EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS

PROJECT No. 3963 -( Rev-3)


Progress S- Curves

Months 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

30/Mar/17

04/May/17

11/May/17

18/May/17

25/May/17

03/Aug/17

10/Aug/17

17/Aug/17

24/Aug/17

31/Aug/17

07/Sep/17

14/Sep/17

21/Sep/17

28/Sep/17

02/Nov/17

09/Nov/17

16/Nov/17

23/Nov/17

30/Nov/17

07/Dec/17

14/Dec/17

21/Dec/17

28/Dec/17

01/Feb/18

08/Feb/18

15/Feb/18

22/Feb/18

01/Mar/18

08/Mar/18

15/Mar/18

22/Mar/18

29/Mar/18

03/May/18

10/May/18

17/May/18

24/May/18

31/May/18

02/Aug/18

09/Aug/18

16/Aug/18

23/Aug/18

30/Aug/18

06/Sep/18

13/Sep/18

20/Sep/18

27/Sep/18

01/Nov/18

08/Nov/18

15/Nov/18

22/Nov/18

29/Nov/18

06/Dec/18

13/Dec/18

20/Dec/18

27/Dec/18

07/Feb/19

14/Feb/19

21/Feb/19

28/Feb/19

07/Mar/19

14/Mar/19

21/Mar/19

28/Mar/19

02/May/19

09/May/19

16/May/19

23/May/19

30/May/19

01/Aug/19

08/Aug/19
06/Apr/17

13/Apr/17

20/Apr/17

27/Apr/17

01/Jun/17

08/Jun/17

15/Jun/17

22/Jun/17

29/Jun/17

05/Oct/17

12/Oct/17

19/Oct/17

26/Oct/17

05/Apr/18

12/Apr/18

19/Apr/18

26/Apr/18

07/Jun/18

14/Jun/18

21/Jun/18

28/Jun/18

04/Oct/18

11/Oct/18

18/Oct/18

25/Oct/18

04/Apr/19

11/Apr/19

18/Apr/19

25/Apr/19

06/Jun/19

13/Jun/19

20/Jun/19

27/Jun/19
16-Mar-17

23-Mar-17

06/Jul/17

13/Jul/17

20/Jul/17

27/Jul/17

04/Jan/18

11/Jan/18

18/Jan/18

25/Jan/18

05/Jul/18

12/Jul/18

19/Jul/18

26/Jul/18

03/Jan/19

10/Jan/19

17/Jan/19

24/Jan/19

31/Jan/19

04/Jul/19

11/Jul/19

18/Jul/19

25/Jul/19
WTG %

2-Mar-17

9-Mar-17
B/LEngg. Cum Plan P 0.00% 0.02% 0.23% 0.32% 1.26% 1.54% 2.19% 3.24% 3.83% 6.02% 8.76% 11.85% 14.09% 16.84% 21.34% 25.47% 28.01% 32.04% 37.29% 40.90% 45.35% 50.32% 54.68% 59.37% 63.43% 68.01% 74.60% 80.23% 87.64% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% E
3.98%
B/L Engg. Cum Act. A 0.00% 0.00% 0.13% 0.58% 1.38% 2.08% 2.88% 3.50% 4.35% 6.11% 8.60% 10.45% 12.54% 14.37% 15.65% 17.55% 19.83% 20.25% 21.99% 23.32% 27.38% 29.45% 33.20% 35.25% 36.74% 38.42% 39.66% 40.04% 41.09% 43.39% 46.18% 48.78% 51.54% 53.98% 56.87% 59.09% 60.99% 63.65% 65.49% 67.61% 69.05% 70.05% 71.83% 72.47% 73.44% 75.14% 76.32% 79.03% 80.89% 82.34% 83.08% 87.29% 88.38% 88.82% 89.52% 90.90% 91.01% 91.80% 92.05% 92.32% 92.47% 92.64% 92.84% 93.34% 93.34% 93.70% 93.70% 93.76% 93.76% 93.84% 93.84% 93.92% 93.92% 94.12% 94.12% 94.15% 94.15% 94.15% 94.17% 94.36% 94.48% 94.53% 94.58% 94.58% 94.64% 94.64% 94.64% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

2-Mar-17 ### 4281000.00% 4281700.00% 4282400.00% 4283100.00% 4283800.00% 4284500.00% 4285200.00% 4285900.00% 4286600.00% 4287300.00% 4288000.00% 4288700.00% 4289400.00% 4290100.00% 4290800.00% 4291500.00% 4292200.00% 4292900.00% 4293600.00% 4294300.00% 4295000.00% 4295700.00% 4296400.00% 4297100.00% 4297800.00% 4298500.00% 4299200.00% 4299900.00% 4300600.00% 4301300.00% 4302000.00% 4302700.00% 4303400.00% 4304100.00% 4304800.00% 4305500.00% 4306200.00% 4306900.00% 4307600.00% 4308300.00% 4309000.00% 4309700.00% 4310400.00% 4311100.00% 4311800.00% 4312500.00% 4313200.00% 4313900.00% 4314600.00% 4315300.00% 4316000.00% 4316700.00% 4317400.00% 4318100.00% 4318800.00% 4319500.00% 4320200.00% 4320900.00% 4321600.00% 4322300.00% 4323000.00% 4323700.00% 4324400.00% 4325100.00% 4325800.00% 4326500.00% 4327200.00% 4327900.00% 4328600.00% 4329300.00% 4330000.00% 4330700.00% 4331400.00% 4332100.00% 4332800.00% 4333500.00% 4334200.00% 4334900.00% 4335600.00% 4336300.00% 4337000.00% 4337700.00% 4338400.00% 4339100.00% 4339800.00% 4340500.00% 4341200.00% 4341900.00% 4342600.00% 4343300.00% 4344000.00% 4344700.00% 4345400.00% 4346100.00% 4346800.00% 4347500.00% 4348200.00% 4348900.00% 4349600.00% 4350300.00% 4351000.00% 4351700.00% 4352400.00%

B/L Proc. Cum Plan P 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.15% 0.23% 0.23% 0.23% 0.31% 1.67% 1.67% 2.41% 2.41% 4.15% 4.15% 6.32% 6.47% 6.90% 8.81% 8.81% 8.92% 11.51% 12.04% 12.56% 13.27% 14.44% 16.60% 16.72% 17.49% 18.80% 20.94% 21.60% 25.88% 26.26% 26.91% 30.09% 30.41% 32.29% 37.07% 38.83% 40.73% 42.74% 43.96% 47.34% 47.54% 50.80% 51.63% 54.82% 55.79% 56.87% 59.60% 60.97% 64.16% 64.37% 68.58% 74.83% 78.23% 82.56% 82.56% 85.56% 91.82% 91.82% 91.82% 91.82% 91.82% 91.82% 91.82% 91.82% 94.55% 95.91% 95.91% 97.96% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% P
65.02%
B/L Proc. Cum Act. A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.32% 0.39% 0.39% 0.39% 1.08% 1.15% 1.83% 2.65% 2.65% 2.81% 2.98% 3.06% 4.54% 7.62% 8.95% 9.41% 9.66% 9.66% 9.96% 10.64% 10.80% 10.96% 10.96% 10.96% 10.96% 12.68% 13.91% 13.91% 14.24% 14.34% 14.57% 14.57% 14.82% 17.78% 20.34% 21.04% 23.22% 27.07% 27.23% 28.31% 28.85% 29.51% 30.08% 30.15% 34.96% 35.31% 35.52% 36.39% 36.49% 36.49% 36.49% 37.32% 37.59% 41.03% 45.19% 48.25% 49.62% 51.25% 55.34% 55.34% 56.27% 59.14% 62.95% 65.42% 65.73% 65.73% 65.73% 66.29% 66.83% 72.79% 74.21% 80.36% 82.74% 85.20% 89.55% 89.55% 89.55% 89.55% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

### ### 4281000.00% 4281700.00% 4282400.00% 4283100.00% 4283800.00% 4284500.00% 4285200.00% 4285900.00% 4286600.00% 4287300.00% 4288000.00% 4288700.00% 4289400.00% 4290100.00% 4290800.00% 4291500.00% 4292200.00% 4292900.00% 4293600.00% 4294300.00% 4295000.00% 4295700.00% 4296400.00% 4297100.00% 4297800.00% 4298500.00% 4299200.00% 4299900.00% 4300600.00% 4301300.00% 4302000.00% 4302700.00% 4303400.00% 4304100.00% 4304800.00% 4305500.00% 4306200.00% 4306900.00% 4307600.00% 4308300.00% 4309000.00% 4309700.00% 4310400.00% 4311100.00% 4311800.00% 4312500.00% 4313200.00% 4313900.00% 4314600.00% 4315300.00% 4316000.00% 4316700.00% 4317400.00% 4318100.00% 4318800.00% 4319500.00% 4320200.00% 4320900.00% 4321600.00% 4322300.00% 4323000.00% 4323700.00% 4324400.00% 4325100.00% 4325800.00% 4326500.00% 4327200.00% 4327900.00% 4328600.00% 4329300.00% 4330000.00% 4330700.00% 4331400.00% 4332100.00% 4332800.00% 4333500.00% 4334200.00% 4334900.00% 4335600.00% 4336300.00% 4337000.00% 4337700.00% 4338400.00% 4339100.00% 4339800.00% 4340500.00% 4341200.00% 4341900.00% 4342600.00% 4343300.00% 4344000.00% 4344700.00% 4345400.00% 4346100.00% 4346800.00% 4347500.00% 4348200.00% 4348900.00% 4349600.00% 4350300.00% 4351000.00% 4351700.00% 4352400.00%

B/L Const. Cum Plan P 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.05% 0.22% 0.39% 0.59% 1.07% 1.74% 1.95% 2.21% 2.51% 2.79% 3.30% 4.11% 4.32% 4.53% 4.91% 5.65% 6.58% 8.11% 9.92% 11.30% 12.50% 13.41% 14.88% 17.14% 18.59% 19.54% 21.01% 22.54% 23.84% 24.86% 26.43% 27.67% 28.88% 30.12% 31.97% 33.72% 35.48% 37.05% 38.37% 40.22% 42.78% 44.87% 46.68% 48.88% 50.47% 51.67% 53.36% 55.09% 58.15% 60.08% 62.64% 66.90% 70.76% 73.97% 76.11% 79.96% 82.78% 86.57% 89.38% 91.17% 93.38% 96.04% 98.34% 99.22% 99.77% 99.94% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% C
WEEKLY CUMM.

21.00%
BASELINE

B/L Const. Cum Act. A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.04% 0.09% 0.47% 0.84% 0.93% 1.00% 1.08% 1.09% 1.60% 1.73% 1.78% 1.85% 1.99% 2.14% 2.72% 3.28% 3.55% 4.40% 4.57% 4.78% 4.91% 5.10% 5.28% 5.53% 6.22% 7.56% 8.39% 8.91% 9.33% 9.75% 10.38% 11.14% 11.94% 11.94% 13.46% 14.80% 16.16% 16.90% 18.49% 20.94% 22.08% 22.71% 23.17% 24.05% 24.94% 24.96% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

### ### 4281000.00% 4281700.00% 4282400.00% 4283100.00% 4283800.00% 4284500.00% 4285200.00% 4285900.00% 4286600.00% 4287300.00% 4288000.00% 4288700.00% 4289400.00% 4290100.00% 4290800.00% 4291500.00% 4292200.00% 4292900.00% 4293600.00% 4294300.00% 4295000.00% 4295700.00% 4296400.00% 4297100.00% 4297800.00% 4298500.00% 4299200.00% 4299900.00% 4300600.00% 4301300.00% 4302000.00% 4302700.00% 4303400.00% 4304100.00% 4304800.00% 4305500.00% 4306200.00% 4306900.00% 4307600.00% 4308300.00% 4309000.00% 4309700.00% 4310400.00% 4311100.00% 4311800.00% 4312500.00% 4313200.00% 4313900.00% 4314600.00% 4315300.00% 4316000.00% 4316700.00% 4317400.00% 4318100.00% 4318800.00% 4319500.00% 4320200.00% 4320900.00% 4321600.00% 4322300.00% 4323000.00% 4323700.00% 4324400.00% 4325100.00% 4325800.00% 4326500.00% 4327200.00% 4327900.00% 4328600.00% 4329300.00% 4330000.00% 4330700.00% 4331400.00% 4332100.00% 4332800.00% 4333500.00% 4334200.00% 4334900.00% 4335600.00% 4336300.00% 4337000.00% 4337700.00% 4338400.00% 4339100.00% 4339800.00% 4340500.00% 4341200.00% 4341900.00% 4342600.00% 4343300.00% 4344000.00% 4344700.00% 4345400.00% 4346100.00% 4346800.00% 4347500.00% 4348200.00% 4348900.00% 4349600.00% 4350300.00% 4351000.00% 4351700.00% 4352400.00%

B/L Pre-Comm. Cum Plan P 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.05% 0.19% 0.19% 1.30% 4.45% 6.68% 17.34% 23.87% 30.87% 37.22% 44.24% 55.66% 64.76% 73.46% 81.01% 87.25% 96.05% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% PC
8.00%
B/L Pre-Comm. Cum Actua A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.17% 0.17% 0.17% 0.17% 0.17% 0.21% 0.30% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

### ### 4281000.00% 4281700.00% 4282400.00% 4283100.00% 4283800.00% 4284500.00% 4285200.00% 4285900.00% 4286600.00% 4287300.00% 4288000.00% 4288700.00% 4289400.00% 4290100.00% 4290800.00% 4291500.00% 4292200.00% 4292900.00% 4293600.00% 4294300.00% 4295000.00% 4295700.00% 4296400.00% 4297100.00% 4297800.00% 4298500.00% 4299200.00% 4299900.00% 4300600.00% 4301300.00% 4302000.00% 4302700.00% 4303400.00% 4304100.00% 4304800.00% 4305500.00% 4306200.00% 4306900.00% 4307600.00% 4308300.00% 4309000.00% 4309700.00% 4310400.00% 4311100.00% 4311800.00% 4312500.00% 4313200.00% 4313900.00% 4314600.00% 4315300.00% 4316000.00% 4316700.00% 4317400.00% 4318100.00% 4318800.00% 4319500.00% 4320200.00% 4320900.00% 4321600.00% 4322300.00% 4323000.00% 4323700.00% 4324400.00% 4325100.00% 4325800.00% 4326500.00% 4327200.00% 4327900.00% 4328600.00% 4329300.00% 4330000.00% 4330700.00% 4331400.00% 4332100.00% 4332800.00% 4333500.00% 4334200.00% 4334900.00% 4335600.00% 4336300.00% 4337000.00% 4337700.00% 4338400.00% 4339100.00% 4339800.00% 4340500.00% 4341200.00% 4341900.00% 4342600.00% 4343300.00% 4344000.00% 4344700.00% 4345400.00% 4346100.00% 4346800.00% 4347500.00% 4348200.00% 4348900.00% 4349600.00% 4350300.00% 4351000.00% 4351700.00% 4352400.00%

B/L Close out Cum Plan P 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.18% 0.81% 1.44% 2.07% 2.70% 4.59% 6.49% 8.38% 10.27% 12.88% 16.04% 19.19% 22.34% 26.94% 35.14% 43.33% 51.53% 59.73% 68.47% 77.30% 86.13% 94.95% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% AS
2.00%
B/L Close out Cum Actual A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

4279600.00% ### 4281000.00% 4281700.00% 4282400.00% 4283100.00% 4283800.00% 4284500.00% 4285200.00% 4285900.00% 4286600.00% 4287300.00% 4288000.00% 4288700.00% 4289400.00% 4290100.00% 4290800.00% 4291500.00% 4292200.00% 4292900.00% 4293600.00% 4294300.00% 4295000.00% 4295700.00% 4296400.00% 4297100.00% 4297800.00% 4298500.00% 4299200.00% 4299900.00% 4300600.00% 4301300.00% 4302000.00% 4302700.00% 4303400.00% 4304100.00% 4304800.00% 4305500.00% 4306200.00% 4306900.00% 4307600.00% 4308300.00% 4309000.00% 4309700.00% 4310400.00% 4311100.00% 4311800.00% 4312500.00% 4313200.00% 4313900.00% 4314600.00% 4315300.00% 4316000.00% 4316700.00% 4317400.00% 4318100.00% 4318800.00% 4319500.00% 4320200.00% 4320900.00% 4321600.00% 4322300.00% 4323000.00% 4323700.00% 4324400.00% 4325100.00% 4325800.00% 4326500.00% 4327200.00% 4327900.00% 4328600.00% 4329300.00% 4330000.00% 4330700.00% 4331400.00% 4332100.00% 4332800.00% 4333500.00% 4334200.00% 4334900.00% 4335600.00% 4336300.00% 4337000.00% 4337700.00% 4338400.00% 4339100.00% 4339800.00% 4340500.00% 4341200.00% 4341900.00% 4342600.00% 4343300.00% 4344000.00% 4344700.00% 4345400.00% 4346100.00% 4346800.00% 4347500.00% 4348200.00% 4348900.00% 4349600.00% 4350300.00% 4351000.00% 4351700.00% 4352400.00%

B/L Overall Cum Plan P 0.00% 0.00% 0.01% 0.01% 0.05% 0.16% 0.19% 0.28% 0.30% 0.39% 0.55% 1.56% 1.65% 2.24% 2.42% 3.71% 3.82% 5.39% 5.69% 6.12% 7.53% 7.73% 7.98% 9.85% 10.35% 10.87% 11.60% 12.58% 14.28% 14.66% 15.20% 16.09% 17.52% 18.05% 20.97% 21.26% 21.74% 23.87% 24.14% 25.47% 28.75% 29.94% 31.22% 32.60% 33.55% 35.94% 36.40% 38.89% 39.73% 42.05% 42.87% 43.88% 46.13% 47.32% 49.60% 50.04% 53.10% 57.44% 59.87% 63.01% 63.27% 65.48% 69.81% 70.20% 70.56% 70.94% 71.26% 71.54% 71.93% 72.47% 74.68% 75.94% 76.41% 78.07% 79.65% 80.01% 80.37% 81.02% 81.43% 81.97% 82.95% 84.02% 84.88% 86.20% 87.54% 88.71% 90.05% 91.24% 92.77% 94.00% 95.30% 96.45% 97.20% 98.08% 98.53% 98.70% 98.87% 99.03% 99.19% 99.37% 99.55% 99.72% 99.90% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% OV
100.00%
B/L Overall Cum Actual A 0.00% 0.00% 0.01% 0.05% 0.11% 0.18% 0.23% 0.28% 0.35% 0.45% 0.60% 0.67% 0.75% 1.27% 1.37% 1.89% 2.51% 2.53% 2.70% 2.86% 3.08% 4.12% 6.27% 7.22% 7.58% 7.81% 7.86% 8.07% 8.56% 8.75% 8.97% 9.07% 9.18% 9.28% 10.51% 11.40% 11.47% 11.79% 11.93% 12.16% 12.22% 12.43% 14.44% 16.21% 16.78% 18.29% 20.85% 21.08% 21.86% 22.37% 22.86% 23.41% 23.51% 26.69% 26.97% 27.28% 27.97% 28.13% 28.31% 28.36% 28.95% 29.16% 31.44% 34.21% 36.25% 37.30% 38.64% 41.47% 41.58% 42.28% 44.23% 46.85% 48.61% 48.99% 48.99% 49.58% 50.07% 50.59% 54.63% 55.89% 60.30% 62.21% 63.94% 66.87% 67.06% 67.24% 67.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

R/C Engg. Cum Plan P 0.00% 0.00% 0.13% 0.58% 1.38% 2.08% 2.88% 3.50% 4.35% 6.11% 8.60% 10.45% 12.54% 14.37% 15.65% 17.55% 19.83% 20.25% 21.99% 23.32% 27.38% 29.45% 33.20% 35.25% 36.74% 38.42% 39.66% 40.04% 41.09% 43.39% 46.18% 48.78% 51.54% 53.98% 56.87% 59.09% 60.99% 63.65% 65.49% 67.61% 69.05% 70.05% 71.83% 72.47% 73.44% 75.14% 76.32% 79.03% 80.89% 82.34% 83.08% 87.29% 88.38% 88.82% 89.52% 90.90% 91.01% 91.80% 92.05% 92.32% 92.47% 92.64% 92.84% 93.34% 93.34% 93.70% 93.70% 93.76% 93.76% 93.84% 93.84% 93.92% 93.92% 94.12% 94.12% 94.15% 94.15% 94.15% 94.17% 94.36% 94.48% 94.53% 94.58% 94.58% 94.64% 94.64% 94.64% 94.64% 94.64% 94.64% 94.64% 94.64% 94.88% 94.88% 94.88% 94.93% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 100.00% 100.00% 100.00% E
3.98%
R/C Engg. Cum Act. A 0.00% 0.00% 0.13% 0.58% 1.38% 2.08% 2.88% 3.50% 4.35% 6.11% 8.60% 10.45% 12.54% 14.37% 15.65% 17.55% 19.83% 20.25% 21.99% 23.32% 27.38% 29.45% 33.20% 35.25% 36.74% 38.42% 39.66% 40.04% 41.09% 43.39% 46.18% 48.78% 51.54% 53.98% 56.87% 59.09% 60.99% 63.65% 65.49% 67.61% 69.05% 70.05% 71.83% 72.47% 73.44% 75.14% 76.32% 79.03% 80.89% 82.34% 83.08% 87.29% 88.38% 88.82% 89.52% 90.90% 91.01% 91.80% 92.05% 92.32% 92.47% 92.64% 92.84% 93.34% 93.34% 93.70% 93.70% 93.76% 93.76% 93.84% 93.84% 93.92% 93.92% 94.12% 94.12% 94.15% 94.15% 94.15% 94.17% 94.36% 94.48% 94.53% 94.58% 94.58% 94.64% 94.64% 94.64%

2-Mar-17 ### 4281000.00% 4281700.00% 4282400.00% 4283100.00% 4283800.00% 4284500.00% 4285200.00% 4285900.00% 4286600.00% 4287300.00% 4288000.00% 4288700.00% 4289400.00% 4290100.00% 4290800.00% 4291500.00% 4292200.00% 4292900.00% 4293600.00% 4294300.00% 4295000.00% 4295700.00% 4296400.00% 4297100.00% 4297800.00% 4298500.00% 4299200.00% 4299900.00% 4300600.00% 4301300.00% 4302000.00% 4302700.00% 4303400.00% 4304100.00% 4304800.00% 4305500.00% 4306200.00% 4306900.00% 4307600.00% 4308300.00% 4309000.00% 4309700.00% 4310400.00% 4311100.00% 4311800.00% 4312500.00% 4313200.00% 4313900.00% 4314600.00% 4315300.00% 4316000.00% 4316700.00% 4317400.00% 4318100.00% 4318800.00% 4319500.00% 4320200.00% 4320900.00% 4321600.00% 4322300.00% 4323000.00% 4323700.00% 4324400.00% 4325100.00% 4325800.00% 4326500.00% 4327200.00% 4327900.00% 4328600.00% 4329300.00% 4330000.00% 4330700.00% 4331400.00% 4332100.00% 4332800.00% 4333500.00% 4334200.00% 4334900.00% 4335600.00% 4336300.00% 4337000.00% 4337700.00% 4338400.00% 4339100.00% 4339800.00% 4340500.00% 4341200.00% 4341900.00% 4342600.00% 4343300.00% 4344000.00% 4344700.00% 4345400.00% 4346100.00% 4346800.00% 4347500.00% 4348200.00% 4348900.00% 4349600.00% 4350300.00% 4351000.00% 4351700.00% 4352400.00%

R/C Proc. Cum Plan P 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.32% 0.39% 0.39% 0.39% 1.08% 1.15% 1.83% 2.65% 2.65% 2.81% 2.98% 3.06% 4.54% 7.62% 8.95% 9.41% 9.66% 9.66% 9.96% 10.64% 10.80% 10.96% 10.96% 10.96% 10.96% 12.68% 13.91% 13.91% 14.24% 14.34% 14.57% 14.57% 14.82% 17.78% 20.34% 21.04% 23.22% 27.07% 27.23% 28.31% 28.85% 29.51% 30.08% 30.15% 34.96% 35.31% 35.52% 36.39% 36.49% 36.49% 36.49% 37.32% 37.59% 41.03% 45.19% 48.25% 49.62% 51.25% 55.34% 55.34% 56.27% 59.14% 62.95% 65.42% 65.73% 65.73% 65.73% 66.29% 66.83% 72.79% 74.21% 80.36% 82.74% 85.20% 89.55% 89.55% 89.55% 89.55% 89.57% 89.57% 89.57% 89.57% 90.50% 90.55% 94.82% 95.45% 95.66% 96.74% 96.74% 98.37% 98.37% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% P
65.02%
R/C Proc. Cum Act. A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.32% 0.39% 0.39% 0.39% 1.08% 1.15% 1.83% 2.65% 2.65% 2.81% 2.98% 3.06% 4.54% 7.62% 8.95% 9.41% 9.66% 9.66% 9.96% 10.64% 10.80% 10.96% 10.96% 10.96% 10.96% 12.68% 13.91% 13.91% 14.24% 14.34% 14.57% 14.57% 14.82% 17.78% 20.34% 21.04% 23.22% 27.07% 27.23% 28.31% 28.85% 29.51% 30.08% 30.15% 34.96% 35.31% 35.52% 36.39% 36.49% 36.49% 36.49% 37.32% 37.59% 41.03% 45.19% 48.25% 49.62% 51.25% 55.34% 55.34% 56.27% 59.14% 62.95% 65.42% 65.73% 65.73% 65.73% 66.29% 66.83% 72.79% 74.21% 80.36% 82.74% 85.20% 89.55% 89.55% 89.55% 89.55%

### ### 4281000.00% 4281700.00% 4282400.00% 4283100.00% 4283800.00% 4284500.00% 4285200.00% 4285900.00% 4286600.00% 4287300.00% 4288000.00% 4288700.00% 4289400.00% 4290100.00% 4290800.00% 4291500.00% 4292200.00% 4292900.00% 4293600.00% 4294300.00% 4295000.00% 4295700.00% 4296400.00% 4297100.00% 4297800.00% 4298500.00% 4299200.00% 4299900.00% 4300600.00% 4301300.00% 4302000.00% 4302700.00% 4303400.00% 4304100.00% 4304800.00% 4305500.00% 4306200.00% 4306900.00% 4307600.00% 4308300.00% 4309000.00% 4309700.00% 4310400.00% 4311100.00% 4311800.00% 4312500.00% 4313200.00% 4313900.00% 4314600.00% 4315300.00% 4316000.00% 4316700.00% 4317400.00% 4318100.00% 4318800.00% 4319500.00% 4320200.00% 4320900.00% 4321600.00% 4322300.00% 4323000.00% 4323700.00% 4324400.00% 4325100.00% 4325800.00% 4326500.00% 4327200.00% 4327900.00% 4328600.00% 4329300.00% 4330000.00% 4330700.00% 4331400.00% 4332100.00% 4332800.00% 4333500.00% 4334200.00% 4334900.00% 4335600.00% 4336300.00% 4337000.00% 4337700.00% 4338400.00% 4339100.00% 4339800.00% 4340500.00% 4341200.00% 4341900.00% 4342600.00% 4343300.00% 4344000.00% 4344700.00% 4345400.00% 4346100.00% 4346800.00% 4347500.00% 4348200.00% 4348900.00% 4349600.00% 4350300.00% 4351000.00% 4351700.00% 4352400.00%

R/C Const. Cum Plan P 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.04% 0.09% 0.47% 0.84% 0.93% 1.00% 1.08% 1.09% 1.60% 1.73% 1.78% 1.85% 1.99% 2.14% 2.72% 3.28% 3.55% 4.40% 4.57% 4.78% 4.91% 5.10% 5.28% 5.53% 6.22% 7.56% 8.39% 8.91% 9.33% 9.75% 10.38% 11.14% 11.94% 11.94% 13.46% 14.80% 16.16% 16.90% 18.49% 20.94% 22.08% 22.71% 23.17% 24.05% 24.94% 24.96% 25.96% 28.35% 31.05% 33.88% 37.30% 41.59% 45.62% 49.68% 55.99% 63.48% 70.92% 72.75% 74.14% 76.08% 78.68% 81.97% 84.90% 88.01% 90.03% 91.76% 93.53% 94.42% 95.67% 96.94% 97.78% 98.37% 98.52% 98.85% 99.08% 99.30% 99.39% 99.55% 99.62% 99.84% 99.96% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 1C
21.00%
WEEKLY CUM M.
RECOVERY

R/C Const. Cum Act. A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.04% 0.09% 0.47% 0.84% 0.93% 1.00% 1.08% 1.09% 1.60% 1.73% 1.78% 1.85% 1.99% 2.14% 2.72% 3.28% 3.55% 4.40% 4.57% 4.78% 4.91% 5.10% 5.28% 5.53% 6.22% 7.56% 8.39% 8.91% 9.33% 9.75% 10.38% 11.14% 11.94% 11.94% 13.46% 14.80% 16.16% 16.90% 18.49% 20.94% 22.08% 22.71% 23.17% 24.05% 24.94% 24.96%

### ### 4281000.00% 4281700.00% 4282400.00% 4283100.00% 4283800.00% 4284500.00% 4285200.00% 4285900.00% 4286600.00% 4287300.00% 4288000.00% 4288700.00% 4289400.00% 4290100.00% 4290800.00% 4291500.00% 4292200.00% 4292900.00% 4293600.00% 4294300.00% 4295000.00% 4295700.00% 4296400.00% 4297100.00% 4297800.00% 4298500.00% 4299200.00% 4299900.00% 4300600.00% 4301300.00% 4302000.00% 4302700.00% 4303400.00% 4304100.00% 4304800.00% 4305500.00% 4306200.00% 4306900.00% 4307600.00% 4308300.00% 4309000.00% 4309700.00% 4310400.00% 4311100.00% 4311800.00% 4312500.00% 4313200.00% 4313900.00% 4314600.00% 4315300.00% 4316000.00% 4316700.00% 4317400.00% 4318100.00% 4318800.00% 4319500.00% 4320200.00% 4320900.00% 4321600.00% 4322300.00% 4323000.00% 4323700.00% 4324400.00% 4325100.00% 4325800.00% 4326500.00% 4327200.00% 4327900.00% 4328600.00% 4329300.00% 4330000.00% 4330700.00% 4331400.00% 4332100.00% 4332800.00% 4333500.00% 4334200.00% 4334900.00% 4335600.00% 4336300.00% 4337000.00% 4337700.00% 4338400.00% 4339100.00% 4339800.00% 4340500.00% 4341200.00% 4341900.00% 4342600.00% 4343300.00% 4344000.00% 4344700.00% 4345400.00% 4346100.00% 4346800.00% 4347500.00% 4348200.00% 4348900.00% 4349600.00% 4350300.00% 4351000.00% 4351700.00% 4352400.00%

R/C Pre-Comm. Cum Plan P 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.17% 0.17% 0.17% 0.17% 0.17% 0.21% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 1.40% 9.52% 19.41% 35.08% 43.03% 43.03% 43.03% 43.03% 43.16% 43.16% 44.04% 46.78% 52.04% 56.36% 57.67% 59.44% 64.54% 71.98% 84.03% 89.68% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% PC
8.00%
R/C Pre-Comm. Cum Actua A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.17% 0.17% 0.17% 0.17% 0.17% 0.21% 0.30%

### ### 4281000.00% 4281700.00% 4282400.00% 4283100.00% 4283800.00% 4284500.00% 4285200.00% 4285900.00% 4286600.00% 4287300.00% 4288000.00% 4288700.00% 4289400.00% 4290100.00% 4290800.00% 4291500.00% 4292200.00% 4292900.00% 4293600.00% 4294300.00% 4295000.00% 4295700.00% 4296400.00% 4297100.00% 4297800.00% 4298500.00% 4299200.00% 4299900.00% 4300600.00% 4301300.00% 4302000.00% 4302700.00% 4303400.00% 4304100.00% 4304800.00% 4305500.00% 4306200.00% 4306900.00% 4307600.00% 4308300.00% 4309000.00% 4309700.00% 4310400.00% 4311100.00% 4311800.00% 4312500.00% 4313200.00% 4313900.00% 4314600.00% 4315300.00% 4316000.00% 4316700.00% 4317400.00% 4318100.00% 4318800.00% 4319500.00% 4320200.00% 4320900.00% 4321600.00% 4322300.00% 4323000.00% 4323700.00% 4324400.00% 4325100.00% 4325800.00% 4326500.00% 4327200.00% 4327900.00% 4328600.00% 4329300.00% 4330000.00% 4330700.00% 4331400.00% 4332100.00% 4332800.00% 4333500.00% 4334200.00% 4334900.00% 4335600.00% 4336300.00% 4337000.00% 4337700.00% 4338400.00% 4339100.00% 4339800.00% 4340500.00% 4341200.00% 4341900.00% 4342600.00% 4343300.00% 4344000.00% 4344700.00% 4345400.00% 4346100.00% 4346800.00% 4347500.00% 4348200.00% 4348900.00% 4349600.00% 4350300.00% 4351000.00% 4351700.00% 4352400.00%

R/C Close out Cum Plan P 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 11.29% 22.58% 33.87% 45.16% 56.45% 67.74% 79.03% 90.32% 100.00% 100.00% 100.00% 100.00% AS
2.00%
R/C Close out Cum Actual A 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

4279600.00% ### 4281000.00% 4281700.00% 4282400.00% 4283100.00% 4283800.00% 4284500.00% 4285200.00% 4285900.00% 4286600.00% 4287300.00% 4288000.00% 4288700.00% 4289400.00% 4290100.00% 4290800.00% 4291500.00% 4292200.00% 4292900.00% 4293600.00% 4294300.00% 4295000.00% 4295700.00% 4296400.00% 4297100.00% 4297800.00% 4298500.00% 4299200.00% 4299900.00% 4300600.00% 4301300.00% 4302000.00% 4302700.00% 4303400.00% 4304100.00% 4304800.00% 4305500.00% 4306200.00% 4306900.00% 4307600.00% 4308300.00% 4309000.00% 4309700.00% 4310400.00% 4311100.00% 4311800.00% 4312500.00% 4313200.00% 4313900.00% 4314600.00% 4315300.00% 4316000.00% 4316700.00% 4317400.00% 4318100.00% 4318800.00% 4319500.00% 4320200.00% 4320900.00% 4321600.00% 4322300.00% 4323000.00% 4323700.00% 4324400.00% 4325100.00% 4325800.00% 4326500.00% 4327200.00% 4327900.00% 4328600.00% 4329300.00% 4330000.00% 4330700.00% 4331400.00% 4332100.00% 4332800.00% 4333500.00% 4334200.00% 4334900.00% 4335600.00% 4336300.00% 4337000.00% 4337700.00% 4338400.00% 4339100.00% 4339800.00% 4340500.00% 4341200.00% 4341900.00% 4342600.00% 4343300.00% 4344000.00% 4344700.00% 4345400.00% 4346100.00% 4346800.00% 4347500.00% 4348200.00% 4348900.00% 4349600.00% 4350300.00% 4351000.00% 4351700.00% 4352400.00%

R/C Overall Cum Plan P 0.00% 0.00% 0.01% 0.02% 0.05% 0.08% 0.11% 0.14% 0.19% 0.45% 0.60% 0.67% 0.75% 1.27% 1.37% 1.89% 2.51% 2.53% 2.70% 2.86% 3.08% 4.12% 6.27% 7.22% 7.58% 7.81% 7.86% 8.07% 8.56% 8.75% 8.97% 9.07% 9.18% 9.28% 10.51% 11.40% 11.47% 11.79% 11.93% 12.16% 12.22% 12.43% 14.44% 16.21% 16.78% 18.29% 20.85% 21.08% 21.86% 22.37% 22.86% 23.4059% 23.5100% 26.69% 26.97% 27.28% 27.97% 28.13% 28.31% 28.36% 28.95% 29.16% 31.44% 34.21% 36.25% 37.30% 38.64% 41.47% 41.58% 42.28% 44.23% 46.85% 48.61% 48.99% 48.99% 49.58% 50.07% 50.59% 54.63% 55.89% 60.30% 62.21% 63.94% 66.87% 67.06% 67.24% 67.26% 67.48% 67.98% 68.55% 69.14% 70.47% 71.41% 75.03% 76.29% 77.76% 80.13% 82.34% 84.57% 86.12% 88.22% 88.76% 89.46% 90.07% 90.74% 91.16% 91.59% 92.19% 92.79% 93.40% 93.77% 94.09% 94.62% 95.25% 96.28% 96.78% 97.65% 97.90% 98.16% 98.40% 98.67% 98.92% 99.16% 99.38% 99.61% 100.00% 100.00% 100.00% OV
100.00%
R/C Overall Cum Actual A 0.00% 0.00% 0.01% 0.02% 0.05% 0.08% 0.11% 0.14% 0.19% 0.45% 0.60% 0.67% 0.75% 1.27% 1.37% 1.89% 2.51% 2.53% 2.70% 2.86% 3.08% 4.12% 6.27% 7.22% 7.58% 7.81% 7.86% 8.07% 8.56% 8.75% 8.97% 9.07% 9.18% 9.28% 10.51% 11.40% 11.47% 11.79% 11.93% 12.16% 12.22% 12.43% 14.44% 16.21% 16.78% 18.29% 20.85% 21.08% 21.86% 22.37% 22.86% 23.41% 23.51% 26.69% 26.97% 27.28% 27.97% 28.13% 28.31% 28.36% 28.95% 29.16% 31.44% 34.21% 36.25% 37.30% 38.64% 41.47% 41.58% 42.28% 44.23% 46.85% 48.61% 48.99% 48.99% 49.58% 50.07% 50.59% 54.63% 55.89% 60.30% 62.21% 63.94% 66.87% 67.06% 67.24% 67.26%

Overall Progress S- Curve O verall Engineering Progress S- Curve


120.00% 120.00%

100.00% 100.00%

80.00% 80.00%

60.00% 60.00%

40.00%
40.00%

20.00%
20.00%

0.00% 0.00%

16- Ma r-17

30- Ma r-17

4- Ma y-17

11- May-17

25-May-17

8-Jun-17

15-J un-17

22-Jun- 17

29-J un-17

6-J ul-17

21- Sep-17

12-Oct -17

19-Oct-17

26-Oct-17

16-Nov-17

23-Nov-17

21- Dec-17

4-Jan-18

15- Feb-18

15-Mar-18

29-Mar-18

5-Apr-18

12-Apr-18

3-May-18

17- Ma y-18

31- Ma y-18

14- Jun-18

28- Jun-18

9-Aug-18

23-Aug-18

13-S ep-18

27- Sep-18

11- Oct-18

25- Oct-18

22- Nov-18

13-Dec-18

20-Dec-18

27-Dec-18

3-J an- 19

17-Jan-19

21- Feb-19

21- Mar-19

4-Apr-19

18-Apr-19

2-May- 19

9- May-19

16-May-19

30-May-19

20- Jun-19

1-Aug-19
2-Mar-17

23-Mar- 17

6-A pr- 17

13- Apr-17

20-Apr-17

27- Apr-17

18-May- 17

1- Jun-17

13-J ul-17

27- Jul-17

3-Aug-17

10- Aug- 17

17-Aug-17

24- Aug- 17

31-Aug-17

7-Sep- 17

14-Sep-17

28-Sep-17

5-Oct -17

2-Nov- 17

9-Nov-17

30-Nov-17

7-Dec-17

14-Dec- 17

28-Dec- 17

11-Jan-18

18- Jan-18

25-Ja n-18

1-Feb- 18

8- Feb-18

22-Feb-18

1-Mar- 18

8- Mar-18

22-Mar-18

19-A pr- 18

26-Apr-18

10-May-18

24-May-18

7- Jun-18

21-Jun-18

5- Jul- 18

12-Jul- 18

19-J ul-18

26-Jul- 18

2- Aug -18

16-Aug-18

30-Aug-18

6-S ep-18

20-Sep- 18

4-Oct-18

18-Oct -18

1- Nov-18

8-Nov- 18

15-Nov- 18

29-Nov -18

6-Dec-18

10-J an- 19

24-J an- 19

31-Jan-19

7-Feb- 19

14-Feb- 19

28-Feb- 19

7-Mar- 19

14-Mar- 19

28-Mar- 19

11-Apr-19

25-Apr-19

23-May -19

6-Jun- 19

13-Jun- 19

27-Jun- 19

4-Jul-19

11-Jul-19

18- Jul-19

25-Jul-19

8- Aug- 19
9-Mar-17

20-Jul-17
05/Oct/17

12/Oct/17

19/Oct/17

26/Oct/17

07/Dec/17

14/Dec/17

21/Dec/17

28/Dec/17

01/Feb/18

08/Feb/18

15/Feb/18

22/Feb/18

01/Mar/18

08/Mar/18

15/Mar/18

22/Mar/18

29/Mar/18

03/May/18

10/May/18

17/May/18

24/May/18

31/May/18

07/Jun/18

14/Jun/18

21/Jun/18

28/Jun/18

06/Sep/18

13/Sep/18

20/Sep/18

27/Sep/18

04/Oct /18

11/Oct /18

18/Oct /18

25/Oct /18

01/Nov /18

08/Nov /18

15/Nov /18

22/Nov /18

29/Nov /18

06/Dec/18

13/Dec/18

20/Dec/18

27/Dec/18

03/J an/19

10/J an/19

17/J an/19
30/Ma r/17

06/Apr/17

13/Apr/17

20/Apr/17

27/Apr/17

04/May/17

11/May/17

18/May/17

25/May/17

01/Jun/17

08/Jun/17

15/Jun/17

22/Jun/17

29/Jun/17

06/Jul/17

13/Jul/17

20/Jul/17

27/Jul/17

03/Aug /17

10/Aug /17

17/Aug /17

24/Aug /17

31/Aug /17

07/Sep/17

14/Sep/17

21/Sep/17

28/Sep/17

02/Nov/17

09/Nov/17

16/Nov/17

23/Nov/17

30/Nov/17

04/Jan/18

11/Jan/18

18/Jan/18

25/Jan/18

05/Apr/18

12/Apr/18

19/Apr/18

26/Apr/18

05/Jul/18

12/Jul/18

19/Jul/18

26/Jul/18

02/Aug/18

09/Aug/18

16/Aug/18

23/Aug/18

30/Aug/18

24/J an/19

31/J an/19

07/F eb/19

14/F eb/19

21/F eb/19

28/F eb/19

07/Mar/19

14/Mar/19

21/Mar/19

28/Mar/19

04/A pr/19

11/A pr/19

18/A pr/19

25/Apr/19

02/Ma y/19

09/Ma y/19

16/Ma y/19

23/Ma y/19

30/Ma y/19

06/Jun/19

13/Jun/19

20/Jun/19

27/Jun/19

04/Jul/19

11/Jul/19

18/Jul/19

25/Jul/19

01/Aug/19

08/Aug/19
-20.00% -20.00%

Overall Procurement Progress S- Curve Overall Construction Progress S- Curve


120.00% 120.00%

100.00% 100.00%

80.00% 80.00%

60.00% 60.00%

40.00% 40.00%

20.00% 20.00%

65.02% 86.00% 0.00% 14.00% 0.00%


18-May-17

25-May-17

1-Jun-17

5-Oct-17

2-Aug-18

9-Aug-18

18-Apr-19

25-Apr-19

16- May-19

23- May-19

30- Ma y-19

16- Ma r-17

6-Apr-17

11- Ma y-17

1-J un-17

15-J un-17

29-Jun- 17

6-Jul-17

3-Aug-17

28- Sep-17

12-Oct -17

26- Oct-17

23-Nov-17

30- Nov-17

21-Dec-17

28- Dec-17

4- Jan-18

18-Jan-18

15-Feb-18

22- Feb-18

15-Mar-18

22- Ma r-18

12-Apr-18

10-May-18

17- May-18

7-J un-18

14- Jun-18

21-J un-18

5-J ul-18

9-Aug-18

13-S ep-18

11- Oct-18

18-Oct -18

29-Nov-18

13-Dec-18

27-Dec-18

3-Jan-19

24-Jan-19

21-Feb-19

28- Feb-19

21-Mar-19

28- Mar-19

4-Apr-19

18-Apr-19

16-May-19

23- May-19

13-Jun- 19

20- Jun-19

27-J un-19
2-Mar-17

9-Mar-17

13-Apr-17

20-Apr-17

27-Apr-17

11-May-17

8-Jun-17

15- Jun-17

22- Jun-17

29- Jun-17

6-Jul-17

13- Jul-17

20-J ul-17

27-J ul-17

3-Aug -17

10-Aug-17

17-Aug-17

24-Aug-17

31-Aug-17

7- Sep-17

12-Oct- 17

19-Oct- 17

26-Oct-17

2-Nov- 17

9-Nov- 17

16- Nov-17

23- Nov-17

30- Nov-17

7-Dec-17

14-Dec-17

21-Dec-17

28-Dec-17

4- Jan-18

11-Ja n-18

18-Ja n-18

25-Ja n-18

1-F eb-18

8-F eb-18

22-Feb- 18

1-Mar-18

8-Mar- 18

15-Mar-18

22- Mar-18

29- Mar-18

5-Apr-18

12- Apr- 18

19- Apr- 18

26-A pr- 18

3-May-18

10-May -18

17-May- 18

24-May- 18

31-May- 18

7- Jun-18

5-J ul-18

12-Jul-18

19-Jul-18

26-Jul- 18

16- Aug- 18

23- Aug- 18

30- Aug- 18

6-Sep- 18

13-S ep-18

20-S ep-18

27-S ep-18

4- Oct-18

11-Oct -18

18-Oct -18

1- Nov-18

8-Nov-18

29-Nov-18

6-Dec-18

13-Dec-18

20-Dec-18

27- Dec-18

3-Jan-19

10- Jan-19

17- Jan-19

24- Jan-19

31-J an- 19

7-Feb-19

14-F eb-19

21-Feb-19

7- Ma r-19

11-Apr-19

2-May- 19

9-May- 19

6-Jun- 19

13- Jun-19

20-J un-19

27-J un-19

4-Jul- 19

11-J ul-19

18-J ul-19

25-Jul-19

1- Aug- 19

8- Aug- 19

2-Mar-17

9-Mar- 17

23-Mar-17

30-Mar- 17

13- Apr-17

20-Apr- 17

27-Apr-17

4-May- 17

18-May -17

25-May- 17

8-Jun-17

22-Jun-17

13-J ul-17

20-Jul-17

27-Jul-17

10-A ug-17

17-Aug-17

24-Aug-17

31- Aug -17

7-Sep-17

14-Sep-17

21-Sep- 17

5-Oct- 17

19-Oct- 17

2-Nov-17

9- Nov-17

16-Nov- 17

7- Dec-17

14-Dec- 17

11-Jan-18

25- Jan-18

1- Feb-18

8-F eb-18

1-Mar-18

8- Ma r-18

29-Mar-18

5- Apr- 18

19- Apr-18

26-Apr- 18

3- Ma y-18

24-May -18

31-May- 18

28-Jun-18

12- Jul- 18

19-J ul-18

26-Jul-18

2-Aug-18

16-A ug- 18

23-Aug-18

30-Aug-18

6-Sep-18

20-Sep-18

27-Sep- 18

4-Oct -18

25-Oct- 18

1-Nov- 18

8-Nov-18

15-Nov -18

22-Nov- 18

6-Dec- 18

20-Dec- 18

10-J an- 19

17-Jan-19

31- Jan-19

7-Feb-19

14-Feb- 19

7-Mar-19

14-Mar- 19

11-Apr-19

25- Apr-19

2-May-19

9- Ma y-19

30-May -19

6- Jun-19

4- Jul- 19

18- Jul- 19

25-J ul-19

1- Aug- 19

8-Aug-19
16-Mar-17

23-Mar-17

30-Mar-17

6- Apr-17

4-May -17

14-Sep- 17

21-Sep- 17

28-Sep- 17

15-Feb- 18

14-Jun-18

21-Jun-18

28-Jun- 18

25-Oct -18

15-Nov- 18

22-Nov-18

28-Feb-19

14-Mar- 19

21-Mar- 19

28-Mar- 19

4-Apr- 19

11-Jul-19
55.92% 9.10%
-20.00% -20.00%

Pre-Commisioning Progress S- Curve Close-Out Progress S- Curve


120.00% 120.00%

100.00% 100.00%

80.00% 80.00%

60.00% 60.00%

40.00% 40.00%

20.00% 20.00%

0.00% 0.00%
13-Apr-17

12-Apr-18

26-Apr-18

7-Fe b-19

6-Jun-19
9-Mar-17

16-Mar-17

30-Mar-17

20-Apr-17

27- Apr-17

4- Ma y-17

11- May-17

25- Ma y-17

1-J un-17

8-Jun- 17

22-J un-17

29-Jun- 17

13-Jul- 17

20-J ul-17

27- Jul- 17

10- Aug- 17

17-Aug-17

24- Aug- 17

31-Aug-17

7-Se p- 17

21-S ep-17

5-Oct- 17

12-Oct- 17

19-Oct-17

26-Oct- 17

2- Nov-17

9-Nov- 17

23- Nov-17

7-Dec- 17

21- Dec-17

4-Jan-18

11-Jan-18

25-Jan-18

1- Feb-18

8-Fe b-18

22- Feb-18

1- Ma r-18

8-Mar- 18

22- Ma r-18

5-Apr-18

19-Apr- 18

3-May-18

10-May-18

24- May-18

7-Jun-18

21- Jun-18

19-J ul-18

26-Jul-18

9-Aug-18

16-Aug-18

23-Aug -18

30-Aug-18

6-Se p- 18

20- Sep-18

4-Oct- 18

18- Oct-18

1-Nov-18

8-Nov -18

22-Nov-18

6-Dec-18

20- Dec-18

3-Jan-19

14-F eb-19

21-Fe b-19

7-Mar- 19

21- Mar-19

4-Apr-19

11-Apr-19

18- Apr- 19

25-Apr-19

2-May-19

23-May-19

13-J un-19

20- Jun-19

4-Jul-19

11-Jul-19

18- Jul- 19

25-Jul-19

1-Aug-19
2-Mar-17

23-Mar-17

6- Apr-17

18-May-17

15-Jun- 17

6-Jul- 17

3- Aug- 17

14-Sep- 17

28-Sep- 17

16-Nov- 17

30-Nov- 17

14-De c- 17

28-De c- 17

18-J an- 18

15-Feb-18

15-Mar- 18

29-Mar- 18

17-May- 18

31-May- 18

14-Jun-18

28-Jun-18

5-Jul-18

12-Jul-18

2-Aug -18

13-Sep-18

27-Sep- 18

11-Oct- 18

25-Oct- 18

15-Nov -18

29-Nov -18

13-De c-18

27-De c- 18

10-Jan-19

17- Jan-19

24-Jan-19

31-J an- 19

28-Feb-19

14-Mar- 19

28-Mar- 19

9-May- 19

16-May -19

30-May -19

27-Jun-19

8-Aug-19

2-Mar- 17

9- Ma r-17

16-Mar-17

23- Mar-17

4-May-17

11-May-17

25- Ma y-17

1-Jun-17

15-J un-17

22-Jun-17

13- Jul- 17

20-Jul-17

27-J ul-17

3-Aug-17

31-Aug-17

14- Sep-17

21-Sep-17

12- Oct-17

26-Oct-17

2-Nov- 17

23- Nov-17

30-Nov-17

14- Dec-17

21-Dec-17

4-Jan-18

11-Jan-18

15-Feb-18

22- Feb-18

8- Mar-18

15- Ma r-18

22-Mar-18

5-Apr-18

12-Apr-18

3-May- 18

24- May-18

14- Jun-18

28-J un-18

12-Jul-18

19-Jul-18

26- Jul-18

2-Aug-18

13- Sep-18

27-Sep-18

11-Oct- 18

18-Oct -18

25- Oct-18

1-Nov -18

8- Nov-18

15- Nov-18

22-Nov-18

13- Dec-18

27-Dec-18

3-Jan-19

31-Jan-19

14- Feb-19

21-Feb-19

7-Mar-19

14-Mar-19

28-Mar-19

4-Apr-19

9- May-19

16- Ma y-19

23-May-19

13-Jun- 19

27-J un-19

4-Jul-19

11-Jul-19

18-J ul-19

25- Jul- 19
30-Mar- 17

6- Apr-17

13- Apr-17

20-Apr-17

27-Apr-17

18-May- 17

8- Jun-17

29-Jun-17

6-Jul- 17

10-Aug-17

17-Aug-17

24- Aug- 17

7- Sep-17

28-Sep- 17

5-Oct- 17

19-Oct -17

9-Nov-17

16-Nov -17

7- Dec-17

28-Dec-17

18-Ja n-18

25-J an- 18

1-Feb- 18

8-F eb-18

1-Mar-18

29-Mar- 18

19-Apr-18

26-A pr- 18

10-May-18

17-May -18

31-May-18

7- Jun-18

21-Jun- 18

5-Jul-18

9- Aug- 18

16-Aug-18

23- Aug -18

30-Aug-18

6-Sep-18

20-Sep- 18

4-Oct- 18

29-Nov- 18

6-Dec-18

20-Dec- 18

10-Jan-19

17-J an- 19

24- Jan-19

7- Feb-19

28-Feb-19

21-Mar- 19

11-Apr-19

18-Apr-19

25- Apr-19

2-May -19

30-May- 19

6-Jun- 19

20-Jun-19

1-Aug-19

8- Aug -19
- 20.00% -20.00%
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS"

PROJECT No. 3963 REV-D

JOB TITLE : "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS"

CLIENT : QATAR PETROLEUM 25-Oct-18

BASELINE PLAN REVISED PLAN

OVERALL PROJECT
PREVIOUS WEEK CURRENT WEEK UP TO DATE PREVIOUS WEEK CURRENT WEEK UP TO DATE

S. No. DESCRIPTION REL. WT. % PLANNED ACTUAL DEV. PLANNED ACTUAL DEV. PLANNED ACTUAL DEV. PLANNED ACTUAL DEV. PLANNED ACTUAL DEV. PLANNED ACTUAL DEV.

1 ENGINEERING PHASE 3.98% 95.00% 94.64% -0.36% 0.00% 0.00% 0.00% 95.00% 94.64% -0.36% 94.64% 94.64% 0.00% 0.00% 0.00% 0.00% 94.64% 94.64% 0.00%

PROCUREMENT
2 65.02% 100.00% 89.55% -10.45% 0.00% 0.00% 0.00% 100.00% 89.55% -10.45% 89.55% 89.55% 0.00% 0.00% 0.00% 0.00% 89.55% 89.55% 0.00%
PHASE

CONSTRUCTION
3 21.00% 82.78% 24.94% -57.84% 3.79% 0.02% -3.78% 86.57% 24.96% -61.61% 24.94% 24.94% 0.00% 0.02% 0.02% 0.00% 24.96% 24.96% 0.00%
PHASE

PRE-COMMISSIONING
4 8.00% 30.87% 0.21% -30.66% 6.35% 0.09% -6.26% 37.22% 0.30% -36.92% 0.21% 0.21% 0.00% 0.09% 0.09% 0.00% 0.30% 0.30% 0.00%
& COMMISSIONING

CLOSE-OUT
5 2.00% 2.70% 0.00% -2.70% 1.89% 0.00% -1.89% 4.59% 0.00% -4.59% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
DOCUMENTS

Overall Project 100.00% 88.71% 67.24% -21.46% 1.34% 0.01% -1.33% 90.05% 67.26% -22.80% 67.24% 67.24% 0.00% 0.01% 0.01% 0.00% 67.26% 67.26% 0.00%
Progress Overall Status
And "S" Curves
WEEK

Cum. Plan
Cum Actual

Cum. Actual
Overall Project

Weekly Plan

Rev. Recovery
B/L Cum. Plan

Weekly Actual
Weekly Actual

Rev. Recovery
Rev. Recovery
Rev. Recovery
B/L Weekly Plan
1
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2-Mar-17

10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%

0.00%
2-Mar-17
100.00%

2
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 9-Mar-17
6-Mar-17

3
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 16-Mar-17 10-Mar-17

14-Mar-17

4
0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.01% 0.00% 23-Mar-17
18-Mar-17

22-Mar-17

5
0.05% 0.03% 0.05% 0.03% 0.05% 0.03% 0.05% 0.04% 30-Mar-17
26-Mar-17

30-Mar-17

6
0.08% 0.03% 0.08% 0.03% 0.08% 0.03% 0.16% 0.11% 6-Apr-17
3-Apr-17

7
0.11% 0.03% 0.11% 0.03% 0.11% 0.03% 0.19% 0.03% 13-Apr-17 7-Apr-17

11-Apr-17

QATAR BRANCH
8
0.14% 0.02% 0.14% 0.02% 0.14% 0.02% 0.28% 0.10% 20-Apr-17 15-Apr-17

19-Apr-17

9
0.19% 0.05% 0.19% 0.05% 0.19% 0.05% 0.30% 0.02% 27-Apr-17
23-Apr-17

27-Apr-17
0.45% 0.27% 0.45% 0.27% 0.45% 0.27% 0.39% 0.09% 4-May-17

10
1-May-17

0.60% 0.15% 0.60% 0.15% 0.60% 0.15% 0.55% 0.16% 11-May-17 5-May-17

11
9-May-17
0.67% 0.07% 0.67% 0.07% 0.67% 0.07% 1.56% 1.01% 18-May-17 13-May-17

12
17-May-17

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION


0.75% 0.08% 0.75% 0.08% 0.75% 0.08% 1.65% 0.09% 25-May-17

13
21-May-17

25-May-17
1.27% 0.52% 1.27% 0.52% 1.27% 0.52% 2.24% 0.59% 1-Jun-17

14
29-May-17

8-Jun-17 2-Jun-17
1.37% 0.10% 1.37% 0.10% 1.37% 0.10% 2.42% 0.18%

15
6-Jun-17

1.89% 0.52% 1.89% 0.52% 1.89% 0.52% 3.71% 1.30% 15-Jun-17 10-Jun-17

16
14-Jun-17
2.51% 0.63% 2.51% 0.63% 2.51% 0.63% 3.82% 0.10% 22-Jun-17

17
18-Jun-17

22-Jun-17
2.53% 0.02% 2.53% 0.02% 2.53% 0.02% 5.39% 1.57% 29-Jun-17

18
26-Jun-17

30-Jun-17
2.70% 0.17% 2.70% 0.17% 2.70% 0.17% 5.69% 0.30% 6-Jul-17

19
4-Jul-17

2.86% 0.16% 2.86% 0.16% 2.86% 0.16% 6.12% 0.43% 13-Jul-17 8-Jul-17

20
12-Jul-17

3.08% 0.22% 3.08% 0.22% 3.08% 0.22% 7.53% 1.42% 20-Jul-17 16-Jul-17

21
20-Jul-17

4.12% 1.04% 4.12% 1.04% 4.12% 1.04% 7.73% 0.20% 27-Jul-17 24-Jul-17
22
28-Jul-17
6.27% 2.15% 6.27% 2.15% 6.27% 2.15% 7.98% 0.25% 3-Aug-17
23

1-Aug-17

5-Aug-17
7.22% 0.95% 7.22% 0.95% 7.22% 0.95% 9.85% 1.87% 10-Aug-17
24

9-Aug-17

13-Aug-17
7.58% 0.36% 7.58% 0.36% 7.58% 0.36% 10.35% 0.50% 17-Aug-17
25

17-Aug-17

7.81% 0.23% 7.81% 0.23% 7.81% 0.23% 10.87% 0.52% 24-Aug-17 21-Aug-17
26

25-Aug-17

7.86% 0.05% 7.86% 0.05% 7.86% 0.05% 11.60% 0.72% 31-Aug-17 29-Aug-17
27

2-Sep-17
8.07% 0.21% 8.07% 0.21% 8.07% 0.21% 12.58% 0.98% 7-Sep-17
28

6-Sep-17

10-Sep-17
8.56% 0.49% 8.56% 0.49% 8.56% 0.49% 14.28% 1.70% 14-Sep-17
29

14-Sep-17

18-Sep-17
8.75% 0.19% 8.75% 0.19% 8.75% 0.19% 14.66% 0.38% 21-Sep-17
30

22-Sep-17

8.97% 0.22% 8.97% 0.22% 8.97% 0.22% 15.20% 0.54% 28-Sep-17 26-Sep-17
31

30-Sep-17
9.07% 0.10% 9.07% 0.10% 9.07% 0.10% 16.09% 0.89% 5-Oct-17
32

4-Oct-17

8-Oct-17
9.18% 0.11% 9.18% 0.11% 9.18% 0.11% 17.52% 1.43% 12-Oct-17
33

12-Oct-17

16-Oct-17
9.28% 0.10% 9.28% 0.10% 9.28% 0.10% 18.05% 0.53% 19-Oct-17
34

20-Oct-17

10.51% 1.23% 10.51% 1.23% 10.51% 1.23% 20.97% 2.92% 26-Oct-17 24-Oct-17
35

28-Oct-17

11.40% 0.89% 11.40% 0.89% 11.40% 0.89% 21.26% 0.29% 2-Nov-17 1-Nov-17
36

5-Nov-17
11.47% 0.08% 11.47% 0.08% 11.47% 0.08% 21.74% 0.48% 9-Nov-17
37

9-Nov-17

13-Nov-17
11.79% 0.32% 11.79% 0.32% 11.79% 0.32% 23.87% 2.13% 16-Nov-17
38

17-Nov-17

21-Nov-17
11.93% 0.14% 11.93% 0.14% 11.93% 0.14% 24.14% 0.27% 23-Nov-17
39

25-Nov-17

12.16% 0.23% 12.16% 0.23% 12.16% 0.23% 25.47% 1.33% 30-Nov-17 29-Nov-17
40

3-Dec-17
12.22% 0.06% 12.22% 0.06% 12.22% 0.06% 28.75% 3.28% 7-Dec-17
41

7-Dec-17

11-Dec-17
12.43% 0.21% 12.43% 0.21% 12.43% 0.21% 29.94% 1.19% 14-Dec-17
42

15-Dec-17
S-Curve

19-Dec-17
14.44% 2.00% 14.44% 2.00% 14.44% 2.00% 31.22% 1.28% 21-Dec-17
43

23-Dec-17

28-Dec-17 27-Dec-17
16.21% 1.77% 16.21% 1.77% 16.21% 1.77% 32.60% 1.38%
44

Overall Project Progress

31-Dec-17

16.78% 0.58% 16.78% 0.58% 16.78% 0.58% 33.55% 0.95% 4-Jan-18 4-Jan-18
45

8-Jan-18
18.29% 1.50% 18.29% 1.50% 18.29% 1.50% 35.94% 2.39% 11-Jan-18
46

12-Jan-18

16-Jan-18
20.85% 2.56% 20.85% 2.56% 20.85% 2.56% 36.40% 0.45% 18-Jan-18
47

20-Jan-18

24-Jan-18
21.08% 0.23% 21.08% 0.23% 21.08% 0.23% 38.89% 2.50% 25-Jan-18
48

28-Jan-18

21.86% 0.78% 21.86% 0.78% 21.86% 0.78% 39.73% 0.83% 1-Feb-18 1-Feb-18
49

5-Feb-18
22.37% 0.51% 22.37% 0.51% 22.37% 0.51% 42.05% 2.32% 8-Feb-18
50

9-Feb-18

13-Feb-18
22.86% 0.49% 22.86% 0.49% 22.86% 0.49% 42.87% 0.82% 15-Feb-18
51

17-Feb-18

21-Feb-18
23.41% 0.55% 23.41% 0.55% 23.41% 0.55% 43.88% 1.01% 22-Feb-18
52

25-Feb-18

1-Mar-18 1-Mar-18
23.510% 0.10% 23.51% 0.10% 23.51% 0.10% 46.13% 2.25%
53

5-Mar-18

26.69% 3.18% 26.69% 3.18% 26.69% 3.18% 47.32% 1.19% 8-Mar-18 9-Mar-18
54

13-Mar-18
26.97% 0.28% 26.97% 0.28% 26.97% 0.28% 49.60% 2.27% 15-Mar-18
55

17-Mar-18

21-Mar-18
27.28% 0.31% 27.28% 0.31% 27.28% 0.31% 50.04% 0.45% 22-Mar-18
56

25-Mar-18

29-Mar-18
27.97% 0.69% 27.97% 0.69% 27.97% 0.69% 53.10% 3.06% 29-Mar-18
57

2-Apr-18

28.13% 0.16% 28.13% 0.16% 28.13% 0.16% 57.44% 4.34% 5-Apr-18 6-Apr-18
58

10-Apr-18
28.31% 0.19% 28.31% 0.19% 28.31% 0.19% 59.87% 2.43% 12-Apr-18
59

14-Apr-18

18-Apr-18
28.36% 0.05% 28.36% 0.05% 28.36% 0.05% 63.01% 3.15% 19-Apr-18
60

22-Apr-18

26-Apr-18
28.95% 0.59% 28.95% 0.59% 28.95% 0.59% 63.27% 0.26% 26-Apr-18
61

30-Apr-18

3-May-18 4-May-18
29.16% 0.21% 29.16% 0.21% 29.16% 0.21% 65.48% 2.21%
62

8-May-18

31.44% 2.28% 31.44% 2.28% 31.44% 2.28% 69.81% 4.33% 10-May-18 12-May-18
63

16-May-18
34.21% 2.76% 34.21% 2.76% 34.21% 2.76% 70.20% 0.39% 17-May-18
64

20-May-18

24-May-18
36.25% 2.04% 36.25% 2.04% 36.25% 2.04% 70.56% 0.37% 24-May-18
65

28-May-18
Overall Progress "S" curve

1-Jun-18
37.30% 1.05% 37.30% 1.05% 37.30% 1.05% 70.94% 0.37% 31-May-18
66

5-Jun-18

38.64% 1.34% 38.64% 1.34% 38.64% 1.34% 71.26% 0.33% 7-Jun-18 9-Jun-18
67

13-Jun-18
41.47% 2.84% 41.47% 2.84% 41.47% 2.84% 71.54% 0.28% 14-Jun-18 17-Jun-18
68

21-Jun-18
41.58% 0.11% 41.58% 0.11% 41.58% 0.11% 71.93% 0.39% 21-Jun-18
69

25-Jun-18

29-Jun-18
42.28% 0.69% 42.28% 0.69% 42.28% 0.69% 72.47% 0.54% 28-Jun-18
70

3-Jul-18

5-Jul-18 7-Jul-18
44.23% 1.96% 44.23% 1.96% 44.23% 1.96% 74.68% 2.21%
71

11-Jul-18

46.85% 2.61% 46.85% 2.61% 46.85% 2.61% 75.94% 1.27% 12-Jul-18 15-Jul-18
72

19-Jul-18
48.61% 1.76% 48.61% 1.76% 48.61% 1.76% 76.41% 0.46% 19-Jul-18
73

23-Jul-18

27-Jul-18
48.99% 0.38% 48.99% 0.38% 48.99% 0.38% 78.07% 1.66% 26-Jul-18
74

31-Jul-18

4-Aug-18
48.99% 0.00% 48.99% 0.00% 48.99% 0.00% 79.65% 1.58% 2-Aug-18
75

8-Aug-18

49.58% 0.59% 49.58% 0.59% 49.58% 0.59% 80.01% 0.35% 9-Aug-18 12-Aug-18
76

16-Aug-18

50.07% 0.49% 50.07% 0.49% 50.07% 0.49% 80.37% 0.36% 16-Aug-18 20-Aug-18
77

24-Aug-18
50.59% 0.52% 50.59% 0.52% 50.59% 0.52% 81.02% 0.65% 23-Aug-18
78

28-Aug-18
PROJECT No. 3963 "

1-Sep-18
54.63% 4.03% 54.63% 4.03% 54.63% 4.03% 81.43% 0.42% 30-Aug-18
79

5-Sep-18

9-Sep-18
55.89% 1.27% 55.89% 1.27% 55.89% 1.27% 81.97% 0.54% 6-Sep-18
80

13-Sep-18

60.30% 4.40% 60.30% 4.40% 60.30% 4.40% 82.95% 0.98% 13-Sep-18 17-Sep-18
81

21-Sep-18
62.21% 1.91% 62.21% 1.91% 62.21% 1.91% 84.02% 1.07% 20-Sep-18
82

25-Sep-18

29-Sep-18
63.94% 1.73% 63.94% 1.73% 63.94% 1.73% 84.88% 0.87% 27-Sep-18
83

3-Oct-18

7-Oct-18
66.87% 2.92% 66.87% 2.92% 66.87% 2.92% 86.20% 1.32% 4-Oct-18
84

11-Oct-18
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS

67.06% 0.19% 67.06% 0.19% 67.06% 0.19% 87.54% 1.34% 11-Oct-18 15-Oct-18
85

19-Oct-18

67.24% 0.19% 67.24% 0.19% 67.24% 0.19% 88.71% 1.17% 18-Oct-18 23-Oct-18
86

27-Oct-18
67.26% 0.01% 67.26% 0.01% 67.26% 0.01% 90.05% 1.34% 25-Oct-18
87

31-Oct-18

4-Nov-18
67.48% 0.23% 91.24% 1.19% 1-Nov-18
88

8-Nov-18

12-Nov-18
67.98% 0.50% 92.77% 1.53% 8-Nov-18
89

16-Nov-18

68.55% 0.57% 94.00% 1.23% 15-Nov-18 20-Nov-18


90

24-Nov-18
69.14% 0.60% 95.30% 1.31% 22-Nov-18
91

28-Nov-18

2-Dec-18
70.47% 1.32% 96.45% 1.15% 29-Nov-18
92

6-Dec-18

10-Dec-18
71.41% 0.94% 97.20% 0.75% 6-Dec-18
93

14-Dec-18

75.03% 3.63% 98.08% 0.88% 13-Dec-18 18-Dec-18


94

22-Dec-18

76.29% 1.26% 98.53% 0.44% 20-Dec-18 26-Dec-18


95

30-Dec-18
77.76% 1.46% 98.70% 0.18% 27-Dec-18
96

3-Jan-19

7-Jan-19
80.13% 2.37% 98.87% 0.16% 3-Jan-19
97

11-Jan-19

15-Jan-19
82.34% 2.21% 99.03% 0.16% 10-Jan-19
98

19-Jan-19

84.57% 2.23% 99.19% 0.16% 17-Jan-19 23-Jan-19


DATE:

27-Jan-19
86.12% 1.55% 99.37% 0.17% 24-Jan-19
31-Jan-19

31-Jan-19 4-Feb-19
88.22% 2.10% 99.55% 0.18%
8-Feb-19

88.76% 0.54% 99.72% 0.18% 7-Feb-19 12-Feb-19

16-Feb-19
89.46% 0.69% 99.90% 0.18% 14-Feb-19 20-Feb-19
25/Oct/18

24-Feb-19
90.07% 0.62% 100.00% 0.10% 21-Feb-19
28-Feb-19

4-Mar-19
90.74% 0.66% 100.00% 0.00% 28-Feb-19
8-Mar-19

91.16% 0.42% 100.00% 0.00% 7-Mar-19 12-Mar-19

16-Mar-19

91.59% 0.43% 100.00% 0.00% 14-Mar-19 20-Mar-19

24-Mar-19
92.19% 0.59% 100.00% 0.00% 21-Mar-19
28-Mar-19

1-Apr-19
92.79% 0.61% 100.00% 0.00% 28-Mar-19
5-Apr-19

9-Apr-19
93.40% 0.61% 100.00% 0.00% 4-Apr-19
13-Apr-19

93.77% 0.37% 100.00% 0.00% 11-Apr-19 17-Apr-19

21-Apr-19
94.09% 0.32% 100.00% 0.00% 18-Apr-19 25-Apr-19

29-Apr-19
94.62% 0.53% 100.00% 0.00% 25-Apr-19
3-May-19

7-May-19
95.25% 0.63% 100.00% 0.00% 2-May-19
11-May-19

96.28% 1.03% 100.00% 0.00% 9-May-19 15-May-19

19-May-19

96.78% 0.50% 100.00% 0.00% 16-May-19 23-May-19

27-May-19
97.65% 0.87% 100.00% 0.00% 23-May-19
31-May-19

4-Jun-19
97.90% 0.24% 100.00% 0.00% 30-May-19
8-Jun-19

12-Jun-19
98.16% 0.26% 100.00% 0.00% 6-Jun-19
16-Jun-19

98.40% 0.24% 100.00% 0.00% 13-Jun-19 20-Jun-19

24-Jun-19
B/L Cum. Plan

98.67% 0.27% 100.00% 0.00% 20-Jun-19 28-Jun-19

2-Jul-19
98.92% 0.25% 100.00% 0.00% 27-Jun-19
Rev. Recovery Cum. Plan

6-Jul-19
Rev. Recovery Cum. Actual

10-Jul-19
99.16% 0.23% 100.00% 0.00% 4-Jul-19
14-Jul-19

99.38% 0.23% 100.00% 0.00% 11-Jul-19 18-Jul-19

22-Jul-19

99.61% 0.23% 100.00% 0.00% 18-Jul-19

100.00% 0.39% 100.00% 0.00% 25-Jul-19


99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126
Summary Status of Engineering
And "S" Curve
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL
DEGASSING STATIONS"

PROJECT No. 3963

JOB TITLE : "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS"

CLIENT : QATAR PETROLEUM 25-Oct-18

SUBJECT : ENGINEERING PHASE PROGRESS MEASUREMENT ( REV : 04)*

Engineering 3.98% 3.98% PREVIOUS WEEK CURRENT WEEK UP TO DATE

Proj.
S. No. DESCRIPTION WT. % PLANNED % ACTUAL % DEV. % PLANNED % ACTUAL % DEV. % PLANNED % ACTUAL % DEV. %
Wtg.

1 GENERAL 0.10% 2.44% 95.00% 95.00% 0.00% 0.00% 0.00% 0.00% 95.00% 95.00% 0.00%

2 CIVIL 0.57% 14.42% 95.00% 95.00% 0.00% 0.00% 0.00% 0.00% 95.00% 95.00% 0.00%

3 ELECTRICAL 0.42% 10.65% 95.00% 95.00% 0.00% 0.00% 0.00% 0.00% 95.00% 95.00% 0.00%

4 SAFETY 0.40% 10.07% 95.00% 95.00% 0.00% 0.00% 0.00% 0.00% 95.00% 95.00% 0.00%

5 INSTRUMENTATION 0.52% 12.96% 95.00% 95.00% 0.00% 0.00% 0.00% 0.00% 95.00% 95.00% 0.00%

6 MECHANICAL 0.08% 1.92% 95.00% 95.00% 0.00% 0.00% 0.00% 0.00% 95.00% 95.00% 0.00%

7 PROCESS 0.45% 11.33% 93.92% 93.92% 0.00% 0.00% 0.00% 0.00% 93.92% 93.92% 0.00%

8 PIPING 1.44% 36.21% 94.35% 94.35% 0.00% 0.00% 0.00% 0.00% 94.35% 94.35% 0.00%

OVERALL Engineering 3.98% 100.00% 94.64% 94.64% 0.00% 0.00% 0.00% 0.00% 94.64% 94.64% 0.00%
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
E
1 1 GENERAL 3963-DGEN-0-00-0002 OT ENGINEERING DOCUMENT & DELIVERABLES REGISTER (EDDR) 1 A 0.417% 14-Mar-17 24-Mar-17 29-Mar-17 14-May-17 4-Jun-17 14-Jun-17 31-Oct-18 12-Mar-17 20-Mar-17 29-Mar-17 3-Aug-17 3-Aug-17 3-Aug-17 22-Jul-19 12-Mar-17 20-Mar-17 29-Mar-17 3-Aug-17 3-Aug-17 3-Aug-17 95% 95% 0% 0.396% 0.396%
2 1 GENERAL 3963-DGEN-0-29-0001 OT DESIGN BASIS MEMORANDUM 1 A 0.222% 15-Mar-17 25-Mar-17 30-Mar-17 30-Apr-17 21-May-17 31-May-17 31-Oct-18 15-Mar-17 29-Mar-17 29-Mar-17 29-Jun-17 26-Jul-17 7-Dec-17 22-Jul-19 15-Mar-17 29-Mar-17 29-Mar-17 29-Jun-17 26-Jul-17 7-Dec-17 95% 95% 0% 0.211% 0.211%
3 1 GENERAL 3963-DGEN-0-04-0003 OT ENGINEERING EXECUTION PLAN 1 A 0.278% 15-Mar-17 25-Mar-17 30-Mar-17 30-Apr-17 21-May-17 31-May-17 31-Oct-18 15-Mar-17 17-Mar-17 20-Mar-17 10-May-17 10-May-17 10-May-17 22-Jul-19 15-Mar-17 17-Mar-17 20-Mar-17 10-May-17 10-May-17 10-May-17 95% 95% 0% 0.264% 0.264%
4 1 GENERAL 3963-DGEN-0-17-0001 OT SITE VISIT (1) - REPORT 1 A 0.972% 15-Mar-17 25-Mar-17 30-Mar-17 30-Apr-17 21-May-17 31-May-17 31-Oct-18 15-Mar-17 17-Mar-17 29-Mar-17 25-May-17 21-Jun-17 21-Jun-17 22-Jul-19 15-Mar-17 17-Mar-17 29-Mar-17 25-May-17 21-Jun-17 21-Jun-17 95% 95% 0% 0.924% 0.924%
5 1 GENERAL 3963-DGEN-0-17-0002 OT SITE VISIT (2) - REPORT 1 A 0.417% 29-Apr-17 1-May-17 4-May-17 25-May-17 15-Jun-17 25-Jun-17 31-Oct-18 2-May-17 4-May-17 4-May-17 1-Jun-17 17-Jul-17 18-Jul-17 22-Jul-19 2-May-17 4-May-17 4-May-17 1-Jun-17 17-Jul-17 18-Jul-17 95% 95% 0% 0.396% 0.396%
6 1 GENERAL 3963-DGEN-0-17-0003 OT SITE VISIT-3 REPORT BY SYSTEM OEM (YOKOGAWA) FOR KAHM / KAHN / KAHS / JALM 1 A 0.056% 30-Jul-17 7-Aug-17 10-Aug-17 31-Aug-17 14-Sep-17 21-Sep-17 31-Oct-18 22-Sep-17 23-Sep-17 25-Sep-17 19-Oct-17 19-Oct-17 14-Dec-17 22-Jul-19 22-Sep-17 23-Sep-17 25-Sep-17 19-Oct-17 19-Oct-17 14-Dec-17 95% 95% 0% 0.053% 0.053%
7 1 GENERAL 3963-DGEN-0-17-0004 OT SITE VISIT-4 REPORT BY SYSTEM OEM (EMERSON) FOR FAHM / FAHN / FAHS 1 A 0.042% 30-Jul-17 7-Aug-17 10-Aug-17 31-Aug-17 14-Sep-17 21-Sep-17 31-Oct-18 27-Jul-17 30-Jul-17 31-Jul-17 5-Oct-17 8-Oct-17 8-Oct-17 22-Jul-19 27-Jul-17 30-Jul-17 31-Jul-17 5-Oct-17 8-Oct-17 8-Oct-17 95% 95% 0% 0.040% 0.040%
8 7 GENERAL 3963-DGEN-0-00-0001 OT MISCELLANEOUS - GENERAL 0 0.042% 16-Aug-17 16-Aug-17 16-Aug-17 23-Aug-17 23-Aug-17 30-Aug-17 31-Oct-18 12-Jan-18 15-Jan-18 18-Jan-18 21-Jan-18 26-Jan-18 27-Jan-18 22-Jul-19 12-Jan-18 15-Jan-18 18-Jan-18 21-Jan-18 26-Jan-18 27-Jan-18 95% 95% 0% 0.040% 0.040%
9 7 PROCESS 3963-FAHM-6-52-0001 OT DUKHAN - FAHAHIL MAIN DEGASSING STATION GENERAL , PROCESS FLOW DIAGRAM 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
10 7 PROCESS 3963-FAHM-6-52-0002 OT PFD FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - FIRST STAGE SEPARATOR & PWT 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 5-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 5-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
11 7 PROCESS 3963-FAHM-6-52-0003 OT PFD FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - SEPARATORS SYSTEM 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
12 7 PROCESS 3963-FAHN-6-52-0001 OT PFD FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION - FIRST STAGE SEPARATOR & PWI 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 14-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 14-Dec-17 95% 95% 0% 0.053% 0.053%
13 7 PROCESS 3963-FAHS-6-52-0001 OT PFD FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - FIRST STAGE SEPARATOR & PWT 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
14 7 PROCESS 3963-JALM-6-52-0001 OT DUKHAN -JALEHA MAIN DEGASSING STATION - GENERAL, PROCESS FLOW DIAGRAM 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
15 7 PROCESS 3963-JALM-6-52-0002 OT PFD FOR DUKHAN -JALEHA MAIN DEGASSING STATION - JALEHA/DIYAB PROD. & FLOW LINES 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
16 7 PROCESS 3963-JALM-6-52-0003 OT PFD FOR DUKHAN -JALEHA MAIN DEGASSING STATION - FIRST STAGE SEPARATORS & PWT 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
17 7 PROCESS 3963-JALM-6-52-0004 OT PFD FOR DUKHAN -JALEHA MAIN DEGASSING STATION - SEPARATION TRAIN 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
18 7 PROCESS 3963-KAHM-6-52-0001 OT DUKHAN - KHATIYAH MAIN DEGASSING STATION - GENERAL, PROCESS FLOW DIAGRAM 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
19 7 PROCESS 3963-KAHM-6-52-0002 OT PFD FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - FIRST STAGE SEPARATORS 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
20 7 PROCESS 3963-KAHM-6-52-0003 OT PFD FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - PRODUCED WATER TREATMENT 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 10-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 10-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
21 7 PROCESS 3963-KAHN-6-52-0001 OT DUKHAN - KHATIYAH NORTH DEGASSING STATION - GENERAL PROCESS FLOW DIAGRAM 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 10-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 10-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
22 7 PROCESS 3963-KAHS-6-52-0001 OT DUKHAN - KHATIYAH SOUTH DEGASSING STATION - GENERAL PROCESS FLOW DIAGRAM 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 10-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 10-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
23 7 PROCESS 3963-KAHS-6-52-0002 OT DUKHAN - KHATIYAH SOUTH DEGASSING STATION - GENERAL PROCESS FLOW DIAGRAM 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 10-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 10-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
24 7 PROCESS 3963-FAHM-6-52-0004 OT PFD FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION 3 PHASE TEST SEPERATOR, SEPARATOR SYSTEM 1 A 0.069% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.066% 0.066%
25 7 PROCESS 3963-DGEN-6-17-0001 OT PROCESS SIMULATION & H&MB REPORT 1 A 0.111% 1-Apr-17 11-Apr-17 16-Apr-17 17-May-17 7-Jun-17 17-Jun-17 31-Oct-18 10-Apr-17 11-Apr-17 12-Apr-17 21-Jun-17 13-Jul-17 18-Jul-17 22-Jul-19 10-Apr-17 11-Apr-17 12-Apr-17 21-Jun-17 13-Jul-17 18-Jul-17 95% 95% 0% 0.106% 0.106%
26 7 PROCESS 3963-DGEN-6-12-0001 OT 3 - PHASE TEST SEPARATOR SIZING CALCULATION 1 B 0.097% 12-Apr-17 22-Apr-17 27-Apr-17 28-May-17 18-Jun-17 28-Jun-17 31-Oct-18 18-Apr-17 12-Jun-17 13-Jun-17 27-Aug-17 19-Sep-17 20-Sep-17 22-Jul-19 18-Apr-17 12-Jun-17 13-Jun-17 27-Aug-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.092% 0.092%
27 7 PROCESS 3963-DGEN-6-00-0001 OT PROJECT DRAWING INDEX (PROCESS) 1 1 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 4-Jun-17 4-Jun-17 2-Oct-17 2-Oct-17 2-Oct-17 22-Jul-19 18-Apr-17 4-Jun-17 4-Jun-17 2-Oct-17 2-Oct-17 2-Oct-17 95% 95% 0% 0.053% 0.053%
28 7 PROCESS 3963-DGEN-6-50-0001 OT LEGEND, SYMBOLS & ABBREVIATIONS (2 SHEETS) 1 B 0.097% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 4-May-17 4-May-17 19-Jun-17 21-Aug-17 21-Aug-17 22-Jul-19 18-Apr-17 4-May-17 4-May-17 19-Jun-17 21-Aug-17 21-Aug-17 95% 95% 0% 0.092% 0.092%
29 7 PROCESS 3963-KAHM-6-50-0001 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION -MANIFOLD SHUTDOWN VALVES 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 3-May-17 3-May-17 15-Jun-17 26-Sep-17 3-Jan-18 22-Jul-19 18-Apr-17 3-May-17 3-May-17 15-Jun-17 26-Sep-17 3-Jan-18 95% 95% 0% 0.053% 0.053%
30 7 PROCESS 3963-KAHM-6-50-0002 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - 3 PHASE TEST SEPARATOR 24-V-XXX1 1 A 0.083% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 3-May-17 3-May-17 15-Jun-17 26-Sep-17 3-Jan-18 22-Jul-19 18-Apr-17 3-May-17 3-May-17 15-Jun-17 26-Sep-17 3-Jan-18 95% 95% 0% 0.079% 0.079%
31 7 PROCESS 3963-KAHM-6-50-0003 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION -NEW 3 PHASE TEST SEPARATOR 24-V-XXX1 1 A 0.083% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 3-May-17 3-May-17 15-Jun-17 26-Sep-17 21-Jan-18 22-Jul-19 18-Apr-17 3-May-17 3-May-17 15-Jun-17 26-Sep-17 21-Jan-18 95% 95% 0% 0.079% 0.079%
32 7 PROCESS 3963-KAHM-6-50-0005 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - DEGASSING VESSEL 24-V-4005 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 3-May-17 3-May-17 15-Jun-17 15-Jun-17 3-Jan-18 22-Jul-19 18-Apr-17 3-May-17 3-May-17 15-Jun-17 15-Jun-17 3-Jan-18 95% 95% 0% 0.053% 0.053%
33 7 PROCESS 3963-KAHM-6-50-0006 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - GAS GATHERING STATION 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 3-May-17 3-May-17 15-Jun-17 26-Sep-17 3-Jan-18 22-Jul-19 18-Apr-17 3-May-17 3-May-17 15-Jun-17 26-Sep-17 3-Jan-18 95% 95% 0% 0.053% 0.053%
34 7 PROCESS 3963-KAHM-6-50-0007 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - CRUDE OIL FROM KHATIYAH NORTH 1 B 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 3-May-17 15-Jun-17 11-Sep-17 12-Sep-17 22-Jul-19 2-Apr-17 5-Apr-17 3-May-17 15-Jun-17 11-Sep-17 12-Sep-17 95% 95% 0% 0.053% 0.053%
35 7 PROCESS 3963-KAHM-6-50-0008 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - CRUDE OIL FROM KHATIYAH SOUTH 1 B 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 18-May-17 15-Jun-17 11-Sep-17 12-Sep-17 22-Jul-19 2-Apr-17 5-Apr-17 18-May-17 15-Jun-17 11-Sep-17 12-Sep-17 95% 95% 0% 0.053% 0.053%
36 7 PROCESS 3963-KAHM-6-51-0001 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - DRAIN COLLECTION 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 3-May-17 15-Jun-17 15-Jun-17 5-Oct-17 22-Jul-19 2-Apr-17 5-Apr-17 3-May-17 15-Jun-17 15-Jun-17 5-Oct-17 95% 95% 0% 0.053% 0.053%
37 7 PROCESS 3963-KAHM-6-51-0002 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION -PROCESS FLARE COLLECTION 1 B 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 30-Apr-17 3-May-17 15-Jun-17 15-Jun-17 5-Oct-17 22-Jul-19 18-Apr-17 30-Apr-17 3-May-17 15-Jun-17 15-Jun-17 5-Oct-17 95% 95% 0% 0.053% 0.053%
38 7 PROCESS 3963-KAHM-6-51-0003 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION -INSTRUMENT AIR DISTRIBUTION 1 B 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 30-Apr-17 3-May-17 15-Jun-17 15-Jun-17 5-Oct-17 22-Jul-19 18-Apr-17 30-Apr-17 3-May-17 15-Jun-17 15-Jun-17 5-Oct-17 95% 95% 0% 0.053% 0.053%
39 7 PROCESS 3963-KAHN-6-50-0001 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - NEW 3 PHASE TEST SEPARATOR 22-V-XXX1 1 A 0.083% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 30-Apr-17 3-May-17 9-Jul-17 26-Sep-17 21-Jan-18 22-Jul-19 18-Apr-17 30-Apr-17 3-May-17 9-Jul-17 26-Sep-17 21-Jan-18 95% 95% 0% 0.079% 0.079%
40 7 PROCESS 3963-KAHN-6-50-0003 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - 3 PHASE TEST SEPARATOR CONT. SKID 22-V 1 A 0.083% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 26-Sep-17 2-Jan-18 22-Jul-19 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 26-Sep-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
41 7 PROCESS 3963-KAHN-6-50-0004 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - PROD WATER DEGASSING VESSEL 22-V-749 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 2-Jan-18 22-Jul-19 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
42 7 PROCESS 3963-KAHN-6-50-0005 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - PROD WATER DEGASSING VESSEL 22-V-749 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 2-Jan-18 22-Jul-19 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
43 7 PROCESS 3963-KAHN-6-50-0006 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - WET LIFT GAS KO DRUM 22-V-4601 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 2-Jan-18 22-Jul-19 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
44 7 PROCESS 3963-KAHN-6-50-0007 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - PIG LAUNCHER 22-Z-7020 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 26-Sep-17 2-Jan-18 22-Jul-19 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 26-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
45 7 PROCESS 3963-KAHN-6-50-0008 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - 3 PHASE TEST SEP. CONT. SKID 22-V-4002 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 26-Sep-17 2-Jan-18 22-Jul-19 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 26-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
46 7 PROCESS 3963-KAHN-6-50-0009 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - FIRST STAGE 3 PHASE SEP. 22-V-7480 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 3-May-17 22-Jun-17 26-Sep-17 2-Jan-18 22-Jul-19 2-Apr-17 5-Apr-17 3-May-17 22-Jun-17 26-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
47 7 PROCESS 3963-KAHN-6-50-0010 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - MANIFOLD SHUTDOWN VALVES 1 B 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 26-Sep-17 2-Jan-18 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 26-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
48 7 PROCESS 3963-KAHN-6-51-0001 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - INSTRUMENT AIR DISTRIBUTION 1 A 0.056% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 95% 95% 0% 0.053% 0.053%
49 7 PROCESS 3963-KAHN-6-52-0002 OT DUKHAN - KHATIYAH NORTH DEGASSING STATION - SEPARATORS SYSTEM PROCESS FLOW DIAGRAM 1 A 0.056% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 10-Aug-17 4-Dec-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 20-Jul-17 10-Aug-17 4-Dec-17 95% 95% 0% 0.053% 0.053%
50 7 PROCESS DEM-3963-KAHM-6-50-0001 DEM P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION -MANIFOLD SHUTDOWN VALVES ,P&ID (DEMOL 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 2-Jan-18 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 2-Jan-18 95% 95% 0% 0.040% 0.040%
51 7 PROCESS DEM-3963-KAHM-6-50-0002 DEM P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - 3 PHASE TEST SEPARATOR 24-V-7900,P&ID ( 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 2-Jan-18 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 2-Jan-18 95% 95% 0% 0.040% 0.040%
52 7 PROCESS DEM-3963-KAHM-6-50-0003 DEM P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - 3 PHASE TEST SEPARATOR 24-V7900 CTRL SKI 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 2-Jan-18 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 2-Jan-18 95% 95% 0% 0.040% 0.040%
53 7 PROCESS DEM-3963-KAHM-6-50-0004 DEM P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - DEGASSING VESSEL 24-V-4005,P&ID (DEMOLI 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 15-Jun-17 2-Jan-18 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 15-Jun-17 2-Jan-18 95% 95% 0% 0.040% 0.040%
54 7 PROCESS DEM-3963-KAHM-6-51-0003 DEM P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - IA DISTRIBUTION P&ID (DEMOLITION) 1 B 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 24-Sep-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 24-Sep-17 95% 95% 0% 0.040% 0.040%
55 7 PROCESS DEM-3963-KAHN-6-50-0001 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - 3 PHASE TEST SEPARATOR 22-V-7400 (DEMO 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 24-Aug-17 4-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 24-Aug-17 4-Oct-17 95% 95% 0% 0.040% 0.040%
56 7 PROCESS DEM-3963-KAHN-6-50-0002 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - 3 PHASE TEST SEPARATOR CONT. SKID 22-V 1 B 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
57 7 PROCESS DEM-3963-KAHN-6-50-0003 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION -3 PHASE TEST SEPARATOR CONT. SKID 22-V- 1 B 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
58 7 PROCESS DEM-3963-KAHN-6-50-0004 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - PROD WATER DEGASSING VESSEL 22-V-749 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 2-Jan-18 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 2-Jan-18 95% 95% 0% 0.040% 0.040%
59 7 PROCESS DEM-3963-KAHN-6-50-0005 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - PROD WATER DEGASSING VESSEL 22-V-749 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 2-Jan-18 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 2-Jan-18 95% 95% 0% 0.040% 0.040%
60 7 PROCESS DEM-3963-KAHN-6-50-0006 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - WET LIFT GAS KO DRUM 22-V-4601 (DEMOL 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
61 7 PROCESS DEM-3963-KAHN-6-50-0007 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - PIG LAUNCHER 22-Z-7020 (DEMOLITION) 1 B 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
62 7 PROCESS DEM-3963-KAHN-6-50-0008 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - 3 PHASE TEST SEP. CONT SKID 22-V-4002 ( 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
63 7 PROCESS DEM-3963-KAHN-6-50-0009 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - FIRST STAGE PHASE SEP. 22-V-7480 (DEMOL 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
64 7 PROCESS DEM-3963-KAHN-6-50-0010 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - MANIFOLD SHUTDOWN VALVES (DEMOLITI 1 B 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 19-Oct-17 22-Jul-19 19-Apr-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
65 7 PROCESS DEM-3963-KAHN-6-51-0001 DEM P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - INSTRUMENT AIR DISTRIBUTION (DEMOLIT 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 22-Jul-19 2-Apr-17 5-Apr-17 3-May-17 22-Jun-17 22-Jun-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
66 7 PROCESS 3963-FAHM-6-50-0001 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - NEW 3 PHASE TEST SEPARATOR 14-V-XXX1 1 A 0.083% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 18-May-17 2-Jul-17 5-Oct-17 21-Jan-18 22-Jul-19 2-Apr-17 5-Apr-17 18-May-17 2-Jul-17 5-Oct-17 21-Jan-18 95% 95% 0% 0.079% 0.079%
67 7 PROCESS 3963-FAHM-6-50-0003 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - HYDROCYCLONE & DEGASSER SKID SHT.2 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 18-May-17 2-Jul-17 5-Oct-17 2-Jan-18 22-Jul-19 2-Apr-17 5-Apr-17 18-May-17 2-Jul-17 5-Oct-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
68 7 PROCESS 3963-FAHM-6-50-0004 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - GAS & OIL DISTRIBUTION 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 14-Jan-18 22-Jul-19 27-Apr-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 14-Jan-18 95% 95% 0% 0.053% 0.053%
69 7 PROCESS 3963-FAHM-6-50-0005 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - 3RD STAGE SUCTION KO DRUM 14-V-5205, 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 14-Jan-18 22-Jul-19 27-Apr-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 14-Jan-18 95% 95% 0% 0.053% 0.053%
70 7 PROCESS 3963-FAHM-6-50-0006 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - 3-PHASE SEPARATOR 14-V-4001 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 14-Jan-18 22-Jul-19 27-Apr-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 14-Jan-18 95% 95% 0% 0.053% 0.053%
71 7 PROCESS 3963-FAHM-6-50-0007 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - S.D.V & R.V. STATION & DIST. MANIFOLD 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 14-Jan-18 22-Jul-19 4-May-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 14-Jan-18 95% 95% 0% 0.053% 0.053%
72 7 PROCESS 3963-FAHM-6-51-0001 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - DRAIN COLLECTION 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 2-Jan-18 22-Jul-19 27-Apr-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
73 7 PROCESS 3963-FAHM-6-51-0002 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - TANK FLARE COLLECTION 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 2-Jan-18 22-Jul-19 11-May-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
74 7 PROCESS 3963-FAHM-6-51-0003 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - INSTRUMENT AIR DISTRIBUTION 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 2-Jan-18 22-Jul-19 27-Apr-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
75 7 PROCESS 3963-KAHS-6-50-0001 OT P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - NEW 3 PHASE TEST SEPARATOR 23-V-XXX1 1 A 0.083% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 4-May-17 9-May-17 10-May-17 22-Jun-17 11-Oct-17 21-Jan-18 22-Jul-19 4-May-17 9-May-17 10-May-17 22-Jun-17 11-Oct-17 21-Jan-18 95% 95% 0% 0.079% 0.079%
76 7 PROCESS 3963-KAHS-6-50-0003 OT P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - 3 PHASE SEPARATION HEADERS 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 9-May-17 10-May-17 22-Jun-17 11-Oct-17 3-Jan-18 22-Jul-19 27-Apr-17 9-May-17 10-May-17 22-Jun-17 11-Oct-17 3-Jan-18 95% 95% 0% 0.053% 0.053%
77 7 PROCESS 3963-KAHS-6-50-0004 OT P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - DEGASSING VESSEL 23-V-7280 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 9-May-17 10-May-17 22-Jun-17 11-Oct-17 3-Jan-18 22-Jul-19 27-Apr-17 9-May-17 10-May-17 22-Jun-17 11-Oct-17 3-Jan-18 95% 95% 0% 0.053% 0.053%
78 7 PROCESS 3963-KAHS-6-50-0005 OT P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - HYDROCARBON CONDENSATE LINES 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 4-May-17 9-May-17 10-May-17 22-Jun-17 11-Oct-17 3-Jan-18 22-Jul-19 4-May-17 9-May-17 10-May-17 22-Jun-17 11-Oct-17 3-Jan-18 95% 95% 0% 0.053% 0.053%
79 7 PROCESS 3963-KAHS-6-50-0006 OT P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - MANIFOLD SHUTDOWN VALVES 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 10-May-17 22-Jun-17 11-Oct-17 3-Jan-18 22-Jul-19 2-Apr-17 5-Apr-17 10-May-17 22-Jun-17 11-Oct-17 3-Jan-18 95% 95% 0% 0.053% 0.053%
80 7 PROCESS 3963-KAHS-6-51-0001 OT P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - DRAIN SYSTEM 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 10-May-17 22-Jun-17 11-Oct-17 2-Jan-18 22-Jul-19 2-Apr-17 5-Apr-17 10-May-17 22-Jun-17 11-Oct-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
81 7 PROCESS 3963-KAHS-6-51-0002 OT P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - FLARE COLLECTION 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 10-May-17 22-Jun-17 22-Jun-17 2-Jan-18 22-Jul-19 2-Apr-17 5-Apr-17 10-May-17 22-Jun-17 22-Jun-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
82 7 PROCESS 3963-KAHS-6-51-0003 OT P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - INSTRUMENT AIR DISTRIBUTION 1 A 0.056% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 2-Jan-18 22-Jul-19 27-Apr-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
83 7 PROCESS DEM-3963-FAHM-6-50-0001 DEM P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION -3 PHASE TEST SEPARATOR 14-V-1900 (DEMOLIT 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 3-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.040% 0.040%
84 7 PROCESS DEM-3963-FAHM-6-50-0002 DEM P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION -3 PHASE TEST SEPARATOR 14-V-1900 CTRL SKID 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 3-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.040% 0.040%
85 7 PROCESS DEM-3963-FAHM-6-50-0003 DEM P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION -HYDROCYCLONE & DEGASSER SKID SHT.2 (DEM 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 5-Oct-17 22-Jul-19 27-Apr-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
86 7 PROCESS DEM-3963-FAHM-6-50-0004 DEM P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION -GAS & OIL DISTRIBUTION (DEMOLITION) 1 B 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 5-Oct-17 22-Jul-19 11-May-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
87 7 PROCESS DEM-3963-FAHM-6-50-0005 DEM P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - S.D.V & R.V. STATION & DIST. MANIFOLD (DEM 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 5-Oct-17 22-Jul-19 27-Apr-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
88 7 PROCESS DEM-3963-FAHM-6-51-0001 DEM P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - DRAIN COLLECTION (DEMOLITION) 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 4-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 4-May-17 14-May-17 18-May-17 4-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.040% 0.040%
89 7 PROCESS DEM-3963-FAHM-6-51-0004 DEM P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION -FLARE COLLECTION (DEMOLITION) 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 14-May-17 18-May-17 2-Jul-17 27-Jun-17 2-Jul-17 22-Jul-19 27-Apr-17 14-May-17 18-May-17 2-Jul-17 27-Jun-17 2-Jul-17 95% 95% 0% 0.040% 0.040%
90 7 PROCESS DEM-3963-FAHM-6-51-0002 DEM P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - TANK FLARE COLLECTION (DEMOLITION) 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 27-Apr-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.040% 0.040%
91 7 PROCESS DEM-3963-FAHM-6-51-0003 DEM P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION -INSTRUMENT AIR DISTRIBUTION (DEMOLITION) 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 27-Sep-17 22-Jul-19 4-May-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 27-Sep-17 95% 95% 0% 0.040% 0.040%
92 7 PROCESS DEM-3963-KAHS-6-51-0001 DEM P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION -DRAIN SYSTEM (DEMOLITION) 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 9-May-17 10-May-17 22-Jun-17 12-Jul-17 17-Jul-17 22-Jul-19 27-Apr-17 9-May-17 10-May-17 22-Jun-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.040% 0.040%
93 7 PROCESS DEM-3963-KAHS-6-51-0003 DEM P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION -INSTRUMENT AIR DISTRIBUTION (DEMOLITI 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 9-May-17 10-May-17 22-Jun-17 17-Jun-17 22-Jun-17 22-Jul-19 27-Apr-17 9-May-17 10-May-17 22-Jun-17 17-Jun-17 22-Jun-17 95% 95% 0% 0.040% 0.040%
94 7 PROCESS 3963-FAHM-6-51-0004 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - FLARE COLLECTION 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 2-Jan-18 22-Jul-19 4-May-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 2-Jan-18 95% 95% 0% 0.040% 0.040%
95 7 PROCESS 3963-FAHN-6-50-0001 OT P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION - MANIFOLD SHUTDOWN VALVES 1 B 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 5-Oct-17 22-Jul-19 4-May-17 14-May-17 18-May-17 2-Jul-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.053% 0.053%
96 7 PROCESS 3963-FAHN-6-50-0002 OT P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -NEW 3 PHASE TEST SEPARATOR 12-V-XXX1 1 A 0.083% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 2-Jul-17 26-Sep-17 21-Jan-18 22-Jul-19 4-May-17 14-May-17 18-May-17 2-Jul-17 26-Sep-17 21-Jan-18 95% 95% 0% 0.079% 0.079%
97 7 PROCESS 3963-FAHN-6-50-0004 OT P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION - HYDROCYCLONE & DEGASSER SKID SHT.2 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 2-Jul-17 26-Sep-17 2-Jan-18 22-Jul-19 11-May-17 14-May-17 18-May-17 2-Jul-17 26-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
98 7 PROCESS 3963-FAHN-6-50-0005 OT P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -PIG LAUNCHER 12-Z-0810 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 18-May-17 2-Jul-17 26-Sep-17 2-Jan-18 22-Jul-19 2-Apr-17 5-Apr-17 18-May-17 2-Jul-17 26-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
99 7 PROCESS 3963-FAHN-6-51-0001 OT P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -DRAIN SYSTEM 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 18-May-17 2-Jul-17 26-Sep-17 2-Jan-18 22-Jul-19 2-Apr-17 5-Apr-17 18-May-17 2-Jul-17 26-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
100 7 PROCESS 3963-FAHN-6-51-0002 OT P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -PROCESS FLARE K.O DRUM 12-V-4017 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 2-Jul-17 26-Sep-17 2-Jan-18 22-Jul-19 11-May-17 14-May-17 18-May-17 2-Jul-17 26-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
101 7 PROCESS 3963-FAHN-6-51-0003 OT P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -INSTRUMENT AIR DISTRIBUTION 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 2-Jul-17 25-Sep-17 2-Jan-18 22-Jul-19 11-May-17 14-May-17 18-May-17 2-Jul-17 25-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
102 7 PROCESS 3963-FAHS-6-50-0001 OT P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - MANIFOLD SHUTDOWN VALVES 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 2-Jan-18 22-Jul-19 3-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
103 7 PROCESS 3963-FAHS-6-50-0002 OT P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - NEW 3 PHASE TEST SEPARATOR 13-V-XXX1 CT 1 A 0.083% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 21-Jan-18 22-Jul-19 11-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 21-Jan-18 95% 95% 0% 0.079% 0.079%
104 7 PROCESS 3963-FAHS-6-50-0004 OT P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - HYDROCYCLONE & DEGASSER SKID SHT. 2 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 2-Jan-18 22-Jul-19 3-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
105 7 PROCESS 3963-FAHS-6-50-0005 OT P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - PIG LAUNCHER 13-Z-0403 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 2-Jan-18 22-Jul-19 4-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
106 7 PROCESS 3963-FAHS-6-51-0001 OT P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION -DRAIN SYSTEM 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 2-Jan-18 22-Jul-19 11-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
107 7 PROCESS 3963-FAHS-6-51-0002 OT P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION -PROCESS FLARE K.O DRUM 13-V-4043 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 2-Jan-18 22-Jul-19 11-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
108 7 PROCESS 3963-FAHS-6-51-0003 OT P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - INSTRUMENT AIR DISTRIBUTION SYSTEM 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 4-May-17 13-May-17 15-May-17 18-May-17 28-Sep-17 2-Jan-18 22-Jul-19 4-May-17 13-May-17 15-May-17 18-May-17 28-Sep-17 2-Jan-18 95% 95% 0% 0.053% 0.053%
109 7 PROCESS DEM-3963-FAHN-6-50-0001 DEM P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -MANIFOLD SHUTDOWN VALVES (DEMOLITION 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 11-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%
110 7 PROCESS DEM-3963-FAHN-6-50-0002 DEM P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -3 PHASE TEST SEPARATOR 12-V-0800 (DEMOL 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 3-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%
111 7 PROCESS DEM-3963-FAHN-6-50-0003 DEM P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -3 PHASE TEST SEPARATOR 12-V-0800 CTRL SK 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 3-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%
112 7 PROCESS DEM-3963-FAHN-6-50-0004 DEM P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -HYDROCYCLONE & DEGASSER SKID SHT 2 (DE 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 3-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%
113 7 PROCESS DEM-3963-FAHN-6-50-0005 DEM P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION - PIG LAUNCHER 12-Z-0810 (DEMOLITION) 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 5-Oct-17 22-Jul-19 11-May-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 5-Oct-17 95% 95% 0% 0.053% 0.053%
114 7 PROCESS DEM-3963-FAHN-6-51-0001 DEM P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION - DRAIN SYSTEM (DEMOLITION) 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 4-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%
115 7 PROCESS DEM-3963-FAHN-6-51-0002 DEM P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -PROCESS FLARE K.O DRUM 12-V-4017 (DEMOL 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 3-Jan-18 22-Jul-19 4-May-17 14-May-17 18-May-17 2-Jul-17 2-Jul-17 3-Jan-18 95% 95% 0% 0.053% 0.053%
116 7 PROCESS DEM-3963-FAHN-6-51-0003 DEM P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION -INSTRUMENT AIR DISTRIBUTION (DEMOLITIO 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 4-May-17 14-May-17 18-May-17 2-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%

Page 8 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
117 7 PROCESS DEM-3963-FAHS-6-50-0001 DEM P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION -MANIFOLD SHUTDOWN VALVES (DEMOLITION 1 A E 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 3-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 4-May-17 14-May-17 18-May-17 3-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%
118 7 PROCESS DEM-3963-FAHS-6-50-0002 DEM P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - 3 PHASE TEST SEPARATOR 13-V-400 (DEMOLI 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 3-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 4-May-17 14-May-17 18-May-17 3-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%
119 7 PROCESS DEM-3963-FAHS-6-50-0003 DEM P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - 3 PHASE TEST SEP. 13-V-400 CTRL SKID (DEMO 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 3-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 11-May-17 14-May-17 18-May-17 3-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%
120 7 PROCESS DEM-3963-FAHS-6-50-0004 DEM P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - HYDROCYCLONE & DEGASSER SKID SHT 2 (DE 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 3-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 11-May-17 14-May-17 18-May-17 3-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%
121 7 PROCESS DEM-3963-FAHS-6-50-0005 DEM P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - PIG LAUNCHER 13-Z-0403 (DEMOLITION) 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 11-May-17 14-May-17 18-May-17 3-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 11-May-17 14-May-17 18-May-17 3-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.053% 0.053%
122 7 PROCESS DEM-3963-FAHS-6-51-0001 DEM P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - DRAIN SYSTEM (DEMOLITION) 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 3-Jul-17 19-Sep-17 20-Sep-17 22-Jul-19 3-May-17 14-May-17 18-May-17 3-Jul-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.053% 0.053%
123 7 PROCESS DEM-3963-FAHS-6-51-0002 DEM P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - PROCESS FLARE K.O DRUM 13-V-4043 (DEMOL 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 3-Jul-17 5-Oct-17 5-Oct-17 22-Jul-19 3-May-17 14-May-17 18-May-17 3-Jul-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.053% 0.053%
124 7 PROCESS DEM-3963-FAHS-6-51-0003 DEM P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - INSTRUMENT AIR DISTRIBUTION SYSTEM (DE 1 A 0.056% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 3-Jul-17 19-Sep-17 20-Sep-17 22-Jul-19 3-May-17 14-May-17 18-May-17 3-Jul-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.053% 0.053%
125 7 PROCESS 3963-JALM-6-50-0003 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION - MANIFOLD SHUTDOWN VALVES 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 3-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 22-Jul-19 3-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
126 7 PROCESS 3963-JALM-6-50-0004 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION - OIL STABILIZATION HEAT EXCH. 31-E-4002 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 11-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 22-Jul-19 11-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
127 7 PROCESS 3963-JALM-6-50-0005 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION - DEGASSER VESSEL 31-V-4009 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
128 7 PROCESS 3963-JALM-6-50-0006 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION - PRODUCED GAS K.O. POT 31-V-5020 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
129 7 PROCESS 3963-JALM-6-50-0007 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION - WET LIFTGAS KO DRUM 31-V-4901 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
130 7 PROCESS 3963-JALM-6-50-0008 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION - GAS GATHERING STATION 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
131 7 PROCESS 3963-JALM-6-50-0009 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION - 3 PHASE TEST SEPARATOR MANIFOLD SHUTDOW 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
132 7 PROCESS 3963-JALM-6-51-0001 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION - DRAIN COLLECTION 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
133 7 PROCESS 3963-JALM-6-51-0002 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION -FLARE COLLECTION 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
134 7 PROCESS 3963-JALM-6-51-0003 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION -INSTRUMENT AIR DISTRIBUTION 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 11-Oct-17 2-Jan-18 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 11-Oct-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
135 7 PROCESS DEM-3963-JALM-6-50-0001 DEM P&ID FOR DUKHAN - JALEHA MAIN DEGASSING STATION - 3 PHASE TEST SEPARATOR 31-V-42 (DEMOLITIO 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 11-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 22-Jul-19 11-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 95% 95% 0% 0.079% 0.079%
136 7 PROCESS DEM-3963-JALM-6-50-0002 DEM P&ID FOR DUKHAN - JALEHA MAIN DEGASSING STATION -3 PHASE TEST SEPARATOR 31-V-42, CONR. SKID 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 11-May-17 20-May-17 22-May-17 9-Jul-17 27-Sep-17 27-Sep-17 22-Jul-19 11-May-17 20-May-17 22-May-17 9-Jul-17 27-Sep-17 27-Sep-17 95% 95% 0% 0.079% 0.079%
137 7 PROCESS DEM-3963-JALM-6-50-0003 DEM P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION -MANIFOLD SHUTDOWN VALVES (DEMOLITION) 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 3-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 22-Jul-19 3-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 95% 95% 0% 0.079% 0.079%
138 7 PROCESS DEM-3963-JALM-6-50-0004 DEM P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION -OIL STABILIZATION HEAT EXCH. 31-E-4002 (DEMO 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 3-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 22-Jul-19 3-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 95% 95% 0% 0.079% 0.079%
139 7 PROCESS DEM-3963-JALM-6-50-0005 DEM P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION -DEGASSER VESSEL 31-V4009 (DEMOLITION) 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 3-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 22-Jul-19 3-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 95% 95% 0% 0.079% 0.079%
140 7 PROCESS DEM-3963-JALM-6-50-0006 DEM P&ID FOR DUKHAN - JALEHA MAIN DEGASSING STATION -PRODUCED GAS KO POT 31-V5020 (DEMOLITION 1 A 0.056% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 3-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 22-Jul-19 3-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 95% 95% 0% 0.053% 0.053%
141 7 PROCESS DEM-3963-JALM-6-50-0007 DEM P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION -WET LIFTGAS KO DRUM 31-V-4901 (DEMOLITION 1 A 0.056% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 11-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 22-Jul-19 11-May-17 20-May-17 22-May-17 9-Jul-17 23-Jul-17 24-Jul-17 95% 95% 0% 0.053% 0.053%
142 7 PROCESS DEM-3963-JALM-6-50-0008 DEM P&ID FOR DUKHAN - JALEHA MAIN DEGASSING STATION -GAS GATHERING STATION (DEMOLITION) 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 28-Sep-17 2-Jan-18 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 28-Sep-17 2-Jan-18 95% 95% 0% 0.079% 0.079%
143 7 PROCESS DEM-3963-JALM-6-50-0009 DEM P&ID FOR DUKHAN - JALEHA MAIN DEGASSING STATION -3 PHASE TEST SEPARATOR MANIFOLD SHUT DO 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 28-Sep-17 19-Oct-17 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 28-Sep-17 19-Oct-17 95% 95% 0% 0.079% 0.079%
144 7 PROCESS DEM-3963-JALM-6-51-0003 DEM P&ID FOR DUKHAN - JALEHA MAIN DEGASSING STATION - INSTRUMENT AIR DISTRIBUTION (DEMOLITION) 1 A 0.056% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 26-Jul-17 27-Jul-17 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 26-Jul-17 27-Jul-17 95% 95% 0% 0.053% 0.053%
145 7 PROCESS 3963-JALM-6-50-0001 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION -NEW 3 PHASE TEST SEPARATOR 31-V-XXX1 1 A 0.056% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 11-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 21-Jan-18 22-Jul-19 11-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 21-Jan-18 95% 95% 0% 0.053% 0.053%
146 7 PROCESS 3963-DGEN-6-05-0001 OT PROCESS DESCRIPTION 1 A 0.111% 3-May-17 13-May-17 18-May-17 18-Jun-17 9-Jul-17 19-Jul-17 31-Oct-18 4-May-17 10-Jun-17 11-Jun-17 18-Sep-17 28-Sep-17 28-Sep-17 22-Jul-19 4-May-17 10-Jun-17 11-Jun-17 18-Sep-17 28-Sep-17 28-Sep-17 95% 95% 0% 0.106% 0.106%
147 7 PROCESS 3963-DGEN-6-17-0002 OT UTILITY ADEQUACY REPORT 1 A 0.069% 12-May-17 22-May-17 27-May-17 27-Jun-17 18-Jul-17 28-Jul-17 31-Oct-18 25-May-17 29-Aug-17 30-Aug-17 27-Sep-17 27-Sep-17 27-Sep-17 22-Jul-19 25-May-17 29-Aug-17 30-Aug-17 27-Sep-17 27-Sep-17 27-Sep-17 95% 95% 0% 0.066% 0.066%
148 7 PROCESS 3963-DGEN-6-03-0001 OT OPERATING CONTROL & SAFEGUARDING & SHUTDOWN PHILOSOPHY 1 B 0.139% 21-May-17 31-May-17 5-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 25-May-17 11-Jul-17 12-Jul-17 3-Oct-17 29-Oct-17 29-Oct-17 22-Jul-19 25-May-17 11-Jul-17 12-Jul-17 3-Oct-17 29-Oct-17 29-Oct-17 95% 95% 0% 0.132% 0.132%
149 7 PROCESS 3963-DGEN-6-03-0003 OT SHUTDOWN AND CHANGEOVER PHILOSOPHY 1 A 0.111% 13-Jul-17 25-Jul-17 30-Jul-17 27-Aug-17 11-Sep-17 18-Sep-17 31-Oct-18 8-Jul-17 25-Oct-17 26-Oct-17 26-Nov-17 4-Dec-17 4-Dec-17 22-Jul-19 8-Jul-17 25-Oct-17 26-Oct-17 26-Nov-17 4-Dec-17 4-Dec-17 95% 95% 0% 0.106% 0.106%
150 7 PROCESS 3963-DGEN-6-12-0002 OT RELIEF VALVE SIZING CALCULATION 3 A 0.111% 13-Jun-17 23-Jun-17 28-Jun-17 29-Jul-17 19-Aug-17 29-Aug-17 31-Oct-18 9-Jul-17 7-Aug-17 9-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 22-Jul-19 9-Jul-17 7-Aug-17 9-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.106% 0.106%
151 7 PROCESS 3963-DGEN-6-12-0003 OT BLOWDOWN CALCULATION 1 A 0.097% 3-Jul-17 13-Jul-17 18-Jul-17 18-Aug-17 8-Sep-17 18-Sep-17 31-Oct-18 3-Jul-17 19-Aug-17 22-Aug-17 27-Sep-17 12-Oct-17 12-Oct-17 22-Jul-19 3-Jul-17 19-Aug-17 22-Aug-17 27-Sep-17 12-Oct-17 12-Oct-17 95% 95% 0% 0.092% 0.092%
152 7 PROCESS 3963-DGEN-6-17-0004 OT HYDRAULIC ANALYSIS /LINE SIZING CALCULATION REPORT 3 A 0.111% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 2-Apr-17 10-Jun-17 11-Jun-17 17-Aug-17 17-Aug-17 17-Aug-17 22-Jul-19 2-Apr-17 10-Jun-17 11-Jun-17 17-Aug-17 17-Aug-17 17-Aug-17 95% 95% 0% 0.106% 0.106%
153 7 PROCESS 3963-DGEN-6-22-0001 OT STARTUP, SHUTDOWN & OPERATING MANUALS 1 A 0.222% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 20-Aug-18 1-Sep-18 24-Dec-18 31-Dec-18 31-Dec-18 22-Jul-19 27-Jul-17 20-Aug-18 1-Sep-18 40% 40% 0% 0.089% 0.089%
154 7 PROCESS DEM-3963-FAHM-6-50-0006 DEM P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION – THREE PHASE SEPARATOR 14-V-4001 (DEMOL 1 A 0.083% 20-Sep-17 25-Sep-17 30-Sep-17 15-Oct-17 9-Nov-17 29-Nov-17 31-Oct-18 17-Sep-17 18-Sep-17 20-Sep-17 18-Dec-17 2-Jan-18 2-Jan-18 22-Jul-19 17-Sep-17 18-Sep-17 20-Sep-17 18-Dec-17 2-Jan-18 2-Jan-18 95% 95% 0% 0.079% 0.079%
155 7 PROCESS DEM-3963-KAHN-6-51-0002 DEM P&ID FOR DUKHAN – KHATIYAH NORTH DEGASSING STATION – INSTRUMENT AIR RECEIVER 22-V-7330 (D 1 A 0.083% 20-Sep-17 25-Sep-17 30-Sep-17 15-Oct-17 9-Nov-17 29-Nov-17 31-Oct-18 17-Sep-17 18-Sep-17 20-Sep-17 17-Dec-17 3-Jan-18 3-Jan-18 22-Jul-19 17-Sep-17 18-Sep-17 20-Sep-17 17-Dec-17 3-Jan-18 3-Jan-18 95% 95% 0% 0.079% 0.079%
156 8 PROCESS 3963-DGEN-6-00-0002 OT MISCELLANEOUS - PROCESS 0 0.111% 31-Aug-17 6-Sep-17 7-Sep-17 14-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 12-Jan-18 12-Jan-18 15-Jan-18 8-Feb-18 8-Mar-18 8-Mar-18 22-Jul-19 12-Jan-18 12-Jan-18 15-Jan-18 8-Feb-18 8-Mar-18 8-Mar-18 95% 95% 0% 0.106% 0.106%
157 7 PROCESS 3963-DGEN-6-03-0002 OT PRE-COMMISSIONING, COMMISSIONING PHILOSOPHY 1 0 0.139% 27-Jun-17 7-Jul-17 12-Jul-17 12-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 28-Jun-17 22-Jan-18 24-Jan-18 6-Aug-18 24-Sep-18 24-Sep-18 22-Jul-19 28-Jun-17 22-Jan-18 24-Jan-18 6-Aug-18 24-Sep-18 24-Sep-18 95% 95% 0% 0.132% 0.132%
158 7 PROCESS 3963-DGEN-6-17-0003 OT FLARE ADEQUACY REPORT 1 A 0.111% 18-Jun-17 28-Jun-17 3-Jul-17 3-Aug-17 24-Aug-17 3-Sep-17 31-Oct-18 22-Jun-17 16-Oct-17 17-Oct-17 22-Jan-18 22-Feb-18 22-Feb-18 22-Jul-19 22-Jun-17 16-Oct-17 17-Oct-17 22-Jan-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.106% 0.106%
159 7 PROCESS 3963-KAHM-6-50-0004 OT P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - 3 PHASE TEST SEP.24-V-XX1 CTRL SKID 1 B 0.083% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 3-May-17 3-May-17 15-Jun-17 26-Sep-17 11-Mar-18 22-Jul-19 18-Apr-17 3-May-17 3-May-17 15-Jun-17 26-Sep-17 11-Mar-18 95% 95% 0% 0.079% 0.079%
160 7 PROCESS 3963-KAHN-6-50-0002 OT P&ID FOR DUKHAN - KHATIYAH NORTH DEGASSING STATION - 3 PHASE TEST SEPARATOR 22-V-XXX1 CTRL 1 B 0.083% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 26-Sep-17 11-Mar-18 22-Jul-19 18-Apr-17 30-Apr-17 3-May-17 22-Jun-17 26-Sep-17 11-Mar-18 95% 95% 0% 0.079% 0.079%
161 7 PROCESS 3963-FAHM-6-50-0002 OT P&ID FOR DUKHAN - FAHAHIL MAIN DEGASSING STATION - NEW 3 PHASE TEST SEPARATOR 14-V-XXX1, CTR 1 B 0.083% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 18-May-17 2-Jul-17 5-Oct-17 11-Mar-18 22-Jul-19 2-Apr-17 5-Apr-17 18-May-17 2-Jul-17 5-Oct-17 11-Mar-18 95% 95% 0% 0.079% 0.079%
162 7 PROCESS 3963-KAHS-6-50-0002 OT P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - NEW 3 PHASE TEST SEPARATOR 23-V-XXX1 1 B 0.083% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 9-May-17 10-May-17 22-Jun-17 11-Oct-17 30-Jan-18 22-Jul-19 27-Apr-17 9-May-17 10-May-17 22-Jun-17 11-Oct-17 30-Jan-18 95% 95% 0% 0.079% 0.079%
163 7 PROCESS 3963-FAHN-6-50-0003 OT P&ID FOR DUKHAN - FAHAHIL NORTH DEGASSING STATION - 3 PHASE TEST SEP. 12-V-XXX1 CTRL SKID 1 B 0.083% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 4-May-17 14-May-17 18-May-17 2-Jul-17 26-Sep-17 11-Mar-18 22-Jul-19 4-May-17 14-May-17 18-May-17 2-Jul-17 26-Sep-17 11-Mar-18 95% 95% 0% 0.079% 0.079%
164 7 PROCESS 3963-FAHS-6-33-0001 OT LINE DESIGNATION TABLE - FAHAHIL SOUTH DEGASSING STATION 1 A 0.056% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 26-Sep-17 28-Sep-17 2-Nov-17 2-Nov-17 24-Jan-18 22-Jul-19 1-Jun-17 26-Sep-17 28-Sep-17 2-Nov-17 2-Nov-17 24-Jan-18 95% 95% 0% 0.053% 0.053%
165 7 PROCESS 3963-FAHS-6-50-0003 OT P&ID FOR DUKHAN - FAHAHIL SOUTH DEGASSING STATION - 3 PHASE TEST SEP. 13-V-XXX1 CTRL SKID 1 B 0.083% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 3-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 11-Mar-18 22-Jul-19 3-May-17 14-May-17 18-May-17 3-Jul-17 28-Sep-17 11-Mar-18 95% 95% 0% 0.079% 0.079%
166 7 PROCESS 3963-JALM-6-50-0002 OT P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION - NEW 3 PHASE TEST SEPARATOR 31-V-XXX1, CTRL 1 B 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 3-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 11-Mar-18 22-Jul-19 3-May-17 20-May-17 22-May-17 9-Jul-17 9-Jul-17 11-Mar-18 95% 95% 0% 0.079% 0.079%
167 7 PROCESS 3963-DGEN-6-30-0001 OT EQUIPMENT LIST 1 A 0.097% 6-May-17 16-May-17 21-May-17 21-Jun-17 12-Jul-17 22-Jul-17 31-Oct-18 11-May-17 4-Jun-17 4-Jun-17 27-Jul-17 28-Sep-17 18-Jan-18 22-Jul-19 11-May-17 4-Jun-17 4-Jun-17 27-Jul-17 28-Sep-17 18-Jan-18 95% 95% 0% 0.092% 0.092%
168 7 PROCESS 3963-FAHM-6-33-0001 OT LINE DESIGNATION TABLE - FAHAHIL MAIN DEGASSING STATION 1 A 0.111% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 26-Sep-17 28-Sep-17 2-Nov-17 2-Nov-17 24-Jan-18 22-Jul-19 31-May-17 26-Sep-17 28-Sep-17 2-Nov-17 2-Nov-17 24-Jan-18 95% 95% 0% 0.106% 0.106%
169 7 PROCESS 3963-FAHN-6-33-0001 OT LINE DESIGNATION TABLE - FAHAHIL NORTH DEGASSING STATION 1 A 0.069% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 7-Jun-17 26-Sep-17 28-Sep-17 2-Nov-17 2-Nov-17 24-Jan-18 22-Jul-19 7-Jun-17 26-Sep-17 28-Sep-17 2-Nov-17 2-Nov-17 24-Jan-18 95% 95% 0% 0.066% 0.066%
170 7 PROCESS 3963-JALM-6-33-0001 OT LINE DESIGNATION TABLE - JALEHA MAIN DEGASSING STATION 1 A 0.056% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 7-Jun-17 26-Sep-17 28-Sep-17 14-Jan-18 24-Jan-18 24-Jan-18 22-Jul-19 7-Jun-17 26-Sep-17 28-Sep-17 14-Jan-18 24-Jan-18 24-Jan-18 95% 95% 0% 0.053% 0.053%
171 7 PROCESS 3963-KAHM-6-33-0001 OT LINE DESIGNATION TABLE - KHATIYAH MAIN DEGASSING STATION 1 A 0.056% 13-Jun-17 23-Jun-17 28-Jun-17 29-Jul-17 19-Aug-17 29-Aug-17 31-Oct-18 8-Jul-17 26-Sep-17 28-Sep-17 2-Nov-17 2-Nov-17 24-Jan-18 22-Jul-19 8-Jul-17 26-Sep-17 28-Sep-17 2-Nov-17 2-Nov-17 24-Jan-18 95% 95% 0% 0.053% 0.053%
172 7 PROCESS 3963-KAHN-6-33-0001 OT LINE DESIGNATION TABLE - KHATIYAH NORTH DEGASSING STATION 1 A 0.056% 13-Jun-17 23-Jun-17 28-Jun-17 29-Jul-17 19-Aug-17 29-Aug-17 31-Oct-18 11-Jul-17 26-Sep-17 28-Sep-17 14-Jan-18 24-Jan-18 24-Jan-18 22-Jul-19 11-Jul-17 26-Sep-17 28-Sep-17 14-Jan-18 24-Jan-18 24-Jan-18 95% 95% 0% 0.053% 0.053%
173 7 PROCESS 3963-KAHS-6-33-0001 OT LINE DESIGNATION TABLE - KHATIYAH SOUTH DEGASSING STATION 1 A 0.056% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 26-Sep-17 28-Sep-17 2-Nov-17 2-Nov-17 24-Jan-18 22-Jul-19 8-Jul-17 26-Sep-17 28-Sep-17 2-Nov-17 2-Nov-17 24-Jan-18 95% 95% 0% 0.053% 0.053%
174 7 PROCESS DEM-3963-KAHM-6-50-0005 DEM P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - GAS GATHERING STATION, P&ID (DEMOLITIO 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 5-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
175 7 PROCESS DEM-3963-KAHM-6-50-0006 DEM P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - 3 PHASE TEST SEPARATOR CRUDE OIL FROM K 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 5-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
176 7 PROCESS DEM-3963-KAHM-6-51-0001 DEM P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - DRAIN COLLECTION, P&ID (DEMOLITION) 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 3-May-17 15-Jun-17 24-Aug-17 5-Oct-17 22-Jul-19 2-Apr-17 5-Apr-17 3-May-17 15-Jun-17 24-Aug-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
177 7 PROCESS DEM-3963-KAHM-6-51-0002 DEM P&ID FOR DUKHAN - KHATIYAH MAIN DEGASSING STATION - PROCESS FLARE COLLECTION, P&ID (DEMOLIT 1 A 0.042% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 5-Oct-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 15-Jun-17 24-Aug-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
178 7 PROCESS DEM-3963-KAHS-6-50-0001 DEM P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - 3 PHASE TEST SEPARATOR 23-V-7200 (DEMO 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 4-May-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 22-Jul-19 4-May-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 95% 95% 0% 0.040% 0.040%
179 7 PROCESS DEM-3963-KAHS-6-50-0002 DEM P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION - 3 PHASE TEST SEPARATOR CONTROL SKID 23 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 4-May-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 22-Jul-19 4-May-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 95% 95% 0% 0.040% 0.040%
180 7 PROCESS DEM-3963-KAHS-6-50-0003 DEM P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION -3 PHASE TEST SEPARATOR HEADERS (DEMOL 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 2-Apr-17 5-Apr-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 22-Jul-19 2-Apr-17 5-Apr-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 95% 95% 0% 0.040% 0.040%
181 7 PROCESS DEM-3963-KAHS-6-50-0004 DEM P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION -DEGASSING VESSEL 23-V-7280 (DEMOLITION 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 2-Apr-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 22-Jul-19 2-Apr-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 95% 95% 0% 0.040% 0.040%
182 7 PROCESS DEM-3963-KAHS-6-50-0005 DEM P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION -HYDROCARBON CONDENSATE LINES (DEMOL 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 22-Jul-19 27-Apr-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 95% 95% 0% 0.040% 0.040%
183 7 PROCESS DEM-3963-KAHS-6-50-0006 DEM P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION -MANIFOLD SHUTDOWN VALVES (DEMOLITIO 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 4-May-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 22-Jul-19 4-May-17 9-May-17 10-May-17 22-Jun-17 22-Jun-17 29-Nov-17 95% 95% 0% 0.040% 0.040%
184 7 PROCESS DEM-3963-KAHS-6-51-0002 DEM P&ID FOR DUKHAN - KHATIYAH SOUTH DEGASSING STATION -FLARE COLLECTION (DEMOLITION) 1 A 0.042% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 4-May-17 9-May-17 10-May-17 22-Jun-17 24-Aug-17 29-Nov-17 22-Jul-19 4-May-17 9-May-17 10-May-17 22-Jun-17 24-Aug-17 29-Nov-17 95% 95% 0% 0.040% 0.040%
185 7 PROCESS DEM-3963-JALM-6-51-0001 DEM P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION -DRAIN COLLECTION (DEMOLITION) 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 15-Oct-17 29-Nov-17 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 15-Oct-17 29-Nov-17 95% 95% 0% 0.079% 0.079%
186 7 PROCESS DEM-3963-JALM-6-51-0002 DEM P&ID FOR DUKHAN -JALEHA MAIN DEGASSING STATION -FLARE COLLECTION (DEMOLITION) 1 A 0.083% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 4-May-17 20-May-17 22-May-17 9-Jul-17 15-Oct-17 29-Nov-17 22-Jul-19 4-May-17 20-May-17 22-May-17 9-Jul-17 15-Oct-17 29-Nov-17 95% 95% 0% 0.079% 0.079%
187 8 PIPING 3963-DGEN-5-14-0001 OT DUKHAN FIELD; PIPING MATERIAL SPECIFICATIONS 1 A 0.140% 13-Apr-17 23-Apr-17 28-Apr-17 29-May-17 19-Jun-17 29-Jun-17 31-Oct-18 19-Apr-17 27-May-17 28-May-17 20-Aug-17 30-Aug-17 8-Oct-17 22-Jul-19 19-Apr-17 27-May-17 28-May-17 20-Aug-17 30-Aug-17 8-Oct-17 95% 95% 0% 0.133% 0.133%
188 8 PIPING 3963-DGEN-5-14-0002 OT DUKHAN FIELD; TECHNICAL SPECIFICATION FOR PIPING STRESS ANALYSIS 1 A 0.084% 10-Apr-17 20-Apr-17 25-Apr-17 26-May-17 16-Jun-17 26-Jun-17 31-Oct-18 29-Mar-17 29-Mar-17 19-Apr-17 25-May-17 11-Jun-17 11-Jun-17 22-Jul-19 29-Mar-17 29-Mar-17 19-Apr-17 25-May-17 11-Jun-17 11-Jun-17 95% 95% 0% 0.080% 0.080%
189 8 PIPING 3963-DGEN-5-14-0004 OT DUKHAN FIELD; TECHNICAL SPECIFICATION FOR PIPES 1 A 0.084% 5-Apr-17 15-Apr-17 20-Apr-17 21-May-17 11-Jun-17 21-Jun-17 31-Oct-18 5-Apr-17 24-Apr-17 27-Apr-17 11-Jul-17 12-Jul-17 13-Jul-17 22-Jul-19 5-Apr-17 24-Apr-17 27-Apr-17 11-Jul-17 12-Jul-17 13-Jul-17 95% 95% 0% 0.080% 0.080%
190 8 PIPING 3963-DGEN-5-14-0005 OT DUKHAN FIELD; TECHNICAL SPECIFICATION FOR FITTINGS & FLANGES 1 A 0.084% 5-Apr-17 15-Apr-17 20-Apr-17 21-May-17 11-Jun-17 21-Jun-17 31-Oct-18 29-Mar-17 24-Apr-17 27-Apr-17 20-Jun-17 20-Jun-17 20-Jun-17 22-Jul-19 29-Mar-17 24-Apr-17 27-Apr-17 20-Jun-17 20-Jun-17 20-Jun-17 95% 95% 0% 0.080% 0.080%
191 8 PIPING 3963-DGEN-5-14-0006 OT DUKHAN FIELD; TECHNICAL SPECIFICATION FOR MANUAL VALVES 1 B 0.084% 1-Apr-17 11-Apr-17 16-Apr-17 17-May-17 7-Jun-17 17-Jun-17 31-Oct-18 5-Apr-17 16-Apr-17 19-Apr-17 13-Jun-17 13-Jun-17 13-Jun-17 22-Jul-19 5-Apr-17 16-Apr-17 19-Apr-17 13-Jun-17 13-Jun-17 13-Jun-17 95% 95% 0% 0.080% 0.080%
192 8 PIPING 3963-DGEN-5-13-0001 OT DUKHAN FIELD; DATA SHEETS FOR BALL VALVES 1 B 0.168% 5-Mar-17 10-Mar-17 14-Mar-17 14-Apr-17 5-May-17 15-May-17 31-Oct-18 15-Mar-17 17-Mar-17 20-Mar-17 1-May-17 7-Jun-17 7-Jun-17 22-Jul-19 15-Mar-17 17-Mar-17 20-Mar-17 1-May-17 7-Jun-17 7-Jun-17 95% 95% 0% 0.160% 0.160%
193 8 PIPING 3963-DGEN-5-13-0002 OT DUKHAN FIELD; DATA SHEET FOR GATE VALVES 1 A 0.112% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 20-Apr-17 16-May-17 16-May-17 5-Jun-17 21-Jun-17 21-Jun-17 22-Jul-19 20-Apr-17 16-May-17 16-May-17 5-Jun-17 21-Jun-17 21-Jun-17 95% 95% 0% 0.106% 0.106%
194 8 PIPING 3963-DGEN-5-13-0003 OT DUKHAN FIELD; DATA SHEET FOR GLOBE VALVES 1 A 0.112% 20-Apr-17 30-Apr-17 5-May-17 5-Jun-17 26-Jun-17 6-Jul-17 31-Oct-18 19-Apr-17 19-May-17 21-May-17 13-Jun-17 11-Jul-17 12-Jul-17 22-Jul-19 19-Apr-17 19-May-17 21-May-17 13-Jun-17 11-Jul-17 12-Jul-17 95% 95% 0% 0.106% 0.106%
195 8 PIPING 3963-DGEN-5-13-0004 OT DUKHAN FIELD; DATA SHEET FOR CHECK VALVES 1 B 0.112% 25-Apr-17 5-May-17 10-May-17 10-Jun-17 1-Jul-17 11-Jul-17 31-Oct-18 20-Apr-17 19-May-17 21-May-17 13-Jun-17 22-Jul-17 23-Jul-17 22-Jul-19 20-Apr-17 19-May-17 21-May-17 13-Jun-17 22-Jul-17 23-Jul-17 95% 95% 0% 0.106% 0.106%
196 8 PIPING 3963-DGEN-5-13-0005 OT DUKHAN FIELD; DATA SHEET FOR NEEDLE VALVES 1 A 0.084% 30-Apr-17 10-May-17 15-May-17 15-Jun-17 6-Jul-17 16-Jul-17 31-Oct-18 5-Apr-17 30-May-17 31-May-17 21-Jun-17 12-Jul-17 13-Jul-17 22-Jul-19 5-Apr-17 30-May-17 31-May-17 21-Jun-17 12-Jul-17 13-Jul-17 95% 95% 0% 0.080% 0.080%
197 8 PIPING 3963-DGEN-5-13-0006 OT DUKHAN FIELD; DATASHEET FOR CORROSION COUPON & CORROSION PROBES 1 A 0.112% 10-May-17 20-May-17 25-May-17 25-Jun-17 16-Jul-17 26-Jul-17 31-Oct-18 11-May-17 8-Jun-17 8-Jun-17 25-Jul-17 25-Jul-17 14-Sep-17 22-Jul-19 11-May-17 8-Jun-17 8-Jun-17 25-Jul-17 25-Jul-17 14-Sep-17 95% 95% 0% 0.106% 0.106%
198 8 PIPING 3963-DGEN-5-15-0001 OT DUKHAN FIELD; MATERIAL REQUISITION FOR MANUAL VALVES (GATE, GLOBE & CHECK) 1 A 0.070% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 25-May-17 6-Jun-17 6-Jun-17 11-Jul-17 15-Jul-17 20-Jul-17 22-Jul-19 25-May-17 6-Jun-17 6-Jun-17 11-Jul-17 15-Jul-17 20-Jul-17 95% 95% 0% 0.067% 0.067%
199 8 PIPING 3963-DGEN-5-15-0002 OT DUKHAN FIELD; MATERIAL REQUISITION FOR PIPING BULK ITEMS 1 A 0.070% 3-Jun-17 13-Jun-17 18-Jun-17 19-Jul-17 9-Aug-17 19-Aug-17 31-Oct-18 7-Jun-17 12-Jul-17 13-Jul-17 1-Aug-17 10-Aug-17 10-Aug-17 22-Jul-19 7-Jun-17 12-Jul-17 13-Jul-17 1-Aug-17 10-Aug-17 10-Aug-17 95% 95% 0% 0.067% 0.067%
200 8 PIPING 3963-DGEN-5-15-0003 OT DUKHAN FIELD; MATERIAL REQUISITIONS FOR BALL VALVES 1 A 0.070% 26-May-17 5-Jun-17 10-Jun-17 11-Jul-17 1-Aug-17 11-Aug-17 31-Oct-18 31-May-17 6-Jun-17 6-Jun-17 11-Jul-17 15-Jul-17 20-Jul-17 22-Jul-19 31-May-17 6-Jun-17 6-Jun-17 11-Jul-17 15-Jul-17 20-Jul-17 95% 95% 0% 0.067% 0.067%
201 8 PIPING 3963-DGEN-5-15-0004 OT DUKHAN FIELD; MATERIAL REQUISITION FOR PIPING SPECIALTY ITEMS (STRAINERS, SAMPLING, CORROSI 1 A 0.070% 29-May-17 8-Jun-17 13-Jun-17 14-Jul-17 4-Aug-17 14-Aug-17 31-Oct-18 31-May-17 30-Jul-17 31-Jul-17 2-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 31-May-17 30-Jul-17 31-Jul-17 2-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.067% 0.067%
202 8 PIPING 3963-DGEN-5-17-0001 OT DUKHAN FIELD; TECHNICAL BID EVALUATION FOR MANUAL VALVES (GATE, GLOBE & CHECK) 1 A 0.252% 17-Jul-17 27-Jul-17 1-Aug-17 18-Aug-17 28-Aug-17 6-Sep-17 31-Oct-18 20-Jul-17 24-Oct-17 26-Oct-17 19-Nov-17 28-Nov-17 28-Nov-17 22-Jul-19 20-Jul-17 24-Oct-17 26-Oct-17 19-Nov-17 28-Nov-17 28-Nov-17 95% 95% 0% 0.240% 0.240%
203 8 PIPING 3963-DGEN-5-17-0003 OT DUKHAN FIELD; TECHNICAL BID EVALUATION FOR BALL VALVES 1 A 0.224% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 24-Oct-17 26-Oct-17 21-Nov-17 5-Dec-17 5-Dec-17 22-Jul-19 27-Jul-17 24-Oct-17 26-Oct-17 21-Nov-17 5-Dec-17 5-Dec-17 95% 95% 0% 0.213% 0.213%
204 8 PIPING 3963-DGEN-5-17-0004 OT DUKHAN FIELD; TECHNICAL BID EVALUATION FOR PIPING SPECIALTY ITEMS (STRAINERS, SAMPLING, COR 1 A 0.224% 10-Aug-17 20-Aug-17 25-Aug-17 12-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 21-Oct-17 23-Oct-17 23-Nov-17 7-Dec-17 3-Dec-17 22-Jul-19 19-Oct-17 21-Oct-17 23-Oct-17 23-Nov-17 7-Dec-17 3-Dec-17 95% 95% 0% 0.213% 0.213%
205 8 PIPING 3963-DGEN-5-36-0001 ET DUKHAN FIELD; EARLY TIE-IN PACKAGE 1 C Y 0.070% 5-Mar-17 10-Mar-17 14-Mar-17 14-Apr-17 5-May-17 15-May-17 31-Oct-18 15-Mar-17 17-Mar-17 20-Mar-17 15-Jun-17 12-Jul-17 13-Jul-17 22-Jul-19 15-Mar-17 17-Mar-17 20-Mar-17 15-Jun-17 12-Jul-17 13-Jul-17 95% 95% 0% 0.067% 0.067%
206 8 PIPING 3963-FAHN-5-33-0001 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; CRITICAL LINE LIST 1 A 0.042% 16-Jun-17 26-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 1-Sep-17 31-Oct-18 21-Jun-17 19-Jul-17 20-Jul-17 20-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 21-Jun-17 19-Jul-17 20-Jul-17 20-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.040% 0.040%
207 8 PIPING 3963-FAHN-5-32-0001 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST 1 A 0.028% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 1-Jun-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.027% 0.027%
208 8 PIPING 3963-FAHN-5-21-0001 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; TIE-IN ENGINEERING PACKAGE 3 0 0.168% 15-Aug-17 25-Aug-17 30-Aug-17 13-Sep-17 18-Sep-17 18-Sep-17 31-Oct-18 19-Oct-17 12-Mar-18 14-Mar-18 8-Sep-18 2-Dec-18 2-Dec-18 22-Jul-19 19-Oct-17 12-Mar-18 14-Mar-18 8-Sep-18 65% 65% 0% 0.109% 0.109%
209 8 PIPING 3963-FAHN-5-31-0001 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; MATERIAL TAKE OFF - PIPING BULK ITEMS 3 A 0.280% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 22-Jul-19 1-Jun-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 95% 95% 0% 0.266% 0.266%
210 8 PIPING 3963-FAHN-5-17-0001 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT 3 A 0.420% 16-Jun-17 26-Jun-17 1-Jul-17 15-Jul-17 20-Jul-17 20-Jul-17 31-Oct-18 21-Jun-17 25-Sep-17 27-Sep-17 16-Oct-17 29-Oct-17 7-Feb-18 22-Jul-19 21-Jun-17 25-Sep-17 27-Sep-17 16-Oct-17 29-Oct-17 7-Feb-18 95% 95% 0% 0.399% 0.399%
211 8 PIPING 3963-FAHN-5-52-0003 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.3 PIPING GA EL.21.600 & ABOVE 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 8-Dec-17 10-Dec-17 12-Feb-18 28-Feb-18 28-Feb-18 22-Jul-19 19-Oct-17 8-Dec-17 10-Dec-17 12-Feb-18 28-Feb-18 28-Feb-18 95% 95% 0% 0.093% 0.093%
212 8 PIPING 3963-FAHN-5-52-0004 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.4 PIPING GA EL.21.600 & ABOVE 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 7-Feb-18 7-Feb-18 22-Jul-19 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 7-Feb-18 7-Feb-18 95% 95% 0% 0.093% 0.093%
213 8 PIPING 3963-FAHN-5-52-0005 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.5 PIPING GA EL.21.600 & ABOVE 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 7-Feb-18 7-Feb-18 22-Jul-19 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 7-Feb-18 7-Feb-18 95% 95% 0% 0.093% 0.093%
214 8 PIPING 3963-FAHN-5-52-0006 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.6 PIPING GA EL.22.620 & ABOVE 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 7-Feb-18 7-Feb-18 22-Jul-19 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 7-Feb-18 7-Feb-18 95% 95% 0% 0.093% 0.093%
215 8 PIPING 3963-FAHN-5-52-0007 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.7 PIPING GA EL.22.620 & ABOVE 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 11-Feb-18 11-Feb-18 22-Jul-19 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 11-Feb-18 11-Feb-18 95% 95% 0% 0.093% 0.093%
216 8 PIPING 3963-FAHN-5-52-0008 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.8 PIPING GA EL.22.620 & ABOVE 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 11-Feb-18 11-Feb-18 22-Jul-19 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 11-Feb-18 11-Feb-18 95% 95% 0% 0.093% 0.093%
217 8 PIPING 3963-FAHN-5-52-0009 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.9 PIPING GA EL.22.620 & ABOVE 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 11-Feb-18 11-Feb-18 22-Jul-19 19-Oct-17 30-Oct-17 31-Oct-17 15-Nov-17 11-Feb-18 11-Feb-18 95% 95% 0% 0.093% 0.093%
218 8 PIPING 3963-FAHN-5-52-0010 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.10 PIPING GA EL.22.620 & ABOVE 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 1-Nov-17 20-Nov-17 11-Feb-18 11-Feb-18 22-Jul-19 19-Oct-17 31-Oct-17 1-Nov-17 20-Nov-17 11-Feb-18 11-Feb-18 95% 95% 0% 0.093% 0.093%
219 8 PIPING 3963-FAHN-5-52-0011 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.11 PIPING GA EL.22.620 & ABOVE 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 1-Nov-17 16-Nov-17 16-Nov-17 20-Nov-17 22-Jul-19 19-Oct-17 31-Oct-17 1-Nov-17 16-Nov-17 16-Nov-17 20-Nov-17 95% 95% 0% 0.093% 0.093%
220 8 PIPING 3963-FAHS-5-33-0001 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; CRITICAL LINE LIST 1 B 0.042% 16-Jun-17 26-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 1-Sep-17 31-Oct-18 21-Jun-17 19-Jul-17 20-Jul-17 23-Aug-17 13-Sep-17 14-Sep-17 22-Jul-19 21-Jun-17 19-Jul-17 20-Jul-17 23-Aug-17 13-Sep-17 14-Sep-17 95% 95% 0% 0.040% 0.040%
221 8 PIPING 3963-FAHS-5-32-0001 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST 1 A 0.028% 28-May-17 7-Jun-17 12-Jun-17 13-Jul-17 3-Aug-17 13-Aug-17 31-Oct-18 1-Jun-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 1-Jun-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.027% 0.027%
222 8 PIPING 3963-FAHS-5-36-0001 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING TIE-IN SCHEDULE 1 A 0.056% 24-Jul-17 3-Aug-17 8-Aug-17 26-Aug-17 5-Sep-17 15-Sep-17 31-Oct-18 16-Jul-17 17-Jul-17 18-Jul-17 14-Nov-17 28-Nov-17 28-Nov-17 22-Jul-19 16-Jul-17 17-Jul-17 18-Jul-17 14-Nov-17 28-Nov-17 28-Nov-17 95% 95% 0% 0.053% 0.053%
223 8 PIPING 3963-FAHS-5-21-0001 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; TIE-IN ENGINEERING PACKAGE 3 A 0.168% 10-Aug-17 20-Aug-17 25-Aug-17 8-Sep-17 13-Sep-17 13-Sep-17 31-Oct-18 19-Oct-17 20-Mar-18 22-Mar-18 30-Aug-18 2-Dec-18 2-Dec-18 22-Jul-19 19-Oct-17 20-Mar-18 22-Mar-18 30-Aug-18 65% 65% 0% 0.109% 0.109%
224 8 PIPING 3963-FAHS-5-31-0001 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; MATERIAL TAKE OFF - PIPING BULK ITEMS 3 A 0.336% 2-Jun-17 12-Jun-17 17-Jun-17 18-Jul-17 8-Aug-17 18-Aug-17 31-Oct-18 7-Jun-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 22-Jul-19 7-Jun-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 95% 95% 0% 0.319% 0.319%
225 8 PIPING 3963-FAHS-5-17-0001 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT 3 A 0.420% 25-Jun-17 5-Jul-17 10-Jul-17 24-Jul-17 29-Jul-17 29-Jul-17 31-Oct-18 29-Jun-17 3-Oct-17 5-Oct-17 23-Oct-17 23-Oct-17 14-Feb-18 22-Jul-19 29-Jun-17 3-Oct-17 5-Oct-17 23-Oct-17 23-Oct-17 14-Feb-18 95% 95% 0% 0.399% 0.399%
226 8 PIPING 3963-FAHS-5-50-0002 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; KEY PLAN 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 26-Nov-17 22-Jul-19 27-Jul-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 26-Nov-17 95% 95% 0% 0.040% 0.040%
227 8 PIPING 3963-FAHS-5-52-0001 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.1 EL. 54.364 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 12-Oct-17 15-Oct-17 16-Oct-17 2-Nov-17 2-Nov-17 2-Nov-17 22-Jul-19 12-Oct-17 15-Oct-17 16-Oct-17 2-Nov-17 2-Nov-17 2-Nov-17 95% 95% 0% 0.093% 0.093%
228 8 PIPING 3963-FAHS-5-52-0002 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.2 EL. 54.364 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 19-Oct-17 30-Oct-17 1-Nov-17 1-Nov-17 1-Nov-17 20-Nov-17 22-Jul-19 19-Oct-17 30-Oct-17 1-Nov-17 1-Nov-17 1-Nov-17 20-Nov-17 95% 95% 0% 0.093% 0.093%
229 8 PIPING 3963-FAHS-5-52-0003 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.3 EL. 54.364 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 12-Oct-17 15-Oct-17 16-Oct-17 2-Nov-17 2-Nov-17 2-Nov-17 22-Jul-19 12-Oct-17 15-Oct-17 16-Oct-17 2-Nov-17 2-Nov-17 2-Nov-17 95% 95% 0% 0.093% 0.093%
230 8 PIPING 3963-FAHS-5-52-0004 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.4 EL. 54.364 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 18-Feb-18 18-Feb-18 22-Jul-19 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 18-Feb-18 18-Feb-18 95% 95% 0% 0.093% 0.093%
231 8 PIPING 3963-FAHS-5-52-0005 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.5 EL. 54.700 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 19-Feb-18 19-Feb-18 22-Jul-19 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 19-Feb-18 19-Feb-18 95% 95% 0% 0.093% 0.093%
232 8 PIPING 3963-FAHS-5-52-0006 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.6 EL. 54.700 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 12-Oct-17 15-Oct-17 16-Oct-17 30-Oct-17 30-Oct-17 18-Feb-18 22-Jul-19 12-Oct-17 15-Oct-17 16-Oct-17 30-Oct-17 30-Oct-17 18-Feb-18 95% 95% 0% 0.093% 0.093%
233 8 PIPING 3963-FAHS-5-52-0007 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.7 EL. 54.470 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 18-Feb-18 18-Feb-18 22-Jul-19 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 18-Feb-18 18-Feb-18 95% 95% 0% 0.093% 0.093%

Page 9 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
234 8 PIPING 3963-FAHS-5-52-0008 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.8 EL. 54.470 & ABOVE 1 1 E 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 19-Oct-17 15-Dec-17 17-Dec-17 25-Feb-18 18-Mar-18 18-Mar-18 22-Jul-19 19-Oct-17 15-Dec-17 17-Dec-17 25-Feb-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.093% 0.093%
235 8 PIPING 3963-FAHS-5-52-0009 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.9 EL. 54.470 TO 58.470 1 1 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 19-Oct-17 18-Dec-17 21-Dec-17 18-Feb-18 18-Mar-18 18-Mar-18 22-Jul-19 19-Oct-17 18-Dec-17 21-Dec-17 18-Feb-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.093% 0.093%
236 8 PIPING 3963-FAHS-5-52-0010 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.10 EL. 54.364 & ABOVE 1 1 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 19-Oct-17 18-Dec-17 20-Dec-17 21-Feb-18 18-Mar-18 18-Mar-18 22-Jul-19 19-Oct-17 18-Dec-17 20-Dec-17 21-Feb-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.093% 0.093%
237 8 PIPING 3963-FAHS-5-52-0011 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.11 EL. 54.364 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 25-Feb-18 25-Feb-18 22-Jul-19 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 25-Feb-18 25-Feb-18 95% 95% 0% 0.093% 0.093%
238 8 PIPING 3963-FAHS-5-52-0012 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.12 EL. 54.364 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 25-Feb-18 25-Feb-18 22-Jul-19 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 25-Feb-18 25-Feb-18 95% 95% 0% 0.093% 0.093%
239 8 PIPING 3963-FAHS-5-52-0013 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.13 EL. 54.364 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 25-Feb-18 25-Feb-18 22-Jul-19 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 25-Feb-18 25-Feb-18 95% 95% 0% 0.093% 0.093%
240 8 PIPING 3963-FAHS-5-52-0014 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.14 EL. 54.364 & ABOVE 1 A 0.098% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 25-Feb-18 25-Feb-18 22-Jul-19 12-Oct-17 15-Oct-17 16-Oct-17 19-Nov-17 25-Feb-18 25-Feb-18 95% 95% 0% 0.093% 0.093%
241 8 PIPING 3963-JALM-5-33-0001 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; CRITICAL LINE LIST 1 B 0.042% 16-Jun-17 26-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 1-Sep-17 31-Oct-18 21-Jun-17 19-Jul-17 20-Jul-17 23-Aug-17 13-Sep-17 14-Sep-17 22-Jul-19 21-Jun-17 19-Jul-17 20-Jul-17 23-Aug-17 13-Sep-17 14-Sep-17 95% 95% 0% 0.040% 0.040%
242 8 PIPING 3963-JALM-5-32-0001 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING SPECIALTY ITEM LIST 1 A 0.028% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 7-Jun-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 7-Jun-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.027% 0.027%
243 8 PIPING 3963-JALM-5-36-0001 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING TIE-IN SCHEDULE 1 A 0.056% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 4-Aug-17 6-Aug-17 8-Aug-17 28-Nov-17 10-Dec-17 10-Dec-17 22-Jul-19 4-Aug-17 6-Aug-17 8-Aug-17 28-Nov-17 10-Dec-17 10-Dec-17 95% 95% 0% 0.053% 0.053%
244 8 PIPING 3963-JALM-5-21-0001 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; TIE-IN ENGINEERING PACKAGE 3 A 0.168% 15-Aug-17 25-Aug-17 30-Aug-17 13-Sep-17 18-Sep-17 18-Sep-17 31-Oct-18 19-Oct-17 20-Mar-18 22-Mar-18 8-Sep-18 2-Dec-18 2-Dec-18 22-Jul-19 19-Oct-17 20-Mar-18 22-Mar-18 8-Sep-18 65% 65% 0% 0.109% 0.109%
245 8 PIPING 3963-JALM-5-31-0001 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; MATERIAL TAKE OFF - PIPING BULK ITEMS 3 A 0.336% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 7-Jun-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 22-Jul-19 7-Jun-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 95% 95% 0% 0.319% 0.319%
246 8 PIPING 3963-JALM-5-17-0001 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING STRESS ANALYSIS REPORT 3 A 0.420% 5-Jul-17 15-Jul-17 20-Jul-17 3-Aug-17 8-Aug-17 8-Aug-17 31-Oct-18 3-Jul-17 11-Oct-17 12-Oct-17 2-Jan-18 26-Feb-18 26-Feb-18 22-Jul-19 3-Jul-17 11-Oct-17 12-Oct-17 2-Jan-18 26-Feb-18 26-Feb-18 95% 95% 0% 0.399% 0.399%
247 8 PIPING 3963-JALM-5-50-0002 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; KEY PLAN 1 A 0.042% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 1-Aug-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 26-Nov-17 22-Jul-19 1-Aug-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 26-Nov-17 95% 95% 0% 0.040% 0.040%
248 8 PIPING 3963-JALM-5-52-0003 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.3 EL.63.000 & ABOVE 1 1 0.140% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 5-Jan-18 7-Jan-18 4-Mar-18 22-Mar-18 22-Mar-18 22-Jul-19 8-Jul-17 5-Jan-18 7-Jan-18 4-Mar-18 22-Mar-18 22-Mar-18 95% 95% 0% 0.133% 0.133%
249 8 PIPING 3963-JALM-5-52-0004 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.4 EL.63.000 & ABOVE 1 1 0.084% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 11-Jul-17 26-Dec-17 28-Dec-17 4-Mar-18 22-Mar-18 22-Mar-18 22-Jul-19 11-Jul-17 26-Dec-17 28-Dec-17 4-Mar-18 22-Mar-18 22-Mar-18 95% 95% 0% 0.080% 0.080%
250 8 PIPING 3963-JALM-5-52-0005 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.5 EL.63.000 & ABOVE 1 1 0.140% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 26-Dec-17 28-Dec-17 4-Mar-18 22-Mar-18 22-Mar-18 22-Jul-19 8-Jul-17 26-Dec-17 28-Dec-17 4-Mar-18 22-Mar-18 22-Mar-18 95% 95% 0% 0.133% 0.133%
251 8 PIPING 3963-JALM-5-52-0006 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.6 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
252 8 PIPING 3963-JALM-5-52-0007 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.7 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
253 8 PIPING 3963-JALM-5-52-0008 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.8 EL.63000 & ABOVE 1 A 0.112% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.106% 0.106%
254 8 PIPING 3963-JALM-5-52-0009 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.9 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 13-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 13-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
255 8 PIPING 3963-JALM-5-52-0010 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.10 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
256 8 PIPING 3963-JALM-5-52-0011 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.11 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 11-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 11-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
257 8 PIPING 3963-JALM-5-52-0012 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.12 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
258 8 PIPING 3963-JALM-5-52-0013 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.13 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 13-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 4-Dec-17 4-Dec-17 22-Jul-19 13-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 4-Dec-17 4-Dec-17 95% 95% 0% 0.067% 0.067%
259 8 PIPING 3963-JALM-5-52-0014 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.14 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 13-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 13-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
260 8 PIPING 3963-JALM-5-52-0015 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.15 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 13-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 13-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
261 8 PIPING 3963-JALM-5-52-0016 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.16 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
262 8 PIPING 3963-JALM-5-52-0017 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.17 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
263 8 PIPING 3963-JALM-5-52-0018 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.18 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
264 8 PIPING 3963-JALM-5-52-0019 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.19 EL.63.000 & ABOVE 1 A 0.070% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 8-Jul-17 30-Oct-17 31-Oct-17 23-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.067% 0.067%
265 8 PIPING 3963-KAHM-5-33-0001 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; CRITICAL LINE LIST 1 A 0.042% 22-Jun-17 2-Jul-17 7-Jul-17 7-Aug-17 28-Aug-17 7-Sep-17 31-Oct-18 21-Jun-17 19-Jul-17 20-Jul-17 20-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 21-Jun-17 19-Jul-17 20-Jul-17 20-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.040% 0.040%
266 8 PIPING 3963-KAHM-5-32-0001 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING SPECIALTY ITEM LIST 1 A 0.028% 21-May-17 31-May-17 5-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 25-May-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 25-May-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.027% 0.027%
267 8 PIPING 3963-KAHM-5-21-0001 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; TIE-IN ENGINEERING PACKAGE 3 A 0.168% 5-Aug-17 15-Aug-17 20-Aug-17 5-Sep-17 15-Sep-17 15-Sep-17 31-Oct-18 19-Oct-17 30-Mar-18 1-Apr-18 7-May-18 27-May-18 27-May-18 22-Jul-19 19-Oct-17 30-Mar-18 1-Apr-18 7-May-18 27-May-18 27-May-18 95% 95% 0% 0.160% 0.160%
268 8 PIPING 3963-KAHM-5-31-0001 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; MATERIAL TAKE OFF - PIPING BULK ITEMS 3 A 0.336% 10-Jun-17 20-Jun-17 25-Jun-17 26-Jul-17 16-Aug-17 26-Aug-17 31-Oct-18 8-Jul-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 22-Jul-19 8-Jul-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 95% 95% 0% 0.319% 0.319%
269 8 PIPING 3963-KAHM-5-31-0002 ET DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; MATERIAL TAKE OFF - PIPING BULK ITEMS (EARLY T 3 A Y 0.084% 7-May-17 11-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 5-May-17 7-May-17 8-May-17 30-Jul-17 29-Jul-17 30-Jul-17 22-Jul-19 5-May-17 7-May-17 8-May-17 30-Jul-17 29-Jul-17 30-Jul-17 95% 95% 0% 0.080% 0.080%
270 8 PIPING 3963-KAHM-5-50-0002 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; KEY PLAN 1 A 0.042% 26-May-17 5-Jun-17 10-Jun-17 11-Jul-17 1-Aug-17 11-Aug-17 31-Oct-18 1-Jun-17 15-Jul-17 16-Jul-17 26-Oct-17 26-Oct-17 26-Nov-17 22-Jul-19 1-Jun-17 15-Jul-17 16-Jul-17 26-Oct-17 26-Oct-17 26-Nov-17 95% 95% 0% 0.040% 0.040%
271 8 PIPING 3963-KAHM-5-52-0002 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.2 EL. 99.143 & ABOVE 1 A 0.060% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 29-Nov-17 22-Jul-19 31-May-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 29-Nov-17 95% 95% 0% 0.057% 0.057%
272 8 PIPING 3963-KAHM-5-52-0004 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.4 EL. 99.143 & ABOVE 1 A 0.075% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 29-Nov-17 22-Jul-19 31-May-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 29-Nov-17 95% 95% 0% 0.072% 0.072%
273 8 PIPING 3963-KAHM-5-52-0006 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.6 EL. 98.973 & ABOVE 1 A 0.090% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 2-Aug-17 3-Aug-17 29-Oct-17 29-Oct-17 29-Nov-17 22-Jul-19 31-May-17 2-Aug-17 3-Aug-17 29-Oct-17 29-Oct-17 29-Nov-17 95% 95% 0% 0.086% 0.086%
274 8 PIPING 3963-KAHM-5-52-0007 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA-255 SHT.7 EL.99.743 & ABOVE 1 A 0.090% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 28-Nov-17 22-Jul-19 1-Jun-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 28-Nov-17 95% 95% 0% 0.086% 0.086%
275 8 PIPING 3963-KAHM-5-52-0010 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.10 EL. 99.443 & ABOVE 1 A 0.075% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 28-Nov-17 22-Jul-19 1-Jun-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 28-Nov-17 95% 95% 0% 0.072% 0.072%
276 8 PIPING 3963-KAHM-5-52-0011 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A. AREA-255, SHT.11 EL.99.9943 & ABOV 1 A 0.075% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 28-Dec-17 22-Jul-19 31-May-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 28-Dec-17 95% 95% 0% 0.072% 0.072%
277 8 PIPING 3963-KAHM-5-71-0002 ET DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING ISOMETRICS FOR EARLY TIE-IN 3 A Y 0.132% 6-Jul-17 16-Jul-17 20-Jul-17 30-Jul-17 9-Aug-17 19-Aug-17 31-Oct-18 18-Jul-17 19-Jul-17 20-Jul-17 7-Sep-17 7-Sep-17 30-Nov-17 22-Jul-19 18-Jul-17 19-Jul-17 20-Jul-17 7-Sep-17 7-Sep-17 30-Nov-17 95% 95% 0% 0.126% 0.126%
278 8 PIPING 3963-KAHN-5-33-0001 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; CRITICAL LINE LIST 1 A 0.042% 22-Jun-17 2-Jul-17 7-Jul-17 7-Aug-17 28-Aug-17 7-Sep-17 31-Oct-18 21-Jun-17 19-Jul-17 20-Jul-17 20-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 21-Jun-17 19-Jul-17 20-Jul-17 20-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.040% 0.040%
279 8 PIPING 3963-KAHN-5-32-0001 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST 1 A 0.028% 26-May-17 5-Jun-17 10-Jun-17 11-Jul-17 1-Aug-17 11-Aug-17 31-Oct-18 31-May-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 31-May-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.027% 0.027%
280 8 PIPING 3963-KAHN-5-21-0001 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; TIE-IN ENGINEERING PACKAGE 3 A 0.224% 8-Aug-17 18-Aug-17 23-Aug-17 6-Sep-17 11-Sep-17 11-Sep-17 31-Oct-18 19-Oct-17 30-Mar-18 1-Apr-18 5-May-18 31-May-18 31-May-18 22-Jul-19 19-Oct-17 30-Mar-18 1-Apr-18 5-May-18 31-May-18 31-May-18 95% 95% 0% 0.213% 0.213%
281 8 PIPING 3963-KAHN-5-31-0001 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; MATERIAL TAKE OFF - PIPING BULK ITEMS 3 A 0.336% 12-Jun-17 22-Jun-17 27-Jun-17 28-Jul-17 18-Aug-17 28-Aug-17 31-Oct-18 11-Jul-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 22-Jul-19 11-Jul-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 95% 95% 0% 0.319% 0.319%
282 8 PIPING 3963-KAHN-5-31-0002 ET DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; MATERIAL TAKE OFF - PIPING BULK ITEMS (EARLY 3 A Y 0.084% 7-May-17 11-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 5-May-17 7-May-17 8-May-17 18-Jul-17 7-Sep-17 7-Sep-17 22-Jul-19 5-May-17 7-May-17 8-May-17 18-Jul-17 7-Sep-17 7-Sep-17 95% 95% 0% 0.080% 0.080%
283 8 PIPING 3963-KAHN-5-50-0002 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; KEY PLAN 1 A 0.042% 30-Jun-17 10-Jul-17 15-Jul-17 15-Aug-17 5-Sep-17 15-Sep-17 31-Oct-18 6-Jul-17 15-Jul-17 16-Jul-17 26-Oct-17 26-Oct-17 28-Nov-17 22-Jul-19 6-Jul-17 15-Jul-17 16-Jul-17 26-Oct-17 26-Oct-17 28-Nov-17 95% 95% 0% 0.040% 0.040%
284 8 PIPING 3963-KAHN-5-52-0006 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.6 EL.103.590 & ABOVE 1 A 0.070% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 19-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 19-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.067% 0.067%
285 8 PIPING 3963-KAHN-5-52-0008 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.8 EL.103.590 & ABOVE 1 B 0.070% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 20-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 20-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.067% 0.067%
286 8 PIPING 3963-KAHN-5-52-0009 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.9 EL.103.590 & ABOVE 1 A 0.070% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 20-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 20-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.067% 0.067%
287 8 PIPING 3963-KAHN-5-52-0011 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.11 EL.103.590 & ABOV 1 A 0.070% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 15-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.067% 0.067%
288 8 PIPING 3963-KAHN-5-52-0012 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.12 EL.103.590 & ABOV 1 A 0.070% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 15-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.067% 0.067%
289 8 PIPING 3963-KAHN-5-71-0002 ET DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING ISOMETRICS FOR EARLY TIE-IN 3 A Y 0.112% 6-Jul-17 16-Jul-17 20-Jul-17 30-Jul-17 9-Aug-17 19-Aug-17 31-Oct-18 18-Jul-17 19-Jul-17 20-Jul-17 7-Sep-17 7-Sep-17 30-Nov-17 22-Jul-19 18-Jul-17 19-Jul-17 20-Jul-17 7-Sep-17 7-Sep-17 30-Nov-17 95% 95% 0% 0.106% 0.106%
290 8 PIPING 3963-KAHS-5-33-0001 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; CRITICAL LINE LIST 1 A 0.042% 23-May-17 2-Jun-17 7-Jun-17 8-Jul-17 29-Jul-17 8-Aug-17 31-Oct-18 25-May-17 19-Jul-17 20-Jul-17 20-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 25-May-17 19-Jul-17 20-Jul-17 20-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.040% 0.040%
291 8 PIPING 3963-KAHS-5-32-0001 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST 1 A 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 25-May-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.027% 0.027%
292 8 PIPING 3963-KAHS-5-21-0001 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; TIE-IN ENGINEERING PACKAGE 3 A 0.280% 10-Aug-17 20-Aug-17 25-Aug-17 8-Sep-17 13-Sep-17 13-Sep-17 31-Oct-18 19-Oct-17 6-Apr-18 8-Apr-18 7-May-18 31-May-18 31-May-18 22-Jul-19 19-Oct-17 6-Apr-18 8-Apr-18 7-May-18 31-May-18 31-May-18 95% 95% 0% 0.266% 0.266%
293 8 PIPING 3963-KAHS-5-31-0001 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; MATERIAL TAKE OFF - PIPING BULK ITEMS 3 A 0.336% 15-Jun-17 25-Jun-17 30-Jun-17 31-Jul-17 21-Aug-17 31-Aug-17 31-Oct-18 8-Jul-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 22-Jul-19 8-Jul-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 95% 95% 0% 0.319% 0.319%
294 8 PIPING 3963-KAHS-5-31-0002 ET DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; MATERIAL TAKE OFF - PIPING BULK ITEMS (EARLY 3 A Y 0.084% 7-May-17 11-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 5-May-17 7-May-17 8-May-17 18-Jul-17 7-Sep-17 7-Sep-17 22-Jul-19 5-May-17 7-May-17 8-May-17 18-Jul-17 7-Sep-17 7-Sep-17 95% 95% 0% 0.080% 0.080%
295 8 PIPING 3963-KAHS-5-50-0002 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; KEY PLAN 1 A 0.042% 20-Jun-17 30-Jun-17 5-Jul-17 5-Aug-17 26-Aug-17 5-Sep-17 31-Oct-18 22-Jun-17 15-Jul-17 16-Jul-17 26-Oct-17 26-Oct-17 28-Nov-17 22-Jul-19 22-Jun-17 15-Jul-17 16-Jul-17 26-Oct-17 26-Oct-17 28-Nov-17 95% 95% 0% 0.040% 0.040%
296 8 PIPING 3963-KAHS-5-52-0004 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.4 EL.26.000 TO 28.600 1 A 0.084% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 29-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 22-Jul-19 29-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 95% 95% 0% 0.080% 0.080%
297 8 PIPING 3963-KAHS-5-52-0005 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.5 EL.28.600 & ABOVE 1 A 0.070% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 22-Jul-19 28-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 95% 95% 0% 0.067% 0.067%
298 8 PIPING 3963-KAHS-5-52-0006 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.6 EL.26.000 TO 28.600 1 A 0.070% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 22-Jul-19 28-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 95% 95% 0% 0.067% 0.067%
299 8 PIPING 3963-KAHS-5-52-0007 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.7 EL.26.000 TO 28.600 1 A 0.070% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 22-Jul-19 28-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 95% 95% 0% 0.067% 0.067%
300 8 PIPING 3963-KAHS-5-52-0008 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.8 EL.26.000 TO 28.600 1 A 0.070% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 22-Jul-19 28-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 95% 95% 0% 0.067% 0.067%
301 8 PIPING 3963-KAHS-5-52-0009 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.9 EL.26.000 & ABOVE 1 A 0.070% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 22-Jul-19 28-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 95% 95% 0% 0.067% 0.067%
302 8 PIPING 3963-KAHS-5-52-0010 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.10 EL.26.000 & ABOVE 1 A 0.070% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 29-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 22-Jul-19 29-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 95% 95% 0% 0.067% 0.067%
303 8 PIPING 3963-KAHS-5-52-0011 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.11 EL.26.000 & ABOVE 1 A 0.070% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 29-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 22-Jul-19 29-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 95% 95% 0% 0.067% 0.067%
304 8 PIPING 3963-KAHS-5-52-0012 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.12 EL.26.000 & ABOVE 1 A 0.070% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 29-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 22-Jul-19 29-Jun-17 21-Oct-17 23-Oct-17 7-Nov-17 7-Nov-17 23-Nov-17 95% 95% 0% 0.067% 0.067%
305 8 PIPING 3963-KAHS-5-71-0002 ET DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING ISOMETRICS FOR EARLY TIE-IN 3 A Y 0.132% 6-Jul-17 16-Jul-17 20-Jul-17 30-Jul-17 9-Aug-17 19-Aug-17 31-Oct-18 18-Jul-17 19-Jul-17 20-Jul-17 20-Jul-17 20-Jul-17 30-Nov-17 22-Jul-19 18-Jul-17 19-Jul-17 20-Jul-17 20-Jul-17 20-Jul-17 30-Nov-17 95% 95% 0% 0.126% 0.126%
306 8 PIPING 3963-FAHM-5-33-0001 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; CRITICAL LINE LIST 1 B 0.028% 16-Jun-17 26-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 1-Sep-17 31-Oct-18 22-Jun-17 19-Jul-17 20-Jul-17 23-Aug-17 13-Sep-17 14-Sep-17 22-Jul-19 22-Jun-17 19-Jul-17 20-Jul-17 23-Aug-17 13-Sep-17 14-Sep-17 95% 95% 0% 0.027% 0.027%
307 8 PIPING 3963-FAHM-5-32-0001 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING SPECIALTY ITEM LIST 1 A 0.028% 30-Jul-17 9-Aug-17 14-Aug-17 1-Sep-17 11-Sep-17 21-Sep-17 31-Oct-18 29-Jul-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 29-Jul-17 30-Jul-17 31-Jul-17 18-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.027% 0.027%
308 8 PIPING 3963-FAHM-5-21-0001 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; TIE-IN ENGINEERING PACKAGE 3 A 0.280% 15-Aug-17 25-Aug-17 30-Aug-17 13-Sep-17 18-Sep-17 18-Sep-17 31-Oct-18 19-Oct-17 20-Mar-18 13-Aug-18 30-Aug-18 2-Dec-18 2-Dec-18 22-Jul-19 19-Oct-17 20-Mar-18 13-Aug-18 30-Aug-18 65% 65% 0% 0.182% 0.182%
309 8 PIPING 3963-FAHM-5-31-0001 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; MATERIAL TAKE OFF - PIPING BULK ITEMS 3 A 0.336% 16-Jun-17 26-Jun-17 1-Jul-17 15-Jul-17 20-Jul-17 20-Jul-17 31-Oct-18 22-Jun-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 22-Jul-19 22-Jun-17 6-Nov-17 13-Nov-17 21-Dec-17 10-Jan-18 10-Jan-18 95% 95% 0% 0.319% 0.319%
310 8 PIPING 3963-FAHM-5-17-0001 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING STRESS ANALYSIS REPORT 3 A 0.420% 30-Jun-17 10-Jul-17 15-Jul-17 29-Jul-17 3-Aug-17 3-Aug-17 31-Oct-18 3-Jul-17 19-Sep-17 20-Sep-17 9-Oct-17 25-Oct-17 29-Jan-18 22-Jul-19 3-Jul-17 19-Sep-17 20-Sep-17 9-Oct-17 25-Oct-17 29-Jan-18 95% 95% 0% 0.399% 0.399%
311 8 PIPING 3963-FAHM-5-52-0003 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.3 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 28-Nov-17 30-Nov-17 1-Feb-18 4-Mar-18 4-Mar-18 22-Jul-19 19-Oct-17 28-Nov-17 30-Nov-17 1-Feb-18 4-Mar-18 4-Mar-18 95% 95% 0% 0.093% 0.093%
312 8 PIPING 3963-FAHM-5-52-0004 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.4 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 6-Nov-17 8-Nov-17 31-Jan-18 4-Mar-18 4-Mar-18 22-Jul-19 19-Oct-17 6-Nov-17 8-Nov-17 31-Jan-18 4-Mar-18 4-Mar-18 95% 95% 0% 0.093% 0.093%
313 8 PIPING 3963-FAHM-5-52-0005 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.5 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 6-Nov-17 8-Nov-17 31-Jan-18 4-Mar-18 4-Mar-18 22-Jul-19 19-Oct-17 6-Nov-17 8-Nov-17 31-Jan-18 4-Mar-18 4-Mar-18 95% 95% 0% 0.093% 0.093%
314 8 PIPING 3963-FAHM-5-52-0006 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.6 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 6-Nov-17 8-Nov-17 31-Jan-18 4-Mar-18 4-Mar-18 22-Jul-19 19-Oct-17 6-Nov-17 8-Nov-17 31-Jan-18 4-Mar-18 4-Mar-18 95% 95% 0% 0.093% 0.093%
315 8 PIPING 3963-FAHM-5-52-0007 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.7 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 6-Nov-17 8-Nov-17 4-Feb-18 4-Mar-18 4-Mar-18 22-Jul-19 19-Oct-17 6-Nov-17 8-Nov-17 4-Feb-18 4-Mar-18 4-Mar-18 95% 95% 0% 0.093% 0.093%
316 8 PIPING 3963-FAHM-5-52-0008 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.8 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 12-Nov-17 12-Nov-17 11-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 12-Nov-17 12-Nov-17 11-Jan-18 95% 95% 0% 0.093% 0.093%
317 8 PIPING 3963-FAHM-5-52-0009 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.9 EL.60.600 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.093% 0.093%
318 8 PIPING 3963-FAHM-5-52-0010 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.10 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
319 8 PIPING 3963-FAHM-5-52-0011 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.11 EL.60.700 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
320 8 PIPING 3963-FAHM-5-52-0012 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA-655 SHT.12 EL.60.450 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
321 8 PIPING 3963-FAHM-5-52-0013 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA-655 SHT.13 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
322 8 PIPING 3963-FAHM-5-52-0014 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA-655 SHT.14 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
323 8 PIPING 3963-FAHM-5-52-0015 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA-655 SHT.15 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
324 8 PIPING 3963-FAHM-5-52-0016 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA- 655 SHT.16 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
325 8 PIPING 3963-FAHM-5-52-0017 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA- 655 SHT.17 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
326 8 PIPING 3963-FAHM-5-52-0018 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA- 655 SHT.18 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
327 8 PIPING 3963-FAHM-5-52-0019 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA- 655 SHT.19 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
328 8 PIPING 3963-FAHM-5-52-0020 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA- 655 SHT.20 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.093% 0.093%
329 8 PIPING 3963-FAHM-5-52-0021 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA- 655 SHT.21 EL.60.000 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 19-Oct-17 31-Oct-17 2-Nov-17 23-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.093% 0.093%
330 8 PIPING DEM-3963-FAHM-5-50-0001 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PLOT PLAN 1 A 0.056% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 25-May-17 25-Jul-17 26-Jul-17 24-Aug-17 14-Sep-17 18-Oct-17 22-Jul-19 25-May-17 25-Jul-17 26-Jul-17 24-Aug-17 14-Sep-17 18-Oct-17 95% 95% 0% 0.053% 0.053%
331 8 PIPING DEM-3963-FAHM-5-52-0001 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.1 EL.60.000 & ABOVE (DE 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 24-Aug-17 14-Sep-17 17-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 24-Aug-17 14-Sep-17 17-Oct-17 95% 95% 0% 0.027% 0.027%
332 8 PIPING DEM-3963-FAHM-5-52-0002 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.2 EL.60.000 & ABOVE (DE 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 2-Aug-17 3-Aug-17 24-Aug-17 14-Sep-17 17-Oct-17 22-Jul-19 13-Jul-17 2-Aug-17 3-Aug-17 24-Aug-17 14-Sep-17 17-Oct-17 95% 95% 0% 0.040% 0.040%
333 8 PIPING DEM-3963-FAHM-5-52-0003 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.3 EL.60.000 & ABOVE (DE 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 2-Aug-17 3-Aug-17 24-Aug-17 14-Sep-17 17-Oct-17 22-Jul-19 13-Jul-17 2-Aug-17 3-Aug-17 24-Aug-17 14-Sep-17 17-Oct-17 95% 95% 0% 0.040% 0.040%
334 8 PIPING DEM-3963-FAHM-5-52-0004 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.4 EL.60.000 & ABOVE (DE 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 2-Aug-17 3-Aug-17 24-Aug-17 14-Sep-17 17-Oct-17 22-Jul-19 13-Jul-17 2-Aug-17 3-Aug-17 24-Aug-17 14-Sep-17 17-Oct-17 95% 95% 0% 0.027% 0.027%
335 8 PIPING DEM-3963-FAHM-5-52-0005 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.5 EL.60.000 & ABOVE (DE 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 24-Aug-17 14-Sep-17 17-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 24-Aug-17 14-Sep-17 17-Oct-17 95% 95% 0% 0.027% 0.027%
336 8 PIPING DEM-3963-FAHM-5-52-0006 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.6 EL.60.000 & ABOVE (DE 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 17-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 17-Oct-17 95% 95% 0% 0.027% 0.027%
337 8 PIPING DEM-3963-FAHM-5-52-0007 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.7 EL.60.000 & ABOVE (DE 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 11-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 17-Oct-17 22-Jul-19 11-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 17-Oct-17 95% 95% 0% 0.027% 0.027%
338 8 PIPING DEM-3963-FAHM-5-52-0008 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.8 EL.60.000 & ABOVE (DE 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 18-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 18-Oct-17 95% 95% 0% 0.027% 0.027%
339 8 PIPING DEM-3963-FAHM-5-52-0009 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.9 EL.60.700 & ABOVE (DE 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 18-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 18-Oct-17 95% 95% 0% 0.027% 0.027%
340 8 PIPING DEM-3963-FAHM-5-52-0010 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.10 EL.60.450 & ABOVE (D 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 18-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 18-Oct-17 95% 95% 0% 0.027% 0.027%
341 8 PIPING DEM-3963-FAHM-5-52-0011 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.11 EL.60.000 & ABOVE (D 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 11-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 18-Oct-17 22-Jul-19 11-Jul-17 2-Aug-17 3-Aug-17 28-Aug-17 5-Oct-17 18-Oct-17 95% 95% 0% 0.027% 0.027%
342 8 PIPING DEM-3963-FAHM-5-52-0012 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.12 EL.60.000 & ABOVE (D 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 29-Aug-17 17-Oct-17 18-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 29-Aug-17 17-Oct-17 18-Oct-17 95% 95% 0% 0.027% 0.027%
343 8 PIPING DEM-3963-FAHM-5-52-0013 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.13 EL.60.000 & ABOVE (D 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 6-Aug-17 8-Aug-17 31-Aug-17 20-Sep-17 18-Oct-17 22-Jul-19 13-Jul-17 6-Aug-17 8-Aug-17 31-Aug-17 20-Sep-17 18-Oct-17 95% 95% 0% 0.027% 0.027%
344 8 PIPING DEM-3963-FAHM-5-52-0014 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.14 EL.60.000 & ABOVE (D 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 6-Aug-17 8-Aug-17 31-Aug-17 20-Sep-17 18-Oct-17 22-Jul-19 13-Jul-17 6-Aug-17 8-Aug-17 31-Aug-17 20-Sep-17 18-Oct-17 95% 95% 0% 0.027% 0.027%
345 8 PIPING DEM-3963-FAHM-5-52-0015 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.15 EL.60.000 & ABOVE (D 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 6-Aug-17 8-Aug-17 31-Aug-17 20-Sep-17 18-Oct-17 22-Jul-19 13-Jul-17 6-Aug-17 8-Aug-17 31-Aug-17 20-Sep-17 18-Oct-17 95% 95% 0% 0.027% 0.027%
346 8 PIPING DEM-3963-FAHM-5-52-0016 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.16 EL.60.000 & ABOVE (D 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 6-Aug-17 8-Aug-17 29-Aug-17 17-Oct-17 18-Oct-17 22-Jul-19 13-Jul-17 6-Aug-17 8-Aug-17 29-Aug-17 17-Oct-17 18-Oct-17 95% 95% 0% 0.027% 0.027%
347 8 PIPING DEM-3963-FAHM-5-52-0017 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.17 EL.60.200 & ABOVE (D 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 6-Aug-17 8-Aug-17 29-Aug-17 17-Oct-17 18-Oct-17 22-Jul-19 8-Jul-17 6-Aug-17 8-Aug-17 29-Aug-17 17-Oct-17 18-Oct-17 95% 95% 0% 0.027% 0.027%
348 8 PIPING DEM-3963-FAHM-5-52-0018 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.18 EL.60.000 & ABOVE (D 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 10-Sep-17 11-Sep-17 26-Sep-17 26-Sep-17 26-Sep-17 22-Jul-19 8-Jul-17 10-Sep-17 11-Sep-17 26-Sep-17 26-Sep-17 26-Sep-17 95% 95% 0% 0.027% 0.027%
349 8 PIPING DEM-3963-FAHM-5-52-0019 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.19 EL.60.000 & ABOVE (D 1 A 0.028% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 10-Sep-17 11-Sep-17 26-Sep-17 26-Sep-17 26-Sep-17 22-Jul-19 8-Jul-17 10-Sep-17 11-Sep-17 26-Sep-17 26-Sep-17 26-Sep-17 95% 95% 0% 0.027% 0.027%
350 8 PIPING DEM-3963-FAHM-5-52-0020 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.23 EL.60.000 & ABOVE (D 1 A 0.056% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 20-Oct-17 22-Oct-17 24-Oct-17 13-Nov-17 13-Nov-17 13-Nov-17 22-Jul-19 20-Oct-17 22-Oct-17 24-Oct-17 13-Nov-17 13-Nov-17 13-Nov-17 95% 95% 0% 0.053% 0.053%

Page 10 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
351 8 PIPING DEM-3963-FAHM-5-52-0021 DEM DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.25 EL.60.000 & ABOVE (D 1 A E 0.056% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 20-Oct-17 22-Oct-17 24-Oct-17 13-Nov-17 13-Nov-17 13-Nov-17 22-Jul-19 20-Oct-17 22-Oct-17 24-Oct-17 13-Nov-17 13-Nov-17 13-Nov-17 95% 95% 0% 0.053% 0.053%
352 8 PIPING DEM-3963-FAHN-5-50-0001 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PLOT PLAN (DEMOLITION) 1 A 0.056% 29-May-17 8-Jun-17 13-Jun-17 14-Jul-17 4-Aug-17 14-Aug-17 31-Oct-18 1-Jun-17 25-Jul-17 26-Jul-17 27-Aug-17 14-Sep-17 18-Oct-17 22-Jul-19 1-Jun-17 25-Jul-17 26-Jul-17 27-Aug-17 14-Sep-17 18-Oct-17 95% 95% 0% 0.053% 0.053%
353 8 PIPING DEM-3963-FAHN-5-52-0001 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.1 EL.21.600 TO 24.050 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 20-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 28-Sep-17 16-Oct-17 22-Jul-19 20-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 28-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
354 8 PIPING DEM-3963-FAHN-5-52-0002 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 400, SHT.2 EL.21.600 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 20-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 20-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
355 8 PIPING DEM-3963-FAHN-5-52-0003 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.3 EL. 21.600 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 15-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
356 8 PIPING DEM-3963-FAHN-5-52-0004 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.4 EL.21.600 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 8-Aug-17 10-Aug-17 2-Oct-17 15-Oct-17 16-Oct-17 22-Jul-19 15-Jul-17 8-Aug-17 10-Aug-17 2-Oct-17 15-Oct-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
357 8 PIPING DEM-3963-FAHN-5-52-0005 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.5 EL. 21.600 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 15-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
358 8 PIPING DEM-3963-FAHN-5-52-0006 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.6 EL. 21.600 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 20-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 20-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
359 8 PIPING DEM-3963-FAHN-5-52-0007 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.7 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 20-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 20-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
360 8 PIPING DEM-3963-FAHN-5-52-0008 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.8 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 15-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
361 8 PIPING DEM-3963-FAHN-5-52-0009 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.9 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 19-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 19-Jul-17 8-Aug-17 10-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
362 8 PIPING DEM-3963-FAHN-5-52-0010 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.10 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 15-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
363 8 PIPING DEM-3963-FAHN-5-52-0011 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.11 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 15-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
364 8 PIPING DEM-3963-FAHN-5-52-0012 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.12 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 19-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 28-Sep-17 16-Oct-17 22-Jul-19 19-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 28-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
365 8 PIPING DEM-3963-FAHN-5-52-0013 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.13 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 28-Sep-17 16-Oct-17 22-Jul-19 15-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 28-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
366 8 PIPING DEM-3963-FAHN-5-52-0014 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.14 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 28-Sep-17 16-Oct-17 22-Jul-19 15-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 28-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
367 8 PIPING DEM-3963-FAHN-5-52-0015 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.15 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 28-Sep-17 16-Oct-17 22-Jul-19 15-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 28-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
368 8 PIPING DEM-3963-FAHN-5-52-0016 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.16 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 20-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 20-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
369 8 PIPING DEM-3963-FAHN-5-52-0017 DEM DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.17 EL. 22.620 & ABOVE 1 A 0.042% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 20-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 22-Jul-19 20-Jul-17 11-Aug-17 13-Aug-17 17-Sep-17 25-Sep-17 16-Oct-17 95% 95% 0% 0.040% 0.040%
370 8 PIPING DEM-3963-FAHS-5-50-0001 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PLOT PLAN (DEMOLITION) 1 A 0.056% 12-Jun-17 22-Jun-17 27-Jun-17 28-Jul-17 18-Aug-17 28-Aug-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 27-Aug-17 14-Sep-17 18-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 27-Aug-17 14-Sep-17 18-Oct-17 95% 95% 0% 0.053% 0.053%
371 8 PIPING DEM-3963-FAHS-5-52-0001 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.1 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 24-Sep-17 17-Oct-17 18-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 24-Sep-17 17-Oct-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
372 8 PIPING DEM-3963-FAHS-5-52-0002 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.2 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.040% 0.040%
373 8 PIPING DEM-3963-FAHS-5-52-0003 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.3 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.040% 0.040%
374 8 PIPING DEM-3963-FAHS-5-52-0004 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.4 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.040% 0.040%
375 8 PIPING DEM-3963-FAHS-5-52-0005 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.5 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.040% 0.040%
376 8 PIPING DEM-3963-FAHS-5-52-0006 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.6 EL. 54.700 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.040% 0.040%
377 8 PIPING DEM-3963-FAHS-5-52-0007 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.7 EL. 54.700 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.040% 0.040%
378 8 PIPING DEM-3963-FAHS-5-52-0008 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.8 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 14-Aug-17 15-Aug-17 16-Aug-17 17-Aug-17 18-Aug-17 22-Jul-19 27-Jul-17 14-Aug-17 15-Aug-17 16-Aug-17 17-Aug-17 18-Aug-17 95% 95% 0% 0.040% 0.040%
379 8 PIPING DEM-3963-FAHS-5-52-0009 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.9 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
380 8 PIPING DEM-3963-FAHS-5-52-0010 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.10 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
381 8 PIPING DEM-3963-FAHS-5-52-0011 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.11 EL. 54.664 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
382 8 PIPING DEM-3963-FAHS-5-52-0012 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.12 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
383 8 PIPING DEM-3963-FAHS-5-52-0013 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.13 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
384 8 PIPING DEM-3963-FAHS-5-52-0014 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.14 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
385 8 PIPING DEM-3963-FAHS-5-52-0015 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.15 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
386 8 PIPING DEM-3963-FAHS-5-52-0016 DEM DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.16 EL. 54.364 & ABOVE 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 22-Jul-19 27-Jul-17 15-Aug-17 17-Aug-17 5-Oct-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.040% 0.040%
387 8 PIPING DEM-3963-JALM-5-50-0001 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PLOT PLAN (DEMOLITION) 1 A 0.056% 19-Jun-17 29-Jun-17 4-Jul-17 4-Aug-17 25-Aug-17 4-Sep-17 31-Oct-18 22-Jun-17 2-Aug-17 3-Aug-17 27-Aug-17 20-Sep-17 18-Oct-17 22-Jul-19 22-Jun-17 2-Aug-17 3-Aug-17 27-Aug-17 20-Sep-17 18-Oct-17 95% 95% 0% 0.053% 0.053%
388 8 PIPING DEM-3963-JALM-5-52-0001 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 803, SHT.1 EL. 63.000 & ABOVE (D 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 18-Aug-17 20-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 22-Jul-19 27-Jul-17 18-Aug-17 20-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 95% 95% 0% 0.040% 0.040%
389 8 PIPING DEM-3963-JALM-5-52-0002 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 803, SHT.2 EL. 63.000 & ABOVE (D 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 18-Aug-17 20-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 22-Jul-19 27-Jul-17 18-Aug-17 20-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 95% 95% 0% 0.040% 0.040%
390 8 PIPING DEM-3963-JALM-5-52-0003 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.3 EL. 63.000 & ABOVE (D 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 18-Aug-17 20-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 22-Jul-19 27-Jul-17 18-Aug-17 20-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 95% 95% 0% 0.040% 0.040%
391 8 PIPING DEM-3963-JALM-5-52-0004 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.4 EL. 63.000 & ABOVE (D 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 17-Aug-17 20-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 22-Jul-19 27-Jul-17 17-Aug-17 20-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 95% 95% 0% 0.040% 0.040%
392 8 PIPING DEM-3963-JALM-5-52-0005 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.5 EL. 63.000 & ABOVE (D 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 17-Aug-17 20-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 22-Jul-19 27-Jul-17 17-Aug-17 20-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 95% 95% 0% 0.040% 0.040%
393 8 PIPING DEM-3963-JALM-5-52-0006 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.6 EL. 63.000 & ABOVE (D 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 22-Jul-19 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 95% 95% 0% 0.040% 0.040%
394 8 PIPING DEM-3963-JALM-5-52-0007 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.7 EL. 63.000 & ABOVE (D 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 22-Jul-19 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 95% 95% 0% 0.040% 0.040%
395 8 PIPING DEM-3963-JALM-5-52-0008 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.8 EL. 63.000 & ABOVE (D 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 22-Jul-19 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 95% 95% 0% 0.040% 0.040%
396 8 PIPING DEM-3963-JALM-5-52-0009 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.9 EL. 63.000 & ABOVE (D 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 22-Jul-19 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 95% 95% 0% 0.040% 0.040%
397 8 PIPING DEM-3963-JALM-5-52-0010 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.10 EL. 63.000 & ABOVE ( 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 22-Jul-19 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 95% 95% 0% 0.040% 0.040%
398 8 PIPING DEM-3963-JALM-5-52-0011 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.11 EL. 63.000 & ABOVE ( 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 22-Jul-19 27-Jul-17 17-Aug-17 20-Aug-17 9-Nov-17 9-Nov-17 9-Nov-17 95% 95% 0% 0.040% 0.040%
399 8 PIPING DEM-3963-JALM-5-52-0012 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.12 EL. 63.000 & ABOVE ( 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 18-Aug-17 21-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 22-Jul-19 27-Jul-17 18-Aug-17 21-Aug-17 5-Oct-17 9-Oct-17 9-Oct-17 95% 95% 0% 0.040% 0.040%
400 8 PIPING DEM-3963-JALM-5-52-0013 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.13 EL. 63.000 & ABOVE ( 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 18-Aug-17 21-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 22-Jul-19 27-Jul-17 18-Aug-17 21-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
401 8 PIPING DEM-3963-JALM-5-52-0014 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.14 EL. 63.000 & ABOVE ( 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 18-Aug-17 21-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 22-Jul-19 27-Jul-17 18-Aug-17 21-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
402 8 PIPING DEM-3963-JALM-5-52-0015 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.15 EL. 63.000 & ABOVE ( 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 18-Aug-17 21-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 22-Jul-19 27-Jul-17 18-Aug-17 21-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
403 8 PIPING DEM-3963-JALM-5-52-0016 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.16 EL. 63.000 & ABOVE ( 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 18-Aug-17 21-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 22-Jul-19 27-Jul-17 18-Aug-17 21-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
404 8 PIPING DEM-3963-JALM-5-52-0017 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.17 EL. 63.000 & ABOVE ( 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 19-Aug-17 22-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 22-Jul-19 27-Jul-17 19-Aug-17 22-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
405 8 PIPING DEM-3963-JALM-5-52-0018 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.18 EL. 63.000 & ABOVE ( 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 19-Aug-17 22-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 22-Jul-19 27-Jul-17 19-Aug-17 22-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
406 8 PIPING DEM-3963-JALM-5-52-0019 DEM DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.19 EL. 63.000 & ABOVE ( 1 A 0.042% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 27-Jul-17 19-Aug-17 22-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 22-Jul-19 27-Jul-17 19-Aug-17 22-Aug-17 27-Sep-17 11-Oct-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
407 8 PIPING DEM-3963-KAHM-5-50-0001 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PLOT PLAN (DEMOLITION) 1 A 0.056% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 7-Jun-17 2-Aug-17 3-Aug-17 27-Aug-17 20-Sep-17 18-Oct-17 22-Jul-19 7-Jun-17 2-Aug-17 3-Aug-17 27-Aug-17 20-Sep-17 18-Oct-17 95% 95% 0% 0.053% 0.053%
408 8 PIPING DEM-3963-KAHM-5-52-0001 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.1 EL.98.973 & ABOVE 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 11-Jul-17 17-Oct-17 18-Oct-17 6-Nov-17 6-Nov-17 23-Nov-17 22-Jul-19 11-Jul-17 17-Oct-17 18-Oct-17 6-Nov-17 6-Nov-17 23-Nov-17 95% 95% 0% 0.040% 0.040%
409 8 PIPING DEM-3963-KAHM-5-52-0002 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.2 EL. 99.143 & ABOVE 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
410 8 PIPING DEM-3963-KAHM-5-52-0003 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.3 EL.99.143 & ABOVE 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
411 8 PIPING DEM-3963-KAHM-5-52-0004 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.4 EL. 99.143 & ABOVE 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 22-Jul-19 13-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
412 8 PIPING DEM-3963-KAHM-5-52-0005 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.5 EL. 99.743 & ABOVE 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 17-Oct-17 18-Oct-17 6-Nov-17 6-Nov-17 23-Nov-17 22-Jul-19 13-Jul-17 17-Oct-17 18-Oct-17 6-Nov-17 6-Nov-17 23-Nov-17 95% 95% 0% 0.040% 0.040%
413 8 PIPING DEM-3963-KAHM-5-52-0006 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.6 EL. 98.973 & ABOVE 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 22-Jul-19 13-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
414 8 PIPING DEM-3963-KAHM-5-52-0007 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.7 EL. 99.863 & ABOVE 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 17-Oct-17 18-Oct-17 6-Nov-17 6-Nov-17 23-Nov-17 22-Jul-19 13-Jul-17 17-Oct-17 18-Oct-17 6-Nov-17 6-Nov-17 23-Nov-17 95% 95% 0% 0.040% 0.040%
415 8 PIPING DEM-3963-KAHM-5-52-0008 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.8 SH24 EL.99.743 & A 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 22-Jul-19 13-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
416 8 PIPING DEM-3963-KAHM-5-52-0009 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.9 EL.99.443 & ABOVE 1 A 0.042% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 22-Jul-19 8-Jul-17 2-Aug-17 3-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
417 8 PIPING DEM-3963-KAHN-5-50-0001 DEM DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PLOT PLAN (DEMOLITION) 1 A 0.056% 26-Jun-17 6-Jul-17 11-Jul-17 11-Aug-17 1-Sep-17 11-Sep-17 31-Oct-18 29-Jun-17 2-Aug-17 3-Aug-17 27-Aug-17 20-Sep-17 18-Oct-17 22-Jul-19 29-Jun-17 2-Aug-17 3-Aug-17 27-Aug-17 20-Sep-17 18-Oct-17 95% 95% 0% 0.053% 0.053%
418 8 PIPING DEM-3963-KAHN-5-52-0001 DEM DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.1 EL.103.590 & ABOV 1 A 0.042% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 22-Jul-19 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 95% 95% 0% 0.040% 0.040%
419 8 PIPING DEM-3963-KAHN-5-52-0002 DEM DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.2 EL.103.590 & ABOV 1 A 0.042% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 22-Jul-19 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 95% 95% 0% 0.040% 0.040%
420 8 PIPING DEM-3963-KAHN-5-52-0003 DEM DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.3 EL.103.590 & ABOV 1 A 0.042% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 22-Jul-19 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 95% 95% 0% 0.040% 0.040%
421 8 PIPING DEM-3963-KAHN-5-52-0004 DEM DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.4 EL.103.590 & ABOV 1 A 0.042% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 22-Jul-19 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 95% 95% 0% 0.040% 0.040%
422 8 PIPING DEM-3963-KAHN-5-52-0005 DEM DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.5 EL.103.590 & ABOV 1 A 0.042% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 22-Jul-19 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 95% 95% 0% 0.040% 0.040%
423 8 PIPING DEM-3963-KAHN-5-52-0006 DEM DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.6 EL.103.590 & ABOV 1 A 0.042% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 22-Jul-19 20-Aug-17 17-Aug-17 20-Aug-17 19-Oct-17 30-Oct-17 19-Nov-17 95% 95% 0% 0.040% 0.040%
424 8 PIPING DEM-3963-KAHS-5-50-0001 DEM DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PLOT PLAN (DEMOLITION) 1 A 0.056% 29-Jun-17 9-Jul-17 14-Jul-17 14-Aug-17 4-Sep-17 14-Sep-17 31-Oct-18 28-Jun-17 2-Aug-17 3-Aug-17 3-Aug-17 3-Aug-17 3-Aug-17 22-Jul-19 28-Jun-17 2-Aug-17 3-Aug-17 3-Aug-17 3-Aug-17 3-Aug-17 95% 95% 0% 0.053% 0.053%
425 8 PIPING DEM-3963-KAHS-5-52-0001 DEM DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.1 EL.26.000 TO 28.60 1 A 0.042% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 25-Sep-17 14-Nov-17 22-Jul-19 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 25-Sep-17 14-Nov-17 95% 95% 0% 0.040% 0.040%
426 8 PIPING DEM-3963-KAHS-5-52-0002 DEM DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.2 EL.28.600 & ABOVE 1 A 0.042% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 28-Sep-17 14-Nov-17 22-Jul-19 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 28-Sep-17 14-Nov-17 95% 95% 0% 0.040% 0.040%
427 8 PIPING DEM-3963-KAHS-5-52-0003 DEM DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.3 EL.26.000 TO 28.60 1 A 0.042% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 28-Sep-17 14-Nov-17 22-Jul-19 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 28-Sep-17 14-Nov-17 95% 95% 0% 0.040% 0.040%
428 8 PIPING DEM-3963-KAHS-5-52-0004 DEM DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.4 EL.26.000 &ABOVE 1 A 0.042% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 28-Sep-17 14-Nov-17 22-Jul-19 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 28-Sep-17 14-Nov-17 95% 95% 0% 0.040% 0.040%
429 8 PIPING DEM-3963-KAHS-5-52-0005 DEM DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.5 EL.26.000 & ABOVE 1 A 0.042% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 28-Sep-17 14-Nov-17 22-Jul-19 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 28-Sep-17 14-Nov-17 95% 95% 0% 0.040% 0.040%
430 8 PIPING DEM-3963-KAHS-5-52-0006 DEM DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.6 EL.26.000 & ABOVE 1 A 0.042% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 25-Sep-17 14-Nov-17 22-Jul-19 16-Aug-17 18-Aug-17 21-Aug-17 18-Sep-17 25-Sep-17 14-Nov-17 95% 95% 0% 0.040% 0.040%
431 8 PIPING DEM-3963-KAHS-5-52-0007 DEM DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.7 EL.26.000 & ABOVE 1 A 0.084% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 19-Oct-17 19-Nov-17 21-Nov-17 5-Dec-17 5-Dec-17 5-Dec-17 22-Jul-19 19-Oct-17 19-Nov-17 21-Nov-17 5-Dec-17 5-Dec-17 5-Dec-17 95% 95% 0% 0.080% 0.080%
432 8 PIPING 3963-FAHM-5-32-0002 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; VALVE LIST 1 A 0.140% 19-May-17 29-May-17 3-Jun-17 4-Jul-17 25-Jul-17 4-Aug-17 31-Oct-18 25-May-17 22-Jul-17 23-Jul-17 10-Aug-17 20-Aug-17 26-Oct-17 22-Jul-19 25-May-17 22-Jul-17 23-Jul-17 10-Aug-17 20-Aug-17 26-Oct-17 95% 95% 0% 0.133% 0.133%
433 8 PIPING 3963-FAHS-5-32-0002 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; VALVE LIST 1 B 0.168% 21-May-17 31-May-17 5-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 25-May-17 22-Jul-17 23-Jul-17 10-Aug-17 23-Aug-17 24-Aug-17 22-Jul-19 25-May-17 22-Jul-17 23-Jul-17 10-Aug-17 23-Aug-17 24-Aug-17 95% 95% 0% 0.160% 0.160%
434 8 PIPING 3963-FAHN-5-32-0002 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; VALVE LIST 1 A 0.140% 23-May-17 2-Jun-17 7-Jun-17 8-Jul-17 29-Jul-17 8-Aug-17 31-Oct-18 25-May-17 22-Jul-17 23-Jul-17 10-Aug-17 20-Aug-17 5-Nov-17 22-Jul-19 25-May-17 22-Jul-17 23-Jul-17 10-Aug-17 20-Aug-17 5-Nov-17 95% 95% 0% 0.133% 0.133%
435 8 PIPING 3963-KAHM-5-32-0002 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; VALVE LIST 1 A 0.070% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 25-May-17 19-Jul-17 20-Jul-17 23-Aug-17 14-Sep-17 14-Nov-17 22-Jul-19 25-May-17 19-Jul-17 20-Jul-17 23-Aug-17 14-Sep-17 14-Nov-17 95% 95% 0% 0.067% 0.067%
436 8 PIPING 3963-KAHS-5-32-0002 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; VALVE LIST 1 A 0.070% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 25-May-17 24-Jul-17 25-Jul-17 2-Nov-17 2-Nov-17 24-Jan-18 22-Jul-19 25-May-17 24-Jul-17 25-Jul-17 2-Nov-17 2-Nov-17 24-Jan-18 95% 95% 0% 0.067% 0.067%
437 8 PIPING 3963-KAHN-5-32-0002 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; VALVE LIST 1 A 0.070% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 25-May-17 24-Jul-17 25-Jul-17 23-Aug-17 14-Sep-17 2-Nov-17 22-Jul-19 25-May-17 24-Jul-17 25-Jul-17 23-Aug-17 14-Sep-17 2-Nov-17 95% 95% 0% 0.067% 0.067%
438 8 PIPING 3963-JALM-5-32-0002 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; VALVE LIST 1 A 0.140% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 25-May-17 24-Jul-17 25-Jul-17 23-Aug-17 14-Sep-17 2-Nov-17 22-Jul-19 25-May-17 24-Jul-17 25-Jul-17 23-Aug-17 14-Sep-17 2-Nov-17 95% 95% 0% 0.133% 0.133%
439 8 PIPING 3963-KAHM-5-32-0015 ET DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; VALVE LIST (EARLY TIE-IN) 1 A Y 0.070% 8-Mar-17 18-Mar-17 23-Mar-17 23-Apr-17 14-May-17 24-May-17 31-Oct-18 15-Mar-17 17-Mar-17 20-Mar-17 30-May-17 12-Jun-17 12-Jun-17 22-Jul-19 15-Mar-17 17-Mar-17 20-Mar-17 30-May-17 12-Jun-17 12-Jun-17 95% 95% 0% 0.067% 0.067%
440 8 PIPING 3963-KAHN-5-32-0016 ET DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; VALVE LIST (EARLY TIE-IN) 1 A Y 0.070% 8-Mar-17 18-Mar-17 23-Mar-17 23-Apr-17 14-May-17 24-May-17 31-Oct-18 15-Mar-17 17-Mar-17 20-Mar-17 30-May-17 12-Jun-17 12-Jun-17 22-Jul-19 15-Mar-17 17-Mar-17 20-Mar-17 30-May-17 12-Jun-17 12-Jun-17 95% 95% 0% 0.067% 0.067%
441 8 PIPING 3963-KAHS-5-32-0017 ET DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; VALVE LIST (EARLY TIE-IN) 1 A Y 0.070% 8-Mar-17 18-Mar-17 23-Mar-17 23-Apr-17 14-May-17 24-May-17 31-Oct-18 15-Mar-17 17-Mar-17 20-Mar-17 30-May-17 12-Jun-17 12-Jun-17 22-Jul-19 15-Mar-17 17-Mar-17 20-Mar-17 30-May-17 12-Jun-17 12-Jun-17 95% 95% 0% 0.067% 0.067%
442 8 PIPING 3963-DGEN-5-17-0006 ET DUKHAN FIELD; TECHNICAL BID EVALUATION FOR BALL VALVES (EARLY TIE-INS) 1 A Y 0.056% 26-Mar-17 5-Apr-17 10-Apr-17 11-May-17 1-Jun-17 11-Jun-17 31-Oct-18 15-Mar-17 17-Mar-17 20-Mar-17 5-Jun-17 24-Jul-17 25-Jul-17 22-Jul-19 15-Mar-17 17-Mar-17 20-Mar-17 5-Jun-17 24-Jul-17 25-Jul-17 95% 95% 0% 0.053% 0.053%
443 8 PIPING 3963-DGEN-5-31-0001 OT DUKHAN FIELD -MTO FOR BALL VALVES 1 A 0.196% 24-Jul-17 26-Jul-17 28-Jul-17 9-Aug-17 21-Aug-17 2-Sep-17 31-Oct-18 21-Mar-17 30-Jul-17 31-Jul-17 9-Dec-17 21-Dec-17 21-Dec-17 22-Jul-19 21-Mar-17 30-Jul-17 31-Jul-17 9-Dec-17 21-Dec-17 21-Dec-17 95% 95% 0% 0.186% 0.186%
444 8 PIPING 3963-DGEN-5-31-0002 OT DUKHAN FIELD - MTO FOR MANUAL VALVES (GATE, GLOBE, NEEDLE & CHECK) 1 A 0.191% 24-Jul-17 26-Jul-17 28-Jul-17 9-Aug-17 21-Aug-17 2-Sep-17 31-Oct-18 27-Jul-17 30-Jul-17 31-Jul-17 25-Oct-17 25-Oct-17 4-Dec-17 22-Jul-19 27-Jul-17 30-Jul-17 31-Jul-17 25-Oct-17 25-Oct-17 4-Dec-17 95% 95% 0% 0.181% 0.181%
445 8 PIPING 3963-DGEN-5-13-0008 OT DUKHAN FIELD -DATASHEET FOR BUTTERFLY VALVES 1 A 0.090% 1-Aug-17 6-Aug-17 11-Aug-17 21-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jul-17 1-Aug-17 3-Aug-17 17-Aug-17 30-Aug-17 5-Oct-17 22-Jul-19 28-Jul-17 1-Aug-17 3-Aug-17 17-Aug-17 30-Aug-17 5-Oct-17 95% 95% 0% 0.085% 0.085%
446 8 PIPING 3963-DGEN-5-13-0009 OT DUKHAN FIELD - DATASHEET FOR STRAINERS 1 A 0.168% 1-Aug-17 6-Aug-17 11-Aug-17 21-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jul-17 1-Aug-17 3-Aug-17 17-Aug-17 19-Sep-17 20-Sep-17 22-Jul-19 28-Jul-17 1-Aug-17 3-Aug-17 17-Aug-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.160% 0.160%
447 8 PIPING 3963-DGEN-5-15-0007 OT DUKHAN FIELD – MATERIAL REQUISITION FOR BUTTERFLY VALVES 1 A 0.084% 1-Aug-17 6-Aug-17 11-Aug-17 21-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jul-17 1-Aug-17 3-Aug-17 17-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 28-Jul-17 1-Aug-17 3-Aug-17 17-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.080% 0.080%
448 6 PIPING 3963-DGEN-5-00-0001 OT MISCELLANEOUS - PIPING 0 0.000% 31-Aug-17 6-Sep-17 7-Sep-17 14-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 1-Feb-18 6-Feb-18 8-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 22-Jul-19 1-Feb-18 6-Feb-18 8-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 95% 95% 0% 0.000% 0.000%
449 8 PIPING 3963-FAHM-7780-6-OC OT PIPING ISOMETRICS - LINE NO.:14-7780-6"-OC-CS1-900-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
450 8 PIPING 3963-FAHM-7775-6-OC OT PIPING ISOMETRICS - LINE NO.:14-7775-6''-OC-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
451 8 PIPING 3963-FAHM-7776-6-OC OT PIPING ISOMETRICS - LINE NO.:14-7776-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
452 8 PIPING 3963-FAHM-1222-8-GP OT PIPING ISOMETRICS - LINE NO.:14-1222-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
453 8 PIPING 3963-FAHM-7790-6-WD OT PIPING ISOMETRICS - LINE NO.:14-7790-6''-WD-L5-300-1X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
454 8 PIPING 3963-FAHM-7811-2-OD OT PIPING ISOMETRICS - LINE NO.:14-7811-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
455 8 PIPING 3963-FAHM-7822-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7822-1''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
456 8 PIPING 3963-FAHM-7807-3-OD OT PIPING ISOMETRICS - LINE NO.:14-7807-3''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
457 8 PIPING 3963-FAHM-7808-2-OD OT PIPING ISOMETRICS - LINE NO.:14-7808-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
458 8 PIPING 3963-FAHM-7809-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7809-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
459 8 PIPING 3963-FAHM-7810-2-OD OT PIPING ISOMETRICS - LINE NO.:14-7810-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
460 8 PIPING 3963-FAHM-8008-6-GV OT PIPING ISOMETRICS - LINE NO.:14-8008-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
461 8 PIPING 3963-FAHM-8009-6-GV OT PIPING ISOMETRICS - LINE NO.:14-8009-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
462 8 PIPING 3963-FAHM-8010-3-GV OT PIPING ISOMETRICS - LINE NO.:14-8010-3''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
463 8 PIPING 3963-FAHM-8011-10-GV OT PIPING ISOMETRICS - LINE NO.:14-8011-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
464 8 PIPING 3963-FAHM-8013-6-GV OT PIPING ISOMETRICS - LINE NO.:14-8013-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
465 8 PIPING 3963-FAHM-8012-10-GV OT PIPING ISOMETRICS - LINE NO.:14-8012-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
466 8 PIPING 3963-FAHM-7777-6-OC OT PIPING ISOMETRICS - LINE NO.:14-7777-6"-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
467 8 PIPING 3963-FAHM-7778-4-OC OT PIPING ISOMETRICS - LINE NO.:14-7778-4''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%

Page 11 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
468 8 PIPING 3963-FAHM-7779-6-OC OT PIPING ISOMETRICS - LINE NO.:14-7779-6''-OC-CS1-300-4X 3 0 E 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
469 8 PIPING 3963-FAHM-7791-4-WD OT PIPING ISOMETRICS - LINE NO.:14-7791-4"-WD-L5-300-1X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
470 8 PIPING 3963-FAHM-7792-6-WD OT PIPING ISOMETRICS - LINE NO.:14-7792-6''-WD-L5-300-1X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
471 8 PIPING 3963-FAHM-8015-8-GV OT PIPING ISOMETRICS - LINE NO.:14-8015-8''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
472 8 PIPING 3963-FAHM-8014-4-GV OT PIPING ISOMETRICS - LINE NO.:14-8014-4''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
473 8 PIPING 3963-FAHM-1224-6-GP OT PIPING ISOMETRICS - LINE NO.:14-1224-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
474 8 PIPING 3963-FAHM-1223-8-GP OT PIPING ISOMETRICS - LINE NO.:14-1223-8"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
475 8 PIPING 3963-FAHM-1225-8-GP OT PIPING ISOMETRICS - LINE NO.:14-1225-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
476 8 PIPING 3963-FAHM-1227-8-GP OT PIPING ISOMETRICS - LINE NO.:14-1227-8''-GP-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
477 8 PIPING 3963-FAHM-1228-8-GP OT PIPING ISOMETRICS - LINE NO.:14-1228-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
478 8 PIPING 3963-FAHM-8017-2-GP OT PIPING ISOMETRICS - LINE NO.:14-8017-2"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
479 8 PIPING 3963-FAHM-8016-3-GV OT PIPING ISOMETRICS - LINE NO.:14-8016-3"-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
480 8 PIPING 3963-FAHM-1226-6-GP OT PIPING ISOMETRICS - LINE NO.:14-1226-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
481 8 PIPING 3963-FAHM-7818-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7818-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
482 8 PIPING 3963-FAHM-7823-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7823-1''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
483 8 PIPING 3963-FAHM-7824-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7824-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
484 8 PIPING 3963-FAHM-7816-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7816-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
485 8 PIPING 3963-FAHM-7815-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7815-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
486 8 PIPING 3963-FAHM-7820-2-OD OT PIPING ISOMETRICS - LINE NO.:14-7820-2"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
487 8 PIPING 3963-FAHM-7817-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7817-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
488 8 PIPING 3963-FAHM-7821-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7821-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
489 8 PIPING 3963-FAHM-7819-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7819-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
490 8 PIPING 3963-FAHM-7812-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7812-1"-OD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
491 8 PIPING 3963-FAHM-7813-1-OD OT PIPING ISOMETRICS - LINE NO.:14-7813-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
492 8 PIPING 3963-FAHM-8012-2-AI OT PIPING ISOMETRICS - LINE NO.:14-8012-2"-AI-CS1-150-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 14-Mar-18 14-Mar-18 14-Mar-18 14-Mar-18 14-Mar-18 22-Jul-19 18-Jan-18 14-Mar-18 14-Mar-18 14-Mar-18 14-Mar-18 14-Mar-18 95% 95% 0% 0.019% 0.019%
493 8 PIPING 3963-FAHM-7805-4-WF OT PIPING ISOMETRICS - LINE NO.:14-7805-4"-WF-L5-150-1X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
494 8 PIPING 3963-FAHM-7807-2-WF OT PIPING ISOMETRICS - LINE NO.:14-7807-2"-WF-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
495 8 PIPING 3963-FAHN-4304-6-OC OT PIPING ISOMETRICS - LINE NO.:12-4304-6"-OC-CS1-900-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
496 8 PIPING 3963-FAHN-4299-6-OC OT PIPING ISOMETRICS - LINE NO.:12-4299-6''-OC-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
497 8 PIPING 3963-FAHN-4300-6-OC OT PIPING ISOMETRICS - LINE NO.:12-4300-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
498 8 PIPING 3963-FAHN-4315-8-GP OT PIPING ISOMETRICS - LINE NO.:12-4315-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
499 8 PIPING 3963-FAHN-4299-6-WD OT PIPING ISOMETRICS - LINE NO.:12-4299-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
500 8 PIPING 3963-FAHN-4302-2-OD OT PIPING ISOMETRICS - LINE NO.:12-4302-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
501 8 PIPING 3963-FAHN-4303-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4303-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
502 8 PIPING 3963-FAHN-4299-3-OD OT PIPING ISOMETRICS - LINE NO.:12-4299-3''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
503 8 PIPING 3963-FAHN-4314-2-OD OT PIPING ISOMETRICS - LINE NO.:12-4314-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
504 8 PIPING 3963-FAHN-4300-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4300-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
505 8 PIPING 3963-FAHN-4301-2-OD OT PIPING ISOMETRICS - LINE NO.:12-4301-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
506 8 PIPING 3963-FAHN-4340-6-GV OT PIPING ISOMETRICS - LINE NO.:12-4340-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
507 8 PIPING 3963-FAHN-4339-6-GV OT PIPING ISOMETRICS - LINE NO.:12-4339-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
508 8 PIPING 3963-FAHN-4338-3-GV OT PIPING ISOMETRICS - LINE NO.:12-4338-3''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
509 8 PIPING 3963-FAHN-4335-10-GV OT PIPING ISOMETRICS - LINE NO.:12-4335-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
510 8 PIPING 3963-FAHN-4337-6-GV OT PIPING ISOMETRICS - LINE NO.:12-4337-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
511 8 PIPING 3963-FAHN-4336-10-GV OT PIPING ISOMETRICS - LINE NO.:12-4336-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 22-Jul-19 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 95% 95% 0% 0.019% 0.019%
512 8 PIPING 3963-FAHN-4303-6-OC OT PIPING ISOMETRICS - LINE NO.:12-4303-6"-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 22-Jul-19 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 95% 95% 0% 0.019% 0.019%
513 8 PIPING 3963-FAHN-4301-4-OC OT PIPING ISOMETRICS - LINE NO.:12-4301-4''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
514 8 PIPING 3963-FAHN-4302-6-OC OT PIPING ISOMETRICS - LINE NO.:12-4302-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
515 8 PIPING 3963-FAHN-4301-4-WD OT PIPING ISOMETRICS - LINE NO.:12-4301-4"-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
516 8 PIPING 3963-FAHN-4300-6-WD OT PIPING ISOMETRICS - LINE NO.:12-4300-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 22-Jul-19 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 95% 95% 0% 0.019% 0.019%
517 8 PIPING 3963-FAHN-4333-8-GV OT PIPING ISOMETRICS - LINE NO.:12-4333-8''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
518 8 PIPING 3963-FAHN-4334-4-GV OT PIPING ISOMETRICS - LINE NO.:12-4334-4''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 22-Jul-19 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 95% 95% 0% 0.019% 0.019%
519 8 PIPING 3963-FAHN-4321-6-GP OT PIPING ISOMETRICS - LINE NO.:12-4321-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
520 8 PIPING 3963-FAHN-4332-8-GP OT PIPING ISOMETRICS - LINE NO.:12-4332-8"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 27-Feb-18 1-Mar-18 1-Mar-18 1-Mar-18 1-Mar-18 22-Jul-19 18-Jan-18 27-Feb-18 1-Mar-18 1-Mar-18 1-Mar-18 1-Mar-18 95% 95% 0% 0.019% 0.019%
521 8 PIPING 3963-FAHN-4317-8-GP OT PIPING ISOMETRICS - LINE NO.:12-4317-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 22-Jul-19 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 95% 95% 0% 0.019% 0.019%
522 8 PIPING 3963-FAHN-4318-8-GP OT PIPING ISOMETRICS - LINE NO.:12-4318-8''-GP-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 22-Jul-19 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 95% 95% 0% 0.019% 0.019%
523 8 PIPING 3963-FAHN-4320-2-GP OT PIPING ISOMETRICS - LINE NO.:12-4320-2"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 22-Jul-19 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 95% 95% 0% 0.019% 0.019%
524 8 PIPING 3963-FAHN-4319-3-GP OT PIPING ISOMETRICS - LINE NO.:12-4319-3"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 22-Jul-19 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 95% 95% 0% 0.019% 0.019%
525 8 PIPING 3963-FAHN-4316-6-GP OT PIPING ISOMETRICS - LINE NO.:12-4316-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
526 8 PIPING 3963-FAHN-4310-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4310-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
527 8 PIPING 3963-FAHN-4313-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4313-1''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
528 8 PIPING 3963-FAHN-4307-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4307-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
529 8 PIPING 3963-FAHN-4306-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4306-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
530 8 PIPING 3963-FAHN-4308-2-OD OT PIPING ISOMETRICS - LINE NO.:12-4308-2"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 22-Jul-19 18-Jan-18 6-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 7-Feb-18 95% 95% 0% 0.019% 0.019%
531 8 PIPING 3963-FAHN-4311-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4311-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
532 8 PIPING 3963-FAHN-4312-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4312-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
533 8 PIPING 3963-FAHN-4315-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4315-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
534 8 PIPING 3963-FAHN-4309-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4309-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
535 8 PIPING 3963-FAHN-4304-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4304-1"-OD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
536 8 PIPING 3963-FAHN-4305-1-OD OT PIPING ISOMETRICS - LINE NO.:12-4305-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 18-Jan-18 4-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.019% 0.019%
537 8 PIPING 3963-FAHN-4343-2-AI OT PIPING ISOMETRICS - LINE NO.:12-4343-2"-AI-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 22-Jul-19 18-Jan-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.019% 0.019%
538 8 PIPING 3963-FAHN-4304-4-WF OT PIPING ISOMETRICS - LINE NO.:12-4304-4"-WF-L5-150-1X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
539 8 PIPING 3963-FAHN-4306-2-WF OT PIPING ISOMETRICS - LINE NO.:12-4305-2"-WF-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
540 8 PIPING 3963-FAHS-6006-6-OC OT PIPING ISOMETRICS - LINE NO.:13-6006-6"-OC-CS1-900-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
541 8 PIPING 3963-FAHS-6001-6-OC OT PIPING ISOMETRICS - LINE NO.:13-6001-6''-OC-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
542 8 PIPING 3963-FAHS-6002-6-OC OT PIPING ISOMETRICS - LINE NO.:13-6002-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
543 8 PIPING 3963-FAHS-6278-8-GP OT PIPING ISOMETRICS - LINE NO.:13-6278-8''-GP-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 22-Jul-19 18-Jan-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 95% 95% 0% 0.019% 0.019%
544 8 PIPING 3963-FAHS-6228-6-WD OT PIPING ISOMETRICS - LINE NO.:13-6228-6''-WD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 22-Jul-19 18-Jan-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 95% 95% 0% 0.019% 0.019%
545 8 PIPING 3963-FAHS-6005-2-OD OT PIPING ISOMETRICS - LINE NO.:13-6005-2''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
546 8 PIPING 3963-FAHS-6004-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6004-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
547 8 PIPING 3963-FAHS-6006-3-OD OT PIPING ISOMETRICS - LINE NO.:13-6006-3''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
548 8 PIPING 3963-FAHS-6001-2-OD OT PIPING ISOMETRICS - LINE NO.:13-6001-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
549 8 PIPING 3963-FAHS-6002-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6002-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
550 8 PIPING 3963-FAHS-6003-2-OD OT PIPING ISOMETRICS - LINE NO.:13-6003-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
551 8 PIPING 3963-FAHS-6295-6-GV OT PIPING ISOMETRICS - LINE NO.:13-6295-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
552 8 PIPING 3963-FAHS-6299-6-GV OT PIPING ISOMETRICS - LINE NO.:13-6299-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
553 8 PIPING 3963-FAHS-6297-3-GV OT PIPING ISOMETRICS - LINE NO.:13-6297-3''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
554 8 PIPING 3963-FAHS-6300-10-GV OT PIPING ISOMETRICS - LINE NO.:13-6300-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
555 8 PIPING 3963-FAHS-6298-6-GV OT PIPING ISOMETRICS - LINE NO.:13-6298-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
556 8 PIPING 3963-FAHS-6296-10-GV OT PIPING ISOMETRICS - LINE NO.:13-6296-10''-GV-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
557 8 PIPING 3963-FAHS-6004-6-OC OT PIPING ISOMETRICS - LINE NO.:13-6004-6"-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
558 8 PIPING 3963-FAHS-6005-4-OC OT PIPING ISOMETRICS - LINE NO.:13-6005-4''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
559 8 PIPING 3963-FAHS-6017-6-OC OT PIPING ISOMETRICS - LINE NO.:13-6017-6''-OC-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
560 8 PIPING 3963-FAHS-6230-4-WD OT PIPING ISOMETRICS - LINE NO.:13-6230-4"-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
561 8 PIPING 3963-FAHS-6229-6-WD OT PIPING ISOMETRICS - LINE NO.:13-6229-6''-WD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
562 8 PIPING 3963-FAHS-6302-8-GV OT PIPING ISOMETRICS - LINE NO.:13-6302-8''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
563 8 PIPING 3963-FAHS-6303-4-GV OT PIPING ISOMETRICS - LINE NO.:13-6303-4''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 22-Jul-19 18-Jan-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 95% 95% 0% 0.019% 0.019%
564 8 PIPING 3963-FAHS-6284-6-GP OT PIPING ISOMETRICS - LINE NO.:13-6284-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
565 8 PIPING 3963-FAHS-6301-8-GP OT PIPING ISOMETRICS - LINE NO.:13-6301-8"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 8-Apr-18 8-Apr-18 8-Apr-18 8-Apr-18 8-Apr-18 22-Jul-19 18-Jan-18 8-Apr-18 8-Apr-18 8-Apr-18 8-Apr-18 8-Apr-18 95% 95% 0% 0.019% 0.019%
566 8 PIPING 3963-FAHS-6279-8-GP OT PIPING ISOMETRICS - LINE NO.:13-6279-8''-GP-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 22-Jul-19 18-Jan-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 95% 95% 0% 0.019% 0.019%
567 8 PIPING 3963-FAHS-6283-8-GP OT PIPING ISOMETRICS - LINE NO.:13-6283-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
568 8 PIPING 3963-FAHS-6281-2-GP OT PIPING ISOMETRICS - LINE NO.:13-6281-2"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
569 8 PIPING 3963-FAHS-6280-3-GP OT PIPING ISOMETRICS - LINE NO.:13-6280-3"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 22-Jul-19 18-Jan-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 14-Feb-18 95% 95% 0% 0.019% 0.019%
570 8 PIPING 3963-FAHS-6282-6-GP OT PIPING ISOMETRICS - LINE NO.:13-6282-6"-GP-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
571 8 PIPING 3963-FAHS-6012-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6012-1''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
572 8 PIPING 3963-FAHS-6285-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6285-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
573 8 PIPING 3963-FAHS-6010-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6010-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
574 8 PIPING 3963-FAHS-6009-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6009-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
575 8 PIPING 3963-FAHS-6015-2-OD OT PIPING ISOMETRICS - LINE NO.:13-6015-2"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
576 8 PIPING 3963-FAHS-6016-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6016-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
577 8 PIPING 3963-FAHS-6011-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6011-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
578 8 PIPING 3963-FAHS-6014-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6014-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
579 8 PIPING 3963-FAHS-6013-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6013-1"-OD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
580 8 PIPING 3963-FAHS-6007-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6007-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
581 8 PIPING 3963-FAHS-6008-1-OD OT PIPING ISOMETRICS - LINE NO.:13-6008-1"-OD-CS1-150-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 22-Jul-19 18-Jan-18 13-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 15-Feb-18 95% 95% 0% 0.019% 0.019%
582 8 PIPING 3963-FAHS-6306-2-AI OT PIPING ISOMETRICS - LINE NO.:13-6306-2"-AI- 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 15-Mar-18 15-Mar-18 15-Mar-18 15-Mar-18 15-Mar-18 22-Jul-19 18-Jan-18 15-Mar-18 15-Mar-18 15-Mar-18 15-Mar-18 15-Mar-18 95% 95% 0% 0.019% 0.019%
583 8 PIPING 3963-FAHS-6233-4-WF OT PIPING ISOMETRICS - LINE NO.:13-6233-4"-WF-L5-150-1X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
584 8 PIPING 3963-FAHS-6235-2-WF OT PIPING ISOMETRICS - LINE NO.:13-6235-2"-WF-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%

Page 12 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
585 8 PIPING 3963-KAHM-1345-6-OC OT PIPING ISOMETRICS - LINE NO.:24-1345-6"-OC-CS1-900-8X 3 0 E 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
586 8 PIPING 3963-KAHM-1346-6-OC OT PIPING ISOMETRICS - LINE NO.:24-1346-6''-OC-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 23-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 22-Jul-19 18-Jan-18 23-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 95% 95% 0% 0.019% 0.019%
587 8 PIPING 3963-KAHM-1348-6-OC OT PIPING ISOMETRICS - LINE NO.:24-1348-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 23-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 22-Jul-19 18-Jan-18 23-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 95% 95% 0% 0.019% 0.019%
588 8 PIPING 3963-KAHM-8601-8-GP OT PIPING ISOMETRICS - LINE NO.:24-8601-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
589 8 PIPING 3963-KAHM-8098-6-WD OT PIPING ISOMETRICS - LINE NO.:24-8098-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 23-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 22-Jul-19 18-Jan-18 23-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 95% 95% 0% 0.019% 0.019%
590 8 PIPING 3963-KAHM-8083-2-OD OT PIPING ISOMETRICS - LINE NO.:24-8083-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
591 8 PIPING 3963-KAHM-8081-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8081-1''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
592 8 PIPING 3963-KAHM-8084-3-OD OT PIPING ISOMETRICS - LINE NO.:24-8084-3''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
593 8 PIPING 3963-KAHM-8080-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8080-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
594 8 PIPING 3963-KAHM-8082-2-OD OT PIPING ISOMETRICS - LINE NO.:24-8082-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
595 8 PIPING 3963-KAHM-8621-6-GV OT PIPING ISOMETRICS - LINE NO.:24-8621-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.019% 0.019%
596 8 PIPING 3963-KAHM-8620-6-GV OT PIPING ISOMETRICS - LINE NO.:24-8620-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.019% 0.019%
597 8 PIPING 3963-KAHM-8622-3-GV OT PIPING ISOMETRICS - LINE NO.:24-8622-3''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.019% 0.019%
598 8 PIPING 3963-KAHM-8623-10-GV OT PIPING ISOMETRICS - LINE NO.:24-8623-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.019% 0.019%
599 8 PIPING 3963-KAHM-8624-6-GV OT PIPING ISOMETRICS - LINE NO.:24-8624-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.019% 0.019%
600 8 PIPING 3963-KAHM-8625-10-GV OT PIPING ISOMETRICS - LINE NO.:24-8625-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.019% 0.019%
601 8 PIPING 3963-KAHM-1349-6-OC OT PIPING ISOMETRICS - LINE NO.:24-1349-6"-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
602 8 PIPING 3963-KAHM-1350-4-OC OT PIPING ISOMETRICS - LINE NO.:24-1350-4''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
603 8 PIPING 3963-KAHM-1351-6-OC OT PIPING ISOMETRICS - LINE NO.:24-1351-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
604 8 PIPING 3963-KAHM-8100-4-WD OT PIPING ISOMETRICS - LINE NO.:24-8100-4"-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 23-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 22-Jul-19 18-Jan-18 23-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 95% 95% 0% 0.019% 0.019%
605 8 PIPING 3963-KAHM-8099-6-WD OT PIPING ISOMETRICS - LINE NO.:24-8099-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 23-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 22-Jul-19 18-Jan-18 23-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18 95% 95% 0% 0.019% 0.019%
606 8 PIPING 3963-KAHM-8626-8-GV OT PIPING ISOMETRICS - LINE NO.:24-8626-8''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.019% 0.019%
607 8 PIPING 3963-KAHM-8627-4-GV OT PIPING ISOMETRICS - LINE NO.:24-8627-4''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
608 8 PIPING 3963-KAHM-8605-6-GP OT PIPING ISOMETRICS - LINE NO.:24-8605-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.019% 0.019%
609 8 PIPING 3963-KAHM-8604-8-GP OT PIPING ISOMETRICS - LINE NO.:24-8604-8"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
610 8 PIPING 3963-KAHM-8602-8-GP OT PIPING ISOMETRICS - LINE NO.:24-8602-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
611 8 PIPING 3963-KAHM-8603-8-GP OT PIPING ISOMETRICS - LINE NO.:24-8603-8''-GP-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
612 8 PIPING 3963-KAHM-8608-2-GP OT PIPING ISOMETRICS - LINE NO.:24-8608-2"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
613 8 PIPING 3963-KAHM-8607-3-GP OT PIPING ISOMETRICS - LINE NO.:24-8607-3"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
614 8 PIPING 3963-KAHM-8606-6-GP OT PIPING ISOMETRICS - LINE NO.:24-8606-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 18-Jan-18 20-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.019% 0.019%
615 8 PIPING 3963-KAHM-8091-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8091-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
616 8 PIPING 3963-KAHM-8093-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8093-1''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
617 8 PIPING 3963-KAHM-8092-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8092-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
618 8 PIPING 3963-KAHM-8090-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8090-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
619 8 PIPING 3963-KAHM-8089-2-OD OT PIPING ISOMETRICS - LINE NO.:24-8089-2"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
620 8 PIPING 3963-KAHM-8088-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8088-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
621 8 PIPING 3963-KAHM-8094-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8094-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
622 8 PIPING 3963-KAHM-8096-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8096-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
623 8 PIPING 3963-KAHM-8087-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8087-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
624 8 PIPING 3963-KAHM-8085-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8085-1"-OD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
625 8 PIPING 3963-KAHM-8086-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8086-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
626 8 PIPING 3963-KAHM-8095-1-OD OT PIPING ISOMETRICS - LINE NO.:24-8095-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
627 8 PIPING 3963-KAHM-8629-2-AI OT PIPING ISOMETRICS - LINE NO.:24-8629-2"-AI-CS1-150-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
628 8 PIPING 3963-KAHM-8176-4-WF OT PIPING ISOMETRICS - LINE NO.:24-8176-4"-WF-L5-150-1X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
629 8 PIPING 3963-KAHM-8178-2-WF OT PIPING ISOMETRICS - LINE NO.:24-8178-2"-WF-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
630 8 PIPING 3963-KAHN-0170-6-OC OT PIPING ISOMETRICS - LINE NO.:22-170-6"-OC-CS1-900-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
631 8 PIPING 3963-KAHN-0162-6-OC OT PIPING ISOMETRICS - LINE NO.:22-162-6''-OC-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
632 8 PIPING 3963-KAHN-0163-6-OC OT PIPING ISOMETRICS - LINE NO.:22-163-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
633 8 PIPING 3963-KAHN-7615-8-GP OT PIPING ISOMETRICS - LINE NO.:22-7615-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
634 8 PIPING 3963-KAHN-0360-6-WD OT PIPING ISOMETRICS - LINE NO.:22-360-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
635 8 PIPING 3963-KAHN-0185-2-OD OT PIPING ISOMETRICS - LINE NO.:22-185-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
636 8 PIPING 3963-KAHN-0186-1-OD OT PIPING ISOMETRICS - LINE NO.:22-186-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
637 8 PIPING 3963-KAHN-0179-3-OD OT PIPING ISOMETRICS - LINE NO.:22-179-3''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
638 8 PIPING 3963-KAHN-0182-2-OD OT PIPING ISOMETRICS - LINE NO.:22-182-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
639 8 PIPING 3963-KAHN-0183-1-OD OT PIPING ISOMETRICS - LINE NO.:22-183-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
640 8 PIPING 3963-KAHN-0184-2-OD OT PIPING ISOMETRICS - LINE NO.:22-184-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
641 8 PIPING 3963-KAHN-0172-6-GV OT PIPING ISOMETRICS - LINE NO.:22-172-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
642 8 PIPING 3963-KAHN-0175-6-GV OT PIPING ISOMETRICS - LINE NO.:22-175-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
643 8 PIPING 3963-KAHN-0173-3-GV OT PIPING ISOMETRICS - LINE NO.:22-173-3''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
644 8 PIPING 3963-KAHN-0176-10-GV OT PIPING ISOMETRICS - LINE NO.:22-176-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
645 8 PIPING 3963-KAHN-0174-6-GV OT PIPING ISOMETRICS - LINE NO.:22-174-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
646 8 PIPING 3963-KAHN-0177-10-GV OT PIPING ISOMETRICS - LINE NO.:22-177-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
647 8 PIPING 3963-KAHN-0164-6-OC OT PIPING ISOMETRICS - LINE NO.:22-164-6"-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
648 8 PIPING 3963-KAHN-0165-6-OC OT PIPING ISOMETRICS - LINE NO.:22-165-6"-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
649 8 PIPING 3963-KAHN-0168-4-OC OT PIPING ISOMETRICS - LINE NO.:22-168-4''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
650 8 PIPING 3963-KAHN-0167-6-OC OT PIPING ISOMETRICS - LINE NO.:22-167-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
651 8 PIPING 3963-KAHN-0361-4-WD OT PIPING ISOMETRICS - LINE NO.:22-361-4"-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
652 8 PIPING 3963-KAHN-0363-6-WD OT PIPING ISOMETRICS - LINE NO.:22-363-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
653 8 PIPING 3963-KAHN-0364-6-WD OT PIPING ISOMETRICS - LINE NO.:22-364-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
654 8 PIPING 3963-KAHN-0179-8-GV OT PIPING ISOMETRICS - LINE NO.:22-179-8''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
655 8 PIPING 3963-KAHN-0178-4-GV OT PIPING ISOMETRICS - LINE NO.:22-178-4''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
656 8 PIPING 3963-KAHN-7621-6-GP OT PIPING ISOMETRICS - LINE NO.:22-7621-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
657 8 PIPING 3963-KAHN-7622-8-GP OT PIPING ISOMETRICS - LINE NO.:22-7622-8"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
658 8 PIPING 3963-KAHN-7917-8-GP OT PIPING ISOMETRICS - LINE NO.:22-7917-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
659 8 PIPING 3963-KAHN-7619-8-GP OT PIPING ISOMETRICS - LINE NO.:22-7619-8''-GP-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
660 8 PIPING 3963-KAHN-7616-8-GP OT PIPING ISOMETRICS - LINE NO.:22-7616-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
661 8 PIPING 3963-KAHN-0180-2-GV OT PIPING ISOMETRICS - LINE NO.:22-180-2"-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
662 8 PIPING 3963-KAHN-7618-3-GP OT PIPING ISOMETRICS - LINE NO.:22-7618-3"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
663 8 PIPING 3963-KAHN-7620-6-GP OT PIPING ISOMETRICS - LINE NO.:22-7620-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 18-Jan-18 21-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.019% 0.019%
664 8 PIPING 3963-KAHN-0362-1-OD OT PIPING ISOMETRICS - LINE NO.:22-362-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
665 8 PIPING 3963-KAHN-0180-1-OD OT PIPING ISOMETRICS - LINE NO.:22-180-1''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
666 8 PIPING 3963-KAHN-0177-1-OD OT PIPING ISOMETRICS - LINE NO.:22-177-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
667 8 PIPING 3963-KAHN-0175-1-OD OT PIPING ISOMETRICS - LINE NO.:22-175-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
668 8 PIPING 3963-KAHN-0187-2-OD OT PIPING ISOMETRICS - LINE NO.:22-187-2"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
669 8 PIPING 3963-KAHN-0169-1-OD OT PIPING ISOMETRICS - LINE NO.:22-169-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
670 8 PIPING 3963-KAHN-0178-1-OD OT PIPING ISOMETRICS - LINE NO.:22-178-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
671 8 PIPING 3963-KAHN-0188-1-OD OT PIPING ISOMETRICS - LINE NO.:22-188-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
672 8 PIPING 3963-KAHN-0176-1-OD OT PIPING ISOMETRICS - LINE NO.:22-176-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
673 8 PIPING 3963-KAHN-0174-1-OD OT PIPING ISOMETRICS - LINE NO.:22-174-1"-OD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
674 8 PIPING 3963-KAHN-0173-1-OD OT PIPING ISOMETRICS - LINE NO.:22-173-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
675 8 PIPING 3963-KAHN-0181-1-OD OT PIPING ISOMETRICS - LINE NO.:22-181-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 18-Jan-18 22-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.019% 0.019%
676 8 PIPING 3963-KAHN-0484-2-AI OT PIPING ISOMETRICS - LINE NO.:22-484-2"-AI-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 22-Jul-19 18-Jan-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.019% 0.019%
677 8 PIPING 3963-KAHN-5001-4-WF OT PIPING ISOMETRICS - LINE NO.:22-5001-4"-WF-L5-150-1X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
678 8 PIPING 3963-KAHN-5003-2-WF OT PIPING ISOMETRICS - LINE NO.:22-5003-2"-WF-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
679 8 PIPING 3963-KAHS-0106-6-OC OT PIPING ISOMETRICS - LINE NO.:23-106-6"-OC-CS1-900-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
680 8 PIPING 3963-KAHS-0101-6-OC OT PIPING ISOMETRICS - LINE NO.:23-101-6''-OC-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
681 8 PIPING 3963-KAHS-0102-6-OC OT PIPING ISOMETRICS - LINE NO.:23-102-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
682 8 PIPING 3963-KAHS-9775-8-GP OT PIPING ISOMETRICS - LINE NO.:23-9775-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
683 8 PIPING 3963-KAHS-9776-6-WD OT PIPING ISOMETRICS - LINE NO.:23-9776-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 3-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 22-Jul-19 18-Jan-18 3-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 95% 95% 0% 0.019% 0.019%
684 8 PIPING 3963-KAHS-9888-2-OD OT PIPING ISOMETRICS - LINE NO.:23-9888-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
685 8 PIPING 3963-KAHS-9889-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9889-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
686 8 PIPING 3963-KAHS-9884-3-OD OT PIPING ISOMETRICS - LINE NO.:23-9884-3''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
687 8 PIPING 3963-KAHS-9885-2-OD OT PIPING ISOMETRICS - LINE NO.:23-9885-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
688 8 PIPING 3963-KAHS-9886-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9886-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
689 8 PIPING 3963-KAHS-9887-2-OD OT PIPING ISOMETRICS - LINE NO.:23-9887-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 95% 95% 0% 0.019% 0.019%
690 8 PIPING 3963-KAHS-9886-6-GV OT PIPING ISOMETRICS - LINE NO.:23-9886-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 27-Jan-18 28-Jan-18 28-Jan-18 28-Jan-18 28-Jan-18 22-Jul-19 18-Jan-18 27-Jan-18 28-Jan-18 28-Jan-18 28-Jan-18 28-Jan-18 95% 95% 0% 0.019% 0.019%
691 8 PIPING 3963-KAHS-9889-6-GV OT PIPING ISOMETRICS - LINE NO.:23-9889-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
692 8 PIPING 3963-KAHS-9887-3-GV OT PIPING ISOMETRICS - LINE NO.:23-9887-3''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
693 8 PIPING 3963-KAHS-9890-10-GV OT PIPING ISOMETRICS - LINE NO.:23-9890-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
694 8 PIPING 3963-KAHS-9888-6-GV OT PIPING ISOMETRICS - LINE NO.:23-9888-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
695 8 PIPING 3963-KAHS-9885-10-GV OT PIPING ISOMETRICS - LINE NO.:23-9885-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
696 8 PIPING 3963-KAHS-0104-6-OC OT PIPING ISOMETRICS - LINE NO.:23-104-6"-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
697 8 PIPING 3963-KAHS-0103-4-OC OT PIPING ISOMETRICS - LINE NO.:23-103-4''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
698 8 PIPING 3963-KAHS-0105-6-OC OT PIPING ISOMETRICS - LINE NO.:23-105-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
699 8 PIPING 3963-KAHS-9777-4-WD OT PIPING ISOMETRICS - LINE NO.:23-9777-4"-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 3-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 22-Jul-19 18-Jan-18 3-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 95% 95% 0% 0.019% 0.019%
700 8 PIPING 3963-KAHS-9778-6-WD OT PIPING ISOMETRICS - LINE NO.:23-9778-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 3-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 22-Jul-19 18-Jan-18 3-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 4-Feb-18 95% 95% 0% 0.019% 0.019%
701 8 PIPING 3963-KAHS-9884-8-GV OT PIPING ISOMETRICS - LINE NO.:23-9884-8''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%

Page 13 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
702 8 PIPING 3963-KAHS-9777-6-GP OT PIPING ISOMETRICS - LINE NO.:23-9777-6"-GP-CS1-150-8X 3 0 E 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
703 8 PIPING 3963-KAHS-9776-8-GP OT PIPING ISOMETRICS - LINE NO.:23-9776-8"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
704 8 PIPING 3963-KAHS-9778-8-GP OT PIPING ISOMETRICS - LINE NO.:23-9778-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
705 8 PIPING 3963-KAHS-9779-6-GP OT PIPING ISOMETRICS - LINE NO.:23-9779-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
706 8 PIPING 3963-KAHS-9893-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9893-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
707 8 PIPING 3963-KAHS-9895-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9895-1''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
708 8 PIPING 3963-KAHS-9896-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9896-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
709 8 PIPING 3963-KAHS-9892-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9892-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
710 8 PIPING 3963-KAHS-9899-2-OD OT PIPING ISOMETRICS - LINE NO.:23-9899-2"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 95% 95% 0% 0.019% 0.019%
711 8 PIPING 3963-KAHS-9898-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9898-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
712 8 PIPING 3963-KAHS-9897-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9897-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
713 8 PIPING 3963-KAHS-9900-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9900-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 27-Jan-18 28-Jan-18 28-Jan-18 28-Jan-18 28-Jan-18 22-Jul-19 18-Jan-18 27-Jan-18 28-Jan-18 28-Jan-18 28-Jan-18 28-Jan-18 95% 95% 0% 0.019% 0.019%
714 8 PIPING 3963-KAHS-9894-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9894-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 95% 95% 0% 0.019% 0.019%
715 8 PIPING 3963-KAHS-9890-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9890-1"-OD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
716 8 PIPING 3963-KAHS-9891-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9891-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 30-Jan-18 95% 95% 0% 0.019% 0.019%
717 8 PIPING 3963-KAHS-9899-1-OD OT PIPING ISOMETRICS - LINE NO.:23-9899-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 18-Jan-18 28-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.019% 0.019%
718 8 PIPING 3963-KAHS-9871-2-AI OT PIPING ISOMETRICS - LINE NO.:23-9871-2"-AI-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 22-Jul-19 18-Jan-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.019% 0.019%
719 8 PIPING 3963-KAHS-3083-4-WF OT PIPING ISOMETRICS - LINE NO.:23-3083-4"-WF-L5-150-1X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
720 8 PIPING 3963-KAHS-3087-2-WF OT PIPING ISOMETRICS - LINE NO.:23-3087-2"-WF-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
721 8 PIPING 3963-JALM-2090-6-OC OT PIPING ISOMETRICS - LINE NO.:31-2090-6"-OC-CS1-900-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 20-Feb-18 20-Feb-18 20-Feb-18 20-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 20-Feb-18 20-Feb-18 20-Feb-18 20-Feb-18 95% 95% 0% 0.019% 0.019%
722 8 PIPING 3963-JALM-2037-6-OC OT PIPING ISOMETRICS - LINE NO.:31-2037-6''-OC-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
723 8 PIPING 3963-JALM-2035-6-OC OT PIPING ISOMETRICS - LINE NO.:31-2035-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
724 8 PIPING 3963-JALM-5201-8-GP OT PIPING ISOMETRICS - LINE NO.:31-5201-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
725 8 PIPING 3963-JALM-2032-6-WD OT PIPING ISOMETRICS - LINE NO.:31-2032-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
726 8 PIPING 3963-JALM-2083-2-OD OT PIPING ISOMETRICS - LINE NO.:31-2083-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
727 8 PIPING 3963-JALM-2084-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2084-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
728 8 PIPING 3963-JALM-2079-3-OD OT PIPING ISOMETRICS - LINE NO.:31-2079-3''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
729 8 PIPING 3963-JALM-2080-2-OD OT PIPING ISOMETRICS - LINE NO.:31-2080-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
730 8 PIPING 3963-JALM-2081-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2081-1"-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
731 8 PIPING 3963-JALM-2082-2-OD OT PIPING ISOMETRICS - LINE NO.:31-2082-2''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
732 8 PIPING 3963-JALM-5210-6-GV OT PIPING ISOMETRICS - LINE NO.:31-5210-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
733 8 PIPING 3963-JALM-5213-6-GV OT PIPING ISOMETRICS - LINE NO.:31-5213-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
734 8 PIPING 3963-JALM-5211-3-GV OT PIPING ISOMETRICS - LINE NO.:31-5211-3''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
735 8 PIPING 3963-JALM-5214-10-GV OT PIPING ISOMETRICS - LINE NO.:31-5214-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
736 8 PIPING 3963-JALM-5212-6-GV OT PIPING ISOMETRICS - LINE NO.:31-5212-6''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
737 8 PIPING 3963-JALM-5215-10-GV OT PIPING ISOMETRICS - LINE NO.:31-5215-10''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
738 8 PIPING 3963-JALM-2086-6-OC OT PIPING ISOMETRICS - LINE NO.:31-2086-6"-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
739 8 PIPING 3963-JALM-2033-4-OC OT PIPING ISOMETRICS - LINE NO.:31-2033-4''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
740 8 PIPING 3963-JALM-2089-6-OC OT PIPING ISOMETRICS - LINE NO.:31-2089-6''-OC-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
741 8 PIPING 3963-JALM-2088-4-WD OT PIPING ISOMETRICS - LINE NO.:31-2088-4"-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
742 8 PIPING 3963-JALM-2034-6-WD OT PIPING ISOMETRICS - LINE NO.:31-2034-6''-WD-L5-300-1X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
743 8 PIPING 3963-JALM-5217-8-GV OT PIPING ISOMETRICS - LINE NO.:31-5217-8''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
744 8 PIPING 3963-JALM-5216-4-GV OT PIPING ISOMETRICS - LINE NO.:31-5216-4''-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
745 8 PIPING 3963-JALM-5204-6-GP OT PIPING ISOMETRICS - LINE NO.:31-5204-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
746 8 PIPING 3963-JALM-5203-8-GP OT PIPING ISOMETRICS - LINE NO.:31-5203-8"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
747 8 PIPING 3963-JALM-5205-8-GP OT PIPING ISOMETRICS - LINE NO.:31-5205-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
748 8 PIPING 3963-JALM-5202-8-GP OT PIPING ISOMETRICS - LINE NO.:31-5202-8''-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
749 8 PIPING 3963-JALM-5207-8-GP OT PIPING ISOMETRICS - LINE NO.:31-5207-8''-GP-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
750 8 PIPING 3963-JALM-5208-2-GP OT PIPING ISOMETRICS - LINE NO.:31-5208-2"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
751 8 PIPING 3963-JALM-5206-2-GP OT PIPING ISOMETRICS - LINE NO.:31-5206-2"-GP-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
752 8 PIPING 3963-JALM-5218-3-GV OT PIPING ISOMETRICS - LINE NO.:31-5218-3"-GV-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
753 8 PIPING 3963-JALM-5209-6-GP OT PIPING ISOMETRICS - LINE NO.:31-5209-6"-GP-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
754 8 PIPING 3963-JALM-2089-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2089-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
755 8 PIPING 3963-JALM-2092-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2092-1''-OD-CS1-150-8X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
756 8 PIPING 3963-JALM-2087-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2087-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
757 8 PIPING 3963-JALM-2086-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2086-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
758 8 PIPING 3963-JALM-2093-2-OD OT PIPING ISOMETRICS - LINE NO.:31-2093-2"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
759 8 PIPING 3963-JALM-2094-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2094-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
760 8 PIPING 3963-JALM-2088-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2088-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
761 8 PIPING 3963-JALM-2091-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2091-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
762 8 PIPING 3963-JALM-2090-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2090-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 19-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 22-Jul-19 18-Jan-18 19-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.019% 0.019%
763 8 PIPING 3963-JALM-2084-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2084-1''-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
764 8 PIPING 3963-JALM-2085-1-OD OT PIPING ISOMETRICS - LINE NO.:31-2085-1"-OD-CS1-300-4X 3 0 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Jul-19 18-Jan-18 20-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 22-Feb-18 95% 95% 0% 0.019% 0.019%
765 8 PIPING 3963-JALM-5212-2-AI OT PIPING ISOMETRICS - LINE NO.:31-5212-2"-AI-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 22-Jul-19 18-Jan-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.019% 0.019%
766 8 PIPING 3963-JALM-2086-4-WF OT PIPING ISOMETRICS - LINE NO.:31-2086-4"-WF-L5-150-1X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
767 8 PIPING 3963-JALM-2087-2-WF OT PIPING ISOMETRICS - LINE NO.:31-2087-2"-WF-CS1-150-4X 3 A 0.020% 21-Aug-17 31-Aug-17 5-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 22-Jul-19 18-Jan-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 1-Apr-18 95% 95% 0% 0.019% 0.019%
768 8 PIPING 3963-KAHN-5-52-0013 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING G.A. AREA 151 SH13 EL.103.590 & ABOV 1 A 0.028% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 2-Jan-18 1-Jan-18 2-Jan-18 22-Jan-18 4-Feb-18 4-Feb-18 22-Jul-19 2-Jan-18 1-Jan-18 2-Jan-18 22-Jan-18 4-Feb-18 4-Feb-18 95% 95% 0% 0.026% 0.026%
769 8 PIPING 3963-KAHN-5-52-0014 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING G.A. AREA 151 SH14 EL.103.590 & ABOV 1 A 0.028% 24-Jul-17 26-Jul-17 28-Jul-17 9-Aug-17 21-Aug-17 2-Sep-17 31-Oct-18 29-Dec-17 1-Jan-18 2-Jan-18 22-Jan-18 4-Feb-18 4-Feb-18 22-Jul-19 29-Dec-17 1-Jan-18 2-Jan-18 22-Jan-18 4-Feb-18 4-Feb-18 95% 95% 0% 0.026% 0.026%
770 8 PIPING 3963-KAHN-5-52-0015 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING G.A AREA 151 SH14 MANIFOLD SHUTDOW 1 A 0.028% 24-Jul-17 26-Jul-17 28-Jul-17 9-Aug-17 21-Aug-17 2-Sep-17 31-Oct-18 30-Dec-17 31-Dec-17 2-Jan-18 23-Jan-18 4-Feb-18 4-Feb-18 22-Jul-19 30-Dec-17 31-Dec-17 2-Jan-18 23-Jan-18 4-Feb-18 4-Feb-18 95% 95% 0% 0.026% 0.026%
771 8 PIPING 3963-KAHS-5-52-0013 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A MANIFOLD SHUTDOWN VALVES (23-S 1 A 0.028% 1-Aug-17 6-Aug-17 11-Aug-17 21-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 2-Jan-18 2-Jan-18 2-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 2-Jan-18 2-Jan-18 2-Jan-18 29-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 0.026% 0.026%
772 8 PIPING DEM-3963-KAHN-5-52-0007 DEM DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING G.A MANIFOLD SHUTDOWN VALVES (22-S 1 A 0.014% 1-Aug-17 6-Aug-17 11-Aug-17 21-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 7-Jan-18 8-Jan-18 9-Jan-18 25-Jan-18 12-Feb-18 12-Feb-18 22-Jul-19 7-Jan-18 8-Jan-18 9-Jan-18 25-Jan-18 12-Feb-18 12-Feb-18 95% 95% 0% 0.013% 0.013%
773 8 PIPING DEM-3963-KAHM-5-52-0010 DEM DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A MANIFOLD SHUTDOWN VALVES (24-SD 1 A 0.014% 1-Aug-17 6-Aug-17 11-Aug-17 21-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 31-Dec-17 7-Jan-18 9-Jan-18 25-Jan-18 12-Feb-18 12-Feb-18 22-Jul-19 31-Dec-17 7-Jan-18 9-Jan-18 25-Jan-18 12-Feb-18 12-Feb-18 95% 95% 0% 0.013% 0.013%
774 8 PIPING 3963-FAHN-5-36-0001 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPING TIE-IN SCHEDULE 1 A 0.056% 23-Jul-17 2-Aug-17 7-Aug-17 25-Aug-17 4-Sep-17 14-Sep-17 31-Oct-18 27-Jul-17 2-Aug-17 3-Aug-17 29-Oct-17 29-Oct-17 11-Jan-18 22-Jul-19 27-Jul-17 2-Aug-17 3-Aug-17 29-Oct-17 29-Oct-17 11-Jan-18 95% 95% 0% 0.053% 0.053%
775 8 PIPING 3963-FAHN-5-57-0001 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PIPE SUPPORT LIST 1 A 0.056% 18-Jul-17 28-Jul-17 2-Aug-17 20-Aug-17 30-Aug-17 9-Sep-17 31-Oct-18 15-Jul-17 15-Oct-17 16-Oct-17 4-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 15-Jul-17 15-Oct-17 16-Oct-17 4-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.053% 0.053%
776 8 PIPING 3963-FAHN-5-50-0001 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; PLOT PLAN 1 C 0.112% 26-Mar-17 5-Apr-17 10-Apr-17 11-May-17 1-Jun-17 11-Jun-17 31-Oct-18 29-Mar-17 5-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 3-Sep-18 22-Jul-19 29-Mar-17 5-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 3-Sep-18 95% 95% 0% 0.106% 0.106%
777 8 PIPING 3963-FAHN-5-50-0002 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; KEY PLAN 1 A 0.042% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 21-Jan-18 22-Jul-19 27-Jul-17 2-Aug-17 3-Aug-17 26-Oct-17 26-Oct-17 21-Jan-18 95% 95% 0% 0.040% 0.040%
778 8 PIPING 3963-FAHS-5-57-0001 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PIPE SUPPORT LIST 1 A 0.056% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 8-Oct-17 10-Oct-17 3-Jan-18 11-Jan-18 11-Jan-18 22-Jul-19 27-Jul-17 8-Oct-17 10-Oct-17 3-Jan-18 11-Jan-18 11-Jan-18 95% 95% 0% 0.053% 0.053%
779 8 PIPING 3963-FAHS-5-50-0001 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; PLOT PLAN 1 C 0.112% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 29-Mar-17 12-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 3-Sep-18 22-Jul-19 29-Mar-17 12-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 3-Sep-18 95% 95% 0% 0.106% 0.106%
780 8 PIPING 3963-JALM-5-57-0001 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPE SUPPORT LIST 1 A 0.056% 24-Jul-17 3-Aug-17 8-Aug-17 26-Aug-17 5-Sep-17 15-Sep-17 31-Oct-18 27-Jul-17 15-Oct-17 16-Oct-17 10-Jan-18 22-Jan-18 22-Jan-18 22-Jul-19 27-Jul-17 15-Oct-17 16-Oct-17 10-Jan-18 22-Jan-18 22-Jan-18 95% 95% 0% 0.053% 0.053%
781 8 PIPING 3963-JALM-5-50-0001 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PLOT PLAN 1 C 0.112% 1-Apr-17 11-Apr-17 16-Apr-17 17-May-17 7-Jun-17 17-Jun-17 31-Oct-18 5-Apr-17 12-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 3-Sep-18 22-Jul-19 5-Apr-17 12-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 3-Sep-18 95% 95% 0% 0.106% 0.106%
782 8 PIPING 3963-KAHM-5-36-0001 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING TIE-IN SCHEDULE 1 A 0.056% 18-Jul-17 28-Jul-17 2-Aug-17 20-Aug-17 30-Aug-17 9-Sep-17 31-Oct-18 20-Jul-17 17-Sep-17 18-Sep-17 10-Dec-17 11-Jan-18 11-Jan-18 22-Jul-19 20-Jul-17 17-Sep-17 18-Sep-17 10-Dec-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.053% 0.053%
783 8 PIPING 3963-KAHM-5-57-0001 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPE SUPPORT LIST 1 A 0.112% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 2-Oct-17 3-Oct-17 5-Oct-17 10-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 2-Oct-17 3-Oct-17 5-Oct-17 10-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.106% 0.106%
784 8 PIPING 3963-KAHM-5-17-0001 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING STRESS ANALYSIS REPORT 3 A 0.336% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 25-Sep-17 27-Sep-17 16-Oct-17 29-Oct-17 21-Jan-18 22-Jul-19 1-Jun-17 25-Sep-17 27-Sep-17 16-Oct-17 29-Oct-17 21-Jan-18 95% 95% 0% 0.319% 0.319%
785 8 PIPING 3963-KAHM-5-50-0001 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PLOT PLAN 1 A 0.112% 30-Mar-17 9-Apr-17 14-Apr-17 15-May-17 5-Jun-17 15-Jun-17 31-Oct-18 15-Mar-17 5-Apr-17 13-Apr-17 23-Oct-17 2-Nov-17 3-Sep-18 22-Jul-19 15-Mar-17 5-Apr-17 13-Apr-17 23-Oct-17 2-Nov-17 3-Sep-18 95% 95% 0% 0.106% 0.106%
786 8 PIPING 3963-KAHN-5-36-0001 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING TIE-IN SCHEDULE 1 A 0.056% 19-Jul-17 29-Jul-17 3-Aug-17 21-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 15-Jul-17 22-Sep-17 24-Sep-17 7-Dec-17 29-Jan-18 29-Jan-18 22-Jul-19 15-Jul-17 22-Sep-17 24-Sep-17 7-Dec-17 29-Jan-18 29-Jan-18 95% 95% 0% 0.053% 0.053%
787 8 PIPING 3963-KAHN-5-57-0001 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPE SUPPORT LIST 1 A 0.056% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 14-Oct-17 15-Oct-17 16-Oct-17 8-Jan-18 21-Jan-18 21-Jan-18 22-Jul-19 14-Oct-17 15-Oct-17 16-Oct-17 8-Jan-18 21-Jan-18 21-Jan-18 95% 95% 0% 0.053% 0.053%
788 8 PIPING 3963-KAHN-5-17-0001 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT 3 A 0.420% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 7-Jun-17 19-Sep-17 20-Sep-17 9-Oct-17 9-Oct-17 21-Jan-18 22-Jul-19 7-Jun-17 19-Sep-17 20-Sep-17 9-Oct-17 9-Oct-17 21-Jan-18 95% 95% 0% 0.399% 0.399%
789 8 PIPING 3963-KAHN-5-50-0001 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PLOT PLAN 1 A 0.112% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 12-Mar-17 5-Apr-17 13-Apr-17 23-Oct-17 2-Nov-17 21-Jan-18 22-Jul-19 12-Mar-17 5-Apr-17 13-Apr-17 23-Oct-17 2-Nov-17 21-Jan-18 95% 95% 0% 0.106% 0.106%
790 8 PIPING 3963-KAHN-5-52-0005 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.5 EL.103.590 & ABOVE 1 A 0.070% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 21-Jan-18 21-Jan-18 22-Jul-19 15-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 21-Jan-18 21-Jan-18 95% 95% 0% 0.067% 0.067%
791 8 PIPING 3963-KAHN-5-52-0007 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.7 EL.103.590 & ABOVE 1 A 0.084% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 21-Jan-18 21-Jan-18 22-Jul-19 15-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 21-Jan-18 21-Jan-18 95% 95% 0% 0.080% 0.080%
792 8 PIPING 3963-KAHN-5-52-0010 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.10 EL.103.590 & ABOV 1 A 0.070% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 19-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 23-Jan-18 23-Jan-18 22-Jul-19 19-Jul-17 9-Oct-17 11-Oct-17 19-Nov-17 23-Jan-18 23-Jan-18 95% 95% 0% 0.067% 0.067%
793 8 PIPING 3963-KAHS-5-36-0001 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING TIE-IN SCHEDULE 1 A 0.056% 22-Jul-17 1-Aug-17 6-Aug-17 24-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 27-Jul-17 17-Sep-17 18-Sep-17 11-Dec-17 17-Jan-18 17-Jan-18 22-Jul-19 27-Jul-17 17-Sep-17 18-Sep-17 11-Dec-17 17-Jan-18 17-Jan-18 95% 95% 0% 0.053% 0.053%
794 8 PIPING 3963-KAHS-5-57-0001 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPE SUPPORT LIST 1 A 0.056% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 14-Oct-17 15-Oct-17 16-Oct-17 3-Jan-18 11-Jan-18 11-Jan-18 22-Jul-19 14-Oct-17 15-Oct-17 16-Oct-17 3-Jan-18 11-Jan-18 11-Jan-18 95% 95% 0% 0.053% 0.053%
795 8 PIPING 3963-KAHS-5-17-0001 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT 3 A 0.420% 10-Jun-17 20-Jun-17 25-Jun-17 26-Jul-17 16-Aug-17 26-Aug-17 31-Oct-18 8-Jul-17 3-Oct-17 5-Oct-17 23-Oct-17 23-Oct-17 31-Jan-18 22-Jul-19 8-Jul-17 3-Oct-17 5-Oct-17 23-Oct-17 23-Oct-17 31-Jan-18 95% 95% 0% 0.399% 0.399%
796 8 PIPING 3963-KAHS-5-50-0001 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PLOT PLAN 1 A 0.112% 1-Apr-17 11-Apr-17 16-Apr-17 17-May-17 7-Jun-17 17-Jun-17 31-Oct-18 14-Mar-17 5-Apr-17 13-Apr-17 23-Oct-17 2-Nov-17 21-Jan-18 22-Jul-19 14-Mar-17 5-Apr-17 13-Apr-17 23-Oct-17 2-Nov-17 21-Jan-18 95% 95% 0% 0.106% 0.106%
797 8 PIPING 3963-FAHM-5-36-0001 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING TIE-IN SCHEDULE 1 A 0.056% 26-Jul-17 5-Aug-17 10-Aug-17 28-Aug-17 7-Sep-17 17-Sep-17 31-Oct-18 15-Jul-17 16-Jul-17 17-Jul-17 13-Nov-17 21-Jan-18 21-Jan-18 22-Jul-19 15-Jul-17 16-Jul-17 17-Jul-17 13-Nov-17 21-Jan-18 21-Jan-18 95% 95% 0% 0.053% 0.053%
798 8 PIPING 3963-FAHM-5-57-0001 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPE SUPPORT LIST 1 A 0.084% 28-Jul-17 7-Aug-17 12-Aug-17 30-Aug-17 9-Sep-17 19-Sep-17 31-Oct-18 2-Oct-17 3-Oct-17 5-Oct-17 20-Dec-17 21-Jan-18 21-Jan-18 22-Jul-19 2-Oct-17 3-Oct-17 5-Oct-17 20-Dec-17 21-Jan-18 21-Jan-18 95% 95% 0% 0.080% 0.080%
799 8 PIPING 3963-FAHM-5-50-0001 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PLOT PLAN 1 A 0.112% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 29-Mar-17 12-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 25-Jan-18 22-Jul-19 29-Mar-17 12-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 25-Jan-18 95% 95% 0% 0.106% 0.106%
800 8 PIPING 3963-FAHM-5-50-0003 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; KEY PLAN 1 A 0.056% 20-Jun-17 30-Jun-17 5-Jul-17 5-Aug-17 26-Aug-17 5-Sep-17 31-Oct-18 15-Mar-17 15-Jul-17 16-Jul-17 26-Oct-17 26-Oct-17 21-Jan-18 22-Jul-19 15-Mar-17 15-Jul-17 16-Jul-17 26-Oct-17 26-Oct-17 21-Jan-18 95% 95% 0% 0.053% 0.053%
801 8 PIPING 3963-KAHM-5-51-0001 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; EQUIPMENT LOCATION PLAN 1 A 0.056% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 9-Apr-17 12-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 6-Mar-18 22-Jul-19 9-Apr-17 12-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 6-Mar-18 95% 95% 0% 0.053% 0.053%
802 8 PIPING 3963-KAHN-5-51-0001 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; EQUIPMENT LOCATION PLAN 1 A 0.056% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 9-Apr-17 12-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 21-Jan-18 22-Jul-19 9-Apr-17 12-Apr-17 13-Apr-17 23-Oct-17 23-Oct-17 21-Jan-18 95% 95% 0% 0.053% 0.053%
803 8 PIPING 3963-KAHS-5-51-0001 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; EQUIPMENT LOCATION PLAN 1 A 0.056% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 9-Apr-17 12-Apr-17 13-Apr-17 23-Oct-17 1-Nov-17 21-Jan-18 22-Jul-19 9-Apr-17 12-Apr-17 13-Apr-17 23-Oct-17 1-Nov-17 21-Jan-18 95% 95% 0% 0.053% 0.053%
804 8 PIPING 3963-FAHM-5-51-0001 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; EQUIPMENT LOCATION PLAN 1 A 0.056% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 9-Apr-17 12-Apr-17 13-Apr-17 24-Oct-17 24-Oct-17 25-Jan-18 22-Jul-19 9-Apr-17 12-Apr-17 13-Apr-17 24-Oct-17 24-Oct-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
805 8 PIPING 3963-FAHN-5-51-0001 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; EQUIPMENT LOCATION PLAN 1 A 0.056% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 9-Apr-17 12-Apr-17 13-Apr-17 24-Oct-17 24-Oct-17 21-Jan-18 22-Jul-19 9-Apr-17 12-Apr-17 13-Apr-17 24-Oct-17 24-Oct-17 21-Jan-18 95% 95% 0% 0.053% 0.053%
806 8 PIPING 3963-FAHS-5-51-0001 OT DUKHAN FIELD - FAHAHIL SOUTH DEGASSING STATION; EQUIPMENT LOCATION PLAN 1 A 0.056% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 9-Apr-17 12-Apr-17 13-Apr-17 24-Oct-17 24-Oct-17 21-Jan-18 22-Jul-19 9-Apr-17 12-Apr-17 13-Apr-17 24-Oct-17 24-Oct-17 21-Jan-18 95% 95% 0% 0.053% 0.053%
807 8 PIPING 3963-JALM-5-51-0001 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; EQUIPMENT LOCATION PLAN 1 A 0.056% 31-Mar-17 10-Apr-17 15-Apr-17 16-May-17 6-Jun-17 16-Jun-17 31-Oct-18 9-Apr-17 12-Apr-17 13-Apr-17 24-Oct-17 24-Oct-17 4-Mar-18 22-Jul-19 9-Apr-17 12-Apr-17 13-Apr-17 24-Oct-17 24-Oct-17 4-Mar-18 95% 95% 0% 0.053% 0.053%
808 8 PIPING 3963-DGEN-5-17-0002 OT DUKHAN FIELD; TECHNICAL BID EVALUATION FOR PIPING BULK ITEMS 1 A 1.270% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 4-Dec-17 6-Dec-17 18-Jan-18 29-Jan-18 29-Jan-18 22-Jul-19 19-Oct-17 4-Dec-17 6-Dec-17 18-Jan-18 29-Jan-18 29-Jan-18 95% 95% 0% 1.206% 1.206%
809 8 PIPING 3963-DGEN-5-57-0001 OT DUKHAN FIELD - STANDARD PIPE SUPPORT DETAILS 1 A 0.168% 21-Jul-17 31-Jul-17 5-Aug-17 23-Aug-17 2-Sep-17 12-Sep-17 31-Oct-18 27-Jul-17 10-Oct-17 12-Oct-17 21-Jan-18 1-Feb-18 1-Feb-18 22-Jul-19 27-Jul-17 10-Oct-17 12-Oct-17 21-Jan-18 1-Feb-18 1-Feb-18 95% 95% 0% 0.160% 0.160%
810 8 PIPING 3963-FAHN-5-52-0001 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.1 PIPING GA EL.21.600 TO 24.050 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 11-Dec-17 13-Dec-17 7-Feb-18 28-Feb-18 28-Feb-18 22-Jul-19 19-Oct-17 11-Dec-17 13-Dec-17 7-Feb-18 28-Feb-18 28-Feb-18 95% 95% 0% 0.093% 0.093%
811 8 PIPING 3963-FAHN-5-52-0002 OT DUKHAN FIELD - FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.2 PIPING GA EL.24.050 & ABOVE 1 A 0.098% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 10-Dec-17 13-Dec-17 12-Feb-18 18-Mar-18 18-Mar-18 22-Jul-19 19-Oct-17 10-Dec-17 13-Dec-17 12-Feb-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.093% 0.093%
812 8 PIPING 3963-JALM-5-52-0001 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.1 EL.63.000 TO 67.000 1 1 0.140% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 26-Dec-17 28-Dec-17 4-Mar-18 22-Mar-18 22-Mar-18 22-Jul-19 8-Jul-17 26-Dec-17 28-Dec-17 4-Mar-18 22-Mar-18 22-Mar-18 95% 95% 0% 0.133% 0.133%
813 8 PIPING 3963-JALM-5-52-0002 OT DUKHAN FIELD - JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.2 EL.67.000 TO OVER 1 1 0.140% 11-Jul-17 21-Jul-17 26-Jul-17 26-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 8-Jul-17 30-Dec-17 2-Jan-18 6-Mar-18 22-Mar-18 22-Mar-18 22-Jul-19 8-Jul-17 30-Dec-17 2-Jan-18 6-Mar-18 22-Mar-18 22-Mar-18 95% 95% 0% 0.133% 0.133%
814 8 PIPING 3963-KAHM-5-52-0001 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.1 EL.101.523 & ABOVE 1 1 0.151% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 7-Dec-17 9-Dec-17 25-Jan-18 18-Mar-18 18-Mar-18 22-Jul-19 31-May-17 7-Dec-17 9-Dec-17 25-Jan-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.143% 0.143%
815 8 PIPING 3963-KAHM-5-52-0003 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.3 EL. 99.143 TO 101.523 1 A 0.151% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 8-Dec-17 10-Dec-17 21-Jan-18 22-Mar-18 22-Mar-18 22-Jul-19 31-May-17 8-Dec-17 10-Dec-17 21-Jan-18 22-Mar-18 22-Mar-18 95% 95% 0% 0.143% 0.143%
816 8 PIPING 3963-KAHM-5-52-0005 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.5 EL. 99.143 & ABOVE 1 A 0.151% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 7-Dec-17 9-Dec-17 25-Jan-18 22-Mar-18 22-Mar-18 22-Jul-19 31-May-17 7-Dec-17 9-Dec-17 25-Jan-18 22-Mar-18 22-Mar-18 95% 95% 0% 0.143% 0.143%
817 8 PIPING 3963-KAHM-5-52-0008 OT DUKHAN FIELD - KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.8 EL.99.863 & ABOVE 1 A 0.075% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 24-Oct-17 26-Oct-17 21-Jan-18 12-Feb-18 12-Feb-18 22-Jul-19 1-Jun-17 24-Oct-17 26-Oct-17 21-Jan-18 12-Feb-18 12-Feb-18 95% 95% 0% 0.072% 0.072%
818 8 PIPING 3963-KAHN-5-52-0002 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.2 EL.105.500 & ABOVE 1 A 0.529% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 19-Jul-17 28-Nov-17 30-Nov-17 17-Jan-18 21-Feb-18 21-Feb-18 22-Jul-19 19-Jul-17 28-Nov-17 30-Nov-17 17-Jan-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.503% 0.503%

Page 14 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
819 8 PIPING 3963-KAHN-5-52-0003 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.3 EL.103.590 TO EL.105 1 A E 0.084% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 8-Dec-17 10-Dec-17 25-Jan-18 21-Feb-18 21-Feb-18 22-Jul-19 15-Jul-17 8-Dec-17 10-Dec-17 25-Jan-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.080% 0.080%
820 8 PIPING 3963-KAHN-5-52-0004 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.4 EL.105.500 & ABOVE 1 A 0.070% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 20-Jul-17 28-Nov-17 30-Nov-17 25-Jan-18 21-Feb-18 21-Feb-18 22-Jul-19 20-Jul-17 28-Nov-17 30-Nov-17 25-Jan-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.067% 0.067%
821 8 PIPING 3963-KAHS-5-52-0001 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.1 EL.26.000 TO 28.380 1 1 0.098% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 29-Jun-17 12-Dec-17 14-Dec-17 21-Jan-18 18-Mar-18 18-Mar-18 22-Jul-19 29-Jun-17 12-Dec-17 14-Dec-17 21-Jan-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.093% 0.093%
822 8 PIPING 3963-KAHS-5-52-0002 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.2 EL.26.000 TO 28.380 1 1 0.140% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 29-Jun-17 18-Dec-17 20-Dec-17 21-Jan-18 18-Mar-18 18-Mar-18 22-Jul-19 29-Jun-17 18-Dec-17 20-Dec-17 21-Jan-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.133% 0.133%
823 8 PIPING 3963-KAHS-5-52-0003 OT DUKHAN FIELD - KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.3 EL.28.380 & ABOVE 1 1 0.084% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 29-Jun-17 11-Dec-17 13-Dec-17 21-Jan-18 18-Mar-18 18-Mar-18 22-Jul-19 29-Jun-17 11-Dec-17 13-Dec-17 21-Jan-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.080% 0.080%
824 8 PIPING 3963-FAHM-5-52-0001 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.1 EL.60.600 TO 63.050 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 4-Dec-17 6-Dec-17 1-Feb-18 18-Mar-18 18-Mar-18 22-Jul-19 19-Oct-17 4-Dec-17 6-Dec-17 1-Feb-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.093% 0.093%
825 8 PIPING 3963-FAHM-5-52-0002 OT DUKHAN FIELD - FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.2 EL.63.050 & ABOVE 1 B 0.098% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 3-Dec-17 5-Dec-17 5-Feb-18 18-Mar-18 18-Mar-18 22-Jul-19 19-Oct-17 3-Dec-17 5-Dec-17 5-Feb-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.093% 0.093%
826 8 PIPING 3963-KAHN-5-52-0001 OT DUKHAN FIELD - KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.1 EL.103.590 TO EL.105 1 A 0.423% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 15-Jul-17 28-Nov-17 30-Nov-17 15-Jan-18 21-Feb-18 21-Feb-18 22-Jul-19 15-Jul-17 28-Nov-17 30-Nov-17 15-Jan-18 21-Feb-18 21-Feb-18 95% 95% 0% 0.402% 0.402%
827 6 MECHANICAL 3963-DGEN-5-14-0007 OT TECHNICAL SPECIFICATION FOR NEW 3 PHASE TEST SEPARATOR 1 A 0.125% 11-Apr-17 21-Apr-17 26-Apr-17 27-May-17 17-Jun-17 27-Jun-17 31-Oct-18 5-Apr-17 25-Apr-17 27-Apr-17 22-Jun-17 2-Aug-17 3-Aug-17 22-Jul-19 5-Apr-17 25-Apr-17 27-Apr-17 22-Jun-17 2-Aug-17 3-Aug-17 95% 95% 0% 0.119% 0.119%
828 6 MECHANICAL 3963-DGEN-5-15-0005 OT MATERIAL REQUISITION FOR SEPARATOR EQUIPMENT 1 A 0.083% 30-Apr-17 10-May-17 15-May-17 15-Jun-17 6-Jul-17 16-Jul-17 31-Oct-18 11-May-17 24-May-17 25-May-17 27-Jun-17 30-Jul-17 31-Jul-17 22-Jul-19 11-May-17 24-May-17 25-May-17 27-Jun-17 30-Jul-17 31-Jul-17 95% 95% 0% 0.079% 0.079%
829 6 MECHANICAL 3963-DGEN-5-17-0005 OT TECHNICAL BID EVALUATION FOR SEPARATOR EQUIPMENT 1 A 0.167% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 3-Aug-17 8-Aug-17 10-Aug-17 22-Aug-17 1-Oct-17 1-Oct-17 22-Jul-19 3-Aug-17 8-Aug-17 10-Aug-17 22-Aug-17 1-Oct-17 1-Oct-17 95% 95% 0% 0.158% 0.158%
830 6 MECHANICAL 3963-DGEN-5-13-0007 OT MECHANICAL DATA SHEETS FOR SEPARATOR EQUIPMENT 1 A 0.125% 23-Apr-17 3-May-17 8-May-17 8-Jun-17 29-Jun-17 9-Jul-17 31-Oct-18 27-Apr-17 23-May-17 25-May-17 27-Jun-17 2-Aug-17 3-Aug-17 22-Jul-19 27-Apr-17 23-May-17 25-May-17 27-Jun-17 2-Aug-17 3-Aug-17 95% 95% 0% 0.119% 0.119%
831 6 MECHANICAL 3963-DGEN-5-14-0008 OT SPECIFICATION FOR PRESSURE RELIEF VALVES 1 A 0.125% 11-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 24-Apr-17 29-Apr-17 2-May-17 6-Jun-17 6-Jun-17 14-Sep-17 22-Jul-19 24-Apr-17 29-Apr-17 2-May-17 6-Jun-17 6-Jun-17 14-Sep-17 95% 95% 0% 0.119% 0.119%
832 6 MECHANICAL 3963-DGEN-5-17-0007 OT MATERIAL SELECTION REPORT (SEPARATORS) 1 A 0.083% 11-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 7-May-17 9-May-17 10-May-17 5-Jun-17 25-Jul-17 26-Jul-17 22-Jul-19 7-May-17 9-May-17 10-May-17 5-Jun-17 25-Jul-17 26-Jul-17 95% 95% 0% 0.079% 0.079%
833 6 MECHANICAL 3963-KAHM-5-13-0001 OT DATA SHEET FOR PRESSURE RELIEF VALVES (KAHM) 1 A 0.125% 6-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 22-Jul-19 10-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 95% 95% 0% 0.119% 0.119%
834 6 MECHANICAL 3963-KAHN-5-13-0001 OT DATA SHEET FOR PRESSURE RELIEF VALVES (KAHN) 1 A 0.125% 6-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 22-Jul-19 10-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 95% 95% 0% 0.119% 0.119%
835 6 MECHANICAL 3963-KAHS-5-13-0001 OT DATA SHEET FOR PRESSURE RELIEF VALVES (KAHS) 1 A 0.125% 6-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 22-Jul-19 10-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 95% 95% 0% 0.119% 0.119%
836 6 MECHANICAL 3963-FAHM-5-13-0001 OT DATA SHEET FOR PRESSURE RELIEF VALVES (FAHM) 1 A 0.125% 6-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 22-Jul-19 10-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 95% 95% 0% 0.119% 0.119%
837 6 MECHANICAL 3963-FAHN-5-13-0001 OT DATA SHEET FOR PRESSURE RELIEF VALVES (FAHN) 1 A 0.125% 6-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 22-Jul-19 10-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 95% 95% 0% 0.119% 0.119%
838 6 MECHANICAL 3963-FAHS-5-13-0001 OT DATA SHEET FOR PRESSURE RELIEF VALVES (FAHS) 1 A 0.125% 6-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 25-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 22-Jul-19 25-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 95% 95% 0% 0.119% 0.119%
839 6 MECHANICAL 3963-JALM-5-13-0001 OT DATA SHEET FOR PRESSURE RELIEF VALVES (JALM) 1 A 0.125% 6-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 25-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 22-Jul-19 25-May-17 7-Aug-17 9-Aug-17 10-Sep-17 20-Sep-17 2-Nov-17 95% 95% 0% 0.119% 0.119%
840 6 MECHANICAL 3963-DGEN-5-15-0006 OT MATERIAL REQUISITION FOR PRESSURE RELIEF VALVES 1 A 0.069% 3-Jun-17 13-Jun-17 18-Jun-17 19-Jul-17 9-Aug-17 19-Aug-17 31-Oct-18 8-Jun-17 20-Jun-17 22-Jun-17 18-Aug-17 18-Oct-17 19-Oct-17 22-Jul-19 8-Jun-17 20-Jun-17 22-Jun-17 18-Aug-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.066% 0.066%
841 6 MECHANICAL 3963-DGEN-5-17-0008 OT TECHNICAL BID EVALUATION FOR PRESSURE RELIEF VALVES 1 A 0.242% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 24-Nov-17 26-Nov-17 26-Dec-17 26-Dec-17 26-Dec-17 22-Jul-19 19-Oct-17 24-Nov-17 26-Nov-17 26-Dec-17 26-Dec-17 26-Dec-17 95% 95% 0% 0.230% 0.230%
842 3 MECHANICAL 3963-DGEN-5-00-0002 OT MISCELLANEOUS - MECHANICAL 0 0.022% 14-Sep-17 14-Sep-17 14-Sep-17 14-Sep-17 14-Sep-17 14-Sep-17 14-Sep-17 1-Feb-18 6-Feb-18 1-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 22-Jul-19 1-Feb-18 6-Feb-18 1-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 95% 95% 0% 0.021% 0.021%
843 3 ELECTRICAL 3963-DGEN-2-14-0001 OT SPECIFICATION FOR ELECTRICAL POWER, CONTROL CABLES 1 A 0.111% 17-Mar-17 27-Mar-17 1-Apr-17 2-May-17 23-May-17 2-Jun-17 31-Oct-18 15-Mar-17 4-Apr-17 12-Apr-17 26-Apr-17 23-May-17 23-May-17 22-Jul-19 15-Mar-17 4-Apr-17 12-Apr-17 26-Apr-17 23-May-17 23-May-17 95% 95% 0% 0.106% 0.106%
844 3 ELECTRICAL 3963-DGEN-2-14-0002 OT SPECIFICATION FOR ELECTRICAL BULK MATERIALS 1 A 0.111% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 29-Mar-17 3-Apr-17 12-Apr-17 26-Apr-17 26-Apr-17 26-Apr-17 22-Jul-19 29-Mar-17 3-Apr-17 12-Apr-17 26-Apr-17 26-Apr-17 26-Apr-17 95% 95% 0% 0.106% 0.106%
845 3 ELECTRICAL 3963-DGEN-2-13-0001 OT DATA SHEET FOR LV CABLES & EARTHING CABLES 1 A 0.097% 17-Mar-17 27-Mar-17 1-Apr-17 2-May-17 23-May-17 2-Jun-17 31-Oct-18 15-Mar-17 3-Apr-17 5-Apr-17 26-Apr-17 7-May-17 7-May-17 22-Jul-19 15-Mar-17 3-Apr-17 5-Apr-17 26-Apr-17 7-May-17 7-May-17 95% 95% 0% 0.092% 0.092%
846 3 ELECTRICAL 3963-DGEN-2-80-0001 OT TYPICAL INSTALLATION DETAILS DRAWINGS FOR POWER 1 A 0.153% 29-Mar-17 8-Apr-17 13-Apr-17 14-May-17 4-Jun-17 14-Jun-17 31-Oct-18 4-Apr-17 6-Apr-17 9-Apr-17 26-Apr-17 7-May-17 7-May-17 22-Jul-19 4-Apr-17 6-Apr-17 9-Apr-17 26-Apr-17 7-May-17 7-May-17 95% 95% 0% 0.145% 0.145%
847 3 ELECTRICAL 3963-DGEN-2-80-0002 OT TYPICAL INSTALLATION DETAILS DRAWINGS FOR EARTHING 1 A 0.153% 29-Mar-17 8-Apr-17 13-Apr-17 14-May-17 4-Jun-17 14-Jun-17 31-Oct-18 2-Apr-17 5-Apr-17 9-Apr-17 3-May-17 3-May-17 3-May-17 22-Jul-19 2-Apr-17 5-Apr-17 9-Apr-17 3-May-17 3-May-17 3-May-17 95% 95% 0% 0.145% 0.145%
848 3 ELECTRICAL 3963-DGEN-2-80-0003 OT TYPICAL INSTALLATION DETAILS DRAWINGS FOR LIGHTING 1 A 0.153% 5-Apr-17 15-Apr-17 20-Apr-17 21-May-17 11-Jun-17 21-Jun-17 31-Oct-18 5-Apr-17 6-Apr-17 9-Apr-17 3-May-17 3-May-17 3-May-17 22-Jul-19 5-Apr-17 6-Apr-17 9-Apr-17 3-May-17 3-May-17 3-May-17 95% 95% 0% 0.145% 0.145%
849 3 ELECTRICAL 3963-KAHM-2-34-0001 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 ELECTRICAL LOAD SCHEDULE 1 B 0.097% 8-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 10-Sep-17 17-Sep-17 31-Oct-18 6-May-17 8-May-17 9-May-17 5-Oct-17 5-Oct-17 5-Oct-17 22-Jul-19 6-May-17 8-May-17 9-May-17 5-Oct-17 5-Oct-17 5-Oct-17 95% 95% 0% 0.092% 0.092%
850 3 ELECTRICAL 3963-KAHM-2-36-0001 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 ELECTRICAL TIE-IN SCHEDULE 1 A 0.083% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 16-May-17 17-May-17 17-May-17 8-Jun-17 16-Jun-17 4-Dec-17 22-Jul-19 16-May-17 17-May-17 17-May-17 8-Jun-17 16-Jun-17 4-Dec-17 95% 95% 0% 0.079% 0.079%
851 3 ELECTRICAL 3963-KAHM-2-37-0001 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 ELECTRICAL CABLE SCHEDULE 1 A 0.097% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 25-May-17 29-May-17 30-May-17 2-Aug-17 3-Aug-17 28-Sep-17 22-Jul-19 25-May-17 29-May-17 30-May-17 2-Aug-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.092% 0.092%
852 3 ELECTRICAL 3963-KAHM-2-54-0001 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 24MCC-2601 MOTOR CONTROL CENTER SINGLE LINE DIAGRAM- 1 B 0.097% 8-Jun-17 18-Jun-17 23-Jun-17 24-Jul-17 14-Aug-17 24-Aug-17 31-Oct-18 7-May-17 9-May-17 10-May-17 4-Jun-17 12-Jun-17 24-Sep-17 22-Jul-19 7-May-17 9-May-17 10-May-17 4-Jun-17 12-Jun-17 24-Sep-17 95% 95% 0% 0.092% 0.092%
853 3 ELECTRICAL 3963-KAHM-2-54-0002 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 24-DB-2604 DISTRIBUTION BOARD SINGLE LINE DIAGRAM-415V 1 A 0.097% 8-Jun-17 18-Jun-17 23-Jun-17 24-Jul-17 14-Aug-17 24-Aug-17 31-Oct-18 7-May-17 9-May-17 10-May-17 4-Jun-17 3-Aug-17 22-Aug-17 22-Jul-19 7-May-17 9-May-17 10-May-17 4-Jun-17 3-Aug-17 22-Aug-17 95% 95% 0% 0.092% 0.092%
854 3 ELECTRICAL 3963-KAHM-2-54-0003 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 24UPS-2605(CLASS A UPS) S.L.D INSTRUMENT UPS 240V A.C. 1 A 0.097% 8-Jun-17 18-Jun-17 23-Jun-17 24-Jul-17 14-Aug-17 24-Aug-17 31-Oct-18 10-May-17 11-May-17 11-May-17 5-Jun-17 13-Jun-17 24-Sep-17 22-Jul-19 10-May-17 11-May-17 11-May-17 5-Jun-17 13-Jun-17 24-Sep-17 95% 95% 0% 0.092% 0.092%
855 3 ELECTRICAL 3963-KAHM-2-64-0001 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 CABLE ROUTING LAYOUT 1 A 0.111% 30-Jun-17 10-Jul-17 15-Jul-17 15-Aug-17 5-Sep-17 15-Sep-17 31-Oct-18 17-Jun-17 18-Jun-17 19-Jun-17 2-Aug-17 3-Aug-17 2-Nov-17 22-Jul-19 17-Jun-17 18-Jun-17 19-Jun-17 2-Aug-17 3-Aug-17 2-Nov-17 95% 95% 0% 0.106% 0.106%
856 3 ELECTRICAL 3963-KAHM-2-65-0002 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 EARTHING LAYOUT 1 A 0.097% 30-Jun-17 10-Jul-17 15-Jul-17 15-Aug-17 5-Sep-17 15-Sep-17 31-Oct-18 2-Jul-17 3-Jul-17 4-Jul-17 23-Jul-17 20-Sep-17 20-Sep-17 22-Jul-19 2-Jul-17 3-Jul-17 4-Jul-17 23-Jul-17 20-Sep-17 20-Sep-17 95% 95% 0% 0.092% 0.092%
857 3 ELECTRICAL 3963-KAHM-2-67-0001 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 LIGHTING LAYOUT 1 A 0.097% 30-Jun-17 10-Jul-17 15-Jul-17 15-Aug-17 5-Sep-17 15-Sep-17 31-Oct-18 27-May-17 27-May-17 28-May-17 22-Jun-17 2-Aug-17 3-Aug-17 22-Jul-19 27-May-17 27-May-17 28-May-17 22-Jun-17 2-Aug-17 3-Aug-17 95% 95% 0% 0.092% 0.092%
858 3 ELECTRICAL 3963-KAHM-2-31-0001 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING C 3 A 0.097% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 2-Oct-17 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 2-Oct-17 95% 95% 0% 0.092% 0.092%
859 3 ELECTRICAL 3963-KAHM-2-31-0002 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, 3 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 26-Feb-18 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 26-Feb-18 95% 95% 0% 0.079% 0.079%
860 3 ELECTRICAL 3963-KAHM-2-17-0001 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 POWER ADEQUACY REPORT 1 A 0.153% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 22-Nov-17 22-Jul-19 25-May-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 22-Nov-17 95% 95% 0% 0.145% 0.145%
861 3 ELECTRICAL 3963-KAHM-2-12-0001 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 LV CABLE SIZING CALCULATION 1 B 0.111% 8-Apr-17 18-Apr-17 23-Apr-17 24-May-17 14-Jun-17 24-Jun-17 31-Oct-18 19-Apr-17 22-Apr-17 24-Apr-17 17-May-17 25-May-17 5-Oct-17 22-Jul-19 19-Apr-17 22-Apr-17 24-Apr-17 17-May-17 25-May-17 5-Oct-17 95% 95% 0% 0.106% 0.106%
862 3 ELECTRICAL 3963-KAHM-2-12-0002 OT DUKHAN FIELD - KHATIYAH MAIN UNIT 24 LIGHTING CALCULATION 1 B 0.111% 18-May-17 28-May-17 2-Jun-17 3-Jul-17 24-Jul-17 3-Aug-17 31-Oct-18 14-Apr-17 14-Apr-17 17-Apr-17 19-Jun-17 19-Jun-17 19-Jun-17 22-Jul-19 14-Apr-17 14-Apr-17 17-Apr-17 19-Jun-17 19-Jun-17 19-Jun-17 95% 95% 0% 0.106% 0.106%
863 3 ELECTRICAL 3963-KAHN-2-34-0001 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 ELECTRICAL LOAD SCHEDULE 1 A 0.097% 18-Jul-17 28-Jul-17 2-Aug-17 20-Aug-17 30-Aug-17 9-Sep-17 31-Oct-18 4-May-17 3-May-17 4-May-17 5-Jul-17 13-Jul-17 18-Sep-17 22-Jul-19 4-May-17 3-May-17 4-May-17 5-Jul-17 13-Jul-17 18-Sep-17 95% 95% 0% 0.092% 0.092%
864 3 ELECTRICAL 3963-KAHN-2-36-0001 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 ELECTRICAL TIE-IN SCHEDULE 1 A 0.097% 28-May-17 7-Jun-17 12-Jun-17 13-Jul-17 3-Aug-17 13-Aug-17 31-Oct-18 16-May-17 17-May-17 17-May-17 8-Jun-17 16-Jun-17 25-Sep-17 22-Jul-19 16-May-17 17-May-17 17-May-17 8-Jun-17 16-Jun-17 25-Sep-17 95% 95% 0% 0.092% 0.092%
865 3 ELECTRICAL 3963-KAHN-2-37-0001 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 ELECTRICAL CABLE SCHEDULE 1 A 0.097% 28-May-17 7-Jun-17 12-Jun-17 13-Jul-17 3-Aug-17 13-Aug-17 31-Oct-18 30-May-17 30-May-17 31-May-17 2-Aug-17 3-Aug-17 19-Sep-17 22-Jul-19 30-May-17 30-May-17 31-May-17 2-Aug-17 3-Aug-17 19-Sep-17 95% 95% 0% 0.092% 0.092%
866 3 ELECTRICAL 3963-KAHN-2-54-0001 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 22-DB-7311/7312 DISTRIBUTION BOARD SINGLE LINE DIAGRA 1 A 0.097% 18-Jun-17 28-Jun-17 3-Jul-17 3-Aug-17 24-Aug-17 3-Sep-17 31-Oct-18 7-May-17 9-May-17 10-May-17 4-Jun-17 3-Aug-17 17-Aug-17 22-Jul-19 7-May-17 9-May-17 10-May-17 4-Jun-17 3-Aug-17 17-Aug-17 95% 95% 0% 0.092% 0.092%
867 3 ELECTRICAL 3963-KAHN-2-54-0002 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 22UPS-1801 UPS 10KVA SINGLE LINE DIAGRAM-110/240V AC 1 A 0.097% 18-Jun-17 28-Jun-17 3-Jul-17 3-Aug-17 24-Aug-17 3-Sep-17 31-Oct-18 11-May-17 11-May-17 11-May-17 5-Jun-17 13-Jun-17 25-Sep-17 22-Jul-19 11-May-17 11-May-17 11-May-17 5-Jun-17 13-Jun-17 25-Sep-17 95% 95% 0% 0.092% 0.092%
868 3 ELECTRICAL 3963-KAHN-2-64-0001 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 CABLE ROUTING LAYOUT 1 A 0.153% 18-Jun-17 28-Jun-17 3-Jul-17 3-Aug-17 24-Aug-17 3-Sep-17 31-Oct-18 17-Jun-17 18-Jun-17 19-Jun-17 2-Aug-17 3-Aug-17 29-Oct-17 22-Jul-19 17-Jun-17 18-Jun-17 19-Jun-17 2-Aug-17 3-Aug-17 29-Oct-17 95% 95% 0% 0.145% 0.145%
869 3 ELECTRICAL 3963-KAHN-2-65-0002 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 EARTHING LAYOUT 1 A 0.111% 18-Jul-17 28-Jul-17 2-Aug-17 20-Aug-17 30-Aug-17 9-Sep-17 31-Oct-18 2-Jul-17 3-Jul-17 4-Jul-17 23-Jul-17 20-Sep-17 20-Sep-17 22-Jul-19 2-Jul-17 3-Jul-17 4-Jul-17 23-Jul-17 20-Sep-17 20-Sep-17 95% 95% 0% 0.106% 0.106%
870 3 ELECTRICAL 3963-KAHN-2-67-0001 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 LIGHTING LAYOUT 1 A 0.097% 18-Jul-17 28-Jul-17 2-Aug-17 20-Aug-17 30-Aug-17 9-Sep-17 31-Oct-18 22-May-17 23-May-17 25-May-17 13-Jun-17 21-Jun-17 3-Aug-17 22-Jul-19 22-May-17 23-May-17 25-May-17 13-Jun-17 21-Jun-17 3-Aug-17 95% 95% 0% 0.092% 0.092%
871 3 ELECTRICAL 3963-KAHN-2-31-0001 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING 3 A 0.097% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 19-Oct-17 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 19-Oct-17 95% 95% 0% 0.092% 0.092%
872 3 ELECTRICAL 3963-KAHN-2-31-0002 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING 3 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 26-Feb-18 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 26-Feb-18 95% 95% 0% 0.079% 0.079%
873 3 ELECTRICAL 3963-KAHN-2-17-0001 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 POWER ADEQUACY REPORT 1 A 0.153% 30-May-17 9-Jun-17 14-Jun-17 15-Jul-17 5-Aug-17 15-Aug-17 31-Oct-18 1-Jun-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 24-Sep-17 22-Jul-19 1-Jun-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 24-Sep-17 95% 95% 0% 0.145% 0.145%
874 3 ELECTRICAL 3963-KAHN-2-12-0001 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 LV CABLE SIZING CALCULATION 1 A 0.111% 15-Apr-17 25-Apr-17 30-Apr-17 31-May-17 21-Jun-17 1-Jul-17 31-Oct-18 19-Apr-17 22-Apr-17 24-Apr-17 17-May-17 25-May-17 5-Oct-17 22-Jul-19 19-Apr-17 22-Apr-17 24-Apr-17 17-May-17 25-May-17 5-Oct-17 95% 95% 0% 0.106% 0.106%
875 3 ELECTRICAL 3963-KAHN-2-12-0002 OT DUKHAN FIELD - KHATIYAH NORTH UNIT 22 LIGHTING CALCULATION 1 A 0.111% 28-May-17 7-Jun-17 12-Jun-17 13-Jul-17 3-Aug-17 13-Aug-17 31-Oct-18 14-Apr-17 14-Apr-17 17-Apr-17 5-Jun-17 13-Jun-17 19-Sep-17 22-Jul-19 14-Apr-17 14-Apr-17 17-Apr-17 5-Jun-17 13-Jun-17 19-Sep-17 95% 95% 0% 0.106% 0.106%
876 3 ELECTRICAL 3963-KAHS-2-34-0001 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 ELECTRICAL LOAD SCHEDULE 1 A 0.097% 15-Jun-17 25-Jun-17 30-Jun-17 31-Jul-17 21-Aug-17 31-Aug-17 31-Oct-18 4-May-17 3-May-17 4-May-17 5-Jul-17 13-Jul-17 20-Sep-17 22-Jul-19 4-May-17 3-May-17 4-May-17 5-Jul-17 13-Jul-17 20-Sep-17 95% 95% 0% 0.092% 0.092%
877 3 ELECTRICAL 3963-KAHS-2-36-0001 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 ELECTRICAL TIE-IN SCHEDULE 1 A 0.097% 25-Jul-17 4-Aug-17 9-Aug-17 27-Aug-17 6-Sep-17 16-Sep-17 31-Oct-18 16-May-17 17-May-17 17-May-17 2-Aug-17 3-Aug-17 25-Sep-17 22-Jul-19 16-May-17 17-May-17 17-May-17 2-Aug-17 3-Aug-17 25-Sep-17 95% 95% 0% 0.092% 0.092%
878 3 ELECTRICAL 3963-KAHS-2-37-0001 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 ELECTRICAL CABLE SCHEDULE 1 A 0.097% 25-Jul-17 4-Aug-17 9-Aug-17 27-Aug-17 6-Sep-17 16-Sep-17 31-Oct-18 30-May-17 30-May-17 31-May-17 2-Aug-17 3-Aug-17 19-Sep-17 22-Jul-19 30-May-17 30-May-17 31-May-17 2-Aug-17 3-Aug-17 19-Sep-17 95% 95% 0% 0.092% 0.092%
879 3 ELECTRICAL 3963-KAHS-2-54-0001 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 23-SB-7220 SWITCHBOARD SINGLE LINE DIAGRAM-415V SYST 1 3 0.083% 4-Jun-17 14-Jun-17 19-Jun-17 20-Jul-17 10-Aug-17 20-Aug-17 31-Oct-18 11-May-17 11-May-17 11-May-17 5-Jun-17 13-Jun-17 19-Sep-17 22-Jul-19 11-May-17 11-May-17 11-May-17 5-Jun-17 13-Jun-17 19-Sep-17 95% 95% 0% 0.079% 0.079%
880 3 ELECTRICAL 3963-KAHS-2-54-0002 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 23-DB-0001/0002- DISTRIBUTION BOARD SINGLE LINE DIAGR 1 A 0.097% 4-Jun-17 14-Jun-17 19-Jun-17 20-Jul-17 10-Aug-17 20-Aug-17 31-Oct-18 7-May-17 9-May-17 10-May-17 4-Jun-17 12-Jun-17 22-Aug-17 22-Jul-19 7-May-17 9-May-17 10-May-17 4-Jun-17 12-Jun-17 22-Aug-17 95% 95% 0% 0.092% 0.092%
881 3 ELECTRICAL 3963-KAHS-2-54-0003 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 23-UPS-7701,15KVA SINGLE LINE DIAGRAM-110/240V AC SYS 1 A 0.097% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 11-May-17 11-May-17 11-May-17 5-Jun-17 3-Aug-17 20-Sep-17 22-Jul-19 11-May-17 11-May-17 11-May-17 5-Jun-17 3-Aug-17 20-Sep-17 95% 95% 0% 0.092% 0.092%
882 3 ELECTRICAL 3963-KAHS-2-64-0001 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 CABLE ROUTING LAYOUT 1 A 0.111% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 17-Jun-17 18-Jun-17 19-Jun-17 2-Aug-17 3-Aug-17 8-Nov-17 22-Jul-19 17-Jun-17 18-Jun-17 19-Jun-17 2-Aug-17 3-Aug-17 8-Nov-17 95% 95% 0% 0.106% 0.106%
883 3 ELECTRICAL 3963-KAHS-2-65-0002 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 EARTHING LAYOUT 1 A 0.097% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jun-17 3-Jul-17 4-Jul-17 23-Jul-17 20-Sep-17 20-Sep-17 22-Jul-19 28-Jun-17 3-Jul-17 4-Jul-17 23-Jul-17 20-Sep-17 20-Sep-17 95% 95% 0% 0.092% 0.092%
884 3 ELECTRICAL 3963-KAHS-2-67-0001 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 LIGHTING LAYOUT 1 A 0.097% 30-Jun-17 10-Jul-17 15-Jul-17 15-Aug-17 5-Sep-17 15-Sep-17 31-Oct-18 25-May-17 27-May-17 28-May-17 22-Jun-17 2-Aug-17 3-Aug-17 22-Jul-19 25-May-17 27-May-17 28-May-17 22-Jun-17 2-Aug-17 3-Aug-17 95% 95% 0% 0.092% 0.092%
885 3 ELECTRICAL 3963-KAHS-2-31-0001 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING 3 A 0.097% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 20-Sep-17 5-Oct-17 19-Oct-17 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 20-Sep-17 5-Oct-17 19-Oct-17 95% 95% 0% 0.092% 0.092%
886 3 ELECTRICAL 3963-KAHS-2-31-0002 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING 3 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 8-Jul-17 8-Jul-17 9-Jul-17 2-Aug-17 3-Aug-17 26-Feb-18 22-Jul-19 8-Jul-17 8-Jul-17 9-Jul-17 2-Aug-17 3-Aug-17 26-Feb-18 95% 95% 0% 0.079% 0.079%
887 3 ELECTRICAL 3963-KAHS-2-17-0001 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 POWER ADEQUACY REPORT 1 A 0.153% 22-Apr-17 2-May-17 7-May-17 7-Jun-17 28-Jun-17 8-Jul-17 31-Oct-18 25-May-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 20-Sep-17 22-Jul-19 25-May-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 20-Sep-17 95% 95% 0% 0.145% 0.145%
888 3 ELECTRICAL 3963-KAHS-2-12-0001 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 LV CABLE SIZING CALCULATION 1 A 0.111% 7-Jul-17 17-Jul-17 22-Jul-17 22-Aug-17 9-Sep-17 16-Sep-17 31-Oct-18 22-Apr-17 22-Apr-17 24-Apr-17 17-May-17 25-May-17 28-Sep-17 22-Jul-19 22-Apr-17 22-Apr-17 24-Apr-17 17-May-17 25-May-17 28-Sep-17 95% 95% 0% 0.106% 0.106%
889 3 ELECTRICAL 3963-KAHS-2-12-0002 OT DUKHAN FIELD - KHATIYAH SOUTH UNIT 23 LIGHTING CALCULATION 1 A 0.111% 7-Jul-17 17-Jul-17 22-Jul-17 22-Aug-17 9-Sep-17 16-Sep-17 31-Oct-18 14-Apr-17 14-Apr-17 17-Apr-17 5-Jun-17 13-Jun-17 19-Sep-17 22-Jul-19 14-Apr-17 14-Apr-17 17-Apr-17 5-Jun-17 13-Jun-17 19-Sep-17 95% 95% 0% 0.106% 0.106%
890 3 ELECTRICAL 3963-FAHM-2-34-0001 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 ELECTRICAL LOAD SCHEDULE 1 A 0.097% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 30-Apr-17 3-May-17 5-Jul-17 3-Aug-17 20-Sep-17 22-Jul-19 19-Apr-17 30-Apr-17 3-May-17 5-Jul-17 3-Aug-17 20-Sep-17 95% 95% 0% 0.092% 0.092%
891 3 ELECTRICAL 3963-FAHM-2-36-0001 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 ELECTRICAL TIE-IN SCHEDULE 1 B 0.097% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 17-May-17 17-May-17 8-Jun-17 22-Jun-17 22-Jun-17 22-Jul-19 19-Apr-17 17-May-17 17-May-17 8-Jun-17 22-Jun-17 22-Jun-17 95% 95% 0% 0.092% 0.092%
892 3 ELECTRICAL 3963-FAHM-2-37-0001 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 ELECTRICAL CABLE SCHEDULE 1 A 0.097% 3-May-17 13-May-17 18-May-17 18-Jun-17 9-Jul-17 19-Jul-17 31-Oct-18 22-May-17 23-May-17 25-May-17 19-Jun-17 27-Jun-17 19-Sep-17 22-Jul-19 22-May-17 23-May-17 25-May-17 19-Jun-17 27-Jun-17 19-Sep-17 95% 95% 0% 0.092% 0.092%
893 3 ELECTRICAL 3963-FAHM-2-54-0001 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 14-MCC-2601 MOTOR CONTROL CENTRE SINGLE LINE DIAGRAM- 1 3 0.083% 3-May-17 13-May-17 18-May-17 18-Jun-17 9-Jul-17 19-Jul-17 31-Oct-18 7-May-17 9-May-17 10-May-17 1-Jun-17 9-Jun-17 19-Sep-17 22-Jul-19 7-May-17 9-May-17 10-May-17 1-Jun-17 9-Jun-17 19-Sep-17 95% 95% 0% 0.079% 0.079%
894 3 ELECTRICAL 3963-FAHM-2-54-0002 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 14-DB-2603 - DISTRIBUTION BOARD SINGLE LINE DIAGRAM-415V 1 B 0.097% 3-May-17 13-May-17 18-May-17 18-Jun-17 9-Jul-17 19-Jul-17 31-Oct-18 7-May-17 9-May-17 10-May-17 1-Jun-17 21-Jun-17 21-Jun-17 22-Jul-19 7-May-17 9-May-17 10-May-17 1-Jun-17 21-Jun-17 21-Jun-17 95% 95% 0% 0.092% 0.092%
895 3 ELECTRICAL 3963-FAHM-2-54-0003 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 14-UPS-2605 UPS,10KVA SINGLE LINE DIAGRAM-240V AC SYSTEM 1 A 0.097% 3-May-17 13-May-17 18-May-17 18-Jun-17 9-Jul-17 19-Jul-17 31-Oct-18 7-May-17 9-May-17 10-May-17 14-Jun-17 22-Jun-17 20-Sep-17 22-Jul-19 7-May-17 9-May-17 10-May-17 14-Jun-17 22-Jun-17 20-Sep-17 95% 95% 0% 0.092% 0.092%
896 3 ELECTRICAL 3963-FAHM-2-64-0001 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 CABLE ROUTING LAYOUT 1 A 0.097% 3-May-17 13-May-17 18-May-17 18-Jun-17 9-Jul-17 19-Jul-17 31-Oct-18 25-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 9-Jan-18 22-Jul-19 25-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 9-Jan-18 95% 95% 0% 0.092% 0.092%
897 3 ELECTRICAL 3963-FAHM-2-65-0002 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 EARTHING LAYOUT 1 A 0.097% 3-May-17 13-May-17 18-May-17 18-Jun-17 9-Jul-17 19-Jul-17 31-Oct-18 25-May-17 2-Jul-17 3-Jul-17 20-Jul-17 19-Sep-17 20-Sep-17 22-Jul-19 25-May-17 2-Jul-17 3-Jul-17 20-Jul-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.092% 0.092%
898 3 ELECTRICAL 3963-FAHM-2-67-0001 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 LIGHTING LAYOUT 1 A 0.097% 3-May-17 13-May-17 18-May-17 18-Jun-17 9-Jul-17 19-Jul-17 31-Oct-18 21-May-17 22-May-17 24-May-17 13-Jun-17 21-Jun-17 3-Aug-17 22-Jul-19 21-May-17 22-May-17 24-May-17 13-Jun-17 21-Jun-17 3-Aug-17 95% 95% 0% 0.092% 0.092%
899 3 ELECTRICAL 3963-FAHM-2-31-0001 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING CA 3 A 0.097% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 6-Jul-17 6-Jul-17 28-Sep-17 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 6-Jul-17 6-Jul-17 28-Sep-17 95% 95% 0% 0.092% 0.092%
900 3 ELECTRICAL 3963-FAHM-2-31-0002 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, 3 A 0.097% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.092% 0.092%
901 3 ELECTRICAL 3963-FAHM-2-17-0001 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 POWER ADEQUACY REPORT 1 A 0.153% 1-May-17 11-May-17 16-May-17 16-Jun-17 7-Jul-17 17-Jul-17 31-Oct-18 25-May-17 12-Jun-17 13-Jun-17 12-Sep-17 24-Sep-17 24-Sep-17 22-Jul-19 25-May-17 12-Jun-17 13-Jun-17 12-Sep-17 24-Sep-17 24-Sep-17 95% 95% 0% 0.145% 0.145%
902 3 ELECTRICAL 3963-FAHM-2-12-0001 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 LV CABLE SIZING CALCULATION 1 A 0.111% 17-Apr-17 27-Apr-17 2-May-17 2-Jun-17 23-Jun-17 3-Jul-17 31-Oct-18 19-Apr-17 22-Apr-17 24-Apr-17 17-May-17 22-Jun-17 22-Jun-17 22-Jul-19 19-Apr-17 22-Apr-17 24-Apr-17 17-May-17 22-Jun-17 22-Jun-17 95% 95% 0% 0.106% 0.106%
903 3 ELECTRICAL 3963-FAHM-2-12-0002 OT DUKHAN FIELD - FAHAHIL MAIN UNIT 14 LIGHTING CALCULATION 1 A 0.111% 24-Apr-17 4-May-17 9-May-17 9-Jun-17 30-Jun-17 10-Jul-17 31-Oct-18 14-Apr-17 14-Apr-17 17-Apr-17 20-Jul-17 18-Sep-17 19-Sep-17 22-Jul-19 14-Apr-17 14-Apr-17 17-Apr-17 20-Jul-17 18-Sep-17 19-Sep-17 95% 95% 0% 0.106% 0.106%
904 3 ELECTRICAL 3963-FAHN-2-34-0001 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 ELECTRICAL LOAD SCHEDULE 1 A 0.097% 24-Apr-17 4-May-17 9-May-17 9-Jun-17 30-Jun-17 10-Jul-17 31-Oct-18 25-Apr-17 30-Apr-17 3-May-17 5-Jul-17 3-Aug-17 28-Sep-17 22-Jul-19 25-Apr-17 30-Apr-17 3-May-17 5-Jul-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.092% 0.092%
905 3 ELECTRICAL 3963-FAHN-2-36-0001 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 ELECTRICAL TIE-IN SCHEDULE 1 A 0.083% 24-Apr-17 4-May-17 9-May-17 9-Jun-17 30-Jun-17 10-Jul-17 31-Oct-18 16-May-17 17-May-17 17-May-17 8-Jun-17 16-Jun-17 7-Dec-17 22-Jul-19 16-May-17 17-May-17 17-May-17 8-Jun-17 16-Jun-17 7-Dec-17 95% 95% 0% 0.079% 0.079%
906 3 ELECTRICAL 3963-FAHN-2-37-0001 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 ELECTRICAL CABLE SCHEDULE 1 A 0.097% 10-May-17 20-May-17 25-May-17 25-Jun-17 16-Jul-17 26-Jul-17 31-Oct-18 22-May-17 23-May-17 25-May-17 19-Jun-17 27-Jun-17 28-Sep-17 22-Jul-19 22-May-17 23-May-17 25-May-17 19-Jun-17 27-Jun-17 28-Sep-17 95% 95% 0% 0.092% 0.092%
907 3 ELECTRICAL 3963-FAHN-2-54-0001 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 12-SB-0007-EXISTING LV SWITCHBOARD SINGLE LINE DIAGRAM 1 B 0.083% 10-May-17 20-May-17 25-May-17 25-Jun-17 16-Jul-17 26-Jul-17 31-Oct-18 7-May-17 9-May-17 10-May-17 1-Jun-17 9-Jun-17 24-Sep-17 22-Jul-19 7-May-17 9-May-17 10-May-17 1-Jun-17 9-Jun-17 24-Sep-17 95% 95% 0% 0.079% 0.079%
908 3 ELECTRICAL 3963-FAHN-2-54-0002 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 12-DB-0001/0002 - EXISTING LV DISTRIBUTION BOARD SINGLE 1 B 0.083% 10-May-17 20-May-17 25-May-17 25-Jun-17 16-Jul-17 26-Jul-17 31-Oct-18 7-May-17 9-May-17 10-May-17 1-Jun-17 21-Jun-17 21-Jun-17 22-Jul-19 7-May-17 9-May-17 10-May-17 1-Jun-17 21-Jun-17 21-Jun-17 95% 95% 0% 0.079% 0.079%
909 3 ELECTRICAL 3963-FAHN-2-54-0003 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 12-UPS-0007 UPS,5KVA SINGLE LINE DIAGRAM-110V AC SYSTEM 1 A 0.083% 10-May-17 20-May-17 25-May-17 25-Jun-17 16-Jul-17 26-Jul-17 31-Oct-18 7-May-17 9-May-17 10-May-17 1-Jun-17 9-Jun-17 20-Sep-17 22-Jul-19 7-May-17 9-May-17 10-May-17 1-Jun-17 9-Jun-17 20-Sep-17 95% 95% 0% 0.079% 0.079%
910 3 ELECTRICAL 3963-FAHN-2-64-0001 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 CABLE ROUTING LAYOUT 1 A 0.097% 3-Jun-17 13-Jun-17 18-Jun-17 19-Jul-17 9-Aug-17 19-Aug-17 31-Oct-18 7-Jun-17 14-Jun-17 15-Jun-17 2-Aug-17 3-Aug-17 4-Dec-17 22-Jul-19 7-Jun-17 14-Jun-17 15-Jun-17 2-Aug-17 3-Aug-17 4-Dec-17 95% 95% 0% 0.092% 0.092%
911 3 ELECTRICAL 3963-FAHN-2-65-0002 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 EARTHING LAYOUT 1 A 0.083% 3-Jun-17 13-Jun-17 18-Jun-17 19-Jul-17 9-Aug-17 19-Aug-17 31-Oct-18 7-Jun-17 3-Jul-17 4-Jul-17 20-Jul-17 19-Sep-17 20-Sep-17 22-Jul-19 7-Jun-17 3-Jul-17 4-Jul-17 20-Jul-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.079% 0.079%
912 3 ELECTRICAL 3963-FAHN-2-67-0001 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 LIGHTING LAYOUT 1 A 0.083% 3-May-17 13-May-17 18-May-17 18-Jun-17 9-Jul-17 19-Jul-17 31-Oct-18 22-May-17 23-May-17 25-May-17 21-Jun-17 29-Jun-17 3-Aug-17 22-Jul-19 22-May-17 23-May-17 25-May-17 21-Jun-17 29-Jun-17 3-Aug-17 95% 95% 0% 0.079% 0.079%
913 3 ELECTRICAL 3963-FAHN-2-31-0001 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING C 3 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.079% 0.079%
914 3 ELECTRICAL 3963-FAHN-2-31-0002 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, 3 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 1-Oct-17 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 1-Oct-17 95% 95% 0% 0.079% 0.079%
915 3 ELECTRICAL 3963-FAHN-2-17-0001 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 POWER ADEQUACY REPORT 1 A 0.153% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 25-May-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 19-Oct-17 22-Jul-19 25-May-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 19-Oct-17 95% 95% 0% 0.145% 0.145%
916 3 ELECTRICAL 3963-FAHN-2-12-0001 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 LV CABLE SIZING CALCULATION 1 A 0.111% 24-Apr-17 4-May-17 9-May-17 9-Jun-17 30-Jun-17 10-Jul-17 31-Oct-18 22-Apr-17 22-Apr-17 24-Apr-17 17-May-17 25-May-17 28-Sep-17 22-Jul-19 22-Apr-17 22-Apr-17 24-Apr-17 17-May-17 25-May-17 28-Sep-17 95% 95% 0% 0.106% 0.106%
917 3 ELECTRICAL 3963-FAHN-2-12-0002 OT DUKHAN FIELD - FAHAHIL NORTH UNIT 12 LIGHTING CALCULATION 1 B 0.111% 1-May-17 11-May-17 16-May-17 16-Jun-17 7-Jul-17 17-Jul-17 31-Oct-18 14-Apr-17 14-Apr-17 17-Apr-17 19-Jun-17 19-Jun-17 19-Jun-17 22-Jul-19 14-Apr-17 14-Apr-17 17-Apr-17 19-Jun-17 19-Jun-17 19-Jun-17 95% 95% 0% 0.106% 0.106%
918 3 ELECTRICAL 3963-FAHS-2-34-0001 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 ELECTRICAL LOAD SCHEDULE 1 B 0.083% 1-May-17 11-May-17 16-May-17 16-Jun-17 7-Jul-17 17-Jul-17 31-Oct-18 25-Apr-17 30-Apr-17 3-May-17 5-Jul-17 3-Aug-17 5-Oct-17 22-Jul-19 25-Apr-17 30-Apr-17 3-May-17 5-Jul-17 3-Aug-17 5-Oct-17 95% 95% 0% 0.079% 0.079%
919 3 ELECTRICAL 3963-FAHS-2-36-0001 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 ELECTRICAL TIE-IN SCHEDULE 1 A 0.083% 1-May-17 11-May-17 16-May-17 16-Jun-17 7-Jul-17 17-Jul-17 31-Oct-18 16-May-17 17-May-17 17-May-17 8-Jun-17 16-Jun-17 7-Dec-17 22-Jul-19 16-May-17 17-May-17 17-May-17 8-Jun-17 16-Jun-17 7-Dec-17 95% 95% 0% 0.079% 0.079%
920 3 ELECTRICAL 3963-FAHS-2-37-0001 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 ELECTRICAL CABLE SCHEDULE 1 A 0.083% 18-May-17 28-May-17 2-Jun-17 3-Jul-17 24-Jul-17 3-Aug-17 31-Oct-18 25-May-17 29-May-17 30-May-17 2-Aug-17 3-Aug-17 28-Sep-17 22-Jul-19 25-May-17 29-May-17 30-May-17 2-Aug-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.079% 0.079%
921 3 ELECTRICAL 3963-FAHS-2-54-0001 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 12-SB-0007-EXISTING LV SWITCHBOARD SINGLE LINE DIAGRAM 1 B 0.083% 18-May-17 28-May-17 2-Jun-17 3-Jul-17 24-Jul-17 3-Aug-17 31-Oct-18 7-May-17 9-May-17 10-May-17 1-Jun-17 9-Jun-17 24-Sep-17 22-Jul-19 7-May-17 9-May-17 10-May-17 1-Jun-17 9-Jun-17 24-Sep-17 95% 95% 0% 0.079% 0.079%
922 3 ELECTRICAL 3963-FAHS-2-54-0002 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 12-DB-0001/0002 - EXISTING LV DISTRIBUTION BOARD SINGLE 1 B 0.083% 18-May-17 28-May-17 2-Jun-17 3-Jul-17 24-Jul-17 3-Aug-17 31-Oct-18 7-May-17 9-May-17 10-May-17 1-Jun-17 21-Jun-17 21-Jun-17 22-Jul-19 7-May-17 9-May-17 10-May-17 1-Jun-17 21-Jun-17 21-Jun-17 95% 95% 0% 0.079% 0.079%
923 3 ELECTRICAL 3963-FAHS-2-54-0003 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 12-UPS-0007 UPS,5KVA SINGLE LINE DIAGRAM-110V AC SYSTEM 1 A 0.083% 18-May-17 28-May-17 2-Jun-17 3-Jul-17 24-Jul-17 3-Aug-17 31-Oct-18 7-May-17 9-May-17 10-May-17 1-Jun-17 9-Jun-17 20-Sep-17 22-Jul-19 7-May-17 9-May-17 10-May-17 1-Jun-17 9-Jun-17 20-Sep-17 95% 95% 0% 0.079% 0.079%
924 3 ELECTRICAL 3963-FAHS-2-64-0001 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 CABLE ROUTING LAYOUT 1 A 0.111% 10-Jun-17 20-Jun-17 25-Jun-17 26-Jul-17 16-Aug-17 26-Aug-17 31-Oct-18 17-Jun-17 18-Jun-17 19-Jun-17 2-Aug-17 3-Aug-17 8-Nov-17 22-Jul-19 17-Jun-17 18-Jun-17 19-Jun-17 2-Aug-17 3-Aug-17 8-Nov-17 95% 95% 0% 0.106% 0.106%
925 3 ELECTRICAL 3963-FAHS-2-65-0002 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 EARTHING LAYOUT 1 A 0.083% 10-Jun-17 20-Jun-17 25-Jun-17 26-Jul-17 16-Aug-17 26-Aug-17 31-Oct-18 2-Jul-17 3-Jul-17 4-Jul-17 23-Jul-17 19-Sep-17 20-Sep-17 22-Jul-19 2-Jul-17 3-Jul-17 4-Jul-17 23-Jul-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.079% 0.079%
926 3 ELECTRICAL 3963-FAHS-2-67-0001 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 LIGHTING LAYOUT 1 A 0.083% 10-Jun-17 20-Jun-17 25-Jun-17 26-Jul-17 16-Aug-17 26-Aug-17 31-Oct-18 27-May-17 27-May-17 28-May-17 21-Jun-17 29-Jun-17 3-Aug-17 22-Jul-19 27-May-17 27-May-17 28-May-17 21-Jun-17 29-Jun-17 3-Aug-17 95% 95% 0% 0.079% 0.079%
927 3 ELECTRICAL 3963-FAHS-2-31-0001 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING C 3 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.079% 0.079%
928 3 ELECTRICAL 3963-FAHS-2-31-0002 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, 3 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 2-Oct-17 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 2-Oct-17 95% 95% 0% 0.079% 0.079%
929 3 ELECTRICAL 3963-FAHS-2-17-0001 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 POWER ADEQUACY REPORT 1 A 0.153% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 25-May-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 7-Dec-17 22-Jul-19 25-May-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 7-Dec-17 95% 95% 0% 0.145% 0.145%
930 3 ELECTRICAL 3963-FAHS-2-12-0001 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 LV CABLE SIZING CALCULATION 1 A 0.111% 1-May-17 11-May-17 16-May-17 16-Jun-17 7-Jul-17 17-Jul-17 31-Oct-18 22-Apr-17 22-Apr-17 24-Apr-17 17-May-17 25-May-17 28-Sep-17 22-Jul-19 22-Apr-17 22-Apr-17 24-Apr-17 17-May-17 25-May-17 28-Sep-17 95% 95% 0% 0.106% 0.106%
931 3 ELECTRICAL 3963-FAHS-2-12-0002 OT DUKHAN FIELD - FAHAHIL SOUTH UNIT 13 LIGHTING CALCULATION 1 A 0.111% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 14-Apr-17 14-Apr-17 17-Apr-17 20-Jul-17 18-Sep-17 19-Sep-17 22-Jul-19 14-Apr-17 14-Apr-17 17-Apr-17 20-Jul-17 18-Sep-17 19-Sep-17 95% 95% 0% 0.106% 0.106%
932 3 ELECTRICAL 3963-JALM-2-34-0001 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 ELECTRICAL LOAD SCHEDULE 1 A 0.083% 30-Jun-17 10-Jul-17 15-Jul-17 15-Aug-17 5-Sep-17 15-Sep-17 31-Oct-18 4-May-17 4-May-17 4-May-17 2-Jul-17 10-Jul-17 20-Sep-17 22-Jul-19 4-May-17 4-May-17 4-May-17 2-Jul-17 10-Jul-17 20-Sep-17 95% 95% 0% 0.079% 0.079%
933 3 ELECTRICAL 3963-JALM-2-36-0001 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 ELECTRICAL TIE-IN SCHEDULE 1 A 0.083% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 16-May-17 17-May-17 17-May-17 8-Jun-17 16-Jun-17 25-Sep-17 22-Jul-19 16-May-17 17-May-17 17-May-17 8-Jun-17 16-Jun-17 25-Sep-17 95% 95% 0% 0.079% 0.079%
934 3 ELECTRICAL 3963-JALM-2-37-0001 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 ELECTRICAL CABLE SCHEDULE 1 A 0.083% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 22-May-17 23-May-17 25-May-17 19-Jun-17 27-Jun-17 19-Sep-17 22-Jul-19 22-May-17 23-May-17 25-May-17 19-Jun-17 27-Jun-17 19-Sep-17 95% 95% 0% 0.079% 0.079%
935 3 ELECTRICAL 3963-JALM-2-54-0001 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 31-MCC-0001-415V MOTOR CONTROL CENTER-SINGLE LINE DIAG 1 3 0.083% 25-May-17 4-Jun-17 9-Jun-17 10-Jul-17 31-Jul-17 10-Aug-17 31-Oct-18 8-May-17 10-May-17 11-May-17 5-Jun-17 13-Jun-17 19-Sep-17 22-Jul-19 8-May-17 10-May-17 11-May-17 5-Jun-17 13-Jun-17 19-Sep-17 95% 95% 0% 0.079% 0.079%

