You are on page 1of 1

50 5700 50

1225 1250 1400 925 900


50x50mm.
TUBULAR SUPPORT

A3 (GA#10 CYCLONE WIRE


ON 50mmØ G.I.
2000 PIPE FRAME)

1050
(GA#10 SLIDING CYCLONE

50
B DOOR ON 50mmØ
G.I. PIPE FRAME)

2150
900

1050
925
NEW CYCLONE WALL
FINISH FLOOR LINE

50
1400

5700
SLIDING CYCLONE DOOR A 2 ELEVATION THRU A
- - SCALE (A3) 1:50 MTS.

1250
A6 A5 A4 A3 A2 A1 A'1 A'2 A'3 A'4 A'5 A'6
63500

30000 33500

6000 6000 6000 6000 6000 3500 6000 6000 6000 6000 6000

REHABILITATION OF NEW
EXISTING GENSET ROOM COMPRESSOR ROOM
B STORAGE
1225

AIR
COMP.
DRYER TANK BACKSIDE STORAGE AREA

5800
GENSET ROOM

6000
BACKSIDE STORAGE AREA

NEW CYCLONE WALL


WITH CYCLONE DOOR
SERVICE LADDER TO ROOF

B1
50

NEW CHB WALL UP

4000
PLASTERED/PAINTED
PLASTIC CURTAIN PLASTIC CURTAIN

B1 NEW

10189
400010000
FEMALE LOCKER
CH=2700

B2 STORAGE AREA
30000

4000
MALE

2011
2000 MALE TOILET STORAGE FOR OLD MACHINES WAREHOUSE AREA
CH=2400 TOILET
24000

NEW DRYWALL
FEMALE TOILET HT=UP TO BOT.OF BEAM OR SLAB FEMALE TOILET
CH=2400
4000

4000
NEW HALLWAY
B3

CH=2700
NEW
LOCKER/
5000

5050
MALE LOCKER
CH=2700 STORAGE AREA STORAGE AREA

REPAINT OF EXISTING STAIR


& CLEANING OF STAIR NOSING
3000

2950
1 CYCLONE WALL LAYOUT B4
WASH BASIN
ELEC.PANEL
CARGO LIFT CARGO LIFT

- - SCALE (A3) 1:50 MTS.


1500 4500

REPAINT OF EXISTING STAIR


& CLEANING OF STAIR NOSING
KEY PLAN
PROJECT TITLE: OWNER : REV. NO. DESCRIPTION CADD DATE A.S.R. SHEET CONTENT/S: SHEET NO.
CADD BY:

CCT CONSTRUCTORS - - - - DATE: 06.23.23

CORPORATION MSM PHILIPPINES MFG., INC.


CYCLONE WALL LAYOUT
SD-01
ARCHITECT
BUILDING-2 RENOVATION WORKS CHECKED BY:
DATE:
PJ. SOAN
06.23.23
ELEVATION THRU A

3RD FLR. PLANTERS PRODUCTS BUILDING, PRC NO: PTR NO:


109 ESTEBAN ST. LEGASPI VILLAGE, MAKATI CITY
TEL. NOS.: 810-2001 TO 03; FAX: 811-3090 TIN NO: ISSUED AT: MR. FUMIHISA MIYASAKA APPROVED BY: K. SETOYAMA REV. DATE:

ISSUED ON: #5 MOUNTAIN DRIVE, LISP II, BRGY. REAL, CALAMBA, LAGUNA
PRESIDENT DATE: 06.23.23 SHOP DRAWING JULY 19, 2023

CCT-QP-10.0-ENG D1 Rev. No.:0

You might also like