You are on page 1of 1

20"

#8@6"C/C
20"

3-SET

20" 5#20

14#20 #8@8"C/C + +
20"

4#20
3-SET
#8
5#20

16" 5#20

14#20 #8@8"C/C + +
24"

4#20
3-SET
#8
5#20

16" 5#25

14#25 #8@8"C/C + +
24"

4#25
3-SET
#8
5#25

20"

14#25 #8@8"C/C + +
20"

3-SET
#8

KEYPLAN:- GENERAL NOTES:- LEGEND :- CONSULTANT:- DRAWN:-


ONLY WRITTEN DIMENSION SHOULD BE FOLLOWED. _ 10"/5" THK.BRICK WORK _ DESIGN:-
PL PLINTH LEVEL
THIS DRAWING SHOULD BE READ IN _
CONJUCTION WITH RELEVANT ARCHITECTURAL _ CONCRETE THK THICKNESS APRO :-
DRAWINGS AND SITE CONDITIONS. _
TYP TYPICAL
ANY DISCREPANCY IN THE DRAWING SHOULD BE BROUGHT _ SAND FILLING #
_
DIAMETER SIGNATURE:-
TO THE KNOWLEDGE OF CONSULTANT _
BEFORE EXECUTION. FFL _ FINISHED FLOOR LEVEL C/C CENTER TO CENTER
_
LOAD HAS BEEN TAKEN FOR (S+4) FLOORS ONLY. _ LVL LEVEL
FGL FINISHED GROUND LEVEL
PILE CAPACITY IS TAKEN AS 25 T.

CLEAR COVER TO MAIN REINFORCEMENT SHALL BE FOR


COLUMN - 40MM, PLINTH BEAM - 50MM, PILE-40mm,
PILE CAP-50mm, BEAM-25mm, SLAB - 20mm .
THE MIX FOR ALL R.C.C. WORK SHALL BE M-20 (1:1.5:3) . PROJECT TITLE:-
ALL THE REINFORCEMENT SHALL BE Fe-500(HYSD BARS) .

MINIMUM DEVELOPMENT LENGTH FOR TOR STEEL SHALL

BE 50d, WHERE "d" IS DIA OF MAIN REINFORCEMENT.


THE LAP SHALL BE STAGGERED AND AVOIDED AT THE
POINT OF MAXIMUM BENDING MOMENT .

ALL DIMENSION & LEVEL ARE IN FEET-INCH.

You might also like