMBOLS CADD: SIGNED
BUREAU OF DESIGN TWO (2) STOREY, TEN (10) SCHEDULE OF LOADS MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E - 10
BUILDINGS DIVISION
SCHEDULE OF LIGHTING FIXTURES AND LAMPS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING ELECTRICAL RISER DIAGRAM CHECKED: SIGNED B 10 67
VINCENT A. BERAN OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR FE AND FHC LAYOUT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR FE AND FHC LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SCHEDULE OF EQUIPMENT EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP - 1
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) MISCELLANEOUS DETAILS
CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
4 67
SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B

ENGINEER III TECHNICAL SERVICES, DPWH


REPUBLIC OF THE PHILIPPINES
DESIGNED: SIGNED
PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR FE AND FHC LAYOUT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR FE AND FHC LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SCHEDULE OF EQUIPMENT EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 2
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) MISCELLANEOUS DETAILS
CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
4 67
SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B

ENGINEER III TECHNICAL SERVICES, DPWH


DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR FE AND FHC LAYOUT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR FE AND FHC LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SCHEDULE OF EQUIPMENT EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 3
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) MISCELLANEOUS DETAILS
CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
4 67
SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B

ENGINEER III TECHNICAL SERVICES, DPWH


DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR FE AND FHC LAYOUT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR FE AND FHC LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SCHEDULE OF EQUIPMENT EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 4
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) MISCELLANEOUS DETAILS
CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
4 67
SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B

ENGINEER III TECHNICAL SERVICES, DPWH


DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR VENTILATION AND CEILING FAN
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SECOND FLOOR VENTILATION AND CEILING FAN EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M- 1
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) LAYOUT
CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
8 67
SCHEDULE OF EQUIPMENT SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MISCELLANEOUS DETAILS CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B

ENGINEER III TECHNICAL SERVICES, DPWH


DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGEND CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR VENTILATION AND CEILING FAN EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M- 2
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) LAYOUT
CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
8 67
SECOND FLOOR VENTILATION AND CEILING FAN SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING LAYOUT CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B

ENGINEER III TECHNICAL SERVICES, DPWH


DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SCHEDULE OF EQUIPMENT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED MISCELLANEOUS DETAILS CADD: SIGNED SIGNED
BUREAU OF DESIGN EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M- 3
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
8 67
SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B

ENGINEER III TECHNICAL SERVICES, DPWH


DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGEND CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR VENTILATION AND CEILING FAN EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M- 4
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) LAYOUT
CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
8 67
SECOND FLOOR VENTILATION AND CEILING FAN SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING LAYOUT CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B
ENGINEER III TECHNICAL SERVICES, DPWH
DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SCHEDULE OF EQUIPMENT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED MISCELLANEOUS DETAILS CADD: SIGNED SIGNED
BUREAU OF DESIGN EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M- 5
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
8 67
SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B

ENGINEER III TECHNICAL SERVICES, DPWH


DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGEND CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR VENTILATION AND CEILING FAN EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M- 6
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) LAYOUT
CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
8 67
SECOND FLOOR VENTILATION AND CEILING FAN SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING LAYOUT CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B

ENGINEER III TECHNICAL SERVICES, DPWH


DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGEND CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR VENTILATION AND CEILING FAN EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M- 7
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) LAYOUT
CHECKED:
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
8 67
SECOND FLOOR VENTILATION AND CEILING FAN SIGNED
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING LAYOUT CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
B

ENGINEER III TECHNICAL SERVICES, DPWH


DESIGNED BY:
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SCHEDULE OF EQUIPMENTS
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ISOMETRIC DIAGRAM OF WATER PUMPING SYSTEM CADD: SIGNED SIGNED
BUREAU OF DESIGN MISCELLANEOUS DETAILS EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
WP - 1
BUILDINGS DIVISION TWO (2) STOREY, TEN (10) JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING
CHECKED: SIGNED B 1 67
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH