LEGEND:

ABBR. DESIGNATION

4WSD FOUR WAY SUPPLY DIFFUSER


380x380mm

FOUR WAY RETURN DIFFUSER


380x380mm

EX.G EXHAUST GRILL 230x230mm

SUPPLY LINEAR SLOT DIFFUSER


1200X250

RETURN LINEAR SLOT DIFFUSER


1200x250mm
SUPPLY REGISTER SLOT DIFFUSER
500X250

RETURN REGISTER SLOT DIFFUSER


500x250mm

CASSETTE TYPE

ACCESS PANEL 600x600mm

CEILING TYPES LEGEND

IN1 Stone Wool Insulation faced with Black


Fibre tissue
IN2 Stone Wool & Painted Plasterboard

IN3 Acoustic Insulation to underside of


slab above M2 ceiling
PA1.1-C Surface Paint

PA1.2-C Surface Paint

PA3.1-C Structural Metal Paint

P1 Painted Plasterboard
(Pointing 2003 – RAL 9010 )

P2 Painted Water-Resistant Plasterboard


(Pointing 2003 – RAL 9010 )

P3 Painted Acoustic Plasterboard

P4 Painted Plasterboard

T1.1-C Timber Panels

T2.1-C Acoustic Timber Panels

T3.1-C Acoustic Timber Panels

M1 External Metal Ceiling 1


600*900 MM
M2 Metal Ceiling 2 (Architectural Feature Metal)

M3 Demountable Suspended Metal Ceiling

M4 Aluminium Baffles

M5 External Metal Ceiling 2

Screen Fabric Blind

Screen Fabric + Blackout Blind

‘ Structural elements (Steel beams, trusses etc.)


to ceiling shown indicative in blue colour for
completeness of the ceiling plan, refer to
Structural Engineer
’ s Drawings and
specifications’

Փ ff

Փ ff

⁰ Փ

7400_LUZ
Փ

REFERENCE DRAWINGS
DWG. No. DRAWING TITLE REV DATE
A-RC-01-103-001 HEADQUARTER BUILDING REFLECTED 00 JULY 2022
CEILING PLAN SECOND FLOOR PART 1

A-RC-01-103-002 HEADQUARTER BUILDING REFLECTED 00 JULY 2022


CEILING PLAN SECOND FLOOR PART2

A-RC-01-401TO 406 HEADQUARTER BUILDING 00 JULY 2022


CEILING DETAILS

A-IN-01-103-000 HEADQUARTER BUILDING INTERIOR


00 JULY 2022
PLAN SECOND FLOOR

SECOND FLOOR POWER


DS-A02-E-0024 02
SYSTEM LAYOUT

DS-A02-E-0041 SECOND FLOOR FRONT OF HOUSE 02


LIGHTING CONTROL CIRCUIT PLAN

DS-A02-E-0046 SECOND FLOOR IT - HEADQUARTER


01
SYSTEM LAYOUT

DS-A02-E-0058 SECOND FLOOR INTRUSION ALARM 00


SYSTEM LAYOUT
SECURITY (ACS. INT & CCTV)
E-SC-01-103-000 Headquarter - Second Floor 00
Plan

DS-A02-E-0033 SECOND FLOOR VOICE EVACUATION


00
SYSTEM LAYOUT
MS-A02-E-0018 IP CCTV SYSTEM 00

MS-A02-E-0015 VOICE EVACUATION SYSTEM 00

MS-A02-E-0014 LIGHTING 01

DS-A02-M-0009 SECOND FLOOR SPRINKLERS SYSTEM 02

RFI-A02-A-125-R00 SECOND FLOOR LOWERING CEILING


LEVEL
MS-A02-A-0080 STAINLESS STEEL CEILING M2 00

MS-A02-A-0050 GYPSUM BOARD ASSEMBLIES & 00


ACOUSTICAL SUSPENDED CEILING
MS-A02-A-0022 STONE WOOL (ROCK WOOL) 02
INSULATION
MS-A02-M-0002 AIR OUTLETS AND INLETS 01

SECOND FLOOR AIR OUTLETS AND 01


DS-A02-M-0002
INLETS
DS-A02-E-0068 IP CCTV SYSTEM 00

KEY PLAN:

Marouf Al Rasafi Street

934.38 m

9 DETAIL 06
Marouf Al Rasafi Street
Expansion Joint Composite
Timber Decking
929.98 m

Open Air
Mechanical
Ventilation Riser
Area

Queen Noor Street


Lift 932.78 m
Lift Over-run Stair 1 Riser
Over-run Grass
933.920 m

934.220 m

Grass Mechanical Mechanical


Room Room 929.98 m

1:02
934.020 m
Louvered Ventilation Enclosure
Composite
Timber Decking
Louvered Ventilation Enclosure

934.020 m
932.436 m
930.631 m
933.790 m

Atrium Roof
Enclosure Atrium Roof
Open Air
Not Occupied Atrium Roof Enclosure
Amphitheater Enclosure Composite
Timber Decking

929.98 m
Refer to Landscape
Package Drawings and
Specifications. Louvered Ventilation Enclosure

Headquarter
Composite Building Roof
Garden 929.98 m
Timber Decking
Ventilation Riser
Mechanical Room
Grass

933.92 m

Stair 2
Lift Over-run
PHASE 1
PHASE 1 BRIDGE A

BRIDGE B
PHASE 2
Expansion Joint 932.31 m

PHASE 2
931.22 m

928.82 m
CORNER
934.25 m
BUILDING FLAT
ROOF

934.05 m

932.31 m

Abdullah Bin Umar Street

*All measurements are in millimeter

NOTE:

01 10-10-2023
00 01-10-2023 REVISED & RESUBMIT
REV. DATE NOTE'S CHKD
ISSUE:
INFORMATION
ARCHITECTS:
MIXITY DESIGN LTD.
ARCHITECTURE, INTERIOR DESIGN, MASTER PLANNING

Level 3. Broadway Studios


T: +44(0) 208 741 59 83
20 Hammersmith Broadway
F: +44(0) 208 741 36 60
Hammersmith
http://www.mixity.co.uk
London W6 7AF
United Kingdom

ALL PRODUCTION AND INTELLECTUAL PROPERTY RIGHTS RESERVED COPYRIGHT © MIXITY DESIGN LTD.

LOCAL CONSULTANT:

ENGICON

Ahmad Bin Hanbal St 127, Amman, +962 6 460 2120


Jordan info@engicon.com
CLIENT:

JORDAN AHLI BANK

Queen Noor St, Amman, Jordan T:+9626500777


https://ahli.com

PROJECT MANAGER:

APEC

55 Abdullah Ghosheh Street,


T:+96265866441
2nd Floor, 206 Amman 11195
www.apec.com.jo
Jordan

CONTRACTOR:

MID CONTRACTING COMPANY LLC.


PROJECT:
JORDAN AHLI BANK
HEADQUARTERS
Amman, Jordan
DRAWING DESCRIPTION:

SECOND FLOOR REFLECTED


CEILING LAYOUT
DETAILS
STAGE:
ISSUED FOR CONSTRUCTION

SD-A02-A-0100-REV.01

DRAWN: CHECKED: DATE: SIZE: SCALE:

DETAIL 07 ALAA ALJABER NADEEN HASSAN 10-10-2023 A0 1:100

10 N DRAWING NO: REV:

1:02 SD-A02-A-RCP-F2-02-0004 01