Page 15 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
936 3 ELECTRICAL 3963-JALM-2-54-0002 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 31-DB-5206B - LIGHTING DISTRIBUTION BOARD SINGLE LINE DIA 1 A E 0.083% 25-May-17 4-Jun-17 9-Jun-17 10-Jul-17 31-Jul-17 10-Aug-17 31-Oct-18 7-May-17 9-May-17 10-May-17 4-Jun-17 12-Jul-17 17-Jul-17 22-Jul-19 7-May-17 9-May-17 10-May-17 4-Jun-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.079% 0.079%
937 3 ELECTRICAL 3963-JALM-2-54-0003 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 31-UPS-0001 UPS,5KVA SINGLE LINE DIAGRAM-110V AC INSTRUM 1 A 0.083% 25-May-17 4-Jun-17 9-Jun-17 10-Jul-17 31-Jul-17 10-Aug-17 31-Oct-18 7-May-17 9-May-17 10-May-17 4-Jun-17 3-Aug-17 23-Aug-17 22-Jul-19 7-May-17 9-May-17 10-May-17 4-Jun-17 3-Aug-17 23-Aug-17 95% 95% 0% 0.079% 0.079%
938 3 ELECTRICAL 3963-JALM-2-64-0001 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 CABLE ROUTING LAYOUT 1 A 0.111% 17-Jun-17 27-Jun-17 2-Jul-17 2-Aug-17 23-Aug-17 2-Sep-17 31-Oct-18 18-Jun-17 19-Jun-17 20-Jun-17 2-Aug-17 3-Aug-17 8-Nov-17 22-Jul-19 18-Jun-17 19-Jun-17 20-Jun-17 2-Aug-17 3-Aug-17 8-Nov-17 95% 95% 0% 0.106% 0.106%
939 3 ELECTRICAL 3963-JALM-2-65-0002 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 EARTHING LAYOUT 1 A 0.083% 17-Jun-17 27-Jun-17 2-Jul-17 2-Aug-17 23-Aug-17 2-Sep-17 31-Oct-18 22-Jun-17 3-Jul-17 4-Jul-17 23-Jul-17 20-Sep-17 20-Sep-17 22-Jul-19 22-Jun-17 3-Jul-17 4-Jul-17 23-Jul-17 20-Sep-17 20-Sep-17 95% 95% 0% 0.079% 0.079%
940 3 ELECTRICAL 3963-JALM-2-67-0001 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 LIGHTING LAYOUT 1 A 0.083% 17-Jun-17 27-Jun-17 2-Jul-17 2-Aug-17 23-Aug-17 2-Sep-17 31-Oct-18 21-May-17 22-May-17 24-May-17 13-Jun-17 21-Jun-17 3-Aug-17 22-Jul-19 21-May-17 22-May-17 24-May-17 13-Jun-17 21-Jun-17 3-Aug-17 95% 95% 0% 0.079% 0.079%
941 3 ELECTRICAL 3963-JALM-2-31-0001 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING CAB 3 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 5-Oct-17 22-Jul-19 4-Jul-17 5-Jul-17 6-Jul-17 2-Aug-17 3-Aug-17 5-Oct-17 95% 95% 0% 0.079% 0.079%
942 3 ELECTRICAL 3963-JALM-2-31-0002 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, P 3 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 6-Aug-17 11-Aug-17 11-Aug-17 31-Oct-18 8-Jul-17 8-Jul-17 9-Jul-17 2-Aug-17 3-Aug-17 26-Feb-18 22-Jul-19 8-Jul-17 8-Jul-17 9-Jul-17 2-Aug-17 3-Aug-17 26-Feb-18 95% 95% 0% 0.079% 0.079%
943 3 ELECTRICAL 3963-JALM-2-17-0001 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 POWER ADEQUACY REPORT 1 A 0.153% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 25-May-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 24-Sep-17 22-Jul-19 25-May-17 12-Jun-17 13-Jun-17 2-Aug-17 3-Aug-17 24-Sep-17 95% 95% 0% 0.145% 0.145%
944 3 ELECTRICAL 3963-JALM-2-12-0001 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 LV CABLE SIZING CALCULATION 1 A 0.111% 1-Apr-17 11-Apr-17 16-Apr-17 17-May-17 7-Jun-17 17-Jun-17 31-Oct-18 19-Apr-17 16-Apr-17 19-Apr-17 17-May-17 25-May-17 1-Oct-17 22-Jul-19 19-Apr-17 16-Apr-17 19-Apr-17 17-May-17 25-May-17 1-Oct-17 95% 95% 0% 0.106% 0.106%
945 3 ELECTRICAL 3963-JALM-2-12-0002 OT DUKHAN FIELD - JALEHA MAIN UNIT 31 LIGHTING CALCULATION 1 A 0.111% 10-May-17 20-May-17 25-May-17 25-Jun-17 16-Jul-17 26-Jul-17 31-Oct-18 14-Apr-17 14-Apr-17 17-Apr-17 20-Jul-17 18-Sep-17 19-Sep-17 22-Jul-19 14-Apr-17 14-Apr-17 17-Apr-17 20-Jul-17 18-Sep-17 19-Sep-17 95% 95% 0% 0.106% 0.106%
946 3 ELECTRICAL 3963-DGEN-2-00-0001 OT DRAWING INDEX – ELECTRICAL 1 A 0.139% 18-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 15-Sep-17 25-Sep-17 31-Oct-18 17-Jul-17 18-Jul-17 19-Jul-17 3-Aug-17 15-Aug-17 15-Aug-17 22-Jul-19 17-Jul-17 18-Jul-17 19-Jul-17 3-Aug-17 15-Aug-17 15-Aug-17 95% 95% 0% 0.132% 0.132%
947 2 ELECTRICAL 3963-DGEN-2-00-0010 OT MISCELLANEOUS - ELECTRICAL 0 0.069% 31-Aug-17 6-Sep-17 7-Sep-17 14-Sep-17 14-Sep-17 21-Sep-17 31-Oct-18 1-Feb-18 6-Feb-18 1-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 22-Jul-19 1-Feb-18 6-Feb-18 1-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 95% 95% 0% 0.066% 0.066%
948 2 CIVIL 3963-DGEN-1-14-0001 OT SPECIFICATION FOR TOPOGRAPHICAL & UG SURVEY WORKS 3 A 0.097% 15-Mar-17 25-Mar-17 30-Mar-17 30-Apr-17 21-May-17 31-May-17 31-Oct-18 16-Mar-17 21-Mar-17 29-Mar-17 24-Apr-17 4-May-17 4-May-17 22-Jul-19 16-Mar-17 21-Mar-17 29-Mar-17 24-Apr-17 4-May-17 4-May-17 95% 95% 0% 0.092% 0.092%
949 2 CIVIL 3963-DGEN-1-14-0002 OT SPECIFICATIONS FOR STRUCTURAL STEEL WORKS 1 A 0.069% 15-Mar-17 25-Mar-17 30-Mar-17 30-Apr-17 21-May-17 31-May-17 31-Oct-18 16-Mar-17 27-Mar-17 5-Apr-17 27-Apr-17 27-Apr-17 27-Apr-17 22-Jul-19 16-Mar-17 27-Mar-17 5-Apr-17 27-Apr-17 27-Apr-17 27-Apr-17 95% 95% 0% 0.066% 0.066%
950 2 CIVIL 3963-DGEN-1-14-0003 OT SPECIFICATIONS FOR CONCRETE WORKS 1 A 0.069% 15-Mar-17 25-Mar-17 30-Mar-17 30-Apr-17 21-May-17 31-May-17 31-Oct-18 21-Mar-17 29-Mar-17 12-Apr-17 4-May-17 4-May-17 4-May-17 22-Jul-19 21-Mar-17 29-Mar-17 12-Apr-17 4-May-17 4-May-17 4-May-17 95% 95% 0% 0.066% 0.066%
951 2 CIVIL 3963-DGEN-1-14-0004 OT SPECIFICATIONS FOR SITE PREPARATION & EARTHWORKS 1 A 0.069% 22-Mar-17 1-Apr-17 6-Apr-17 7-May-17 28-May-17 7-Jun-17 31-Oct-18 14-Mar-17 29-Mar-17 5-Apr-17 13-May-17 15-May-17 18-May-17 22-Jul-19 14-Mar-17 29-Mar-17 5-Apr-17 13-May-17 15-May-17 18-May-17 95% 95% 0% 0.066% 0.066%
952 2 CIVIL 3963-DGEN-1-14-0005 OT SPECIFICATIONS FOR ROAD & PAVING WORKS 1 A 0.069% 22-Mar-17 1-Apr-17 6-Apr-17 7-May-17 28-May-17 7-Jun-17 31-Oct-18 16-Mar-17 29-Mar-17 5-Apr-17 8-May-17 8-May-17 8-May-17 22-Jul-19 16-Mar-17 29-Mar-17 5-Apr-17 8-May-17 8-May-17 8-May-17 95% 95% 0% 0.066% 0.066%
953 2 CIVIL 3963-DGEN-1-29-0001 OT CIVIL & STRUCTURAL DESIGN CRITERIA 1 A 0.139% 15-Apr-17 25-Apr-17 30-Apr-17 31-May-17 21-Jun-17 1-Jul-17 31-Oct-18 21-Mar-17 5-Apr-17 4-May-17 1-Jun-17 1-Jun-17 1-Jun-17 22-Jul-19 21-Mar-17 5-Apr-17 4-May-17 1-Jun-17 1-Jun-17 1-Jun-17 95% 95% 0% 0.132% 0.132%
954 2 CIVIL 3963-DGEN-1-87-0001 OT GENERAL NOTES - CONCRETE WORKS 1 A 0.083% 15-Mar-17 25-Mar-17 30-Mar-17 30-Apr-17 21-May-17 31-May-17 31-Oct-18 21-Mar-17 21-Mar-17 5-Apr-17 3-May-17 24-May-17 24-May-17 22-Jul-19 21-Mar-17 21-Mar-17 5-Apr-17 3-May-17 24-May-17 24-May-17 95% 95% 0% 0.079% 0.079%
955 2 CIVIL 3963-DGEN-1-87-0002 OT GENERAL NOTES - STRUCTURAL STEEL WORKS 1 A 0.083% 15-Mar-17 25-Mar-17 30-Mar-17 30-Apr-17 21-May-17 31-May-17 31-Oct-18 16-Mar-17 20-Mar-17 5-Apr-17 2-May-17 2-May-17 2-May-17 22-Jul-19 16-Mar-17 20-Mar-17 5-Apr-17 2-May-17 2-May-17 2-May-17 95% 95% 0% 0.079% 0.079%
956 2 CIVIL 3963-DGEN-1-57-0001 OT TYPICAL DETAILS OF HANDRAIL 1 A 0.083% 12-Apr-17 22-Apr-17 27-Apr-17 28-May-17 18-Jun-17 28-Jun-17 31-Oct-18 16-Mar-17 29-Mar-17 20-Apr-17 8-May-17 24-May-17 24-May-17 22-Jul-19 16-Mar-17 29-Mar-17 20-Apr-17 8-May-17 24-May-17 24-May-17 95% 95% 0% 0.079% 0.079%
957 2 CIVIL 3963-DGEN-1-57-0002 OT TYPICAL DETAILS OF STAIRS 1 A 0.083% 5-Apr-17 15-Apr-17 20-Apr-17 21-May-17 11-Jun-17 21-Jun-17 31-Oct-18 21-Mar-17 23-Apr-17 25-Apr-17 10-May-17 10-May-17 10-May-17 22-Jul-19 21-Mar-17 23-Apr-17 25-Apr-17 10-May-17 10-May-17 10-May-17 95% 95% 0% 0.079% 0.079%
958 2 CIVIL 3963-DGEN-1-57-0004 OT TYPICAL DETAILS OF FRONT ACCESS LADDER 1 A 0.083% 3-Apr-17 15-Apr-17 20-Apr-17 21-May-17 11-Jun-17 21-Jun-17 31-Oct-18 2-May-17 4-May-17 4-May-17 22-May-17 24-May-17 24-May-17 22-Jul-19 2-May-17 4-May-17 4-May-17 22-May-17 24-May-17 24-May-17 95% 95% 0% 0.079% 0.079%
959 2 CIVIL 3963-DGEN-1-57-0006 OT TYPICAL DETAILS OF SIDE ACCESS LADDER 1 A 0.083% 12-Apr-17 24-Apr-17 29-Apr-17 30-May-17 20-Jun-17 30-Jun-17 31-Oct-18 4-May-17 6-Jun-17 6-Jun-17 4-Jul-17 5-Jul-17 6-Jul-17 22-Jul-19 4-May-17 6-Jun-17 6-Jun-17 4-Jul-17 5-Jul-17 6-Jul-17 95% 95% 0% 0.079% 0.079%
960 2 CIVIL 3963-DGEN-1-64-0001 OT TYPICAL REINFORCED CONCRETE PAVING DETAILS 1 A 0.083% 22-Mar-17 1-Apr-17 6-Apr-17 7-May-17 28-May-17 7-Jun-17 31-Oct-18 14-Mar-17 2-Apr-17 5-Apr-17 3-May-17 24-May-17 24-May-17 22-Jul-19 14-Mar-17 2-Apr-17 5-Apr-17 3-May-17 24-May-17 24-May-17 95% 95% 0% 0.079% 0.079%
961 2 CIVIL 3963-DGEN-1-57-0003 OT TYPICAL DETAILS OF GRATING 1 A 0.083% 5-Apr-17 15-Apr-17 20-Apr-17 21-May-17 11-Jun-17 21-Jun-17 31-Oct-18 15-Mar-17 23-Apr-17 25-Apr-17 10-May-17 10-May-17 10-May-17 22-Jul-19 15-Mar-17 23-Apr-17 25-Apr-17 10-May-17 10-May-17 10-May-17 95% 95% 0% 0.079% 0.079%
962 2 CIVIL 3963-DGEN-1-64-0002 OT TYPICAL DETAILS FOR ROAD SIGNS & BARRIER 1 A 0.083% 22-Mar-17 1-Apr-17 6-Apr-17 7-May-17 28-May-17 7-Jun-17 31-Oct-18 15-Mar-17 2-Apr-17 5-Apr-17 2-May-17 2-May-17 2-May-17 22-Jul-19 15-Mar-17 2-Apr-17 5-Apr-17 2-May-17 2-May-17 2-May-17 95% 95% 0% 0.079% 0.079%
963 2 CIVIL 3963-DGEN-1-87-0003 OT TYPICAL MISC. FOUNDATIONS DETAILS 1 A 0.222% 20-Jun-17 30-Jun-17 5-Jul-17 5-Aug-17 26-Aug-17 5-Sep-17 31-Oct-18 22-Jun-17 8-Nov-17 15-Nov-17 4-Jan-18 4-Jan-18 4-Jan-18 22-Jul-19 22-Jun-17 8-Nov-17 15-Nov-17 4-Jan-18 4-Jan-18 4-Jan-18 95% 95% 0% 0.211% 0.211%
964 2 CIVIL 3963-DGEN-1-87-0004 OT TYPICAL STRUCTURAL CONNECTION DETAILS 1 2 0.111% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 18-May-17 30-Sep-17 2-Oct-17 13-Oct-17 13-Oct-17 13-Oct-17 22-Jul-19 18-May-17 30-Sep-17 2-Oct-17 13-Oct-17 13-Oct-17 13-Oct-17 95% 95% 0% 0.106% 0.106%
965 2 CIVIL 3963-DGEN-1-87-0005 OT TYPICAL PIPE SLEEPER FOUNDATION DETAILS 1 A 0.111% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 18-May-17 7-Aug-17 9-Aug-17 20-Dec-17 20-Dec-17 20-Dec-17 22-Jul-19 18-May-17 7-Aug-17 9-Aug-17 20-Dec-17 20-Dec-17 20-Dec-17 95% 95% 0% 0.106% 0.106%
966 2 CIVIL 3963-DGEN-1-87-0006 OT TYPICAL PIPE SUPPORT FOUNDATION DETAILS 1 A 0.111% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 18-May-17 12-Aug-17 14-Aug-17 3-Sep-17 20-Sep-17 16-Nov-17 22-Jul-19 18-May-17 12-Aug-17 14-Aug-17 3-Sep-17 20-Sep-17 16-Nov-17 95% 95% 0% 0.106% 0.106%
967 2 CIVIL 3963-DGEN-1-58-0001 OT TYPICAL PIPE SUPPORT STRUCTURAL DETAILS 1 B 0.111% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 18-May-17 7-Aug-17 9-Aug-17 10-Dec-17 20-Dec-17 20-Dec-17 22-Jul-19 18-May-17 7-Aug-17 9-Aug-17 10-Dec-17 20-Dec-17 20-Dec-17 95% 95% 0% 0.106% 0.106%
968 2 CIVIL 3963-DGEN-1-87-0008 OT TYPICAL ROAD CROSS SECTION DETAILS 1 1 0.083% 12-Apr-17 22-Apr-17 27-Apr-17 28-May-17 18-Jun-17 28-Jun-17 31-Oct-18 22-Mar-17 4-May-17 4-May-17 15-Oct-17 15-Oct-17 15-Oct-17 22-Jul-19 22-Mar-17 4-May-17 4-May-17 15-Oct-17 15-Oct-17 15-Oct-17 95% 95% 0% 0.079% 0.079%
969 2 CIVIL 3963-DGEN-1-87-0009 OT TYPICAL SOAKAWAY PIT DETAILS 1 0 0.000% 12-Apr-17 22-Apr-17 27-Apr-17 28-May-17 18-Jun-17 28-Jun-17 31-Oct-18 28-Jan-18 30-Jan-18 31-Jan-18 22-Mar-18 28-Mar-18 28-Mar-18 22-Jul-19 28-Jan-18 30-Jan-18 31-Jan-18 22-Mar-18 28-Mar-18 28-Mar-18 95% 95% 0% 0.000% 0.000%
970 2 CIVIL 3963-KAHN-1-64-0001 OT KHATIYAH NORTH DEGASSING STATION SITE GRADING LAYOUT & DETAILS 1 A 0.097% 19-Apr-17 29-Apr-17 4-May-17 4-Jun-17 25-Jun-17 5-Jul-17 31-Oct-18 21-Mar-17 13-Jun-17 14-Jun-17 8-Nov-17 8-Nov-17 7-Feb-18 22-Jul-19 21-Mar-17 13-Jun-17 14-Jun-17 8-Nov-17 8-Nov-17 7-Feb-18 95% 95% 0% 0.092% 0.092%
971 2 CIVIL 3963-KAHN-1-50-0001 OT KHATIYAH NORTH DEGASSING STATION GENERAL ARRANGEMENT CIVIL 1 A 0.097% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 16-Sep-17 17-Sep-17 31-Oct-17 31-Oct-17 21-Feb-18 22-Jul-19 1-Jun-17 16-Sep-17 17-Sep-17 31-Oct-17 31-Oct-17 21-Feb-18 95% 95% 0% 0.092% 0.092%
972 2 CIVIL 3963-KAHN-1-50-0002 OT KHATIYAH NORTH DEGASSING STATION DRAINAGE LAYOUT & DETAILS 1 B 0.097% 19-Apr-17 29-Apr-17 4-May-17 4-Jun-17 25-Jun-17 5-Jul-17 31-Oct-18 22-Mar-17 13-Jun-17 14-Jun-17 5-Nov-17 5-Nov-17 4-Feb-18 22-Jul-19 22-Mar-17 13-Jun-17 14-Jun-17 5-Nov-17 5-Nov-17 4-Feb-18 95% 95% 0% 0.092% 0.092%
973 2 CIVIL 3963-KAHN-1-66-0002 OT KHATIYAH NORTH DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS 1 A 0.139% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 25-May-17 13-Sep-17 14-Sep-17 6-Dec-17 4-Feb-18 4-Feb-18 22-Jul-19 25-May-17 13-Sep-17 14-Sep-17 6-Dec-17 4-Feb-18 4-Feb-18 95% 95% 0% 0.132% 0.132%
974 2 CIVIL 3963-KAHN-1-66-0003 OT KHATIYAH NORTH DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.139% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 25-May-17 18-Sep-17 19-Sep-17 25-Oct-17 25-Oct-17 13-Feb-18 22-Jul-19 25-May-17 18-Sep-17 19-Sep-17 25-Oct-17 25-Oct-17 13-Feb-18 95% 95% 0% 0.132% 0.132%
975 2 CIVIL 3963-KAHN-1-51-0001 OT KHATIYAH NORTH DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 1 A 0.278% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 25-May-17 13-Sep-17 14-Sep-17 13-Dec-17 5-Feb-18 5-Feb-18 22-Jul-19 25-May-17 13-Sep-17 14-Sep-17 13-Dec-17 5-Feb-18 5-Feb-18 95% 95% 0% 0.264% 0.264%
976 2 CIVIL 3963-KAHN-1-51-0002 OT KHATIYAH NORTH DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS 1 A 0.139% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 25-May-17 23-Sep-17 25-Sep-17 26-Oct-17 26-Oct-17 30-Jan-18 22-Jul-19 25-May-17 23-Sep-17 25-Sep-17 26-Oct-17 26-Oct-17 30-Jan-18 95% 95% 0% 0.132% 0.132%
977 2 CIVIL 3963-KAHN-1-50-0003 OT KHATIYAH NORTH DEGASSING STATION FOUNDATION LOCATION PLAN 1 A 0.278% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 25-May-17 1-Oct-17 3-Oct-17 14-Nov-17 7-Mar-18 7-Mar-18 22-Jul-19 25-May-17 1-Oct-17 3-Oct-17 14-Nov-17 7-Mar-18 7-Mar-18 95% 95% 0% 0.264% 0.264%
978 2 CIVIL 3963-KAHM-1-64-0001 OT KHATIYAH MAIN DEGASSING STATION PAVING LAYOUT & DETAILS 1 A 0.069% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 5-Apr-17 26-Jun-17 28-Jun-17 14-Nov-17 12-Feb-18 12-Feb-18 22-Jul-19 5-Apr-17 26-Jun-17 28-Jun-17 14-Nov-17 12-Feb-18 12-Feb-18 95% 95% 0% 0.066% 0.066%
979 2 CIVIL 3963-KAHM-1-50-0001 OT KHATIYAH MAIN DEGASSING STATION GENERAL ARRANGEMENT CIVIL 1 A 0.069% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 24-Sep-17 26-Sep-17 5-Nov-17 5-Nov-17 22-Feb-18 22-Jul-19 1-Jun-17 24-Sep-17 26-Sep-17 5-Nov-17 5-Nov-17 22-Feb-18 95% 95% 0% 0.066% 0.066%
980 2 CIVIL 3963-KAHM-1-50-0002 OT KHATIYAH MAIN DEGASSING STATION DRAINAGE LAYOUT & DETAILS 1 B 0.069% 28-Apr-17 8-May-17 13-May-17 13-Jun-17 4-Jul-17 14-Jul-17 31-Oct-18 5-Apr-17 25-Jun-17 27-Jun-17 15-Nov-17 12-Feb-18 12-Feb-18 22-Jul-19 5-Apr-17 25-Jun-17 27-Jun-17 15-Nov-17 12-Feb-18 12-Feb-18 95% 95% 0% 0.066% 0.066%
981 2 CIVIL 3963-KAHM-1-66-0002 OT KHATIYAH MAIN DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS 1 A 0.139% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 18-Sep-17 20-Sep-17 2-Nov-17 2-Nov-17 7-Feb-18 22-Jul-19 25-May-17 18-Sep-17 20-Sep-17 2-Nov-17 2-Nov-17 7-Feb-18 95% 95% 0% 0.132% 0.132%
982 2 CIVIL 3963-KAHM-1-66-0003 OT KHATIYAH MAIN DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.139% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 26-Sep-17 28-Sep-17 5-Dec-17 13-Feb-18 13-Feb-18 22-Jul-19 1-Jun-17 26-Sep-17 28-Sep-17 5-Dec-17 13-Feb-18 13-Feb-18 95% 95% 0% 0.132% 0.132%
983 2 CIVIL 3963-KAHM-1-51-0001 OT KHATIYAH MAIN DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 1 A 0.278% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 30-Sep-17 2-Oct-17 15-Nov-17 8-Feb-18 8-Feb-18 22-Jul-19 1-Jun-17 30-Sep-17 2-Oct-17 15-Nov-17 8-Feb-18 8-Feb-18 95% 95% 0% 0.264% 0.264%
984 2 CIVIL 3963-KAHM-1-51-0002 OT KHATIYAH MAIN DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS 1 A 0.139% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 29-Sep-17 1-Oct-17 2-Nov-17 2-Nov-17 4-Feb-18 22-Jul-19 1-Jun-17 29-Sep-17 1-Oct-17 2-Nov-17 2-Nov-17 4-Feb-18 95% 95% 0% 0.132% 0.132%
985 2 CIVIL 3963-KAHM-1-50-0003 OT KHATIYAH MAIN DEGASSING STATION FOUNDATION LOCATION PLAN 1 A 0.278% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 3-Oct-17 5-Oct-17 15-Apr-18 15-Apr-18 15-Apr-18 22-Jul-19 25-May-17 3-Oct-17 5-Oct-17 15-Apr-18 15-Apr-18 15-Apr-18 95% 95% 0% 0.264% 0.264%
986 2 CIVIL 3963-KAHS-1-64-0001 OT KHATIYAH SOUTH DEGASSING STATION PAVING LAYOUT & DETAILS 1 A 0.069% 5-May-17 15-May-17 20-May-17 20-Jun-17 11-Jul-17 21-Jul-17 31-Oct-18 22-Mar-17 18-Nov-17 20-Nov-17 18-Jan-18 20-Jan-18 20-Jan-18 22-Jul-19 22-Mar-17 18-Nov-17 20-Nov-17 18-Jan-18 20-Jan-18 20-Jan-18 95% 95% 0% 0.066% 0.066%
987 2 CIVIL 3963-KAHS-1-50-0001 OT KHATIYAH SOUTH DEGASSING STATION GENERAL ARRANGEMENT CIVIL 1 A 0.069% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 13-Jul-17 24-Sep-17 26-Sep-17 5-Nov-17 5-Nov-17 25-Feb-18 22-Jul-19 13-Jul-17 24-Sep-17 26-Sep-17 5-Nov-17 5-Nov-17 25-Feb-18 95% 95% 0% 0.066% 0.066%
988 2 CIVIL 3963-KAHS-1-50-0002 OT KHATIYAH SOUTH DEGASSING STATION DRAINAGE LAYOUT & DETAILS 1 B 0.139% 5-May-17 15-May-17 20-May-17 20-Jun-17 11-Jul-17 21-Jul-17 31-Oct-18 22-Mar-17 25-Sep-17 27-Sep-17 16-Nov-17 4-Feb-18 4-Feb-18 22-Jul-19 22-Mar-17 25-Sep-17 27-Sep-17 16-Nov-17 4-Feb-18 4-Feb-18 95% 95% 0% 0.132% 0.132%
989 2 CIVIL 3963-KAHS-1-66-0002 OT KHATIYAH SOUTH DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS 1 A 0.139% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 13-Jul-17 24-Sep-17 26-Sep-17 5-Feb-18 5-Feb-18 5-Feb-18 22-Jul-19 13-Jul-17 24-Sep-17 26-Sep-17 5-Feb-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.132% 0.132%
990 2 CIVIL 3963-KAHS-1-66-0003 OT KHATIYAH SOUTH DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 1 B 0.069% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 13-Jul-17 29-Sep-17 1-Oct-17 6-Dec-17 15-Feb-18 15-Feb-18 22-Jul-19 13-Jul-17 29-Sep-17 1-Oct-17 6-Dec-17 15-Feb-18 15-Feb-18 95% 95% 0% 0.066% 0.066%
991 2 CIVIL 3963-KAHS-1-51-0001 OT KHATIYAH SOUTH DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 1 B 0.278% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 1-Oct-17 3-Oct-17 16-Nov-17 12-Feb-18 12-Feb-18 22-Jul-19 8-Jul-17 1-Oct-17 3-Oct-17 16-Nov-17 12-Feb-18 12-Feb-18 95% 95% 0% 0.264% 0.264%
992 2 CIVIL 3963-KAHS-1-51-0002 OT KHATIYAH SOUTH DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS 1 A 0.139% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 3-Oct-17 5-Oct-17 6-Dec-17 5-Feb-18 5-Feb-18 22-Jul-19 8-Jul-17 3-Oct-17 5-Oct-17 6-Dec-17 5-Feb-18 5-Feb-18 95% 95% 0% 0.132% 0.132%
993 2 CIVIL 3963-KAHS-1-50-0003 OT KHATIYAH SOUTH DEGASSING STATION FOUNDATION LOCATION PLAN 1 A 0.278% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 11-Oct-17 12-Oct-17 11-Jan-18 12-Mar-18 12-Mar-18 22-Jul-19 8-Jul-17 11-Oct-17 12-Oct-17 11-Jan-18 12-Mar-18 12-Mar-18 95% 95% 0% 0.264% 0.264%
994 2 CIVIL 3963-FAHN-1-64-0001 OT FAHAHIL NORTH DEGASSING STATION PAVING LAYOUT & DETAILS 1 A 0.069% 12-May-17 22-May-17 27-May-17 27-Jun-17 18-Jul-17 28-Jul-17 31-Oct-18 25-May-17 18-Sep-17 19-Sep-17 7-Nov-17 7-Nov-17 18-Feb-18 22-Jul-19 25-May-17 18-Sep-17 19-Sep-17 7-Nov-17 7-Nov-17 18-Feb-18 95% 95% 0% 0.066% 0.066%
995 2 CIVIL 3963-FAHN-1-50-0001 OT FAHAHIL NORTH DEGASSING STATION GENERAL ARRANGEMENT CIVIL 1 A 0.069% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 22-Jun-17 10-Oct-17 12-Oct-17 6-Nov-17 6-Nov-17 20-Nov-17 22-Jul-19 22-Jun-17 10-Oct-17 12-Oct-17 6-Nov-17 6-Nov-17 20-Nov-17 95% 95% 0% 0.066% 0.066%
996 2 CIVIL 3963-FAHN-1-50-0002 OT FAHAHIL NORTH DEGASSING STATION DRAINAGE LAYOUT & DETAILS 1 A 0.069% 12-May-17 22-May-17 27-May-17 27-Jun-17 18-Jul-17 28-Jul-17 31-Oct-18 25-May-17 18-Sep-17 19-Sep-17 13-Nov-17 5-Mar-18 5-Mar-18 22-Jul-19 25-May-17 18-Sep-17 19-Sep-17 13-Nov-17 5-Mar-18 5-Mar-18 95% 95% 0% 0.066% 0.066%
997 2 CIVIL 3963-FAHN-1-66-0001 OT FAHAHIL NORTH DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS 1 A 0.139% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 22-Jun-17 28-Aug-17 29-Aug-17 1-Nov-17 1-Nov-17 29-Jan-18 22-Jul-19 22-Jun-17 28-Aug-17 29-Aug-17 1-Nov-17 1-Nov-17 29-Jan-18 95% 95% 0% 0.132% 0.132%
998 2 CIVIL 3963-FAHN-1-66-0002 OT FAHAHIL NORTH DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS 1 A 0.139% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 22-Jun-17 3-Oct-17 5-Oct-17 11-Dec-17 15-Feb-18 15-Feb-18 22-Jul-19 22-Jun-17 3-Oct-17 5-Oct-17 11-Dec-17 15-Feb-18 15-Feb-18 95% 95% 0% 0.132% 0.132%
999 2 CIVIL 3963-FAHN-1-66-0003 OT FAHAHIL NORTH DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.111% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 22-Jun-17 21-Aug-17 24-Aug-17 7-Nov-17 7-Nov-17 1-Mar-18 22-Jul-19 22-Jun-17 21-Aug-17 24-Aug-17 7-Nov-17 7-Nov-17 1-Mar-18 95% 95% 0% 0.106% 0.106%
1000 2 CIVIL 3963-FAHN-1-51-0001 OT FAHAHIL NORTH DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 1 A 0.111% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 21-Jun-17 12-Aug-17 14-Aug-17 6-Sep-17 20-Sep-17 1-Mar-18 22-Jul-19 21-Jun-17 12-Aug-17 14-Aug-17 6-Sep-17 20-Sep-17 1-Mar-18 95% 95% 0% 0.106% 0.106%
1001 2 CIVIL 3963-FAHN-1-51-0002 OT FAHAHIL NORTH DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS 1 A 0.333% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 21-Jun-17 18-Oct-17 19-Oct-17 27-Feb-18 19-Mar-18 19-Mar-18 22-Jul-19 21-Jun-17 18-Oct-17 19-Oct-17 27-Feb-18 19-Mar-18 19-Mar-18 95% 95% 0% 0.317% 0.317%
1002 2 CIVIL 3963-FAHN-1-50-0003 OT FAHAHIL NORTH DEGASSING STATION FOUNDATION LOCATION PLAN 1 A 0.278% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 21-Jun-17 28-Oct-17 29-Oct-17 18-Mar-18 18-Mar-18 18-Mar-18 22-Jul-19 21-Jun-17 28-Oct-17 29-Oct-17 18-Mar-18 18-Mar-18 18-Mar-18 95% 95% 0% 0.264% 0.264%
1003 2 CIVIL 3963-FAHM-1-64-0001 OT FAHAHIL MAIN DEGASSING STATION PAVING LAYOUT & DETAILS 1 A 0.069% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 25-May-17 3-Jul-17 4-Jul-17 6-Nov-17 6-Nov-17 21-Feb-18 22-Jul-19 25-May-17 3-Jul-17 4-Jul-17 6-Nov-17 6-Nov-17 21-Feb-18 95% 95% 0% 0.066% 0.066%
1004 2 CIVIL 3963-FAHM-1-50-0001 OT FAHAHIL MAIN DEGASSING STATION GENERAL ARRANGEMENT CIVIL 1 A 0.069% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 5-Jul-17 10-Oct-17 14-Dec-17 8-Apr-18 25-Apr-18 25-Apr-18 22-Jul-19 5-Jul-17 10-Oct-17 14-Dec-17 8-Apr-18 25-Apr-18 25-Apr-18 95% 95% 0% 0.066% 0.066%
1005 2 CIVIL 3963-FAHM-1-50-0002 OT FAHAHIL MAIN DEGASSING STATION DRAINAGE LAYOUT & DETAILS 1 A 0.069% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 25-May-17 3-Jul-17 4-Jul-17 5-Mar-18 5-Mar-18 5-Mar-18 22-Jul-19 25-May-17 3-Jul-17 4-Jul-17 5-Mar-18 5-Mar-18 5-Mar-18 95% 95% 0% 0.066% 0.066%
1006 2 CIVIL 3963-FAHM-1-66-0001 OT FAHAHIL MAIN DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS 1 A 0.139% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 3-Jul-17 25-Sep-17 27-Sep-17 1-Nov-17 1-Nov-17 29-Jan-18 22-Jul-19 3-Jul-17 25-Sep-17 27-Sep-17 1-Nov-17 1-Nov-17 29-Jan-18 95% 95% 0% 0.132% 0.132%
1007 2 CIVIL 3963-FAHM-1-66-0002 OT FAHAHIL MAIN DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS 1 A 0.139% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 3-Jul-17 10-Oct-17 12-Oct-17 2-Nov-17 2-Nov-17 15-Feb-18 22-Jul-19 3-Jul-17 10-Oct-17 12-Oct-17 2-Nov-17 2-Nov-17 15-Feb-18 95% 95% 0% 0.132% 0.132%
1008 2 CIVIL 3963-FAHM-1-66-0003 OT FAHAHIL MAIN DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.139% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 3-Jul-17 15-Oct-17 16-Oct-17 7-Dec-17 5-Apr-18 5-Apr-18 22-Jul-19 3-Jul-17 15-Oct-17 16-Oct-17 7-Dec-17 5-Apr-18 5-Apr-18 95% 95% 0% 0.132% 0.132%
1009 2 CIVIL 3963-FAHM-1-51-0001 OT FAHAHIL MAIN DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 1 A 0.139% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 4-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 29-Apr-18 29-Apr-18 22-Jul-19 4-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 29-Apr-18 29-Apr-18 95% 95% 0% 0.132% 0.132%
1010 2 CIVIL 3963-FAHM-1-51-0002 OT FAHAHIL MAIN DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS 1 A 0.278% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 4-Jul-17 10-Oct-17 12-Oct-17 2-Nov-17 2-Nov-17 26-Feb-18 22-Jul-19 4-Jul-17 10-Oct-17 12-Oct-17 2-Nov-17 2-Nov-17 26-Feb-18 95% 95% 0% 0.264% 0.264%
1011 2 CIVIL 3963-FAHM-1-50-0003 OT FAHAHIL MAIN DEGASSING STATION FOUNDATION LOCATION PLAN 1 0 0.278% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 4-Jul-17 22-Oct-17 24-Oct-17 25-Mar-18 2-Apr-18 2-Apr-18 22-Jul-19 4-Jul-17 22-Oct-17 24-Oct-17 25-Mar-18 2-Apr-18 2-Apr-18 95% 95% 0% 0.264% 0.264%
1012 2 CIVIL 3963-FAHS-1-64-0001 OT FAHAHIL SOUTH DEGASSING STATION SITE GRADING LAYOUT & DETAILS 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 10-Oct-17 12-Oct-17 13-Nov-17 5-Apr-18 5-Apr-18 22-Jul-19 25-May-17 10-Oct-17 12-Oct-17 13-Nov-17 5-Apr-18 5-Apr-18 95% 95% 0% 0.066% 0.066%
1013 2 CIVIL 3963-FAHS-1-50-0001 OT FAHAHIL SOUTH DEGASSING STATION GENERAL ARRANGEMENT CIVIL 1 1 0.069% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 11-Jul-17 6-Oct-17 20-Nov-17 3-Apr-18 3-Apr-18 3-Apr-18 22-Jul-19 11-Jul-17 6-Oct-17 20-Nov-17 3-Apr-18 3-Apr-18 3-Apr-18 95% 95% 0% 0.066% 0.066%
1014 2 CIVIL 3963-FAHS-1-50-0002 OT FAHAHIL SOUTH DEGASSING STATION DRAINAGE LAYOUT & DETAILS 1 1 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 3-Oct-17 5-Oct-17 11-Apr-18 11-Apr-18 11-Apr-18 22-Jul-19 25-May-17 3-Oct-17 5-Oct-17 11-Apr-18 11-Apr-18 11-Apr-18 95% 95% 0% 0.066% 0.066%
1015 2 CIVIL 3963-FAHS-1-66-0001 OT FAHAHIL SOUTH DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS 1 A 0.139% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 10-Oct-17 12-Oct-17 1-Nov-17 1-Nov-17 29-Jan-18 22-Jul-19 8-Jul-17 10-Oct-17 12-Oct-17 1-Nov-17 1-Nov-17 29-Jan-18 95% 95% 0% 0.132% 0.132%
1016 2 CIVIL 3963-FAHS-1-66-0002 OT FAHAHIL SOUTH DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS 1 A 0.139% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 10-Oct-17 12-Oct-17 2-Nov-17 2-Nov-17 15-Feb-18 22-Jul-19 8-Jul-17 10-Oct-17 12-Oct-17 2-Nov-17 2-Nov-17 15-Feb-18 95% 95% 0% 0.132% 0.132%
1017 2 CIVIL 3963-FAHS-1-66-0003 OT FAHAHIL SOUTH DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.139% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 23-Oct-17 25-Oct-17 19-Nov-17 14-Mar-18 14-Mar-18 22-Jul-19 8-Jul-17 23-Oct-17 25-Oct-17 19-Nov-17 14-Mar-18 14-Mar-18 95% 95% 0% 0.132% 0.132%
1018 2 CIVIL 3963-FAHS-1-51-0001 OT FAHAHIL SOUTH DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 1 A 0.278% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 11-Jul-17 25-Oct-17 26-Oct-17 6-Dec-17 13-Mar-18 13-Mar-18 22-Jul-19 11-Jul-17 25-Oct-17 26-Oct-17 6-Dec-17 13-Mar-18 13-Mar-18 95% 95% 0% 0.264% 0.264%
1019 2 CIVIL 3963-FAHS-1-51-0002 OT FAHAHIL SOUTH DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS 1 A 0.139% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 10-Oct-17 12-Oct-17 2-Nov-17 2-Nov-17 1-Mar-18 22-Jul-19 8-Jul-17 10-Oct-17 12-Oct-17 2-Nov-17 2-Nov-17 1-Mar-18 95% 95% 0% 0.132% 0.132%
1020 2 CIVIL 3963-FAHS-1-50-0003 OT FAHAHIL SOUTH DEGASSING STATION FOUNDATION LOCATION PLAN 1 A 0.278% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 20-Oct-17 22-Oct-17 1-Apr-18 23-Apr-18 23-Apr-18 22-Jul-19 8-Jul-17 20-Oct-17 22-Oct-17 1-Apr-18 23-Apr-18 23-Apr-18 95% 95% 0% 0.264% 0.264%
1021 2 CIVIL 3963-JALM-1-64-0002 OT JALEHA MAIN DEGASSING STATION ROAD & PAVING LAYOUT & DETAILS 1 0 0.167% 7-Jun-17 17-Jun-17 22-Jun-17 23-Jul-17 13-Aug-17 23-Aug-17 31-Oct-18 7-Jun-17 1-Oct-17 3-Oct-17 4-May-18 24-Sep-18 24-Sep-18 22-Jul-19 7-Jun-17 1-Oct-17 3-Oct-17 4-May-18 24-Sep-18 24-Sep-18 95% 95% 0% 0.159% 0.159%
1022 2 CIVIL 3963-JALM-1-50-0001 OT JALEHA MAIN DEGASSING STATION GENERAL ARRANGEMENT CIVIL 1 1 0.097% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 3-Oct-17 5-Oct-17 24-Dec-17 27-May-18 27-May-18 22-Jul-19 8-Jul-17 3-Oct-17 5-Oct-17 24-Dec-17 27-May-18 27-May-18 95% 95% 0% 0.092% 0.092%
1023 2 CIVIL 3963-JALM-1-66-0001 OT JALEHA MAIN DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS 1 A 0.139% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 17-Oct-17 18-Oct-17 27-Dec-17 11-Mar-18 11-Mar-18 22-Jul-19 13-Jul-17 17-Oct-17 18-Oct-17 27-Dec-17 11-Mar-18 11-Mar-18 95% 95% 0% 0.132% 0.132%
1024 2 CIVIL 3963-JALM-1-66-0003 OT JALEHA MAIN DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 1 0 0.139% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 17-Oct-17 19-Oct-17 11-Apr-18 11-Apr-18 11-Apr-18 22-Jul-19 13-Jul-17 17-Oct-17 19-Oct-17 11-Apr-18 11-Apr-18 11-Apr-18 95% 95% 0% 0.132% 0.132%
1025 2 CIVIL 3963-JALM-1-51-0001 OT JALEHA MAIN DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 1 1 0.10% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 11-Jul-17 8-Nov-17 15-Nov-17 29-Nov-17 1-May-18 1-May-18 22-Jul-19 11-Jul-17 8-Nov-17 15-Nov-17 29-Nov-17 1-May-18 1-May-18 95% 95% 0% 0.092% 0.092%
1026 2 CIVIL 3963-JALM-1-51-0002 OT JALEHA MAIN DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS 1 0 0.139% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 18-Oct-17 19-Oct-17 20-Mar-18 29-Apr-18 29-Apr-18 22-Jul-19 8-Jul-17 18-Oct-17 19-Oct-17 20-Mar-18 29-Apr-18 29-Apr-18 95% 95% 0% 0.132% 0.132%
1027 2 CIVIL 3963-JALM-1-50-0003 OT JALEHA MAIN DEGASSING STATION FOUNDATION LOCATION PLAN 1 0 0.097% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 8-Jul-17 6-Nov-17 8-Nov-17 27-May-18 28-Jun-18 28-Jun-18 22-Jul-19 8-Jul-17 6-Nov-17 8-Nov-17 27-May-18 28-Jun-18 28-Jun-18 95% 95% 0% 0.092% 0.092%
1028 2 CIVIL DEM-3963-KAHN-1-50-0001 DEM KHATIYAH NORTH DEGASSING STATION EXISTING TEST SEPERATOR -STEEL WORK DEMOLITION DRAWING 3 A 0.083% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 19-Jul-17 20-Jul-17 13-Aug-17 22-Aug-17 23-Aug-17 22-Jul-19 1-Jun-17 19-Jul-17 20-Jul-17 13-Aug-17 22-Aug-17 23-Aug-17 95% 95% 0% 0.079% 0.079%
1029 2 CIVIL DEM-3963-KAHN-1-50-0002 DEM KHATIYAH NORTH DEGASSING STATION EXISTING TEST SEPERATOR -CONCRETE WORK DEMOLITION DRA 3 A 0.097% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 19-Jul-17 20-Jul-17 13-Aug-17 22-Aug-17 23-Aug-17 22-Jul-19 31-May-17 19-Jul-17 20-Jul-17 13-Aug-17 22-Aug-17 23-Aug-17 95% 95% 0% 0.092% 0.092%
1030 2 CIVIL DEM-3963-KAHM-1-50-0001 DEM KHATIYAH MAIN DEGASSING STATION EXISTING TEST SEPERATOR -STEEL WORK DEMOLITION DRAWING 3 A 0.083% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 19-Jul-17 20-Jul-17 10-Aug-17 22-Aug-17 23-Aug-17 22-Jul-19 31-May-17 19-Jul-17 20-Jul-17 10-Aug-17 22-Aug-17 23-Aug-17 95% 95% 0% 0.079% 0.079%
1031 2 CIVIL DEM-3963-KAHM-1-50-0002 DEM KHATIYAH MAIN DEGASSING STATION EXISTING TEST SEPERATOR -CONCRETE WORK DEMOLITION DRAW 3 A 0.083% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 19-Jul-17 20-Jul-17 10-Aug-17 22-Aug-17 23-Aug-17 22-Jul-19 31-May-17 19-Jul-17 20-Jul-17 10-Aug-17 22-Aug-17 23-Aug-17 95% 95% 0% 0.079% 0.079%
1032 2 CIVIL DEM-3963-KAHS-1-50-0001 DEM KHATIYAH SOUTH DEGASSING STATION EXISTING TEST SEPERATOR -STEEL WORK DEMOLITION DRAWING 3 A 0.083% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 19-Jul-17 20-Jul-17 17-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 31-May-17 19-Jul-17 20-Jul-17 17-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.079% 0.079%
1033 2 CIVIL DEM-3963-KAHS-1-50-0002 DEM KHATIYAH SOUTH DEGASSING STATION EXISTING TEST SEPERATOR -CONCRETE WORK DEMOLITION DRA 3 A 0.083% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 19-Jul-17 20-Jul-17 17-Aug-17 27-Aug-17 29-Aug-17 22-Jul-19 31-May-17 19-Jul-17 20-Jul-17 17-Aug-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.079% 0.079%
1034 2 CIVIL DEM-3963-FAHN-1-50-0001 DEM FAHAHIL NORTH DEGASSING STATION EXISTING TEST SEPERATOR -STEEL WORK DEMOLITION DRAWING 3 A 0.097% 31-May-17 10-Jun-17 22-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 25-Jul-17 26-Jul-17 24-Aug-17 13-Sep-17 14-Sep-17 22-Jul-19 1-Jun-17 25-Jul-17 26-Jul-17 24-Aug-17 13-Sep-17 14-Sep-17 95% 95% 0% 0.092% 0.092%
1035 2 CIVIL DEM-3963-FAHN-1-50-0002 DEM FAHAHIL NORTH DEGASSING STATION EXISTING TEST SEPERATOR -CONCRETE WORK DEMOLITION DRAW 3 A 0.097% 31-May-17 10-Jun-17 22-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 25-Jul-17 26-Jul-17 24-Aug-17 13-Sep-17 14-Sep-17 22-Jul-19 1-Jun-17 25-Jul-17 26-Jul-17 24-Aug-17 13-Sep-17 14-Sep-17 95% 95% 0% 0.092% 0.092%
1036 2 CIVIL DEM-3963-FAHM-1-50-0001 DEM FAHAHIL MAIN DEGASSING STATION EXISTING TEST SEPERATOR -STEEL WORK DEMOLITION DRAWING 3 A 0.083% 31-May-17 10-Jun-17 22-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 19-Jul-17 20-Jul-17 10-Aug-17 22-Aug-17 23-Aug-17 22-Jul-19 1-Jun-17 19-Jul-17 20-Jul-17 10-Aug-17 22-Aug-17 23-Aug-17 95% 95% 0% 0.079% 0.079%
1037 2 CIVIL DEM-3963-FAHM-1-50-0002 DEM FAHAHIL MAIN DEGASSING STATION EXISTING TEST SEPERATOR -CONCRETE WORK DEMOLITION DRAWI 3 A 0.097% 31-May-17 10-Jun-17 22-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 19-Jul-17 20-Jul-17 10-Aug-17 22-Aug-17 23-Aug-17 22-Jul-19 1-Jun-17 19-Jul-17 20-Jul-17 10-Aug-17 22-Aug-17 23-Aug-17 95% 95% 0% 0.092% 0.092%
1038 2 CIVIL DEM-3963-FAHS-1-50-0001 DEM FAHAHIL SOUTH DEGASSING STATION EXISTING TEST SEPERATOR -STEEL WORK DEMOLITION DRAWING 3 A 0.083% 31-May-17 10-Jun-17 22-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 30-Jul-17 31-Jul-17 3-Sep-17 19-Sep-17 20-Sep-17 22-Jul-19 1-Jun-17 30-Jul-17 31-Jul-17 3-Sep-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.079% 0.079%
1039 2 CIVIL DEM-3963-FAHS-1-50-0002 DEM FAHAHIL SOUTH DEGASSING STATION EXISTING TEST SEPERATOR -CONCRETE WORK DEMOLITION DRAW 3 A 0.083% 31-May-17 10-Jun-17 22-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 30-Jul-17 31-Jul-17 3-Sep-17 19-Sep-17 20-Sep-17 22-Jul-19 1-Jun-17 30-Jul-17 31-Jul-17 3-Sep-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.079% 0.079%
1040 2 CIVIL DEM-3963-JALM-1-50-0001 DEM JALEHA MAIN DEGASSING STATION EXISTING TEST SEPERATOR -STEEL WORK DEMOLITION DRAWING 3 A 0.083% 31-May-17 10-Jun-17 22-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 25-Jul-17 26-Jul-17 29-Aug-17 20-Sep-17 21-Nov-17 22-Jul-19 1-Jun-17 25-Jul-17 26-Jul-17 29-Aug-17 20-Sep-17 21-Nov-17 95% 95% 0% 0.079% 0.079%
1041 2 CIVIL DEM-3963-JALM-1-50-0002 DEM JALEHA MAIN DEGASSING STATION EXISTING TEST SEPERATOR -CONCRETE WORK DEMOLITION DRAWIN 3 A 0.083% 31-May-17 10-Jun-17 22-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 25-Jul-17 26-Jul-17 29-Aug-17 3-Oct-17 3-Oct-17 22-Jul-19 1-Jun-17 25-Jul-17 26-Jul-17 29-Aug-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.079% 0.079%
1042 2 CIVIL 3963-DGEN-1-12-0002 OT DESIGN CALCULATION FOR METERING SKID FOUNDATION 1 A 0.208% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 13-Jul-17 25-Sep-17 27-Sep-17 7-Feb-18 7-Feb-18 7-Feb-18 22-Jul-19 13-Jul-17 25-Sep-17 27-Sep-17 7-Feb-18 7-Feb-18 7-Feb-18 95% 95% 0% 0.198% 0.198%
1043 2 CIVIL 3963-DGEN-1-12-0003 OT DESIGN CALCULATION FOR TEST SEPARATOR PLATFORM 1 1 0.994% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 13-Jul-17 28-Aug-17 29-Aug-17 19-Nov-17 26-Apr-18 26-Apr-18 22-Jul-19 13-Jul-17 28-Aug-17 29-Aug-17 19-Nov-17 26-Apr-18 26-Apr-18 95% 95% 0% 0.945% 0.945%
1044 2 CIVIL 3963-DGEN-1-12-0004 OT DESIGN CALCULATION FOR PIPE SLEEPERS 1 1 0.194% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 13-Jul-17 28-Oct-17 29-Oct-17 20-Dec-17 15-Apr-18 15-Apr-18 22-Jul-19 13-Jul-17 28-Oct-17 29-Oct-17 20-Dec-17 15-Apr-18 15-Apr-18 95% 95% 0% 0.185% 0.185%
1045 2 CIVIL 3963-DGEN-1-12-0005 OT DESIGN CALCULATION FOR PIPE SUPPORTS 1 0 0.194% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 6-Nov-17 13-Nov-17 21-Apr-18 2-May-18 2-May-18 22-Jul-19 8-Jul-17 6-Nov-17 13-Nov-17 21-Apr-18 2-May-18 2-May-18 95% 95% 0% 0.185% 0.185%
1046 2 CIVIL 3963-DGEN-1-57-0005 OT TYPICAL DETAILS OF FIRE PROOFING 1 A 0.111% 3-May-17 13-May-17 18-May-17 18-Jun-17 9-Jul-17 19-Jul-17 31-Oct-18 8-Jun-17 13-Jun-17 14-Jun-17 13-Jul-17 13-Jul-17 18-Jul-17 22-Jul-19 8-Jun-17 13-Jun-17 14-Jun-17 13-Jul-17 13-Jul-17 18-Jul-17 95% 95% 0% 0.106% 0.106%
1047 2 CIVIL 3963-KAHN-1-66-0004 OT KHATIYAH NORTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 12-Oct-17 11-Oct-17 12-Oct-17 30-Oct-17 30-Oct-17 29-Jan-18 22-Jul-19 12-Oct-17 11-Oct-17 12-Oct-17 30-Oct-17 30-Oct-17 29-Jan-18 95% 95% 0% 0.013% 0.013%
1048 2 CIVIL 3963-KAHM-1-66-0004 OT KHATIYAH MAIN DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 23-Oct-17 25-Oct-17 21-Nov-17 5-Feb-18 5-Feb-18 22-Jul-19 19-Oct-17 23-Oct-17 25-Oct-17 21-Nov-17 5-Feb-18 5-Feb-18 95% 95% 0% 0.013% 0.013%
1049 2 CIVIL 3963-KAHS-1-66-0004 OT KHATIYAH SOUTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 25-Oct-17 26-Oct-17 4-Dec-17 5-Feb-18 5-Feb-18 22-Jul-19 19-Oct-17 25-Oct-17 26-Oct-17 4-Dec-17 5-Feb-18 5-Feb-18 95% 95% 0% 0.013% 0.013%
1050 2 CIVIL 3963-FAHN-1-66-0004 OT FAHAHIL NORTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 31-Oct-17 1-Nov-17 20-Nov-17 22-Feb-18 22-Feb-18 22-Jul-19 19-Oct-17 31-Oct-17 1-Nov-17 20-Nov-17 22-Feb-18 22-Feb-18 95% 95% 0% 0.013% 0.013%
1051 2 CIVIL 3963-FAHM-1-66-0004 OT FAHAHIL MAIN DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 31-Oct-17 1-Nov-17 21-Nov-17 21-Feb-18 21-Feb-18 22-Jul-19 19-Oct-17 31-Oct-17 1-Nov-17 21-Nov-17 21-Feb-18 21-Feb-18 95% 95% 0% 0.013% 0.013%
1052 2 CIVIL 3963-FAHS-1-66-0004 OT FAHAHIL SOUTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 1-Nov-17 2-Nov-17 21-Nov-17 22-Feb-18 22-Feb-18 22-Jul-19 19-Oct-17 1-Nov-17 2-Nov-17 21-Nov-17 22-Feb-18 22-Feb-18 95% 95% 0% 0.013% 0.013%

