Tocation: Aste Tesued by: ng, ldrees A Biss
Violation:
\With reference tothe above topic and the attached photos, please note the folowing:
1. The absence ofa safety officer an the jab sie.
2. Unsafe scaffolding onsite without tags as attached photos.
3. Thenumber of fre extinguishers at the siteis not enough and doesn’t cover al the areas atthe sit,
4. The Contractor cuts off firefighting pipes with unprotected and untied oxygen cylinders ax attaches
photos
‘5. The Contractor shall ensue that allthe contactor staff comply with PPE ae attached photos.
6. Staircases without handrails as attached photos
7. Unsafe electrical connections and dant fallow the safety measurements as attached photos.
8. Unprotected excavations at basement floor and wn protected exposed stel bars without caps as
attached photos.
9. Material arrangement missing 28 attached photos,
10. Housekeeping forthe site is requited a attached photos.
Resident Supervision Consultant: Eng. drees A-Aiss oe Date: 07/01/2023,
Date received by ROM: F/\/ 20> Received by
Resident Construction Manager CommentsSAFETY NOTICE (W
‘No. :SN-0003
Project 7 Jordan Ani Bank New headquarters
employer + Jordan Ahi Bank
Jroject construction Management (CM) Alle Planning & Engineering Corporation
uperdsion Constant (SC) Engleon
Icontractor MID Contacting Co.
ackage:_ Main Works Poskage ion! Oz
To: TheContractor
Subject: Safety Observations
Tocation: Asie Tesued by: ng, ldrees Al Biss,
Violation:
\With reference tothe above topic and the attached phatos, please note the following
‘The absence ofa safety ofeer onthe job site
Unsafe scaffolding on site without tags.as attached photos.
The number of fire extinguishers atthe site Isnot enough and doesn’t cover all the areas atthe ste
The Contractor cuts of firefighting pipes with unprotected and untied exygen cylinders as attached
photos
‘The Contractor shall ensure that all the contractor staff comply with PPE as attached photos,
‘Star cases without handrail as attached photos
Unsafe electrical connectiors and don't follow the safety measurements as attached photos
Unprotected excavations atbasement flaor and un protected exposed stoel bars without caps as
attached photos.
9. Material arrangementis mising as attached phatos.
10, Housekeeping forthe site Isrequired as atached photos.
Resident Supervision Consultant Eng. Mrees A-Bss en bate: 07/01/2023
7]
Date received by ROWE Signature
Resident Construction Manager Comments
Resident Construction Manager: ate
Toke ed Car
arEC rome 27ote Received by Contractor: Received by Signature:
contractor Remark: Agree 0 Disagree
Date received by RCM Received by Signature
Resident Construction Manager Comments:
Resident Construction Manager: Date
Toe eo Tara
Date Received by Sc: Received by: Sonate:
ScRemarke Cl Approved ——CIRevise Resubmit ejected
Resident Supervision Consultant: Date:
‘Date received by ROM Received by ‘Sianature
Resident Construction Manager Comments:
Resident Construction Manager ate
Tate ey onar
ote Received by Contractor: Received by Signture:
mslover
‘Superision Consutont
avec Fone 27PUP RU EN AU]
Col oes oid
Rr)7 Jam 2023 at 11:05:40 AM
Ma'rouf Al-Rasafi Street 45
Amman.
JordanZ
Ne CEBU
x bdal
Eon ie)
Iza