You are on page 1of 1

80

50
90
70
50 30 50 30 50 30 50 30 50 30 50
1220MM

WHITE BACKGROUND

50 X 50 HORIZONTAL COCO LUMBER


170
50 30 50 40 60 30 60

REPUBLIC OF THE PHILIPPINES


OFFICE OF THE CITY ENGINEER
.\33BILLBOARD-Billboard\33BILLBOARD-Billboard_4.BMP

OFFICE OF THE DISTRICT ENGINEER


J. ROSALES AVE. BUTUAN CITY DISPLAY AREA
(1220 X 2440 X 12.50MM THK. MARINE PLYWOOD)

40mm 320mm BILLBOARD

2440MM
50 x 50 WOODEN STAKE
50 x 75 VERTICAL COCO LUMBER

1000
%1.14 5*#&' %1/$+0#6+10 (14 6*' ;'..19 $#%-)4170&
%;#0
/#)'06#
;'..19 GROUND LEVEL
;'..19
STANDARD PROJECT BILLBOARD

500
EDGE OF ROAD

Name of Agency TRAFFIC DIRECTION


Business Address
ORIENTATION FRONT ELEVATION (OPTION 2)
SCALE NTS SCALE NTS
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE CITY ENGINEER
.\33BILLBOARD-Billboard\33BILLBOARD-Billboard_3.BMP

OFFICE OF THE DISTRICT ENGINEER


J. ROSALES AVE. BUTUAN CITY

Cost : ______________________ 50 X 50 HORIZONTAL COCO LUMBER


DISPLAY AREA
Location : _______________________________ Fund Source/s : _________________

50 X 50 HORIZONTAL COCO LUMBER


Implementing Agency/ies: : __________________________________ DISPLAY AREA
Development Partner/s : ____________________________________ (12.50MM THK. MARINE PLYWOOD)

Contractor/Supplier : _______________________________________
Brief Description of Project : _________________________________
50 x 75 VERTICAL COCO LUMBER
50 x 50 WOODEN STAKE 50 x 50 WOODEN STAKE
2438

50 x 75 VERTICAL COCO LUMBER

1000

1000
Project Details:
GROUND LEVEL GROUND LEVEL
Project Date Project Status

500

500
Target Date of Percentage of As of Cost Incurred Date Remarks
Duration Started
Completion Completion (Date) to Date Completed

1000
TYPICAL FRAME ELEVATION FRONT ELEVATION (OPTION 1)
SCALE NTS SCALE NTS

For particulars or complaints about this project, please contact the Regional Office or Cluster
which has audit jurisdiction on this project: BILLBOARD FRAME
SCALE NTS

COA Regional Office No.//Cluster: XIII


.\33BILLBOARD-Billboard\33BILLBOARD-Billboard_2.BMP

Address: SOUTH MONTILLA BLVD., BUTUAN CITY


Contact No. :(085) 342-5637 or Text COA Citizen's Desk at 0915-5391857

2438
PROJECT BILLBOARD

COA BILLBOARD
PREPARED BY: SHEET CONTENTS:
PROJECT & LOCATION: CHECKED BY: REVIEWED BY : RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

ALBERT C. ARUJ III REPUBLIC OF THE PHILIPPINES


PROPRIETOR / GEN. MANAGER AS STAKED PLAN FOR THE
CITY GOVERMENT OF BUTUAN
RAMISES CONSTRUCTION CONSTRUCTION OF FOOTBRIDGE, BRGY. MANILA DE BUGABUS OFFICE OF THE CITY ENGINEER M-01
General Engineering General Building J.Rosales Ave., Brgy. Doongan, Butuan City ROCKY JOHN E. MONTENEGRO BOYD JACINTO R. BAHAN ARMANDO A. ABADAY RONNIE VICENTE C.LAGNADA
Project Engineer OIC Chief, Construction Division OIC, City Engineer City Mayor
BRGY. MANILA DE BUGABUS, BUTUAN CITY

You might also like