SITE INSTRUCTION
1No,:$¢-8.0001
Prec Tora Ani Wank Wow hendgaarars
lemployer Jordan Ai Bank
Jroeet Construction Rtanagerent (PCM) ‘led Panning & Engineering Corporation
[supervision constant (SC) Engcon|
lausnties Surveying Conant (SC) Nb Acre & Parner (NEA)
contractor Mio Contracting Co.
[sckage: Main Wore FasiageWa. AOE
‘To: The Contractor
Subject: Demolishing Work forBlock Works
You are hereby istrcte as flows:
Ik was noted that the contractor did not adhere to the approved method of statement for
Gdemolshing the external blocc walls, as he used the large hammer instead ofthe electric hammer,
‘causing the demolished mass ofall outside the bulng instead of inside as stipulated Inthe approved
‘method of statement. This wa Is considered unsafe and causes a threat to those around the building
leven witha steel wie mesh,
‘Therefore, based onthe above the contractors required to adhere to the statement method,
Resident Supervision Consultant Eng, drees ALS Date: 16/01/2023
TateRacened By RENE [ZT
Resident Construction Manager Comments nnn ee
avec rome 18SITEINSTRUCTON
No.3 94-0008
Proiec Toran AN Bank New headquarters
lempioyr Jordan ai Bank
project constrction Managemen (PCR) ‘Aled Panning & Engineering Corporation
supervision Constant (5) + Engcon
uenldes Surveying Consular (SC) Nabi Azzam & Partners (NEA)
weacor Mio Contracting.
age: _ Wan Works Padlage Wax AO
To! The Contractor
Subject: Demolishing Work forBlock Works
You are hereby instructed as follows:
Ie was notied that the contactor did not adhere to the approved method of statement for
demolishing the external block wal, 2s he used the lage hammer instead of the electric hammer,
‘causing the demolished mass to fall outside the bulding instead of inside as stipulated inthe approved
method of statement. This way is considered unsafe and causes a threat to those around the builing
‘even wlth a ste! wire mesh
‘Therefore, based on the above the contractors required to adhere tothe statement method.
Resident Supervision Consultant: En, trees ABs Date: 16/01/2023
Date Recehed by RENE Recened by gare
Resdent Construction Manager Comments: _ 7
Resident construction Manager -
me Read by Cartractor Aco Sertire
Te
avec row 18