Page 16 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
1053 2 CIVIL 3963-JALM-1-66-0004 OT JALEHA MAIN DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS 1 1 E 0.046% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 5-Nov-17 7-Nov-17 27-Nov-17 20-Mar-18 20-Mar-18 22-Jul-19 19-Oct-17 5-Nov-17 7-Nov-17 27-Nov-17 20-Mar-18 20-Mar-18 95% 95% 0% 0.044% 0.044%
1054 2 CIVIL 3963-KAHN-1-51-0003 OT KHATIYAH NORTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS 1 B 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 23-Sep-17 24-Sep-17 26-Sep-17 29-Oct-17 29-Oct-17 27-Nov-17 22-Jul-19 23-Sep-17 24-Sep-17 26-Sep-17 29-Oct-17 29-Oct-17 27-Nov-17 95% 95% 0% 0.013% 0.013%
1055 2 CIVIL 3963-KAHM-1-51-0003 OT KHATIYAH MAIN DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 25-Oct-17 26-Oct-17 4-Dec-17 4-Feb-18 4-Feb-18 22-Jul-19 19-Oct-17 25-Oct-17 26-Oct-17 4-Dec-17 4-Feb-18 4-Feb-18 95% 95% 0% 0.013% 0.013%
1056 2 CIVIL 3963-KAHS-1-51-0003 OT KHATIYAH SOUTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 1-Nov-17 2-Nov-17 26-Nov-17 7-Feb-18 7-Feb-18 22-Jul-19 19-Oct-17 1-Nov-17 2-Nov-17 26-Nov-17 7-Feb-18 7-Feb-18 95% 95% 0% 0.013% 0.013%
1057 2 CIVIL 3963-FAHN-1-51-0003 OT FAHAHIL NORTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 1-Nov-17 2-Nov-17 26-Nov-17 26-Feb-18 26-Feb-18 22-Jul-19 19-Oct-17 1-Nov-17 2-Nov-17 26-Nov-17 26-Feb-18 26-Feb-18 95% 95% 0% 0.013% 0.013%
1058 2 CIVIL 3963-FAHM-1-51-0003 OT FAHAHIL MAIN DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 1-Nov-17 2-Nov-17 26-Nov-17 21-Feb-18 21-Feb-18 22-Jul-19 19-Oct-17 1-Nov-17 2-Nov-17 26-Nov-17 21-Feb-18 21-Feb-18 95% 95% 0% 0.013% 0.013%
1059 2 CIVIL 3963-FAHS-1-51-0003 OT FAHAHIL SOUTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 31-Oct-17 1-Nov-17 26-Nov-17 28-Feb-18 28-Feb-18 22-Jul-19 19-Oct-17 31-Oct-17 1-Nov-17 26-Nov-17 28-Feb-18 28-Feb-18 95% 95% 0% 0.013% 0.013%
1060 2 CIVIL 3963-JALM-1-51-0003 OT JALEHA MAIN DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS 1 1 0.046% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Oct-17 5-Nov-17 7-Nov-17 26-Nov-17 20-Mar-18 20-Mar-18 22-Jul-19 19-Oct-17 5-Nov-17 7-Nov-17 26-Nov-17 20-Mar-18 20-Mar-18 95% 95% 0% 0.044% 0.044%
1061 2 CIVIL 3963-KAHN-1-51-0004 OT KHATIYAH NORTH EARLY TIE IN PIPE SUPPORTS STRUCTURAL SCHEDULE & DETAILS 1 B 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 28-Nov-17 28-Nov-17 29-Nov-17 4-Dec-17 13-Dec-17 13-Dec-17 22-Jul-19 28-Nov-17 28-Nov-17 29-Nov-17 4-Dec-17 13-Dec-17 13-Dec-17 95% 95% 0% 0.013% 0.013%
1062 2 CIVIL 3963-KAHS-1-51-0004 OT KHATIYAH SOUTH EARLY TIE IN PIPE SUPPORTS STRUCTURAL SCHEDULE & DETAILS 1 A 0.014% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 28-Nov-17 28-Nov-17 29-Nov-17 4-Dec-17 13-Dec-17 13-Dec-17 22-Jul-19 28-Nov-17 28-Nov-17 29-Nov-17 4-Dec-17 13-Dec-17 13-Dec-17 95% 95% 0% 0.013% 0.013%
1063 2 CIVIL 3963-KAHM-1-51-0004 OT KHATIYAH MAIN EARLY TIE IN PIPE SUPPORTS STRUCTURAL SCHEDULE & DETAILS 1 A 0.000% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 28-Nov-17 28-Nov-17 29-Nov-17 4-Dec-17 11-Dec-17 11-Dec-17 22-Jul-19 28-Nov-17 28-Nov-17 29-Nov-17 4-Dec-17 11-Dec-17 11-Dec-17 95% 95% 0% 0.000% 0.000%
1064 2 CIVIL 3963-KAHN-1-66-0005 OT KHATIYAH NORTH EARLY TIE IN PIPE SUPPORTS FOUDATION SCHEDULE & DETAILS 1 B 0.0% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 28-Nov-17 28-Nov-17 29-Nov-17 4-Dec-17 13-Dec-17 13-Dec-17 22-Jul-19 28-Nov-17 28-Nov-17 29-Nov-17 4-Dec-17 13-Dec-17 13-Dec-17 95% 95% 0% 0.000% 0.000%
1065 2 CIVIL 3963-KAHS-1-66-0005 OT KHATIYAH SOUTH EARLY TIE IN PIPE SUPPORTS FOUDATION SCHEDULE & DETAILS 1 B 0.000% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 28-Nov-17 28-Nov-17 29-Nov-17 13-Dec-17 19-Dec-17 19-Dec-17 22-Jul-19 28-Nov-17 28-Nov-17 29-Nov-17 13-Dec-17 19-Dec-17 19-Dec-17 95% 95% 0% 0.000% 0.000%
1066 2 CIVIL 3963-KAHM-1-66-0005 OT KHATIYAH MAIN EARLY TIE IN PIPE SUPPORTS FOUDATION SCHEDULE & DETAILS 1 C 0.000% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 28-Nov-17 28-Nov-17 29-Nov-17 4-Dec-17 19-Dec-17 19-Dec-17 22-Jul-19 28-Nov-17 28-Nov-17 29-Nov-17 4-Dec-17 19-Dec-17 19-Dec-17 95% 95% 0% 0.000% 0.000%
1067 4 CIVIL 3963-DGEN-1-00-0001 OT MISCELLANEOUS - CIVIL 0 0.000% 31-Aug-17 6-Sep-17 7-Sep-17 14-Sep-17 14-Sep-17 21-Sep-17 31-Oct-18 1-Feb-18 6-Feb-18 8-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 22-Jul-19 1-Feb-18 6-Feb-18 8-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 95% 95% 0% 0.000% 0.000%
1068 2 CIVIL 3963-JALM-1-66-0002 OT JALEHA MAIN DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS 1 A 0.171% 10-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 12-Sep-17 19-Sep-17 31-Oct-18 13-Jul-17 17-Oct-17 18-Oct-17 27-Dec-17 20-Mar-18 20-Mar-18 22-Jul-19 13-Jul-17 17-Oct-17 18-Oct-17 27-Dec-17 20-Mar-18 20-Mar-18 95% 95% 0% 0.163% 0.163%
1069 2 CIVIL 3963-KAHN-1-66-0001 OT KHATIYAH NORTH DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS 1 B 0.139% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 25-May-17 5-Sep-17 6-Sep-17 25-Oct-17 25-Oct-17 21-Jan-18 22-Jul-19 25-May-17 5-Sep-17 6-Sep-17 25-Oct-17 25-Oct-17 21-Jan-18 95% 95% 0% 0.132% 0.132%
1070 2 CIVIL 3963-KAHM-1-66-0001 OT KHATIYAH MAIN DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS 1 B 0.139% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 18-Sep-17 19-Sep-17 30-Oct-17 30-Oct-17 21-Jan-18 22-Jul-19 25-May-17 18-Sep-17 19-Sep-17 30-Oct-17 30-Oct-17 21-Jan-18 95% 95% 0% 0.132% 0.132%
1071 2 CIVIL 3963-KAHS-1-66-0001 OT KHATIYAH SOUTH DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS 1 B 0.139% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 13-Jul-17 18-Sep-17 20-Sep-17 1-Nov-17 1-Nov-17 21-Jan-18 22-Jul-19 13-Jul-17 18-Sep-17 20-Sep-17 1-Nov-17 1-Nov-17 21-Jan-18 95% 95% 0% 0.132% 0.132%
1072 2 CIVIL 3963-DGEN-1-12-0001 OT DESIGN CALCULATION FOR TEST SEPARATOR FOUNDATION 1 A 0.144% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 6-Sep-17 7-Sep-17 2-Nov-17 2-Nov-17 22-Jan-18 22-Jul-19 8-Jul-17 6-Sep-17 7-Sep-17 2-Nov-17 2-Nov-17 22-Jan-18 95% 95% 0% 0.137% 0.137%
1073 4 SAFETY 3963-DGEN-3-04-0002 OT PROJECT HSE PLAN 1 A 0.139% 1-Apr-17 11-Apr-17 16-Apr-17 17-May-17 7-Jun-17 17-Jun-17 31-Oct-18 26-Mar-17 29-Mar-17 5-Apr-17 5-Apr-17 8-Jun-17 8-Jun-17 22-Jul-19 26-Mar-17 29-Mar-17 5-Apr-17 5-Apr-17 8-Jun-17 8-Jun-17 95% 95% 0% 0.132% 0.132%
1074 4 SAFETY 3963-DGEN-3-03-0001 OT FIRE & SAFETY PHILOSOPHY 1 B 0.139% 25-Mar-17 4-Apr-17 9-Apr-17 10-May-17 31-May-17 10-Jun-17 31-Oct-18 29-Mar-17 2-Apr-17 5-Apr-17 4-May-17 20-Jun-17 20-Jun-17 22-Jul-19 29-Mar-17 2-Apr-17 5-Apr-17 4-May-17 20-Jun-17 20-Jun-17 95% 95% 0% 0.132% 0.132%
1075 4 SAFETY 3963-DGEN-3-03-0002 OT HAZARDOUS AREA CLASSIFICATION PHILOSOPHY AND SCHEDULE FOR ALL DEGASSING STATIONS 1 B 0.139% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 3-Apr-17 19-May-17 21-May-17 4-Jul-17 13-Jul-17 18-Jul-17 22-Jul-19 3-Apr-17 19-May-17 21-May-17 4-Jul-17 13-Jul-17 18-Jul-17 95% 95% 0% 0.132% 0.132%
1076 4 SAFETY 3963-DGEN-3-17-0001 L TERMS OF REFERENCE FOR HAZID 1 A 0.125% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 5-Apr-17 17-Jul-17 18-Jul-17 3-Aug-17 14-Aug-17 14-Aug-17 22-Jul-19 5-Apr-17 17-Jul-17 18-Jul-17 3-Aug-17 14-Aug-17 14-Aug-17 95% 95% 0% 0.119% 0.119%
1077 4 SAFETY 3963-DGEN-3-17-0003 L HAZID/ENVID CLOSE OUT REPORT 1 A 0.264% 15-Jul-17 25-Jul-17 30-Jul-17 30-Aug-17 13-Sep-17 20-Sep-17 31-Oct-18 14-Nov-17 16-Dec-17 17-Dec-17 22-Jan-18 5-Feb-18 5-Feb-18 22-Jul-19 14-Nov-17 16-Dec-17 17-Dec-17 22-Jan-18 5-Feb-18 5-Feb-18 95% 95% 0% 0.251% 0.251%
1078 4 SAFETY 3963-DGEN-3-17-0004 L TERMS OF REFERENCE FOR HAZOP 1 A 0.069% 15-May-17 25-May-17 30-May-17 30-Jun-17 21-Jul-17 31-Jul-17 31-Oct-18 5-Apr-17 18-Oct-17 19-Oct-17 24-Jan-18 24-Jan-18 24-Jan-18 22-Jul-19 5-Apr-17 18-Oct-17 19-Oct-17 24-Jan-18 24-Jan-18 24-Jan-18 95% 95% 0% 0.066% 0.066%
1079 4 SAFETY 3963-DGEN-3-17-0005 L HAZOP REPORT 1 A 0.250% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 11-Nov-17 19-Nov-17 21-Nov-17 10-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 11-Nov-17 19-Nov-17 21-Nov-17 10-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.238% 0.238%
1080 4 SAFETY 3963-DGEN-3-17-0006 L HAZOP CLOSE OUT REPORT 1 A 0.250% 31-Jul-17 10-Aug-17 15-Aug-17 4-Sep-17 13-Sep-17 16-Sep-17 31-Oct-18 19-Oct-17 16-Dec-17 17-Dec-17 21-Jan-18 12-Mar-18 12-Mar-18 22-Jul-19 19-Oct-17 16-Dec-17 17-Dec-17 21-Jan-18 12-Mar-18 12-Mar-18 95% 95% 0% 0.238% 0.238%
1081 4 SAFETY 3963-DGEN-3-17-0008 OT QRA ASSUMPTION REGISTER 1 A 0.069% 5-May-17 15-May-17 20-May-17 20-Jun-17 11-Jul-17 21-Jul-17 31-Oct-18 25-May-17 8-Aug-17 10-Aug-17 25-Oct-17 25-Oct-17 22-Jan-18 22-Jul-19 25-May-17 8-Aug-17 10-Aug-17 25-Oct-17 25-Oct-17 22-Jan-18 95% 95% 0% 0.066% 0.066%
1082 4 SAFETY 3963-DGEN-3-17-0010 OT FRA ASSUMPTION REGISTER 1 A 0.125% 10-May-17 20-May-17 25-May-17 25-Jun-17 16-Jul-17 26-Jul-17 31-Oct-18 25-May-17 19-Jul-17 20-Jul-17 10-Aug-17 21-Aug-17 22-Aug-17 22-Jul-19 25-May-17 19-Jul-17 20-Jul-17 10-Aug-17 21-Aug-17 22-Aug-17 95% 95% 0% 0.119% 0.119%
1083 4 SAFETY 3963-DGEN-3-17-0011 OT FIRE RISK ASSESSMENT STUDY 1 1 0.285% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 21-Jun-17 1-Jan-18 3-Jan-18 29-Jan-18 28-Jul-18 28-Jul-18 22-Jul-19 21-Jun-17 1-Jan-18 3-Jan-18 29-Jan-18 28-Jul-18 28-Jul-18 95% 95% 0% 0.270% 0.270%
1084 4 SAFETY 3963-DGEN-3-17-0012 OT FIREWATER DEMAND AND AVAILABILITY REPORT 1 A 0.139% 20-Apr-17 30-Apr-17 5-May-17 5-Jun-17 26-Jun-17 6-Jul-17 31-Oct-18 5-Apr-17 9-May-17 10-May-17 15-Jun-17 15-Jun-17 4-Oct-17 22-Jul-19 5-Apr-17 9-May-17 10-May-17 15-Jun-17 15-Jun-17 4-Oct-17 95% 95% 0% 0.132% 0.132%
1085 4 SAFETY 3963-DGEN-3-17-0013 OT HSE ACTION TRACKING REGISTER 1 A 0.153% 10-Aug-17 20-Aug-17 25-Aug-17 12-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 8-Jun-18 10-Jun-18 10-Aug-18 9-Sep-18 9-Sep-18 22-Jul-19 19-Oct-17 8-Jun-18 10-Jun-18 10-Aug-18 9-Sep-18 9-Sep-18 95% 95% 0% 0.145% 0.145%
1086 4 SAFETY 3963-DGEN-3-17-0015 OT TBE FOR FIRE FIGHINT & SAFETY EQUIPMENT 1 2 0.153% 7-Aug-17 17-Aug-17 22-Aug-17 9-Sep-17 15-Sep-17 18-Sep-17 31-Oct-18 19-Oct-17 29-Nov-17 3-Dec-17 6-Feb-18 28-Mar-18 28-Mar-18 22-Jul-19 19-Oct-17 29-Nov-17 3-Dec-17 6-Feb-18 28-Mar-18 28-Mar-18 95% 95% 0% 0.145% 0.145%
1087 4 SAFETY 3963-DGEN-3-15-0001 OT MATERIAL REQUISITION FOR DELUGE SKID 1 A 0.125% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 4-Jul-17 24-Jul-17 25-Jul-17 10-Aug-17 30-Aug-17 9-Jan-18 22-Jul-19 4-Jul-17 24-Jul-17 25-Jul-17 10-Aug-17 30-Aug-17 9-Jan-18 95% 95% 0% 0.119% 0.119%
1088 4 SAFETY 3963-DGEN-3-15-0002 OT MATERIAL REQUISITION FOR FIRE FIGHTING SYSTEM 1 A 0.125% 5-Jul-17 15-Jul-17 20-Jul-17 20-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 4-Jul-17 24-Jul-17 25-Jul-17 10-Aug-17 30-Aug-17 3-Jan-18 22-Jul-19 4-Jul-17 24-Jul-17 25-Jul-17 10-Aug-17 30-Aug-17 3-Jan-18 95% 95% 0% 0.119% 0.119%
1089 4 SAFETY 3963-DGEN-3-14-0001 OT DELUGE SKIDS SPECIFICATION 1 B 0.056% 20-Apr-17 30-Apr-17 5-May-17 5-Jun-17 26-Jun-17 6-Jul-17 31-Oct-18 5-Apr-17 9-May-17 11-May-17 9-Jul-17 30-Aug-17 3-Jan-18 22-Jul-19 5-Apr-17 9-May-17 11-May-17 9-Jul-17 30-Aug-17 3-Jan-18 95% 95% 0% 0.053% 0.053%
1090 4 SAFETY 3963-DGEN-3-14-0002 OT FIRE FIGHTING & SAFETY EQUIPMENT SPECIFIFCATION 1 C 0.125% 20-Apr-17 30-Apr-17 5-May-17 5-Jun-17 26-Jun-17 6-Jul-17 31-Oct-18 19-Apr-17 9-May-17 10-May-17 1-Jun-17 26-Jul-17 27-Jul-17 22-Jul-19 19-Apr-17 9-May-17 10-May-17 1-Jun-17 26-Jul-17 27-Jul-17 95% 95% 0% 0.119% 0.119%
1091 4 SAFETY 3963-DGEN-3-14-0003 OT PASSIVE FIRE PROTECTION-SPECIFICATION 1 A 0.125% 9-Apr-17 19-Apr-17 24-Apr-17 25-May-17 15-Jun-17 25-Jun-17 31-Oct-18 19-Apr-17 24-Apr-17 26-Apr-17 6-Jul-17 12-Jul-17 17-Jul-17 22-Jul-19 19-Apr-17 24-Apr-17 26-Apr-17 6-Jul-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.119% 0.119%
1092 4 SAFETY 3963-DGEN-3-12-0001 OT DELUGE SYSTEM CALCULATION 1 B 0.125% 25-Apr-17 5-May-17 10-May-17 10-Jun-17 1-Jul-17 11-Jul-17 31-Oct-18 5-Apr-17 6-Jun-17 6-Jun-17 12-Dec-17 23-Jan-18 23-Jan-18 22-Jul-19 5-Apr-17 6-Jun-17 6-Jun-17 12-Dec-17 23-Jan-18 23-Jan-18 95% 95% 0% 0.119% 0.119%
1093 4 SAFETY 3963-FAHM-3-58-0001 OT 3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (FAHM) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 95% 95% 0% 0.066% 0.066%
1094 4 SAFETY 3963-FAHN-3-58-0001 OT 3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (FAHN) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 95% 95% 0% 0.066% 0.066%
1095 4 SAFETY 3963-FAHS-3-58-0001 OT 3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (FAHS) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 95% 95% 0% 0.066% 0.066%
1096 4 SAFETY 3963-JALM-3-58-0001 OT 3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (JALM) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 95% 95% 0% 0.066% 0.066%
1097 4 SAFETY 3963-KAHM-3-58-0001 OT 3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (KAHM) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 95% 95% 0% 0.066% 0.066%
1098 4 SAFETY 3963-KAHN-3-58-0001 OT 3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (KAHN) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 95% 95% 0% 0.066% 0.066%
1099 4 SAFETY 3963-KAHS-3-58-0001 OT 3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (KAHS) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 14-Dec-17 25-Jan-18 25-Jan-18 95% 95% 0% 0.066% 0.066%
1100 4 SAFETY 3963-FAHM-3-60-0001 OT PASSIVE FIRE PROTECTION LAYOUT (FAHM) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 7-Jan-18 23-Jan-18 23-Jan-18 22-Jul-19 25-May-17 27-May-17 28-May-17 7-Jan-18 23-Jan-18 23-Jan-18 95% 95% 0% 0.066% 0.066%
1101 4 SAFETY 3963-FAHN-3-60-0001 OT PASSIVE FIRE PROTECTION LAYOUT (FAHN) 1 2 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 7-Jan-18 8-Jul-18 8-Jul-18 22-Jul-19 25-May-17 27-May-17 28-May-17 7-Jan-18 8-Jul-18 8-Jul-18 95% 95% 0% 0.066% 0.066%
1102 4 SAFETY 3963-FAHS-3-60-0001 OT PASSIVE FIRE PROTECTION LAYOUT (FAHS) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 7-Jan-18 21-Jul-18 21-Jul-18 22-Jul-19 25-May-17 27-May-17 28-May-17 7-Jan-18 21-Jul-18 21-Jul-18 95% 95% 0% 0.066% 0.066%
1103 4 SAFETY 3963-JALM-3-60-0001 OT PASSIVE FIRE PROTECTION LAYOUT (JALM) 1 2 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 7-Jan-18 11-Jul-18 11-Jul-18 22-Jul-19 25-May-17 27-May-17 28-May-17 7-Jan-18 11-Jul-18 11-Jul-18 95% 95% 0% 0.066% 0.066%
1104 4 SAFETY 3963-KAHM-3-60-0001 OT PASSIVE FIRE PROTECTION LAYOUT (KAHM) 1 2 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 7-Jan-18 11-Jul-18 11-Jul-18 22-Jul-19 25-May-17 27-May-17 28-May-17 7-Jan-18 11-Jul-18 11-Jul-18 95% 95% 0% 0.066% 0.066%
1105 4 SAFETY 3963-KAHN-3-60-0001 OT PASSIVE FIRE PROTECTION LAYOUT (KAHN) 1 2 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 7-Jan-18 26-Aug-18 26-Aug-18 22-Jul-19 25-May-17 27-May-17 28-May-17 7-Jan-18 26-Aug-18 26-Aug-18 95% 95% 0% 0.066% 0.066%
1106 4 SAFETY 3963-KAHS-3-60-0001 OT PASSIVE FIRE PROTECTION LAYOUT (KAHS) 1 2 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 7-Jan-18 11-Jul-18 11-Jul-18 22-Jul-19 25-May-17 27-May-17 28-May-17 7-Jan-18 11-Jul-18 11-Jul-18 95% 95% 0% 0.066% 0.066%
1107 4 SAFETY 3963-FAHM-3-54-0001 OT SAFETY SIGN LAYOUTS (FAHM) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 16-Dec-17 23-Jan-18 23-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 16-Dec-17 23-Jan-18 23-Jan-18 95% 95% 0% 0.066% 0.066%
1108 4 SAFETY 3963-FAHN-3-54-0001 OT SAFETY SIGN LAYOUTS (FAHN) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 16-Dec-17 23-Jan-18 23-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 16-Dec-17 23-Jan-18 23-Jan-18 95% 95% 0% 0.066% 0.066%
1109 4 SAFETY 3963-FAHS-3-54-0001 OT SAFETY SIGN LAYOUTS (FAHS) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 16-Dec-17 23-Jan-18 23-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 16-Dec-17 23-Jan-18 23-Jan-18 95% 95% 0% 0.066% 0.066%
1110 4 SAFETY 3963-JALM-3-54-0001 OT SAFETY SIGN LAYOUTS (JALM) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 17-Aug-17 17-Aug-17 23-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 17-Aug-17 17-Aug-17 23-Jan-18 95% 95% 0% 0.066% 0.066%
1111 4 SAFETY 3963-KAHM-3-54-0001 OT SAFETY SIGN LAYOUTS (KAHM) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 17-Aug-17 17-Aug-17 23-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 17-Aug-17 17-Aug-17 23-Jan-18 95% 95% 0% 0.066% 0.066%
1112 4 SAFETY 3963-KAHN-3-54-0001 OT SAFETY SIGN LAYOUTS (KAHN) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 17-Aug-17 17-Aug-17 23-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 17-Aug-17 17-Aug-17 23-Jan-18 95% 95% 0% 0.066% 0.066%
1113 4 SAFETY 3963-KAHS-3-54-0001 OT SAFETY SIGN LAYOUTS (KAHS) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 31-May-17 1-Jun-17 17-Aug-17 17-Aug-17 23-Jan-18 22-Jul-19 25-May-17 31-May-17 1-Jun-17 17-Aug-17 17-Aug-17 23-Jan-18 95% 95% 0% 0.066% 0.066%
1114 4 SAFETY 3963-FAHM-3-59-0001 OT FIREWATER RING MAIN, P&ID (FAHM) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 11-May-17 11-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 22-Jul-19 11-May-17 11-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 95% 95% 0% 0.079% 0.079%
1115 4 SAFETY 3963-FAHM-3-59-0002 OT FIREWATER DELUGE SYSTEM, P&ID (FAHM) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 3-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 9-Jan-18 22-Jul-19 3-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 9-Jan-18 95% 95% 0% 0.079% 0.079%
1116 4 SAFETY 3963-FAHN-3-59-0001 OT FIREWATER RING MAIN, P&ID (FAHN) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 4-May-17 9-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 22-Jul-19 4-May-17 9-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 95% 95% 0% 0.079% 0.079%
1117 4 SAFETY 3963-FAHN-3-59-0002 OT FIREWATER DELUGE SYSTEM, P&ID (FAHN) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 3-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 10-Jan-18 22-Jul-19 3-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 10-Jan-18 95% 95% 0% 0.079% 0.079%
1118 4 SAFETY 3963-FAHS-3-59-0001 OT FIREWATER RING MAIN, P&ID (FAHS) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 11-May-17 11-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 22-Jul-19 11-May-17 11-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 95% 95% 0% 0.079% 0.079%
1119 4 SAFETY 3963-FAHS-3-59-0002 OT FIREWATER DELUGE SYSTEM, P&ID (FAHS) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 4-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 10-Jan-18 22-Jul-19 4-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 10-Jan-18 95% 95% 0% 0.079% 0.079%
1120 4 SAFETY 3963-JALM-3-59-0001 OT FIREWATER RING MAIN, P&ID (JALM) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 11-May-17 11-May-17 11-May-17 17-Aug-17 17-Aug-17 11-Jan-18 22-Jul-19 11-May-17 11-May-17 11-May-17 17-Aug-17 17-Aug-17 11-Jan-18 95% 95% 0% 0.079% 0.079%
1121 4 SAFETY 3963-JALM-3-59-0002 OT FIREWATER DELUGE SYSTEM, P&ID (JALM) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 4-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 10-Jan-18 22-Jul-19 4-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 10-Jan-18 95% 95% 0% 0.079% 0.079%
1122 4 SAFETY 3963-KAHM-3-59-0001 OT FIREWATER RING MAIN, P&ID (KAHM) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 4-May-17 9-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 22-Jul-19 4-May-17 9-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 95% 95% 0% 0.079% 0.079%
1123 4 SAFETY 3963-KAHM-3-59-0002 OT FIREWATER DELUGE SYSTEM, P&ID (KAHM) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 11-May-17 11-May-17 11-May-17 27-Aug-17 20-Sep-17 10-Jan-18 22-Jul-19 11-May-17 11-May-17 11-May-17 27-Aug-17 20-Sep-17 10-Jan-18 95% 95% 0% 0.079% 0.079%
1124 4 SAFETY 3963-KAHN-3-59-0001 OT FIREWATER RING MAIN, P&ID (KAHN) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 3-May-17 9-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 22-Jul-19 3-May-17 9-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 95% 95% 0% 0.079% 0.079%
1125 4 SAFETY 3963-KAHN-3-59-0002 OT FIREWATER DELUGE SYSTEM, P&ID (KAHN) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 4-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 11-Jan-18 22-Jul-19 4-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 11-Jan-18 95% 95% 0% 0.079% 0.079%
1126 4 SAFETY 3963-KAHS-3-59-0001 OT FIREWATER RING MAIN, P&ID (KAHS) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 11-May-17 11-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 22-Jul-19 11-May-17 11-May-17 11-May-17 30-Aug-17 20-Sep-17 11-Jan-18 95% 95% 0% 0.079% 0.079%
1127 4 SAFETY 3963-KAHS-3-59-0002 OT FIREWATER DELUGE SYSTEM, P&ID (KAHS) 1 A 0.083% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 4-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 10-Jan-18 22-Jul-19 4-May-17 9-May-17 11-May-17 27-Aug-17 20-Sep-17 10-Jan-18 95% 95% 0% 0.079% 0.079%
1128 4 SAFETY 3963-FAHM-3-13-0001 OT DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(FAHM) 1 A 0.069% 7-May-17 17-May-17 22-May-17 22-Jun-17 13-Jul-17 23-Jul-17 31-Oct-18 10-May-17 22-May-17 24-May-17 21-Jun-17 29-Jun-17 11-Jan-18 22-Jul-19 10-May-17 22-May-17 24-May-17 21-Jun-17 29-Jun-17 11-Jan-18 95% 95% 0% 0.066% 0.066%
1129 4 SAFETY 3963-FAHN-3-13-0001 OT DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(FAHN) 1 A 0.069% 7-May-17 17-May-17 22-May-17 22-Jun-17 13-Jul-17 23-Jul-17 31-Oct-18 10-May-17 22-May-17 24-May-17 21-Jun-17 29-Jun-17 11-Jan-18 22-Jul-19 10-May-17 22-May-17 24-May-17 21-Jun-17 29-Jun-17 11-Jan-18 95% 95% 0% 0.066% 0.066%
1130 4 SAFETY 3963-FAHS-3-13-0001 OT DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(FAHS) 1 A 0.069% 7-May-17 17-May-17 22-May-17 22-Jun-17 13-Jul-17 23-Jul-17 31-Oct-18 10-May-17 22-May-17 24-May-17 21-Jun-17 29-Jun-17 11-Jan-18 22-Jul-19 10-May-17 22-May-17 24-May-17 21-Jun-17 29-Jun-17 11-Jan-18 95% 95% 0% 0.066% 0.066%
1131 4 SAFETY 3963-JALM-3-13-0001 OT DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(JALM) 1 A 0.069% 7-May-17 17-May-17 22-May-17 22-Jun-17 13-Jul-17 23-Jul-17 31-Oct-18 21-May-17 22-May-17 24-May-17 21-Jun-17 29-Jun-17 11-Jan-18 22-Jul-19 21-May-17 22-May-17 24-May-17 21-Jun-17 29-Jun-17 11-Jan-18 95% 95% 0% 0.066% 0.066%
1132 4 SAFETY 3963-KAHM-3-13-0001 OT DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(KAHM) 1 A 0.069% 7-May-17 17-May-17 22-May-17 22-Jun-17 13-Jul-17 23-Jul-17 31-Oct-18 21-May-17 22-May-17 24-May-17 18-Jul-17 26-Jul-17 11-Jan-18 22-Jul-19 21-May-17 22-May-17 24-May-17 18-Jul-17 26-Jul-17 11-Jan-18 95% 95% 0% 0.066% 0.066%
1133 4 SAFETY 3963-KAHN-3-13-0001 OT DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(KAHN) 1 A 0.069% 7-May-17 17-May-17 22-May-17 22-Jun-17 13-Jul-17 23-Jul-17 31-Oct-18 10-May-17 22-May-17 24-May-17 21-Jun-17 29-Jun-17 11-Jan-18 22-Jul-19 10-May-17 22-May-17 24-May-17 21-Jun-17 29-Jun-17 11-Jan-18 95% 95% 0% 0.066% 0.066%
1134 4 SAFETY 3963-KAHS-3-13-0001 OT DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(KAHS) 1 A 0.069% 7-May-17 17-May-17 22-May-17 22-Jun-17 13-Jul-17 23-Jul-17 31-Oct-18 10-May-17 31-May-17 1-Jun-17 21-Jun-17 29-Jun-17 11-Jan-18 22-Jul-19 10-May-17 31-May-17 1-Jun-17 21-Jun-17 29-Jun-17 11-Jan-18 95% 95% 0% 0.066% 0.066%
1135 4 SAFETY 3963-FAHM-3-13-0002 OT DATA SHEET FOR DELUGE SKIDS (FAHM) 1 B 0.069% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 3-May-17 11-May-17 11-May-17 19-Jul-17 7-Aug-17 24-Jan-18 22-Jul-19 3-May-17 11-May-17 11-May-17 19-Jul-17 7-Aug-17 24-Jan-18 95% 95% 0% 0.066% 0.066%
1136 4 SAFETY 3963-FAHN-3-13-0002 OT DATA SHEET FOR DELUGE SKIDS (FAHN) 1 B 0.069% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 3-May-17 11-May-17 11-May-17 19-Jul-17 7-Aug-17 24-Jan-18 22-Jul-19 3-May-17 11-May-17 11-May-17 19-Jul-17 7-Aug-17 24-Jan-18 95% 95% 0% 0.066% 0.066%
1137 4 SAFETY 3963-FAHS-3-13-0002 OT DATA SHEET FOR DELUGE SKIDS (FAHS) 1 B 0.069% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 3-May-17 11-May-17 11-May-17 19-Jul-17 7-Aug-17 24-Jan-18 22-Jul-19 3-May-17 11-May-17 11-May-17 19-Jul-17 7-Aug-17 24-Jan-18 95% 95% 0% 0.066% 0.066%
1138 4 SAFETY 3963-JALM-3-13-0002 OT DATA SHEET FOR DELUGE SKIDS (JALM) 1 B 0.069% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 3-May-17 11-May-17 11-May-17 19-Jul-17 7-Aug-17 24-Jan-18 22-Jul-19 3-May-17 11-May-17 11-May-17 19-Jul-17 7-Aug-17 24-Jan-18 95% 95% 0% 0.066% 0.066%
1139 4 SAFETY 3963-KAHM-3-13-0002 OT DATA SHEET FOR DELUGE SKIDS (KAHM) 1 B 0.056% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 3-May-17 11-May-17 11-May-17 19-Jul-17 10-Aug-17 24-Jan-18 22-Jul-19 3-May-17 11-May-17 11-May-17 19-Jul-17 10-Aug-17 24-Jan-18 95% 95% 0% 0.053% 0.053%
1140 4 SAFETY 3963-KAHN-3-13-0002 OT DATA SHEET FOR DELUGE SKIDS (KAHN) 1 B 0.056% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 3-May-17 11-May-17 11-May-17 20-Jul-17 10-Aug-17 24-Jan-18 22-Jul-19 3-May-17 11-May-17 11-May-17 20-Jul-17 10-Aug-17 24-Jan-18 95% 95% 0% 0.053% 0.053%
1141 4 SAFETY 3963-KAHS-3-13-0002 OT DATA SHEET FOR DELUGE SKIDS (KAHS) 1 B 0.056% 26-Apr-17 6-May-17 11-May-17 11-Jun-17 2-Jul-17 12-Jul-17 31-Oct-18 3-May-17 11-May-17 11-May-17 20-Jul-17 10-Aug-17 24-Jan-18 22-Jul-19 3-May-17 11-May-17 11-May-17 20-Jul-17 10-Aug-17 24-Jan-18 95% 95% 0% 0.053% 0.053%
1142 4 SAFETY 3963-JALM-3-56-0001 OT CAUSE & EFFECT CHART (F&G) (JALM) 1 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 22-Jul-19 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 95% 95% 0% 0.066% 0.066%
1143 4 SAFETY 3963-KAHS-3-56-0001 OT CAUSE & EFFECT CHART (F&G) (KAHS) 1 A 0.056% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 22-Jul-19 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1144 4 SAFETY 3963-FAHM-3-56-0001 OT CAUSE & EFFECT CHART (F&G) (FAHM) 1 A 0.056% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 22-Jul-19 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1145 4 SAFETY 3963-FAHN-3-56-0001 OT CAUSE & EFFECT CHART (F&G) (FAHN) 1 A 0.056% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 25-Sep-17 25-Jan-18 22-Jul-19 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 25-Sep-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1146 4 SAFETY 3963-FAHS-3-56-0001 OT CAUSE & EFFECT CHART (F&G) (FAHS) 1 A 0.056% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 22-Jul-19 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1147 4 SAFETY 3963-KAHM-3-56-0001 OT CAUSE & EFFECT CHART (F&G) (KAHM) 1 A 0.056% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 22-Jul-19 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1148 4 SAFETY 3963-KAHN-3-56-0001 OT CAUSE & EFFECT CHART (F&G) (KAHN) 1 A 0.056% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 22-Jul-19 25-May-17 8-Jun-17 8-Jun-17 17-Jul-17 30-Aug-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1149 4 SAFETY DEM-3963-FAHM-3-55-0002 DEM DEMOLITION - CAUSE & EFFECT CHART (PROCESS) (FAHM) 1 A 0.167% 8-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 15-Sep-17 25-Sep-17 31-Oct-18 11-Jul-17 11-Jul-17 11-Jul-17 25-Jul-17 25-Jul-17 23-Aug-17 22-Jul-19 11-Jul-17 11-Jul-17 11-Jul-17 25-Jul-17 25-Jul-17 23-Aug-17 95% 95% 0% 0.158% 0.158%
1150 4 SAFETY DEM-3963-FAHN-3-55-0002 DEM DEMOLITION - CAUSE & EFFECT CHART (PROCESS) (FAHN) 1 A 0.167% 8-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 15-Sep-17 25-Sep-17 31-Oct-18 11-Jul-17 11-Jul-17 11-Jul-17 25-Jul-17 25-Jul-17 23-Aug-17 22-Jul-19 11-Jul-17 11-Jul-17 11-Jul-17 25-Jul-17 25-Jul-17 23-Aug-17 95% 95% 0% 0.158% 0.158%
1151 4 SAFETY DEM-3963-KAHM-3-55-0002 DEM DEMOLITION - CAUSE & EFFECT CHART (PROCESS) (KAHM) 1 A 0.167% 8-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 15-Sep-17 25-Sep-17 31-Oct-18 11-Jul-17 11-Jul-17 11-Jul-17 25-Jul-17 25-Jul-17 23-Aug-17 22-Jul-19 11-Jul-17 11-Jul-17 11-Jul-17 25-Jul-17 25-Jul-17 23-Aug-17 95% 95% 0% 0.158% 0.158%
1152 4 SAFETY DEM-3963-KAHN-3-55-0002 DEM DEMOLITION - CAUSE & EFFECT CHART (PROCESS) (KAHN) 1 A 0.167% 8-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 15-Sep-17 25-Sep-17 31-Oct-18 8-Jul-17 8-Jul-17 11-Jul-17 25-Jul-17 25-Jul-17 23-Aug-17 22-Jul-19 8-Jul-17 8-Jul-17 11-Jul-17 25-Jul-17 25-Jul-17 23-Aug-17 95% 95% 0% 0.158% 0.158%
1153 4 SAFETY DEM-3963-JALM-3-55-0002 DEM DEMOLITION - CAUSE & EFFECT CHART (PROCESS) (JALM) 1 A 0.167% 8-Jul-17 20-Jul-17 25-Jul-17 25-Aug-17 15-Sep-17 25-Sep-17 31-Oct-18 8-Jul-17 8-Jul-17 11-Jul-17 25-Jul-17 25-Jul-17 23-Aug-17 22-Jul-19 8-Jul-17 8-Jul-17 11-Jul-17 25-Jul-17 25-Jul-17 23-Aug-17 95% 95% 0% 0.158% 0.158%
1154 4 SAFETY 3963-DGEN-3-62-0001 OT F&G SCHEMATIC DIAGRAM (TYPICAL) 1 B 0.014% 5-Sep-17 21-Sep-17 28-Sep-17 10-Oct-17 20-Oct-17 4-Nov-17 31-Oct-18 5-Sep-17 14-Sep-17 21-Sep-17 4-Dec-17 4-Dec-17 4-Dec-17 22-Jul-19 5-Sep-17 14-Sep-17 21-Sep-17 4-Dec-17 4-Dec-17 4-Dec-17 95% 95% 0% 0.013% 0.013%
1155 5 SAFETY 3963-DGEN-3-00-0001 OT MISCELLANEOUS - SAFETY 0 #N/A 0.056% 31-Aug-17 6-Sep-17 7-Sep-17 14-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 1-Feb-18 6-Feb-18 8-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 22-Jul-19 1-Feb-18 6-Feb-18 8-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 95% 95% 0% 0.053% 0.053%
1156 4 SAFETY 3963-FAHM-3-50-0001 OT ESCAPE ROUTE LAYOUT (FAHM) 3 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 25-May-17 25-May-17 28-Dec-17 31-Jan-18 31-Jan-18 22-Jul-19 25-May-17 25-May-17 25-May-17 28-Dec-17 31-Jan-18 31-Jan-18 95% 95% 0% 0.066% 0.066%
1157 4 SAFETY 3963-FAHN-3-50-0001 OT ESCAPE ROUTE LAYOUT (FAHN) 3 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 28-Dec-17 31-Jan-18 31-Jan-18 22-Jul-19 25-May-17 27-May-17 28-May-17 28-Dec-17 31-Jan-18 31-Jan-18 95% 95% 0% 0.066% 0.066%
1158 4 SAFETY 3963-FAHS-3-50-0001 OT ESCAPE ROUTE LAYOUT (FAHS) 3 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 28-Dec-17 20-Mar-18 20-Mar-18 22-Jul-19 25-May-17 27-May-17 28-May-17 28-Dec-17 20-Mar-18 20-Mar-18 95% 95% 0% 0.066% 0.066%
1159 4 SAFETY 3963-JALM-3-50-0001 OT ESCAPE ROUTE LAYOUT (JALM) 3 A 0.083% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 25-May-17 25-May-17 28-Dec-17 14-Mar-18 14-Mar-18 22-Jul-19 25-May-17 25-May-17 25-May-17 28-Dec-17 14-Mar-18 14-Mar-18 95% 95% 0% 0.079% 0.079%
1160 4 SAFETY 3963-KAHM-3-50-0001 OT ESCAPE ROUTE LAYOUT (KAHM) 3 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 28-Dec-17 14-Mar-18 14-Mar-18 22-Jul-19 25-May-17 27-May-17 28-May-17 28-Dec-17 14-Mar-18 14-Mar-18 95% 95% 0% 0.066% 0.066%
1161 4 SAFETY 3963-KAHN-3-50-0001 OT ESCAPE ROUTE LAYOUT (KAHN) 3 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 28-Dec-17 14-Mar-18 14-Mar-18 22-Jul-19 25-May-17 27-May-17 28-May-17 28-Dec-17 14-Mar-18 14-Mar-18 95% 95% 0% 0.066% 0.066%
1162 4 SAFETY 3963-KAHS-3-50-0001 OT ESCAPE ROUTE LAYOUT (KAHS) 3 A 0.069% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 2-Jan-18 14-Mar-18 14-Mar-18 22-Jul-19 25-May-17 27-May-17 28-May-17 2-Jan-18 14-Mar-18 14-Mar-18 95% 95% 0% 0.066% 0.066%
1163 4 SAFETY 3963-JALM-3-55-0001 OT CAUSE & EFFECT CHART (PROCESS) (JALM) 1 3 0.056% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 15-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 22-Jul-19 15-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 95% 95% 0% 0.053% 0.053%
1164 4 SAFETY 3963-KAHS-3-55-0001 OT CAUSE & EFFECT CHART (PROCESS) (KAHS) 1 3 0.056% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 22-Jul-19 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 95% 95% 0% 0.053% 0.053%
1165 4 SAFETY 3963-FAHM-3-55-0001 OT CAUSE & EFFECT CHART (PROCESS) (FAHM) 1 3 0.056% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 22-Jul-19 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 95% 95% 0% 0.053% 0.053%
1166 4 SAFETY 3963-FAHN-3-55-0001 OT CAUSE & EFFECT CHART (PROCESS) (FAHN) 1 3 0.056% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 22-Jul-19 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 95% 95% 0% 0.053% 0.053%
1167 4 SAFETY 3963-FAHS-3-55-0001 OT CAUSE & EFFECT CHART (PROCESS) (FAHS) 1 3 0.056% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 22-Jul-19 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 95% 95% 0% 0.053% 0.053%
1168 4 SAFETY 3963-KAHM-3-55-0001 OT CAUSE & EFFECT CHART (PROCESS) (KAHM) 1 3 0.056% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 22-Jul-19 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 5-May-18 95% 95% 0% 0.053% 0.053%
1169 4 SAFETY 3963-KAHN-3-55-0001 OT CAUSE & EFFECT CHART (PROCESS) (KAHN) 1 3 0.056% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 8-Apr-18 22-Jul-19 25-May-17 10-Jul-17 11-Jul-17 10-Aug-17 30-Aug-17 8-Apr-18 95% 95% 0% 0.053% 0.053%

Page 17 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
1170 4 SAFETY 3963-KAHM-3-51-0002 OT KHATIYAH MAIN UNIT 24 HAZARDOUS AREA CLASSIFICATION LAYOUT 1 A E 0.083% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 22-Oct-17 31-Oct-17 22-Mar-18 22-Jul-19 25-May-17 27-May-17 28-May-17 22-Oct-17 31-Oct-17 22-Mar-18 95% 95% 0% 0.079% 0.079%
1171 4 SAFETY 3963-KAHN-3-51-0002 OT KHATIYAH NORTH UNIT 22 HAZARDOUS AREA CLASSIFICATION LAYOUT 1 A 0.083% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 22-Oct-17 31-Oct-17 22-Mar-18 22-Jul-19 25-May-17 27-May-17 28-May-17 22-Oct-17 31-Oct-17 22-Mar-18 95% 95% 0% 0.079% 0.079%
1172 4 SAFETY 3963-KAHS-3-51-0002 OT KHATIYAH SOUTH UNIT 23 HAZARDOUS AREA CLASSIFICATION LAYOUT 1 A 0.083% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 22-Oct-17 31-Oct-17 22-Mar-18 22-Jul-19 25-May-17 27-May-17 28-May-17 22-Oct-17 31-Oct-17 22-Mar-18 95% 95% 0% 0.079% 0.079%
1173 4 SAFETY 3963-FAHS-3-51-0002 OT FAHAHIL SOUTH UNIT 13 HAZARDOUS AREA CLASSIFICATION LAYOUT 1 2 0.083% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 22-Oct-17 31-Oct-17 22-Mar-18 22-Jul-19 25-May-17 27-May-17 28-May-17 22-Oct-17 31-Oct-17 22-Mar-18 95% 95% 0% 0.079% 0.079%
1174 4 SAFETY 3963-JALM-3-51-0002 OT JALEHA MAIN UNIT 31 HAZARDOUS AREA CLASSIFICATION LAYOUT 1 A 0.069% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 22-Oct-17 31-Oct-17 22-Mar-18 22-Jul-19 25-May-17 27-May-17 28-May-17 22-Oct-17 31-Oct-17 22-Mar-18 95% 95% 0% 0.066% 0.066%
1175 4 SAFETY 3963-DGEN-3-17-0009 OT QRA STUDY 1 0 0.229% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 21-Jun-17 21-Jan-18 28-Jan-18 27-May-18 28-Jul-18 28-Jul-18 22-Jul-19 21-Jun-17 21-Jan-18 28-Jan-18 27-May-18 28-Jul-18 28-Jul-18 95% 95% 0% 0.218% 0.218%
1176 4 SAFETY 3963-DGEN-3-17-0002 L HAZID/ENVID REPORT 1 1 0.083% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 3-Nov-17 19-Nov-17 21-Nov-17 21-Jan-18 20-Mar-18 20-Mar-18 22-Jul-19 3-Nov-17 19-Nov-17 21-Nov-17 21-Jan-18 20-Mar-18 20-Mar-18 95% 95% 0% 0.079% 0.079%
1177 4 SAFETY 3963-DGEN-3-17-0014 OT TBE FOR DELUGE SKIDS 1 A 0.472% 7-Aug-17 17-Aug-17 22-Aug-17 9-Sep-17 15-Sep-17 18-Sep-17 31-Oct-18 19-Oct-17 18-Dec-17 21-Dec-17 18-Jan-18 6-Feb-18 6-Feb-18 22-Jul-19 19-Oct-17 18-Dec-17 21-Dec-17 18-Jan-18 6-Feb-18 6-Feb-18 95% 95% 0% 0.449% 0.449%
1178 4 SAFETY 3963-FAHM-3-51-0001 OT FAHAHIL MAIN UNIT 14 HAZARDOUS AREA CLASSIFICATION LAYOUT 1 1 0.069% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 20-Oct-17 22-Oct-17 21-Jan-18 22-Mar-18 22-Mar-18 22-Jul-19 25-May-17 20-Oct-17 22-Oct-17 21-Jan-18 22-Mar-18 22-Mar-18 95% 95% 0% 0.066% 0.066%
1179 4 SAFETY 3963-FAHN-3-51-0002 OT FAHAHIL NORTH UNIT 12 HAZARDOUS AREA CLASSIFICATION LAYOUT 1 A 0.083% 20-May-17 30-May-17 4-Jun-17 5-Jul-17 26-Jul-17 5-Aug-17 31-Oct-18 25-May-17 27-May-17 28-May-17 21-Jan-18 22-Mar-18 22-Mar-18 22-Jul-19 25-May-17 27-May-17 28-May-17 21-Jan-18 22-Mar-18 22-Mar-18 95% 95% 0% 0.079% 0.079%
1180 5 INSTRUMENT 3963-DGEN-4-45-0001 OT SCOPE OF WORK FOR DIC SYSTEM MODIFICATION AT DUKHAN 1 A 0.111% 7-Jun-17 17-Jun-17 22-Jun-17 23-Jul-17 13-Aug-17 23-Aug-17 31-Oct-18 8-Jun-17 2-Aug-17 3-Aug-17 12-Sep-17 25-Sep-17 25-Sep-17 22-Jul-19 8-Jun-17 2-Aug-17 3-Aug-17 12-Sep-17 25-Sep-17 25-Sep-17 95% 95% 0% 0.106% 0.106%
1181 5 INSTRUMENT 3963-DGEN-4-15-0001 OT MATERIAL REQUISITION FOR ELECTRONIC INSTRUMENTS (PT/TT) 1 B 0.069% 26-Jun-17 6-Jul-17 11-Jul-17 11-Aug-17 1-Sep-17 11-Sep-17 31-Oct-18 29-Jun-17 18-Jul-17 19-Jul-17 2-Aug-17 3-Aug-17 20-Sep-17 22-Jul-19 29-Jun-17 18-Jul-17 19-Jul-17 2-Aug-17 3-Aug-17 20-Sep-17 95% 95% 0% 0.066% 0.066%
1182 5 INSTRUMENT 3963-DGEN-4-15-0002 OT MATERIAL REQUISITION FOR LEVEL GAUGES (MAGNETIC) 1 B 0.069% 20-Jun-17 30-Jun-17 5-Jul-17 5-Aug-17 26-Aug-17 5-Sep-17 31-Oct-18 22-Jun-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 22-Jul-19 22-Jun-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.066% 0.066%
1183 5 INSTRUMENT 3963-DGEN-4-15-0003 OT MATERIAL REQUISITION FOR RESTRICTION ORIFICE 1 B 0.069% 28-Jun-17 8-Jul-17 13-Jul-17 13-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 29-Jun-17 26-Jul-17 27-Jul-17 10-Aug-17 21-Aug-17 22-Aug-17 22-Jul-19 29-Jun-17 26-Jul-17 27-Jul-17 10-Aug-17 21-Aug-17 22-Aug-17 95% 95% 0% 0.066% 0.066%
1184 5 INSTRUMENT 3963-DGEN-4-15-0004 OT MATERIAL REQUISITION FOR SHUTDOWN & BLOWDOWN VALVES 1 B 0.069% 29-May-17 8-Jun-17 13-Jun-17 14-Jul-17 4-Aug-17 14-Aug-17 31-Oct-18 31-May-17 18-Jun-17 19-Jun-17 18-Aug-17 28-Sep-17 28-Sep-17 22-Jul-19 31-May-17 18-Jun-17 19-Jun-17 18-Aug-17 28-Sep-17 28-Sep-17 95% 95% 0% 0.066% 0.066%
1185 5 INSTRUMENT 3963-DGEN-4-15-0006 OT MATERIAL REQUISITION FOR FIRE & GAS DEVICES 1 A 0.069% 24-Jun-17 4-Jul-17 9-Jul-17 9-Aug-17 30-Aug-17 9-Sep-17 31-Oct-18 29-Jun-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 1-Oct-17 22-Jul-19 29-Jun-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 1-Oct-17 95% 95% 0% 0.066% 0.066%
1186 5 INSTRUMENT 3963-DGEN-4-15-0014 OT MATERIAL REQUISITION FOR EXISTING SYSTEM MODIFICATIONS (HONEYWELL) 1 A 0.097% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 6-Aug-17 8-Aug-17 1-Oct-17 12-Oct-17 12-Oct-17 22-Jul-19 8-Jul-17 6-Aug-17 8-Aug-17 1-Oct-17 12-Oct-17 12-Oct-17 95% 95% 0% 0.092% 0.092%
1187 5 INSTRUMENT 3963-DGEN-4-17-0014 OT TECHNICAL BID EVALUATION FOR EXISTING SYSTEM MODIFICATIONS (HONEYWELL) 1 A 0.167% 19-Aug-17 29-Aug-17 3-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 28-Nov-17 30-Nov-17 13-Dec-17 26-Dec-17 26-Dec-17 22-Jul-19 19-Oct-17 28-Nov-17 30-Nov-17 13-Dec-17 26-Dec-17 26-Dec-17 95% 95% 0% 0.158% 0.158%
1188 5 INSTRUMENT 3963-DGEN-4-17-0002 OT TECHNICAL BID EVALUATION FOR ELECTRONIC INSTRUMENTS (PT) 1 B 0.139% 26-Aug-17 5-Sep-17 10-Sep-17 17-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 4-Nov-17 6-Nov-17 30-Nov-17 7-Feb-18 7-Feb-18 22-Jul-19 19-Oct-17 4-Nov-17 6-Nov-17 30-Nov-17 7-Feb-18 7-Feb-18 95% 95% 0% 0.132% 0.132%
1189 5 INSTRUMENT 3963-DGEN-4-17-0003 OT TECHNICAL BID EVALUATION FOR LEVEL GAUGES (MAGNETIC) 1 A 0.139% 19-Aug-17 29-Aug-17 3-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 4-Nov-17 6-Nov-17 14-Nov-17 14-Nov-17 20-Nov-17 22-Jul-19 19-Oct-17 4-Nov-17 6-Nov-17 14-Nov-17 14-Nov-17 20-Nov-17 95% 95% 0% 0.132% 0.132%
1190 5 INSTRUMENT 3963-DGEN-4-17-0004 OT TECHNICAL BID EVALUATION FOR RESTRICTION ORIFICE 1 A 0.139% 30-Aug-17 9-Sep-17 14-Sep-17 21-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 18-Dec-17 10-Jan-18 18-Jan-18 18-Jan-18 18-Jan-18 22-Jul-19 19-Oct-17 18-Dec-17 10-Jan-18 18-Jan-18 18-Jan-18 18-Jan-18 95% 95% 0% 0.132% 0.132%
1191 5 INSTRUMENT 3963-DGEN-4-17-0005 OT TECHNICAL BID EVALUATION FOR SHUTDOWN & BLOWDOWN VALVES 1 2 0.181% 22-Jul-17 1-Aug-17 6-Aug-17 24-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 27-Jul-17 27-Nov-17 30-Nov-17 21-Dec-17 26-May-18 26-May-18 22-Jul-19 27-Jul-17 27-Nov-17 30-Nov-17 21-Dec-17 26-May-18 26-May-18 95% 95% 0% 0.172% 0.172%
1192 5 INSTRUMENT 3963-DGEN-4-74-0001 OT HOOK-UP DIAGRAM (PROCESS) 1 A 0.083% 2-Aug-17 12-Aug-17 17-Aug-17 7-Sep-17 16-Sep-17 19-Sep-17 31-Oct-18 1-Aug-17 2-Aug-17 3-Aug-17 29-Aug-17 18-Oct-17 19-Oct-17 22-Jul-19 1-Aug-17 2-Aug-17 3-Aug-17 29-Aug-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.079% 0.079%
1193 5 INSTRUMENT 3963-DGEN-4-74-0002 OT HOOK-UP DIAGRAM PNEUMATIC) 1 A 0.083% 8-Aug-17 18-Aug-17 23-Aug-17 10-Sep-17 16-Sep-17 19-Sep-17 31-Oct-18 1-Aug-17 2-Aug-17 3-Aug-17 29-Aug-17 20-Sep-17 13-Nov-17 22-Jul-19 1-Aug-17 2-Aug-17 3-Aug-17 29-Aug-17 20-Sep-17 13-Nov-17 95% 95% 0% 0.079% 0.079%
1194 5 INSTRUMENT 3963-DGEN-4-78-0001 OT INSTRUMENT INSTALLATION DETAILS 1 A 0.111% 16-Aug-17 26-Aug-17 31-Aug-17 15-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 1-Aug-17 6-Aug-17 8-Aug-17 5-Sep-17 20-Sep-17 19-Oct-17 22-Jul-19 1-Aug-17 6-Aug-17 8-Aug-17 5-Sep-17 20-Sep-17 19-Oct-17 95% 95% 0% 0.106% 0.106%
1195 5 INSTRUMENT 3963-FAHM-4-45-0001 OT SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (FAHM) 1 A 0.028% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 11-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 22-Jul-19 11-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1196 5 INSTRUMENT 3963-FAHM-4-13-0001 OT DATA SHEET FOR PRESSURE GAUGES (FAHM) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1197 5 INSTRUMENT 3963-FAHM-4-13-0002 OT DATA SHEET FOR TEMP GAUGES (FAHM) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 22-Jul-19 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 95% 95% 0% 0.026% 0.026%
1198 5 INSTRUMENT 3963-FAHM-4-13-0003 OT DATA SHEET FOR PRESSURE TRANSMITTERS (FAHM) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1199 5 INSTRUMENT 3963-FAHM-4-13-0004 OT DATA SHEET FOR TEMP TRANSMITTERS (FAHM) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1200 5 INSTRUMENT 3963-FAHM-4-13-0005 OT DATA SHEET FOR FLOWMETER - CORIOLIS (FAHM) 1 A 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 25-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 22-Jul-19 25-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.040% 0.040%
1201 5 INSTRUMENT 3963-FAHM-4-13-0006 OT DATA SHEET FOR LEVEL TRANSMITTERS (FAHM) 1 B 0.028% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 14-Dec-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 14-Dec-17 95% 95% 0% 0.026% 0.026%
1202 5 INSTRUMENT 3963-FAHM-4-13-0007 OT DATA SHEET FOR BS&W ANALYSERS (FAHM) 1 A 0.042% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 22-Jul-19 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 95% 95% 0% 0.040% 0.040%
1203 5 INSTRUMENT 3963-FAHM-4-13-0008 OT DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (FAHM) 1 A 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-Apr-17 15-Aug-17 17-Aug-17 27-Sep-17 18-Oct-17 26-Dec-17 22-Jul-19 4-Apr-17 15-Aug-17 17-Aug-17 27-Sep-17 18-Oct-17 26-Dec-17 95% 95% 0% 0.040% 0.040%
1204 5 INSTRUMENT 3963-FAHM-4-13-0009 OT DATA SHEET FOR CONTROL VALVES (FAHM) 1 A 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-May-17 15-Aug-17 17-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 22-Jul-19 4-May-17 15-Aug-17 17-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
1205 5 INSTRUMENT 3963-FAHM-4-13-0010 OT DATA SHEET FOR FLOWMETER - VORTEX (FAHM) 1 A 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 19-Jun-17 20-Jun-17 22-Aug-17 19-Sep-17 20-Sep-17 22-Jul-19 10-May-17 19-Jun-17 20-Jun-17 22-Aug-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.040% 0.040%
1206 5 INSTRUMENT 3963-FAHM-4-13-0011 OT DATA SHEET FOR RESTRICTION ORIFICE (FAHM) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 22-Jul-19 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 95% 95% 0% 0.026% 0.026%
1207 5 INSTRUMENT 3963-FAHM-4-13-0012 OT DATA SHEET FOR FIRE & GAS DEVICES (FAHM) 1 A 0.042% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 15-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 22-Jul-19 15-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 95% 95% 0% 0.040% 0.040%
1208 5 INSTRUMENT 3963-FAHM-4-13-0013 OT DATA SHEET FOR LEVEL GAUGES (FAHM) 1 B 0.042% 23-Jun-17 28-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 1-Sep-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 22-Aug-17 23-Aug-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 22-Aug-17 23-Aug-17 95% 95% 0% 0.040% 0.040%
1209 5 INSTRUMENT 3963-FAHM-4-00-0001 OT INSTRUMENT INDEX (FAHM) 1 A 0.028% 30-May-17 9-Jun-17 14-Jun-17 15-Jul-17 5-Aug-17 15-Aug-17 31-Oct-18 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 5-Oct-17 22-Jul-19 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 5-Oct-17 95% 95% 0% 0.026% 0.026%
1210 5 INSTRUMENT 3963-FAHM-4-39-0001 OT INPUT / OUTPUT LIST - DCS/ESD/F&G (FAHM) 1 A 0.028% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 8-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 22-Jul-19 8-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 95% 95% 0% 0.026% 0.026%
1211 5 INSTRUMENT 3963-FAHM-4-67-0001 OT ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (FAHM) 1 A 0.028% 19-Jun-17 29-Jun-17 4-Jul-17 4-Aug-17 25-Aug-17 4-Sep-17 31-Oct-18 22-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 25-Sep-17 10-Dec-17 22-Jul-19 22-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 25-Sep-17 10-Dec-17 95% 95% 0% 0.026% 0.026%
1212 5 INSTRUMENT 3963-FAHM-4-37-0001 OT INSTRUMENT CABLE SCHEDULE - DCS/ESD/F&G (FAHM) 1 A 0.028% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 28-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1213 5 INSTRUMENT 3963-FAHM-4-30-0002 OT INSTRUMENT JUNCTION BOX SCHEDULE (FAHM) 1 A 0.028% 28-Jun-17 8-Jul-17 13-Jul-17 13-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 28-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 16-Oct-17 29-Nov-17 22-Jul-19 28-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 16-Oct-17 29-Nov-17 95% 95% 0% 0.026% 0.026%
1214 5 INSTRUMENT 3963-FAHM-4-31-0001 OT INSTRUMENT MTO’S (FAHM) 3 A 0.042% 10-Aug-17 20-Aug-17 25-Aug-17 8-Sep-17 13-Sep-17 13-Sep-17 31-Oct-18 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 14-Dec-17 22-Jul-19 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 14-Dec-17 95% 95% 0% 0.040% 0.040%
1215 5 INSTRUMENT 3963-FAHM-4-55-0001 OT INSTRUMENT CABLE BLOCK DIAGRAM (FAHM) 1 A 0.028% 6-May-17 16-May-17 21-May-17 21-Jun-17 12-Jul-17 22-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1216 5 INSTRUMENT 3963-FAHM-4-56-0001 OT F&G CABLE BLOCK DIAGRAM (FAHM) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1217 5 INSTRUMENT 3963-FAHM-4-50-0001 OT INSTRUMENT LOCATION LAYOUT (FAHM) 1 A 0.042% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 18-May-17 19-May-17 21-May-17 5-Oct-17 12-Oct-17 12-Oct-17 22-Jul-19 18-May-17 19-May-17 21-May-17 5-Oct-17 12-Oct-17 12-Oct-17 95% 95% 0% 0.040% 0.040%
1218 5 INSTRUMENT 3963-FAHM-4-65-0001 OT INSTRUMENT INTERCONNECTION DIAGRAM (FAHM) 1 A 0.042% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 11-Jul-17 10-Oct-17 12-Oct-17 19-Nov-17 7-Dec-17 7-Dec-17 22-Jul-19 11-Jul-17 10-Oct-17 12-Oct-17 19-Nov-17 7-Dec-17 7-Dec-17 95% 95% 0% 0.040% 0.040%
1219 5 INSTRUMENT 3963-FAHM-4-65-0002 OT FIRE & GAS INTERCONNECTION DIAGRAM (FAHM) 1 A 0.042% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 22-Jun-17 20-Oct-17 22-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 22-Jul-19 22-Jun-17 20-Oct-17 22-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 95% 95% 0% 0.040% 0.040%
1220 5 INSTRUMENT 3963-FAHM-4-66-0001 OT INSTRUMENT LOOP DIAGRAM (FAHM) 1 A 0.056% 8-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 10-Sep-17 17-Sep-17 31-Oct-18 11-Jul-17 17-Nov-17 19-Nov-17 7-Dec-17 12-Mar-18 12-Mar-18 22-Jul-19 11-Jul-17 17-Nov-17 19-Nov-17 7-Dec-17 12-Mar-18 12-Mar-18 95% 95% 0% 0.053% 0.053%
1221 5 INSTRUMENT 3963-FAHM-4-66-0002 OT FIRE & GAS LOOP DIAGRAM (FAHM) 1 A 0.028% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.026% 0.026%
1222 5 INSTRUMENT 3963-FAHN-4-45-0001 OT SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (FAHN) 1 A 0.028% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 22-Jul-19 8-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1223 5 INSTRUMENT 3963-FAHN-4-13-0001 OT DATA SHEET FOR PRESSURE GAUGES (FAHN) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1224 5 INSTRUMENT 3963-FAHN-4-13-0002 OT DATA SHEET FOR TEMP GAUGES (FAHN) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 22-Jul-19 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 95% 95% 0% 0.026% 0.026%
1225 5 INSTRUMENT 3963-FAHN-4-13-0003 OT DATA SHEET FOR PRESSURE TRANSMITTERS (FAHN) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1226 5 INSTRUMENT 3963-FAHN-4-13-0004 OT DATA SHEET FOR TEMP TRANSMITTERS (FAHN) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1227 5 INSTRUMENT 3963-FAHN-4-13-0005 OT DATA SHEET FOR FLOWMETER - CORIOLIS (FAHN) 1 A 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 25-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 22-Jul-19 25-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.040% 0.040%
1228 5 INSTRUMENT 3963-FAHN-4-13-0006 OT DATA SHEET FOR LEVEL TRANSMITTERS (FAHN) 1 B 0.028% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 17-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 14-Dec-17 22-Jul-19 17-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 14-Dec-17 95% 95% 0% 0.026% 0.026%
1229 5 INSTRUMENT 3963-FAHN-4-13-0007 OT DATA SHEET FOR BS&W ANALYSERS (FAHN) 1 A 0.042% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 22-Jul-19 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 95% 95% 0% 0.040% 0.040%
1230 5 INSTRUMENT 3963-FAHN-4-13-0008 OT DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (FAHN) 1 A 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-Apr-17 15-Aug-17 17-Aug-17 27-Sep-17 18-Oct-17 26-Dec-17 22-Jul-19 4-Apr-17 15-Aug-17 17-Aug-17 27-Sep-17 18-Oct-17 26-Dec-17 95% 95% 0% 0.040% 0.040%
1231 5 INSTRUMENT 3963-FAHN-4-13-0009 OT DATA SHEET FOR CONTROL VALVES (FAHN) 1 A 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 3-May-17 1-Aug-17 3-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 22-Jul-19 3-May-17 1-Aug-17 3-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
1232 5 INSTRUMENT 3963-FAHN-4-13-0010 OT DATA SHEET FOR FLOWMETER - VORTEX (FAHN) 1 B 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 19-Jun-17 20-Jun-17 22-Aug-17 18-Oct-17 19-Oct-17 22-Jul-19 10-May-17 19-Jun-17 20-Jun-17 22-Aug-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
1233 5 INSTRUMENT 3963-FAHN-4-13-0011 OT DATA SHEET FOR RESTRICTION ORIFICE (FAHN) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 22-Jul-19 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 95% 95% 0% 0.026% 0.026%
1234 5 INSTRUMENT 3963-FAHN-4-13-0012 OT DATA SHEET FOR FIRE & GAS DEVICES (FAHN) 1 A 0.042% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 17-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 22-Jul-19 17-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 95% 95% 0% 0.040% 0.040%
1235 5 INSTRUMENT 3963-FAHN-4-13-0013 OT DATA SHEET FOR LEVEL GAUGES (FAHN) 1 B 0.042% 23-Jun-17 28-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 22-Aug-17 23-Aug-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 22-Aug-17 23-Aug-17 95% 95% 0% 0.040% 0.040%
1236 5 INSTRUMENT 3963-FAHN-4-00-0001 OT INSTRUMENT INDEX (FAHN) 1 A 0.028% 30-May-17 9-Jun-17 14-Jun-17 15-Jul-17 5-Aug-17 15-Aug-17 31-Oct-18 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 20-Nov-17 22-Jul-19 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 20-Nov-17 95% 95% 0% 0.026% 0.026%
1237 5 INSTRUMENT 3963-FAHN-4-39-0001 OT INPUT / OUTPUT LIST - DCS/ESD/F&G (FAHN) 1 A 0.028% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 8-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 22-Jul-19 8-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 95% 95% 0% 0.026% 0.026%
1238 5 INSTRUMENT 3963-FAHN-4-67-0001 OT ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (FAHN) 1 A 0.028% 19-Jun-17 29-Jun-17 4-Jul-17 4-Aug-17 25-Aug-17 4-Sep-17 31-Oct-18 22-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 25-Sep-17 10-Dec-17 22-Jul-19 22-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 25-Sep-17 10-Dec-17 95% 95% 0% 0.026% 0.026%
1239 5 INSTRUMENT 3963-FAHN-4-37-0001 OT INSTRUMENT CABLE SCHEDULE - DCS/ESD/F&G (FAHN) 1 A 0.028% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 28-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1240 5 INSTRUMENT 3963-FAHN-4-30-0002 OT INSTRUMENT JUNCTION BOX SCHEDULE (FAHN) 1 A 0.028% 28-Jun-17 8-Jul-17 13-Jul-17 13-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 28-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 28-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1241 5 INSTRUMENT 3963-FAHN-4-31-0001 OT INSTRUMENT MTO’S (FAHN) 3 A 0.042% 10-Aug-17 20-Aug-17 25-Aug-17 8-Sep-17 13-Sep-17 13-Sep-17 31-Oct-18 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 14-Dec-17 22-Jul-19 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 14-Dec-17 95% 95% 0% 0.040% 0.040%
1242 5 INSTRUMENT 3963-FAHN-4-55-0001 OT INSTRUMENT CABLE BLOCK DIAGRAM (FAHN) 1 A 0.028% 6-May-17 16-May-17 21-May-17 21-Jun-17 12-Jul-17 22-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1243 5 INSTRUMENT 3963-FAHN-4-56-0001 OT F&G CABLE BLOCK DIAGRAM (FAHN) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1244 5 INSTRUMENT 3963-FAHN-4-50-0001 OT INSTRUMENT LOCATION LAYOUT (FAHN) 1 A 0.042% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 18-May-17 19-May-17 21-May-17 25-Sep-17 10-Oct-17 10-Oct-17 22-Jul-19 18-May-17 19-May-17 21-May-17 25-Sep-17 10-Oct-17 10-Oct-17 95% 95% 0% 0.040% 0.040%
1245 5 INSTRUMENT 3963-FAHN-4-65-0001 OT INSTRUMENT INTERCONNECTION DIAGRAM (FAHN) 1 A 0.042% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 10-Oct-17 12-Oct-17 19-Nov-17 7-Dec-17 7-Dec-17 22-Jul-19 8-Jul-17 10-Oct-17 12-Oct-17 19-Nov-17 7-Dec-17 7-Dec-17 95% 95% 0% 0.040% 0.040%
1246 5 INSTRUMENT 3963-FAHN-4-65-0002 OT FIRE & GAS INTERCONNECTION DIAGRAM (FAHN) 1 A 0.042% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 22-Jun-17 20-Oct-17 22-Oct-17 28-Nov-17 11-Dec-17 11-Dec-17 22-Jul-19 22-Jun-17 20-Oct-17 22-Oct-17 28-Nov-17 11-Dec-17 11-Dec-17 95% 95% 0% 0.040% 0.040%
1247 5 INSTRUMENT 3963-FAHN-4-66-0001 OT INSTRUMENT LOOP DIAGRAM (FAHN) 1 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 10-Sep-17 17-Sep-17 31-Oct-18 8-Jul-17 17-Nov-17 19-Nov-17 7-Dec-17 12-Mar-18 12-Mar-18 22-Jul-19 8-Jul-17 17-Nov-17 19-Nov-17 7-Dec-17 12-Mar-18 12-Mar-18 95% 95% 0% 0.079% 0.079%
1248 5 INSTRUMENT 3963-FAHN-4-66-0002 OT FIRE & GAS LOOP DIAGRAM (FAHN) 1 A 0.028% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.026% 0.026%
1249 5 INSTRUMENT 3963-FAHS-4-45-0001 OT SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (FAHS) 1 A 0.028% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 13-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 22-Jul-19 13-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1250 5 INSTRUMENT 3963-FAHS-4-13-0001 OT DATA SHEET FOR PRESSURE GAUGES (FAHS) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1251 5 INSTRUMENT 3963-FAHS-4-13-0002 OT DATA SHEET FOR TEMP GAUGES (FAHS) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 22-Jul-19 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 95% 95% 0% 0.026% 0.026%
1252 5 INSTRUMENT 3963-FAHS-4-13-0003 OT DATA SHEET FOR PRESSURE TRANSMITTERS (FAHS) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1253 5 INSTRUMENT 3963-FAHS-4-13-0004 OT DATA SHEET FOR TEMP TRANSMITTERS (FAHS) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1254 5 INSTRUMENT 3963-FAHS-4-13-0005 OT DATA SHEET FOR FLOWMETER - CORIOLIS (FAHS) 1 A 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 22-Jul-19 10-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.040% 0.040%
1255 5 INSTRUMENT 3963-FAHS-4-13-0006 OT DATA SHEET FOR LEVEL TRANSMITTERS (FAHS) 1 B 0.028% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 17-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 21-Dec-17 22-Jul-19 17-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 21-Dec-17 95% 95% 0% 0.026% 0.026%
1256 5 INSTRUMENT 3963-FAHS-4-13-0007 OT DATA SHEET FOR BS&W ANALYSERS (FAHS) 1 A 0.042% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 22-Jul-19 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 95% 95% 0% 0.040% 0.040%
1257 5 INSTRUMENT 3963-FAHS-4-13-0008 OT DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (FAHS) 1 A 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-Apr-17 15-Aug-17 17-Aug-17 27-Sep-17 18-Oct-17 26-Dec-17 22-Jul-19 4-Apr-17 15-Aug-17 17-Aug-17 27-Sep-17 18-Oct-17 26-Dec-17 95% 95% 0% 0.040% 0.040%
1258 5 INSTRUMENT 3963-FAHS-4-13-0009 OT DATA SHEET FOR CONTROL VALVES (FAHS) 1 A 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 10-May-17 1-Aug-17 3-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 22-Jul-19 10-May-17 1-Aug-17 3-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
1259 5 INSTRUMENT 3963-FAHS-4-13-0010 OT DATA SHEET FOR FLOWMETER - VORTEX (FAHS) 1 B 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 19-Jun-17 20-Jun-17 22-Aug-17 19-Sep-17 20-Sep-17 22-Jul-19 10-May-17 19-Jun-17 20-Jun-17 22-Aug-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.040% 0.040%
1260 5 INSTRUMENT 3963-FAHS-4-13-0011 OT DATA SHEET FOR RESTRICTION ORIFICE (FAHS) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 22-Jul-19 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 95% 95% 0% 0.026% 0.026%
1261 5 INSTRUMENT 3963-FAHS-4-13-0012 OT DATA SHEET FOR FIRE & GAS DEVICES (FAHS) 1 A 0.042% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 17-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 22-Jul-19 17-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 95% 95% 0% 0.040% 0.040%
1262 5 INSTRUMENT 3963-FAHS-4-13-0013 OT DATA SHEET FOR LEVEL GAUGES (FAHS) 1 B 0.042% 23-Jun-17 28-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 22-Aug-17 23-Aug-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 22-Aug-17 23-Aug-17 95% 95% 0% 0.040% 0.040%
1263 5 INSTRUMENT 3963-FAHS-4-00-0001 OT INSTRUMENT INDEX (FAHS) 1 A 0.028% 30-May-17 9-Jun-17 14-Jun-17 15-Jul-17 5-Aug-17 15-Aug-17 31-Oct-18 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 19-Oct-17 22-Jul-19 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1264 5 INSTRUMENT 3963-FAHS-4-39-0001 OT INPUT / OUTPUT LIST - DCS/ESD/F&G (FAHS) 1 A 0.028% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 8-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 22-Jul-19 8-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 95% 95% 0% 0.026% 0.026%
1265 5 INSTRUMENT 3963-FAHS-4-67-0001 OT ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (FAHS) 1 A 0.028% 19-Jun-17 29-Jun-17 4-Jul-17 4-Aug-17 25-Aug-17 4-Sep-17 31-Oct-18 21-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 25-Sep-17 10-Dec-17 22-Jul-19 21-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 25-Sep-17 10-Dec-17 95% 95% 0% 0.026% 0.026%
1266 5 INSTRUMENT 3963-FAHS-4-37-0001 OT INSTRUMENT CABLE SCHEDULE - DCS/ESD/F&G (FAHS) 1 A 0.028% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 29-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 29-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1267 5 INSTRUMENT 3963-FAHS-4-30-0002 OT INSTRUMENT JUNCTION BOX SCHEDULE (FAHS) 1 A 0.028% 28-Jun-17 8-Jul-17 13-Jul-17 13-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 29-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 29-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1268 5 INSTRUMENT 3963-FAHS-4-31-0001 OT INSTRUMENT MTO’S (FAHS) 3 A 0.042% 10-Aug-17 20-Aug-17 25-Aug-17 8-Sep-17 13-Sep-17 13-Sep-17 31-Oct-18 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 13-Dec-17 22-Jul-19 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 13-Dec-17 95% 95% 0% 0.040% 0.040%
1269 5 INSTRUMENT 3963-FAHS-4-55-0001 OT INSTRUMENT CABLE BLOCK DIAGRAM (FAHS) 1 A 0.028% 6-May-17 16-May-17 21-May-17 21-Jun-17 12-Jul-17 22-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1270 5 INSTRUMENT 3963-FAHS-4-56-0001 OT F&G CABLE BLOCK DIAGRAM (FAHS) 1 C 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 14-Aug-17 14-Aug-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 14-Aug-17 14-Aug-17 95% 95% 0% 0.026% 0.026%
1271 5 INSTRUMENT 3963-FAHS-4-50-0001 OT INSTRUMENT LOCATION LAYOUT (FAHS) 1 A 0.042% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 18-May-17 19-May-17 21-May-17 25-Sep-17 10-Oct-17 10-Oct-17 22-Jul-19 18-May-17 19-May-17 21-May-17 25-Sep-17 10-Oct-17 10-Oct-17 95% 95% 0% 0.040% 0.040%
1272 5 INSTRUMENT 3963-FAHS-4-65-0001 OT INSTRUMENT INTERCONNECTION DIAGRAM (FAHS) 1 A 0.042% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 13-Jul-17 10-Oct-17 12-Oct-17 19-Nov-17 7-Dec-17 7-Dec-17 22-Jul-19 13-Jul-17 10-Oct-17 12-Oct-17 19-Nov-17 7-Dec-17 7-Dec-17 95% 95% 0% 0.040% 0.040%
1273 5 INSTRUMENT 3963-FAHS-4-65-0002 OT FIRE & GAS INTERCONNECTION DIAGRAM (FAHS) 1 A 0.042% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 21-Jun-17 24-Oct-17 26-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 22-Jul-19 21-Jun-17 24-Oct-17 26-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 95% 95% 0% 0.040% 0.040%
1274 5 INSTRUMENT 3963-FAHS-4-66-0001 OT INSTRUMENT LOOP DIAGRAM (FAHS) 1 A 0.083% 8-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 10-Sep-17 17-Sep-17 31-Oct-18 13-Jul-17 17-Nov-17 19-Nov-17 7-Dec-17 18-Mar-18 18-Mar-18 22-Jul-19 13-Jul-17 17-Nov-17 19-Nov-17 7-Dec-17 18-Mar-18 18-Mar-18 95% 95% 0% 0.079% 0.079%
1275 5 INSTRUMENT 3963-FAHS-4-66-0002 OT FIRE & GAS LOOP DIAGRAM (FAHS) 1 A 0.056% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.053% 0.053%
1276 5 INSTRUMENT 3963-KAHM-4-45-0001 ET SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (KAHM) 1 A Y 0.028% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 22-Jul-19 8-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1277 5 INSTRUMENT 3963-KAHM-4-13-0001 OT DATA SHEET FOR PRESSURE GAUGES (KAHM) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1278 5 INSTRUMENT 3963-KAHM-4-13-0002 OT DATA SHEET FOR TEMP GAUGES (KAHM) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 22-Jul-19 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 95% 95% 0% 0.026% 0.026%
1279 5 INSTRUMENT 3963-KAHM-4-13-0003 OT DATA SHEET FOR PRESSURE TRANSMITTERS (KAHM) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1280 5 INSTRUMENT 3963-KAHM-4-13-0004 OT DATA SHEET FOR TEMP TRANSMITTERS (KAHM) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1281 5 INSTRUMENT 3963-KAHM-4-13-0005 OT DATA SHEET FOR FLOWMETER - CORIOLIS (KAHM) 1 A 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 22-Jul-19 10-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.040% 0.040%
1282 5 INSTRUMENT 3963-KAHM-4-13-0006 OT DATA SHEET FOR LEVEL TRANSMITTERS (KAHM) 1 B 0.028% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 21-Dec-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 21-Dec-17 95% 95% 0% 0.026% 0.026%
1283 5 INSTRUMENT 3963-KAHM-4-13-0007 OT DATA SHEET FOR BS&W ANALYSERS (KAHM) 1 A 0.042% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 22-Jul-19 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 95% 95% 0% 0.040% 0.040%
1284 5 INSTRUMENT 3963-KAHM-4-13-0008 OT DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (KAHM) 1 B 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-Apr-17 15-Aug-17 17-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 22-Jul-19 4-Apr-17 15-Aug-17 17-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
1285 5 INSTRUMENT 3963-KAHM-4-13-0009 OT DATA SHEET FOR CONTROL VALVES (KAHM) 1 A 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-May-17 15-Aug-17 17-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 22-Jul-19 4-May-17 15-Aug-17 17-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
1286 5 INSTRUMENT 3963-KAHM-4-13-0010 OT DATA SHEET FOR FLOWMETER - VORTEX (KAHM) 1 B 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 25-May-17 19-Jun-17 20-Jun-17 27-Jul-17 27-Jul-17 20-Sep-17 22-Jul-19 25-May-17 19-Jun-17 20-Jun-17 27-Jul-17 27-Jul-17 20-Sep-17 95% 95% 0% 0.040% 0.040%

Page 18 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
1287 5 INSTRUMENT 3963-KAHM-4-13-0011 OT DATA SHEET FOR RESTRICTION ORIFICE (KAHM) 1 A E 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 22-Jul-19 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 95% 95% 0% 0.026% 0.026%
1288 5 INSTRUMENT 3963-KAHM-4-13-0012 OT DATA SHEET FOR FIRE & GAS DEVICES (KAHM) 1 A 0.042% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 15-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 22-Jul-19 15-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 95% 95% 0% 0.040% 0.040%
1289 5 INSTRUMENT 3963-KAHM-4-13-0013 OT DATA SHEET FOR LEVEL GAUGES (KAHM) 1 B 0.042% 23-Jun-17 28-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 20-Aug-17 20-Aug-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 20-Aug-17 20-Aug-17 95% 95% 0% 0.040% 0.040%
1290 5 INSTRUMENT 3963-KAHM-4-00-0001 OT INSTRUMENT INDEX (KAHM) 1 A 0.028% 30-May-17 9-Jun-17 14-Jun-17 15-Jul-17 5-Aug-17 15-Aug-17 31-Oct-18 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 19-Oct-17 22-Jul-19 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1291 5 INSTRUMENT 3963-KAHM-4-39-0001 OT INPUT / OUTPUT LIST - DCS/ESD/F&G (KAHM) 1 A 0.028% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 7-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 22-Jul-19 7-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 95% 95% 0% 0.026% 0.026%
1292 5 INSTRUMENT 3963-KAHM-4-67-0001 OT ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (KAHM) 1 A 0.028% 19-Jun-17 29-Jun-17 4-Jul-17 4-Aug-17 25-Aug-17 4-Sep-17 31-Oct-18 21-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 28-Sep-17 10-Dec-17 22-Jul-19 21-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 28-Sep-17 10-Dec-17 95% 95% 0% 0.026% 0.026%
1293 5 INSTRUMENT 3963-KAHM-4-37-0001 OT INSTRUMENT CABLE SCHEDULE - DCS/ESD/F&G (KAHM) 1 A 0.028% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 29-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 29-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1294 5 INSTRUMENT 3963-KAHM-4-30-0002 OT INSTRUMENT JUNCTION BOX SCHEDULE (KAHM) 1 A 0.028% 28-Jun-17 8-Jul-17 13-Jul-17 13-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 28-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 28-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1295 5 INSTRUMENT 3963-KAHM-4-31-0001 OT INSTRUMENT MTO’S (KAHM) 3 A 0.042% 10-Aug-17 20-Aug-17 25-Aug-17 8-Sep-17 13-Sep-17 13-Sep-17 31-Oct-18 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 14-Dec-17 22-Jul-19 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 14-Dec-17 95% 95% 0% 0.040% 0.040%
1296 5 INSTRUMENT 3963-KAHM-4-55-0001 OT INSTRUMENT CABLE BLOCK DIAGRAM (KAHM) 1 A 0.028% 6-May-17 16-May-17 21-May-17 21-Jun-17 12-Jul-17 22-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1297 5 INSTRUMENT 3963-KAHM-4-56-0001 OT F&G CABLE BLOCK DIAGRAM (KAHM) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 5-Jun-17 5-Jun-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 5-Jun-17 5-Jun-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1298 5 INSTRUMENT 3963-KAHM-4-50-0001 OT INSTRUMENT LOCATION LAYOUT (KAHM) 1 A 0.042% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 18-May-17 19-May-17 21-May-17 5-Oct-17 12-Oct-17 12-Oct-17 22-Jul-19 18-May-17 19-May-17 21-May-17 5-Oct-17 12-Oct-17 12-Oct-17 95% 95% 0% 0.040% 0.040%
1299 5 INSTRUMENT 3963-KAHM-4-65-0001 OT INSTRUMENT INTERCONNECTION DIAGRAM (KAHM) 1 A 0.042% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 14-Oct-17 15-Oct-17 10-Dec-17 21-Dec-17 21-Dec-17 22-Jul-19 8-Jul-17 14-Oct-17 15-Oct-17 10-Dec-17 21-Dec-17 21-Dec-17 95% 95% 0% 0.040% 0.040%
1300 5 INSTRUMENT 3963-KAHM-4-65-0002 OT FIRE & GAS INTERCONNECTION DIAGRAM (KAHM) 1 A 0.042% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 21-Jun-17 20-Oct-17 22-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 22-Jul-19 21-Jun-17 20-Oct-17 22-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 95% 95% 0% 0.040% 0.040%
1301 5 INSTRUMENT 3963-KAHM-4-66-0001 OT INSTRUMENT LOOP DIAGRAM (KAHM) 1 A 0.056% 8-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 10-Sep-17 17-Sep-17 31-Oct-18 11-Jul-17 6-Nov-17 13-Nov-17 10-Dec-17 22-Feb-18 22-Feb-18 22-Jul-19 11-Jul-17 6-Nov-17 13-Nov-17 10-Dec-17 22-Feb-18 22-Feb-18 95% 95% 0% 0.053% 0.053%
1302 5 INSTRUMENT 3963-KAHM-4-66-0002 OT FIRE & GAS LOOP DIAGRAM (KAHM) 1 A 0.056% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.053% 0.053%
1303 5 INSTRUMENT 3963-KAHN-4-45-0001 ET SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (KAHN) 1 A Y 0.028% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 11-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 28-Sep-17 19-Oct-17 22-Jul-19 11-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 28-Sep-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1304 5 INSTRUMENT 3963-KAHN-4-13-0001 OT DATA SHEET FOR PRESSURE GAUGES (KAHN) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1305 5 INSTRUMENT 3963-KAHN-4-13-0002 OT DATA SHEET FOR TEMP GAUGES (KAHN) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 22-Jul-19 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 95% 95% 0% 0.026% 0.026%
1306 5 INSTRUMENT 3963-KAHN-4-13-0003 OT DATA SHEET FOR PRESSURE TRANSMITTERS (KAHN) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1307 5 INSTRUMENT 3963-KAHN-4-13-0004 OT DATA SHEET FOR TEMP TRANSMITTERS (KAHN) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1308 5 INSTRUMENT 3963-KAHN-4-13-0005 OT DATA SHEET FOR FLOWMETER - CORIOLIS (KAHN) 1 A 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 25-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 22-Jul-19 25-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.040% 0.040%
1309 5 INSTRUMENT 3963-KAHN-4-13-0006 OT DATA SHEET FOR LEVEL TRANSMITTERS (KAHN) 1 B 0.028% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 14-Sep-17 28-Sep-17 21-Dec-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 14-Sep-17 28-Sep-17 21-Dec-17 95% 95% 0% 0.026% 0.026%
1310 5 INSTRUMENT 3963-KAHN-4-13-0007 OT DATA SHEET FOR BS&W ANALYSERS (KAHN) 1 A 0.042% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 22-Jul-19 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 95% 95% 0% 0.040% 0.040%
1311 5 INSTRUMENT 3963-KAHN-4-13-0008 OT DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (KAHN) 1 B 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-Apr-17 15-Aug-17 17-Aug-17 18-Sep-17 28-Sep-17 18-Oct-17 22-Jul-19 4-Apr-17 15-Aug-17 17-Aug-17 18-Sep-17 28-Sep-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
1312 5 INSTRUMENT 3963-KAHN-4-13-0009 OT DATA SHEET FOR CONTROL VALVES (KAHN) 1 A 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-May-17 15-Aug-17 17-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 22-Jul-19 4-May-17 15-Aug-17 17-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
1313 5 INSTRUMENT 3963-KAHN-4-13-0010 OT DATA SHEET FOR FLOWMETER - VORTEX (KAHN) 1 B 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 25-May-17 19-Jun-17 20-Jun-17 22-Aug-17 16-Sep-17 17-Sep-17 22-Jul-19 25-May-17 19-Jun-17 20-Jun-17 22-Aug-17 16-Sep-17 17-Sep-17 95% 95% 0% 0.040% 0.040%
1314 5 INSTRUMENT 3963-KAHN-4-13-0011 OT DATA SHEET FOR RESTRICTION ORIFICE (KAHN) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 22-Jul-19 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 95% 95% 0% 0.026% 0.026%
1315 5 INSTRUMENT 3963-KAHN-4-13-0012 OT DATA SHEET FOR FIRE & GAS DEVICES (KAHN) 1 A 0.042% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 15-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 22-Jul-19 15-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 95% 95% 0% 0.040% 0.040%
1316 5 INSTRUMENT 3963-KAHN-4-13-0013 OT DATA SHEET FOR LEVEL GAUGES (KAHN) 1 B 0.042% 23-Jun-17 28-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 20-Aug-17 20-Aug-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 20-Aug-17 20-Aug-17 95% 95% 0% 0.040% 0.040%
1317 5 INSTRUMENT 3963-KAHN-4-00-0001 OT INSTRUMENT INDEX (KAHN) 1 A 0.028% 30-May-17 9-Jun-17 14-Jun-17 15-Jul-17 5-Aug-17 15-Aug-17 31-Oct-18 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 19-Oct-17 22-Jul-19 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1318 5 INSTRUMENT 3963-KAHN-4-39-0001 OT INPUT / OUTPUT LIST - DCS/ESD/F&G (KAHN) 1 A 0.028% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 7-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 22-Jul-19 7-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 95% 95% 0% 0.026% 0.026%
1319 5 INSTRUMENT 3963-KAHN-4-67-0001 OT ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (KAHN) 1 A 0.028% 19-Jun-17 29-Jun-17 4-Jul-17 4-Aug-17 25-Aug-17 4-Sep-17 31-Oct-18 22-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 25-Sep-17 10-Dec-17 22-Jul-19 22-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 25-Sep-17 10-Dec-17 95% 95% 0% 0.026% 0.026%
1320 5 INSTRUMENT 3963-KAHN-4-37-0001 OT INSTRUMENT CABLE SCHEDULE - DCS/ESD/F&G (KAHN) 1 A 0.028% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 28-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1321 5 INSTRUMENT 3963-KAHN-4-30-0002 OT INSTRUMENT JUNCTION BOX SCHEDULE (KAHN) 1 A 0.028% 28-Jun-17 8-Jul-17 13-Jul-17 13-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 28-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 28-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1322 5 INSTRUMENT 3963-KAHN-4-31-0001 OT INSTRUMENT MTO’S (KAHN) 3 A 0.042% 10-Aug-17 20-Aug-17 25-Aug-17 8-Sep-17 13-Sep-17 13-Sep-17 31-Oct-18 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 14-Dec-17 22-Jul-19 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 14-Dec-17 95% 95% 0% 0.040% 0.040%
1323 5 INSTRUMENT 3963-KAHN-4-55-0001 OT INSTRUMENT CABLE BLOCK DIAGRAM (KAHN) 1 A 0.028% 6-May-17 16-May-17 21-May-17 21-Jun-17 12-Jul-17 22-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1324 5 INSTRUMENT 3963-KAHN-4-56-0001 OT F&G CABLE BLOCK DIAGRAM (KAHN) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1325 5 INSTRUMENT 3963-KAHN-4-50-0001 OT INSTRUMENT LOCATION LAYOUT (KAHN) 1 A 0.042% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 18-May-17 19-May-17 21-May-17 5-Oct-17 12-Oct-17 12-Oct-17 22-Jul-19 18-May-17 19-May-17 21-May-17 5-Oct-17 12-Oct-17 12-Oct-17 95% 95% 0% 0.040% 0.040%
1326 5 INSTRUMENT 3963-KAHN-4-65-0001 OT INSTRUMENT INTERCONNECTION DIAGRAM (KAHN) 1 A 0.042% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 11-Jul-17 14-Oct-17 15-Oct-17 10-Dec-17 21-Dec-17 21-Dec-17 22-Jul-19 11-Jul-17 14-Oct-17 15-Oct-17 10-Dec-17 21-Dec-17 21-Dec-17 95% 95% 0% 0.040% 0.040%
1327 5 INSTRUMENT 3963-KAHN-4-65-0002 OT FIRE & GAS INTERCONNECTION DIAGRAM (KAHN) 1 A 0.042% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 22-Jun-17 20-Oct-17 22-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 22-Jul-19 22-Jun-17 20-Oct-17 22-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 95% 95% 0% 0.040% 0.040%
1328 5 INSTRUMENT 3963-KAHN-4-66-0001 OT INSTRUMENT LOOP DIAGRAM (KAHN) 1 A 0.056% 8-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 10-Sep-17 17-Sep-17 31-Oct-18 11-Jul-17 6-Nov-17 13-Nov-17 10-Dec-17 26-Feb-18 26-Feb-18 22-Jul-19 11-Jul-17 6-Nov-17 13-Nov-17 10-Dec-17 26-Feb-18 26-Feb-18 95% 95% 0% 0.053% 0.053%
1329 5 INSTRUMENT 3963-KAHN-4-66-0002 OT FIRE & GAS LOOP DIAGRAM (KAHN) 1 A 0.056% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.053% 0.053%
1330 5 INSTRUMENT 3963-KAHS-4-45-0001 ET SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (KAHS) 1 A Y 0.028% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 22-Jul-19 8-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1331 5 INSTRUMENT 3963-KAHS-4-13-0001 OT DATA SHEET FOR PRESSURE GAUGES (KAHS) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1332 5 INSTRUMENT 3963-KAHS-4-13-0002 OT DATA SHEET FOR TEMP GAUGES (KAHS) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 22-Jul-19 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 95% 95% 0% 0.026% 0.026%
1333 5 INSTRUMENT 3963-KAHS-4-13-0003 OT DATA SHEET FOR PRESSURE TRANSMITTERS (KAHS) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 17-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1334 5 INSTRUMENT 3963-KAHS-4-13-0004 OT DATA SHEET FOR TEMP TRANSMITTERS (KAHS) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 17-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1335 5 INSTRUMENT 3963-KAHS-4-13-0005 OT DATA SHEET FOR FLOWMETER - CORIOLIS (KAHS) 1 A 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 25-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 22-Jul-19 25-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.040% 0.040%
1336 5 INSTRUMENT 3963-KAHS-4-13-0006 OT DATA SHEET FOR LEVEL TRANSMITTERS (KAHS) 1 B 0.028% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 21-Dec-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 21-Dec-17 95% 95% 0% 0.026% 0.026%
1337 5 INSTRUMENT 3963-KAHS-4-13-0007 OT DATA SHEET FOR BS&W ANALYSERS (KAHS) 1 A 0.042% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 22-Jul-19 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 95% 95% 0% 0.040% 0.040%
1338 5 INSTRUMENT 3963-KAHS-4-13-0008 OT DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (KAHS) 1 B 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-Apr-17 15-Aug-17 17-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 22-Jul-19 4-Apr-17 15-Aug-17 17-Aug-17 18-Sep-17 25-Sep-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
1339 5 INSTRUMENT 3963-KAHS-4-13-0009 OT DATA SHEET FOR CONTROL VALVES (KAHS) 1 A 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-May-17 15-Aug-17 17-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 22-Jul-19 4-May-17 15-Aug-17 17-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
1340 5 INSTRUMENT 3963-KAHS-4-13-0010 OT DATA SHEET FOR FLOWMETER - VORTEX (KAHS) 1 B 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 19-Jun-17 20-Jun-17 22-Aug-17 19-Sep-17 20-Sep-17 22-Jul-19 10-May-17 19-Jun-17 20-Jun-17 22-Aug-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.040% 0.040%
1341 5 INSTRUMENT 3963-KAHS-4-13-0011 OT DATA SHEET FOR RESTRICTION ORIFICE (KAHS) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 22-Jul-19 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 95% 95% 0% 0.026% 0.026%
1342 5 INSTRUMENT 3963-KAHS-4-13-0012 OT DATA SHEET FOR FIRE & GAS DEVICES (KAHS) 1 A 0.042% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 15-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 22-Jul-19 15-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 95% 95% 0% 0.040% 0.040%
1343 5 INSTRUMENT 3963-KAHS-4-13-0013 OT DATA SHEET FOR LEVEL GAUGES (KAHS) 1 B 0.042% 23-Jun-17 28-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 20-Aug-17 20-Aug-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 20-Aug-17 20-Aug-17 95% 95% 0% 0.040% 0.040%
1344 5 INSTRUMENT 3963-KAHS-4-00-0001 OT INSTRUMENT INDEX (KAHS) 1 A 0.028% 30-May-17 9-Jun-17 14-Jun-17 15-Jul-17 5-Aug-17 15-Aug-17 31-Oct-18 31-May-17 10-Jun-17 11-Jun-17 5-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 31-May-17 10-Jun-17 11-Jun-17 5-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1345 5 INSTRUMENT 3963-KAHS-4-39-0001 OT INPUT / OUTPUT LIST - DCS/ESD/F&G (KAHS) 1 A 0.028% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 7-Jun-17 10-Jul-17 11-Jul-17 18-Sep-17 25-Sep-17 7-Dec-17 22-Jul-19 7-Jun-17 10-Jul-17 11-Jul-17 18-Sep-17 25-Sep-17 7-Dec-17 95% 95% 0% 0.026% 0.026%
1346 5 INSTRUMENT 3963-KAHS-4-67-0001 OT ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (KAHS) 1 A 0.028% 19-Jun-17 29-Jun-17 4-Jul-17 4-Aug-17 25-Aug-17 4-Sep-17 31-Oct-18 22-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 25-Sep-17 10-Dec-17 22-Jul-19 22-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 25-Sep-17 10-Dec-17 95% 95% 0% 0.026% 0.026%
1347 5 INSTRUMENT 3963-KAHS-4-37-0001 OT INSTRUMENT CABLE SCHEDULE - DCS/ESD/F&G (KAHS) 1 A 0.028% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 28-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 28-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1348 5 INSTRUMENT 3963-KAHS-4-30-0002 OT INSTRUMENT JUNCTION BOX SCHEDULE (KAHS) 1 A 0.028% 28-Jun-17 8-Jul-17 13-Jul-17 13-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 29-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 29-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1349 5 INSTRUMENT 3963-KAHS-4-31-0001 OT INSTRUMENT MTO’S (KAHS) 3 A 0.042% 10-Aug-17 20-Aug-17 25-Aug-17 8-Sep-17 13-Sep-17 13-Sep-17 31-Oct-18 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 13-Dec-17 22-Jul-19 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 13-Dec-17 95% 95% 0% 0.040% 0.040%
1350 5 INSTRUMENT 3963-KAHS-4-55-0001 OT INSTRUMENT CABLE BLOCK DIAGRAM (KAHS) 1 A 0.028% 6-May-17 16-May-17 21-May-17 21-Jun-17 12-Jul-17 22-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1351 5 INSTRUMENT 3963-KAHS-4-56-0001 OT F&G CABLE BLOCK DIAGRAM (KAHS) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1352 5 INSTRUMENT 3963-KAHS-4-50-0001 OT INSTRUMENT LOCATION LAYOUT (KAHS) 1 A 0.042% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 18-May-17 19-May-17 21-May-17 26-Sep-17 10-Oct-17 10-Oct-17 22-Jul-19 18-May-17 19-May-17 21-May-17 26-Sep-17 10-Oct-17 10-Oct-17 95% 95% 0% 0.040% 0.040%
1353 5 INSTRUMENT 3963-KAHS-4-65-0001 OT INSTRUMENT INTERCONNECTION DIAGRAM (KAHS) 1 A 0.042% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 14-Oct-17 15-Oct-17 10-Dec-17 21-Dec-17 21-Dec-17 22-Jul-19 8-Jul-17 14-Oct-17 15-Oct-17 10-Dec-17 21-Dec-17 21-Dec-17 95% 95% 0% 0.040% 0.040%
1354 5 INSTRUMENT 3963-KAHS-4-65-0002 OT FIRE & GAS INTERCONNECTION DIAGRAM (KAHS) 1 A 0.042% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 22-Jun-17 20-Oct-17 22-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 22-Jul-19 22-Jun-17 20-Oct-17 22-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 95% 95% 0% 0.040% 0.040%
1355 5 INSTRUMENT 3963-KAHS-4-66-0001 OT INSTRUMENT LOOP DIAGRAM (KAHS) 1 A 0.056% 8-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 10-Sep-17 17-Sep-17 31-Oct-18 13-Jul-17 6-Nov-17 13-Nov-17 10-Dec-17 26-Feb-18 26-Feb-18 22-Jul-19 13-Jul-17 6-Nov-17 13-Nov-17 10-Dec-17 26-Feb-18 26-Feb-18 95% 95% 0% 0.053% 0.053%
1356 5 INSTRUMENT 3963-KAHS-4-66-0002 OT FIRE & GAS LOOP DIAGRAM (KAHS) 1 A 0.056% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.053% 0.053%
1357 5 INSTRUMENT 3963-JALM-4-45-0001 OT SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (JALM) 1 A 0.028% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 13-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 22-Jul-19 13-Jul-17 26-Jul-17 27-Jul-17 12-Sep-17 25-Sep-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1358 5 INSTRUMENT 3963-JALM-4-13-0001 OT DATA SHEET FOR PRESSURE GAUGES (JALM) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1359 5 INSTRUMENT 3963-JALM-4-13-0002 OT DATA SHEET FOR TEMP GAUGES (JALM) 1 B 0.028% 24-May-17 3-Jun-17 8-Jun-17 9-Jul-17 30-Jul-17 9-Aug-17 31-Oct-18 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 22-Jul-19 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 4-Oct-17 95% 95% 0% 0.026% 0.026%
1360 5 INSTRUMENT 3963-JALM-4-13-0003 OT DATA SHEET FOR PRESSURE TRANSMITTERS (JALM) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 13-Jun-17 14-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1361 5 INSTRUMENT 3963-JALM-4-13-0004 OT DATA SHEET FOR TEMP TRANSMITTERS (JALM) 1 B 0.028% 16-May-17 26-May-17 31-May-17 1-Jul-17 22-Jul-17 1-Aug-17 31-Oct-18 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 22-Jul-19 15-May-17 10-Jun-17 11-Jun-17 15-Jul-17 19-Jul-17 24-Sep-17 95% 95% 0% 0.026% 0.026%
1362 5 INSTRUMENT 3963-JALM-4-13-0005 OT DATA SHEET FOR FLOWMETER - CORIOLIS (JALM) 1 A 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 10-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 22-Jul-19 10-May-17 11-Jul-17 12-Jul-17 22-Aug-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.040% 0.040%
1363 5 INSTRUMENT 3963-JALM-4-13-0006 OT DATA SHEET FOR LEVEL TRANSMITTERS (JALM) 1 B 0.028% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 21-Dec-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 14-Sep-17 25-Sep-17 21-Dec-17 95% 95% 0% 0.026% 0.026%
1364 5 INSTRUMENT 3963-JALM-4-13-0007 OT DATA SHEET FOR BS&W ANALYSERS (JALM) 1 A 0.042% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 22-Jul-19 25-May-17 18-Jun-17 19-Jun-17 26-Jul-17 24-Sep-17 24-Sep-17 95% 95% 0% 0.040% 0.040%
1365 5 INSTRUMENT 3963-JALM-4-13-0008 OT DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (JALM) 1 B 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 4-Apr-17 15-Aug-17 17-Aug-17 18-Sep-17 28-Sep-17 18-Oct-17 22-Jul-19 4-Apr-17 15-Aug-17 17-Aug-17 18-Sep-17 28-Sep-17 18-Oct-17 95% 95% 0% 0.040% 0.040%
1366 5 INSTRUMENT 3963-JALM-4-13-0009 OT DATA SHEET FOR CONTROL VALVES (JALM) 1 A 0.042% 2-May-17 12-May-17 17-May-17 17-Jun-17 8-Jul-17 18-Jul-17 31-Oct-18 10-May-17 1-Aug-17 3-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 22-Jul-19 10-May-17 1-Aug-17 3-Aug-17 30-Aug-17 20-Sep-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
1367 5 INSTRUMENT 3963-JALM-4-13-0010 OT DATA SHEET FOR FLOWMETER - VORTEX (JALM) 1 B 0.042% 8-May-17 18-May-17 23-May-17 23-Jun-17 14-Jul-17 24-Jul-17 31-Oct-18 25-May-17 19-Jun-17 20-Jun-17 22-Aug-17 19-Sep-17 20-Sep-17 22-Jul-19 25-May-17 19-Jun-17 20-Jun-17 22-Aug-17 19-Sep-17 20-Sep-17 95% 95% 0% 0.040% 0.040%
1368 5 INSTRUMENT 3963-JALM-4-13-0011 OT DATA SHEET FOR RESTRICTION ORIFICE (JALM) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 22-Jul-19 25-May-17 19-Sep-17 20-Sep-17 18-Oct-17 8-Nov-17 8-Nov-17 95% 95% 0% 0.026% 0.026%
1369 5 INSTRUMENT 3963-JALM-4-13-0012 OT DATA SHEET FOR FIRE & GAS DEVICES (JALM) 1 A 0.042% 22-May-17 1-Jun-17 6-Jun-17 6-Jul-17 27-Jul-17 6-Aug-17 31-Oct-18 15-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 22-Jul-19 15-May-17 17-Jun-17 18-Jun-17 24-Jul-17 10-Aug-17 28-Sep-17 95% 95% 0% 0.040% 0.040%
1370 5 INSTRUMENT 3963-JALM-4-13-0013 OT DATA SHEET FOR LEVEL GAUGES (JALM) 1 B 0.042% 23-Jun-17 28-Jun-17 1-Jul-17 1-Aug-17 22-Aug-17 6-Aug-17 31-Oct-18 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 27-Aug-17 29-Aug-17 22-Jul-19 15-May-17 19-Jul-17 20-Jul-17 20-Jul-17 27-Aug-17 29-Aug-17 95% 95% 0% 0.040% 0.040%
1371 5 INSTRUMENT 3963-DGEN-3-17-0016 OT SIL WORKSHOP REPORT 1 A 0.083% 8-Jul-17 20-Jul-17 25-Jul-17 22-Aug-17 6-Sep-17 13-Sep-17 31-Oct-18 8-Jul-17 29-Nov-17 3-Dec-17 10-Jan-18 24-Jan-18 24-Jan-18 22-Jul-19 8-Jul-17 29-Nov-17 3-Dec-17 10-Jan-18 24-Jan-18 24-Jan-18 95% 95% 0% 0.079% 0.079%
1372 5 INSTRUMENT 3963-DGEN-4-14-0009 OT SPECIFICATION FOR BULK MATERIALS 1 A 0.083% 23-Apr-17 5-May-17 10-May-17 10-Jun-17 1-Jul-17 11-Jul-17 31-Oct-18 3-May-17 11-May-17 11-May-17 22-Jun-17 12-Jul-17 17-Jul-17 22-Jul-19 3-May-17 11-May-17 11-May-17 22-Jun-17 12-Jul-17 17-Jul-17 95% 95% 0% 0.079% 0.079%
1373 5 INSTRUMENT 3963-DGEN-4-14-0010 OT SPECIFICATION FOR INSTRUMENT CABLES 1 A 0.083% 23-Apr-17 5-May-17 10-May-17 10-Jun-17 1-Jul-17 11-Jul-17 31-Oct-18 4-May-17 7-May-17 8-May-17 22-Jun-17 13-Jul-17 18-Jul-17 22-Jul-19 4-May-17 7-May-17 8-May-17 22-Jun-17 13-Jul-17 18-Jul-17 95% 95% 0% 0.079% 0.079%
1374 5 INSTRUMENT 3963-DGEN-4-14-0013 OT SPECIFICATION FOR FOUNDATION FIELDBUS CABLES 1 A 0.083% 23-Apr-17 5-May-17 10-May-17 10-Jun-17 1-Jul-17 11-Jul-17 31-Oct-18 4-May-17 7-May-17 8-May-17 22-Jun-17 13-Jul-17 18-Jul-17 22-Jul-19 4-May-17 7-May-17 8-May-17 22-Jun-17 13-Jul-17 18-Jul-17 95% 95% 0% 0.079% 0.079%
1375 5 INSTRUMENT 3963-JALM-4-00-0001 OT INSTRUMENT INDEX (JALM) 1 A 0.028% 30-May-17 9-Jun-17 14-Jun-17 15-Jul-17 5-Aug-17 15-Aug-17 31-Oct-18 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 19-Oct-17 22-Jul-19 31-May-17 10-Jun-17 11-Jun-17 2-Aug-17 3-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1376 5 INSTRUMENT 3963-JALM-4-39-0001 OT INPUT / OUTPUT LIST - DCS/ESD/F&G (JALM) 1 A 0.028% 5-Jun-17 15-Jun-17 20-Jun-17 21-Jul-17 11-Aug-17 21-Aug-17 31-Oct-18 8-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 22-Jul-19 8-Jun-17 10-Jul-17 11-Jul-17 2-Aug-17 3-Aug-17 7-Dec-17 95% 95% 0% 0.026% 0.026%
1377 5 INSTRUMENT 3963-JALM-4-67-0001 OT ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (JALM) 1 A 0.028% 19-Jun-17 29-Jun-17 4-Jul-17 4-Aug-17 25-Aug-17 4-Sep-17 31-Oct-18 22-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 28-Sep-17 10-Dec-17 22-Jul-19 22-Jun-17 30-Jul-17 31-Jul-17 17-Sep-17 28-Sep-17 10-Dec-17 95% 95% 0% 0.026% 0.026%
1378 5 INSTRUMENT 3963-JALM-4-37-0001 OT INSTRUMENT CABLE SCHEDULE - DCS/ESD/F&G (JALM) 1 A 0.028% 25-Jun-17 5-Jul-17 10-Jul-17 10-Aug-17 31-Aug-17 10-Sep-17 31-Oct-18 29-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 29-Jun-17 29-Jul-17 30-Jul-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1379 5 INSTRUMENT 3963-JALM-4-30-0002 OT INSTRUMENT JUNCTION BOX SCHEDULE (JALM) 1 A 0.028% 28-Jun-17 8-Jul-17 13-Jul-17 13-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 29-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 29-Jun-17 2-Aug-17 3-Aug-17 4-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1380 5 INSTRUMENT 3963-JALM-4-31-0001 OT INSTRUMENT MTO’S (JALM) 3 A 0.042% 10-Aug-17 20-Aug-17 25-Aug-17 8-Sep-17 13-Sep-17 13-Sep-17 31-Oct-18 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 14-Dec-17 22-Jul-19 28-Sep-17 29-Sep-17 1-Oct-17 8-Nov-17 8-Nov-17 14-Dec-17 95% 95% 0% 0.040% 0.040%
1381 5 INSTRUMENT 3963-JALM-4-55-0001 OT INSTRUMENT CABLE BLOCK DIAGRAM (JALM) 1 A 0.028% 6-May-17 16-May-17 21-May-17 21-Jun-17 12-Jul-17 22-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1382 5 INSTRUMENT 3963-JALM-4-56-0001 OT F&G CABLE BLOCK DIAGRAM (JALM) 1 A 0.028% 13-May-17 23-May-17 28-May-17 28-Jun-17 19-Jul-17 29-Jul-17 31-Oct-18 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 22-Jul-19 25-May-17 5-Jun-17 5-Jun-17 26-Jul-17 10-Aug-17 19-Oct-17 95% 95% 0% 0.026% 0.026%
1383 5 INSTRUMENT 3963-JALM-4-50-0001 OT INSTRUMENT LOCATION LAYOUT (JALM) 1 A 0.056% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 18-May-17 19-May-17 21-May-17 25-Sep-17 10-Oct-17 10-Oct-17 22-Jul-19 18-May-17 19-May-17 21-May-17 25-Sep-17 10-Oct-17 10-Oct-17 95% 95% 0% 0.053% 0.053%
1384 5 INSTRUMENT 3963-JALM-4-65-0001 OT INSTRUMENT INTERCONNECTION DIAGRAM (JALM) 1 A 0.042% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 8-Jul-17 14-Oct-17 15-Oct-17 10-Dec-17 21-Dec-17 21-Dec-17 22-Jul-19 8-Jul-17 14-Oct-17 15-Oct-17 10-Dec-17 21-Dec-17 21-Dec-17 95% 95% 0% 0.040% 0.040%
1385 5 INSTRUMENT 3963-JALM-4-65-0002 OT FIRE & GAS INTERCONNECTION DIAGRAM (JALM) 1 A 0.042% 21-Jun-17 1-Jul-17 6-Jul-17 6-Aug-17 27-Aug-17 6-Sep-17 31-Oct-18 21-Jun-17 20-Oct-17 22-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 22-Jul-19 21-Jun-17 20-Oct-17 22-Oct-17 27-Nov-17 11-Dec-17 11-Dec-17 95% 95% 0% 0.040% 0.040%
1386 5 INSTRUMENT 3963-JALM-4-66-0001 OT INSTRUMENT LOOP DIAGRAM (JALM) 1 A 0.056% 8-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 10-Sep-17 17-Sep-17 31-Oct-18 11-Jul-17 5-Nov-17 12-Nov-17 10-Dec-17 26-Feb-18 26-Feb-18 22-Jul-19 11-Jul-17 5-Nov-17 12-Nov-17 10-Dec-17 26-Feb-18 26-Feb-18 95% 95% 0% 0.053% 0.053%
1387 5 INSTRUMENT 3963-JALM-4-66-0002 OT FIRE & GAS LOOP DIAGRAM (JALM) 1 A 0.056% 29-Jul-17 8-Aug-17 13-Aug-17 31-Aug-17 10-Sep-17 20-Sep-17 31-Oct-18 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 22-Jul-19 19-Oct-17 4-Nov-17 6-Nov-17 29-Nov-17 11-Jan-18 11-Jan-18 95% 95% 0% 0.053% 0.053%
1388 5 INSTRUMENT DEM-3963-FAHM-4-39-0002 DEM DEMOLITION - INPUT / OUTPUT LIST - DCS/ESD/F&G (FAHM) 1 A 0.028% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 22-Mar-17 17-May-17 17-May-17 14-Jun-17 14-Jun-17 14-Jun-17 22-Jul-19 22-Mar-17 17-May-17 17-May-17 14-Jun-17 14-Jun-17 14-Jun-17 95% 95% 0% 0.026% 0.026%
1389 5 INSTRUMENT DEM-3963-FAHN-4-39-0002 DEM DEMOLITION - INPUT / OUTPUT LIST - DCS/ESD/F&G (FAHN) 1 A 0.028% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 15-Mar-17 17-May-17 17-May-17 14-Jun-17 25-Jul-17 26-Jul-17 22-Jul-19 15-Mar-17 17-May-17 17-May-17 14-Jun-17 25-Jul-17 26-Jul-17 95% 95% 0% 0.026% 0.026%
1390 5 INSTRUMENT DEM-3963-FAHS-4-39-0002 DEM DEMOLITION - INPUT / OUTPUT LIST - DCS/ESD/F&G (FAHS) 1 A 0.028% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 21-Mar-17 17-May-17 17-May-17 14-Jun-17 25-Jul-17 26-Jul-17 22-Jul-19 21-Mar-17 17-May-17 17-May-17 14-Jun-17 25-Jul-17 26-Jul-17 95% 95% 0% 0.026% 0.026%
1391 5 INSTRUMENT DEM-3963-KAHM-4-39-0002 DEM DEMOLITION - INPUT / OUTPUT LIST - DCS/ESD/F&G (KAHM) 1 A 0.028% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 15-Mar-17 17-May-17 17-May-17 14-Jun-17 25-Jul-17 26-Jul-17 22-Jul-19 15-Mar-17 17-May-17 17-May-17 14-Jun-17 25-Jul-17 26-Jul-17 95% 95% 0% 0.026% 0.026%
1392 5 INSTRUMENT DEM-3963-KAHN-4-39-0002 DEM DEMOLITION - INPUT / OUTPUT LIST - DCS/ESD/F&G (KAHN) 1 A 0.028% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 14-Mar-17 17-May-17 17-May-17 14-Jun-17 22-Jun-17 26-Jul-17 22-Jul-19 14-Mar-17 17-May-17 17-May-17 14-Jun-17 22-Jun-17 26-Jul-17 95% 95% 0% 0.026% 0.026%
1393 5 INSTRUMENT DEM-3963-KAHS-4-39-0002 DEM DEMOLITION - INPUT / OUTPUT LIST - DCS/ESD/F&G (KAHS) 1 A 0.028% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 21-Mar-17 19-May-17 21-May-17 20-Jun-17 20-Jun-17 20-Jun-17 22-Jul-19 21-Mar-17 19-May-17 21-May-17 20-Jun-17 20-Jun-17 20-Jun-17 95% 95% 0% 0.026% 0.026%
1394 5 INSTRUMENT DEM-3963-JALM-4-39-0002 DEM DEMOLITION - INPUT / OUTPUT LIST - DCS/ESD/F&G (JALM) 1 A 0.028% 29-Apr-17 9-May-17 14-May-17 14-Jun-17 5-Jul-17 15-Jul-17 31-Oct-18 15-Mar-17 17-May-17 17-May-17 14-Jun-17 22-Jun-17 26-Jul-17 22-Jul-19 15-Mar-17 17-May-17 17-May-17 14-Jun-17 22-Jun-17 26-Jul-17 95% 95% 0% 0.026% 0.026%
1395 5 INSTRUMENT 3963-FAHS-4-52-0001 OT BUILDING LAYOUT (FAHS) 1 C 0.056% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 15-May-17 6-Jun-17 6-Jun-17 23-Jul-17 24-Jul-17 25-Jul-17 22-Jul-19 15-May-17 6-Jun-17 6-Jun-17 23-Jul-17 24-Jul-17 25-Jul-17 95% 95% 0% 0.053% 0.053%
1396 5 INSTRUMENT 3963-KAHN-4-52-0001 OT INST. EQUIP. LAYOUT IN CONTROL ROOM/INST. EQUIP. ROOM (KAHN) 1 A 0.056% 17-May-17 27-May-17 1-Jun-17 2-Jul-17 23-Jul-17 2-Aug-17 31-Oct-18 15-May-17 8-Jun-17 8-Jun-17 26-Jul-17 20-Sep-17 27-Nov-17 22-Jul-19 15-May-17 8-Jun-17 8-Jun-17 26-Jul-17 20-Sep-17 27-Nov-17 95% 95% 0% 0.053% 0.053%
1397 5 INSTRUMENT 3963-FAHM-4-53-0001 OT INSTRUMENT CABLE ROUTING LAYOUT (FAHM) 1 A 0.111% 27-May-17 6-Jun-17 11-Jun-17 12-Jul-17 2-Aug-17 12-Aug-17 31-Oct-18 31-May-17 12-Sep-17 13-Sep-17 4-Oct-17 4-Oct-17 4-Oct-17 22-Jul-19 31-May-17 12-Sep-17 13-Sep-17 4-Oct-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.106% 0.106%
1398 5 INSTRUMENT 3963-FAHN-4-53-0001 OT INSTRUMENT CABLE ROUTING LAYOUT (FAHN) 1 A 0.111% 27-May-17 6-Jun-17 11-Jun-17 12-Jul-17 2-Aug-17 12-Aug-17 31-Oct-18 1-Jun-17 17-Jul-17 18-Jul-17 13-Sep-17 4-Oct-17 4-Oct-17 22-Jul-19 1-Jun-17 17-Jul-17 18-Jul-17 13-Sep-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.106% 0.106%
1399 5 INSTRUMENT 3963-FAHS-4-53-0001 OT INSTRUMENT CABLE ROUTING LAYOUT (FAHS) 1 A 0.056% 27-May-17 6-Jun-17 11-Jun-17 12-Jul-17 2-Aug-17 12-Aug-17 31-Oct-18 1-Jun-17 17-Jul-17 18-Jul-17 27-Aug-17 29-Aug-17 31-Aug-17 22-Jul-19 1-Jun-17 17-Jul-17 18-Jul-17 27-Aug-17 29-Aug-17 31-Aug-17 95% 95% 0% 0.053% 0.053%
1400 5 INSTRUMENT 3963-KAHM-4-53-0001 OT INSTRUMENT CABLE ROUTING LAYOUT (KAHM) 1 A 0.042% 27-May-17 6-Jun-17 11-Jun-17 12-Jul-17 2-Aug-17 12-Aug-17 31-Oct-18 1-Jun-17 18-Jun-17 19-Jun-17 17-Sep-17 4-Oct-17 4-Oct-17 22-Jul-19 1-Jun-17 18-Jun-17 19-Jun-17 17-Sep-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.040% 0.040%
1401 5 INSTRUMENT 3963-KAHN-4-53-0001 OT INSTRUMENT CABLE ROUTING LAYOUT (KAHN) 1 A 0.042% 27-May-17 6-Jun-17 11-Jun-17 12-Jul-17 2-Aug-17 12-Aug-17 31-Oct-18 1-Jun-17 18-Jun-17 19-Jun-17 17-Sep-17 4-Oct-17 4-Oct-17 22-Jul-19 1-Jun-17 18-Jun-17 19-Jun-17 17-Sep-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.040% 0.040%
1402 5 INSTRUMENT 3963-KAHS-4-53-0001 OT INSTRUMENT CABLE ROUTING LAYOUT (KAHS) 1 A 0.042% 27-May-17 6-Jun-17 11-Jun-17 12-Jul-17 2-Aug-17 12-Aug-17 31-Oct-18 1-Jun-17 29-Aug-17 30-Aug-17 3-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 1-Jun-17 29-Aug-17 30-Aug-17 3-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.040% 0.040%
1403 5 INSTRUMENT 3963-JALM-4-53-0001 OT INSTRUMENT CABLE ROUTING LAYOUT (JALM) 1 A 0.042% 27-May-17 6-Jun-17 11-Jun-17 12-Jul-17 2-Aug-17 12-Aug-17 31-Oct-18 1-Jun-17 17-Jul-17 18-Jul-17 17-Sep-17 4-Oct-17 4-Oct-17 22-Jul-19 1-Jun-17 17-Jul-17 18-Jul-17 17-Sep-17 4-Oct-17 4-Oct-17 95% 95% 0% 0.040% 0.040%

