You are on page 1of 2
smrEmstauction, No. :5C-$.0002 ree Toran Ai Bank ew headquarter ployer Jordan A Bank rec Construction Management (CH) Aled Panning & Engineering Corporation persion Consultan (SC) = Engeon| nies Surveying Coneuitnt (SC): Nah Azra & Partners (NEA). tractor Mo Contracting Co. Package: — Wain Works FaciageNo? AOE To: The Contractor Subject: Demoishing Work for Conerete Slab Youare hereby instructed as Flows: Iwas noted that the contrater dd not adhere tothe method of demolishing the concrete lab, as he used Umberto support the demolished slab instead ofthe I eam, which is unsafe and unacceptable, ‘Based onthe foregoing, the contractor's required to adhere tothe approved method ofthe statement Resident Supervision Consuant: Eng. lrees ALi DateRecevedbyRCM TE /\/ Tata Recehed YS ‘Resident Construction Manage: Comments Suede J 7 7% asset constuction Manage Cole ouetevesivcomneer 174) pom Resmedbr Serta Date: 16/01/2023 Saat iperaeaae frome 7 orden A Banik New hesdauartos lmpioyer Jordan Ai Bank Projet Construction Managemen (PCM) Aled Panning & Engineering Corporation Supervision Consultant (SC) ngcon fauenties Surveying Consultant (asc) Nabth Azra & Partners (MEA) contract MID Contracting Co. [rctage: Main Works Faciagev.t AO ‘To: The Contractor Subject: Demolshing Work for Concrete Slab Youare hereby instructed a fotows twas noted thatthe contractor didnot adhere to the method of demolishing the conerete sab as he ‘used timber to support the demolished slab instead of the | bear, which is unsafe and unacceptable, ‘Based onthe foregoing the cortractor is required to adhere tothe approved method ofthe statement Resident Supervision Consultan: Eng, trees ALB Date: 16fox/2023 Senature ‘ate Received by ROWE Resident Construction Manager Comments Issuedon // Resident Construction Manager pana at are rome

You might also like