You are on page 1of 21

8 8

7 7

6 6

5 5

VOIP

4 4

Row 2 Row 3 Row 4 Row 5 Row 6 Row 7

HEAVY DUTY RACKING SYSTEM :


78 RACK
624 PALLET

3 3
Medium Rack Area Working Bench / PC Cart
Flooring
Pallet
11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18 19 20
19 20

10 10 (bordes)
Row 1 9 Row 1 9

8 8
VOIP
7 7

6 6
Inventory Room OFFICE AREA 16 STAFF
5 (Operational Branch )
4 Training Labs
Training Room
3

2 1 2
Interview Security
Room Room
Westafel Cooler Chiller Small

Server Room

Island Wood Desk Island Wood Desk


Pantry Sink Cabinet

Meeting Room 1 Meeting Room 2

Lobby

Toilet Toilet Praying


- Osaka Grey - Osaka Grey Room
- Urinoir - Urinoir
- Closet - Closet
- Westafel - Westafel Sofa Bench
- Shower - Shower

1 1

Genset Area

A B C A B C

1st FLOOR LAYOUT 2ND FLOOR LAYOUT


Medium Rack Area Working Bench / PC Cart
Flooring
Pallet
11 12 13 14 15 16 17 18
19 20

10
9

6
Inventory Room
5 (Operational Branch )
4 Training Labs
Training Room
3

Interview Security
Room Room
Westafel Cooler Chiller Small

Island Wood Desk Island Wood Desk


Pantry Sink Cabinet

Lobby

Toilet Toilet Praying


- Osaka Grey - Osaka Grey Room
- Urinoir - Urinoir
- Closet - Closet
- Westafel - Westafel Sofa Bench
- Shower - Shower

1st FLOOR FURNITURE


11 12 13 14 15 16 17 18 19 20

10 (bordes)

8
VOIP
7

6
OFFICE AREA 16 STAFF

Server Room

Meeting Room 1 Meeting Room 2

2nd FLOOR FURNITURE


11 12 13 14 15 16 17 18 19 20

10 (bordes)

8
VOIP
7

6
OFFICE AREA 16 STAFF

Server Room

Meeting Room 1 Meeting Room 2

2nd FLOOR FURNITURE


8 8

7 7

6 6

5 5

VOIP

4 4

3 3

11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18 19 20
19 20

10 10 (bordes)

9 9

8 8
VOIP
7 7

6 6

2 1 2

1 1

A B C A B C

1st FLOOR STRUKTUR 2ND FLOOR STRUKTUR


LT. 2

LT. I

DETAIL STRUKTUR
6.30
6.30

3.50

0.0

TAMPAK SAMPING STRUKTUR


3.50 Lantai 2 3.5 Lantai 2
20 20
19 19
18 18
17 17
16 16
15 15
14 14
13 13
12 12
11 11
10 10
9 Tinggi Anak Tangga 17.5 cm
9
8 Lebar Pijakan tangga 30 cm 8
7 Lebar Tangga 120 cm 7
6 6
5 5
4 4
3 3
2 2
1 0.0 Lantai Dasar 1 0.0 Lantai Dasar

Tampak Depan Tampak Samping

11 12 13 14 15 16 17 18 19 20

10 (bordes)

Tampak Atas

DETAIL TANGGA
Partisi Tembok

8 8 Partisi full Kaca

Partisi Gypsum

BRC

7 7

6 6

5 5

VOIP

4 4

3 3
Medium Rack

11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18 19 20
19 20

10 10 (bordes)

9 9

8 8
VOIP
7 Inventory Room 7

6 Training Labs 6
OFFICE AREA
Training Room
5

2 1 2
Interview Security
Room Room
Server Room

Meeting Room 1 Meeting Room 2

Lobby

Praying
Toilet Toilet
Room

1 1

Genset Area

A B C A B C

1st FLOOR LAYOUT 2ND FLOOR LAYOUT


8 8

7 7

6 6

5 5

VOIP

4 4

3 3
W.4 W.4
W.5

11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18 19 20
19 20
D.1

10 10 (bordes)