Page 19 of 63
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
100.000% REV D
Original BL Rev-D 25-Oct-18
SHUTDO
DISCSE ITEM DOC CURRENT WN START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT START DRAFT/IDC IFC IFA IAWH IAFC AS-BUILT Deliverable Milestone
SRN DISCIPLINE DOC NO DOC DESC WV Weight Factor %
Q CODE CLASS REVISION PACKAG 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100% 5% 0% 40% 65% 85% 95% 100%
E Plan Actual Variance
SHUTDO PLANNED PLANNED ACTUAL
ITEM DOC CURRENT WN Planned Actual Actual
SRN SEQ DISCIPLINE DOC NO DOC DESC WV PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT PLS PLD PLIFC PLIFA PLIAWH PLIAFC PLASBUILT ACTS ACTD ACTIFC ACTIFA ACTIAWH ACTIAFC ACTASBUILT Plan WF Actual WF
CODE CLASS REVISION PACKAG Deliverable MS Deliverable MS Deliverable MS
1404 5 INSTRUMENT 3963-FAHM-4-54-0001 OT FIRE & GAS CABLE ROUTING LAYOUT (FAHM) 1 A E 0.042% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 1-Jun-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.040% 0.040%
1405 5 INSTRUMENT 3963-FAHN-4-54-0001 OT FIRE & GAS CABLE ROUTING LAYOUT (FAHN) 1 A 0.056% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 1-Jun-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.053% 0.053%
1406 5 INSTRUMENT 3963-FAHS-4-54-0001 OT FIRE & GAS CABLE ROUTING LAYOUT (FAHS) 1 A 0.056% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 1-Jun-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.053% 0.053%
1407 5 INSTRUMENT 3963-KAHM-4-54-0001 OT FIRE & GAS CABLE ROUTING LAYOUT (KAHM) 1 A 0.056% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 1-Jun-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 1-Jun-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.053% 0.053%
1408 5 INSTRUMENT 3963-KAHN-4-54-0001 OT FIRE & GAS CABLE ROUTING LAYOUT (KAHN) 1 A 0.056% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 31-May-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.053% 0.053%
1409 5 INSTRUMENT 3963-KAHS-4-54-0001 OT FIRE & GAS CABLE ROUTING LAYOUT (KAHS) 1 A 0.056% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 31-May-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 31-May-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.053% 0.053%
1410 5 INSTRUMENT 3963-JALM-4-54-0001 OT FIRE & GAS CABLE ROUTING LAYOUT (JALM) 1 A 0.056% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 22-Mar-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 22-Jul-19 22-Mar-17 23-Jul-17 24-Jul-17 3-Oct-17 3-Oct-17 3-Oct-17 95% 95% 0% 0.053% 0.053%
1411 5 INSTRUMENT 3963-DGEN-4-15-0008 OT MATERIAL REQUISITION FOR GAUGES (PG/TG) 1 B 0.069% 2-Jul-17 12-Jul-17 17-Jul-17 17-Aug-17 6-Sep-17 16-Sep-17 31-Oct-18 15-Mar-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 20-Sep-17 22-Jul-19 15-Mar-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 20-Sep-17 95% 95% 0% 0.066% 0.066%
1412 5 INSTRUMENT 3963-DGEN-4-15-0009 OT MATERIAL REQUISITION FOR FLOW TRANSMITTERS 1 B 0.069% 18-Jun-17 28-Jun-17 3-Jul-17 3-Aug-17 24-Aug-17 3-Sep-17 31-Oct-18 21-Mar-17 12-Jul-17 13-Jul-17 2-Aug-17 3-Aug-17 20-Sep-17 22-Jul-19 21-Mar-17 12-Jul-17 13-Jul-17 2-Aug-17 3-Aug-17 20-Sep-17 95% 95% 0% 0.066% 0.066%
1413 5 INSTRUMENT 3963-DGEN-4-15-0010 OT MATERIAL REQUISITION FOR BS&W ANALYSERS 1 A 0.069% 12-Jun-17 22-Jun-17 27-Jun-17 28-Jul-17 18-Aug-17 28-Aug-17 31-Oct-18 15-Mar-17 11-Jul-17 12-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 22-Jul-19 15-Mar-17 11-Jul-17 12-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.066% 0.066%
1414 5 INSTRUMENT 3963-DGEN-4-15-0011 OT MATERIAL REQUISITION FOR CONTROL VALVES 1 A 0.069% 31-May-17 10-Jun-17 15-Jun-17 16-Jul-17 6-Aug-17 16-Aug-17 31-Oct-18 14-Mar-17 18-Jun-17 19-Jun-17 17-Aug-17 17-Sep-17 18-Sep-17 22-Jul-19 14-Mar-17 18-Jun-17 19-Jun-17 17-Aug-17 17-Sep-17 18-Sep-17 95% 95% 0% 0.066% 0.066%
1415 5 INSTRUMENT 3963-DGEN-4-17-0008 OT TECHNICAL BID EVALUATION FOR GAUGES (PG/TG) 1 B 0.167% 30-Aug-17 9-Sep-17 14-Sep-17 21-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 21-Mar-17 12-Dec-17 14-Dec-17 4-Jan-18 4-Jan-18 4-Jan-18 22-Jul-19 21-Mar-17 12-Dec-17 14-Dec-17 4-Jan-18 4-Jan-18 4-Jan-18 95% 95% 0% 0.158% 0.158%
1416 5 INSTRUMENT 3963-DGEN-4-17-0009 OT TECHNICAL BID EVALUATION FOR FLOW TRANSMITTERS 1 A 0.167% 5-Aug-17 15-Aug-17 20-Aug-17 9-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 15-Mar-17 24-Oct-17 26-Oct-17 21-Nov-17 9-Jan-18 9-Jan-18 22-Jul-19 15-Mar-17 24-Oct-17 26-Oct-17 21-Nov-17 9-Jan-18 9-Jan-18 95% 95% 0% 0.158% 0.158%
1417 5 INSTRUMENT 3963-DGEN-4-17-0010 OT TECHNICAL BID EVALUATION FOR BS&W ANALYSERS 1 A 0.222% 12-Aug-17 22-Aug-17 27-Aug-17 12-Sep-17 18-Sep-17 21-Sep-17 31-Oct-18 21-Mar-17 25-Nov-17 27-Nov-17 21-Dec-17 18-Jan-18 18-Jan-18 22-Jul-19 21-Mar-17 25-Nov-17 27-Nov-17 21-Dec-17 18-Jan-18 18-Jan-18 95% 95% 0% 0.211% 0.211%
1418 5 INSTRUMENT 3963-DGEN-4-17-0011 OT TECHNICAL BID EVALUATION FOR CONTROL VALVES 1 A 0.222% 22-Jul-17 1-Aug-17 6-Aug-17 24-Aug-17 3-Sep-17 13-Sep-17 31-Oct-18 27-Jul-17 24-Oct-17 26-Oct-17 19-Nov-17 3-Dec-17 3-Dec-17 22-Jul-19 27-Jul-17 24-Oct-17 26-Oct-17 19-Nov-17 3-Dec-17 3-Dec-17 95% 95% 0% 0.211% 0.211%
1419 5 INSTRUMENT 3963-DGEN-4-14-0002 OT SPECIFICATION FOR PRESSURE INSTRUMENTS 1 A 0.056% 10-Apr-17 20-Apr-17 25-Apr-17 26-May-17 16-Jun-17 26-Jun-17 31-Oct-18 19-Apr-17 27-Apr-17 30-Apr-17 5-Jun-17 5-Jun-17 5-Jun-17 22-Jul-19 19-Apr-17 27-Apr-17 30-Apr-17 5-Jun-17 5-Jun-17 5-Jun-17 95% 95% 0% 0.053% 0.053%
1420 5 INSTRUMENT 3963-DGEN-4-14-0003 OT SPECIFICATION FOR TEMPERATURE INSTRUMENTS 1 A 0.056% 10-Apr-17 20-Apr-17 25-Apr-17 26-May-17 16-Jun-17 26-Jun-17 31-Oct-18 19-Apr-17 29-Apr-17 2-May-17 16-Jul-17 24-Jul-17 25-Jul-17 22-Jul-19 19-Apr-17 29-Apr-17 2-May-17 16-Jul-17 24-Jul-17 25-Jul-17 95% 95% 0% 0.053% 0.053%
1421 5 INSTRUMENT 3963-DGEN-4-14-0004 OT SPECIFICATION FOR FLOW INSTRUMENTS 1 A 0.056% 16-Apr-17 26-Apr-17 1-May-17 1-Jun-17 22-Jun-17 2-Jul-17 31-Oct-18 22-Mar-17 29-Apr-17 2-May-17 16-Jul-17 24-Jul-17 25-Jul-17 22-Jul-19 22-Mar-17 29-Apr-17 2-May-17 16-Jul-17 24-Jul-17 25-Jul-17 95% 95% 0% 0.053% 0.053%
1422 5 INSTRUMENT 3963-DGEN-4-14-0005 OT SPECIFICATION FOR LEVEL INSTRUMENTS 1 A 0.056% 16-Apr-17 26-Apr-17 1-May-17 1-Jun-17 22-Jun-17 2-Jul-17 31-Oct-18 15-Mar-17 29-Apr-17 2-May-17 17-Aug-17 17-Aug-17 17-Aug-17 22-Jul-19 15-Mar-17 29-Apr-17 2-May-17 17-Aug-17 17-Aug-17 17-Aug-17 95% 95% 0% 0.053% 0.053%
1423 5 INSTRUMENT 3963-DGEN-4-14-0006 OT SPECIFICATION FOR CONTROL VALVES 1 A 0.056% 4-Apr-17 14-Apr-17 19-Apr-17 20-May-17 10-Jun-17 20-Jun-17 31-Oct-18 21-Mar-17 27-Apr-17 30-Apr-17 5-Jun-17 5-Jun-17 5-Jun-17 22-Jul-19 21-Mar-17 27-Apr-17 30-Apr-17 5-Jun-17 5-Jun-17 5-Jun-17 95% 95% 0% 0.053% 0.053%
1424 5 INSTRUMENT 3963-DGEN-4-14-0007 OT SPECIFICATION FOR SHUTDOWN / BLOWDOWN VALVES 1 A 0.056% 4-Apr-17 14-Apr-17 19-Apr-17 20-May-17 10-Jun-17 20-Jun-17 31-Oct-18 15-Mar-17 27-Apr-17 30-Apr-17 17-Aug-17 17-Aug-17 17-Aug-17 22-Jul-19 15-Mar-17 27-Apr-17 30-Apr-17 17-Aug-17 17-Aug-17 17-Aug-17 95% 95% 0% 0.053% 0.053%
1425 5 INSTRUMENT 3963-DGEN-4-14-0008 OT SPECIFICATION FOR FIRE & GAS DEVICES 1 A 0.056% 22-Apr-17 2-May-17 7-May-17 7-Jun-17 28-Jun-17 8-Jul-17 31-Oct-18 14-Mar-17 27-Apr-17 30-Apr-17 12-Jul-17 13-Jul-17 18-Jul-17 22-Jul-19 14-Mar-17 27-Apr-17 30-Apr-17 12-Jul-17 13-Jul-17 18-Jul-17 95% 95% 0% 0.053% 0.053%
1426 5 INSTRUMENT 3963-DGEN-4-14-0011 OT SPECIFICATION FOR RESTRICTION ORIFICE 1 A 0.056% 2-May-17 5-May-17 10-May-17 10-Jun-17 1-Jul-17 11-Jul-17 31-Oct-18 15-Mar-17 30-Apr-17 3-May-17 15-Jul-17 19-Jul-17 14-Sep-17 22-Jul-19 15-Mar-17 30-Apr-17 3-May-17 15-Jul-17 19-Jul-17 14-Sep-17 95% 95% 0% 0.053% 0.053%
1427 5 INSTRUMENT 3963-DGEN-4-14-0012 OT SPECIFICATION FOR BS&W ANALYSER 1 A 0.056% 7-May-17 10-May-17 15-May-17 15-Jun-17 6-Jul-17 16-Jul-17 31-Oct-18 14-Mar-17 19-May-17 21-May-17 16-Jul-17 24-Jul-17 25-Jul-17 22-Jul-19 14-Mar-17 19-May-17 21-May-17 16-Jul-17 24-Jul-17 25-Jul-17 95% 95% 0% 0.053% 0.053%
1428 5 INSTRUMENT 3963-DGEN-4-15-0012 OT MATERIAL REQUISITION FOR EXISTING SYSTEM MODIFICATIONS (EMERSON) 1 A 0.056% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 21-Mar-17 6-Aug-17 8-Aug-17 1-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 21-Mar-17 6-Aug-17 8-Aug-17 1-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.053% 0.053%
1429 5 INSTRUMENT 3963-DGEN-4-15-0013 ET MATERIAL REQUISITION FOR EXISTING SYSTEM MODIFICATIONS (YOKOGAWA) 1 A Y 0.056% 14-Jun-17 24-Jun-17 29-Jun-17 30-Jul-17 20-Aug-17 30-Aug-17 31-Oct-18 15-Mar-17 2-Aug-17 3-Aug-17 1-Oct-17 18-Oct-17 19-Oct-17 22-Jul-19 15-Mar-17 2-Aug-17 3-Aug-17 1-Oct-17 18-Oct-17 19-Oct-17 95% 95% 0% 0.053% 0.053%
1430 5 INSTRUMENT 3963-DGEN-4-17-0012 OT TECHNICAL BID EVALUATION FOR EXISTING SYSTEM MODIFICATIONS (EMERSON) 1 A 0.278% 19-Aug-17 29-Aug-17 3-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 21-Mar-17 28-Nov-17 30-Nov-17 21-Dec-17 21-Dec-17 21-Dec-17 22-Jul-19 21-Mar-17 28-Nov-17 30-Nov-17 21-Dec-17 21-Dec-17 21-Dec-17 95% 95% 0% 0.264% 0.264%
1431 5 INSTRUMENT 3963-DGEN-4-17-0013 ET TECHNICAL BID EVALUATION FOR EXISTING SYSTEM MODIFICATIONS (YOKOGAWA) 1 A Y 0.278% 19-Aug-17 29-Aug-17 3-Sep-17 16-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 5-Nov-17 12-Nov-17 6-Dec-17 6-Dec-17 6-Dec-17 22-Jul-19 19-Oct-17 5-Nov-17 12-Nov-17 6-Dec-17 6-Dec-17 6-Dec-17 95% 95% 0% 0.264% 0.264%
1432 5 INSTRUMENT 3963-DGEN-4-15-0015 OT MATERIAL REQUISITION FOR LEVEL GAUGES (GLASS TYPE) 1 B 0.028% 6-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 13-Sep-17 23-Sep-17 31-Oct-18 18-Jul-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 22-Jul-19 18-Jul-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.026% 0.026%
1433 5 INSTRUMENT 3963-DGEN-4-15-0016 OT MATERIAL REQUISITION FOR LEVEL TRANSMITTERS (DISPLACER) 1 B 0.028% 6-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 13-Sep-17 23-Sep-17 31-Oct-18 18-Jul-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 22-Jul-19 18-Jul-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.026% 0.026%
1434 5 INSTRUMENT 3963-DGEN-4-15-0017 OT MATERIAL REQUISITION FOR LEVEL TRANSMITTERS (RADAR) 1 B 0.028% 6-Jul-17 18-Jul-17 23-Jul-17 23-Aug-17 13-Sep-17 23-Sep-17 31-Oct-18 18-Jul-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 22-Jul-19 18-Jul-17 19-Jul-17 20-Jul-17 2-Aug-17 3-Aug-17 28-Sep-17 95% 95% 0% 0.026% 0.026%
1435 5 INSTRUMENT 3963-DGEN-4-17-0016 OT TECHNICAL BID EVALUATION FOR LEVEL TRANSMITTERS (DISPLACER) 1 A 0.028% 13-Sep-17 25-Sep-17 30-Sep-17 31-Oct-17 21-Nov-17 1-Dec-17 31-Oct-18 19-Oct-17 7-Nov-17 9-Nov-17 9-Nov-17 7-Dec-17 4-Dec-17 22-Jul-19 19-Oct-17 7-Nov-17 9-Nov-17 9-Nov-17 7-Dec-17 4-Dec-17 95% 95% 0% 0.026% 0.026%
1436 5 INSTRUMENT 3963-DGEN-4-17-0017 OT TECHNICAL BID EVALUATION FOR LEVEL TRANSMITTERS (RADAR) 1 A 0.028% 13-Sep-17 25-Sep-17 30-Sep-17 31-Oct-17 21-Nov-17 1-Dec-17 31-Oct-18 19-Oct-17 8-Dec-17 10-Dec-17 4-Jan-18 9-Jan-18 9-Jan-18 22-Jul-19 19-Oct-17 8-Dec-17 10-Dec-17 4-Jan-18 9-Jan-18 9-Jan-18 95% 95% 0% 0.026% 0.026%
1437 5 INSTRUMENT 3963-FAHM-4-13-0014 OT DATA SHEET FOR INSTRUMENT CABLES (FAHM) 1 B 0.028% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 15-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 22-Jul-19 15-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 95% 95% 0% 0.026% 0.026%
1438 5 INSTRUMENT 3963-FAHN-4-13-0014 OT DATA SHEET FOR INSTRUMENT CABLES (FAHN) 1 B 0.028% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 22-Jul-19 19-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 95% 95% 0% 0.026% 0.026%
1439 5 INSTRUMENT 3963-FAHS-4-13-0014 OT DATA SHEET FOR INSTRUMENT CABLES (FAHS) 1 B 0.028% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 15-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 22-Jul-19 15-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 95% 95% 0% 0.026% 0.026%
1440 5 INSTRUMENT 3963-KAHM-4-13-0014 OT DATA SHEET FOR INSTRUMENT CABLES (KAHM) 1 B 0.028% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 20-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 22-Jul-19 20-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 95% 95% 0% 0.026% 0.026%
1441 5 INSTRUMENT 3963-KAHN-4-13-0014 OT DATA SHEET FOR INSTRUMENT CABLES (KAHN) 1 B 0.028% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 20-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 22-Jul-19 20-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 95% 95% 0% 0.026% 0.026%
1442 5 INSTRUMENT 3963-KAHS-4-13-0014 OT DATA SHEET FOR INSTRUMENT CABLES (KAHS) 1 B 0.028% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 15-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 22-Jul-19 15-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 95% 95% 0% 0.026% 0.026%
1443 5 INSTRUMENT 3963-JALM-4-13-0014 OT DATA SHEET FOR INSTRUMENT CABLES (JALM) 1 B 0.028% 14-Jul-17 26-Jul-17 31-Jul-17 31-Aug-17 21-Sep-17 1-Oct-17 31-Oct-18 19-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 22-Jul-19 19-Jul-17 29-Jul-17 30-Jul-17 18-Sep-17 28-Sep-17 28-Sep-17 95% 95% 0% 0.026% 0.026%
1444 5 INSTRUMENT 3963-DGEN-3-17-0017 OT SIL - TERMS OF REFERENCE 1 A 0.028% 14-Sep-17 23-Sep-17 30-Sep-17 10-Oct-17 20-Oct-17 4-Nov-17 31-Oct-18 17-Oct-17 18-Oct-17 19-Oct-17 24-Jan-18 24-Jan-18 24-Jan-18 22-Jul-19 17-Oct-17 18-Oct-17 19-Oct-17 24-Jan-18 24-Jan-18 24-Jan-18 95% 95% 0% 0.026% 0.026%
1445 0 INSTRUMENT 3963-DGEN-4-00-0001 OT MISCELLANEOUS - INSTRUMENTATION 0 0 0.000% 14-Sep-17 23-Sep-17 30-Sep-17 10-Oct-17 20-Oct-17 4-Nov-17 31-Oct-18 1-Feb-18 6-Feb-18 8-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 22-Jul-19 1-Feb-18 6-Feb-18 8-Mar-18 8-Mar-18 8-Mar-18 8-Mar-18 95% 95% 0% 0.000% 0.000%
1446 5 INSTRUMENT 3963-FAHM-4-51-0001 OT FIRE & GAS LOCATION LAYOUT (FAHM) 1 A 0.056% 22-Apr-17 2-May-17 7-May-17 7-Jun-17 28-Jun-17 8-Jul-17 31-Oct-18 11-May-17 18-Jun-17 19-Jun-17 19-Jul-17 10-Aug-17 25-Jan-18 22-Jul-19 11-May-17 18-Jun-17 19-Jun-17 19-Jul-17 10-Aug-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1447 5 INSTRUMENT 3963-FAHN-4-51-0001 OT FIRE & GAS LOCATION LAYOUT (FAHN) 1 A 0.056% 22-Apr-17 2-May-17 7-May-17 7-Jun-17 28-Jun-17 8-Jul-17 31-Oct-18 11-May-17 18-Jun-17 19-Jun-17 19-Jul-17 10-Aug-17 25-Jan-18 22-Jul-19 11-May-17 18-Jun-17 19-Jun-17 19-Jul-17 10-Aug-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1448 5 INSTRUMENT 3963-FAHS-4-51-0001 OT FIRE & GAS LOCATION LAYOUT (FAHS) 1 A 0.056% 22-Apr-17 2-May-17 7-May-17 7-Jun-17 28-Jun-17 8-Jul-17 31-Oct-18 11-May-17 18-Jun-17 19-Jun-17 19-Jul-17 10-Aug-17 25-Jan-18 22-Jul-19 11-May-17 18-Jun-17 19-Jun-17 19-Jul-17 10-Aug-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1449 5 INSTRUMENT 3963-KAHM-4-51-0001 OT FIRE & GAS LOCATION LAYOUT (KAHM) 1 A 0.056% 22-Apr-17 2-May-17 7-May-17 7-Jun-17 28-Jun-17 8-Jul-17 31-Oct-18 11-May-17 19-May-17 21-May-17 19-Jun-17 20-Sep-17 25-Jan-18 22-Jul-19 11-May-17 19-May-17 21-May-17 19-Jun-17 20-Sep-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1450 5 INSTRUMENT 3963-KAHN-4-51-0001 OT FIRE & GAS LOCATION LAYOUT (KAHN) 1 A 0.056% 22-Apr-17 2-May-17 7-May-17 7-Jun-17 28-Jun-17 8-Jul-17 31-Oct-18 11-May-17 17-May-17 17-May-17 11-Jun-17 11-Jun-17 25-Jan-18 22-Jul-19 11-May-17 17-May-17 17-May-17 11-Jun-17 11-Jun-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1451 5 INSTRUMENT 3963-KAHS-4-51-0001 OT FIRE & GAS LOCATION LAYOUT (KAHS) 1 A 0.056% 22-Apr-17 2-May-17 7-May-17 7-Jun-17 28-Jun-17 8-Jul-17 31-Oct-18 11-May-17 17-May-17 17-May-17 11-Jun-17 11-Jun-17 25-Jan-18 22-Jul-19 11-May-17 17-May-17 17-May-17 11-Jun-17 11-Jun-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1452 5 INSTRUMENT 3963-JALM-4-51-0001 OT FIRE & GAS LOCATION LAYOUT (JALM) 1 A 0.056% 22-Apr-17 2-May-17 7-May-17 7-Jun-17 28-Jun-17 8-Jul-17 31-Oct-18 11-May-17 17-May-17 17-May-17 11-Jun-17 11-Jun-17 25-Jan-18 22-Jul-19 11-May-17 17-May-17 17-May-17 11-Jun-17 11-Jun-17 25-Jan-18 95% 95% 0% 0.053% 0.053%
1453 5 INSTRUMENT 3963-DGEN-4-17-0007 OT TECHNICAL BID EVALUATION FOR FIRE & GAS DEVICES 1 1 0.181% 26-Aug-17 5-Sep-17 10-Sep-17 17-Sep-17 21-Sep-17 21-Sep-17 31-Oct-18 19-Oct-17 5-Dec-17 7-Dec-17 21-Feb-18 16-Apr-18 16-Apr-18 22-Jul-19 19-Oct-17 5-Dec-17 7-Dec-17 21-Feb-18 16-Apr-18 16-Apr-18 95% 95% 0% 0.172% 0.172%
1454 5 INSTRUMENT 3963-DGEN-4-17-0015 OT TECHNICAL BID EVALUATION FOR LEVEL GAUGES (GLASS TYPE) 1 1 0.028% 13-Sep-17 25-Sep-17 30-Sep-17 31-Oct-17 21-Nov-17 1-Dec-17 31-Oct-18 19-Oct-17 16-Dec-17 17-Dec-17 7-Feb-18 5-Apr-18 5-Apr-18 22-Jul-19 19-Oct-17 16-Dec-17 17-Dec-17 7-Feb-18 5-Apr-18 5-Apr-18 95% 95% 0% 0.026% 0.026%

Ind. OWF IWF (Out of 100%)


Discipline Weight
NO.OF DE Factor Plan Actual Plan Actual
OTHER OT 8 GENERAL 2.44% 2.32% 2.32% 95.00% 95.00%
111 CIVIL 13.19% 12.53% 12.53% 95.00% 95.00% ITEM G A
105 ELECTRICAL 10.65% 10.12% 10.12% 95.00% 95.00% ITEM F B Ind. Weight Factor OWF IWF (Out of 100%) PROGRESS

96 SAFETY 8.19% 7.78% 7.78% 95.00% 95.00% ITEM H C 93.43% DISCIPLINE Plan Actual Plan Actual Var. 11/1/2018 94.64%
263 INSTRUMENTATIO 12.35% 11.73% 11.73% 95.00% 95.00% ITEM E D 94.28% GENERAL 2.44% 2.32% 2.32% 95.00% 95.00% 0.00% 11/8/2018 94.64%
0.144% 16 MECHANICAL 1.92% 1.82% 1.82% 95.00% 95.00% E 95.00% CIVIL 14.42% 13.70% 13.70% 95.00% 95.00% 0.00% 11/15/2018 94.64%
110 PROCESS 7.78% 7.27% 7.27% 93.43% 93.43% ITEM C F 95.00% ELECTRICAL 10.65% 10.12% 10.12% 95.00% 95.00% 0.00% 11/22/2018 94.64%
525 PIPING 31.00% 29.21% 29.21% 94.24% 94.24% G 95.00% SAFETY 10.07% 9.57% 9.57% 95.00% 95.00% 0.00% 11/29/2018 94.64%
1234 Total 87.52% 82.79% 82.79% 94.59% 94.59% H 95.00% INSTRUMENTATION 12.96% 12.31% 12.31% 95.00% 95.00% 0.00% 12/6/2018 94.88%
I MECHANICAL 1.92% 1.82% 1.82% 95.00% 95.00% 0.00% 12/13/2018 94.88%
Engineering Discipline Progress Table (Mechanical & Piping)
Ind.
J 95.00% PROCESS 11.33% 10.64% 10.64% 93.92% 93.92% 0.00% 12/20/2018 94.88%
NO.OF DEDiscipline Weight WT Progress % K 95.00% PIPING 36.21% 34.16% 34.16% 94.35% 94.35% 0.00% 12/27/2018 94.93%
Factor
OTHER OT 16 MECHANICAL 1.92% 5.82% 95.00% L 95.00% Total 100.00% 94.64% 94.64% 94.64% 94.64% 0.00% 1/3/2019 95.00%
525 PIPING 31.00% 94.18% 94.24% M 1/10/2019
541 Total 32.91% 100.00% 94.28% ITEM-D 1/17/2019
1/24/2019

Engineering Discipline Progress Table- Demolition Discipline


Ind. OWF IWF (Out of 100%)
Discipline Weight
NO.OF DE Factor Plan Actual Plan Actual
DEMOLIT DEM 0 GENERAL 0.00% 0.00% 0.00% #DIV/0! #DIV/0!
14 CIVIL 1.22% 1.16% 1.16% 95.00% 95.00%
0 ELECTRICAL 0.00% 0.00% 0.00%
5 SAFETY 0.83% 0.79% 0.79% 95.00% 95.00%
7 INSTRUMENTATIO 0.19% 0.18% 0.18% 95.00% 95.00%
0 MECHANICAL 0.00% 0.00% 0.00%
68 PROCESS 3.56% 3.38% 3.38% 95.00% 95.00%
104 PIPING 4.25% 4.03% 4.03% 95.00% 95.00%
198 Total 10.05% 9.55% 9.55% 95.00% 95.00% ITEM J

Engineering Discipline Progress Table- Early Tie-in Package


Ind. OWF IWF (Out of 100%)
Discipline Weight
NO.OF DE Factor Plan Actual Plan Actual
EARLY TIE-I ET 5 INSTRUMENTATIO 0.42% 0.40% 0.40% 95.00% 95.00%
11 PIPING 0.97% 0.92% 0.92% 95.00% 95.00%
16 Total 1.38% 1.31% 1.31% 95.00% 95.00% ITEM K

Engineering Discipline Progress Table- Early Tie-in Package


ITEM- CODE Ind. OWF IWF (Out of 100%)
Discipline Weight
NO.OF DE Factor Plan Actual Plan Actual
HAZID & HA L 6 SAFETY 1.04% 0.99% 0.99% 95.00% 95.00%
6 Total 1.04% 0.99% 0.99% 95.00% 95.00% ITEM L

Page 20 of 63
Plan
Plan
WEEK

Actual
Actual
Rev. Cum.
Rev. Cum.
Cum Actual
Overall Project

Rev. Weekly

Rev. Weekly
B/L Cum. Plan

Weekly Actual
B/L Weekly Plan
100.00%

0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
2-Mar-17

1
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2-Mar-17
6-Mar-17
10-Mar-17

2
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.02% 9-Mar-17
14-Mar-17
18-Mar-17

3
0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.20% 0.23% 16-Mar-17
22-Mar-17
26-Mar-17

4
0.45% 0.58% 0.45% 0.58% 0.45% 0.58% 0.10% 0.32% 23-Mar-17
30-Mar-17
3-Apr-17

5
0.80% 1.38% 0.80% 1.38% 0.80% 1.38% 0.94% 1.26% 30-Mar-17
7-Apr-17
11-Apr-17

6
0.70% 2.08% 0.70% 2.08% 0.68% 2.08% 0.28% 1.54% 6-Apr-17 15-Apr-17
19-Apr-17

7
0.80% 2.88% 0.80% 2.88% 0.81% 2.88% 0.65% 2.19% 13-Apr-17 23-Apr-17
27-Apr-17

QATAR BRANCH
8
0.62% 3.50% 0.62% 3.50% 0.62% 3.50% 1.05% 3.24% 20-Apr-17 1-May-17
5-May-17
9-May-17

9
0.85% 4.35% 0.85% 4.35% 0.85% 4.35% 0.59% 3.83% 27-Apr-17
13-May-17

4-May-17 17-May-17

10
1.76% 6.11% 1.76% 6.11% 1.76% 6.11% 2.19% 6.02%
21-May-17
25-May-17
2.49% 8.60% 2.49% 8.60% 2.50% 8.60% 2.74% 8.76% 11-May-17

11
29-May-17
2-Jun-17
18-May-17

12
1.85% 10.45% 1.85% 10.45% 1.85% 10.45% 3.10% 11.85%
6-Jun-17

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION


10-Jun-17
2.08% 12.54% 2.08% 12.54% 2.08% 12.54% 2.23% 14.09% 25-May-17

13
14-Jun-17
18-Jun-17
1-Jun-17

14
1.84% 14.37% 1.84% 14.37% 1.84% 14.37% 2.75% 16.84% 22-Jun-17
26-Jun-17
8-Jun-17

15
1.28% 15.65% 1.28% 15.65% 1.28% 15.65% 4.50% 21.34% 30-Jun-17
4-Jul-17
1.89% 17.55% 1.89% 17.55% 1.89% 17.55% 4.13% 25.47% 15-Jun-17 8-Jul-17

16
12-Jul-17
22-Jun-17 16-Jul-17

17
2.28% 19.83% 2.28% 19.83% 2.28% 19.83% 2.54% 28.01%
20-Jul-17

0.42% 20.25% 0.42% 20.25% 0.42% 20.25% 4.04% 32.04% 29-Jun-17 24-Jul-17

18
28-Jul-17

6-Jul-17 1-Aug-17

19
1.74% 21.99% 1.74% 21.99% 1.74% 21.99% 5.24% 37.29%
5-Aug-17
9-Aug-17
1.33% 23.32% 1.33% 23.32% 1.33% 23.32% 3.61% 40.90% 13-Jul-17

20
13-Aug-17
17-Aug-17
4.06% 27.38% 4.06% 27.38% 4.06% 27.38% 4.45% 45.35% 20-Jul-17

21
21-Aug-17
25-Aug-17
2.07% 29.45% 2.07% 29.45% 2.07% 29.45% 4.97% 50.32% 22 27-Jul-17 29-Aug-17
2-Sep-17
3-Aug-17 6-Sep-17
23

3.74% 33.20% 3.74% 33.20% 3.74% 33.20% 4.36% 54.68%


10-Sep-17

2.05% 35.25% 2.05% 35.25% 2.05% 35.25% 4.69% 59.37% 10-Aug-17 14-Sep-17
24

18-Sep-17

17-Aug-17 22-Sep-17
25

1.48% 36.74% 1.48% 36.74% 1.48% 36.74% 4.06% 63.43%


26-Sep-17
30-Sep-17
1.69% 38.42% 1.69% 38.42% 1.69% 38.42% 4.58% 68.01% 24-Aug-17
26

4-Oct-17
8-Oct-17
31-Aug-17
27

1.24% 39.66% 1.24% 39.66% 1.24% 39.66% 6.60% 74.60%


12-Oct-17
16-Oct-17
0.38% 40.04% 0.38% 40.04% 0.38% 40.04% 5.63% 80.23% 7-Sep-17
28

20-Oct-17
24-Oct-17
14-Sep-17
29

1.06% 41.09% 1.06% 41.09% 1.06% 41.09% 7.40% 87.64% 28-Oct-17


1-Nov-17
2.30% 43.39% 2.30% 43.39% 2.30% 43.39% 7.36% 95.00% 21-Sep-17
30

5-Nov-17
9-Nov-17
28-Sep-17 13-Nov-17
31

2.79% 46.18% 2.79% 46.18% 2.79% 46.18% 0.00% 95.00%


17-Nov-17
2.59% 48.78% 2.59% 48.78% 2.59% 48.78% 0.00% 95.00% 5-Oct-17 21-Nov-17
32

25-Nov-17

2.76% 51.54% 2.76% 51.54% 2.76% 51.54% 0.00% 95.00% 12-Oct-17 29-Nov-17
33

3-Dec-17
7-Dec-17
19-Oct-17
34

2.44% 53.98% 2.44% 53.98% 2.44% 53.98% 0.00% 95.00%


11-Dec-17
15-Dec-17
2.89% 56.87% 2.89% 56.87% 2.89% 56.87% 0.00% 95.00% 26-Oct-17
35

19-Dec-17
23-Dec-17
2-Nov-17
36

2.22% 59.09% 2.22% 59.09% 2.22% 59.09% 0.00% 95.00%


27-Dec-17
31-Dec-17
1.90% 60.99% 1.90% 60.99% 1.90% 60.99% 0.00% 95.00% 9-Nov-17
37

4-Jan-18
8-Jan-18
16-Nov-17
38

2.67% 63.65% 2.67% 63.65% 2.67% 63.65% 0.00% 95.00% 12-Jan-18


16-Jan-18
1.84% 65.49% 1.84% 65.49% 1.84% 65.49% 0.00% 95.00% 23-Nov-17
39

20-Jan-18
24-Jan-18
30-Nov-17 28-Jan-18
40

2.12% 67.61% 2.12% 67.61% 2.12% 67.61% 0.00% 95.00%


1-Feb-18
1.44% 69.05% 1.44% 69.05% 1.44% 69.05% 0.00% 95.00% 7-Dec-17 5-Feb-18
41

9-Feb-18

1.00% 70.05% 1.00% 70.05% 1.00% 70.05% 0.00% 95.00% 14-Dec-17 13-Feb-18
42

17-Feb-18
S-Curve

21-Dec-17 21-Feb-18
43

1.78% 71.83% 1.78% 71.83% 1.78% 71.83% 0.00% 95.00%


25-Feb-18
1-Mar-18
0.64% 72.47% 0.64% 72.47% 0.64% 72.47% 0.00% 95.00% 28-Dec-17
44

5-Mar-18
Overall Engineering Progress

9-Mar-18
4-Jan-18
45

0.97% 73.44% 0.97% 73.44% 0.97% 73.44% 0.00% 95.00%


13-Mar-18
17-Mar-18
1.69% 75.14% 1.69% 75.14% 1.69% 75.14% 0.00% 95.00% 11-Jan-18
46

21-Mar-18
25-Mar-18
18-Jan-18
47

1.19% 76.32% 1.19% 76.32% 1.19% 76.32% 0.00% 95.00% 29-Mar-18


2-Apr-18
2.71% 79.03% 2.71% 79.03% 2.71% 79.03% 0.00% 95.00% 25-Jan-18
48

6-Apr-18
10-Apr-18
1-Feb-18 14-Apr-18
49

1.85% 80.89% 1.85% 80.89% 1.85% 80.89% 0.00% 95.00%


18-Apr-18
1.45% 82.34% 1.45% 82.34% 1.45% 82.34% 0.00% 95.00% 8-Feb-18 22-Apr-18
50

26-Apr-18

15-Feb-18 30-Apr-18
51

0.75% 83.08% 0.75% 83.08% 0.75% 83.08% 0.00% 95.00%


4-May-18
8-May-18
4.21% 87.29% 4.21% 87.29% 4.21% 87.29% 0.00% 95.00% 22-Feb-18
52

12-May-18
16-May-18
1.09% 88.375% 1.09% 88.38% 1.09% 88.38% 0.00% 95.00% 1-Mar-18
53

20-May-18
24-May-18
0.45% 88.82% 0.45% 88.82% 0.45% 88.82% 0.00% 95.00% 8-Mar-18
54

28-May-18
1-Jun-18
Overall Engineering Progress "S" curve

0.69% 89.52% 0.69% 89.52% 0.69% 89.52% 0.00% 95.00% 15-Mar-18


55

5-Jun-18
9-Jun-18
1.38% 90.90% 1.38% 90.90% 1.38% 90.90% 0.00% 95.00% 22-Mar-18
56

13-Jun-18
17-Jun-18
0.12% 91.01% 0.12% 91.01% 0.12% 91.01% 0.00% 95.00% 29-Mar-18
57

21-Jun-18
25-Jun-18
0.79% 91.80% 0.79% 91.80% 0.79% 91.80% 0.00% 95.00% 5-Apr-18 29-Jun-18
58

3-Jul-18
0.25% 92.05% 0.25% 92.05% 0.25% 92.05% 5.00% 95.00% 12-Apr-18 7-Jul-18
59

11-Jul-18

0.27% 92.32% 0.27% 92.32% 0.27% 92.32% 0.00% 95.00% 19-Apr-18 15-Jul-18
60

19-Jul-18
23-Jul-18
26-Apr-18
61

0.15% 92.47% 0.15% 92.47% 0.15% 92.47% 0.00% 95.00%


27-Jul-18
31-Jul-18
0.17% 92.64% 0.17% 92.64% 0.17% 92.64% 0.00% 95.00% 3-May-18
62

4-Aug-18
8-Aug-18
10-May-18
63

0.20% 92.84% 0.20% 92.84% 0.20% 92.84% 0.00% 95.00%


12-Aug-18
16-Aug-18
0.50% 93.34% 0.50% 93.34% 0.50% 93.34% 0.00% 95.00% 17-May-18
64

20-Aug-18
24-Aug-18
24-May-18
65

0.00% 93.34% 0.00% 93.34% 0.00% 93.34% 0.00% 95.00% 28-Aug-18


1-Sep-18
0.37% 93.70% 0.37% 93.70% 0.37% 93.70% 0.00% 95.00% 31-May-18
66

5-Sep-18
9-Sep-18
7-Jun-18 13-Sep-18
67

0.00% 93.70% 0.00% 93.70% 0.00% 93.70% 0.00% 95.00%


17-Sep-18
0.05% 93.76% 0.05% 93.76% 0.05% 93.76% 0.00% 95.00% 14-Jun-18 21-Sep-18
68

25-Sep-18

21-Jun-18 29-Sep-18
69

0.00% 93.76% 0.00% 93.76% 0.00% 93.76% 0.00% 95.00%


3-Oct-18

28-Jun-18 7-Oct-18
0.08% 93.84% 0.08% 93.84% 0.08% 93.84% 0.00% 95.00%
70

11-Oct-18
15-Oct-18
0.00% 93.84% 0.00% 93.84% 0.00% 93.84% 0.00% 95.00% 5-Jul-18
71

19-Oct-18
23-Oct-18
12-Jul-18
72

0.08% 93.92% 0.08% 93.92% 0.08% 93.92% 0.00% 95.00%


27-Oct-18
31-Oct-18
0.00% 93.92% 0.00% 93.92% 0.00% 93.92% 0.00% 95.00% 19-Jul-18
73

4-Nov-18
8-Nov-18
26-Jul-18
74

0.20% 94.12% 0.20% 94.12% 0.20% 94.12% 0.00% 95.00% 12-Nov-18


16-Nov-18
0.00% 94.12% 0.00% 94.12% 0.00% 94.12% 0.00% 95.00% 2-Aug-18
75

20-Nov-18
24-Nov-18
9-Aug-18 28-Nov-18
76

0.03% 94.15% 0.03% 94.15% 0.03% 94.15% 0.00% 95.00%


2-Dec-18
0.00% 94.15% 0.00% 94.15% 0.00% 94.15% 0.00% 95.00% 16-Aug-18 6-Dec-18
77

10-Dec-18

23-Aug-18 14-Dec-18
78

0.00% 94.15% 0.00% 94.15% 0.00% 94.15% 0.00% 95.00%


PROJECT No. 3963 "

18-Dec-18

30-Aug-18 22-Dec-18
0.02% 94.17% 0.02% 94.17% 0.02% 94.17% 0.00% 95.00%
79

26-Dec-18
30-Dec-18
0.19% 94.36% 0.19% 94.36% 0.19% 94.36% 0.00% 95.00% 6-Sep-18
80

3-Jan-19
7-Jan-19
13-Sep-18
81

0.12% 94.48% 0.12% 94.48% 0.12% 94.48% 0.00% 95.00%


11-Jan-19
15-Jan-19
0.04% 94.53% 0.04% 94.53% 0.04% 94.53% 0.00% 95.00% 20-Sep-18
82

19-Jan-19
23-Jan-19
27-Sep-18
83

0.05% 94.58% 0.05% 94.58% 0.05% 94.58% 0.00% 95.00% 27-Jan-19


31-Jan-19
0.00% 94.58% 0.00% 94.58% 0.00% 94.58% 0.00% 95.00% 4-Oct-18
84

4-Feb-19
8-Feb-19
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS

11-Oct-18 12-Feb-19
85

0.07% 94.64% 0.07% 94.64% 0.07% 94.64% 0.00% 95.00%


16-Feb-19
0.00% 94.64% 0.00% 94.64% 0.00% 94.64% 0.00% 95.00% 18-Oct-18 20-Feb-19
86

24-Feb-19
25-Oct-18 28-Feb-19
87

0.00% 94.64% 0.00% 94.64% 0.00% 94.64% 0.00% 95.00%


4-Mar-19

1-Nov-18 8-Mar-19
0.00% 94.64% 0.00% 95.00%
88

12-Mar-19
16-Mar-19
8-Nov-18
89

0.00% 94.64% 0.00% 95.00%


20-Mar-19
24-Mar-19
0.00% 94.64% 0.00% 95.00% 15-Nov-18
90

28-Mar-19
1-Apr-19
0.00% 94.64% 0.00% 95.00% 22-Nov-18
91

5-Apr-19
9-Apr-19
0.00% 94.64% 0.00% 95.00% 29-Nov-18
92

13-Apr-19
17-Apr-19
0.24% 94.88% 0.00% 95.00% 6-Dec-18
93

21-Apr-19
25-Apr-19
0.00% 94.88% 0.00% 95.00% 13-Dec-18 29-Apr-19
94

3-May-19
0.00% 94.88% 0.00% 95.00% 20-Dec-18 7-May-19
95

11-May-19

0.06% 94.93% 0.00% 95.00% 27-Dec-18 15-May-19


96

19-May-19

3-Jan-19 23-May-19
0.07% 95.00% 0.00% 95.00%
97

27-May-19
31-May-19
0.00% 95.00% 0.00% 95.00% 10-Jan-19
98

4-Jun-19
DATE:

8-Jun-19
17-Jan-19
99

0.00% 95.00% 0.00% 95.00%


12-Jun-19
16-Jun-19
0.00% 95.00% 0.00% 95.00% 24-Jan-19 20-Jun-19
100
Cum Actual

24-Jun-19
B/L Cum. Plan

31-Jan-19
3/Nov/18

0.00% 95.00% 0.00% 95.00% 28-Jun-19


Rev. Cum. Actual
Rev. Cum. Plan

2-Jul-19
5.00% 100.00% 0.00% 95.00% 11-Jul-19 6-Jul-19
10-Jul-19

0.00% 100.00% 0.00% 95.00% 18-Jul-19 14-Jul-19


18-Jul-19

25-Jul-19 22-Jul-19
0.00% 100.00% 0.00% 95.00%
101 124 125 126
Summary Status of Procurement
And "S" Curve
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS
IN ALL DEGASSING STATIONS"
8.2. PROCUREMENT PROGRESS TABLE (REV : 04)
PROJECT No. 3963 AS OF : 25-Oct-18

OVERALL PREVIOUS WEEK CURRENT WEEK UP TO DATE

Proj.
SER. DESCRIPTION WT. % PLANNED % ACTUAL % DEV. % PLANNED % ACTUAL % DEV. % PLANNED % ACTUAL % DEV. %
Wtg.

1 LLI ITEMS 49.29% 75.800% 86.21% 86.21% 0.00% 0.00% 0.00% 0.00% 86.21% 86.21% 0.00%

2 BULK MATERIALS 15.73% 24.200% 100.00% 100.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 0.00%

OVERALL Project
65.02% 100.00% 89.55% 89.55% 0.00% 0.00% 0.00% 0.00% 89.55% 89.55% 0.00%
(In terms of overall Project WTG)

PAGE 23 OF 63
Procurement Control Register - Equipment
Project No. - 3963
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS"
As Of : 25-Oct-18
Materails QP inspected and All Spare parts
SL. Proc. Issue RFQ to Issue Purchase Approve Vendor Received Filled SPIR Inspection cleared & Ex-works Del. & FOB
Description Sec. Issue MR
Vendors Order Document (QP) (Mftg.) FAT Complete
received and cleared material at received & SPIR % Weight % Progress
No. Category cleared at site site completed

Progress Scale 5% 10% 15% 30% 40% 60% 70% 85% 90% 100% WTGE % Phy. Comp. % Variance
1.0 LONG LEAD ITEMS P 75.800% (10.569)

F 75.80% 65.231% 0.00%

A 65.231%
1 Equipment
P 13-May-17 13-May-17 19-Jul-17 10-Sep-17 8-Dec-17 4-Jul-18 10-Jul-18 24-Jul-18 27-Jul-18 27-Jul-18 100.00% 0.00
1.1 Test Separator F 28-May-17 12-Jun-17 12-Sep-17 26-Oct-17 18-Jan-18 11-Jun-18 14-Jun-18 03-Jul-18 25-Aug-18 25-Aug-18 12.16% 100.00% 0.00
A 28-May-17 12-Jun-17 12-Sep-17 26-Oct-17 18-Jan-18 11-Jun-18 14-Jun-18 03-Jul-18 25-Aug-18 25-Aug-18 100.00%
P 1-Jun-17 1-Jun-17 9-Aug-17 12-Oct-17 9-Jan-18 12-Feb-18 18-Feb-18 3-Apr-18 6-Apr-18 6-Apr-18 100.00% (15.00)
1.2 BS&W Meter F 12-Jul-17 23-Jul-17 18-Jan-18 17-May-18 24-May-18 12-Jul-18 30-Aug-18 04-Oct-18 29-Nov-18 29-Nov-18 3.42% 85.00% 0.00
A 12-Jul-17 23-Jul-17 18-Jan-18 17-May-18 24-May-18 12-Jul-18 30-Aug-18 04-Oct-18 85.00%
P 13-May-17 13-May-17 19-Jul-17 10-Sep-17 8-Dec-17 4-Jul-18 10-Jul-18 24-Jul-18 27-Jul-18 27-Jul-18 100.00% 0.00
1.3 Sand Jetting F 28-May-17 12-Jun-17 12-Sep-17 26-Oct-17 18-Jan-18 11-Jun-18 14-Jun-18 03-Jul-18 25-Aug-18 25-Aug-18 1.47% 100.00% 0.00
A 28-May-17 12-Jun-17 12-Sep-17 26-Oct-17 18-Jan-18 11-Jun-18 14-Jun-18 03-Jul-18 25-Aug-18 25-Aug-18 100.00%
2 Piping
P 3-Apr-17 3-Apr-17 8-May-17 27-May-17 15-Jun-17 15-Aug-17 28-Aug-17 30-Sep-17 4-Oct-17 4-Oct-17 100.00% 0.00
2.1 Early Tie-in Valves F 03-Apr-17 03-Apr-17 11-May-17 04-Jul-17 03-Aug-17 24-Aug-17 21-Sep-17 31-Oct-17 27-Nov-17 27-Nov-17 1.51% 100.00% 0.00
A 03-Apr-17 03-Apr-17 11-May-17 04-Jul-17 03-Aug-17 24-Aug-17 21-Sep-17 31-Oct-17 27-Nov-17 27-Nov-17 100.00%
3 Instrumentation
P 10-Aug-17 10-Aug-17 19-Oct-17 7-Dec-17 5-Jan-18 2-Feb-18 8-Feb-18 9-Mar-18 12-Mar-18 12-Mar-18 100.00% (15.00)
ELECTRONIC
3.1 F 19-Jul-17 23-Jul-17 18-Jan-18 22-Apr-18 10-May-18 30-Aug-18 03-Sep-18 27-Sep-18 10-Dec-18 10-Dec-18 4.16% 85.00% 0.00
INSTRUMENTS (PT/TT)
A 19-Jul-17 23-Jul-17 18-Jan-18 22-Apr-18 10-May-18 30-Aug-18 03-Sep-18 27-Sep-18 85.00%
P 10-Aug-17 10-Aug-17 19-Oct-17 7-Dec-17 5-Jan-18 2-Feb-18 8-Feb-18 9-Mar-18 12-Mar-18 12-Mar-18 100.00% (15.00)
LEVEL GAUGES
3.2 F 24-Jul-17 26-Jul-17 12-Dec-17 28-Mar-18 08-Feb-18 02-Sep-18 02-Sep-18 03-Oct-18 10-Dec-18 10-Dec-18 0.46% 85.00% 0.00
(MAGNETIC)
A 24-Jul-17 26-Jul-17 12-Dec-17 28-Mar-18 08-Feb-18 02-Sep-18 02-Sep-18 03-Oct-18 85.00%
P 10-Aug-17 10-Aug-17 19-Oct-17 7-Dec-17 5-Jan-18 2-Feb-18 8-Feb-18 9-Mar-18 12-Mar-18 12-Mar-18 100.00% (15.00)
3.3 GAUGES (PG/TG) F 20-Jul-17 23-Jul-17 30-Jan-18 28-Mar-18 15-Feb-18 30-Aug-18 02-Sep-18 13-Sep-18 10-Dec-18 10-Dec-18 3.24% 85.00% 0.00
Field
A 20-Jul-17 23-Jul-17 30-Jan-18 28-Mar-18 15-Feb-18 30-Aug-18 02-Sep-18 13-Sep-18 85.00%
Instrumentati
P 10-Aug-17 10-Aug-17 19-Oct-17 7-Dec-17 5-Jan-18 2-Feb-18 8-Feb-18 9-Mar-18 12-Mar-18 12-Mar-18 100.00% (40.00)
LEVEL GAUGES (GLASS on
3.4 F 24-Jul-17 26-Jul-17 15-Feb-18 02-Sep-18 17-May-18 05-Sep-18 04-Dec-18 07-Dec-18 10-Dec-18 10-Dec-18 0.46% 60.00% 0.00
TYPE)
A 24-Jul-17 26-Jul-17 15-Feb-18 02-Sep-18 17-May-18 05-Sep-18 60.00%
P 10-Aug-17 10-Aug-17 19-Oct-17 7-Dec-17 5-Jan-18 2-Feb-18 8-Feb-18 9-Mar-18 12-Mar-18 12-Mar-18 100.00% (30.00)
LEVEL TRANSMITTERS
3.5 F 25-Jul-17 30-Jul-17 28-Dec-17 29-Apr-18 08-Feb-18 02-Sep-18 10-Sep-18 01-Nov-18 10-Dec-18 10-Dec-18 0.92% 70.00% 0.00
(DISPLACER)
A 25-Jul-17 30-Jul-17 28-Dec-17 29-Apr-18 08-Feb-18 02-Sep-18 10-Sep-18 01-Nov-18 70.00%
P 10-Aug-17 10-Aug-17 19-Oct-17 7-Dec-17 5-Jan-18 2-Feb-18 8-Feb-18 9-Mar-18 12-Mar-18 12-Mar-18 100.00% (30.00)
LEVEL TRANSMITTERS
3.6 F 25-Jul-17 30-Jul-17 30-Jan-18 12-Apr-18 15-Mar-18 02-Sep-18 10-Sep-18 29-Nov-18 10-Dec-18 10-Dec-18 1.39% 70.00% 0.00
(RADAR)
A 25-Jul-17 30-Jul-17 30-Jan-18 12-Apr-18 15-Mar-18 02-Sep-18 10-Sep-18 70.00%
P 15-Jun-17 15-Jun-17 23-Aug-17 11-Oct-17 8-Jan-18 24-Feb-18 2-Mar-18 15-Apr-18 18-Apr-18 18-Apr-18 100.00% 0.00
3.7 RESTRICTION ORIFICE F 02-Aug-17 12-Nov-17 15-Feb-18 10-May-18 15-Mar-18 04-Jul-18 12-Jul-18 02-Aug-18 03-Sep-18 03-Sep-18 2.09% 100.00% 0.00
A 02-Aug-17 12-Nov-17 15-Feb-18 10-May-18 15-Mar-18 04-Jul-18 12-Jul-18 02-Aug-18 03-Sep-18 03-Sep-18 100.00%
P 15-Jun-17 15-Jun-17 23-Aug-17 11-Oct-17 8-Jan-18 24-Feb-18 2-Mar-18 15-Apr-18 18-Apr-18 18-Apr-18 100.00% (40.00)
SHUTDOWN & BLOWDOWN
3.8 F 19-Jun-17 20-Aug-17 05-Apr-18 30-Aug-18 15-Sep-18 02-Oct-18 29-Nov-18 16-Dec-18 20-Dec-18 20-Dec-18 2.09% 60.00% 0.00
VALVES Control A 19-Jun-17 20-Aug-17 05-Apr-18 30-Aug-18 15-Sep-18 02-Oct-18 60.00%
Valve / SD & P 15-Jun-17 15-Jun-17 23-Aug-17 11-Oct-17 8-Jan-18 24-Feb-18 2-Mar-18 15-Apr-18 18-Apr-18 18-Apr-18 100.00% (15.00)
BD Valve /
3.9 FLOW TRANSMITTERS F 13-Jul-17 23-Jul-17 18-Jan-18 06-May-18 15-Feb-18 20-Sep-18 25-Sep-18 30-Sep-18 10-Dec-18 10-Dec-18 2.09% 85.00% 0.00
PRV/
A 13-Jul-17 23-Jul-17 18-Jan-18 06-May-18 15-Feb-18 20-Sep-18 25-Sep-18 30-Sep-18 85.00%
Orifice /
P 15-Jun-17 15-Jun-17 23-Aug-17 11-Oct-17 8-Jan-18 24-Feb-18 2-Mar-18 15-Apr-18 18-Apr-18 18-Apr-18 100.00% 0.00
Flow Meters
3.10 CONTROL VALVES F 03-Aug-17 06-Aug-17 19-Nov-17 28-Dec-17 13-Dec-17 28-May-18 31-May-18 12-Jul-18 28-Aug-18 28-Aug-18 2.09% 100.00% 0.00
A 03-Aug-17 06-Aug-17 19-Nov-17 28-Dec-17 13-Dec-17 28-May-18 31-May-18 12-Jul-18 28-Aug-18 28-Aug-18 100.00%
Procurement Control Register - Equipment
Project No. - 3963
Control "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS"
Valve / SD &
BD Valve / As Of : 25-Oct-18
PRV/ Materails QP inspected and All Spare parts
SL. Proc. /
Orifice Issue RFQ to Issue Purchase Approve Vendor Received Filled SPIR Inspection cleared & Ex-works Del. & FOB
Description Sec. Issue MR
Vendors Order Document (QP) (Mftg.) FAT Complete
received and cleared material at received & SPIR % Weight % Progress
No. Category
Flow Meters cleared at site site completed

Progress Scale 5% 10% 15% 30% 40% 60% 70% 85% 90% 100% WTGE % Phy. Comp. % Variance
P 15-Jun-17 15-Jun-17 23-Aug-17 11-Oct-17 8-Jan-18 24-Feb-18 2-Mar-18 15-Apr-18 18-Apr-18 18-Apr-18 100.00% (15.00)
3.11 PRESSURE RELIEF VALVES F 15-Aug-17 19-Aug-17 04-Jan-18 27-Mar-18 19-Mar-18 28-Jun-18 05-Jul-18 15-Sep-18 10-Dec-18 10-Dec-18 2.09% 85.00% 0.00
A 15-Aug-17 19-Aug-17 04-Jan-18 27-Mar-18 19-Mar-18 28-Jun-18 05-Jul-18 15-Sep-18 85.00%
EXISTING SYSTEM P 29-Jun-17 29-Jun-17 6-Sep-17 25-Oct-17 22-Jan-18 27-Mar-18 2-Apr-18 1-May-18 4-May-18 4-May-18 100.00% 0.00
3.12 MODIFICATIONS F 03-Aug-17 17-Oct-01 28-Dec-17 17-May-18 08-Feb-18 19-Jul-18 19-Jul-18 19-Jul-18 19-Jul-18 19-Jul-18 4.00% 100.00% 0.00
(HONEYWELL) A 03-Aug-17 17-Oct-01 28-Dec-17 17-May-18 08-Feb-18 19-Jul-18 19-Jul-18 19-Jul-18 19-Jul-18 19-Jul-18 100.00%
EXISTING SYSTEM Modification P 29-Jun-17 29-Jun-17 6-Sep-17 25-Oct-17 22-Jan-18 27-Mar-18 2-Apr-18 1-May-18 4-May-18 4-May-18 100.00% (15.00)
3.13 MODIFICATIONS of Existing F 10-Aug-17 17-Oct-17 28-Dec-17 17-May-18 10-May-18 07-Jun-18 12-Jul-18 27-Sep-18 10-Dec-18 10-Dec-18 8.00% 85.00% 0.00
(EMERSON) System, A 10-Aug-17 17-Oct-17 28-Dec-17 17-May-18 10-May-18 07-Jun-18 12-Jul-18 27-Sep-18 85.00%
EXISTING SYSTEM Yokogawa,E P 29-Jun-17 29-Jun-17 6-Sep-17 25-Oct-17 22-Jan-18 27-Mar-18 2-Apr-18 1-May-18 4-May-18 4-May-18 100.00% 0.00
3.14 MODIFICATIONS merson, F 27-Jul-17 10-Aug-17 21-Dec-17 21-Dec-17 21-Dec-17 28-Dec-17 04-Jan-18 11-Jan-18 18-Jan-18 18-Jan-18 6.00% 100.00% 0.00
(YOKOGAWA)-KHATIYAH Honey well A 27-Jul-17 10-Aug-17 21-Dec-17 21-Dec-17 21-Dec-17 28-Dec-17 04-Jan-18 11-Jan-18 18-Jan-18 18-Jan-18 100.00%
EXISTING SYSTEM P 29-Jun-17 29-Jun-17 6-Sep-17 25-Oct-17 22-Jan-18 27-Mar-18 2-Apr-18 1-May-18 4-May-18 4-May-18 100.00% (15.00)
3.15 MODIFICATIONS F 27-Jul-17 10-Aug-17 21-Dec-17 28-Jun-18 10-May-18 05-Sep-18 05-Sep-18 27-Sep-18 10-Dec-18 10-Dec-18 2.00% 85.00% 0.00
(YOKOGAWA)-JALEHA A 27-Jul-17 10-Aug-17 21-Dec-17 28-Jun-18 10-May-18 05-Sep-18 05-Sep-18 27-Sep-18 85.00%
4 Electrical
P 10-Jul-17 10-Jul-17 18-Sep-17 6-Nov-17 20-Nov-17 9-Dec-17 15-Dec-17 13-Jan-18 16-Jan-18 16-Jan-18 100.00% 0.00
4.1 Junction Box/Lighting Fixture F 30-Jul-17 14-Aug-17 06-Mar-18 07-May-18 10-May-18 31-May-18 18-Jul-18 26-Aug-18 30-Sep-18 30-Sep-18 0.68% 100.00% 0.00
A 30-Jul-17 14-Aug-17 06-Mar-18 07-May-18 10-May-18 31-May-18 18-Jul-18 26-Aug-18 30-Sep-18 30-Sep-18 100.00%
5 Loss Preventation
P 11-Jul-17 11-Jul-17 23-Sep-17 11-Nov-17 25-Dec-17 24-Feb-18 2-Mar-18 31-Mar-18 3-Apr-18 3-Apr-18 100.00% (15.00)
5.1 Fire Detection System F 23-Jul-17 03-Aug-17 25-Jan-18 30-Apr-18 10-May-18 30-Aug-18 30-Aug-18 30-Sep-18 10-Dec-18 10-Dec-18 3.22% 85.00% 0.00
A 23-Jul-17 03-Aug-17 25-Jan-18 30-Apr-18 10-May-18 30-Aug-18 30-Aug-18 30-Sep-18 85.00%
P 20-Jul-17 20-Jul-17 28-Sep-17 16-Nov-17 30-Dec-17 2-Apr-18 8-Apr-18 7-May-18 10-May-18 10-May-18 100.00% (40.00)
Deluge Skids and Fire water
5.2 F 25-Jul-17 03-Aug-17 22-Feb-18 17-May-18 24-May-18 02-Oct-18 03-Jan-19 15-Jan-19 31-Jan-19 31-Jan-19 10.86% 60.00% 0.00
Spray Nozzles
A 25-Jul-17 03-Aug-17 22-Feb-18 17-May-18 24-May-18 02-Oct-18 60.00%
P 20-Jul-17 20-Jul-17 28-Sep-17 16-Nov-17 30-Dec-17 13-Feb-18 19-Feb-18 20-Mar-18 23-Mar-18 23-Mar-18 100.00% (15.00)
Firefighting & Safety
5.3 F 25-Jul-17 03-Aug-17 01-Mar-18 28-Jun-18 17-May-18 13-Sep-18 15-Sep-18 30-Sep-18 27-Dec-18 27-Dec-18 1.40% 85.00% 0.00
Equipment
A 25-Jul-17 03-Aug-17 01-Mar-18 28-Jun-18 17-May-18 13-Sep-18 15-Sep-18 30-Sep-18 85.00%
Procurement Control Register - Equipment
Project No. - 3963
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS"
As Of : 25-Oct-18
Issue Materails
SL. Issue RFQ to 90 % Material All Spare parts
Description Sec. Purchase Ex-works 50% Ex-works 90% received and % Weight % Progress
No. Vendors Required at Site received
Order cleared at site
Progress Scale 5% 15% 30% 40% 50% 80% 100% WTGE % Phy. Comp. % Variance
P 24.200% 0.00
2.0 BULK MATERIAL F 24.20% 24.053% 0.147%
A 24.200%
1 Piping
P 1/Jul/17 28/Aug/17 11/Oct/17 9/Nov/17 28/Nov/17 17/Dec/17 26/Dec/17 100.00% 0.00
1.1 Bolts&Nuts/Gaskets F 10-Aug-17 18-Jan-18 24-May-18 24-May-18 12-Sep-18 15-Sep-18 15-Sep-18 0.40% 100.00% 0.00
A 10-Aug-17 18-Jan-18 24-May-18 24-May-18 1-Sep-18 10-Sep-18 10-Sep-18 100.00%
2 Intrumentation
P 26/Aug/17 7/Nov/17 6/Dec/17 25/Dec/17 8/Jan/18 22/Jan/18 28/Jan/18 100.00% 0.00
2.1 Cable tray/cable/tubes & fittings F 10-Aug-17 6-Mar-18 24-May-18 15-Sep-18 22-Sep-18 25-Sep-18 25-Sep-18 4.18% 100.00% 0.00
A 10-Aug-17 6-Mar-18 24-May-18 6-Aug-18 20-Aug-18 13-Sep-18 13-Sep-18 100.00%
3 Electrical
P 10/Jul/17 18/Sep/17 17/Oct/17 5/Nov/17 24/Nov/17 13/Dec/17 23/Dec/17 100.00% 0.00
3.1 Cable Trays/cable F 10-Aug-17 6-Mar-18 3-May-18 31-May-18 28-Aug-18 31-Aug-18 31-Aug-18 0.87% 100.00% 0.00
A 10-Aug-17 6-Mar-18 3-May-18 31-May-18 26-Aug-18 6-Sep-18 6-Sep-18 100.00%
4 Civil/Strctural Steel
P 7-Aug-17 5-Oct-17 24-Oct-17 12-Nov-17 26-Nov-17 7-Dec-17 16-Dec-17 100.00% 0.00
4.1 Civil/Strctural Steel F 07-Aug-17 19-Dec-17 11-Jan-18 18-Jan-18 01-Feb-18 29-Mar-18 29-Mar-18 8.54% 100.00% 0.00
A 7-Aug-17 19-Dec-17 11-Jan-18 18-Jan-18 1-Feb-18 26-Feb-18 26-Feb-18 100.00%
5 Early Tie-in Piping
P 15/Apr/17 28/May/17 11/Jun/17 25/Jun/17 30/Jul/17 5/Aug/17 14/Aug/17 100.00% 0.00
5.1 Pipes Early Tie-ins F 20-Apr-17 17-Jul-17 24-Aug-17 28-Sep-17 02-Nov-17 02-Nov-17 02-Nov-17 1.11% 100.00% 0.00
A 20-Apr-17 17-Jul-17 24-Aug-17 28-Sep-17 2-Nov-17 2-Nov-17 2-Nov-17 100.00%
P 15/Apr/17 28/May/17 11/Jun/17 25/Jun/17 31/Aug/17 4/Sep/17 13/Sep/17 100.00% 0.00
5.2 Early Tie-in Flanges F 20-Apr-17 17-Jul-17 24-Aug-17 28-Sep-17 02-Nov-17 02-Nov-17 02-Nov-17 0.23% 100.00% 0.00
A 20-Apr-17 17-Jul-17 24-Aug-17 28-Sep-17 2-Nov-17 2-Nov-17 2-Nov-17 100.00%
P 15/Apr/17 28/May/17 11/Jun/17 25/Jun/17 31/Aug/17 4/Sep/17 13/Sep/17 100.00% 0.00
5.3 Early Tie-in Fittings F 20-Apr-17 17-Jul-17 24-Aug-17 28-Sep-17 02-Nov-17 02-Nov-17 02-Nov-17 0.33% 100.00% 0.00
A 20-Apr-17 17-Jul-17 24-Aug-17 28-Sep-17 2-Nov-17 2-Nov-17 2-Nov-17 100.00%
P 13/Jun/17 10/Aug/17 30/Nov/17 18/Feb/18 4/Apr/18 7/Apr/18 16/Apr/18 100.00% 0.00
5.4 Ball Valve F 7-Aug-17 28-Dec-17 10-May-18 24-May-18 27-Sep-18 30-Sep-18 30-Sep-18 3.00% 100.00% 0.00
A 7-Aug-17 28-Dec-17 10-May-18 24-May-18 26-Aug-18 13-Sep-18 13-Sep-18 100.00%
P 13/Jun/17 10/Aug/17 30/Nov/17 18/Feb/18 4/Apr/18 7/Apr/18 16/Apr/18 100.00% 0.00
5.5 GGC Valve F 07-Aug-17 22-Dec-17 20-May-18 20-May-18 13-Jun-18 16-Jun-18 16-Jun-18 3.00% 100.00% 0.00
A 7-Aug-17 21-Dec-17 10-May-18 24-May-18 11-Jul-18 11-Jul-18 11-Jul-18 100.00%
P 1/Jul/17 28/Aug/17 28/Oct/17 21/Nov/17 23/Dec/17 26/Dec/17 4/Jan/18 100.00% 0.00
5.6 Pipes Remaining F 13-Aug-17 18-Jan-18 24-May-18 5-Jul-18 11-Sep-18 14-Sep-18 14-Sep-18 1.69% 100.00% 0.00
A 13-Aug-17 18-Jan-18 24-May-18 5-Jul-18 28-Aug-18 13-Sep-18 13-Sep-18 100.00%
P 1/Jul/17 28/Aug/17 28/Oct/17 21/Nov/17 23/Dec/17 26/Dec/17 4/Jan/18 100.00% 0.00
5.7 Flanges F 13-Aug-17 18-Jan-18 24-May-18 5-Jul-18 11-Sep-18 14-Sep-18 14-Sep-18 0.35% 100.00% 0.00
A 13-Aug-17 18-Jan-18 24-May-18 5-Jul-18 28-Aug-18 13-Sep-18 13-Sep-18 100.00%
P 1/Jul/17 28/Aug/17 28/Oct/17 21/Nov/17 23/Dec/17 26/Dec/17 4/Jan/18 100.00% 0.00
5.8 Remiaining Project Fittings - Y -Strainer F 3-Aug-17 14-Dec-17 17-May-18 7-Jun-18 27-Sep-18 30-Sep-18 30-Sep-18 0.25% 100.00% 0.00
A 3-Aug-17 14-Dec-17 17-May-18 7-Jun-18 29-Aug-18 27-Sep-18 27-Sep-18 100.00%
P 1/Jul/17 28/Aug/17 28/Oct/17 21/Nov/17 23/Dec/17 26/Dec/17 4/Jan/18 100.00% 0.00
F 3-Aug-17 22-Feb-18 31-May-18 07-Oct-18 27-Oct-18 30-Oct-18 30-Oct-18 0.25% 40.00% 60.00
5.9 Remiaining Project Fittings -Corrosion Probes A 3-Aug-17 22-Feb-18 31-May-18 23-Aug-18 30-Aug-18 1-Sep-18 1-Sep-18 100.00%
WEEK

Cum. Plan
Cum Actual

Cum. Actual
Overall Project

Weekly Plan
Rev. Recovery
B/L Cum. Plan

Weekly Actual
Weekly Actual

Rev. Recovery
Rev. Recovery
Rev. Recovery
B/L Weekly Plan
100.00%

0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
2-Mar-17

1
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2-Mar-17
6-Mar-17

2
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 9-Mar-17 10-Mar-17
14-Mar-17

3
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 16-Mar-17
18-Mar-17
22-Mar-17

4
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 23-Mar-17
26-Mar-17
30-Mar-17

5
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 30-Mar-17
3-Apr-17

6
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.15% 6-Apr-17 7-Apr-17
11-Apr-17

7
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 13-Apr-17
15-Apr-17
19-Apr-17

QATAR BRANCH
8
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.08% 0.23% 20-Apr-17
23-Apr-17
27-Apr-17

9
0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.00% 0.23% 27-Apr-17
1-May-17
0.00% 0.23% 4-May-17 5-May-17

10
0.30% 0.32% 0.30% 0.32% 0.30% 0.32%
9-May-17
0.07% 0.39% 0.07% 0.39% 0.07% 0.39% 0.08% 0.31% 11-May-17

11
13-May-17
17-May-17
1.36% 1.67% 18-May-17

12
0.00% 0.39% 0.00% 0.39% 0.00% 0.39%
21-May-17

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION


0.00% 0.39% 0.00% 0.39% 0.00% 0.39% 0.00% 1.67% 25-May-17 25-May-17

13
29-May-17
0.74% 2.41% 1-Jun-17

14
0.68% 1.08% 0.68% 1.08% 0.68% 1.08% 2-Jun-17
6-Jun-17
0.08% 1.15% 0.08% 1.15% 0.08% 1.15% 0.00% 2.41% 8-Jun-17

15
10-Jun-17
14-Jun-17
1.75% 4.15% 15-Jun-17

16
0.68% 1.83% 0.68% 1.83% 0.68% 1.83%
18-Jun-17

0.82% 2.65% 0.82% 2.65% 0.82% 2.65% 0.00% 4.15% 22-Jun-17 22-Jun-17

17
26-Jun-17
0.00% 2.65% 0.00% 2.65% 0.00% 2.65% 2.17% 6.32% 29-Jun-17

18
30-Jun-17
4-Jul-17
0.15% 6.47% 6-Jul-17

19
0.15% 2.81% 0.15% 2.81% 0.15% 2.81% 8-Jul-17
12-Jul-17
0.17% 2.98% 0.17% 2.98% 0.17% 2.98% 0.43% 6.90% 13-Jul-17

20
16-Jul-17
20-Jul-17
0.08% 3.06% 0.08% 3.06% 0.08% 3.06% 1.91% 8.81% 20-Jul-17
21 24-Jul-17

0.00% 8.81% 27-Jul-17 28-Jul-17


22
1.48% 4.54% 1.48% 4.54% 1.48% 4.54%
1-Aug-17
3.08% 7.62% 3.08% 7.62% 3.08% 7.62% 0.11% 8.92% 3-Aug-17 5-Aug-17
23

9-Aug-17
2.59% 11.51% 10-Aug-17
24

1.33% 8.95% 1.33% 8.95% 1.33% 8.95% 13-Aug-17


17-Aug-17
0.46% 9.41% 0.46% 9.41% 0.46% 9.41% 0.52% 12.04% 17-Aug-17
25

21-Aug-17

0.25% 9.66% 0.25% 9.66% 0.25% 9.66% 0.52% 12.56% 24-Aug-17 25-Aug-17
26

29-Aug-17
0.71% 13.27% 31-Aug-17
27

0.00% 9.66% 0.00% 9.66% 0.00% 9.66% 2-Sep-17


6-Sep-17
0.30% 9.96% 0.30% 9.96% 0.30% 9.96% 1.17% 14.44% 7-Sep-17
28

10-Sep-17
14-Sep-17
2.16% 16.60% 14-Sep-17
29

0.68% 10.64% 0.68% 10.64% 0.68% 10.64%


18-Sep-17

0.15% 10.80% 0.15% 10.80% 0.15% 10.80% 0.12% 16.72% 21-Sep-17 22-Sep-17
30

26-Sep-17
0.77% 17.49% 28-Sep-17
31

0.17% 10.96% 0.17% 10.96% 0.17% 10.96% 30-Sep-17


4-Oct-17
0.00% 10.96% 0.00% 10.96% 0.00% 10.96% 1.31% 18.80% 5-Oct-17
32

8-Oct-17
12-Oct-17
2.14% 20.94% 12-Oct-17
33

0.00% 10.96% 0.00% 10.96% 0.00% 10.96%


16-Oct-17

0.00% 10.96% 0.00% 10.96% 0.00% 10.96% 0.66% 21.60% 19-Oct-17 20-Oct-17
34

24-Oct-17
4.28% 25.88% 26-Oct-17
35

1.72% 12.68% 1.72% 12.68% 1.72% 12.68% 28-Oct-17


1-Nov-17
0.38% 26.26% 2-Nov-17
36

1.23% 13.91% 1.23% 13.91% 1.23% 13.91% 5-Nov-17


9-Nov-17
0.00% 13.91% 0.00% 13.91% 0.00% 13.91% 0.65% 26.91% 9-Nov-17
37

13-Nov-17

3.18% 30.09% 16-Nov-17 17-Nov-17


38

0.32% 14.24% 0.32% 14.24% 0.32% 14.24%


21-Nov-17
0.10% 14.34% 0.10% 14.34% 0.10% 14.34% 0.32% 30.41% 23-Nov-17
39

25-Nov-17
29-Nov-17
1.88% 32.29% 30-Nov-17
40

0.23% 14.57% 0.23% 14.57% 0.23% 14.57%


3-Dec-17
7-Dec-17
0.00% 14.57% 0.00% 14.57% 0.00% 14.57% 4.78% 37.07% 7-Dec-17
41

11-Dec-17

1.76% 38.83% 14-Dec-17 15-Dec-17


42

0.26% 14.82% 0.26% 14.82% 0.26% 14.82%


19-Dec-17
S-Curve

2.95% 17.78% 2.95% 17.78% 2.95% 17.78% 1.90% 40.73% 21-Dec-17


43

23-Dec-17
27-Dec-17
2.01% 42.74% 28-Dec-17
44

2.56% 20.34% 2.56% 20.34% 2.56% 20.34%


31-Dec-17
Overall Procurement Progress

4-Jan-18
0.70% 21.04% 0.70% 21.04% 0.70% 21.04% 1.23% 43.96% 4-Jan-18
45

8-Jan-18

2.18% 23.22% 2.18% 23.22% 2.18% 23.22% 3.37% 47.34% 11-Jan-18 12-Jan-18
46

16-Jan-18
0.20% 47.54% 18-Jan-18
47

3.85% 27.07% 3.85% 27.07% 3.85% 27.07% 20-Jan-18


24-Jan-18
0.16% 27.23% 0.16% 27.23% 0.16% 27.23% 3.26% 50.80% 25-Jan-18
48

28-Jan-18
1-Feb-18
0.84% 51.63% 1-Feb-18
49

1.09% 28.31% 1.09% 28.31% 1.09% 28.31%


5-Feb-18

0.54% 28.85% 0.54% 28.85% 0.54% 28.85% 3.19% 54.82% 8-Feb-18 9-Feb-18
50

13-Feb-18
0.96% 55.79% 15-Feb-18
51

0.66% 29.51% 0.66% 29.51% 0.66% 29.51% 17-Feb-18


21-Feb-18
0.57% 30.08% 0.57% 30.08% 0.57% 30.08% 1.08% 56.87% 22-Feb-18
52

25-Feb-18
1-Mar-18
2.73% 59.60% 1-Mar-18
53

0.07% 30.151% 0.07% 30.15% 0.07% 30.15%


5-Mar-18

4.81% 34.96% 4.81% 34.96% 4.81% 34.96% 1.37% 60.97% 8-Mar-18 9-Mar-18
54

13-Mar-18
Overall Procurement Progress "S" curve

0.35% 35.31% 0.35% 35.31% 0.35% 35.31% 3.19% 64.16% 15-Mar-18


55

17-Mar-18
21-Mar-18
0.21% 64.37% 22-Mar-18
56

0.21% 35.52% 0.21% 35.52% 0.21% 35.52%


25-Mar-18

29-Mar-18
29-Mar-18
0.87% 36.39% 0.87% 36.39% 0.87% 36.39% 4.21% 68.58%
57

2-Apr-18
6.25% 74.83% 5-Apr-18 6-Apr-18
58

0.10% 36.49% 0.10% 36.49% 0.10% 36.49%


10-Apr-18
0.00% 36.49% 0.00% 36.49% 0.00% 36.49% 3.40% 78.23% 12-Apr-18
59

14-Apr-18
18-Apr-18
4.3% 82.6% 19-Apr-18
60

0.00% 36.49% 0.00% 36.49% 0.00% 36.49%


22-Apr-18

0.0% 82.6% 26-Apr-18 26-Apr-18


0.83% 37.32% 0.83% 37.32% 0.83% 37.32%
61

30-Apr-18
3.0% 85.6% 3-May-18 4-May-18
62

0.27% 37.59% 0.27% 37.59% 0.27% 37.59%


8-May-18
3.43% 41.03% 3.43% 41.03% 3.43% 41.03% 6.3% 91.8% 10-May-18
63

12-May-18
16-May-18
4.17% 45.19% 4.17% 45.19% 4.17% 45.19% 0.0% 91.8% 17-May-18
64

20-May-18

0.0% 91.8% 24-May-18 24-May-18


65

3.06% 48.25% 3.06% 48.25% 3.06% 48.25%


28-May-18
1.37% 49.62% 1.37% 49.62% 1.37% 49.62% 0.0% 91.8% 31-May-18 1-Jun-18
66

5-Jun-18
0.0% 7-Jun-18
67

1.63% 51.25% 1.63% 51.25% 1.63% 51.25% 91.82% 9-Jun-18


13-Jun-18
4.09% 55.34% 4.09% 55.34% 4.09% 55.34% 0.00% 91.82% 14-Jun-18
68

17-Jun-18

21-Jun-18 21-Jun-18
69

0.00% 55.34% 0.00% 55.34% 0.00% 55.34% 0.00% 91.82%


25-Jun-18
0.93% 56.27% 0.93% 56.27% 0.93% 56.27% 0.00% 91.82% 28-Jun-18 29-Jun-18
70

3-Jul-18
5-Jul-18
71

2.87% 59.14% 2.87% 59.14% 2.87% 59.14% 2.73% 94.55% 7-Jul-18


11-Jul-18
3.81% 62.95% 3.81% 62.95% 3.81% 62.95% 1.36% 95.91% 12-Jul-18
72

15-Jul-18

19-Jul-18 19-Jul-18
73

2.47% 65.42% 2.47% 65.42% 2.47% 65.42% 0.00% 95.91%


23-Jul-18
26-Jul-18 27-Jul-18
74

0.31% 65.73% 0.31% 65.73% 0.31% 65.73% 2.04% 97.96%


31-Jul-18
0.00% 65.73% 0.00% 65.73% 0.00% 65.73% 2.04% 100.00% 2-Aug-18
75

4-Aug-18
8-Aug-18
9-Aug-18
76

0.00% 65.73% 0.00% 65.73% 0.00% 65.73% 0.00% 100.00%


12-Aug-18

0.56% 66.29% 0.56% 66.29% 0.56% 66.29% 0.00% 100.00% 16-Aug-18 16-Aug-18
77

20-Aug-18
23-Aug-18
78

0.54% 66.83% 0.54% 66.83% 0.54% 66.83% 0.00% 100.00% 24-Aug-18


PROJECT No. 3963 "

28-Aug-18
5.96% 72.79% 5.96% 72.79% 5.96% 72.79% 0.00% 100.00% 30-Aug-18
79

1-Sep-18
5-Sep-18
6-Sep-18
80

1.42% 74.21% 1.42% 74.21% 1.42% 74.21% 0.00% 100.00%


9-Sep-18

6.15% 80.36% 6.15% 80.36% 6.15% 80.36% 0.00% 100.00% 13-Sep-18 13-Sep-18
81

17-Sep-18
20-Sep-18
82

2.38% 82.74% 2.38% 82.74% 2.38% 82.74% 0.00% 100.00% 21-Sep-18


25-Sep-18
27-Sep-18
83

2.46% 85.20% 2.46% 85.20% 2.46% 85.20% 0.00% 100.00% 29-Sep-18


3-Oct-18
4.35% 89.55% 4.35% 89.55% 4.35% 89.55% 0.00% 100.00% 4-Oct-18
84

7-Oct-18
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS

11-Oct-18 11-Oct-18
85

0.00% 89.55% 0.00% 89.55% 0.00% 89.55% 0.00% 100.00%


15-Oct-18
0.00% 89.55% 0.00% 89.55% 0.00% 89.55% 0.00% 100.00% 18-Oct-18
86

19-Oct-18
23-Oct-18
25-Oct-18
87

0.00% 89.55% 0.00% 89.55% 0.00% 89.55% 0.00% 100.00% 27-Oct-18


31-Oct-18
0.02% 89.57% 0.00% 100.00% 1-Nov-18
88

4-Nov-18

8-Nov-18 8-Nov-18
89

0.00% 89.57% 0.00% 100.00%


12-Nov-18
0.00% 89.57% 0.00% 100.00% 15-Nov-18
90

16-Nov-18
20-Nov-18
22-Nov-18
91

0.00% 89.57% 0.00% 100.00%


24-Nov-18
28-Nov-18
0.93% 90.50% 0.00% 100.00% 29-Nov-18
92

2-Dec-18

0.05% 90.55% 0.00% 100.00% 6-Dec-18 6-Dec-18


93

10-Dec-18
13-Dec-18
94

4.27% 94.82% 0.00% 100.00% 14-Dec-18


18-Dec-18
0.63% 95.45% 0.00% 100.00% 20-Dec-18
95

22-Dec-18
26-Dec-18
27-Dec-18
96

0.21% 95.66% 0.00% 100.00%


30-Dec-18

1.09% 96.74% 0.00% 100.00% 3-Jan-19 3-Jan-19


97

7-Jan-19
10-Jan-19
98

0.00% 96.74% 0.00% 100.00% 11-Jan-19


DATE:

15-Jan-19
1.63% 98.37% 0.00% 100.00% 17-Jan-19
19-Jan-19
Cum Actual

24-Jan-19 23-Jan-19
B/L Cum. Plan

0.00% 98.37% 0.00% 100.00%


27-Jan-19
1.63% 100.00% 0.00% 100.00% 31-Jan-19
31-Jan-19
25/Oct/18

4-Feb-19
0.00% 100.00% 0.00% 100.00% 7-Feb-19
Rev. Recovery Cum. Plan

8-Feb-19
Rev. Recovery Cum. Actual

0.00% 100.00% 0.00% 100.00% 14-Feb-19 12-Feb-19


16-Feb-19
0.00% 100.00% 0.00% 100.00% 21-Feb-19 20-Feb-19
99 100 101 102 103 104

0.00% 100.00%
Procurement Control Register - Equipment
Project No. - 3963
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS"
As Of : 25-Oct-18
Approve All Spare parts
Issue Received Ex-works Del. Materails QP inspected
SL. Issue RFQ to Vendor Inspection received &
Description Sec. Issue MR Purchase Filled SPIR & FOB received and and cleared % Weight % Progress
No. Vendors Document cleared & FAT SPIR
Order (Mftg.) Complete cleared at site material at site
(QP) completed
%
Progress Scale 5% 10% 15% 30% 40% 60% 70% 85% 90% 100% WTGE % Phy. Comp.
Variance
P 75.80%
1.0 LONG LEAD F 75.80% -66.78%
ITEMS A 9.02%
1 Equipment
P 13-May-17 13-May-17 19-Jul-17 10-Sep-17 8-Dec-17 4-Jul-18 10-Jul-18 24-Jul-18 27-Jul-18 27-Jul-18 100.00%
1.1 Test Separator F 12.16% (85.00)
A 28-May-17 12-Jun-17 12-Sep-17 15.00%
P 1-Jun-17 1-Jun-17 9-Aug-17 12-Oct-17 9-Jan-18 12-Feb-18 18-Feb-18 3-Apr-18 6-Apr-18 6-Apr-18 100.00%
1.2 BS&W Meter F 3.42% (90.00)
A 12-Jul-17 23-Jul-17 10.00%
P 13-May-17 13-May-17 19-Jul-17 10-Sep-17 8-Dec-17 4-Jul-18 10-Jul-18 24-Jul-18 27-Jul-18 27-Jul-18 100.00%
1.3 Sand Jetting F 1.47% (85.00)
A 28-May-17 12-Jun-17 12-Sep-17 15.00%
2 Piping
P 3-Apr-17 3-Apr-17 8-May-17 27-May-17 15-Jun-17 15-Aug-17 28-Aug-17 30-Sep-17 4-Oct-17 4-Oct-17 100.00%
2.1 Early Tie-in Valves F 1.51% (40.00)
A 03-Apr-17 03-Apr-17 11-May-17 04-Jul-17 03-Aug-17 24-Aug-17 60.00%
3 Instrumentation
P 10-Aug-17 10-Aug-17 19-Oct-17 7-Dec-17 5-Jan-18 2-Feb-18 8-Feb-18 9-Mar-18 12-Mar-18 12-Mar-18 100.00%
3.1 Field Instrumentation F 10.63% (90.00)
A 20-Jul-17 30-Jul-17 10.00%
Control Valve / SD & BD P 15-Jun-17 15-Jun-17 23-Aug-17 11-Oct-17 8-Jan-18 24-Feb-18 2-Mar-18 15-Apr-18 18-Apr-18 18-Apr-18 100.00%
3.2 Valve / PRV/ Orifice / Flow F 10.44% (90.00)
Meters A 19-Jun-17 23-Jul-17 10.00%
Modification of Existing P 29-Jun-17 29-Jun-17 6-Sep-17 25-Oct-17 22-Jan-18 27-Mar-18 2-Apr-18 1-May-18 4-May-18 4-May-18 100.00%
3.3 System, Yokogawa,Emerson, F 20.01% (90.00)
Honey well A 03-Aug-17 10-Aug-17 10.00%
4 Electrical
P 10-Jul-17 10-Jul-17 18-Sep-17 6-Nov-17 20-Nov-17 9-Dec-17 15-Dec-17 13-Jan-18 16-Jan-18 16-Jan-18 100.00%
4.1 Junction Box/Lighting Fixture F 0.68% (90.00)
A 30-Jul-17 14-Aug-17 10.00%
5 Loss Preventation
P 11-Jul-17 11-Jul-17 23-Sep-17 11-Nov-17 25-Dec-17 24-Feb-18 2-Mar-18 31-Mar-18 3-Apr-18 3-Apr-18 100.00%
5.1 Fire Detection System F 3.22% (90.00)
A 20-Jul-17 03-Aug-17 10.00%
P 20-Jul-17 20-Jul-17 28-Sep-17 16-Nov-17 30-Dec-17 2-Apr-18 8-Apr-18 7-May-18 10-May-18 10-May-18 100.00%
Deluge Skids and Fire water
5.2 F 10.86% (90.00)
Spray Nozzles
A 25-Jul-17 03-Aug-17 10.00%
P 20-Jul-17 20-Jul-17 28-Sep-17 16-Nov-17 30-Dec-17 13-Feb-18 19-Feb-18 20-Mar-18 23-Mar-18 23-Mar-18 100.00%
Firefighting & Safety
5.3 F 1.40% (90.00)
Equipment
A 25-Jul-17 03-Aug-17 10.00%
Procurement Control Register - Equipment
Project No. - 3963
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS"
As Of : 25-Oct-18
Issue Materails 90 % Material
SL. Issue RFQ to All Spare parts
Description Sec. Purchase Ex-works 50% Ex-works 90% received and Required at % Weight % Progress
No. Vendors received
Order cleared at site Site
Progress Scale 5% 15% 30% 40% 50% 80% 100% WTGE % Phy. Comp. % Variance
P 24.20%
2.0 BULK MATERIAL F 24.20% -22.57%
A 1.63%
1 Piping
P 1-Jul-17 28-Aug-17 11-Oct-17 9-Nov-17 28-Nov-17 17-Dec-17 26-Dec-17 100.00%
1.1 Bolts&Nuts/Gaskets F 0.40% (95.00)
A 10-Aug-17 5.00%
2 Intrumentation
P 26-Aug-17 7-Nov-17 6-Dec-17 25-Dec-17 8-Jan-18 22-Jan-18 28-Jan-18 100.00%
2.1 Cable tray/cable/tubes & fittings F 4.18% (95.00)
A 10-Aug-17 5.00%
3 Electrical
P 10-Jul-17 18-Sep-17 17-Oct-17 5-Nov-17 24-Nov-17 13-Dec-17 23-Dec-17 100.00%
3.1 Cable Trays/cable F 0.87% (95.00)
A 10-Aug-17 5.00%
4 Civil/Strctural Steel
P 7-Aug-17 5-Oct-17 24-Oct-17 12-Nov-17 26-Nov-17 7-Dec-17 16-Dec-17 100.00%
4.1 Civil/Strctural Steel F 8.54% (95.00)
A 07-Aug-17 5.00%
Issue Materails 90 % Material
Issue RFQ to All Spare parts
5 Piping Vendors
Purchase Ex-works 50% Ex-works 90% received and Required at
received
Order cleared at site Site
P 15-Apr-17 28-May-17 11-Jun-17 25-Jun-17 30-Jul-17 5-Aug-17 14-Aug-17 100.00%
5.1 Pipes Early Tie-ins F 1.11% (70.00)
A 20-Apr-17 17-Jul-17 24-Aug-17 30.00%
P 15-Apr-17 28-May-17 11-Jun-17 25-Jun-17 31-Aug-17 4-Sep-17 13-Sep-17 100.00%
5.2 Early Tie-in Flanges F 0.23% (70.00)
A 20-Apr-17 17-Jul-17 24-Aug-17 30.00%
P 15-Apr-17 28-May-17 11-Jun-17 25-Jun-17 31-Aug-17 4-Sep-17 13-Sep-17 100.00%
5.3 Early Tie-in Fittings F 0.33% (70.00)
A 20-Apr-17 17-Jul-17 24-Aug-17 30.00%
P 13-Jun-17 10-Aug-17 30-Nov-17 18-Feb-18 4-Apr-18 7-Apr-18 16-Apr-18 100.00%
5.4 Ball Valve / GGC Valve F 6.00% (95.00)
A 06-Jun-17 5.00%
P 1-Jul-17 28-Aug-17 28-Oct-17 21-Nov-17 23-Dec-17 26-Dec-17 4-Jan-18 100.00%
5.5 Pipes Remaining F 1.69% (95.00)
A 10-Aug-17 5.00%
P 1-Jul-17 28-Aug-17 28-Oct-17 21-Nov-17 23-Dec-17 26-Dec-17 4-Jan-18 100.00%
5.6 Flanges F 0.35% (95.00)
A 10-Aug-17 5.00%
P 1-Jul-17 28-Aug-17 28-Oct-17 21-Nov-17 23-Dec-17 26-Dec-17 4-Jan-18 100.00%
F 0.49%
5.7 Remiaining Project Fittings A 10-Aug-17 5.00% (95.00)
Summary Status of Construction
And "S" Curve
8.3. CONSTRUCTION MEASUREMENT SHEET

PROJECT No. 3963

JOB TITLE : "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS"

CLIENT :QATAR PETROLEUM 25-Oct-18

SUBJECT : CONSTRUCTION PHASE PROGRESS MEASUREMENT

8.3. CONSTRUCTION MEASUREMENT SHEET (REV : 04)

CONSTRUCTION 38% PREVIOUS WEEK CURRENT WEEK UP TO DATE

Project Wt.
SER. DESCRIPTION WT. % PLANNED ACTUAL DEV. PLANNED ACTUAL DEV. PLANNED ACTUAL DEV.
%
1 Fabrication 6.53%
1.1 Khatiyah Main 0.8478% 4.0372% 33.571% 33.571% 0.000% 4.465% 5.401% 0.936% 38.036% 38.972% 0.936%
1.2 Khatiyah South 0.9407% 4.4794% 32.958% 32.958% 0.000% 4.086% 2.738% -1.348% 37.045% 35.696% -1.348%
1.3 JALM 1.0501% 5.0005% 19.809% 19.809% 0.000% 2.920% 5.870% 2.951% 22.729% 25.679% 2.951%
1.4 Fahahil South 0.8849% 4.2138% 19.650% 19.650% 0.000% 3.590% 9.779% 6.190% 23.240% 29.430% 6.190%
1.5 Fahahil North 0.8988% 4.2800% 20.788% 20.788% 0.000% 3.201% 9.682% 6.481% 23.988% 30.469% 6.481%
1.6 Fahahil Main 0.8874% 4.2256% 16.672% 16.672% 0.000% 2.813% 8.776% 5.962% 19.485% 25.448% 5.962%
1.7 Khatiyah North 1.0197% 4.8555% 33.412% 33.412% 0.000% 3.250% 3.831% 0.581% 36.662% 37.243% 0.581%
2 Installation 14.47%
2.1 Khatiyah Main 2.22% 10.55% 28.979% 28.979% 0.000% 0.968% 0.490% -0.478% 29.947% 29.469% -0.478%
2.2 Khatiyah South 1.86% 8.87% 29.182% 29.182% 0.000% 1.043% -0.960% -2.003% 30.225% 28.222% -2.003%
2.3 JALM 2.29% 10.90% 18.972% 18.972% 0.000% 0.815% 1.514% 0.699% 19.787% 20.486% 0.699%
2.4 Fahahil South 1.99% 9.45% 20.951% 20.951% 0.000% 1.081% 2.956% 1.875% 22.033% 23.908% 1.875%
2.5 Fahahil North 2.11% 10.06% 18.883% 18.883% 0.000% 1.140% 4.282% 3.141% 20.023% 23.164% 3.141%
2.6 Fahahil Main 2.07% 9.86% 2.444% 2.444% 0.000% 0.387% 0.467% 0.080% 2.831% 2.911% 0.080%
2.7 Khatiyah North 1.93% 9.21% 25.840% 25.840% 0.000% 0.770% -0.423% -1.193% 26.609% 25.417% -1.193%

OVERALL CONSTRUCTION 21.00% 100.00% 22.08% 22.08% 0.00% 2.88% 2.88% 0.00% 24.96% 24.96% 0.00%
WEEK

Cum Actual

Cum. Plan
Overall Project

Cum. Actual
Weekly Plan
Rev. Recovery
B/L Cum. Plan

Weekly Actual
Weekly Actual

Rev. Recovery
Rev. Recovery
Rev. Recovery
B/L Weekly Plan
1
2-Mar-17

0.00%
100.00%

10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 90.00%
2-Mar-17
6-Mar-17

2
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 9-Mar-17
10-Mar-17

3
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 16-Mar-17 14-Mar-17
18-Mar-17

4
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 23-Mar-17
22-Mar-17
26-Mar-17

5
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 30-Mar-17
30-Mar-17
3-Apr-17

6
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 6-Apr-17
7-Apr-17

7
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 13-Apr-17 11-Apr-17
15-Apr-17

QATAR BRANCH
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 20-Apr-17 19-Apr-17
23-Apr-17

9
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 27-Apr-17
27-Apr-17
1-May-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 4-May-17

10
5-May-17

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 11-May-17 9-May-17

11
13-May-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 18-May-17 17-May-17

12
21-May-17

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION


0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 25-May-17

13
25-May-17
29-May-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1-Jun-17

14
2-Jun-17

0.00% 0.00% 8-Jun-17 6-Jun-17


0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

15
10-Jun-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 15-Jun-17 14-Jun-17

16
18-Jun-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 22-Jun-17

17
22-Jun-17
26-Jun-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 29-Jun-17

18
30-Jun-17
4-Jul-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 6-Jul-17

19
8-Jul-17

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 13-Jul-17 12-Jul-17
20 16-Jul-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 20-Jul-17 20-Jul-17
21

24-Jul-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 27-Jul-17 28-Jul-17
22

1-Aug-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 3-Aug-17
23

5-Aug-17
9-Aug-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 10-Aug-17
24

13-Aug-17

0.00% 0.00% 17-Aug-17 17-Aug-17


0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
25

21-Aug-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 24-Aug-17 25-Aug-17
26

29-Aug-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 31-Aug-17
27

2-Sep-17
6-Sep-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 7-Sep-17
28

10-Sep-17
14-Sep-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 14-Sep-17
29

18-Sep-17

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.05% 0.05% 21-Sep-17 22-Sep-17
30

26-Sep-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.22% 0.17% 28-Sep-17
31

30-Sep-17
4-Oct-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.39% 0.18% 5-Oct-17
32

