02 March 2016
CONTENTS

I INTRODUCTION: OVERVIEW

II TILES: TYPES, GRADES, TESTING, DIMENSIONS, MARKINGS

III PREINSTALLATION: CHECKLIST, TOOLS, MATERIALS

IV INSTALLATION: STEP BY STEP, PATTERNS

V POST INSTALLATION: CHECKLIST, COMMON PROBLEMS

VI BEST PRACTICE: TILE SETTER, SAFETY, QUALITY

VII

TILING WORKS
INTRODUCTION

INOCENCIO, KING ALDOUS


02 March 2016
I. INTRODUCTION
OVERVIEW

TILING WORKS
TILES

INOCENCIO, KING ALDOUS


02 March 2016
II. THE TILE
TILES

o A manufactured piece of hard-wearing material such


as ceramic, stone, metal, or even glass

o Often used to form wall and floor coverings

o Tiles are most often made of ceramic, typically glazed for


internal uses and unglazed for roofing

TILING WORKS
II. THE TILE
TILES: DIFFERENT TYPES
o Ceramic Tiles o Natural Stone
-Glazed Tiles
-Unglazed -Granite
o Porcelain Tiles -Slate
o Mosaic Tiles -Travertine
-Marble
-Onyx
-Sandstone
TILING WORKS
II. THE TILE
TILES: DIFFERENT TYPES
Ceramic Tiles

Glazed Unglazed

TILING WORKS
II. THE TILE
TILES: DIFFERENT TYPES
Porcelain

TILING WORKS
II. THE TILE
TILES: DIFFERENT TYPES
Mosaic

TILING WORKS
II. THE TILE
ORDERING AND BUYING
o Environment of the area to be tiled
o The use which the tiles will be put to
o Design Considerations
o Tile Dimension
o Quantity
o Percentage of extra tile
o Tile Grade

TILING WORKS
II. THE TILE
DIMENSION

TILING WORKS
II. THE TILE
DIMENSION

TILING WORKS
II. THE TILE
DIMENSION

TILING WORKS
II. THE TILE
QUANTITY
• Depends on the dimension of the floor and wall lay
out
• The size and shape of area to be tiled

TILING WORKS
II. THE TILE
PERCENTAGE OF EXTRA TILE
• 10 % for Regular tile
• 15% Diagonal tile

TILING WORKS
II. THE TILE
TILE GRADE
• Grade 1 • Grade 4
– No foot traffic. Weakest – Moderate to Heavy Traffic
– of all standard grade tile. • Grade 5
• Grade 2 – Heavy Traffic to extra
– Light Traffic heavy traffic
• Grade 3
– Light to moderate traffic

TILING WORKS
II. THE TILE
MARKING
• Trademark of Manufacturer
• Manufacturer,usage(text or symbol) grade
• Nominal(Length,width and thickness)
• Address of the Manufacturer
• The words “Made in Philippines” or country of origin
must be specified in the packaging

TILING WORKS
II. THE TILE
NON DESTRUCTIVE TEST
I Visual Inspection for II Dimensions
structural defects and -Measurement of size
surface quality (length and width)
-Surface defects ( Floor and -Measurement of wedging
Wall Tiles) -Measurement of Thickness
-Color Shade -Measurement of Flatness

TILING WORKS
II. THE TILE
DESTRUCTIVE TEST
• Water Absorption - ( PNS ISO 10545-3)
• Modulus Rupture - ( PNS ISO 10545-4)
• Crazing resistance - ( PNS ISO 10545-11)
• Thermal Shock Resistance - ( PNS ISO 10545-9)
• Abrasion Test
• Glazed - ( PNS ISO 10545-6)
• Unglazed- ( PNS ISO 10545-7)

TILING WORKS
II. THE TILE
DESTRUCTIVE TEST
• Water Absorption - ( PNS ISO 10545-3)
• Modulus Rupture - ( PNS ISO 10545-4)
• Crazing resistance - ( PNS ISO 10545-11)
• Thermal Shock Resistance - ( PNS ISO 10545-9)
• Abrasion Test
• Glazed - ( PNS ISO 10545-6)
• Unglazed- ( PNS ISO 10545-7)

TILING WORKS
PREINSTALLATION

SANCHEZ, JUSTIN
02 March 2016
III. PREINSTALLATION
CHECKLIST
A. Approved “ For Construction” Plan/ Drawing
1. Unit Layout, Hallway/Atrium and Balcony Layout
2. T&B Details/Layout Reflecting
Tile Setting Point
3. Floor Finish Elevation
B. Approved Materials
4. Brand and model of Tiles (Uniform shade, grain of vinyl)
5. Tile adhesive
6. Washout (Approved mixture, color and size)
7. Approved mixture of adhesive-cement ratio (2:1)
TILING WORKS
III. PREINSTALLATION
CHECKLIST
C. Civil Works Requirements
8. Surface free from laitance
9. Floor elevations
10. Plastering
11. Doors and Windows
12. Dry wall tracks / studs installed
13. Rubcon complete
14. Railings on hallway / balcony