9 9

8 8 W.4
VOIP
7 W.6 7

6 6

4
D.1
3

2 1 2
D.1 D.1 D.1
D.1 D.1 W.4
W.1 W.4

W.3 W.2 W.1

D.1 D.1

D.1

D.2 D.2 D.1

W.4 W.4

1 1

Genset Area

A B C A B C

1st FLOOR DOOR - WINDOW 2ND FLOOR DOOR - WINDOW


W.1 W.2 W.3 W.4
Code : W - 1 Window Code : W - 4 Window
Code : W - 2 Window Code : W - 3 Window
Detail : uk. 1 x 1.5 m, Tebal 8mm , Alu. 4cm Hitam Detail : uk. 2 x 1.5 m, Tebal 8mm , Alu. 4cm Hitam
Detail : uk. 1.2 x 1.5 m, Tebal 8mm , Alu. 4cm Hitam Detail : uk. 1.5 x 1.5 m, Tebal 8mm , Alu. 4cm Hitam
Jumlah : 2 Unit Jumlah : 7 Unit
Jumlah : 1 Unit Jumlah : 1 Unit
Posisi : Posisi :
Posisi : Posisi :
1. Ruang Security 1. Lobby
1. Ruang Security (sisi selatan) 1. Ruang Interview (sisi selatan)
2. Area Pantry 2. Server Room
3. Meeting Room 2
4. Area office x4

W.5 W.6 D.1 D.2

Code : W - 5 Window Code : W - 6 Window


Code : D - 1 Glass Door Code : D - 2 PVC Door
Detail : uk. 2.5 x 1.5 m, Tebal 8mm , Alu. 4cm Hitam Detail : uk. 3 x 1.5 m, Tebal 8mm , Alu. 4cm Hitam
Detail : uk. 2.1 x 1 m, Tebal 10mm , Alu. 4cm Hitam Detail : uk. 2.1 x 0.7 m,
Jumlah : 1 Unit Jumlah : 1 Unit
Jumlah : 11 Unit Jumlah : 2 Unit
Posisi : Posisi :
Posisi : Posisi :
1. Training Room (sisi utara) 1. Training Room (sisi barat)
1. Lobby - Lounge 7. Inventory Room 1. Toilet x2
2. Security room 8. Server Room
3. Training class 9. Office Room (tangga)
4. Training labs 10. Meeting Room 1
5. Interview room 11. Meeting Room 2
6. Praying room

1st FLOOR DOOR - WINDOW 2ND FLOOR DOOR - WINDOW


Full Kaca Area Lobby Full Kaca Interview Room Full Kaca Training Class Full Kaca Training Labs Full Kaca PartisiTraining Labs - Training Room

Full Kaca Inventory Room Full Kaca Praying Room

1st FLOOR DOOR - WINDOW 2ND FLOOR DOOR - WINDOW


8 8

7 7

6 6

5 5

VOIP

4 4

3 3

11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18 19 20
19 20

10 10 (bordes)

9 9

8 8
VOIP
7 7

6 6

4
LAMPU HIGH BAY
3
LAMPU GATE IN & OUT

2 LAMPU FACADE & NEON BOX

2 1 2

1 1

Genset Area

A B C A B C

1st FLOOR LAYOUT 2ND FLOOR LAYOUT


8 8

7 7

6 6

5 5

VOIP

4 4

Row 2 Row 3 Row 4 Row 5 Row 6 Row 7

HEAVY DUTY RACKING SYSTEM :


78 RACK
624 PALLET

3 3

11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18 19 20
19 20

10 10 (bordes)
Row 1 9 Row 1 9

8 8
VOIP
7 7

6 6

2 1 2

1 1

A B C A B C
1st FLOOR LAYOUT 2ND FLOOR LAYOUT
FRONT VIEW

5.00

3.15

2.00

0.00

SIDE VIEW
8 8

7 7

6 6

5 5

VOIP

4 4
Grey Epoxy Grey Epoxy Grey Epoxy
Row 2 Row 3 Row 4
62 sqm 68.5 sqm 62 sqm

Blue Epoxy
556 sqm

3 3

Grey Epoxy 11 12 13 14 15 16 17 18
Grey Epoxy 11 12 13 14 15 16 17 18 19 20
Row 1 19 20
Row 5
44 sqm 44 sqm
10 10 (bordes)

9 9

8 8
VOIP
7 7

6 6

2 1 2

Vynil Vynil 99 m2
110.95m2

1 1

Genset Area

A B C A B C

1st FLOOR PLAN 2ND FLOOR PLAN


8

Ventilator Ventilator
Turbin Turbin

Ventilator Ventilator
Turbin Turbin

Ventilator Ventilator
Turbin Turbin

A B C
ROOF LAYOUT
BACKSIDE VIEW
RIGHT SIDE VIEW
LEFT SIDE VIEW
ROOF LAYOUT

You might also like