8-Oct-17
12-Oct-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.59% 0.20% 12-Oct-17
33

16-Oct-17

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.07% 0.48% 19-Oct-17 20-Oct-17
34

24-Oct-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.74% 0.67% 26-Oct-17 28-Oct-17
35

1-Nov-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.95% 0.21% 2-Nov-17
36

5-Nov-17
9-Nov-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.21% 0.26% 9-Nov-17
37

13-Nov-17

2.51% 0.30% 16-Nov-17 17-Nov-17


0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
38

21-Nov-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.79% 0.28% 23-Nov-17 25-Nov-17
39

29-Nov-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 3.30% 0.51% 30-Nov-17
40

3-Dec-17
7-Dec-17
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 4.11% 0.81% 7-Dec-17
41

11-Dec-17
15-Dec-17
0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 4.32% 0.21% 14-Dec-17
42

19-Dec-17
S-Curve

0.05% 0.09% 0.05% 0.09% 0.09% 0.05% 4.53% 0.21% 21-Dec-17 23-Dec-17
43

27-Dec-17
0.38% 0.47% 0.38% 0.47% 0.47% 0.38% 4.91% 0.37% 28-Dec-17
44

31-Dec-17
4-Jan-18
Overall Construction Progress

0.38% 0.84% 0.38% 0.84% 0.84% 0.38% 5.65% 0.74% 4-Jan-18


45

8-Jan-18
12-Jan-18
0.08% 0.93% 0.08% 0.93% 0.93% 0.08% 6.58% 0.93% 11-Jan-18
46

16-Jan-18

0.07% 1.00% 0.07% 1.00% 1.00% 0.07% 8.11% 1.53% 18-Jan-18 20-Jan-18
47

24-Jan-18
0.08% 1.08% 0.08% 1.08% 1.08% 0.08% 9.92% 1.81% 25-Jan-18 28-Jan-18
48

1-Feb-18
0.01% 1.09% 0.01% 1.09% 1.09% 0.01% 11.30% 1.38% 1-Feb-18
49

5-Feb-18
9-Feb-18
0.50% 1.60% 0.50% 1.60% 1.60% 0.50% 12.50% 1.19% 8-Feb-18
50

13-Feb-18

15-Feb-18
17-Feb-18
0.14% 1.73% 0.14% 1.73% 1.73% 0.14% 13.41% 0.91%
51

21-Feb-18
0.04% 1.78% 0.04% 1.78% 1.78% 0.04% 14.88% 1.47% 22-Feb-18 25-Feb-18
52

1-Mar-18
0.07% 1.849% 0.07% 1.85% 1.85% 0.07% 17.14% 2.26% 1-Mar-18
53

5-Mar-18
9-Mar-18
0.14% 1.99% 0.14% 1.99% 1.99% 0.14% 18.59% 1.44% 8-Mar-18
54

13-Mar-18
17-Mar-18
0.15% 2.14% 0.15% 2.14% 2.14% 0.15% 19.54% 0.95% 15-Mar-18
55

21-Mar-18

0.57% 2.72% 0.57% 2.72% 2.72% 0.57% 21.01% 1.47% 22-Mar-18 25-Mar-18
56

29-Mar-18
0.56% 3.28% 0.56% 3.28% 3.28% 0.56% 22.54% 1.53% 29-Mar-18
57

2-Apr-18
6-Apr-18
0.28% 3.55% 0.28% 3.55% 3.55% 0.28% 23.84% 1.30% 5-Apr-18
58

10-Apr-18
14-Apr-18
0.85% 4.40% 0.85% 4.40% 4.40% 0.85% 24.86% 1.03% 12-Apr-18
59

18-Apr-18

0.18% 4.57% 0.18% 4.57% 4.57% 0.18% 26.4% 1.6% 19-Apr-18 22-Apr-18
60

26-Apr-18
0.21% 4.78% 0.21% 4.78% 4.78% 0.21% 27.7% 1.2% 26-Apr-18 30-Apr-18
61

4-May-18
0.12% 4.91% 0.12% 4.91% 4.91% 0.12% 28.9% 1.2% 3-May-18
62

8-May-18
12-May-18
0.20% 5.10% 0.20% 5.10% 5.10% 0.20% 30.1% 1.2% 10-May-18
63

16-May-18

17-May-18
20-May-18
0.17% 5.28% 0.17% 5.28% 5.28% 0.17% 32.0% 1.9%
64

24-May-18
0.25% 5.53% 0.25% 5.53% 5.53% 0.25% 33.7% 1.7% 24-May-18 28-May-18
65

1-Jun-18
0.69% 6.22% 0.69% 6.22% 6.22% 0.69% 35.5% 1.8% 31-May-18
66

5-Jun-18
9-Jun-18
1.33% 7.56% 1.33% 7.56% 7.56% 1.33% 37.05% 1.6% 7-Jun-18
67

13-Jun-18
17-Jun-18
0.83% 8.39% 0.83% 8.39% 8.39% 0.83% 38.37% 1.33% 14-Jun-18
68

21-Jun-18

0.52% 8.91% 0.52% 8.91% 8.91% 0.52% 40.22% 1.84% 21-Jun-18 25-Jun-18
69

29-Jun-18
0.42% 9.33% 0.42% 9.33% 9.33% 0.42% 42.78% 2.56% 28-Jun-18
70

3-Jul-18
7-Jul-18
0.42% 9.75% 0.42% 9.75% 9.75% 0.42% 44.87% 2.09% 5-Jul-18
71

11-Jul-18
15-Jul-18
0.64% 10.38% 0.64% 10.38% 10.38% 0.64% 46.68% 1.81% 12-Jul-18
72

19-Jul-18

0.75% 11.14% 0.75% 11.14% 11.14% 0.75% 48.88% 2.20% 19-Jul-18 23-Jul-18
73

27-Jul-18
0.80% 11.94% 0.80% 11.94% 11.94% 0.80% 50.47% 1.59% 26-Jul-18 31-Jul-18
74

4-Aug-18
0.00% 11.94% 0.00% 11.94% 11.94% 0.00% 51.67% 1.20% 2-Aug-18
75

8-Aug-18
12-Aug-18
1.53% 13.46% 1.53% 13.46% 13.46% 1.53% 53.36% 1.69% 9-Aug-18
76

16-Aug-18

16-Aug-18 20-Aug-18
1.34% 14.80% 1.34% 14.80% 14.80% 1.34% 55.09% 1.73%
77

24-Aug-18
1.36% 16.16% 1.36% 16.16% 16.16% 1.36% 58.15% 3.06% 23-Aug-18 28-Aug-18
78

1-Sep-18
0.75% 16.90% 0.75% 16.90% 16.90% 0.75% 60.08% 1.93% 30-Aug-18
79

5-Sep-18
9-Sep-18
1.59% 18.49% 1.59% 18.49% 18.49% 1.59% 62.64% 2.56% 6-Sep-18
80

13-Sep-18
17-Sep-18
2.45% 20.94% 2.45% 20.94% 20.94% 2.45% 66.90% 4.26% 13-Sep-18
81

21-Sep-18

1.14% 22.08% 1.14% 22.08% 22.08% 1.14% 70.76% 3.86% 20-Sep-18 25-Sep-18
82

PROJECT No. 3963 "

29-Sep-18
0.63% 22.71% 0.63% 22.71% 22.71% 0.63% 73.97% 3.21% 27-Sep-18
83

3-Oct-18
7-Oct-18
0.45% 23.17% 0.45% 23.17% 23.17% 0.45% 76.11% 2.14% 4-Oct-18
84

11-Oct-18
15-Oct-18
0.88% 24.05% 0.88% 24.05% 24.05% 0.88% 79.96% 3.85% 11-Oct-18
85

19-Oct-18

0.90% 24.94% 0.90% 24.94% 24.94% 0.90% 82.78% 2.82% 18-Oct-18 23-Oct-18
86

27-Oct-18
0.02% 24.96% 0.02% 24.96% 24.96% 0.02% 86.57% 3.79% 25-Oct-18 31-Oct-18
87
Overall Construction Progress "S" curve

4-Nov-18
1.00% 25.96% 89.38% 2.81% 1-Nov-18
88

8-Nov-18
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS

12-Nov-18
2.39% 28.35% 91.17% 1.79% 8-Nov-18
89

16-Nov-18

15-Nov-18
20-Nov-18
2.70% 31.05% 93.38% 2.21%
90

24-Nov-18
2.83% 33.88% 96.04% 2.67% 22-Nov-18 28-Nov-18
91

2-Dec-18
3.42% 37.30% 98.34% 2.30% 29-Nov-18
92

6-Dec-18
10-Dec-18
4.28% 41.59% 99.22% 0.88% 6-Dec-18
93

14-Dec-18
18-Dec-18
4.03% 45.62% 99.77% 0.55% 13-Dec-18
94

22-Dec-18

4.06% 49.68% 99.94% 0.17% 20-Dec-18 26-Dec-18


95

30-Dec-18
6.31% 55.99% 100.00% 0.06% 27-Dec-18
96

3-Jan-19
7-Jan-19
7.49% 63.48% 100.00% 0.00% 3-Jan-19
97

11-Jan-19
15-Jan-19
7.44% 70.92% 100.00% 0.00% 10-Jan-19
98

19-Jan-19

1.82% 72.75% 100.00% 0.00% 17-Jan-19 23-Jan-19


27-Jan-19
1.39% 74.14% 100.00% 0.00% 24-Jan-19
31-Jan-19
4-Feb-19
1.95% 76.08% 100.00% 0.00% 31-Jan-19
8-Feb-19

2.59% 78.68% 100.00% 0.00% 7-Feb-19 12-Feb-19


16-Feb-19
3.29% 81.97% 100.00% 0.00% 14-Feb-19 20-Feb-19
24-Feb-19
2.93% 84.90% 100.00% 0.00% 21-Feb-19
28-Feb-19
4-Mar-19
3.11% 88.01% 100.00% 0.00% 28-Feb-19
8-Mar-19

2.02% 90.03% 100.00% 0.00% 7-Mar-19 12-Mar-19


16-Mar-19
DATE:

1.73% 91.76% 100.00% 0.00% 14-Mar-19 20-Mar-19


24-Mar-19
1.77% 93.53% 100.00% 0.00% 21-Mar-19
28-Mar-19
1-Apr-19
0.89% 94.42% 100.00% 0.00% 28-Mar-19
5-Apr-19
25/Oct/18

4-Apr-19
9-Apr-19
1.24% 95.67% 100.00% 0.00%
13-Apr-19
1.27% 96.94% 100.00% 0.00% 11-Apr-19 17-Apr-19
21-Apr-19
0.84% 97.78% 100.00% 0.00% 18-Apr-19 25-Apr-19
29-Apr-19
0.58% 98.37% 100.00% 0.00% 25-Apr-19
3-May-19
7-May-19
0.15% 98.52% 100.00% 0.00% 2-May-19
11-May-19

0.34% 98.85% 100.00% 0.00% 9-May-19 15-May-19


19-May-19
0.23% 99.08% 100.00% 0.00% 16-May-19 23-May-19
27-May-19
0.22% 99.30% 100.00% 0.00% 23-May-19
31-May-19
Cum Actual
B/L Cum. Plan

4-Jun-19
0.09% 99.39% 100.00% 0.00% 30-May-19
8-Jun-19

0.16% 99.55% 100.00% 0.00% 6-Jun-19 12-Jun-19


16-Jun-19
Rev. Recovery Cum. Plan

13-Jun-19 20-Jun-19
Rev. Recovery Cum. Actual

0.07% 99.62% 100.00% 0.00%


24-Jun-19
0.22% 99.84% 100.00% 0.00% 20-Jun-19
28-Jun-19
2-Jul-19
0.12% 99.96% 100.00% 0.00% 27-Jun-19

0.04% 100.00% 100.00% 0.00% 4-Jul-19


99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123
Attachment-6 Construction
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
EPIC FOR REPLACEMENT OF OLD 3-PHASE TEST SEPARATORSTLL DEGASSING STATIONS, DUKHAN
CONSTRUCTION PROGRESS (MONITORING WEIGHTAGE): LAST WEEK Current Week Cumulative

Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

21.00% 100.00%
FABRICATION
KAHM
Structural Steel Fabrication
FAB. OF SEPERATOR & PLATFORM STR.
1 F0010 2.40 INCL.LADDERS/STAIRS/HR/WW/CROS FAB KM STFB Kg 9298 9112.04 06/Sep/18 20/Nov/18 6/Sep/18 0.04% 0.21% 100.000% 95.00% 0.00% 3.000% 65.789% 98.000% 32.21%
TRANSFER TO SITE FOR INSTLN.
FAB. OF METERING SKID
2 F0040 2.40 INCL.LADDERS/STAIRS/HR/WW/CROS FAB KM STFB Kg 4078 4078 08/Aug/18 15/Oct/18 8/Aug/18 15/Oct/18 0.04% 0.21% 100.000% 95.00% 0.00% 5.000% 100.000% 100.000% 0.00%
TRANSFER TO SITE FOR INSTALLATION

FAB. OF PSV
3 F0030 2.40 INCL.LADDERS/STAIRS/HR/WW/CROS.
STRUCTURE TRANSFER TO SITE FOR FAB KM STFB Kg 1705 1705 09/Aug/18 23/Oct/18 15/Jul/18 23/Oct/18 0.04% 0.21% 100.000% 98.00% 0.00% 0.000% 100.000% 100.000% 0.00%
INSTALLATION

4 F0020 XX 2.40 FAB.


SITE
OF PIPESUPPORT STRUCTURE SHIFT TO FAB KM STFB Sqm 5780 5780 07/Jun/18 12/Nov/18 4/Feb/18 19/Jul/18 0.02% 0.11% 100.000% 100.00% 0.00% 0.000% 88.679% 100.000% 11.32%

FAB. OF PIPESUPPORT STRUCTURE SHIFT TO


5 F0020 XX 2.40 SITE FAB KM STFB Sqm 1320 1280.4 07/Jun/18 12/Nov/18 7/Jun/18 0.04% 0.21% 100.000% 97.00% 0.00% 0.000% 88.679% 97.000% 8.32%

FABRICATION OF INSTRUMENT STANCHION


6 F0020-1 2.40 SUPPORTS FAB KM STFB 0 13/Aug/18 03/Sep/18 20/Jun/18 27/Jul/18 0.04% 0.21% 100.000% 100.00% 0.00% 0.000% 100.000% 100.000% 0.00%

Piping Fabrication
FBE PIPING (AT KUWAIT)
9 F0080 2.10 PIPING FABRICATION & FBE COATINGT FAB KM PPFB DIN 2677 535.4 08/Oct/18 10/Dec/18 08/Oct/18 0.17% 0.80% 74.074% 12.00% -45.95% 8.000% 28.125% 20.000% -8.13%
KUWAIT
10 F0110 2.10 FBE PIPING BULK DELIVERT SITE FAB KM PPFB LM 110 0 05/Dec/18 15/Dec/18 0.06% 0.27% 0.000% 0.00% 0.00% 0.000% 0.000% 0.000% 0.00%
REMANING PIPING (NON FBE)
12 ETPFKM-1 2.10 Early Tie-in Fabrication Works FAB KM PPFB 0 19/Dec/17 18/Jan/18 19/Dec/17 18/Jan/18 0.05% 0.23% 100.000% 100.00% 0.00% 0.0% 100.000% 100.00% 0.00%

13 F0080-1 2.10 COMPLETE PIPING FABRICATION INCL.


HYDROTEST/ PAINTING & COATING FAB KM PPFB 0 24/Oct/18 08/Dec/18 24/Oct/18 0.22% 1.07% 91.892% 5.00% -87.54% 0.000% 4.348% 5.000% 0.65%

14 F0110-1 2.10 FABRICATION SPOOLS DELIVER TO SITE FAB KM PPFB 0 28/Nov/18 12/Dec/18 0.11% 0.53% 50.000% 0.00% -50.00% 0.000% 0.000% 0.000% 0.00%
KAHN
Structural Steel Fabrication
FAB. OF SEPERATOR & PLATFORM STR.
17 F110 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS FAB KN STFB Kg 9298 8368.2 19/Sep/18 13/Nov/18 19/Sep/18 0.04% 0.21% 100.000% 75.00% 0.00% 15.000% 66.071% 90.000% 23.93%
TRANSFER TO SITE FOR INSTLN.
FAB. OF METERING SKID
18 F140 XX 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB KN STFB Kg 4909.175 4909.175 28/May/18 16/Aug/18 28/May/18 19/Jul/18 0.02% 0.08% 100.000% 100.00% 0.00% 0.000% 100.000% 100.000% 0.00%
TRANSFER TO SITE FOR INSTALLATION
FAB. OF METERING SKID
19 F140 XX 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB KN STFB Kg 866.325 866.325 28/May/18 16/Aug/18 28/May/18 20/Aug/18 0.04% 0.21% 100.000% 100.00% 0.00% 0.000% 100.000% 100.000% 0.00%
TRANSFER TO SITE FOR INSTALLATION

FAB. OF PSV
20 F130 XX 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB KN STFB Kg 6570.5 6570.5 17/May/18 21/Aug/18 17/May/18 19/Jul/18 0.02% 0.08% 100.000% 100.00% 0.00% 0.000% 100.000% 100.000% 0.00%
STRUCTURE TO SITE FOR INSTALLATION

FAB. OF PSV
21 F130 XX 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB KN STFB Kg 1159.5 1159.5 17/May/18 21/Aug/18 17/May/18 26/Aug/18 0.04% 0.21% 100.000% 100.00% 0.00% 0.000% 100.000% 100.000% 0.00%
STRUCTURE TO SITE FOR INSTALLATION

COMPLETE FAB. OF PIPESUPPORT


22 F120 XX 1.40 STRUCTURE TRANSFER TO SITE FOR FAB KN STFB Kg 7140 7140 9/May/18 13/Nov/18 5/Feb/18 19/Jul/18 0.02% 0.08% 100.000% 100.00% 0.00% 0.000% 89.947% 100.000% 10.05%
INSTALLATION
COMPLETE FAB. OF PIPESUPPORT
23 F120 XX 1.40 STRUCTURE TRANSFER TO SITE FOR FAB KN STFB Kg 1660 1643.4 09/May/18 13/Nov/18 9/May/18 0.04% 0.21% 100.000% 98.00% 0.00% 1.000% 89.947% 99.000% 9.05%
INSTALLATION
FABRICATION OF INSTRUMENT STANCHION
24 F120-1 1.40 FAB KN STFB 0 15/Aug/18 16/Sep/18 26/Jun/18 26/Jul/18 0.04% 0.21% 100.000% 100.00% 0.00% 0.000% 100.000% 100.000% 0.00%
SUPPORTS
Piping Fabrication
FBE PIPING (AT KUWAIT)
27 F180 1.10 PIPING FABRICATION & FBE COATINGT FAB KN PPFB DIN 3118 623.6 08/Oct/18 03/Dec/18 08/Oct/18 0.21% 0.99% 74.074% 12.00% -42.50% 8.000% 31.579% 20.000% -11.58%
KUWAIT
28 F210 1.10 FBE PIPING BULK DELIVERT SITE FAB KN PPFB LM 147 0 01/Dec/18 15/Dec/18 0.07% 0.33% 0.000% 0.00% 0.000% 0.000% 0.00%
REMAINING PIPING ( NON FBE)
30 ETPFKN-1 1.10 Early Tie-in Fabrication Works FAB KN PPFB 0 19/Dec/17 19/Jan/18 19/Dec/17 19/Jan/18 0.06% 0.29% 100.000% 100.00% 0.00% 0.000% 100.000% 100.000% 0.00%

31 F180-1 1.10 COMPLETE PIPING FABRICATION . FAB KN PPFB 0 27/Oct/18 03/Dec/18 27/Oct/18 0.28% 1.31% 91.892% 5.00% -91.89% 0.000% 0.000% 5.000% 5.00%
HYDROTEST/ PAINTING & COATING
32 F210-1 1.10 FABRICATION SPOOLS DELIVER TO SITE FAB KN PPFB 0 24/Nov/18 08/Dec/18 0.14% 0.66% 50.000% -50.00% 0.000% 0.000% 0.00%
KAHS
Structural Steel Fabrication
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

FAB. OF METERING SKID


35 F250 XX 3.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB KS STFB Kg 4594.25 4594.25 19/Jun/18 26/Aug/18 19/Jun/18 19/Jul/18 0.01% 0.05% 100.000% 100.00% 0.00% 0.000% 100.000% 100.000% 0.00%
TRANSFER TO SITE FOR INSTALLATION
FAB. OF METERING SKID
36 F250 XX 3.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB KS STFB Kg 810.75 810.75 19/Jun/18 26/Aug/18 20/Jun/18 26/Aug/18 0.04% 0.20% 100.000% 100.00% 0.00% 0.000% 100.000% 100.000% 0.00%
TRANSFER TO SITE FOR INSTALLATION

37 F230 XX 3.40 FAB. OF PIPESUPPORT STRUCTURE FAB KS STFB Kg 1620 1620 06/Feb/18 10/Nov/18 6/Feb/18 19/Jul/18 0.01% 0.05% 100.000% 100.00% 0.00% 0.000% 94.245% 100.000% 5.76%
TRANSFER TO SITE FOR INSTALLATION

38 F230 XX 3.40 FAB. OF PIPESUPPORT STRUCTURE


TRANSFER TO SITE FOR INSTALLATION FAB KS STFB Kg 850 833 6/Feb/18 10/Nov/18 7/Apr/18 0.04% 0.20% 100.000% 98.00% 0.00% 98.000% 94.245% 98.000% 3.76%

FAB. OF SEPERATOR & PLATFORM STR.


39 F220 3.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB KS STFB Kg 9298 8833.1 16/Aug/18 05/Nov/18 25/Aug/18 0.04% 0.20% 100.000% 92.00% 0.00% 95.000% 86.585% 95.000% 8.41%
TRANSFER TO SITE FOR INSTLN.

FAB. OF PSV
INCL.LADDERS/STAIRS/HR/WW/CROS.
40 F240 3.40 FAB KS STFB Kg 1705 1619.75 06/Feb/18 05/Nov/18 10/Jul/18 0.04% 0.20% 100.000% 92.00% 0.00% 95.000% 95.971% 95.000% -0.97%
STRUCTURE TRANSFER TO SITE FOR
INSTALLATION
FABRICATION OF INSTRUMENT STANCHION
41 F260-1 3.40 FAB KS STFB 0 02/Sep/18 16/Sep/18 26/Jun/18 26/Jul/18 0.04% 0.20% 100.000% 100.00% 0.00% 100.000% 100.000% 100.000% 0.00%
SUPPORTS
Piping Fabrication
FBE PIPING (AT KUWAIT)
44 F290 3.10 PIPING FABRICATION & FBE COATINGT FAB KS PPFB DIN 2945 589 08/Oct/18 03/Dec/18 08/Oct/18 0.20% 0.93% 58.621% 12.00% -27.04% 8.000% 31.579% 20.000% -11.58%
KUWAIT
45 F320-2 3.10 FBE PIPING BULK DELIVERT SITE FAB KS PPFB 0 04/Dec/18 13/Dec/18 0.07% 0.31% 0.000% 0.00% 0.000% 0.000% 0.00%
REMAINING PIPING (NON - FBE)
47 SDCN100 3.10 Early Tie-in Fabrication Works FAB KS PPFB 0 19/Dec/17 18/Jan/18 19/Dec/17 18/Jan/18 0.06% 0.27% 100.000% 100.00% 0.00% 0.000% 100.000% 100.000% 0.00%

48 F290-1 3.10 COMPLETE PIPING FABRICATION INCL. FAB KS PPFB 0 25/Oct/18 24/Nov/18 25/Oct/18 0.26% 1.24% 91.892% 5.00% -88.67% 0.000% 3.226% 5.000% 1.77%
HYDROTEST/ PAINTING & COATING
49 F320-1 3.10 FABRICATION SPOOLS DELIVER TO SITE FAB KS PPFB 0 18/Nov/18 02/Dec/18 0.13% 0.62% 62.500% -62.50% 0.000% 0.000% 0.00%
JALM
Structural Steel Fabrication
FAB. OF SEPERATOR & PLATFORM STR.
52 F330 7.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB JL STFB Kg 9298 5578.8 11/Sep/18 22/Dec/18 11/Sep/18 0.09% 0.41% 100.000% 50.00% -56.31% 10.000% 43.689% 60.000% 16.31%
TRANSFER TO SITE FOR INSTLN.
FAB. OF METERING SKID
53 F340 7.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB JL STFB Kg 2470 2173.6 11/Sep/18 22/Dec/18 11/Sep/18 0.01% 0.03% 100.000% 85.00% -56.31% 3.000% 43.689% 88.000% 44.31%
TRANSFER TO SITE FOR INSTALLATION

FAB. OF PSV
54 F350 7.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB JL STFB Kg 1705 545.6 12/Sep/18 22/Dec/18 12/Sep/18 0.01% 0.06% 100.000% 25.00% -56.86% 7.000% 43.137% 32.000% -11.14%
STRUCTURE TRANSFER TO SITE FOR
INSTALLATION

55 F360 7.40 FAB. OF PIPESUPPORT STRUCTURE FAB JL STFB Kg 4078 1835.1 20/Sep/18 31/Dec/18 12/Sep/18 0.01% 0.06% 79.070% 35.00% -44.12% 10.000% 34.951% 45.000% 10.05%
TRANSFER TO SITE FOR INSTALLATION

56 F370 7.40 FABRICATION


SUPPORTS
OF INSTRUMENT STANCHION FAB JL STFB PCS 151 151 02/Sep/18 16/Sep/18 26/Jun/18 26/Jul/18 0.14% 0.67% 0.000% 100.00% 100.00% 0.000% 100.000% 100.000% 0.00%

Piping Fabrication
FBE PIPING (AT KUWAIT)
59 F400 7.10 PIPING
KUWAIT
FABRICATION & FBE COATINGT FAB JL PPFB DIN 3564 712.8 11/Oct/18 22/Dec/18 11/Oct/18 0.24% 1.14% 48.780% 12.00% -28.23% 8.000% 20.548% 20.000% -0.55%

60 F430 7.10 FBE PIPING BULK DELIVERT SITE FAB JL PPFB LM 170 0 23/Dec/18 01/Jan/19 0.08% 0.38% 0.000% 0.00% 0.000% 0.000% 0.00%
REMAINING PIPING (NON FBE0
COMPLETE PIPING FABRICATION
62 F400-1 7.10 HYDROTEST/ PAINTING & COATING FAB JL PPFB 0 28/Nov/18 05/Jan/19 0.32% 1.51% 65.789% -65.79% 5.000% 0.000% 5.000% 5.00%

63 F430-1 7.10 FABRICATION SPOOLS DELIVER TO SITE FAB JL PPFB 0 26/Dec/18 09/Jan/19 0.16% 0.76% 0.000% 0.00% 0.000% 0.000% 0.00%
FAHS
Structural Steel Fabrication
COMPLETE FAB. OF SEPERATOR &
PLATFORM STR.
66 F440 6.40 INCL.LADDERS/STAIRS/HR/WW/CROS. BY FAB FS STFB Kg 9298 6043.7 11/Sep/18 29/Dec/18 11/Sep/18 0.10% 0.48% 89.474% 60.00% -48.56% 5.000% 40.909% 65.000% 24.09%
PETROSERV & TRANSFER TO SITE FOR
INSTLN.

COMPLETE SS FAB. OF METERING SKID


INCL.LADDERS/STAIRS/HR/WW/CROS. BY
67 F450 6.40 PETROSERV & TRANSFER TO SITE FOR FAB FS STFB Kg 2470 2223 09/Sep/18 29/Dec/18 9/Sep/18 0.01% 0.05% 89.474% 85.00% -47.51% 5.000% 41.964% 90.000% 48.04%
INSTALLATION

COMPLETE FAB. OF PSV


68 F460 6.40 INCL.LADDERS/STAIRS/HR/WW/CROS.
STRUCTURE BY PETROSERV & TRANSFER TO FAB FS STFB Kg 1705 818.4 11/Sep/18 10/Dec/18 11/Sep/18 0.02% 0.10% 100.000% 40.00% -50.55% 8.000% 49.451% 48.000% -1.45%
SITE FOR INSTALLATION

COMPLETE FAB. OF PIPESUPPORT


69 F470 6.40 STRUCTURE BY PETROSERV & TRANSFER TO FAB FS STFB Kg 4078 2039 12/Sep/18 19/Dec/18 12/Sep/18 0.02% 0.10% 86.207% 45.00% -41.76% 5.000% 44.444% 50.000% 5.56%
SITE FOR INSTALLATION
FABRICATION OF INSTRUMENT STANCHION
70 F480 6.40 FAB FS STFB PCS 151 151 03/Sep/18 16/Sep/18 26/Jun/18 27/Jul/18 0.12% 0.55% 45.000% 100.00% 55.00% 0.000% 100.000% 100.000% 0.00%
SUPPORTS
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

Piping Fabrication
FBE PIPING (AT KUWAIT)
PIPING FABRICATION & FBE COATINGT
73 F510 6.10 FAB FS PPFB DIN 2678 535.6 18/Oct/18 16/Dec/18 18/Oct/18 0.18% 0.88% 48.780% 12.00% -35.45% 8.000% 13.333% 20.000% 6.67%
KUWAIT
74 F540 6.10 FBE PIPING BULK DELIVERT SITE FAB FS PPFB LM 142 0 17/Dec/18 25/Dec/18 0.06% 0.29% 0.000% 0.00% 0.000% 0.000% 0.00%
REMANING PIPING (NON FBE)
76 F510-1 6.10 COMPLETE PIPING FABRICATION INCL. FAB FS PPFB 0 05/Nov/18 12/Dec/18 0.25% 1.17% 65.789% -65.79% 5.000% 0.000% 5.000% 5.00%
HYDROTEST/ PAINTING & COATING
77 F540-1 6.10 FABRICATION SPOOLS DELIVER TO SITE FAB FS PPFB 0 04/Dec/18 22/Dec/18 0.12% 0.59% 10.000% -10.00% 0.000% 0.000% 0.00%
FAHN
Structural Steel Fabrication
FAB. OF SEPERATOR & PLATFORM STR.
80 F550 4.40 INCL.LADDERS/STAIRS/HR/WW/CROS FAB FN STFB Kg 9298 5578.8 10/Sep/18 02/Jan/19 10/Sep/18 0.12% 0.58% 89.474% 50.00% -49.47% 10.000% 40.000% 60.000% 20.00%
TRANSFER TO SITE FOR INSTLN.
FAB OF METERING SKID
81 F560 4.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB FN STFB Kg 2470 2223 12/Sep/18 02/Jan/19 12/Sep/18 0.01% 0.06% 89.474% 85.00% -50.54% 5.000% 38.938% 90.000% 51.06%
TRANSFER TO SITE FOR INSTALLATION

FAB OF PSV
INCL.LADDERS/STAIRS/HR/WW/CROS.
82 F570 4.40 FAB FN STFB Kg 1705 1193.5 11/Sep/18 19/Dec/18 11/Sep/18 0.02% 0.12% 89.474% 50.00% -44.47% 20.000% 45.000% 70.000% 25.00%
STRUCTURE TRANSFER TO SITE FOR
INSTALLATION
FAB. OF PIPESUPPORT STRUCTURE
83 F580 4.40 FAB FN STFB Kg 4078 2120.56 11/Sep/18 02/Jan/19 11/Sep/18 0.02% 0.12% 89.474% 48.00% -50.00% 4.000% 39.474% 52.000% 12.53%
TRANSFER TO SITE FOR INSTALLATION

84 F590 4.40 FABRICATION OF INSTRUMENT STANCHION FAB FN STFB PCS 151 151 03/Sep/18 11/Oct/18 26/Jul/18 0.11% 0.53% 45.000% 100.00% 55.00% 0.000% 100.000% 100.000% 0.00%
SUPPORTS
Piping Fabrication
FBE PIPING (AT KUWAIT)
87 F620 4.10 PIPING
KUWAIT
FABRICATION & FBE COATINGT FAB FN PPFB DIN 2522 504.4 14/Oct/18 25/Dec/18 14/Oct/18 0.18% 0.86% 48.780% 12.00% -32.34% 8.00% 16.44% 20.00% 3.56%

88 F650 4.10 FBE PIPING BULK DELIVERT SITE FAB FN PPFB LM 164 0 26/Dec/18 05/Jan/19 0.06% 0.29% 0.000% 0.00% 0.00% 0.00% 0.00%
REMAINING PIPING (NON FBE)
90 F620-1 4.10 COMPLETE PIPING FABRICATION INCL.
HYDROTEST/ PAINTING & COATING FAB FN PPFB 0 19/Nov/18 26/Dec/18 0.24% 1.15% 65.789% -65.79% 5.00% 0.00% 5.00% 5.00%

91 F650-1 4.10 FABRICATION SPOOLS DELIVER TO SITE FAB FN PPFB 0 16/Dec/18 03/Jan/19 0.12% 0.58% 0.000% 0.00% 0.00% 0.00% 0.00%
FAHM
Structural Steel Fabrication
FAB. OF SEPERATOR & PLATFORM STR.
94 F660 5.40 INCL.LADDERS/STAIRS/HR/WW/CROS. FAB FM STFB Kg 9298 4370.06 13/Sep/18 24/Jan/19 13/Sep/18 0.08% 0.39% 71.429% 40.00% -39.34% 7.00% 32.09% 47.00% 14.91%
TRANSFER TO SITE FOR INSTLN.
FAB. OF METERING SKID
95 F670 5.40 INCL.LADDERS/STAIRS/HR/WW/CROS FAB FM STFB Kg 2470 1778.4 13/Sep/18 24/Jan/19 13/Sep/18 0.01% 0.04% 71.429% 30.00% -39.34% 42.00% 32.09% 72.00% 39.91%
TRANSFER TO SITE FOR INSTALLATION

FAB.OF PSV
INCL.LADDERS/STAIRS/HR/WW/CROS.
96 F680 5.40 STRUCTURE TRANSFER TO SITE FOR FAB FM STFB Kg 1705 596.75 13/Sep/18 09/Jan/19 13/Sep/18 0.02% 0.08% 71.429% 30.00% -35.29% 5.00% 36.13% 35.00% -1.13%
INSTALLATION

97 F690 5.40 FAB. OF PIPESUPPORT STRUCTURE


TRANSFER TO SITE FOR INSTALLATION FAB FM STFB Kg 4078 3140.06 12/Sep/18 05/Jan/19 12/Sep/18 0.02% 0.08% 62.500% 75.00% -24.57% 2.00% 37.93% 77.00% 39.07%

98 F700 5.40 FABRICATION OF INSTRUMENT STANCHION FAB FM STFB PCS 151 151 03/Sep/18 16/Sep/18 3/Sep/18 16/Sep/18 0.11% 0.53% 0.000% 100.00% 100.00% 0.00% 100.00% 100.00% 0.00%
SUPPORTS
Piping Fabrication
FBE PIPING (AT KUWAIT)
PIPING FABRICATION & FBE COATINGT
101 F730 5.10 KUWAIT FAB FM PPFB DIN 2775 555 18/Oct/18 31/Dec/18 18/Oct/18 0.20% 0.93% 43.478% 12.00% -32.81% 8.00% 10.67% 20.00% 9.33%

102 F760 5.10 FBE PIPING BULK DELIVERT SITE FAB FM PPFB LM 146 0 01/Jan/19 10/Jan/19 0.07% 0.31% 0.000% 0.00% 0.00% 0.00% 0.00%
REMAINING PIPING (NON FBE)
COMPLETE PIPING FABRICATION INCL.
104 F730-1 5.10 HYDROTEST/ PAINTING & COATING FAB FM PPFB 0 29/Nov/18 14/Jan/19 0.26% 1.25% 50.000% -50.00% 5.00% 0.00% 5.00% 5.00%

105 F760-1 5.10 FABRICATION SPOOLS DELIVER TO SITE FAB FM PPFB 0 29/Dec/18 16/Jan/19 0.13% 0.62% 0.000% 0.00% 0.00% 0.00% 0.00%
INSTALLATION
KAHN
Civil Works
COMMOMN
110 A1440 1.40 GRADING INS KN CV SQM 246 246 10/Feb/18 31/May/18 09/Feb/18 19/Jul/18 0.04% 0.18% 100.000% 100.00% 0.00% 0.00% 100.00% 100.00% 0.00%

111 A1510 1.40 CABLE TRENCHESND UTILITY ROAD


CROSSINGS INS KN CV LM 500 175 25/Aug/18 21/Nov/18 25/Aug/18 0.00% 0.01% 100.000% 25.00% -30.34% 10.00% 69.66% 35.00% -34.66%

112 A1520 1.40 DRAINAGE PIPE CULVERTS INS KN CV LM 33 33 30/Sep/18 16/Oct/18 30/Sep/18 16/Oct/18 0.01% 0.02% 0.000% 100.00% 100.00% 0.00% 100.00% 100.00% 0.00%

113 A1530 1.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS KN CV PCS 1 0 02/Jan/19 16/Jan/19 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

ROADSND PAVING(INCLUDING
114 A1500 1.40 MODIFICATIONS) INS KN CV SQM 231 0 02/Jan/19 16/Jan/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

115 A1440-1 1.40 PROTECTION OF UNDERGROUND CABLES INS KN CV 0 05/Sep/18 21/Nov/18 05/Sep/18 0.01% 0.04% 100.000% 90.00% -34.62% 0.00% 65.38% 90.00% 24.62%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

116 A1445-6 1.40 SOAKWAY PIT EXCAVATION & INSTALLATION INS


INCL. DEMOLITION - IFPPLICABLE KN CV 0 14/Aug/18 17/Nov/18 14/Aug/18 0.01% 0.04% 100.000% 90.00% -23.96% 0.00% 76.04% 90.00% 13.96%

117 A1530-1 1.40 RE-INSTATEMENT OF EXISTING PAVEMENT INS KN CV 0 02/Jan/19 16/Jan/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(INTERLOCK PAVING)
TEST SEPERATOR
119 A1445 1.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS KN CV CUM 40 40 9-Feb-18 29-Mar-18 9-Feb-18 29-Mar-18 0.02% 0.09% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

120 A1450 1.40 FOUNDATION WORK (STEEL FIXING) INS KN CV ton 1534 1534 1-Apr-18 12-Apr-18 1-Apr-18 12-Apr-18 0.02% 0.07% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
121 A1450-1 1.40 FOUNDATION WORK (CONCRETE) INS KN CV CUM 15.8 15.8 1-Apr-18 26-Apr-18 1-Apr-18 26-Apr-18 0.02% 0.07% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

122 A1450-2 XX 1.40 CURING / WATERPROOFING / BACK FILLING INS KN CV CUM 45 45 24-May-18 11-Aug-18 27-May-18 19-Jul-18 0.02% 0.07% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

123 A1450-2 XX 1.40 CURING / WATERPROOFING / BACK FILLING INS KN CV CUM 45 45 24/May/18 11/Aug/18 24-May-18 11-Aug-18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

TEST SEPERATOR PLATFORM


125 A1445-1 1.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS KN CV 0 09/Feb/18 29/Mar/18 09/Feb/18 29/Mar/18 0.02% 0.09% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

126 A1450-3 1.40 FOUNDATION WORK (STEEL FIXING) INS KN CV 0 01/Apr/18 16/Jul/18 01/Apr/18 16/Jul/18 0.02% 0.07% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
127 A1450-4 1.40 FOUNDATION WORK (CONCRETE) INS KN CV 0 01/Apr/18 26/Jul/18 01/Apr/18 26/Jul/18 0.02% 0.07% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

128 A1450-5 XX 1.40 CURING / WATERPROOFING / BACK FILLING INS KN CV 0 27/May/18 11-Aug-18 27/May/18 19-Jul-18 0.02% 0.07% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

129 A1450-5 XX 1.40 CURING / WATERPROOFING / BACK FILLING INS KN CV 0 27/May/18 11/Aug/18 27/May/18 11/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

METERING SKID
131 A1445-2 1.40 EXCAVATION INS KN CV CUM 60 60 06/Mar/18 29/Mar/18 06/Mar/18 29/Mar/18 0.04% 0.19% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
132 A1490 1.40 FOUNDATION WORK (STEEL FIXING) INS KN CV kg 1656 1656 01/Apr/18 12/Apr/18 01/Apr/18 12/Apr/18 0.03% 0.15% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
133 A1490-1 1.40 FOUNDATION WORK (CONCRETE) INS KN CV CUM 14.55 14.55 01/Apr/18 26/Apr/18 01/Apr/18 26/Apr/18 0.03% 0.15% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

134 A1490-2 1.40 CURING / WATERPROOFING / BACK FILLING INS KN CV CUM 108 108 28/May/18 11/Aug/18 28/May/18 11/Aug/18 0.03% 0.15% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

PIPE SUPPORT
136 A1445-3 XX 1.40 EXCAVATION FOR STRUCTURAL STEEL PIPE INS KN CV CUM 78.6 78.6 22/Mar/18 06/Aug/18 22/Mar/18 31/May/18 0.04% 0.19% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
SUPPORTS
EXCAVATION FOR STRUCTURAL STEEL PIPE
137 A1445-3 XX 1.40 INS KN CV CUM 78.6 78.6 22/Mar/18 06/Aug/18 22/Mar/18 06/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
SUPPORTS
138 A1470 XX 1.40 FOUNDATION WORK (STEEL FIXING) INS KN CV kg 2880 2880 10/Dec/17 18/Aug/18 10/Dec/17 19/Jul/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
139 A1470 XX 1.40 FOUNDATION WORK (STEEL FIXING) INS KN CV kg 2880 2880 10/Dec/17 18/Aug/18 10/Dec/17 18/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
140 A1470-1 XX 1.40 FOUNDATION WORK (CONCRETE) INS KN CV CUM 24 24 10/Dec/17 18/Aug/18 10/Dec/17 19/Jul/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
141 A1470-1 XX 1.40 FOUNDATION WORK (CONCRETE) INS KN CV CUM 24 24 10/Dec/17 18/Aug/18 10/Dec/17 18/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

142 A1470-2 XX 1.40 CURING / WATERPROOFING / BACK FILLING INS KN CV CUM 76 76 10/Dec/17 23/Aug/18 10/Dec/17 19/Jul/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

143 A1470-2 XX 1.40 CURING / WATERPROOFING / BACK FILLING INS KN CV CUM 76 76 10/Dec/17 23/Aug/18 10/Dec/17 23/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

PSV
145 A1445-4 1.40 EXCAVATION (INCLUDINGREA LIGHTING INS KN CV CUM 100 100 24/Mar/18 05/Jul/18 24/Mar/18 05/Jul/18 0.04% 0.19% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
POLES)
146 A1490-3 1.40 FOUNDATION WORK (STEEL FIXING) INS KN CV CUM 3647 3647 15/Apr/18 08/Aug/18 15/Apr/18 08/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
147 A1490-5 1.40 FOUNDATION WORK (CONCRETE) INS KN CV CUM 26 26 22/Apr/18 08/Aug/18 22/Apr/18 08/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

148 A1490-6 XX 1.40 CURING / WATERPROOFING / BACK FILLING INS KN CV CUM 206 206 04/Jun/18 11/Aug/18 04/Jun/18 19/Jul/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

149 A1490-6 XX 1.40 CURING / WATERPROOFING / BACK FILLING INS KN CV CUM 206 206 04/Jun/18 11/Aug/18 04/Jun/18 11/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

Structural Steel
TEST SEPERATOR

INSTALLATION OF STRUCTURAL STEELWORK


152 A2360 1.40 OPERATINGNDCCESS PLATFORMS (TEST INS KN STIN Kg 9298 1394.7 02/Oct/18 03/Dec/18 02/Oct/18 0.09% 0.44% 100.000% 10.00% -61.90% 5.00% 38.10% 15.00% -23.10%
SEPERATOR & PLATFORM)

INSTALLATION OF LADDERS, STAIRS,


153 A2400 1.40 HANDRAILS INS KN STIN PCS 151 0 14/Nov/18 03/Dec/18 0.01% 0.04% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

METERING SKID
INSTALLATION OF STRUCTURAL STEEL OF
155 A2360-1 1.40 METERING SKID INCL. WALK WAY OR CROSS INS KN STIN 0 04/Oct/18 06/Dec/18 04/Oct/18 30/Oct/18 0.02% 0.08% 100.000% 10.00% -65.63% 5.00% 34.38% 15.00% -19.38%
OVER
PSV
157 A2380 1.40 INSTALLATION OF PSV VALVESCCESS INS KN STIN Kg 1705 255.75 10/Oct/18 06/Dec/18 10/Oct/18 0.01% 0.04% 100.000% 10.00% -72.41% 5.00% 27.59% 15.00% -12.59%
PLATFORMS
PIPE SUPPORT

INSTALLATION OF STRUCTURAL STEEL PIPE


159 A2370 1.40 SUPPORTS & MODIFICATIONS OF INS KN STIN Kg 2470 247 11/Oct/18 18/Dec/18 11/Oct/18 0.00% 0.02% 100.000% 0.00% -78.26% 10.00% 21.74% 10.00% -11.74%
EXISTINGCCESS PLATFORMS (IFPPLICABLE)

FIELD INSTRUMENT
161 A2370-1 1.40 INSTALLATION OF INSTRUMENT STANCHION INS KN STIN 0 15/Dec/18 18/Dec/18 0.00% 0.02% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

Mechanical
163 A2775 1.10 INSTALLATION OF NEW TEST SEPARATOR INS KN ME SET 137.5 137.5 05/Sep/18 06/Sep/18 04/Sep/18 06/Sep/18 0.02% 0.10% 100.000% 100.00% 0.00% 0.00% 100.00% 100.00% 0.00%

Piping
EARLY SHUTDOWN WORKS - Pre Shutdownnd Plant Shutdown Tie-in
166 A5550 1.10 MOBILIZATION OF OF TEAMPPLY PTW INS KN PPIN 0 31/Dec/17 31/Dec/17 31/Dec/17 31/Dec/17 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

167 A5560 1.10 SCAFFOLDING / PLATE FORM / WORK INS KN PPIN PCS 150 150 31/Dec/17 05/Jan/18 31/Dec/17 05/Jan/18 0.02% 0.11% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
PERMIT ISSUE
168 A5570 1.10 PIPING TIE-IN / NDT INS KN PPIN DIN 90 90 09/Feb/18 14/Feb/18 09/Feb/18 14/Feb/18 0.01% 0.07% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
169 A5580 1.10 TIE-IN COMPLETE / REMOVE SCAFFOLD INS KN PPIN PCS 15 15 06/Feb/18 17/Feb/18 06/Feb/18 17/Feb/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
PIPING -REMAINING

171 A2920 1.10 PIPING INSTALLATION ON PIPE INS KN PPIN DIN 334.728 0 10/Dec/18 29/Dec/18 0.03% 0.12% 20.690% 0.00% -20.69% 0.00% 0.00% 0.00% 0.00%
SUPPORT,PIERACK &ROUND EQUIPMENT

172 A2920-1 1.10 INSTALLATION OF BALL VALVE & GGC VALVE INS KN PPIN 0 19/Dec/18 27/Dec/18 0.03% 0.12% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

HYDRO-TESTING, FLUSHING, DRAININGND


173 A2940 1.10 PURGING INS KN PPIN SET 220.8 0 26/Dec/18 02/Jan/19 0.03% 0.16% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

174 A2950 1.10 TIE-IN INS KN PPIN PCS 2007.808 0 02/Jan/19 06/Jan/19 0.31% 1.48% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INLET PIPING TIE-IN TO SEPARATOR
175 A2930 1.10 INS KN PPIN DIN 334.88 0 02/Jan/19 06/Jan/19 0.05% 0.25% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(PARTIAL SHUTDOWN TIE-IN)
REPLACE THE SHUTVALVET POINT OF OIL-IN
176 A2951 1.10 INS KN PPIN PCS 32.384 0 03/Jan/19 06/Jan/19 0.01% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TIE-IN / INSTALL SDV
Electrical
178 A5990 1.30 CABLE TRENCHES INS KN EL M 500 175 25/Aug/18 21/Nov/18 25/Aug/18 0.00% 0.00% 100.000% 0.00% -30.34% 35.00% 69.66% 35.00% -34.66%
A6000 1.30 EARTH PIT DRILLING INS KN EL NO 3 0 12/Nov/18 17/Nov/18 0.01% 0.07% 0.00% 0.00% 0.00%
178 A3290 1.30 CABLE TRAY INSTALLATION INS KN EL LM 301.4 0 06/Dec/18 15/Dec/18 0.03% 0.16% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
179 A3280 1.30 U/G CABLE LAYING INS KN EL LM 170.5 0 06/Dec/18 20/Dec/18 0.01% 0.06% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
180 A3310 1.30 CABLE LAYING INS KN EL LM 165 0 09/Dec/18 27/Dec/18 0.03% 0.12% 33.333% 0.00% -33.33% 0.00% 0.00% 0.00% 0.00%
181 A3280-2 1.30 BACK FILLING OF CABLE TRENCH INS KN EL 0 09/Dec/18 23/Dec/18 0.01% 0.06% 40.000% 0.00% -40.00% 0.00% 0.00% 0.00% 0.00%
182 A3270 1.30 CABLE GLANDINGND TERMINATION INS KN EL LM 123.2 0 18/Dec/18 31/Dec/18 0.02% 0.09% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

183 A3300 1.30 ELECTRICAL EQUIPMENTS INSTALLATION INS KN EL PCS 96.8 0 18/Dec/18 31/Dec/18 0.01% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

184 A3320 1.30 LIGHTING FICTUREND DB INSTALLATION INS KN EL PCS 233.2 0 25/Dec/18 31/Dec/18 0.04% 0.17% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

185 A3310-1 1.30 HOOK UP INS KN EL 0 31/Dec/18 05/Jan/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
186 A3330 1.30 ELECTRICAL TIE-INS INS KN EL SET 44 0 05/Jan/19 09/Jan/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
187 A3340 1.30 ENERGIZATION INS KN EL SET 44 0 09/Jan/19 12/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Instrument & Control
189 A3950 1.20 CABLE TRAYND SUPPORT INSTALLATION INS KN IN LM 36.3 0 22/Nov/18 12/Dec/18 0.02% 0.07% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

189 A4790 1.20 JB SUPPORT INSTALLATION INS KN IN 0 09/Dec/18 11/Dec/18 0.00% 0.01% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
190 A4870 1.20 JB INSTALLATION INS KN IN 0 11/Dec/18 13/Dec/18 0.00% 0.01% 41.667% 0.00% -41.67% 0.00% 0.00% 0.00% 0.00%
190 A3980 1.20 INSTRUMENT CABLE LAYING INS KN IN LM 1218.8 0 11/Dec/18 29/Dec/18 0.02% 0.07% 41.667% 0.00% -41.67% 0.00% 0.00% 0.00% 0.00%

191 A3970 1.20 INSTRUMENT EQUIPEMNT INSTALLATION INS KN IN SET 396 0 22/Dec/18 29/Dec/18 0.04% 0.18% 5.000% 0.00% -5.00% 0.00% 0.00% 0.00% 0.00%

192 A3970-1 1.20 FIELD INSTRUMENT INSTALLATION (GAUGES INS KN IN 0 24/Dec/18 30/Dec/18 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
& TRANSMITTERS)

191 A3970-11 1.20 CABLE GLANDND TERMINATION (ALONG JBs) INS KN IN 0 25/Dec/18 29/Dec/18 0.00% 0.01% 5.000% 0.00% -5.00% 0.00% 0.00% 0.00% 0.00%

192 A3970-21 1.20 CABLE GLANDND TERMINATION (ALONG


INSTRUMENTS) INS KN IN 0 27/Dec/18 01/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

193 A3970-2 1.20 INSTALLATION


METERING SKID
OF BS & WNALYZERS ON INS KN IN 0 29/Dec/18 31/Dec/18 0.02% 0.09% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

DCS MODIFICATION IN CONTROL ROOM BY


194 A3990 1.20 VENDOR INS KN IN 0 29/Dec/18 07/Jan/19 0.02% 0.09% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

195 A3970-3 1.20 INSTALLATION OF INSTRUMENT VALVE INS KN IN 0 26/Dec/18 29/Dec/18 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
196 A4860 1.50 INSTALLATION OF DELUGE INS KN IN SET 671 0 01/Jan/19 05/Jan/19 0.03% 0.14% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
197 A3980-2 1.20 SS TUBEND LEAK TEST INS KN IN 0 01/Jan/19 05/Jan/19 0.06% 0.27% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INSTRUMENT EQUIPMENT CALIBRATION /
198 A3960 1.20 INS KN IN SET 154 0 02/Jan/19 06/Jan/19 0.08% 0.36% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
LOOP TEST
F&G System
189 A6010 1.20 F&G SUPPORTS INSTALLATION INS KN IN 0 09/Dec/18 12/Dec/18 0.00% 0.02% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
189 A6030 1.20 F&G CABLE INSTALLATION INS KN IN 0 11/Dec/18 20/Dec/18 0.00% 0.02% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
190 A6020 1.20 F&G DEVICES INSTALLATION INS KN IN 0 11/Dec/18 15/Dec/18 0.00% 0.02% 41.667% 0.00% -41.67% 0.00% 0.00% 0.00% 0.00%
190 A6040 1.20 F&G JB SUPPORT INSTALLATION INS KN IN 0 11/Dec/18 13/Dec/18 0.00% 0.02% 41.667% 0.00% -41.67% 0.00% 0.00% 0.00% 0.00%
191 A6050 1.20 F&G JB INSTALLATION INS KN IN 0 12/Dec/18 15/Dec/18 0.00% 0.02% 5.000% 0.00% -5.00% 0.00% 0.00% 0.00% 0.00%

192 A6060 1.20 F&G CABLE GLANDINGND TERMINATION INS KN IN 0 27/Dec/18 01/Jan/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

191 A6070 1.20 F&G LOOP PREPARATION INS KN IN 0 01/Jan/19 02/Jan/19 0.00% 0.02% 5.000% 0.00% -5.00% 0.00% 0.00% 0.00% 0.00%
192 A6080 1.20 F&G LOOP TESTING INS KN IN 0 03/Jan/19 07/Jan/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Painting & Fireproofing
200 A4300 1.40 STRUCTURAL STEEL PAINTINGND TOUCH-UP INS KN FP SQM 206 0 15/Dec/18 23/Dec/18 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

201 A4310 1.10 PIPING PAINTINGND TOUCH-UP INS KN FP SQM 178 0 29/Dec/18 06/Jan/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

202 A4320 1.50 FIREPROOFING FOR STRUCTURAL STEEL INS KN FP SQM 1051.6 0 15/Dec/18 27/Dec/18 0.16% 0.77% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Demolition Works
204 D0000 1.60 WORK PERMITPPROVED FOR DEMOLITION INS KN DEM PCS 8.8 0 26/Jan/19 29/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

205 D0010 1.60 DEPRESSURIZATION / ISOLATION (PIPING & INS KN DEM PCS 34.1 0 29/Jan/19 30/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INSTRUMENTATION)

206 D0030 1.60 APPLYNTI RUST TO FOUNDATION BOTLS INS KN DEM PCS 22 0 30/Jan/19 02/Feb/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

207 D0020 1.60 COLD CUTTING INLETND OUTLET PIPING INS KN DEM PCS 77 0 02/Feb/19 25/Feb/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

208 D0040 1.60 UNBOLD & REMOVE EXISTING SEPARATOR INS KN DEM PCS 132 0 25/Feb/19 27/Feb/19 0.02% 0.10% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

REMOVE CONCRETE FOUNDATION / GRADE


209 D0050 1.60 THEREA INS KN DEM PCS 174 0 28/Feb/19 13/Mar/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

KAHM
Civil Works
COMMOMN
213 A1580 2.40 GRADING INS KM CV SQM 357.5 357.5 17/Feb/18 02/Apr/18 17/Feb/18 18/Jul/18 0.06% 0.26% 100.000% 100.00% 0.00% 0.00% 100.00% 100.00% 0.00%

214 A1700 2.40 SOAKWAY PIT EXCAVATION & INSTALLATION INS


INCL. DEMOLITION - IFPPLICABLE KM CV PCS 123.2 117.04 04/Aug/18 05/Nov/18 04/Aug/18 0.02% 0.09% 100.000% 95.00% 0.00% 0.00% 88.30% 95.00% 6.70%

215 A1650 2.40 CABLE TRENCHESND UTILITY ROAD INS KM CV LM 700 210 25/Sep/18 21/Nov/18 25/Sep/18 0.01% 0.06% 100.000% 12.00% -46.55% 18.00% 53.45% 30.00% -23.45%
CROSSINGS

216 A1580-1 2.40 PROTECTION OF UNDERGROUND CABLES INS KM CV 0 23/Sep/18 21/Nov/18 23/Sep/18 0.01% 0.06% 100.000% 50.00% -45.00% 10.00% 55.00% 60.00% 5.00%

217 A1660 2.40 DRAINAGE PIPE CULVERTS INS KM CV LM 0.187 0.1496 16/Oct/18 05/Dec/18 16/Oct/18 0.01% 0.03% 0.000% 70.00% 19.61% 10.00% 19.61% 80.00% 60.39%
218 A1690 2.40 PAVING&GRADING(GRAVEL FILL) INS KM CV 0 05/Jan/19 14/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

219 A1640 2.40 ROADSND PAVING(INCLUDING


MODIFICATIONS) INS KM CV SQM 60.5 0 03/Jan/19 14/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

220 A1670 2.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS KM CV PCS 107.8 0 05/Jan/19 14/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TEST SEPERATOR
222 A1585 2.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS KM CV CUM 40 40 17/Feb/18 02/Apr/18 17/Feb/18 02/Apr/18 0.02% 0.09% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

223 A1590 2.40 FOUNDATION WORK (STEEL FIXING) INS KM CV kg 1534 1534 19/May/18 18/Jul/18 19/May/18 18/Jul/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
224 A1590-1 2.40 FOUNDATION WORK (CONCRETE) INS KM CV CUM 15.8 15.8 01/Apr/18 04/Aug/18 01/Apr/18 04/Aug/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

225 A1590-2 XX 2.40 CURING / WATERPROOFING / BACK FILLING INS KM CV CUM 45 45 09/Jul/18 18/Aug/18 09/Jul/18 19/Jul/18 0.01% 0.05% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

226 A1590-2 XX 2.40 CURING / WATERPROOFING / BACK FILLING INS KM CV CUM 45 45 09/Jul/18 18/Aug/18 09/Jul/17 18/Aug/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

TEST SEPERATOR PLATFORM


228 A1585-1 2.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS KM CV 0 17/Feb/18 02/Apr/18 17/Feb/18 02/Apr/18 0.02% 0.09% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

229 A1590-3 2.40 FOUNDATION WORK (STEEL FIXING) INS KM CV 0 19/May/18 18/Jul/18 19/May/18 18/Jul/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
230 A1590-4 2.40 FOUNDATION WORK (CONCRETE) INS KM CV 0 01/Apr/18 04/Aug/18 01/Apr/18 04/Aug/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

231 A1590-5 XX 2.40 CURING / WATERPROOFING / BACK FILLING INS KM CV 0 09/Jul/18 20/Sep/18 09/Jul/18 19/Jul/18 0.01% 0.05% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

232 A1590-5 XX 2.40 CURING / WATERPROOFING / BACK FILLING INS KM CV 0 09/Jul/18 20/Sep/18 09/Jul/18 20/Sep/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

METERING SKID
234 A1585-2 2.40 EXCAVATION INS KM CV CUM 60 60 03/Mar/18 01/Apr/18 03/Mar/18 01/Apr/18 0.04% 0.19% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
235 A1630 2.40 FOUNDATION WORK (STEEL FIXING) INS KM CV kg 1656 1656 19/May/18 18/Jul/18 19/May/18 18/Jul/18 0.03% 0.12% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
236 A1630-1 2.40 FOUNDATION WORK (CONCRETE) INS KM CV CUM 14.55 14.55 01/Apr/18 02/Aug/18 01/Apr/18 02/Aug/18 0.03% 0.12% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

237 A1630-2 XX 2.40 CURING / WATERPROOFING / BACK FILLING INS KM CV CUM 108 108 01/Jul/18 18/Sep/18 01/Jul/18 19/Jul/18 0.02% 0.11% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

238 A1630-2 XX 2.40 CURING / WATERPROOFING / BACK FILLING INS KM CV CUM 108 108 01/Jul/18 18/Sep/18 01/Jul/18 18/Sep/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

PIPE SUPPORT
EXCAVATION FOR STRUCTURAL STEEL PIPE
240 A1585-3 2.40 INS KM CV CUM 63.87 63.87 03/Dec/17 18/Jul/18 03/Dec/17 18/Jul/18 0.04% 0.19% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
SUPPORTS
241 A1610 XX 2.40 FOUNDATION WORK (STEEL FIXING) INS KM CV CUM 1455 1455 16/Dec/17 25/Aug/18 16/Dec/17 19/Jul/18 0.05% 0.22% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
242 A1610 XX 2.40 FOUNDATION WORK (STEEL FIXING) INS KM CV CUM 1455 1455 16/Dec/17 25/Aug/18 16/Dec/17 25/Aug/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
243 A1610-1 XX 2.40 FOUNDATION WORK (CONCRETE) INS KM CV CUM 30 30 16/Dec/17 27/Aug/18 16/Dec/17 19/Jul/18 0.04% 0.21% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
244 A1610-1 XX 2.40 FOUNDATION WORK (CONCRETE) INS KM CV CUM 30 30 16/Dec/17 27/Aug/18 16/Dec/17 27/Aug/18 0.00% 0.02% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

245 A1610-2 XX 2.40 CURING / WATERPROOFING / BACK FILLING INS KM CV CUM 76 76 16/Dec/17 29/Aug/18 16/Dec/17 19/Jul/18 0.04% 0.19% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

246 A1610-2 XX 2.40 CURING / WATERPROOFING / BACK FILLING INS KM CV CUM 76 76 16/Dec/17 29/Aug/18 16/Dec/17 29/Aug/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

PSV
248 A1585-4 2.40 EXCAVATION (INCLUDINGREA LIGHTING INS KM CV CUM 100 100 17/Feb/18 21/Jun/18 17/Mar/18 21/Jun/18 0.04% 0.19% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
POLES)
249 A1630-3 XX 2.40 FOUNDATION WORK (STEEL FIXING) INS KM CV CUM 3647 3647 20/May/18 25/Aug/18 20/May/18 19/Jul/18 0.01% 0.05% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

250 A1630-3 XX 2.40 FOUNDATION WORK (STEEL FIXING) INS KM CV CUM 3647 3647 20/May/18 25/Aug/18 20/May/18 25/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
251 A1630-4 XX 2.40 FOUNDATION WORK (CONCRETE) INS KM CV CUM 26 26 20/May/18 26/Aug/18 18/May/18 19/Jul/18 0.01% 0.05% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
252 A1630-4 XX 2.40 FOUNDATION WORK (CONCRETE) INS KM CV CUM 26 26 20/May/18 26/Aug/18 18/May/18 26/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

253 A1630-5 XX 2.40 CURING / WATERPROOFING / BACK FILLING INS KM CV CUM 206 206 02/Jul/18 13/Sep/18 02/Jul/18 19/Jul/18 0.01% 0.04% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

254 A1630-5 XX 2.40 CURING / WATERPROOFING / BACK FILLING INS KM CV CUM 206 206 02/Jul/18 13/Sep/18 02/Jul/18 13/Sep/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

Structural Steel
TEST SEPERATOR

INSTALLATION OF STRUCTURAL STEELWORK


257 A2420 2.40 OPERATINGNDCCESS PLATFORMS (TEST INS KM STIN Kg 9298 1394.7 14/Oct/18 29/Nov/18 14/Oct/18 0.10% 0.49% 100.000% 5.00% -74.47% 10.00% 25.53% 15.00% -10.53%
SEPERATOR & PLATFORM)

INSTALLATION OF LADDERS, STAIRS,


258 A2460 2.40 HANDRAILS INS KM STIN PCS 151 0 20/Nov/18 29/Nov/18 0.01% 0.04% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

METERING SKID
INSTALLATION OF STRUCTURAL STEEL OF
260 A2430 2.40 METERING SKID INCL. WALK WAY OR CROSS INS KM STIN Kg 2470 247 04/Oct/18 22/Nov/18 04/Oct/18 0.01% 0.03% 100.000% 10.00% -56.00% 0.00% 44.00% 10.00% -34.00%
OVER
PSV
INSTALLATION OF PSV VALVESCCESS
262 A2440 2.40 PLATFORMS INS KM STIN Kg 1705 0 08/Nov/18 17/Nov/18 01/Nov/18 0.01% 0.06% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

PIPE SUPPORT

INSTALLATION OF STRUCTURAL STEEL PIPE


264 A2450 2.40 SUPPORTS & MODIFICATIONS OF INS KM STIN Kg 4078 0 13/Nov/18 01/Dec/18 0.01% 0.05% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
EXISTINGCCESS PLATFORMS (IFPPLICABLE)

FIELD INSTRUMENT
266 A2450-1 2.40 INSTALLATION OF INSTRUMENT STANCHION INS KM STIN 0 25/Nov/18 01/Dec/18 0.01% 0.05% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

Mechanical
268 A2795 2.10 INSTALLATION OF NEW TEST SEPARATOR INS KM ME SET 137.5 137.5 16/Oct/18 18/Oct/18 16/Oct/18 18/Oct/18 0.02% 0.10% 100.000% 20.00% 0.00% 80.00% 100.00% 100.00% 0.00%

Piping
EARLY SHUTDOWN WORKS - Pre Shutdownnd Plant Shutdown Tie-in
271 A5590 2.10 MOBILIZATION OF OF TEAMPPLY PTW INS KM PPIN 0 31/Dec/17 31/Dec/17 31/Dec/17 31/Dec/17 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
SCAFFOLDING / PLATE FORM / WORK
272 A5600 2.10 PERMIT ISSUE INS KM PPIN PCS 156 156 31/Dec/17 05/Jan/18 31/Dec/17 05/Jan/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

273 A5610 2.10 PIPING TIE-IN / NDT INS KM PPIN DIN 93 93 09/Feb/18 14/Feb/18 09/Feb/18 14/Feb/18 0.02% 0.07% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
274 A5620 2.10 TIE-IN COMPLETE / REMOVE SCAFFOLD INS KM PPIN PCS 16 16 06/Feb/18 17/Feb/18 06/Feb/18 17/Feb/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
PIPING -REMAINING

PIPING INSTALLATION ON PIPE


276 A2970 2.10 SUPPORT,PIERACK &ROUND EQUIPMENT INS KM PPIN DIN 392.6 0 29/Nov/18 22/Dec/18 0.03% 0.14% 17.857% 0.00% -17.86% 0.00% 0.00% 0.00% 0.00%

277 A2970-1 2.10 INSTALLATION OF BALL VALVE & GGC VALVE INS KM PPIN 0 11/Dec/18 20/Dec/18 0.03% 0.14% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

278 A2990 2.10 HYDRO-TESTING, FLUSHING, DRAININGND INS KM PPIN SET 220 0 17/Dec/18 26/Dec/18 0.03% 0.16% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PURGING

279 A2980 2.10 INLET PIPING TIE-IN TO SEPARATOR


(PARTIAL SHUTDOWN TIE-IN) INS KM PPIN DIN 390 0 26/Dec/18 30/Dec/18 0.06% 0.29% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

280 A3000 2.10 TIE-IN INS KM PPIN PCS 2000 0 26/Dec/18 30/Dec/18 0.31% 1.47% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

281 A3001 2.10 REPLACE THE SHUTVALVET POINT OF OIL-IN INS


TIE-IN / INSTALL SDV KM PPIN PCS 60 0 27/Dec/18 30/Dec/18 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Electrical
283 A6090 2.30 CABLE TRENCHES INS KM EL LM 700 210 25/Sep/18 21/Nov/18 0.00% 0.00% 100.000% 5.00% -46.55% 25.00% 53.45% 30.00% -23.45%
284 A3440 2.30 EARTH PIT DRILLING INS KM EL NO 3 0 17/Nov/18 20/Nov/18 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
283 A3380 2.30 CABLE TRAY INSTALLATION INS KM EL LM 292.6 0 25/Nov/18 04/Dec/18 0.01% 0.05% 100.000% 5.00% -100.00% -5.00% 0.00% 0.00% 0.00%
284 A3370 2.30 U/G CABLE LAYING INS KM EL LM 154 0 28/Nov/18 13/Dec/18 0.02% 0.11% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
285 A3400 2.30 CABLE LAYING INS KM EL LM 114.4 0 10/Dec/18 26/Dec/18 0.02% 0.08% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
286 A3370-1 2.30 BACK FILLING OF CABLE TRENCH INS KM EL 0 15/Dec/18 27/Dec/18 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
287 A3360 2.30 CABLE GLANDINGND TERMINATION INS KM EL LM 116.6 0 15/Dec/18 27/Dec/18 0.02% 0.09% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

288 A3390 2.30 ELECTRICAL EQUIPMENTS INSTALLATION INS KM EL PCS 92.4 0 15/Dec/18 27/Dec/18 0.01% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

289 A3410 2.30 LIGHTING FIXTUREND DB INSTALLATION INS KM EL PCS 231 0 22/Dec/18 27/Dec/18 0.04% 0.17% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

290 A3400-1 2.30 HOOK UP INS KM EL 0 29/Dec/18 01/Jan/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
291 A3420 2.30 ELECTRICAL TIE-INS INS KM EL SET 44 0 02/Jan/19 06/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
292 A3430 2.30 ENERGIZATION INS KM EL SET 44 0 07/Jan/19 09/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Instrument & Control
294 A4000 2.20 CABLE TRAY/DUCT INSTALLATION INS KM IN LM 36.3 0 26/Nov/18 13/Dec/18 0.02% 0.08% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
294 A4590 2.20 JB SUPPORT INSTLLATION INS KM IN 0 11/Dec/18 13/Dec/18 0.00% 0.01% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
295 A5350 2.20 JB INSTALLATION INS KM IN 0 15/Dec/18 17/Dec/18 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
295 A4030 2.20 INSTRUMENT CABLE LAYING INS KM IN LM 1464.1 0 05/Dec/18 25/Dec/18 0.02% 0.08% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

296 A4020 2.20 INSTRUMENT EQUIPEMNT INSTALLATION INS KM IN SET 317.9 0 25/Dec/18 01/Jan/19 0.04% 0.19% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

FIELD INSTRUMENT INSTALLATION (GAUGES


297 A4020-1 2.20 INS KM IN 0 25/Dec/18 01/Jan/19 0.04% 0.19% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
& TRANSMITTER)

296 A4020-11 2.20 CABLE GLANDND TERMINATION (ALONG JBs) INS KM IN 0 30/Dec/18 05/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

297 A4020-21 2.20 CABLE GLANDND TERMINATION (ALONG INS KM IN 0 30/Dec/18 06/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INSTRUMENTS)

298 A4040 2.20 DCS MODIFICATION IN CONTROL ROOM BY


VENDOR INS KM IN 0 23/Dec/18 01/Jan/19 0.02% 0.10% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

299 A4020-2 2.20 INSTALLATION OF BS & WNALYZERS ON INS KM IN 0 30/Dec/18 01/Jan/19 0.02% 0.10% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
METERING SKID
300 A4020-3 2.20 INSTALLATION OF INSTRUMENT VALVE INS KM IN 0 01/Jan/19 05/Jan/19 0.04% 0.19% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
301 A4030-1 2.20 SS TUBEND LEAK TEST INS KM IN 0 02/Jan/19 06/Jan/19 0.06% 0.29% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
302 A5280 2.50 INSTALLATION OF DELUGE INS KM IN SET 671 0 01/Jan/19 07/Jan/19 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

303 A4010 2.20 INSTRUMENT EQUIPMENT CALIBRATION / INS KM IN SET 154 0 07/Jan/19 10/Jan/19 0.08% 0.39% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
LOOP TEST
F&G System
294 A6100 2.50 F&G SUPPORT INSTALLATION INS KM IN 0 10/Dec/18 13/Dec/18 0.00% 0.02% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
294 A6110 2.50 F&G DEVICES INSTALLATION INS KM IN 0 12/Dec/18 16/Dec/18 0.00% 0.02% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
295 A6130 2.50 F&G JB SUPPORT INSTALLATION INS KM IN 0 15/Dec/18 16/Dec/18 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
295 A6120 2.50 F&G CABLE INSTALLATION INS KM IN 0 16/Dec/18 25/Dec/18 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
296 A6140 2.50 F&G JB INSTALLATION INS KM IN 0 17/Dec/18 18/Dec/18 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

297 A6150 2.50 F&G CABLE GLANDINGND TERMINATION INS KM IN 0 31/Dec/18 05/Jan/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

296 A6160 2.50 F&G LOOP PREPARATION INS KM IN 0 05/Jan/19 06/Jan/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
297 A6170 2.50 F&G LOOP TESTING INS KM IN 0 07/Jan/19 10/Jan/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Painting & Fireproofing
305 A4340 2.10 PIPING PAINTINGND TOUCH-UP INS KM FP SQM 277 0 22/Dec/18 29/Dec/18 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

306 A4350 2.50 FIREPROOFING FOR STRUCTURAL STEEL INS KM FP SQM 1180.3 0 02/Dec/18 20/Dec/18 0.18% 0.87% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

307 A4330 2.40 STRUCTURAL STEEL PAINTINGND TOUCH-UP INS KM FP SQM 231.3 0 28/Nov/18 08/Dec/18 0.04% 0.17% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Demolition Works
309 DM1000 2.60 WORK PERMITPPROVED FOR DEMOLITION INS KM DEM PCS 8.8 0 24/Jan/19 27/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

310 DM1010 2.60 DEPRESSURIZATION


INSTRUMENTATION)
/ ISOLATION (PIPING & INS KM DEM PCS 41.8 0 27/Jan/19 29/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

311 DM1030 2.60 APPLYNTI RUST TO FOUNDATION BOTLS INS KM DEM PCS 28.6 0 29/Jan/19 30/Jan/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

312 DM1020 2.60 COLD CUTTING INLETND OUTLET PIPING INS KM DEM PCS 66 0 30/Jan/19 23/Feb/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

313 DM1040 2.60 UNBOLD & REMOVE EXISTING SEPARATOR INS KM DEM PCS 165 0 23/Feb/19 24/Feb/19 0.03% 0.12% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

314 DM1050 2.60 REMOVE CONCRETE FOUNDATION / GRADE INS KM DEM PCS 218 0 24/Feb/19 10/Mar/19 0.03% 0.16% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
THEREA
KAHS
Civil Works
COMMOMN
318 A1710 3.40 GRADING INS KS CV SQM 286 286 10/Feb/18 31/May/18 10/Feb/18 19/Jul/18 0.04% 0.21% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

SOAKWAY PIT EXCAVATION & INSTALLATION


319 A1715-6 3.40 INS KS CV 0 06/Aug/18 03/Nov/18 06/Aug/18 0.01% 0.05% 100.000% 95.00% 0.00% 98.00% 90.00% 98.00% 8.00%
INCL. DEMOLITION - IFPPLICABLE

320 A1780-2 3.40 CABLE TRENCHES INS KS CV 0 24/Sep/18 22/Nov/18 24/Sep/18 0.00% 0.00% 100.000% 20.00% 0.00% 35.00% 53.33% 35.00% -18.33%

321 A1710-1 3.40 PROTECTION OF UNDERGROUND CABLES INS KS CV 0 14/Sep/18 22/Nov/18 14/Sep/18 0.00% 0.01% 100.000% 90.00% 0.00% 90.00% 60.00% 90.00% 30.00%

322 A1780 3.40 UTILITY ROAD CROSSINGS INS KS CV PCS 140.8 0 11/Dec/18 09/Jan/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
323 A1790 3.40 DRAINAGE PIPE CULVERTS INS KS CV LM 0.187 0 08/Dec/18 30/Dec/18 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
ROADSND PAVING(INCLUDING
324 A1770 3.40 MODIFICATIONS) INS KS CV SQM 35.2 0 31/Dec/18 14/Jan/19 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

325 A1800 3.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS KS CV PCS 132 0 31/Dec/18 14/Jan/19 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

RE-INSTATEMENT OF EXISTING PAVEMENT


326 A1800-1 3.40 INS KS CV 0 30/Dec/18 13/Jan/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(INTERLOCK PAVING)
TEST SEPERATOR
328 A1715 3.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS KS CV CUM 40 40 10/Feb/18 01/Mar/18 10/Feb/18 01/Mar/18 0.02% 0.08% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

329 A1720 3.40 FOUNDATION WORK (STEEL FIXING) INS KS CV kg 1656 1656 07/Apr/18 12/Apr/18 07/Apr/18 12/Apr/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
330 A1720-1 3.40 FOUNDATION WORK (CONCRETE) INS KS CV CUM 14.55 14.55 07/Apr/18 26/Apr/18 07/Apr/18 26/Apr/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

331 A1720-2 XX 3.40 CURING / WATERPROOFING / BACK FILLING INS KS CV CUM 108 108 17/May/18 08/Aug/18 17/May/18 16/Jul/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

332 A1720-2 XX 3.40 CURING / WATERPROOFING / BACK FILLING INS KS CV CUM 108 108 17/May/18 08/Aug/18 17/May/18 08/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

TEST SEPERATOR PLATFORM


Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

334 A1715-1 3.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS KS CV 0 10/Feb/18 01/Mar/18 10/Feb/18 01/Mar/18 0.02% 0.08% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

335 A1720-3 3.40 FOUNDATION WORK (STEEL FIXING) INS KS CV 0 07/Apr/18 12/Apr/18 07/Apr/18 12/Apr/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
336 A1720-4 3.40 FOUNDATION WORK (CONCRETE) INS KS CV 0 07/Apr/18 26/Apr/18 07/Apr/18 26/Apr/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

337 A1720-5 XX 3.40 CURING / WATERPROOFING / BACK FILLING INS KS CV 0 17/May/18 08/Aug/18 17/May/18 16/Jul/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

338 A1720-5 XX 3.40 CURING / WATERPROOFING / BACK FILLING INS KS CV 0 17/May/18 08/Aug/18 17/May/18 08/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

METERING SKID
340 A1715-2 3.40 EXCAVATION INS KS CV CUM 60 60 10/Feb/18 24/Mar/18 10/Feb/18 24/Mar/18 0.03% 0.16% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
341 A1760-1 3.40 FOUNDATION WORK (STEEL FIXING) INS KS CV kg 1656 1656 22/Mar/18 12/Apr/18 22/Mar/18 12/Apr/18 0.02% 0.11% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
342 A1760 3.40 FOUNDATION WORK (CONCRETE) INS KS CV CUM 14.55 14.55 18/Mar/18 24/May/18 18/Mar/18 24/May/18 0.02% 0.11% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

343 A1760-2 XX 3.40 CURING / WATERPROOFING / BACK FILLING INS KS CV CUM 108 108 15/May/18 08/Aug/18 15/May/18 19/Jul/18 0.02% 0.11% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

344 A1760-2 XX 3.40 CURING / WATERPROOFING / BACK FILLING INS KS CV CUM 108 108 15/May/18 08/Aug/18 15/May/18 08/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

PIPE SUPPORT
EXCAVATION FOR STRUCTURAL STEEL PIPE
346 A1715-3 3.40 SUPPORTS INS KS CV CUM 72 72 25/Dec/17 19/Jul/18 10/Feb/18 19/Apr/18 0.03% 0.16% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

347 A1740 XX 3.40 FOUNDATION WORK (STEEL FIXING) INS KS CV CUM 4200 4200 25/Dec/17 08/Aug/18 25/Dec/17 19/Jul/18 0.03% 0.15% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
348 A1740 XX 3.40 FOUNDATION WORK (STEEL FIXING) INS KS CV CUM 4200 4200 25/Dec/17 08/Aug/18 25/Dec/17 08/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
349 A1740-1 XX 3.40 FOUNDATION WORK (CONCRETE) INS KS CV CUM 35 35 25/Dec/17 14/Aug/18 25/Dec/17 19/Jul/18 0.03% 0.15% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
350 A1740-1 XX 3.40 FOUNDATION WORK (CONCRETE) INS KS CV CUM 35 35 25/Dec/17 14/Aug/18 25/Dec/17 14/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

351 A1740-2 XX 3.40 CURING / WATERPROOFING / BACK FILLING INS KS CV CUM 150 150 25/Dec/17 25/Oct/18 25/Dec/17 19/Jul/18 0.03% 0.15% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

352 A1740-2 XX 3.40 CURING / WATERPROOFING / BACK FILLING INS KS CV CUM 150 150 25/Dec/17 25/Oct/18 25/Dec/17 0.00% 0.00% 100.000% 98.00% 0.00% 100.00% 100.00% 100.00% 0.00%

PSV
354 A1715-4 3.40 EXCAVATION (INCLUDINGREA LIGHTING INS KS CV CUM 100 100 05/Mar/18 31/May/18 05/Mar/18 31/May/18 0.03% 0.16% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
POLES)
355 A1760-5 3.40 FOUNDATION WORK (STEEL FIXING) INS KS CV CUM 3647 3647 25/Mar/18 17/May/18 25/Mar/18 17/May/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
356 A1760-3 3.40 FOUNDATION WORK (CONCRETE) INS KS CV CUM 26 26 18/Mar/18 21/Jun/18 18/Mar/18 21/Jun/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

357 A1760-4 XX 3.40 CURING / WATERPROOFING / BACK FILLING INS KS CV CUM 206 206 18/Mar/18 06/Aug/18 18/Mar/18 19/Jul/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

358 A1760-4 XX 3.40 CURING / WATERPROOFING / BACK FILLING INS KS CV CUM 206 206 18/Mar/18 06/Aug/18 18/Mar/18 06/Aug/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

Structural Steel
TEST SEPERATOR

INSTALLATION OF STRUCTURAL STEELWORK


361 A2480 3.40 OPERATINGNDCCESS PLATFORMS (TEST INS KS STIN Kg 9298 929.8 27/Sep/18 21/Nov/18 27/Sep/18 0.09% 0.45% 100.000% 10.00% -48.21% 10.00% 51.79% 10.00% -41.79%
SEPERATOR & PLATFORM)

INSTALLATION OF LADDERS, STAIRS,


362 A2510 3.40 INS KS STIN Kg 4078 0 12/Nov/18 21/Nov/18 0.01% 0.06% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
HANDRAILS
METERING SKID
INSTALLATION OF STRUCTURAL STEEL OF
364 A2490 3.40 METERING SKID INCL. WALK WAY OR CROSS INS KS STIN Kg 2470 2470 13/Oct/18 23/Oct/18 13/Oct/18 23/Oct/18 0.01% 0.03% 100.000% 70.00% 0.00% 100.00% 100.00% 100.00% 0.00%
OVER
PSV
366 A2500 3.40 INSTALLATION
PLATFORMS
OF PSV VALVESCCESS INS KS STIN Kg 1705 596.75 17/Oct/18 15/Nov/18 17/Oct/18 01/Nov/18 0.01% 0.06% 100.000% 35.00% 0.00% 35.00% 30.00% 35.00% 5.00%

PIPE SUPPORT

INSTALLATION OF STRUCTURAL STEEL PIPE


368 A2520 3.40 SUPPORTS & MODIFICATIONS OF INS KS STIN PCS 151 30.2 10/Oct/18 27/Nov/18 10/Oct/18 0.00% 0.02% 100.000% 10.00% -67.35% 20.00% 32.65% 20.00% -12.65%
EXISTINGCCESS PLATFORMS (IFPPLICABLE)

FIELD INSTRUMENT
370 A2520-1 3.40 INSTALLATION OF INSTRUMENT STANCHION INS KS STIN 0 25/Nov/18 29/Nov/18 0.00% 0.02% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

Mechanical
372 A2815 3.10 INSTALLATION OF NEW TEST SEPARATOR INS KS ME SET 137.5 137.5 09/Aug/18 09/Aug/18 09/Aug/18 09/Aug/18 0.02% 0.10% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

Piping
EARLY SHUTDOWN WORKS - Pre Shutdownnd Plant Shutdown Tie-in
375 A3061 3.10 MOBILIZATION OF OF TEAMPPLY PTW INS KS PPIN 0 31/Dec/17 31/Dec/17 31/Dec/17 31/Dec/17 0.01% 0.05% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

376 A3071 3.10 SCAFFOLDING


PERMIT ISSUE
/ PLATE FORM / WORK INS KS PPIN PCS 142 142 31/Dec/17 05/Jan/18 31/Dec/17 05/Jan/17 0.01% 0.05% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

377 A3091 3.10 TIE-IN COMPLETE / REMOVE SCAFFOLD INS KS PPIN PCS 14 14 06/Feb/18 17/Feb/18 06/Feb/18 17/Feb/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
378 A3081 3.10 PIPING TIE-IN / NDT INS KS PPIN DIN 85 85 09/Feb/18 14/Feb/18 09/Feb/18 14/Feb/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
STATION PIPING

PIPING INSTALLATION ON PIPE


380 A3020 3.10 INS KS PPIN DIN 368 0 16/Dec/18 05/Jan/19 0.03% 0.14% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SUPPORT,PIERACK &ROUND EQUIPMENT
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

381 A3020-1 3.10 INSTALLATION OF BALL VALVE & GGC VALVE INS KS PPIN 0 24/Dec/18 02/Jan/19 0.03% 0.14% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

HYDRO-TESTING, FLUSHING, DRAININGND


382 A3040 3.10 INS KS PPIN SET 220.8 0 24/Dec/18 06/Jan/19 0.03% 0.16% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PURGING

383 A3030 3.10 INLET PIPING TIE-IN TO SEPARATOR INS KS PPIN DIN 367.896 0 06/Jan/19 09/Jan/19 0.06% 0.27% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(PARTIAL SHUTDOWN TIE-IN)
384 A3050 3.10 TIE-IN INS KS PPIN PCS 1752.784 0 06/Jan/19 09/Jan/19 0.27% 1.29% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

385 A3051 3.10 REPLACE THE SHUTVALVET POINT OF OIL-IN INS KS PPIN PCS 60.72 0 07/Jan/19 09/Jan/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TIE-IN / INSTALL SDV
Instrument & Control
387 A4050 3.20 CABLE TRAY/DUCT INSTALLATION INS KS IN LM 36.3 0 13/Nov/18 02/Dec/18 0.01% 0.06% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
387 A4640 3.20 JB SUPPORT INSTALLATION INS KS IN 0 02/Dec/18 05/Dec/18 0.00% 0.01% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
388 A4740 3.20 JB INSTALLATION INS KS IN 0 04/Dec/18 06/Dec/18 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
388 A4080-1 3.20 INSTRUMENT CABLE LAYING INS KS IN 0 05/Dec/18 24/Dec/18 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

389 A4070 3.20 INSTRUMENT EQUIPEMNT INSTALLATION INS KS IN SET 317.9 0 20/Dec/18 26/Dec/18 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

390 A4080-2 3.20 FIELD INSTRUMENT INSTALLATION INS KS IN 0 16/Dec/18 23/Dec/18 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(GAUGESND TRANSMITTERS)

389 A4080-11 3.20 CABLE GLANDND TERMINATION (ALONG JB) INS KS IN 0 24/Dec/18 03/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

CABLE GLANDND TERMINATION (ALONG


390 A4080-21 3.20 INSTRUMENT) INS KS IN 0 20/Dec/18 25/Dec/18 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

DCS INSTALLATION IN CONTROL ROOM BY


391 A4090 3.20 INS KS IN 0 25/Dec/18 05/Jan/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
VENDOR

392 A4090-1 3.20 INSTALLATION OF BS & WNALYZERS ON INS KS IN 0 25/Dec/18 26/Dec/18 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
METERING SKID
393 A4090-2 3.20 INSTALLATION OF INSTRUMENT VALVE INS KS IN 0 23/Dec/18 25/Dec/18 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
394 A5300 3.50 INSTALLATION OF DELUGE INS KS IN SET 451 0 01/Jan/19 08/Jan/19 0.02% 0.11% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

395 A4060 3.20 INSTRUMENT EQUIPMENT CALIBRATION / INS KS IN SET 0 0 05/Jan/19 08/Jan/19 0.05% 0.22% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
LOOP TEST
396 A4080 3.20 SS TUBEND LEAK TEST INS KS IN LM 1056 0 01/Jan/19 05/Jan/19 0.06% 0.30% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Electrical
387 A1780-12 3.40 CABLE TRENCH INS KS IN M 500 400 24/Sep/18 22/Nov/18 0.00% 0.00% 100.000% 0.00% -46.67% 80.00% 53.33% 80.00% 26.67%
388 A3530 3.30 EARTH PIT DRILLING INS KS IN NO 3 0 08/Nov/18 12/Nov/18 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
398 A3460 3.30 U/G CABLE LAYING INS KS EL LM 161.7 0 29/Nov/18 04/Dec/18 0.02% 0.12% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
399 A3470 3.30 CABLE TRAY INSTALLATION INS KS EL LM 292.6 0 22/Nov/18 01/Dec/18 0.01% 0.05% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
400 A3490 3.30 CABLE LAYING INS KS EL LM 88 0 02/Dec/18 10/Dec/18 0.01% 0.06% 42.105% 0.00% -42.11% 0.00% 0.00% 0.00% 0.00%
401 A3460-1 3.30 BACK FILLING OF CABLE TRENCH INS KS EL 0 02/Dec/18 11/Dec/18 0.02% 0.07% 53.333% 0.00% -53.33% 0.00% 0.00% 0.00% 0.00%
402 A3450 3.30 CABLE GLANDINGND TERMINATION INS KS EL LM 116.6 0 22/Dec/18 29/Dec/18 0.02% 0.09% 7.143% 0.00% -7.14% 0.00% 0.00% 0.00% 0.00%

403 A3480 3.30 ELECTRICAL EQUIPMENTS INSTALLATION INS KS EL PCS 92.4 0 09/Dec/18 19/Dec/18 0.01% 0.07% 7.143% 0.00% -7.14% 0.00% 0.00% 0.00% 0.00%

404 A3500 3.30 LIGHTING FIXTUREND DB INSTALLATION INS KS EL PCS 231 0 16/Dec/18 24/Dec/18 0.04% 0.17% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

405 A3510-1 3.30 HOOK UP INS KS EL 0 25/Dec/18 29/Dec/18 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
406 A3510 3.30 ELECTRICAL TIE-INS INS KS EL SET 44 0 03/Jan/19 05/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
407 A3520 3.30 ENERGIZATION INS KS EL SET 44 0 05/Jan/19 07/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
F&G System
387 A5920 3.50 F&G SUPPORTS INSTALLATION INS KS IN LM 36.3 0 28/Nov/18 02/Dec/18 0.00% 0.01% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
387 A5930 3.50 F&G DEVICES INSTALLATION INS KS IN 0 04/Dec/18 09/Dec/18 0.00% 0.01% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
388 A5910 3.50 F&G CABLE INSTALLATION INS KS IN 0 05/Dec/18 15/Dec/18 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
388 A5940 3.50 F&G JB SUPPORT INSTALLATION INS KS IN 0 05/Dec/18 06/Dec/18 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
389 A5950 3.50 F&G JB INSTALLATION INS KS IN SET 317.9 0 06/Dec/18 09/Dec/18 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

390 A5960 3.50 F&G CABLE GLANDINGND TERMINATION INS KS IN 0 20/Dec/18 25/Dec/18 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

389 A5970 3.50 F&G LOOP PREPARATION INS KS IN 0 25/Dec/18 27/Dec/18 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
390 A5980 3.50 F&G LOOP TESTING INS KS IN 0 31/Dec/18 05/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Painting & Fireproofing
409 A4360 3.40 STRUCTURAL STEEL PAINTINGND TOUCH-UP INS KS FP SQM 194 0 15/Dec/18 27/Dec/18 0.03% 0.14% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

410 A4370 3.10 PIPING PAINTINGND TOUCH-UP INS KS FP SQM 259 0 24/Dec/18 27/Dec/18 0.04% 0.19% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

411 A4380 3.50 FIREPROOFING FOR STRUCTURAL STEEL INS KS FP SQM 995.5 0 19/Dec/18 06/Jan/19 0.15% 0.73% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Demolition Works
413 DM1070 3.60 WORK PERMITPPROVED FOR DEMOLITION INS KS DEM PCS 8.8 0 17/Jan/19 20/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

414 DM1080 3.60 DEPRESSURIZATION / ISOLATION (PIPING & INS KS DEM PCS 39.93 0 27/Jan/19 28/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INSTRUMENTATION)

415 DM1100 3.60 APPLYNTI RUST TO FOUNDATION BOTLS INS KS DEM PCS 19.965 0 28/Jan/19 30/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

416 DM1090 3.60 COLD CUTTING INLETND OUTLET PIPING INS KS DEM PCS 39.93 0 28/Jan/19 20/Feb/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
REMOVAL

417 DM1110 3.60 UNBOLD & REMOVE EXISTING SEPARATOR INS KS DEM PCS 139.755 0 20/Feb/19 24/Feb/19 0.02% 0.10% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

REMOVE CONCRETE FOUNDATION / GRADE


418 DM1120 3.60 THEREA INS KS DEM PCS 169 0 24/Feb/19 10/Mar/19 0.03% 0.12% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

JALM
Civil Works
COMMOMN
422 A1840 7.40 GRADING INS JL CV SQM 374 374 05/Jun/18 12/Jun/18 05/Jun/18 18/Jul/18 0.06% 0.28% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

SOAKWAY PIT EXCAVATION & INSTALLATION


423 A1845-6 7.40 INS JL CV 0 23/Aug/18 21/Nov/18 23/Aug/18 0.02% 0.09% 100.000% 70.00% -29.67% 77.00% 70.33% 77.00% 6.67%
INCL. DEMOLITION - IFPPLICABLE

424 A1910 7.40 CABLE TRENCHESND UTILITY ROAD


CROSSINGS INS JL CV PCS 316.8 15.84 18/Oct/18 23/Dec/18 18/Oct/10 0.02% 0.09% 68.966% 0.00% -57.03% 5.00% 11.94% 5.00% -6.94%

425 A1840-1 7.40 PROTECTION OF UNDERGROUND CABLES INS JL CV 0 04/Dec/18 09/Dec/18 0.02% 0.09% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

426 A1920 7.40 DRAINAGE PIPE CULVERTS INS JL CV LM 56.1 0 09/Dec/18 20/Jan/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

427 A1936 7.40 RE-INSTATEMENT OF EXISTINGSPHALT ROAD INS JL CV SQM 14.3 0 13/Mar/19 28/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

428 A1930 7.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS JL CV PCS 66 0 17/Mar/19 31/Mar/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

RE-INSTATEMENT OF EXISTING PAVEMENT


429 A1938 7.40 INS JL CV SQM 13.2 0 17/Mar/19 31/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(INTERLOCK PAVING)
430 A1935 7.40 NEW RETAINING WALLS INS JL CV CUM 168 0 13/Mar/19 28/Mar/19 0.03% 0.14% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
431 A1937 7.40 CONCRETE KERB INS JL CV CUM 235.4 0 13/Mar/19 28/Mar/19 0.04% 0.19% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TEST SEPERATOR
433 A1845 XX 7.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS JL CV CUM 55.33 55.33 12/Jun/18 09/Aug/18 12/Jun/18 18/Jul/18 0.03% 0.16% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

434 A1845 XX 7.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS JL CV CUM 55.33 55.33 12/Jun/18 09/Aug/18 12/Jun/18 09/Aug/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

435 A1850 XX 7.40 FOUNDATION WORK (STEEL FIXING) INS JL CV CUM 1534 1534 10/Jul/18 19/Aug/18 10/Jul/18 19/Jul/18 0.01% 0.05% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
436 A1850 XX 7.40 FOUNDATION WORK (STEEL FIXING) INS JL CV CUM 1534 1534 10/Jul/18 19/Aug/18 10/Jul/18 19/Aug/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
437 A1850-1 7.40 FOUNDATION WORK (CONCRETE) INS JL CV CUM 15.8 15.8 13/Aug/18 23/Aug/18 13/Aug/18 23/Aug/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

438 A1850-2 7.40 CURING / WATERPROOFING / BACK FILLING INS JL CV CUM 45 45 26/Aug/18 08/Oct/18 26/Aug/18 08/Oct/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

TEST SEPERATOR PLATFORM


440 A1845-1 7.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS JL CV 0 27/Jul/18 11/Aug/18 27/Jul/18 11/Aug/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

441 A1850-3 7.40 FOUNDATION WORK (STEEL FIXING) INS JL CV 0 12/Aug/18 03/Sep/18 12/Aug/18 03/Sep/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
442 A1850-4 7.40 FOUNDATION WORK (CONCRETE) INS JL CV 0 03/Sep/18 22/Sep/18 03/Sep/18 22/Sep/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

443 A1850-5 7.40 CURING / WATERPROOFING / BACK FILLING INS JL CV 0 11/Sep/18 25/Sep/18 11/Sep/18 25/Sep/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

METERING SKID
445 A1845-2 7.40 EXCAVATION / Blinidng INS JL CV CUM 60 60 12/Jun/18 05/Jul/18 12/Jun/18 05/Jul/18 0.03% 0.16% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
446 A1890 7.40 FOUNDATION WORK (STEEL FIXING) INS JL CV CUM 1656 1656 03/Jul/18 31/Jul/18 03/Jul/18 31/Jul/18 0.02% 0.11% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
447 A1890-1 7.40 FOUNDATION WORK (CONCRETE) INS JL CV CUM 14.55 14.55 09/Jul/18 05/Aug/18 09/Jul/18 05/Aug/18 0.02% 0.11% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

448 A1890-3 7.40 CURING / WATERPROOFING / BACK FILLING INS JL CV CUM 108 108 08/Aug/18 27/Sep/18 08/Aug/18 27/Sep/18 0.02% 0.11% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

PIPE SUPPORT
450 A1845-3 7.40 EXCAVATION FOR STRUCTURAL STEEL PIPE INS JL CV CUM 50 49 03/Aug/18 22/Nov/18 03/Aug/18 0.03% 0.16% 100.000% 98.00% -25.00% 98.00% 75.00% 98.00% 23.00%
SUPPORTS
451 A1870-1 XX 7.40 FOUNDATION WORK (STEEL FIXING) INS JL CV CUM 4200 4200 09/Jul/18 06/Dec/18 09/Jul/18 19/Jul/18 0.01% 0.05% 100.000% 100.00% -27.81% 100.00% 72.19% 100.00% 27.81%
452 A1870-1 XX 7.40 FOUNDATION WORK (STEEL FIXING) INS JL CV CUM 4200 3528 09/Jul/18 06/Dec/18 06/Aug/18 0.02% 0.10% 100.000% 80.00% -27.81% 84.00% 72.19% 84.00% 11.81%
453 A1870-2 7.40 FOUNDATION WORK (CONCRETE) INS JL CV CUM 35 26.25 10/Sep/18 16/Dec/18 10/Sep/18 0.03% 0.16% 100.000% 55.00% -53.06% 75.00% 46.94% 75.00% 28.06%

454 A1870-3 7.40 CURING / WATERPROOFING / BACK FILLING INS JL CV CUM 76 45.6 20/Sep/18 25/Dec/18 20/Sep/18 0.03% 0.16% 100.000% 30.00% -62.89% 60.00% 37.11% 60.00% 22.89%

PSV
456 A1845-4 XX 7.40 EXCAVATION INS JL CV CUM 30 30 05/Jun/18 06/Sep/18 05/Jun/18 19/Jul/18 0.01% 0.05% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
457 A1845-4 XX 7.40 EXCAVATION INS JL CV CUM 70 70 05/Jun/18 06/Sep/18 05/Jun/18 06/Sep/18 0.02% 0.11% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
458 A1890-4 XX 7.40 FOUNDATION WORK (STEEL FIXING) INS JL CV CUM 3647 3647 09/Jul/18 13/Sep/18 09/Jul/18 19/Jul/18 0.00% 0.01% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
459 A1890-4 XX 7.40 FOUNDATION WORK (STEEL FIXING) INS JL CV CUM 3647 3647 09/Jul/18 13/Sep/18 09/Jul/18 13/Sep/18 0.00% 0.02% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
460 A1890-5 7.40 FOUNDATION WORK (CONCRETE) INS JL CV CUM 26 26 16/Aug/18 16/Sep/18 16/Aug/18 16/Sep/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

461 A1890-6 7.40 CURING / WATERPROOFING / BACK FILLING INS JL CV CUM 206 206 03/Sep/18 03/Oct/18 03/Sep/18 03/Oct/18 0.01% 0.03% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

Structural Steel
TEST SEPERATOR

INSTALLATION OF STRUCTURAL STEELWORK


464 A2540 7.40 OPERATINGNDCCESS PLATFORMS (TEST INS JL STIN Kg 9298 464.9 07/Oct/18 09/Jan/19 07/Oct/18 0.10% 0.45% 60.000% 5.00% -40.00% 5.00% 20.00% 5.00% -15.00%
SEPERATOR & PLATFORM)

465 A2580 7.40 INSTALLATION OF LADDERS, STAIRS, INS JL STIN PCS 151 0 01/Jan/19 09/Jan/19 0.02% 0.11% 18.182% 0.00% -18.18% 0.00% 0.00% 0.00% 0.00%
HANDRAILS
METERING SKID
INSTALLATION OF STRUCTURAL STEEL OF
467 A2550 7.40 METERING SKID INCL. WALK WAY OR CROSS INS JL STIN Kg 2470 0 01/Jan/19 14/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
OVER
PSV
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

INSTALLATION OF PSV VALVESCCESS


469 A2560 7.40 PLATFORMS INS JL STIN Kg 1705 0 01/Jan/19 14/Jan/19 0.01% 0.06% 18.182% 0.00% -18.18% 0.00% 0.00% 0.00% 0.00%

PIPE SUPPORT

INSTALLATION OF STRUCTURAL STEEL PIPE


471 A2570 7.40 SUPPORTS & MODIFICATIONS OF INS JL STIN Kg 4078 0 27/Dec/18 14/Jan/19 0.01% 0.03% 15.000% 0.00% -15.00% 0.00% 0.00% 0.00% 0.00%
EXISTINGCCESS PLATFORMS (IFPPLICABLE)