TILING WORKS
III. PREINSTALLATION
CHECKLIST

D. MEPF Requirements
16. Balcony riser stub-outs installed
17. Trench drain along hallways installed
18. Tested Fire protection
19. Floor Outlet Location

TILING WORKS
III. PREINSTALLATION
MATERIALS
o Tiles o Cement board screws
o Thin-set mortar o Grout
o Cement backer board o Sealer

TILING WORKS
III. PREINSTALLATION
TOOLS
o Level o Rubber float
o Tape measure o Grout sponge
o Pencil o Tile Spacers
o Speed square
o Notched trowel

TILING WORKS
III. PREINSTALLATION
TOOLS
o Power drill o Safety glasses and earplugs
o Mixing paddle o Scoring cutter or wet saw
o Buckets o Handsaw or jamb saw
o Kneepads

TILING WORKS
INSTALLATION

SANCHEZ, JUSTIN
02 March 2016
IV. INSTALLATION
STEP BY STEP
1. Measuring floor or wall 7. Finishing wall edges
2. Purchasing tiles 8. Applying grout
3. Surface preparation 9. Sealing grout
4. Layout
5. Laying tile
6. Cutting tiles

TILING WORKS
IV. INSTALLATION
STEP BY STEP

TILING WORKS
IV. INSTALLATION
PATTERNS
o Straight lay
o Diagonal
o Running bond

TILING WORKS
IV. INSTALLATION
PATTERNS
o Checkerboard
o Diagonal with dots
o Pinwheels

TILING WORKS
IV. INSTALLATION
PATTERNS
o Basket weave
o Modular
o Herringbone

TILING WORKS
IV. INSTALLATION
PATTERNS
o Windmills

TILING WORKS
POST INSTALLATION

GO, VERNES RITCHMAN JOREL


02 March 2016
V. POST INSTALLATION
CHECKLIST
Correct slope to drain
Checking of all pipes and declogging conducted
“KAPAK” and chipped edges
Squareness, levelness and alignment
Check for blindspots and continuity for
washouts
Tile Spacing

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
1. LOOSENED TILE
CAUSE
- Insufficient coverage of adhesive
- Thermal and moisture expansion of the
slab
- Shrinking of the concrete
- Seismic shifts, settling, heavy winds,
material changes
TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
2. CRACKED TILE AND GROUT
CAUSE
- Movement of substrate
- Concrete slab cracks
- Improper installation of underlayment
- Excess deflection of substrate

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
-visual results such as grout work, tile spacing,
layout, cutting, lippage

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
INCONSISTENT GROUT LINES

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
INCORRECT SUBSTRATE

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
INSUFFICIENT ADHESIVE

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
ONE INCH GROUT LINE

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
ONE INCH GROUT LINE

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
SLOPPY TILE PLACEMENT

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
UNDERCUT TILE

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
FLAWED GROUT

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
WATER LEAKAGE

TILING WORKS
V. POST INSTALLATION
COMMON PROBLEMS
CAUSED BY POOR WORKMANSHIP
UNCHECKED MEPF

TILING WORKS
BEST PRACTICES
A STEP-BY-STEP GUIDE TO
CREATING THE PERFECT TILED
FLOOR

DE TORRES, KERWIN
02 March 2016
VI. BEST PRACTICE
THINGS TO CHECK

o Materials
o Worker
o Space and Location
o Cost
o Time
o Safety

TILING WORKS
VI. BEST PRACTICE
TILE SETTLER

o Precision
o Good in measuring
o Good visuals
o Physical fit
o Good understanding of
artistic balance and color

TILING WORKS
VI. BEST PRACTICES
MATERIALS
o Wall tile vs floor tile
o Adhesive
o Grout
o Tile file

TILING WORKS
VI. BEST PRACTICES
MATERIALS
o Tile spacer 3-5mm
o Tile cutter
o Tile calculation

TILING WORKS
VI. BEST PRACTICES
MATERIALS

TILING WORKS
VI. BEST PRACTICES
MATERIALS

TILING WORKS
VI. BEST PRACTICES
SAFETY
o Knee pads
o Dust mask
o Safety goggles or glasses

TILING WORKS
VI. BEST PRACTICES
PREPARE THE SUBSTRATE

On Concrete
o TSP (tri-sodium phosphate)
o Level
o Cured
o Dust free

TILING WORKS
VI. BEST PRACTICES
PREPARE THE SUBSTRATE

Tile to tile
o Clean
o Not loose
o Flat surface
o primer

TILING WORKS
VI. BEST PRACTICES

1 Use of base board 5 Tile gaps

2 Use of ledger

3 Clean right away

4 Cut outlet holes

TILING WORKS
VI. BEST PRACTICES
OTHER TIPS
• Use a rubber sandal cut
• Grout should fill up the gaps until just
below the tile surface.
• Protect the grouted areas
• When using two-toned wall patterns,
the darker color is used in the lower
portion with the lighter color on top.
• non glossy tiles for wet areas
TILING WORKS
VI. BEST PRACTICES
OTHER TIPS
• non glossy tiles for wet areas

TILING WORKS
END OF PRESENTATION