FIRST FLOOR LAYOUT PLAN FIRST FLOOR SLAB - REINFORCING DETAILING PLAN

Slab depth=10cm Sc. 1:50 Sc. 1:50

SC1 SC2
40x50 40x50

10
C C1 - 30x30

50

30

30
9 Rep. top

10
7

3
2Ø6 L=4.3m
7 3

1
8
6

205

8
8
8
9 Rep. top

55
G2 - 30x80
G2 - 30x80
2Ø6 L=4.3m
Bar schedule - First floor slab

20
G1- 20x40
9 Rep. top Length Lengths per bar size

55
Structural

4
7
2Ø6 L=4.3m 7 3
Bar Mark Bar Size Total Bars of bar
Member B500
(mm) (m) 6 mm 8 mm

8
8
210
6

8
8
8
1 8 224 2.45 548.80
40 9 Rep. top
2 6 224 6.90 1545.60

FIRST FLOOR SLAB


30 2Ø6 L=4.3m
3 6 460 0.75 345.00
920

870

20
G1- 20x40
5 30 5 7 9 Rep. top

5
2Ø6 L=4.3m 7
4 8 224 1.40 313.60
3

10
5 6 560 1.40 784.00

35
8
6 6 320 4.50 1440.00

8
6

210

8
8
35

8
7 8 240 1.30 312.00

2
9 Rep. top
30 430 30 430 15 2Ø6 L=4.3m 8 6 128 2.10 268.80
9 6 128 4.30 550.40

20
G1- 20x40
9 Rep. top

5
7
2Ø6 L=4.3m 7
3
Total length per bar size [m] 4933.00 1174.40
Steel weight per meter [Kg] 0.222 0.395

8
210
6
Total weight per bar size [Kg] 1096.00 464.00

8
8
8
60
50 9 Rep. top
TOTAL MASS [Kg] 1560
15

2Ø6 L=4.3m

B
20

20
50

G3 - 20x60

5
1890

9 Rep. top
15

7 2Ø6 L=4.3m 7 3
210

8
6

8
8
8
m
9 Rep. top

L=6.90m
2Ø6 L=4.3m
G1- 20x40
20
G2 - 30x80

G2 - 30x80

9 Rep. top
Materials:

5
7

Ø6/160
2Ø6 L=4.3m 7
3
G1 - Beam CONCRETE: C16/20
G2 - Girder
8

70
210

8
STEEL: B500

8
G3 - Inner longitudinal beam

8
80

2
C1 - Tie Beam

5 Ø6/160 L=1.40m
9 Rep. top

55
2Ø6 L=4.3m
Structural Class: S4
870
920

20

G1- 20x40
9 Rep. top
7 2Ø6 L=4.3m
55
7
Cover to reinforcement: Cnom=20mm
Ø6/250
3 L=0.75m Max. aggregate size: Dg=16mm
2Ø6 L=2.10

8 2Ø6 L=2.10

2Ø6 L=2.10

2Ø6 L=2.10

2Ø6 L=2.10
8 Rep. top

Rep. top

8 Rep. top

Rep. top
6
210

8 Rep. top
8
4 Ø8/160 L=1.40m

9 Rep. top
55

2Ø6 L=4.3m
20

G1- 20x40
45 45
9 Rep. top
55

7 Ø8/250 L=1.3m 2Ø6 L=4.3m 7 Ø8/250 L=1.3m


Ø6/250
2Ø6 L=2.10

8 2Ø6 L=2.10

1 Ø8/160 L=2.45m

2Ø6 L=2.10

8 2Ø6 L=2.10
3 L=0.75m
8 Rep. top

Rep. top

8 Rep. top

Rep. top

6 Ø6/250 L=4.5m

2Ø6 L=2.10
205

3 Ø6/160 L=0.75m

Rep. top
9 Rep. top

8
46
10

2Ø6 L=4.3m

A C1 - 30x30
50

30

30
10

40 420 40 420 40 420 40 420 40

460 460 460 460 Client: PHASE


FACULTY OF CONSTRUCITONS DEPARTMENT OF CONCRETE STRUCTURES THD.
1880
Scale Project: NO.
1:50 WAREHOUSE BUILDING-CENTRAL WING PLAN
Designed Mihai Andrei-Alexandru

1 2 3 4 5 Drawn Mihai Andrei-Alexandru


2017
LAYOUT DETAILS AND REINFORCEMENT
FIRST FLOOR SLAB R01
Checked