FIELD INSTRUMENT
473 A2570-1 7.40 INSTALLATION OF INSTRUMENT STANCHION INS JL STIN 0 10/Jan/19 14/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Mechanical
475 A2835 7.10 INSTALLATION OF NEW TEST SEPARATOR INS JL ME SET 137.5 137.5 10/Sep/18 14/Oct/18 10/Sep/18 14/Oct/18 0.02% 0.10% 100.000% 50.00% 0.00% 100.00% 100.00% 100.00% 0.00%

Piping
HOT TAPPING
478 HT1080 7.10 MOBILIZATION
CONTRACTOR
OF HOT TAPPING SUB INS JL HTAP 0 10/Feb/19 12/Feb/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

SCAFFOLDING / PLATE FORM / WORK


479 HT1090 7.10 PERMIT ISSUE INS JL HTAP 0 12/Feb/19 19/Feb/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

480 HT1100 7.10 FLARE TAPPING / NDT INS JL HTAP 0 19/Feb/19 28/Feb/19 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
FLARE TAPPING COMPLETE / REMOVE
481 HT1110 7.10 SCAFFOLD INS JL HTAP 0 24/Feb/19 28/Feb/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Pre Shutdownnd Plant Shutdown Tie-in


483 A3100-2 7.10 MOBILIZATION OF OF TEAMPPLY PTW INS JL PPIN 0 04/Mar/19 05/Mar/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

484 A3100-3 7.10 SCAFFOLDING / PLATE FORM / WORK INS JL PPIN 0 05/Mar/19 11/Mar/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PERMIT ISSUE
485 A3100-4 7.10 PIPING TIE-IN / NDT PRE SHUT DOWN INS JL PPIN 0 21/Feb/19 28/Feb/19 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
486 A3100-5 7.10 PIPING TIE-IN / NDT SHUT DOWN INS JL PPIN 0 05/Mar/19 15/Mar/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PIPING -REMAINING

PIPING INSTALLATION ON PIPE


488 A3070 7.10 INS JL PPIN DIN 446 0 01/Jan/19 06/Feb/19 0.10% 0.48% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SUPPORT,PIERACK &ROUND EQUIPMENT

489 A3070-1 7.10 INSTALLATION OF BALL VALVE & GGC VALVE INS JL PPIN 0 27/Jan/19 05/Feb/19 0.05% 0.24% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

INLET PIPING TIE-IN TO SEPARATOR


490 A3080 7.10 (PARTIAL SHUTDOWN TIE-IN) INS JL PPIN DIN 446 0 06/Mar/19 11/Mar/19 0.10% 0.48% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

HYDRO-TESTING, FLUSHING, DRAININGND


491 A3090 7.10 PURGING INS JL PPIN SET 240 0 07/Feb/19 20/Feb/19 0.05% 0.24% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

492 A3100 7.10 TIE-IN INS JL PPIN PCS 2151.6 0 05/Mar/19 11/Mar/19 0.07% 0.34% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
REPLACE THE SHUTVALVET POINT OF OIL-IN
493 A3101 7.10 INS JL PPIN PCS 66 0 09/Mar/19 11/Mar/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TIE-IN / INSTALL SDV
Electrical
495 A6180 7.40 CABLE TRENCH INS JL EL LM 500 0 25/Nov/18 23/Dec/18 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
496 A6190 7.30 EARTH PIT DRILLING INS JL EL NO 3 0 04/Dec/18 10/Dec/18 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
495 A3560 7.30 CABLE TRAY INSTALLATION INS JL EL LM 292.6 0 10/Jan/19 19/Jan/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
496 A3550 7.30 U/G CABLE LAYING INS JL EL LM 275 0 12/Jan/19 26/Jan/19 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
497 A3580 7.30 CABLE LAYING INS JL EL LM 243.1 0 15/Jan/19 06/Feb/19 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

498 A3570 7.30 ELECTRICAL EQUIPMENTS INSTALLATION INS JL EL PCS 83.6 0 03/Feb/19 16/Feb/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

499 A3550-1 7.30 BACK FILLING OF CABLE TRENCH INS JL EL 0 26/Jan/19 09/Feb/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
500 A3540 7.30 CABLE GLANDND TERMINATION INS JL EL LM 116.6 0 05/Feb/19 16/Feb/19 0.02% 0.09% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

501 A3590 7.30 LIGHTING FIXTUREND DB INSTALLATION INS JL EL PCS 198 0 10/Feb/19 16/Feb/19 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

502 A3580-1 7.30 HOOK UP INS JL EL 0 17/Feb/19 20/Feb/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
503 A3600 7.30 ELECTRICAL TIE-INS INS JL EL SET 44 0 20/Feb/19 26/Feb/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
504 A3610 7.30 ENERGIZATION INS JL EL SET 44 0 26/Feb/19 02/Mar/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Instrument & Control
506 A4100 7.20 CABLE TRAYND SUPPORT INSTALLATION INS JL IN LM 36.3 0 29/Dec/18 16/Jan/19 0.02% 0.08% 20.000% 0.00% -20.00% 0.00% 0.00% 0.00% 0.00%

506 A4540 7.20 JB SUPPORT INSTALLATION INS JL IN 0 16/Jan/19 19/Jan/19 0.00% 0.01% 20.000% 0.00% -20.00% 0.00% 0.00% 0.00% 0.00%
507 A4880 7.20 JB INSTALLATION INS JL IN 0 20/Jan/19 22/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
507 A4130 7.20 INSTRUMENT CABLE LAYING INS JL IN LM 1672 0 12/Jan/19 31/Jan/19 0.02% 0.08% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

508 A4120 7.20 INSTRUMENT EQUIPEMNT INSTALLATION INS JL IN SET 317.9 0 24/Jan/19 16/Feb/19 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

509 A4120-1 7.20 FIELD INSTRUMENT INSTALLATION INS JL IN 0 30/Jan/19 19/Feb/19 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(GAUGESND TRANSMITTER)

510 A4120-3 7.20 INSTALLATION OF BS & WNALYZERS ON INS JL IN 0 14/Feb/19 16/Feb/19 0.02% 0.10% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
METERING SKID

508 A4120-11 7.20 CABLE GLANDND TERMINATION (ALONG JB) INS JL IN 0 31/Jan/19 06/Feb/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

509 A4120-21 7.20 CABLE GLANDND TERMINATION (ALONG


INSTRUMENT) INS JL IN 0 19/Feb/19 25/Feb/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

511 A4140 7.20 DCS INSTALLATION IN CONTROL ROOM BY


VENDOR INS JL IN 0 20/Feb/19 25/Feb/19 0.02% 0.10% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

512 A5310 7.50 INSTALLATION OF DELUGE INS JL IN SET 605 0 12/Feb/19 20/Feb/19 0.02% 0.10% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
513 A4120-2 7.20 INSTALLATION OF INSTRUMENT VALVE INS JL IN 0 19/Feb/19 24/Feb/19 0.06% 0.31% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
514 A4130-1 7.20 SS TUBEND LEAK TEST INS JL IN 0 21/Feb/19 25/Feb/19 0.06% 0.31% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

515 A4110 7.20 INSTRUMENT EQUIPMENT CALIBRATION / INS JL IN SET 154 0 25/Feb/19 02/Mar/19 0.09% 0.41% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
LOOP TEST
F&G System
506 A6230 7.50 F&G CABLE INSTALLATION INS JL IN 0 12/Jan/19 21/Jan/19 0.00% 0.01% 20.000% 0.00% -20.00% 0.00% 0.00% 0.00% 0.00%
506 A6200 7.50 F&G SUPPORT INSTALLATION INS JL IN 0 13/Jan/19 16/Jan/19 0.00% 0.01% 20.000% 0.00% -20.00% 0.00% 0.00% 0.00% 0.00%
507 A6210 7.50 F&G DEVICES INSTALLATION INS JL IN 0 15/Jan/19 19/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
507 A6220 7.50 F&G JB SUPPORT INSTALLATION INS JL IN 0 20/Jan/19 21/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
508 A6240 7.50 F&G JB INSTALLATION INS JL IN 0 22/Jan/19 23/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

509 A6250 7.50 F&G CABLE GLANDINGND TERMINATION INS JL IN 0 21/Feb/19 25/Feb/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

510 A6260 7.50 F&G LOOP PREPARATION INS JL IN 0 26/Feb/19 27/Feb/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
508 A6270 7.50 F&G LOOP TESTING INS JL IN 0 27/Feb/19 02/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Painting & Fireproofing
517 A4390 7.40 STRUCTURAL STEEL PAINTINGND TOUCH-UP INS JL FP SQM 203 0 06/Feb/19 20/Feb/19 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

518 A4400 7.10 PIPING PAINTINGND TOUCH-UP INS JL FP SQM 302 0 06/Feb/19 20/Feb/19 0.05% 0.22% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

519 A4410 7.50 FIREPROOFING FOR STRUCTURAL STEEL INS JL FP SQM 1037.3 0 06/Feb/19 25/Feb/19 0.16% 0.76% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Demolition Works
521 DM1140 7.60 WORK PERMITPPROVED FOR DEMOLITION INS JL DEM PCS 8.8 0 03/Apr/19 06/Apr/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

522 DM1150 7.60 DEPRESSURIZATION / ISOLATION (PIPING & INS JL DEM PCS 80.96 0 07/Apr/19 09/Apr/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INSTRUMENTATION)

523 DM1170 7.60 APPLYNTI RUST TO FOUNDATION BOTLS INS JL DEM PCS 40.48 0 09/Apr/19 10/Apr/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

524 DM1160 7.60 COLD CUTTING INLETND OUTLET PIPING INS JL DEM PCS 80.96 0 10/Apr/19 06/May/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

525 DM1180 7.60 UNBOLD & REMOVE EXISTING SEPARATOR INS JL DEM PCS 283.36 0 06/May/19 08/May/19 0.04% 0.21% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

526 DM1190 7.60 REMOVE


THEREA
CONCRETE FOUNDATION / GRADE INS JL DEM PCS 333 0 08/May/19 26/May/19 0.05% 0.25% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

FAHS
Civil Works
COMMOMN
530 A1960 6.40 GRADING INS FS CV SQM 239.8 239.8 08/Apr/18 14/Apr/18 08/Apr/18 14/Apr/18 0.04% 0.17% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

531 A1960-1 6.40 PROTECTION OF UNDERGROUND CABLES INS FS CV 0 10/Sep/18 10/Dec/18 10/Sep/18 0.00% 0.00% 100.000% 90.00% 0.00% 90.00% 50.00% 90.00% 40.00%

CABLE TRENCHESND UTILITY ROAD


532 A2030 6.40 CROSSINGS INS FS CV PCS 369.6 166.32 10/Sep/18 10/Dec/18 10/Sep/18 0.03% 0.14% 100.000% 35.00% 0.00% 45.00% 50.00% 45.00% -5.00%

533 A1965-5 6.40 SOAKWAY PIT EXCAVATION & INSTALLATION INS FS CV 0 05/Sep/18 10/Dec/18 05/Sep/18 0.03% 0.14% 100.000% 55.00% 0.00% 65.00% 52.58% 65.00% 12.42%
INCL. DEMOLITION - IFPPLICABLE

534 A2040 6.40 DRAINAGE PIPE CULVERTS INS FS CV LM 4.95 0 11/Dec/18 21/Jan/19 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

535 A2020 6.40 ROADSND PAVING(INCLUDING INS FS CV SQM 57.75 0 04/Apr/19 20/Apr/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
MODIFICATIONS)

536 A2050 6.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS FS CV PCS 66 0 18/Apr/19 02/May/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

537 A2080 6.40 RE-INSTATEMENT OF EXISTING PAVEMENT


(INTERLOCK PAVING) INS FS CV SQM 25.85 0 02/May/19 16/May/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TEST SEPERATOR
539 A1965 6.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS FS CV CUM 40 40 08/Apr/18 04/May/18 08/Apr/18 04/May/18 0.04% 0.17% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

540 A1970 6.40 FOUNDATION WORK (STEEL FIXING) INS FS CV CUM 1534 1534 02/Jun/18 05/Jul/18 02/Jun/18 05/Jul/18 0.03% 0.13% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
541 A1970-1 XX 6.40 FOUNDATION WORK (CONCRETE) INS FS CV CUM 15.8 15.8 02/Jun/18 19/Jul/18 02/Jun/18 19/Jul/18 0.03% 0.12% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
542 A1970-1 XX 6.40 FOUNDATION WORK (CONCRETE) INS FS CV CUM 15.8 15.8 02/Jun/18 19/Jul/18 02/Jun/18 20/Jul/18 0.00% 0.02% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

543 A1970-2 XX 6.40 CURING / WATERPROOFING / BACK FILLING INS FS CV CUM 45 45 19/Jul/18 13/Sep/18 19/Jul/18 19/Jul/18 0.01% 0.04% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

544 A1970-2 XX 6.40 CURING / WATERPROOFING / BACK FILLING INS FS CV CUM 45 45 19/Jul/18 13/Sep/18 19/Jul/18 13/Sep/18 0.00% 0.02% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

TEST SEPERATOR PLATFORM


546 A1965-1 6.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS FS CV 0 01/Aug/18 09/Oct/18 01/Aug/18 09/Oct/18 0.00% 0.02% 100.000% 95.00% 0.00% 100.00% 100.00% 100.00% 0.00%

547 A1970-3 6.40 FOUNDATION WORK (STEEL FIXING) INS FS CV 0 22/Aug/18 06/Dec/18 22/Aug/18 0.00% 0.02% 100.000% 90.00% 0.00% 97.00% 60.75% 97.00% 36.25%
548 A1970-4 6.40 FOUNDATION WORK (CONCRETE) INS FS CV 0 03/Sep/18 16/Dec/18 03/Sep/18 0.00% 0.02% 100.000% 45.00% 0.00% 75.00% 50.48% 75.00% 24.52%

549 A1970-5 6.40 CURING / WATERPROOFING / BACK FILLING INS FS CV 0 16/Sep/18 25/Dec/18 16/Sep/18 0.00% 0.02% 100.000% 25.00% 0.00% 60.00% 39.60% 60.00% 20.40%

METERING SKID
551 A1965-2 XX 6.40 EXCAVATION INS FS CV CUM 62.91 62.91 14/Apr/18 21/Jul/18 14/Apr/18 21/Jun/18 0.04% 0.17% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
552 A1965-2 XX 6.40 EXCAVATION INS FS CV CUM 62.91 62.91 14/Apr/18 21/Jul/18 14/Apr/18 21/Jul/17 0.02% 0.09% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
553 A2010 XX 6.40 FOUNDATION WORK (STEEL FIXING) INS FS CV CUM 1656 1656 09/Jul/18 10/Sep/18 09/Jul/18 19/Jul/18 0.01% 0.04% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
554 A2010 XX 6.40 FOUNDATION WORK (STEEL FIXING) INS FS CV CUM 1656 1656 09/Jul/18 10/Sep/18 09/Jul/18 10/Sep/18 0.02% 0.08% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

555 A2010-1 6.40 FOUNDATION WORK (CONCRETE) INS FS CV CUM 14.55 14.55 15/Aug/18 24/Sep/18 15/Aug/18 24/Sep/18 0.02% 0.09% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

556 A2010-2 6.40 CURING / WATERPROOFING / BACK FILLING INS FS CV CUM 108 97.2 11/Sep/18 01/Dec/18 11/Sep/18 0.02% 0.09% 100.000% 65.00% 0.00% 90.00% 54.88% 90.00% 35.12%

PIPE SUPPORT
558 A1965-3 XX 6.40 EXCAVATION FOR STRUCTURAL STEEL PIPE INS FS CV CUM 50 50 18/Jul/18 24/Nov/18 18/Jul/18 19/Jul/18 0.00% 0.00% 100.000% 100.00% -23.08% 100.00% 76.92% 100.00% 23.08%
SUPPORTS

559 A1965-3 XX 6.40 EXCAVATION FOR STRUCTURAL STEEL PIPE INS FS CV CUM 50 47.5 18/Jul/18 24/Nov/18 18/Jul/18 0.03% 0.17% 100.000% 88.00% 0.00% 95.00% 76.92% 95.00% 18.08%
SUPPORTS
560 A1990 XX 6.40 FOUNDATION WORK (STEEL FIXING) INS FS CV CUM 4200 4200 14/Sep/18 05/Dec/18 10/Jun/18 19/Jul/18 0.02% 0.12% 100.000% 100.00% -49.40% 100.00% 50.60% 100.00% 49.40%
561 A1990 XX 6.40 FOUNDATION WORK (STEEL FIXING) INS FS CV CUM 4200 2730 14/Sep/18 05/Dec/18 14/Sep/18 0.02% 0.08% 100.000% 30.00% -49.40% 65.00% 50.60% 65.00% 14.40%
562 A1990-1 6.40 FOUNDATION WORK (CONCRETE) INS FS CV CUM 35 11.55 30/Sep/18 10/Dec/18 30/Sep/18 0.04% 0.19% 100.000% 10.00% -63.89% 33.00% 36.11% 33.00% -3.11%

563 A1990-2 6.40 CURING / WATERPROOFING / BACK FILLING INS FS CV CUM 76 25.08 03/Oct/18 10/Dec/18 03/Oct/18 0.04% 0.19% 100.000% 10.00% -66.67% 33.00% 33.33% 33.00% -0.33%

PSV
565 A1965-4 6.40 EXCAVATION INS FS CV CUM 100 100 21/May/18 08/Aug/18 21/May/18 08/Aug/18 0.04% 0.17% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
566 A2010-3 XX 6.40 FOUNDATION WORK (STEEL FIXING) INS FS CV CUM 3647 3647 05/Jun/18 15/Nov/18 05/Jun/18 19/Jul/18 0.01% 0.03% 100.000% 100.00% -12.80% 100.00% 87.20% 100.00% 12.80%
567 A2010-3 XX 6.40 FOUNDATION WORK (STEEL FIXING) INS FS CV CUM 3647 3464.65 05/Jun/18 15/Nov/18 05/Jun/18 28/Oct/18 0.00% 0.02% 100.000% 95.00% -12.80% 95.00% 87.20% 95.00% 7.80%
568 A2010-4 XX 6.40 FOUNDATION WORK (CONCRETE) INS FS CV CUM 26 26 08/Jul/18 29/Nov/18 08/Jul/18 19/Jul/18 0.00% 0.01% 100.000% 100.00% -24.14% 100.00% 75.86% 100.00% 24.14%
569 A2010-4 XX 6.40 FOUNDATION WORK (CONCRETE) INS FS CV CUM 26 23.4 08/Jul/18 29/Nov/18 08/Jul/18 31/Oct/18 0.01% 0.03% 100.000% 90.00% -24.14% 90.00% 75.86% 90.00% 14.14%

570 A2010-5 6.40 CURING / WATERPROOFING / BACK FILLING INS FS CV CUM 206 185.4 08/Sep/18 13/Dec/18 08/Sep/18 0.01% 0.04% 100.000% 90.00% -50.52% 90.00% 49.48% 90.00% 40.52%

Structural Steel
TEST SEPERATOR

INSTALLATION OF STRUCTURAL STEELWORK


573 A2600 6.40 OPERATINGNDCCESS PLATFORMS (TEST INS FS STIN Kg 9298 0 30/Dec/18 17/Jan/19 0.11% 0.51% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SEPERATOR & PLATFORM)

574 A2640 6.40 INSTALLATION OF LADDERS, STAIRS, INS FS STIN PCS 151 0 08/Jan/19 17/Jan/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
HANDRAILS
METERING SKID
INSTALLATION OF STRUCTURAL STEEL OF
576 A2610 6.40 METERING SKID INCL. WALK WAY OR CROSS INS FS STIN Kg 2470 0 31/Dec/18 20/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
OVER
PSV
INSTALLATION OF PSV VALVESCCESS
578 A2620 6.40 PLATFORMS INS FS STIN Kg 1705 0 16/Dec/18 24/Dec/18 0.01% 0.07% 18.182% 0.00% -18.18% 0.00% 0.00% 0.00% 0.00%

PIPE SUPPORT

INSTALLATION OF STRUCTURAL STEEL PIPE


580 A2630 6.40 SUPPORTS & MODIFICATIONS OF INS FS STIN Kg 4078 0 20/Dec/18 21/Jan/19 0.01% 0.03% 10.000% 0.00% -10.00% 0.00% 0.00% 0.00% 0.00%
EXISTINGCCESS PLATFORMS (IFPPLICABLE)

FIELD INSTRUMENT
582 A2630-1 6.40 INSTALLATION OF INSTRUMENT STANCHION INS FS STIN 0 28/Jan/19 02/Feb/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Mechanical
584 A2855 6.10 INSTALLATION OF NEW TEST SEPARATOR INS FS ME SET 137.5 137.5 06/Oct/18 08/Oct/18 06/Oct/18 08/Oct/18 0.02% 0.10% 100.000% 0.00% 0.00% 100.00% 100.00% 100.00% 0.00%

Piping
HOT TAPPING
587 HT1120 6.10 MOBILIZATION
CONTRACTOR
OF HOT TAPPING SUB INS FS HTAP 0 28/Feb/19 03/Mar/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

588 HT1130 6.10 SCAFFOLDING


PERMIT ISSUE
/ PLATE FORM / WORK INS FS HTAP 0 03/Mar/19 12/Mar/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

589 HT1140 6.10 FLARE TIE-IN / NDT INS FS HTAP 0 13/Mar/19 27/Mar/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

590 HT1150 6.10 HOT TIE-IN COMPLETE / REMOVE SCAFFOLD INS FS HTAP 0 09/Apr/19 22/Apr/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Pre Shutdownnd Plant Shutdown Tie-in


592 A3150-000 6.10 MOBILIZATION OF OF TEAMPPLY PTW INS FS PPIN 0 30/Mar/19 30/Mar/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
593 A3150-1 6.10 PIPING TIE-IN / NDT PRE SHUT DOWN INS FS PPIN 0 30/Mar/19 15/Apr/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SCAFFOLDING / PLATE FORM / WORK
594 A3150-00 6.10 INS FS PPIN 0 31/Mar/19 08/Apr/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PERMIT ISSUE
595 A3150-2 6.10 PIPING TIE-IN / NDT SHUT DOWN INS FS PPIN 0 15/Apr/19 22/Apr/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PIPING -REMAINING

597 A3120 6.10 PIPING INSTALLATION ON PIPE


SUPPORT,PIERACK &ROUND EQUIPMENT INS FS PPIN DIN 335 0 23/Dec/18 03/Feb/19 0.07% 0.34% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

598 A3120-1 6.10 INSTALLATION OF BALL VALVE & GGC VALVE INS FS PPIN 0 15/Jan/19 24/Jan/19 0.04% 0.17% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

599 A3140 6.10 HYDRO-TESTING,


PURGING
FLUSHING, DRAININGND INS FS PPIN SET 240 0 29/Jan/19 12/Feb/19 0.07% 0.34% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

INLET PIPING TIE-IN TO SEPARATOR


600 A3130 6.10 (PARTIAL SHUTDOWN TIE-IN) INS FS PPIN DIN 335 0 29/Jan/19 03/Feb/19 0.04% 0.17% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

601 A3150 6.10 TIE-IN INS FS PPIN PCS 1412.4 0 29/Jan/19 03/Feb/19 0.05% 0.24% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

REPLACE THE SHUTVALVET POINT OF OIL-IN


602 A3151 6.10 TIE-IN / INSTALL SDV INS FS PPIN PCS 66 0 31/Jan/19 03/Feb/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Electrical
604 A6520 6.40 CABLE TRENCH INS FS EL LM 500 0 10/Sep/18 10/Dec/18 0.00% 0.00% 100.000% 0.00% -50.00% 0.00% 50.00% 0.00% -50.00%
605 A3920 6.30 EARTH PIT DRILLING INS FS EL NO 3 0 20/Dec/18 24/Dec/18 0.00% 0.02% 40.000% 0.00% -40.00% 0.00% 0.00% 0.00% 0.00%
604 A3650 6.30 CABLE TRAY INSTALLATION INS FS EL LM 301.4 0 20/Dec/18 08/Jan/19 0.01% 0.05% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
605 A3640 6.30 U/G CABLE LAYING INS FS EL LM 319 0 03/Jan/19 10/Jan/19 0.05% 0.23% 40.000% 0.00% -40.00% 0.00% 0.00% 0.00% 0.00%
606 A3640-1 6.30 BACK FILLING OF CABLE TRENCH INS FS EL 0 10/Jan/19 27/Jan/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
607 A3670 6.30 CABLE LAYING INS FS EL LM 259.6 0 23/Dec/18 08/Jan/19 0.04% 0.19% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
608 A3630 6.30 CABLE GLADND TERMINATION INS FS EL LM 123.2 0 30/Dec/18 12/Jan/19 0.02% 0.09% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

609 A3660 6.30 ELECTRICAL EQUIPMENTS INSTALLATION INS FS EL PCS 110 0 30/Dec/18 12/Jan/19 0.02% 0.08% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

610 A3680 6.30 LIGHTING FIXTUREND DB INSTALLATION INS FS EL PCS 253 0 05/Jan/19 12/Jan/19 0.04% 0.19% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

611 A3670-1 6.30 HOOK UP INS FS EL 0 12/Jan/19 16/Jan/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
612 A3690 6.30 ELECTRICAL TIE-INS INS FS EL SET 44 0 16/Jan/19 17/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
613 A3700 6.30 ENERGIZATION INS FS EL SET 44 0 17/Jan/19 21/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Instrument & Control
615 A4150 6.20 CABLE TRAY/DUCT INSTALLATION INS FS IN LM 36.3 0 05/Jan/19 21/Jan/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
615 A3710 6.20 JB SUPPORT INSTALLATION INS FS IN 0 17/Jan/19 21/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
616 A3810 6.20 JB INSTALLATION INS FS IN 0 22/Jan/19 26/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
616 A4180 6.20 INSTRUMENT CABLE LAYING INS FS IN LM 1117.6 0 17/Jan/19 05/Feb/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

617 A3900 6.20 CABLE GLANDND TERMINATION (ALONG JB) INS FS IN 0 27/Jan/19 31/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

617 A4170 6.20 INSTRUMENT EQUIPEMNT INSTALLATION INS FS IN SET 306.9 0 02/Feb/19 20/Feb/19 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

618 A4170-2 6.20 FIELD INSTRUMENT INSTALLATION INS FS IN 0 02/Feb/19 20/Feb/19 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(GAUGESND TRANSMITTER)

619 A4170-3 6.20 INSTALLATION OF BS & WNALYZERS ON INS FS IN 0 18/Feb/19 20/Feb/19 0.02% 0.08% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
METERING SKID

618 A3910 6.20 CABLE GLANDND TERMINATION (ALONG INS FS IN 0 20/Feb/19 25/Feb/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INSTRUMENTS)

620 A4190 6.20 DCS MODIFICATIOM IN CONTROL ROOM BY INS FS IN 0 24/Feb/19 02/Mar/19 0.02% 0.08% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
VENDOR
621 A4170-1 6.20 INSTALLATION OF INSTRUMENT VALVE INS FS IN 0 14/Feb/19 20/Feb/19 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
622 A5320 6.50 INSTALLATION OF DELUGE INS FS IN SET 451 0 16/Feb/19 20/Feb/19 0.02% 0.11% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

623 A4160 6.20 INSTRUMENT EQUIPMENT CALIBRATION / INS FS IN SET 147.4 0 05/Mar/19 11/Mar/19 0.05% 0.23% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
LOOP TEST
624 A4180-1 6.20 SS TUBEND LEAK TEST INS FS IN 0 02/Mar/19 05/Mar/19 0.06% 0.30% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
F&G System
615 A6290 6.50 F&G SUPPORT INSTALLATION INS FS IN 0 17/Jan/19 21/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
615 A6280 6.50 F&G CABLE INSTALLATION INS FS IN 0 17/Jan/19 27/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
616 A6300 6.50 F&G DEVICES INSTALLATION INS FS IN 0 21/Jan/19 24/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
616 A6310 6.50 F&G JB SUPPORT INSTALLATION INS FS IN 0 22/Jan/19 23/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
617 A6320 6.50 F&G JB INSTALLATION INS FS IN 0 27/Jan/19 28/Jan/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

617 A6330 6.50 F&G CABLE GLANDINGND TERMINATION INS FS IN 0 20/Feb/19 25/Feb/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

618 A6340 6.50 F&G LOOP PREPARATION INS FS IN 0 25/Feb/19 27/Feb/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
619 A6350 6.50 F&G LOOP TESTING INS FS IN 0 03/Mar/19 05/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Painting & Fireproofing
626 A4430 6.10 PIPING PAINTINGND TOUCH-UP INS FS FP SQM 241 0 29/Jan/19 12/Feb/19 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

627 A4440 6.50 FIREPROOFING FOR STRUCTURAL STEEL INS FS FP SQM 1146.2 0 02/Feb/19 02/Mar/19 0.18% 0.84% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

628 A4420 6.40 STRUCTURAL STEEL PAINTINGND TOUCH-UP INS FS FP SQM 237 0 27/Jan/19 09/Feb/19 0.04% 0.17% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Demolition Works
630 DM1210 6.60 WORK PERMITPPROVED FOR DEMOLITION INS FS DEM PCS 8.8 0 18/May/19 20/May/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

DEPRESSURIZATION / ISOLATION (PIPING &


631 DM1220 6.60 INSTRUMENTATION) INS FS DEM PCS 47.52 0 21/May/19 22/May/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

632 DM1240 6.60 APPLYNTI RUST TO FOUNDATION BOTLS INS FS DEM PCS 23.76 0 22/May/19 23/May/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

633 DM1230 6.60 COLD CUTTING INLETND OUTLET PIPING INS FS DEM PCS 47.52 0 23/May/19 16/Jun/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

634 DM1250 6.60 UNBOLD & REMOVE EXISTING SEPARATOR INS FS DEM PCS 166.32 0 16/Jun/19 18/Jun/19 0.03% 0.12% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

REMOVE CONCRETE FOUNDATION / GRADE


635 DM1260 6.60 INS FS DEM PCS 199 0 18/Jun/19 01/Jul/19 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
THEREA
FAHN
Civil Works
COMMOMN
639 A2090 4.40 GRADING INS FN CV SQM 338.8 338.8 05/May/18 10/May/18 05/May/18 10/May/18 0.05% 0.24% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

640 A2090-1 4.40 PROTECTION OF UNDERGROUND CABLES INS FN CV 0 13/Aug/18 24/Dec/18 13/Aug/18 0.00% 0.00% 0.000% 80.00% 55.22% 80.00% 55.22% 80.00% 24.78%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

641 A2095-00 4.40 SOAKWAY PIT EXCAVATION & INSTALLATION INS


INCL. DEMOLITION - IFPPLICABLE FN CV 0 18/Sep/18 07/Nov/18 12/Sep/18 0.01% 0.05% 100.000% 50.00% -25.49% 55.00% 74.51% 55.00% -19.51%

642 A2160-1 4.40 CABLE TRENCHES INS FN CV 0 08/Nov/18 24/Dec/18 0.01% 0.05% 42.857% 0.00% -42.86% 0.00% 0.00% 0.00% 0.00%
643 A2170 4.40 DRAINAGE PIPE CULVERTS INS FN CV LM 4.587 0 25/Dec/18 06/Jan/19 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

644 A2200 4.40 RE-INSTATEMENT OF EXISTING PAVEMENT INS FN CV SQM 178.75 0 13/Apr/19 28/Apr/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(INTERLOCK PAVING)

645 A2150 4.40 ROADSND PAVING(INCLUDING INS FN CV SQM 0 0 13/Apr/19 28/Apr/19 0.01% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
MODIFICATIONS)
646 A2160 4.40 UTILITY ROAD CROSSINGS INS FN CV PCS 211.2 0 16/Apr/19 05/May/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

647 A2180 4.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS FN CV PCS 66 0 21/Apr/19 05/May/19 0.01% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TEST SEPERATOR
649 A2095 XX 4.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS FN CV CUM 40 40 05/May/18 04/Aug/18 05/May/18 05/Jul/18 0.04% 0.18% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

650 A2095 XX 4.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS FN CV CUM 40 40 05/May/18 04/Aug/18 05/May/18 04/Aug/18 0.00% 0.02% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

651 A2100 XX 4.40 FOUNDATION WORK (STEEL FIXING) INS FN CV CUM 1534 1534 03/Jul/18 16/Aug/18 03/Jul/18 19/Jul/18 0.02% 0.12% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
652 A2100 XX 4.40 FOUNDATION WORK (STEEL FIXING) INS FN CV CUM 1534 1534 03/Jul/18 16/Aug/18 03/Jul/18 16/Aug/18 0.00% 0.02% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
653 A2100-1 XX 4.40 FOUNDATION WORK (CONCRETE) INS FN CV CUM 15.8 15.8 17/Jul/18 23/Aug/18 17/Jul/18 17/Jul/18 0.01% 0.06% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
654 A2100-1 XX 4.40 FOUNDATION WORK (CONCRETE) INS FN CV CUM 15.8 15.8 17/Jul/18 23/Aug/18 17/Jul/18 23/Aug/18 0.00% 0.02% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

655 A2100-3 4.40 CURING / WATERPROOFING / BACK FILLING INS FN CV CUM 45 45 05/Aug/18 09/Sep/18 05/Aug/18 09/Sep/18 0.00% 0.02% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%

TEST SEPERATOR PLATFORM


657 A2095-1 4.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS FN CV 0 28/Aug/18 26/Nov/18 28/Aug/18 0.01% 0.03% 100.000% 50.00% -35.16% 84.00% 64.84% 84.00% 19.16%

658 A2100-4 4.40 FOUNDATION WORK (STEEL FIXING) INS FN CV 0 10/Oct/18 03/Dec/18 10/Oct/18 0.01% 0.03% 100.000% 0.00% -70.91% 60.00% 29.09% 60.00% 30.91%
659 A2100-5 4.40 FOUNDATION WORK (CONCRETE) INS FN CV 0 22/Nov/18 12/Dec/18 0.01% 0.03% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

660 A2140-125 4.40 CURING / WATERPROOFING / BACK FILLING INS FN CV 0 03/Dec/18 31/Dec/18 0.01% 0.03% 40.000% 0.00% -40.00% 0.00% 0.00% 0.00% 0.00%

METERING SKID
662 A2095-2 4.40 EXCAVATION INS FN CV CUM 60 60 05/May/18 07/Aug/18 05/May/18 07/Aug/18 0.03% 0.15% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
663 A2140 XX 4.40 FOUNDATION WORK (STEEL FIXING) INS FN CV CUM 1656 1656 04/Jul/18 05/Sep/18 04/Jul/18 04/Jul/18 0.01% 0.04% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
664 A2140 XX 4.40 FOUNDATION WORK (STEEL FIXING) INS FN CV CUM 1656 1656 04/Jul/18 05/Sep/18 04/Jul/18 05/Sep/18 0.02% 0.11% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
665 A2140-1 4.40 FOUNDATION WORK (CONCRETE) INS FN CV CUM 14.55 14.55 28/Aug/18 28/Oct/18 28/Aug/18 20/Oct/18 0.02% 0.11% 100.000% 98.00% -4.84% 100.00% 95.16% 100.00% 4.84%

666 A2140-2 4.40 CURING / WATERPROOFING / BACK FILLING INS FN CV CUM 108 103.68 08/Oct/18 26/Nov/18 08/Oct/18 0.02% 0.11% 100.000% 92.00% -64.00% 96.00% 36.00% 96.00% 60.00%

PIPE SUPPORT
EXCAVATION FOR STRUCTURAL STEEL PIPE
668 A2095-3 4.40 SUPPORTS INS FN CV CUM 50 47.5 04/Aug/18 15/Nov/18 04/Aug/18 0.04% 0.19% 100.000% 92.00% -20.19% 95.00% 79.81% 95.00% 15.19%

669 A2120 XX 4.40 FOUNDATION WORK (STEEL FIXING) INS FN CV CUM 4200 4200 08/Sep/18 29/Nov/18 09/Jul/18 09/Jul/18 0.02% 0.07% 100.000% 100.00% -42.17% 100.00% 57.83% 100.00% 42.17%
670 A2120 XX 4.40 FOUNDATION WORK (STEEL FIXING) INS FN CV CUM 4200 3570 08/Sep/18 29/Nov/18 08/Sep/18 0.04% 0.19% 100.000% 85.00% -42.17% 85.00% 57.83% 85.00% 27.17%
671 A2120-1 4.40 FOUNDATION WORK (CONCRETE) INS FN CV CUM 35 29.75 11/Sep/18 19/Dec/18 11/Sep/18 0.04% 0.19% 85.106% 80.00% -40.11% 85.00% 45.00% 85.00% 40.00%

672 A2120-2 4.40 CURING / WATERPROOFING / BACK FILLING INS FN CV CUM 76 38 16/Sep/18 02/Jan/19 16/Sep/18 0.04% 0.19% 60.417% 30.00% -23.72% 50.00% 36.70% 50.00% 13.30%

PSV
674 A2095-4 XX 4.40 EXCAVATION INS FN CV CUM 100 100 26/May/18 22/Oct/18 26/May/18 26/May/18 0.02% 0.07% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
675 A2095-4 XX 4.40 EXCAVATION INS FN CV CUM 100 100 26/May/18 22/Oct/18 26/May/18 22/Oct/18 0.02% 0.11% 100.000% 95.00% 0.00% 100.00% 100.00% 100.00% 0.00%
676 A2140-3 XX 4.40 FOUNDATION WORK (STEEL FIXING) INS FN CV CUM 3647 3647 09/Jul/18 15/Nov/18 09/Jul/18 09/Jul/18 0.00% 0.02% 100.000% 100.00% -16.15% 100.00% 83.85% 100.00% 16.15%
677 A2140-3 XX 4.40 FOUNDATION WORK (STEEL FIXING) INS FN CV CUM 3647 3099.95 09/Jul/18 15/Nov/18 09/Jul/18 0.01% 0.03% 100.000% 85.00% -16.15% 85.00% 83.85% 85.00% 1.15%
678 A2140-4 4.40 FOUNDATION WORK (CONCRETE) INS FN CV CUM 26 19.5 10/Sep/18 29/Dec/18 10/Sep/18 0.01% 0.05% 100.000% 70.00% -58.56% 75.00% 41.44% 75.00% 33.56%

679 A2140-5 4.40 CURING / WATERPROOFING / BACK FILLING INS FN CV CUM 206 133.9 18/Sep/18 15/Dec/18 18/Sep/18 0.01% 0.05% 100.000% 50.00% -57.30% 65.00% 42.70% 65.00% 22.30%

Structural Steel
TEST SEPERATOR

INSTALLATION OF STRUCTURAL STEELWORK


682 A2660 4.40 OPERATINGNDCCESS PLATFORMS (TEST INS FN STIN Kg 9298 0 06/Jan/19 26/Jan/19 0.06% 0.30% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SEPERATOR & PLATFORM)

INSTALLATION OF LADDERS, STAIRS,


683 A2660-1 4.40 INS FN STIN 0 16/Jan/19 26/Jan/19 0.06% 0.30% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
HANDRAILS
METERING SKID
INSTALLATION OF STRUCTURAL STEEL OF
685 A2670 4.40 METERING SKID INCL. WALK WAY OR CROSS INS FN STIN Kg 2470 0 09/Jan/19 21/Jan/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
OVER
PSV
687 A2680 4.40 INSTALLATION OF PSV VALVESCCESS INS FN STIN Kg 1705 0 26/Dec/18 05/Jan/19 0.02% 0.08% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PLATFORMS
PIPE SUPPORT

INSTALLATION OF STRUCTURAL STEEL PIPE


689 A2690 4.40 SUPPORTS & MODIFICATIONS OF INS FN STIN Kg 4078 0 10/Jan/19 30/Jan/19 0.02% 0.08% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
EXISTINGCCESS PLATFORMS (IFPPLICABLE)

FIELD INSTRUMENT
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

691 A2700 4.40 INSTALLATION OF INSTRUMENT STANCHION INS FN STIN PCS 151 0 30/Jan/19 04/Feb/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Mechanical
693 A2875 4.10 INSTALLATION OF NEW TEST SEPARATOR INS FN ME SET 137.5 137.5 05/Sep/18 12/Sep/18 05/Sep/18 12/Sep/18 0.02% 0.10% 0.000% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00%

Piping
Pre Shutdownnd Plant Shutdown Tie-in
696 A3200-a 4.10 MOBILIZATION OF OF TEAMPPLY PTW INS FN PPIN 0 24/Mar/19 24/Mar/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

697 A3200-b 4.10 SCAFFOLDING


PERMIT ISSUE
/ PLATE FORM / WORK INS FN PPIN 0 24/Mar/19 31/Mar/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

698 A3200-1 4.10 PIPING TIE-IN / NDT PRE SHUT DOWN INS FN PPIN 0 31/Mar/19 15/Apr/19 0.06% 0.29% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
699 A3200-2 4.10 PIPING TIE-IN / NDT SHUT DOWN INS FN PPIN 0 15/Apr/19 22/Apr/19 0.02% 0.10% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PIPING -REMAINING

PIPING INSTALLATION ON PIPE


701 A3170 4.10 INS FN PPIN DIN 316 0 21/Jan/19 13/Feb/19 0.08% 0.39% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SUPPORT,PIERACK &ROUND EQUIPMENT

702 A3170-1 4.10 INSTALLATION OF BALL VALVE & GGC VALVE INS FN PPIN 0 29/Jan/19 11/Feb/19 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

HYDRO-TESTING, FLUSHING, DRAININGND


703 A3190 4.10 INS FN PPIN SET 240 0 02/Feb/19 16/Feb/19 0.08% 0.39% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PURGING
INLET PIPING TIE-IN TO SEPARATOR
704 A3180 4.10 (PARTIAL SHUTDOWN TIE-IN) INS FN PPIN DIN 316 0 15/Apr/19 20/Apr/19 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

705 A3200 4.10 TIE-IN INS FN PPIN PCS 1782 0 15/Apr/19 20/Apr/19 0.06% 0.27% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

706 A3201 4.10 REPLACE THE SHUTVALVET POINT OF OIL-IN INS FN PPIN PCS 66 0 17/Apr/19 20/Apr/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TIE-IN / INSTALL SDV
Electrical
708 A2160-11 4.40 CABLE TRENCH INS FN EL LM 141.9 0 08/Nov/18 24/Dec/18 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
709 A3930 4.30 EARTH PIT DRILLING INS FN EL 0 31/Dec/18 05/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
708 A3730 4.30 U/G CABLE LAYING INS FN EL LM 141.9 0 30/Dec/18 07/Jan/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
709 A3730-1 4.30 BACK FILLING OF CABLE TRENCH INS FN EL 0 06/Jan/19 19/Jan/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
710 A3760 4.30 CABLE LAYING INS FN EL LM 88 0 30/Jan/19 18/Feb/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
711 A3720 4.30 CABLE GLANDND TERMINATION INS FN EL LM 116.6 0 16/Feb/19 28/Feb/19 0.02% 0.09% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

712 A3750 4.30 ELECTRICAL EQUIPMENTS INSTALLATION INS FN EL PCS 92.4 0 02/Feb/19 14/Feb/19 0.01% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

713 A3770 4.30 LIGHTING FIXTUREND DB INSTALLATION INS FN EL PCS 231 0 21/Feb/19 03/Mar/19 0.04% 0.17% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

714 A3740 4.30 CABLE TRAY INSTALLATION INS FN EL LM 292.6 0 26/Jan/19 04/Feb/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
715 A3760-1 4.30 HOOK UP INS FN EL 0 03/Mar/19 07/Mar/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
716 A3780 4.30 ELECTRICAL TIE-INS INS FN EL SET 44 0 07/Mar/19 09/Mar/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
717 A3790 4.30 ENERGIZATION INS FN EL SET 44 0 10/Mar/19 13/Mar/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Instrument & Control
719 A4200 4.20 CABLE TRAY/DUCT INSTALLATION INS FN IN LM 36.3 0 16/Jan/19 30/Jan/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
719 A4940 4.20 JB SUPPORT INSTALLATION INS FN IN LM 36.3 0 27/Jan/19 30/Jan/19 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
720 A4930 4.20 JB INSTALLATION INS FN IN 0 30/Jan/19 02/Feb/19 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

720 A4220-2 4.20 FIELD INSTRUMENT INSTALLATION INS FN IN 0 23/Jan/19 18/Feb/19 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(GAUGESND TRANMITTERS)
721 A4230 4.20 INSTRUMENT CABLE LAYING INS FN IN LM 1441 0 22/Jan/19 09/Feb/19 0.03% 0.14% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

722 A4220 4.20 INSTRUMENT EQUIPEMNT INSTALLATION INS FN IN SET 317.9 0 23/Jan/19 12/Feb/19 0.05% 0.23% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

721 A4980 4.20 CABLE GLANDND TERMINATION (ALONG JB) INS FN IN LM 1441 0 10/Feb/19 20/Feb/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

722 A4990 4.20 CABLE GLANDND TERMINATION (ALONG INS FN IN SET 317.9 0 16/Feb/19 23/Feb/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INSTRUMENTS)

723 A4240 4.20 DCS MODIFICATION IN CONTROL ROOM BY INS FN IN 0 12/Feb/19 21/Feb/19 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
VENDOR
724 A4220-1 4.20 INSTALLATION OF INSTRUMENT VALVE INS FN IN 0 10/Feb/19 12/Feb/19 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

725 A4220-3 4.20 INSTALLATION OF BS & WNALYZERS ON INS FN IN 0 10/Feb/19 12/Feb/19 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
METERING SKID
726 A4230-1 4.20 SS TUBEND LEAK TEST INS FN IN 0 23/Feb/19 26/Feb/19 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INSTRUMENT EQUIPMENT CALIBRATION /
727 A4210 4.20 INS FN IN SET 154 0 25/Feb/19 03/Mar/19 0.02% 0.11% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
LOOP TEST
728 A5330 4.50 INSTALLATION OF DELUGE INS FN IN SET 550 0 05/Feb/19 12/Feb/19 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
F&G System
719 A6360 4.50 F&G CABLE INSTALLATION INS FN IN LM 36.3 0 22/Jan/19 30/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
719 A6370 4.50 F&G SUPPORT INSTALLATION INS FN IN LM 36.3 0 27/Jan/19 30/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
720 A6380 4.50 F&G DEVICES INSTALLATION INS FN IN 0 29/Jan/19 02/Feb/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
720 A6390 4.50 F&G JB SUPPORT INSTALLATION INS FN IN 0 30/Jan/19 31/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
721 A6400 4.50 F&G JB INSTALLATION INS FN IN LM 1441 0 02/Feb/19 04/Feb/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

722 A6410 4.50 F&G CABLE GLANDINGND TERMINATION INS FN IN SET 317.9 0 18/Feb/19 23/Feb/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

721 A6420 4.50 F&G LOOP PREPARATION INS FN IN LM 1441 0 23/Feb/19 24/Feb/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
722 A6430 4.50 F&G LOOP TESTING INS FN IN SET 317.9 0 24/Feb/19 27/Feb/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Painting & Fireproofing
730 A4460 4.10 PIPING PAINTINGND TOUCH-UP INS FN FP SQM 256 0 04/Feb/19 18/Feb/19 0.04% 0.19% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

731 A4450 4.40 STRUCTURAL STEEL PAINTINGND TOUCH-UP INS FN FP SQM 247 0 04/Feb/19 18/Feb/19 0.04% 0.18% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

732 A4470 4.50 FIREPROOFING FOR STRUCTURAL STEEL INS FN FP SQM 1256.2 0 10/Feb/19 04/Mar/19 0.19% 0.92% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Demolition Works
734 DM1280 4.60 WORK PERMITPPROVED FOR DEMOLITION INS FN DEM PCS 8.8 0 07/May/19 09/May/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

735 DM1290 4.60 DEPRESSURIZATION / ISOLATION (PIPING & INS FN DEM PCS 54.56 0 11/May/19 12/May/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INSTRUMENTATION)

736 DM1310 4.60 APPLYNTI RUST TO FOUNDATION BOTLS INS FN DEM PCS 27.28 0 12/May/19 13/May/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

737 DM1300 4.60 COLD CUTTING INLETND OUTLET PIPING INS FN DEM PCS 54.56 0 13/May/19 05/Jun/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

738 DM1320 4.60 UNBOLD & REMOVE EXISTING SEPARATOR INS FN DEM PCS 190.96 0 05/Jun/19 06/Jun/19 0.03% 0.14% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

739 DM1330 4.60 REMOVE


THEREA
CONCRETE FOUNDATION / GRADE INS FN DEM PCS 227 0 08/Jun/19 25/Jun/19 0.04% 0.17% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

FAHM
DEMOLITION WORKS
METHOD STATEMENT RE SUBMISSION
742 FM-DEM-1010 5.60 INS FM DEM 0 24/Jun/18 19/Sep/18 24/Jun/18 19/Sep/18 0.00% 0.00% 100.000% 100.00% 0.00% 100.00% 100.00% 100.00% 0.00%
&PPROVED BY QP
OPERATION CLEARANCE & VESSEL
DEPRESSURIZATION BY QP OPERATION TEAM
743 FM-DEM-1020 5.60 INS FM DEM 0 01/Nov/18 06/Nov/18 01/Nov/18 0.000% 0.00% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
& HANDOVER TO CPECCTO START ISOLATION
& DEMOLITION
PURGING / SYSTEM ISOLATE SEPERATOR
744 FM-DEM-1030 5.60 INS FM DEM 0 07/Nov/18 14/Nov/18 01/Nov/18 0.00% 0.00% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
FROM EXISTING SYSTEM

COMPLETE DEMO WORK OF SEPARATOR &


745 FM-DEM-1040 5.60 METERING SKID FOUNDATION (CIVIL,PIPING, INS FM DEM 0 15/Nov/18 19/Dec/18 0.00% 0.00% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
ELEC. & INSTR.)

ISOLATION WORKS
PIPING ISOLATION
749 A5630 5.60 ISOLATION OF EXISTING VALVES INS FM DEM 0 07/Nov/18 12/Nov/18 0.01% 0.05% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%
INSTRUMENT ISOLATION
749 A5640 5.60 ISOLATION OFSSOCIATED INTRUMENTS INS FM DEM 0 11/Nov/18 12/Nov/18 0.01% 0.05% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

ELECTRICAL ISOLATION
749 A5650 5.60 ISOLATION OFSSOCIATED ELECTRICAL ITEMS INS FM DEM 0 13/Nov/18 14/Nov/18 0.01% 0.05% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

DEMOLITION WORKS
DEMOLITION OF EXISTING PIPING
REMOVAL OF EXISITNG PIPING WITH
749 A5660 5.60 INS FM DEM 0 14/Nov/18 21/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%
SEPARATOR
DEMOLITION OF EXISTING INSTRUMENTATION

REMOVAL OF EXISITNG INTRUMENTSND


749 A5670 5.60 CABLES WITH SEPARATOR INS FM DEM 0 19/Nov/18 21/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

749 A5680 5.60 REMOVAL


LOGIC
OF SEPARTOR FROM EXISTING INS FM DEM 0 20/Nov/18 25/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

DISMANTLING OF EXISTING SEPARATOR

749 A5690 5.60 REMOVAL OF EXISITNG INTRUMENTSND INS FM DEM 0 25/Nov/18 26/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%
CABLES WITH SEPARATOR

REMOVAL OF SEPARTOR FROM EXISTING


749 A5700 5.60 LOGIC INS FM DEM 0 25/Nov/18 26/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

REMOVAL OF SEPARTOR FROM EXISTING


749 A5710 5.60 LOGIC INS FM DEM 0 27/Nov/18 28/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

DISMANTLING OF EXISTING SEPARATOR PLATFORM


749 A5750 5.60 APPLICATION OFNTI-RUST PAINT/COATING INS FM DEM 0 26/Nov/18 26/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

UNBOLTING OF SEPARATOR FROM


749 A5760 5.60 INS FM DEM 0 26/Nov/18 27/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%
FOUNDATION

749 A5770 5.60 LIFITNGND REMOVAL FROM FOUNDATION INS FM DEM 0 27/Nov/18 01/Dec/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

DISMANTLING OF EXISTING METERING SKID


749 A5720 5.60 APPLICATION OFNTI-RUST PAINT/COATING INS FM DEM 0 27/Nov/18 27/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

749 A5730 5.60 UNBOLTING


FOUNDATION
OF PLATFORM FROM INS FM DEM 0 27/Nov/18 28/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

749 A5740 5.60 LIFTINGND REMOVAL FROM FOUNDATION INS FM DEM 0 01/Dec/18 02/Dec/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

DISMANTLING OF EXISTING METERING SKID PLATFORM


Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

749 A5780 5.60 APPLICATION OFNTI-RUST PAINT/COATING INS FM DEM 0 27/Nov/18 28/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

749 A5790 5.60 UNBOLTING FROM FOUNDATION INS FM DEM 0 27/Nov/18 29/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

749 A5800 5.60 LIFTINGND REMOVAL FROM FOUNDATION INS FM DEM 0 02/Dec/18 05/Dec/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

DISMANTLING OF EXISTING PSV PLATFORM


749 A5810 5.60 APPLICATION OFNTI-RUST PAINT/COATING INS FM DEM 0 27/Nov/18 28/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

749 A5820 5.60 UNBOLTING


FOUNDATION
OF PLATFORM FROM INS FM DEM 0 27/Nov/18 29/Nov/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

749 A5830 5.60 LIFTINGND REMOVAL FROM FOUNDATION INS FM DEM 0 04/Dec/18 05/Dec/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%

DEMOLITION OF EXISITNG SEPARATOR FOUNDATION


749 A5840 5.60 EXISTING SEPARATOR FOUNDATION INS FM DEM 0 02/Dec/18 20/Dec/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%
DEMOLITION
DEMOLITION OF EXISTING METERING SKID FOUNDATION
749 A5850 5.60 EXISTING FOUNDATION DEMOLITION INS FM DEM 0 06/Dec/18 15/Dec/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%
DEMOLITION OF EXISTING PSV FOUNDATION
749 A5860 5.60 EXISTING FOUNDATION DEMOLITION INS FM DEM 0 06/Dec/18 13/Dec/18 0.00% 0.01% 100.000% 65.00% -100.00% 0.00% 0.00% 0.00% 0.00%
INSTALLATION
Civil Works
COMMOMN
749 A2230 5.40 GRADING INS FM CV SQM 363 272.25 14/Sep/18 15/Nov/18 14/Sep/18 0.06% 0.27% 100.000% 65.00% -33.33% 75.00% 66.67% 75.00% 8.33%

750 A2300 5.40 CABLE TRENCHESND UTILITY ROAD INS FM CV PCS 827.2 0 04/Dec/18 01/Jan/19 0.03% 0.15% 75.862% 0.00% -75.86% 0.00% 0.00% 0.00% 0.00%
CROSSINGS

SOAKWAY PIT EXCAVATION & INSTALLATION


751 A2280-3 5.40 INCL. DEMOLITION - IFPPLICABLE INS FM CV 0 25/Nov/18 18/Dec/18 0.03% 0.15% 91.667% 0.00% -91.67% 0.00% 0.00% 0.00% 0.00%

752 A2230-1 5.40 PROTECTION OF UNDERGROUND CABLES INS FM CV 0 26/Dec/18 10/Jan/19 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

753 A2290 5.40 ROADSND PAVING(INCLUDING INS FM CV SQM 0 0 18/Apr/19 07/May/19 0.03% 0.15% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
MODIFICATIONS)
754 A2310 5.40 DRAINAGE PIPE CULVERTS INS FM CV LM 3.3 0 22/Jan/19 19/Feb/19 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

755 A2320 5.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS FM CV PCS 66 0 07/May/19 26/May/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

756 A2350 5.40 RE-INSTATEMENT OF EXISTING PAVEMENT


(INTERLOCK PAVING) INS FM CV SQM 171.6 0 07/May/19 26/May/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TEST SEPERATOR
758 A2240 5.40 EXCAVATION INS FM CV CUM 0 20/Dec/18 06/Jan/19 0.03% 0.14% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
759 A2250 5.40 BLINDING INS FM CV CUM 0 02/Jan/19 08/Jan/19 0.00% 0.02% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
760 A2240-1 5.40 FOUNDATION (STEEL FIXING) INS FM CV CUM 0 06/Jan/19 22/Jan/19 0.02% 0.08% 12.500% 0.00% -12.50% 0.00% 0.00% 0.00% 0.00%
761 A2270 5.40 FORMWORK FOR FOUNDATION INS FM CV CUM 0 14/Jan/19 22/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
758 A2240-11 5.40 FOUNDATION (CONCRETE) INS FM CV CUM 0 19/Jan/19 30/Jan/19 0.02% 0.11% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
759 A2240-2 5.40 CURING INS FM CV CUM 0 26/Jan/19 03/Feb/19 0.01% 0.04% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

760 A2240-22 5.40 WATER PROOFING (BITUMEN COATING) INS FM CV CUM 0 29/Jan/19 07/Feb/19 0.01% 0.04% 12.500% 0.00% -12.50% 0.00% 0.00% 0.00% 0.00%

761 A2240-32 5.40 BACKFILL INS FM CV CUM 0 03/Feb/19 12/Feb/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TEST SEPERATOR PLATFORM
758 A5900 5.40 EXCAVATION INS FM CV CUM 0 01/Jan/19 26/Jan/19 0.00% 0.00% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
759 A2240-62 5.40 BLINDING INS FM CV CUM 0 22/Jan/19 07/Feb/19 0.00% 0.00% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
760 A5880 5.40 FOUNDATION (STEEL FIXING) INS FM CV CUM 0 22/Jan/19 31/Jan/19 0.00% 0.00% 12.500% 0.00% -12.50% 0.00% 0.00% 0.00% 0.00%
761 A5890 5.40 FORMWORK FOR FOUNDATION INS FM CV CUM 0 31/Jan/19 07/Feb/19 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
758 A2240-72 5.40 FOUNDATION (CONCRETE) INS FM CV CUM 0 06/Feb/19 16/Feb/19 0.00% 0.00% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
759 A2240-82 5.40 CURING INS FM CV CUM 0 11/Feb/19 18/Feb/19 0.00% 0.00% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

760 A2240-42 5.40 WATER PROOFING (BITUMEN COATING) INS FM CV CUM 0 16/Feb/19 23/Feb/19 0.00% 0.00% 12.500% 0.00% -12.50% 0.00% 0.00% 0.00% 0.00%

761 A2240-52 5.40 BACKFILL INS FM CV CUM 0 18/Feb/19 25/Feb/19 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
METERING SKID
763 A2240-12 5.40 EXCAVATION INS FM CV CUM 60 0 30/Dec/18 12/Jan/19 0.01% 0.06% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
759 A2240-92 5.40 BLINDING INS FM CV CUM 0 01/Jan/19 08/Jan/19 0.01% 0.06% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
760 A2240-102 5.40 FOUNDATION (STEEL FIXING) INS FM CV CUM 0 05/Jan/19 14/Jan/19 0.01% 0.06% 12.500% 0.00% -12.50% 0.00% 0.00% 0.00% 0.00%
761 A2240-122 5.40 FORMWORK FOR FOUNDATION INS FM CV CUM 0 09/Jan/19 14/Jan/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
758 A2240-112 5.40 FOUNDATION (CONCRETE) INS FM CV CUM 0 12/Jan/19 21/Jan/19 0.01% 0.06% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
759 A2240-132 5.40 CURING INS FM CV CUM 0 21/Jan/19 28/Jan/19 0.01% 0.06% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

760 A2240-142 5.40 WATER PROOFING (BITUMEN COATING) INS FM CV CUM 0 28/Jan/19 30/Jan/19 0.01% 0.06% 12.500% 0.00% -12.50% 0.00% 0.00% 0.00% 0.00%

761 A2240-152 5.40 BACKFILL INS FM CV CUM 0 30/Jan/19 06/Feb/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PIPE SUPPORT
765 A2235-4 5.40 EXCAVATION FOR STRUCTURAL STEEL PIPE INS FM CV CUM 0 04/Aug/18 24/Nov/18 0.03% 0.14% 100.000% 63.00% -26.55% 63.00% 73.45% 63.00% -10.45%
SUPPORTS

766 A2260-3 5.40 BLINDING CONCRETE FOR PS FOUNDATIONS INS FM CV CUM 0 07/Nov/18 05/Dec/18 01/Nov/18 0.00% 0.02% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

767 A2260 5.40 FOUNDATION WORK (STEEL FIXING) INS FM CV CUM 0 13/Nov/18 12/Dec/18 0.02% 0.10% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
768 A2260-4 5.40 FORMWORK FOR FOR PS FOUNDAITON INS FM CV CUM 0 20/Nov/18 12/Dec/18 0.01% 0.04% 68.966% 0.00% -68.97% 0.00% 0.00% 0.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

765 A2260-1 5.40 FOUNDATION WORK (CONCRETE) INS FM CV CUM 0 21/Nov/18 20/Dec/18 0.03% 0.15% 100.000% 63.00% -100.00% 0.00% 0.00% 0.00% 0.00%
766 A2260-2 5.40 CURING INS FM CV CUM 0 24/Nov/18 23/Dec/18 0.01% 0.05% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

767 A2260-5 5.40 WATER PROOFING (BITUMENT COATING) INS FM CV CUM 0 09/Dec/18 31/Dec/18 0.01% 0.05% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%

768 A2260-6 5.40 BACKFILLING INS FM CV CUM 0 16/Dec/18 07/Jan/19 0.01% 0.05% 68.966% 0.00% -68.97% 0.00% 0.00% 0.00% 0.00%
PSV
770 A2235-5 5.40 EXCAVATION (INCLUDINGREA LIGHTING INS FM CV CUM 100 0 20/Dec/18 06/Jan/19 0.03% 0.15% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
POLES)
771 A2280 5.40 FOUNDATION WORK (STEEL FIXING) INS FM CV CUM 3647 0 06/Jan/19 22/Jan/19 0.01% 0.03% 100.000% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00%
772 A2280-1 5.40 FOUNDATION WORK (CONCRETE) INS FM CV CUM 26 0 22/Jan/19 07/Feb/19 0.01% 0.03% 18.750% 0.00% -18.75% 0.00% 0.00% 0.00% 0.00%

773 A2280-2 5.40 CURING / WATERPROOFING / BACK FILLING INS FM CV CUM 206 0 07/Feb/19 21/Feb/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Structural Steel
TEST SEPERATOR
INSTALLATION OF LADDERS, STAIRS,
776 A2730-1 5.40 HANDRAILS INS FM STIN 0 26/Feb/19 21/Mar/19 0.05% 0.23% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

INSTALLATION OF STRUCTURAL STEELWORK


777 A2730 5.40 OPERATINGNDCCESS PLATFORMS (TEST INS FM STIN Kg 9298 0 26/Feb/19 21/Mar/19 0.05% 0.23% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SEPERATOR & PLATFORM)

METERING SKID
INSTALLATION OF STRUCTURAL STEEL OF
779 A2740 5.40 METERING SKID INCL. WALK WAY OR CROSS INS FM STIN Kg 2470 0 04/Feb/19 17/Feb/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
OVER
PSV
781 A2750 5.40 INSTALLATION OF PSV VALVESCCESS INS FM STIN Kg 1705 0 25/Feb/19 09/Mar/19 0.01% 0.06% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PLATFORMS
PIPE SUPPORT

INSTALLATION OF STRUCTURAL STEEL PIPE


783 A2760 5.40 SUPPORTS & MODIFICATIONS OF INS FM STIN Kg 4078 0 24/Dec/18 24/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
EXISTINGCCESS PLATFORMS (IFPPLICABLE)

784 A2760-1 5.40 MODIFICATIONS OF EXISTING PIPE INS FM STIN 0 24/Dec/18 09/Jan/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SUPORT /CCESS PLATFORMS
FIELD INSTRUMENT
786 A2770 5.40 INSTALLATION OF INSTRUMENT STANCHION INS FM STIN PCS 151 0 26/Jan/19 30/Jan/19 0.01% 0.04% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Mechanical
788 A2900 5.10 INSTALLATION OF NEW TEST SEPARATOR INS FM ME SET 137.5 0 07/Feb/19 11/Feb/19 0.02% 0.10% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Piping
HOT TAPPING
791 HT1160 5.10 MOBILIZATION OF HOT TAPPING SUB INS FM HTAP 0 11/Mar/19 13/Mar/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
CONTRACTOR

792 HT1170 5.10 SCAFFOLDING / PLATE FORM / WORK INS FM HTAP 0 14/Mar/19 23/Mar/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PERMIT ISSUE
793 HT1180 5.10 HOT TAPPING / NDT INS FM HTAP 0 24/Mar/19 30/Mar/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

794 HT1190 5.10 HOT TAPPING COMPLETE / REMOVE INS FM HTAP 0 03/Apr/19 06/Apr/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SCAFFOLD
PIPE INSTALATION & Pre Shutdown WORKS
796 A3260-a 5.10 MOBILIZATION OF OF TEAMPPLY PTW INS FM PPIN 0 06/Apr/19 06/Apr/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

797 A3260-b 5.10 SCAFFOLDING


PERMIT ISSUE
/ PLATE FORM / WORK INS FM PPIN 0 06/Apr/19 13/Apr/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

798 A3230 5.10 PIPING INSTALLATION ON PIPE INS FM PPIN DIN 347 0 02/Feb/19 24/Feb/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
SUPPORT,PIERACK &ROUND EQUIPMENT

799 A3230-1 5.10 INSTALLATION OF BALL VALVE & GGC VALVE INS FM PPIN 0 07/Feb/19 17/Feb/19 0.03% 0.13% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

HYDRO-TESTING, FLUSHING, DRAININGND


800 A3250 5.10 INS FM PPIN SET 440 0 25/Mar/19 06/Apr/19 0.03% 0.16% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PURGING

801 A3240 5.10 INLET PIPING TIE-IN TO SEPARATOR INS FM PPIN DIN 347 0 06/Apr/19 11/Apr/19 0.05% 0.26% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(PARTIAL SHUTDOWN TIE-IN)
802 A3260 5.10 PIPING TIE-IN / NDT PRE SHUT DOWN INS FM PPIN PCS 1412.4 0 08/Apr/19 14/Apr/19 0.05% 0.26% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Plant Shutdown Tie-in
804 A3260-1 5.10 PIPING TIE-IN / NDT SHUT DOWN INS FM PPIN 0 15/Apr/19 22/Apr/19 0.03% 0.16% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

805 A3261 5.10 REPLACE THE SHUTVALVET POINT OF OIL-IN


TIE-IN / INSTALL SDV INS FM PPIN PCS 66 0 21/Apr/19 22/Apr/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Electrical
807 A6530 5.40 CABLE TRENCH INS FM EL LM 500 0 03/Dec/18 26/Dec/18 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
808 A3940 5.30 EARTH PIT DRILLING INS FM EL NO 3 0 19/Jan/19 23/Jan/19 0.00% 0.02% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
807 A3840 5.30 CABLE TRAY INSTALLATION INS FM EL LM 292.6 0 17/Feb/19 03/Mar/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
808 A3830 5.30 U/G CABLE LAYING INS FM EL LM 253 0 13/Feb/19 21/Feb/19 0.04% 0.19% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
809 A3860 5.30 CABLE LAYING INS FM EL LM 184.8 0 20/Feb/19 03/Mar/19 0.03% 0.14% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
810 A3820 5.30 CABLE GLANDND TERMINATION INS FM EL LM 116.6 0 21/Feb/19 03/Mar/19 0.02% 0.09% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Inv 3963- 3963- 3963- Actual phy Forecast Start Forecast Finish Overall Const. Ind. Last Week Last Weekct Current Current Plan %
Sr.no. Activity ID XX Code Activity Name PHASE AREA DISC U.M. Qty progress (Rev : 04) (Rev : 04) Actual Start Actual Finish Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual (Rev : 04) Actual % Variance

811 A3850 5.30 ELECTRICAL EQUIPMENTS INSTALLATION INS FM EL PCS 92.4 0 21/Feb/19 12/Mar/19 0.01% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

812 A3830-1 5.30 BACK FILLING OF CABLE TRENCH INS FM EL 0 23/Feb/19 03/Mar/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

813 A3870 5.30 LIGHTING FIXTUREND DB INSTALLATION INS FM EL PCS 231 0 05/Mar/19 12/Mar/19 0.04% 0.17% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

814 A3890-1 5.30 HOOK UP INS FM EL 0 12/Mar/19 14/Mar/19 0.02% 0.07% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
815 A3880 5.30 ELECTRICAL TIE-INS INS FM EL SET 44 0 14/Mar/19 17/Mar/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
816 A3890 5.30 ENERGIZATION INS FM EL SET 44 0 17/Mar/19 20/Mar/19 0.01% 0.03% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Instrument & Control
818 A4260 5.20 CABLE TRAYND SUPPORT INSTALLATION INS FM IN LM 36.3 0 16/Feb/19 05/Mar/19 0.02% 0.08% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

818 A5000 5.20 JB SUPPORT INSTALLATION INS FM IN LM 36.3 0 03/Mar/19 05/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
819 A5040 5.20 JB INSTALLATION INS FM IN LM 1563.1 0 06/Mar/19 09/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
819 A4290 5.20 INSTRUMENT CABLE LAYING INS FM IN LM 1563.1 0 28/Feb/19 19/Mar/19 0.02% 0.08% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

820 A5050 5.20 CABLE GLANDND TERMINATION (ALONG JB) INS FM IN SET 317.9 0 09/Mar/19 19/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

820 A4280 5.20 INSTRUMENT EQUIPEMNT INSTALLATION INS FM IN SET 317.9 0 11/Mar/19 20/Mar/19 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

FIELD INSTRUMENT INSTALLATION


821 A4280-2 5.20 (GAUGESND TRANSMITTER) INS FM IN 0 11/Mar/19 18/Mar/19 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

822 A5340 5.50 INSTALLATION OF DELUGE INS FM IN SET 671 0 11/Mar/19 20/Mar/19 0.01% 0.05% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
CABLE GLANDND TERMINATION (ALONG
821 A5060 5.20 INSTRUMENTS) INS FM IN 0 18/Mar/19 24/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

823 A4920 5.20 DCS MODIFICATION IN CONTROL ROOM BY INS FM IN 0 19/Mar/19 30/Mar/19 0.02% 0.10% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
VENDOR
INSTALLATION OF BS & WNALYZERS ON
824 A4280-3 5.20 INS FM IN 0 16/Mar/19 18/Mar/19 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
METERING SKID
825 A4280-1 5.20 INSTALLATION OF INSTRUMENT VALVE INS FM IN 0 16/Mar/19 18/Mar/19 0.06% 0.30% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

826 A4270 5.20 INSTRUMENT EQUIPMENT CALIBRATION / INS FM IN SET 154 0 30/Mar/19 02/Apr/19 0.06% 0.30% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
LOOP TEST
827 A4290-1 5.20 SS TUBEND LEAK TEST INS FM IN 0 19/Mar/19 21/Mar/19 0.08% 0.40% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
F&G System
818 A6440 5.50 F&G CABLE INSTALLATION INS FM IN LM 36.3 0 28/Feb/19 10/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
818 A6450 5.50 F&G SUPPORT INSTALLATION INS FM IN LM 36.3 0 02/Mar/19 05/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
819 A6460 5.50 F&G DEVICES INSTALLATION INS FM IN LM 1563.1 0 05/Mar/19 09/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
819 A6470 5.50 F&G JB SUPPORT INSTALLATION INS FM IN LM 1563.1 0 06/Mar/19 07/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
820 A6480 5.50 F&G JB INSTALLATION INS FM IN SET 317.9 0 09/Mar/19 10/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

820 A6490 5.50 F&G CABLE GLANDINGND TERMINATION INS FM IN SET 317.9 0 19/Mar/19 24/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

821 A6500 5.50 F&G LOOP PREPARATION INS FM IN 0 24/Mar/19 25/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
822 A6510 5.50 F&G LOOP TESTING INS FM IN SET 671 0 25/Mar/19 28/Mar/19 0.00% 0.01% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Painting & Fireproofing
829 A4480 5.40 STRUCTURAL STEEL PAINTINGND TOUCH-UP INS FM FP SQM 196 0 19/Mar/19 30/Mar/19 0.03% 0.14% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

830 A4500 5.50 FIREPROOFING FOR STRUCTURAL STEEL INS FM FP SQM 1002.1 0 25/Mar/19 08/Apr/19 0.15% 0.74% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

831 A4490 5.10 PIPING PAINTINGND TOUCH-UP INS FM FP SQM 277 0 27/Mar/19 06/Apr/19 0.04% 0.20% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Summary Status of Pre-commissioning
& Commissioning and "S" Curve
8.4. PRE-COMMISSIONING & COMMISSIONING MEASUREMENT SHEET

PROJECT No. 3963

JOB TITLE : "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS"

CLIENT :QATAR PETROLEUM 25-Oct-18

SUBJECT : PRE-COMMISSIONING & COMMISSIONING MEASUREMENT SHEET

8.4. PRE-COMMISSIONING & COMMISSIONING MEASUREMENT SHEET REV : 04* - DRAFT

PRE-COMMISIONING & COMMISSIONING PREVIOUS WEEK CURRENT WEEK UP TO DATE

SER. DESCRIPTION Project Wt. WT. % PLANNED ACTUAL DEV. PLANNED ACTUAL DEV. PLANNED ACTUAL DEV.

1 Pre-Commissioning

1.1 Khatiyah Main 0.51% 6.35% 0.47% 0.472% 0.00% 0.19% 0.194% 0.00% 0.67% 0.67% 0.00%
1.2 Khatiyah North 0.51% 6.35% 0.47% 0.472% 0.00% 0.19% 0.194% 0.00% 0.67% 0.67% 0.00%
1.3 Khatiyah South 0.51% 6.35% 0.47% 0.472% 0.00% 0.19% 0.194% 0.00% 0.67% 0.67% 0.00%
1.4 JALM 0.51% 6.35% 0.47% 0.472% 0.00% 0.19% 0.194% 0.00% 0.67% 0.67% 0.00%
1.5 Fahahil South 0.51% 6.35% 0.47% 0.472% 0.00% 0.19% 0.194% 0.00% 0.67% 0.67% 0.00%
1.6 Fahahil North 0.51% 6.35% 0.47% 0.472% 0.00% 0.19% 0.194% 0.00% 0.67% 0.67% 0.00%
1.7 Fahahil Main 0.51% 6.35% 0.47% 0.472% 0.00% 0.19% 0.194% 0.00% 0.67% 0.67% 0.00%

2 Commisioning

2.1 Khatiyah Main 0.63% 7.94% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00%
2.1 Khatiyah North 0.63% 7.94% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00%
2.1 Khatiyah South 0.63% 7.94% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00%
2.1 JALM 0.63% 7.94% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00%
2.1 Fahahil South 0.63% 7.94% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00%
2.1 Fahahil North 0.63% 7.94% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00%
2.1 Fahahil Main 0.63% 7.94% 0.00% 0.000% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

OVERALL PRE-COMM & COMMISSIOING 8.00% 100.0% 0.21% 0.21% 0.00% 0.09% 0.09% 0.00% 0.30% 0.30% 0.00%
Area Document IND. Start of Issue for Issued for AFC with AFC without IND. WTG. OVERALL
Discipline Code Number Document Description WTG. Document Review Approval comments comments ACH. WTG.

5% 35% 25% 20% 15%


PROCESS GENERAL 3963-DGEN-6-22-0001 STARTUP, SHUTDOWN & OPERATING MANUALS 13% 100% 100% 100% 50% 75% 10%
PROCESS GENERAL 3963-DGEN-6-03-0002 PRE-COMMISSIONING AND COMMISSIONING PHILOSOPHY 16% 100% 100% 100% 100% 100% 100% 16%
PROCESS GENERAL 3963-DGEN-0-05-0008 COMMISSIONIG AND PERFORMANCE TEST PROCEDURE 16% 100% 100% 40% 6%
COMMISSIONING GENERAL 3963-DGEN-0-04-0006 PRE-COMMISSIONING AND COMMISSIONING PLAN 17% 100% 100% 40% 7%
COMMISSIONING GENERAL 3963-DGEN-0-01-0001 SYSTEM & SUB-SYSTEM LIST 8% 100% 100% 40% 3%
MECHANICAL AND PIPING GENERAL 3963-DGEN-5-05-0035 MECHANICAL AND PIPING PRE-COMMISSIONIG PROCEDURE 12% 100% 100% 40% 5%
ELECTRICAL GENERAL 3963-DGEN-2-05-0001 ELECTRICAL PRE-COMMISSIONIG PROCEDURE 10% 100% 5% 1%
INSTRUMENT GENERAL 3963-DGEN-4-05-0002 INSTRUMENT PRE-COMMISSIONIG PROCEDURE 8% 100% 5% 0%

100% 48%
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
EPIC FOR REPLACEMENT OF OLD 3-PHASE TEST SEPARATORSTLL DEGASSING STATIONS, DUKHAN

PRE-COMMISIONING & COMMISSIONING PROGRESS (MONITORING WEIGHTAGE):

Overall Individualctiv
Activity ID Activity Name Unit Quantity B/L ES Dtae B/L EF Dtae Start Finish Duration Progress Table
Weighted ity Weighted

Overall Individualctiv
Pre-comm/ Comm Phase Area Activity Name Unit Quantity B/L ES Dtae B/L EF Dtae Start Finish Duration
Weighted ity Weighted

8% todate Plan % Actual % Variance


Precommissioning total >> 22-Aug-18 18-Dec-18 9-Sep-18 14-May-19 247 3.56% 44.44%
Khatiyah Main 22-Aug-18 27-Sep-18 9-Sep-18 19-Jan-19 132 0.00%

A4510 Pre-comm Khatiyah Main Preparation of plansnd procedures for precommissioning SET 1 22-Aug-18 29-Aug-18 9-Sep-18 31-Dec-18 113 0.01% 0.18% 11% 24.00% 24%
A3001 Pre-comm Khatiyah Main Inst loop and functional Testing SET 1 12-Sep-18 15-Sep-18 7-Jan-19 10-Jan-19 3 0.14% 1.76% 0% 0.00%
A4550 Pre-comm Khatiyah Main Electrical Lighting Test SET 1 12-Sep-18 27-Sep-18 9-Jan-19 14-Jan-19 5 0.09% 1.10% 0% 0.00%
A4520 Pre-comm Khatiyah Main DELUGE SKID FUNCTIONAL TESTING SET 1 12-Sep-18 27-Sep-18 12-Jan-19 14-Jan-19 2 0.09% 1.10% 0% 0.00%
A4520-1 Pre-comm Khatiyah Main Leak test for Separator and Piping SET 1 16-Sep-18 18-Sep-18 10-Jan-19 15-Jan-19 5 0.07% 0.88% 0% 0.00%
A4530 Pre-comm Khatiyah Main Punchlist SET 1 19-Sep-18 22-Sep-18 15-Jan-19 19-Jan-19 4 0.11% 1.32% 0% 0.00%
Khatiyah North 23-Sep-18 16-Oct-18 9-Sep-18 20-Jan-19 133 0.00% 0%
A4560 Pre-comm Khatiyah North Preparation of plansnd procedures for precommissioning SET 1 23-Sep-18 30-Sep-18 9-Sep-18 31-Dec-18 113 0.01% 0.18% 11% 24.00% 24%
A2951 Pre-comm Khatiyah North Inst loop and functional Testing SET 1 23-Sep-18 16-Oct-18 2-Jan-19 6-Jan-19 4 0.14% 1.76% 0% 0.00%
A4600 Pre-comm Khatiyah North Electrical Lighting Test SET 1 30-Sep-18 2-Oct-18 6-Jan-19 10-Jan-19 4 0.09% 1.10% 0% 0.00%
A4570-1 Pre-comm Khatiyah North DELUGE SKID FUNCTIONAL TESTING SET 1 30-Sep-18 2-Oct-18 9-Jan-19 12-Jan-19 3 0.09% 1.10% 0% 0.00%
A4570 Pre-comm Khatiyah North Leak test for Separator and Piping SET 1 3-Oct-18 6-Oct-18 12-Jan-19 15-Jan-19 3 0.07% 0.88% 0% 0.00%
A4580 Pre-comm Khatiyah North Punchlist SET 1 7-Oct-18 9-Oct-18 16-Jan-19 20-Jan-19 4 0.11% 1.32% 0% 0.00%
Khatiyah South 2-Oct-18 25-Oct-18 9-Sep-18 17-Jan-19 130 0.00% 0%
A4610 Pre-comm Khatiyah South Preparation of plansnd procedures for precommissioning SET 1 2-Oct-18 9-Oct-18 9-Sep-18 31-Dec-18 113 0.01% 0.18% 11% 24.00% 24%
A3051 Pre-comm Khatiyah South Inst loop and functional Testing SET 1 2-Oct-18 25-Oct-18 6-Jan-19 8-Jan-19 2 0.14% 1.76% 0% 0.00%
A4620 Pre-comm Khatiyah South Electrical Lighting Test SET 1 6-Oct-18 8-Oct-18 8-Jan-19 13-Jan-19 5 0.09% 1.10% 0% 0.00%
a4650 Pre-comm Khatiyah South DELUGE SKID FUNCTIONAL TESTING SET 1 6-Oct-18 8-Oct-18 9-Jan-19 14-Jan-19 5 0.09% 1.10% 0% 0.00%
A4620-1 Pre-comm Khatiyah South Leak test for Separator and Piping SET 1 17-Oct-18 20-Oct-18 8-Jan-19 13-Jan-19 5 0.07% 0.88% 0% 0.00%
A4630 Pre-comm Khatiyah South Punchlist SET 1 21-Oct-18 23-Oct-18 14-Jan-19 17-Jan-19 3 0.11% 1.32% 0% 0.00%
JALM 29-Sep-18 10-Nov-18 9-Sep-18 25-Mar-19 197 0.00% 0%
A4660 Pre-comm JALM Preparation of plansnd procedures for precommissioning SET 1 29-Sep-18 6-Oct-18 9-Sep-18 28-Feb-19 172 0.01% 0.18% 11% 24.00% 24%
A3101 Pre-comm JALM Inst loop and functional Testing SET 1 29-Sep-18 1-Nov-18 13-Mar-19 16-Mar-19 3 0.14% 1.76% 0% 0.00%
A4700 Pre-comm JALM Electrical Lighting Test SET 1 2-Oct-18 4-Oct-18 19-Mar-19 24-Mar-19 5 0.09% 1.10% 0% 0.00%
A4670 Pre-comm JALM DELUGE SKID FUNCTIONAL TESTING SET 1 2-Oct-18 4-Oct-18 19-Mar-19 24-Mar-19 5 0.09% 1.10% 0% 0.00%
A4680 Pre-comm JALM Leak test for Separator and Piping SET 1 4-Nov-18 6-Nov-18 21-Mar-19 24-Mar-19 3 0.07% 0.88% 0% 0.00%
A4690 Pre-comm JALM Punchlist SET 1 7-Nov-18 10-Nov-18 21-Mar-19 25-Mar-19 4 0.11% 1.32% 0% 0.00%
Fahahil South 13-Oct-18 17-Nov-18 9-Sep-18 8-May-19 241 0.00% 0%
A4710 Pre-comm Fahahil South Preparation of plansnd procedures for precommissioning SET 1 13-Oct-18 20-Oct-18 9-Sep-18 21-Mar-19 193 0.01% 0.18% 24% 24.00% 24%
a3151 Pre-comm Fahahil South Inst loop and functional Testing SET 1 13-Oct-18 10-Nov-18 23-Apr-19 25-Apr-19 2 0.14% 1.76% 0% 0.00%
A4750 Pre-comm Fahahil South Electrical Lighting Test SET 1 16-Oct-18 18-Oct-18 25-Apr-19 30-Apr-19 5 0.09% 1.10% 0% 0.00%
a4720 Pre-comm Fahahil South DELUGE SKID FUNCTIONAL TESTING SET 1 16-Oct-18 18-Oct-18 30-Apr-19 5-May-19 5 0.09% 1.10% 0% 0.00%
A4720-1 Pre-comm Fahahil South Leak test for Separator and Piping SET 1 11-Nov-18 13-Nov-18 2-May-19 5-May-19 3 0.07% 0.88% 0% 0.00%
A4730 Pre-comm Fahahil South Punchlist SET 1 14-Nov-18 17-Nov-18 5-May-19 8-May-19 3 0.11% 1.32% 0% 0.00%
Fahahil North 30-Oct-18 18-Dec-18 9-Sep-18 1-May-19 234 0.00% 0%
A4760 Pre-comm Fahahil North Preparation of plansnd procedures for precommissioning SET 1 30-Oct-18 6-Nov-18 9-Sep-18 21-Mar-19 193 0.01% 0.18% 24% 24.00% 24%
A3201 Pre-comm Fahahil North Inst loop and functional Testing SET 1 30-Oct-18 26-Nov-18 16-Apr-19 18-Apr-19 2 0.14% 1.76% 0% 0.00%
A4800 Pre-comm Fahahil North Electrical Lighting Test SET 1 9-Dec-18 11-Dec-18 20-Apr-19 24-Apr-19 4 0.09% 1.10% 0% 0.00%
A4770 Pre-comm Fahahil North DELUGE SKID FUNCTIONAL TESTING SET 1 9-Dec-18 11-Dec-18 24-Apr-19 27-Apr-19 3 0.09% 1.10% 0% 0.00%
A4770-1 Pre-comm Fahahil North Leak test for Separator and Piping SET 1 12-Dec-18 15-Dec-18 23-Apr-19 28-Apr-19 5 0.07% 0.88% 0% 0.00%
A4780 Pre-comm Fahahil North Punchlist SET 1 16-Dec-18 18-Dec-18 28-Apr-19 1-May-19 3 0.11% 1.32% 0% 0.00%
Fahahil Main 10-Nov-18 8-Dec-18 27-Sep-18 14-May-19 229 0.00% 0%
A4810 Pre-comm Fahahil Main Preparation of plansnd procedures for precommissioning SET 1 10-Nov-18 17-Nov-18 27-Sep-18 31-Mar-19 185 0.01% 0.18% 24% 24.00% 24%
A4850 Pre-comm Fahahil Main Inst loop and functional Testing SET 1 10-Nov-18 8-Dec-18 23-Apr-19 27-Apr-19 4 0.14% 1.76% 0% 0.00%
A4820 Pre-comm Fahahil Main Electrical Lighting Test SET 1 13-Nov-18 15-Nov-18 28-Apr-19 2-May-19 4 0.09% 1.10% 0% 0.00%
A4820-1 Pre-comm Fahahil Main DELUGE SKID FUNCTIONAL TESTING SET 1 13-Nov-18 15-Nov-18 4-May-19 5-May-19 1 0.09% 1.10% 0% 0.00%
A4830 Pre-comm Fahahil Main Leak test for Separator and Piping SET 1 28-Nov-18 1-Dec-18 6-May-19 11-May-19 5 0.07% 0.88% 0% 0.00%
A4840 Pre-comm Fahahil Main Punchlist SET 1 2-Dec-18 4-Dec-18 12-May-19 14-May-19 2 0.11% 1.32% 0% 0.00%
Commissioning total >> 29-Sep-18 17-Dec-18 17-Jan-19 22-May-19 125 4.44% 55.56% 0%
Khatiyah Main 29-Sep-18 8-Oct-18 19-Jan-19 27-Jan-19 8 0.00% 0%
A4890 CommissioningKhatiyah Main Start of Production SET 1 29-Sep-18 1-Oct-18 19-Jan-19 20-Jan-19 1 0.08% 1.06% 0% 0.00%
A4900 CommissioningKhatiyah Main Commissioning and Startup SET 1 30-Sep-18 2-Oct-18 19-Jan-19 22-Jan-19 3 0.18% 2.29% 0% 0.00%
A4910 CommissioningKhatiyah Main Performance Tests SET 1 2-Oct-18 8-Oct-18 22-Jan-19 27-Jan-19 5 0.37% 4.59% 0% 0.00%
Khatiyah North 17-Oct-18 30-Oct-18 20-Jan-19 29-Jan-19 9 0.00% 0%
A4950 CommissioningKhatiyah North Start of Production SET 1 17-Oct-18 20-Oct-18 20-Jan-19 20-Jan-19 0 0.08% 1.06% 0% 0.00%
A4960 CommissioningKhatiyah North Commissioning and Startup SET 1 22-Oct-18 24-Oct-18 20-Jan-19 24-Jan-19 4 0.18% 2.29% 0% 0.00%
A4970 CommissioningKhatiyah North Performance Tests SET 1 24-Oct-18 30-Oct-18 24-Jan-19 29-Jan-19 5 0.37% 4.59% 0% 0.00%
Khatiyah South 1-Nov-18 9-Nov-18 17-Jan-19 26-Jan-19 9 0.00% 0%
A5010 CommissioningKhatiyah South Start of Production SET 1 1-Nov-18 3-Nov-18 17-Jan-19 17-Jan-19 0 0.08% 1.06% 0% 0.00%
A5020 CommissioningKhatiyah South Commissioning and Startup SET 1 1-Nov-18 4-Nov-18 17-Jan-19 21-Jan-19 4 0.18% 2.29% 0% 0.00%
A5030 CommissioningKhatiyah South Performance Tests SET 1 4-Nov-18 9-Nov-18 22-Jan-19 26-Jan-19 4 0.37% 4.59% 0% 0.00%
Jaleha Main 7-Nov-18 16-Nov-18 25-Mar-19 6-Apr-19 12 0.00% 0%
A5070 CommissioningJALM Start of Production SET 1 7-Nov-18 9-Nov-18 25-Mar-19 25-Mar-19 0 0.08% 1.06% 0% 0.00%
A5080 CommissioningJALM Commissioning and Startup SET 1 8-Nov-18 10-Nov-18 26-Mar-19 30-Mar-19 4 0.18% 2.29% 0% 0.00%
A5090 CommissioningJALM Performance Tests SET 1 10-Nov-18 16-Nov-18 31-Mar-19 6-Apr-19 6 0.37% 4.59% 0% 0.00%
Fahahil South 17-Nov-18 26-Nov-18 9-May-19 20-May-19 11 0.00% 0%
A5130 CommissioningFahahil South Start of Production SET 1 17-Nov-18 20-Nov-18 9-May-19 9-May-19 0 0.08% 1.06% 0% 0.00%
A5140 CommissioningFahahil South Commissioning and Startup SET 1 18-Nov-18 21-Nov-18 9-May-19 13-May-19 4 0.18% 2.29% 0% 0.00%
A5150 CommissioningFahahil South Performance Tests SET 1 21-Nov-18 26-Nov-18 18-May-19 20-May-19 2 0.37% 4.59% 0% 0.00%
Overall Individualctiv
Activity ID Activity Name Unit Quantity B/L ES Dtae B/L EF Dtae Start Finish Duration Progress Table
Weighted ity Weighted

Overall Individualctiv
Pre-comm/ Comm Phase Area Activity Name Unit Quantity B/L ES Dtae B/L EF Dtae Start Finish Duration
Weighted ity Weighted

Fahahil North 28-Nov-18 7-Dec-18 1-May-19 9-May-19 8 0.00% 0%


A5190 CommissioningFahahil North Start of Production SET 1 28-Nov-18 30-Nov-18 1-May-19 2-May-19 1 0.08% 1.06% 0% 0.00%
A5200 CommissioningFahahil North Commissioning and Startup SET 1 29-Nov-18 1-Dec-18 2-May-19 5-May-19 3 0.18% 2.29% 0% 0.00%
A5210 CommissioningFahahil North Performance Tests SET 1 1-Dec-18 7-Dec-18 6-May-19 9-May-19 3 0.37% 4.59% 0% 0.00%
Fahahil Main 8-Dec-18 17-Dec-18 15-May-19 22-May-19 7 0.00% 0%
A5250 CommissioningFahahil Main Start of Production SET 1 8-Dec-18 11-Dec-18 15-May-19 15-May-19 0 0.08% 1.06% 0% 0.00%
A5260 CommissioningFahahil Main Commissioning and Startup SET 1 9-Dec-18 12-Dec-18 15-May-19 18-May-19 3 0.18% 2.29% 0% 0.00%
A5270 CommissioningFahahil Main Performance Tests SET 1 12-Dec-18 17-Dec-18 19-May-19 22-May-19 3 0.37% 4.59% 0% 0.00%
0.00%
100.00%

10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
2- 90.00%

Week
4-

Cum Actual
Weekly Actual
B/L Cum. Plan
6-

B/L Weekly Plan

Revised Weekly Plan

Revised Weekly Actual


8-

Revised Cumulative Plan


Overall Construction

Revised Cumulative Actual


10
12
14
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2-Aug-18 16

W-75
18
20
22
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 9-Aug-18
24

W-76
26
28

Doha, Qatar
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 16-Aug-18 30

QATAR BRANCH
Cum Actual

W-77
1-
B/L Cum. Plan

3-
5-
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.05% 0.05% 23-Aug-18 7-

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION


W-78
9-
Revised Cumulative Plan

11
Revised Cumulative Actual

13
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.19% 0.14% 30-Aug-18 15

W-79
17
19
21
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.19% 0.00% 6-Sep-18

W-80
23
25
27
0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 1.30% 1.10% 13-Sep-18 29

W-81
1-
3-
5-
0.00% 0.17% 0.00% 0.17% 0.17% 0.00% 4.45% 3.15% 20-Sep-18 7-

W-82
9-
11
13
0.00% 0.17% 0.00% 0.17% 0.17% 0.00% 6.68% 2.23% 27-Sep-18
15

W-83
17
19

0.00% 0.17% 0.00% 0.17% 0.17% 0.00% 17.34% 10.66% 4-Oct-18 21


W-84

23
25
27
0.00% 0.17% 0.00% 0.17% 0.17% 0.00% 23.87% 6.53% 11-Oct-18 29
W-85

31
2-
4-
0.04% 0.21% 0.04% 0.21% 0.21% 0.04% 30.87% 7.00% 18-Oct-18 6-
W-86

8-
10
12
0.09% 0.30% 0.09% 0.30% 0.30% 0.09% 37.22% 6.35% 25-Oct-18
W-87

14
16
18
0.00% 0.30% 0.00% -0.30% 44.24% 7.03% 1-Nov-18 20
W-88

22
24
26
0.00% 0.30% 0.00% 0.00% 55.66% 11.41% 8-Nov-18 28
W-89

30
2-
4-
0.00% 0.30% 64.76% 9.10% 15-Nov-18

S-Curve
6-
W-90

8-
10
0.00% 0.30% 73.46% 8.70% 22-Nov-18 12
W-91

14
16
18
Pre-Commisioning & Commissioning Progress 0.00% 0.30% 81.01% 7.55% 29-Nov-18 20
W-92

22
24
26
0.00% 0.30% 87.25% 6.24% 6-Dec-18 28
W-93

30
Pre-Commisioning & Commisioning Progress "S" Curve

1-
3-
0.00% 0.30% 96.05% 8.80% 13-Dec-18 5-
W-94

7-
9-
11
13
0.00% 0.30% 100.00% 3.95% 20-Dec-18
15
W-95

17
19
21
0.00% 0.30% 100.00% 0.00% 27-Dec-18 23
W-96

25
27
1.11% 1.40% 100.00% 0.00% 3-Jan-19 29
W-97

31
2-
8.11% 9.52% 100.00% 0.00% 10-Jan-19 4-
W-98

6-
8-
9.89% 19.41% 100.00% 0.00% 17-Jan-19 10
12
14
15.67% 35.08% 100.00% 0.00% 24-Jan-19 16
18
20
7.95% 43.03% 100.00% 0.00% 31-Jan-19 22
24
26
0.00% 43.03% 100.00% 0.00% 7-Feb-19 28
2-
4-
0.00% 43.03% 100.00% 0.00% 14-Feb-19 6-
8-
1
0.00% 43.03% 100.00% 0.00% 21-Feb-19 1
1
1
0.13% 43.16% 100.00% 0.00% 28-Feb-19 1
2
2
0.00% 43.16% 100.00% 0.00% 7-Mar-19 2
PROJECT No. 3963 "

2
2
0.88% 44.04% 100.00% 0.00% 14-Mar-19 3
1-
3-
2.74% 46.78% 100.00% 0.00% 21-Mar-19 5-
7-
9-

5.26% 52.04% 100.00% 0.00% 28-Mar-19 11


13
15

4.33% 56.36% 100.00% 0.00% 4-Apr-19 17


19
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS

21

57.67% 23
1.31% 100.00% 0.00% 11-Apr-19
25
27
29
1.76% 59.44% 100.00% 0.00% 18-Apr-19
1
3
5
5.10% 64.54% 100.00% 0.00% 25-Apr-19
7
9
1
7.44% 71.98% 100.00% 0.00% 2-May-19
1
1
1
12.05% 84.03% 100.00% 0.00% 9-May-19
1
2
2
5.66% 89.68% 100.00% 0.00% 16-May-19
DATE: 25/Oct/18

10.32% 100.00% 100.00% 0.00% 23-May-19


W-99 W-100 W-101 W-102 W-103 W-104 W-105 W-106 W-107 W-108 W-109 W-110 W-111 W-112 W-113 W-114 W-115 W-116 W-117
Summary Status of Close-out and "S" Curve
8.5. CLOSE-OUT MEASUREMENT SHEET

PROJECT No. 3963

#REF!

CLIENT :QATAR PETROLEUM 25-Oct-18

SUBJECT : CLOSE-OUT MEASUREMENT SHEET

4% PREVIOUS WEEK CURRENT WEEK UP TO DATE

SER. DESCRIPTION Project Wt. WT. % PLANNED ACTUAL DEV. PLANNED ACTUAL DEV. PLANNED ACTUAL DEV.

1 ClOSE OUT & HANDOVER 2%


1.1 Khatiyah Main 0.39% 19.37% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00%
1.2 Khatiyah North 0.33% 16.67% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00%
1.3 Khatiyah South 0.33% 16.67% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00%
1.4 JALM 0.28% 13.87% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00%
1.5 Fahahil South 0.28% 13.87% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00%
1.6 Fahahil North 0.22% 11.17% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00%
1.7 Fahahil Main 0.17% 8.38% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00% 0.00% 0.000% 0.00%

OVERALL ClOSE OUT & HANDOVER 2.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
EPIC FOR REPLACEMENT OF OLD 3-PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS, DUKHAN

CLOSE-OUT PROGRESS (MONITORING WEIGHTAGE):


Individual
Overall
Activity ID Activity Name Unit Quantity Start Finish Duration Activity Progress Table
Weighted
Weighted
Close Out 2% Last week This week Todate Plan % Actual % Variance
Khatiyah Main 22-May-19 22-Jul-19 62 0.00%
Khatiyah Main Engineering / Vendor Documents SET 5 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Khatiyah Main As-built Drawings / Construction SET 130 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Khatiyah North 0.00%
Khatiyah North Engineering / Vendor Documents SET 5 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Khatiyah North As-built Drawings / Construction SET 130 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Khatiyah South 0.00%
Khatiyah South Engineering / Vendor Documents SET 5 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Khatiyah South As-built Drawings / Construction SET 130 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
JALM 0.00%
JALM Engineering / Vendor Documents SET 5 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
JALM As-built Drawings / Construction SET 130 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Fahahil South 0.00%
Fahahil South Engineering / Vendor Documents SET 5 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Fahahil South As-built Drawings / Construction SET 130 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Fahahil North 0.00%
Fahahil North Engineering / Vendor Documents SET 5 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Fahahil North As-built Drawings / Construction SET 130 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Fahahil Main 0.00%
Fahahil Main Engineering / Vendor Documents SET 5 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Fahahil Main As-built Drawings / Construction SET 130 22-May-19 22-Jul-19 62 0.14% 7.14% 0.00%
Week

Cum Act
Week Act
Cum. Plan
Week Plan
100

0
10
20
30
40
50
60
70
80
90

Overall Project C
0.00% 0.00% 0.00% 0.00% 22-Jan-19

100
0.00% 0.00% 0.00% 0.00% 29-Jan-19

101

Doha, Qatar
QATAR BRANCH
0.00% 0.00% 0.00% 0.00% 5-Feb-19

102
0.00% 0.00% 0.00% 0.00% 12-Feb-19

103
0.00% 0.00% 0.00% 0.00% 19-Feb-19

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION


104
0.00% 0.00% 0.00% 0.00% 26-Feb-19

105
0.00% 0.00% 0.00% 0.00% 5-Mar-19

106
0.00% 0.00% 0.00% 0.00% 12-Mar-19
107

0.00% 0.00% 0.00% 0.00% 19-Mar-19


108

0.00% 0.00% 0.00% 0.00% 26-Mar-19


109

0.00% 0.00% 0.00% 0.00% 2-Apr-19


110

0.00% 0.00% 0.00% 0.00% 9-Apr-19


111

0.00% 0.00% 0.00% 0.00% 16-Apr-19


112

0.00% 0.00% 0.00% 0.00% 23-Apr-19


S-Curve
113

0.00% 0.00% 0.00% 0.00% 30-Apr-19


114

Overall Project Close-Out


Close-Out "S"Curve

0.00% 0.00% 0.00% 0.00% 7-May-19


115

0.00% 0.00% 0.00% 0.00% 14-May-19


116

0.00% 0.00% 0.00% 0.00% 21-May-19


117

0.00% 0.00% 11.29% 11.29% 28-May-19


118

0.00% 0.00% 22.58% 11.29% 4-Jun-19


119

0.00% 0.00% 33.87% 11.29% 11-Jun-19


120

0.00% 0.00% 45.16% 11.29% 18-Jun-19


121

SEPARATORS IN ALL DEGASSING STATIONS


EPIC OF REPLACMENT OF THREE PHASE TEST

0.00% 0.00% 56.45% 11.29% 25-Jun-19


122

DATE:

0.00% 0.00% 67.74% 11.29% 2-Jul-19


123

0.00% 0.00% 79.03% 11.29% 9-Jul-19


25/Oct/18
124

0.00% 0.00% 90.32% 11.29% 16-Jul-19


125
Act
Act

Plan

Cum

0.00% 0.00% 100.00% 9.68% 23-Jul-19


Cum.

126
Week

0
10
20
30
40
50
60
70
80
90

0.00% 0.00% 100.00% 0.00% 30-Jul-19


100

127

0.00% 0.00% 100.00% 0.00% 6-Aug-19


128

You might also like