You are on page 1of 11
EU SAFETY NOTICE (SN) ‘No. : 9-003 Price ordan ani bank New hesdquaries———————iY lempoyer + Jordon an Bank [project construction management (PCM): Aled Panaing &Englneerlag Corporation Isupervision Consultant(s) Engicon Icontractor MID Contracting co Pedage: Wain wort PachageNont AGE To: The Contractor ‘Subject: Safety Observations Tocation: Aste Tesued by: ng, ldrees A Biss Violation: \With reference tothe above topic and the attached photos, please note the folowing: 1. The absence ofa safety officer an the jab sie. 2. Unsafe scaffolding onsite without tags as attached photos. 3. Thenumber of fre extinguishers at the siteis not enough and doesn’t cover al the areas atthe sit, 4. The Contractor cuts off firefighting pipes with unprotected and untied oxygen cylinders ax attaches photos ‘5. The Contractor shall ensue that allthe contactor staff comply with PPE ae attached photos. 6. Staircases without handrails as attached photos 7. Unsafe electrical connections and dant fallow the safety measurements as attached photos. 8. Unprotected excavations at basement floor and wn protected exposed stel bars without caps as attached photos. 9. Material arrangement missing 28 attached photos, 10. Housekeeping forthe site is requited a attached photos. Resident Supervision Consultant: Eng. drees A-Aiss oe Date: 07/01/2023, Date received by ROM: F/\/ 20> Received by Resident Construction Manager Comments SAFETY NOTICE (W ‘No. :SN-0003 Project 7 Jordan Ani Bank New headquarters employer + Jordan Ahi Bank Jroject construction Management (CM) Alle Planning & Engineering Corporation uperdsion Constant (SC) Engleon Icontractor MID Contacting Co. ackage:_ Main Works Poskage ion! Oz To: TheContractor Subject: Safety Observations Tocation: Asie Tesued by: ng, ldrees Al Biss, Violation: \With reference tothe above topic and the attached phatos, please note the following ‘The absence ofa safety ofeer onthe job site Unsafe scaffolding on site without tags.as attached photos. The number of fire extinguishers atthe site Isnot enough and doesn’t cover all the areas atthe ste The Contractor cuts of firefighting pipes with unprotected and untied exygen cylinders as attached photos ‘The Contractor shall ensure that all the contractor staff comply with PPE as attached photos, ‘Star cases without handrail as attached photos Unsafe electrical connectiors and don't follow the safety measurements as attached photos Unprotected excavations atbasement flaor and un protected exposed stoel bars without caps as attached photos. 9. Material arrangementis mising as attached phatos. 10, Housekeeping forthe site Isrequired as atached photos. Resident Supervision Consultant Eng. Mrees A-Bss en bate: 07/01/2023 7] Date received by ROWE Signature Resident Construction Manager Comments Resident Construction Manager: ate Toke ed Car arEC rome 27 ote Received by Contractor: Received by Signature: contractor Remark: Agree 0 Disagree Date received by RCM Received by Signature Resident Construction Manager Comments: Resident Construction Manager: Date Toe eo Tara Date Received by Sc: Received by: Sonate: ScRemarke Cl Approved ——CIRevise Resubmit ejected Resident Supervision Consultant: Date: ‘Date received by ROM Received by ‘Sianature Resident Construction Manager Comments: Resident Construction Manager ate Tate ey onar ote Received by Contractor: Received by Signture: mslover ‘Superision Consutont avec Fone 27 PUP RU EN AU] Col oes oid Rr) 7 Jam 2023 at 11:05:40 AM Ma'rouf Al-Rasafi Street 45 Amman. Jordan Z Ne CEBU x bdal Eon ie) Iza

You might also like