Professional Documents
Culture Documents
INDEX
750
STAIR SECTION
499
600
230 mm THK WALL 200MM THK. WALL
800
150 mm THK WALL 2500 SCENIC LIFT
SW
100 mm THK WALL VOID
200
RCC WALL 1500 498 1050 COVERED WITH
1050
750 750 750 720 W.C 1500
1145
1200
TILE DROP W.C 1500 1800 1800 11155
770
C94 FABRICATION
HIS TOILET 16
C - CHANGING ROOM OR
2500
1175 CLUB CLUB WIRE MESH C95
WC - WATER CLOSET C93 800
845
TOILET LIFT-5 LIFT-6
1450
J.C
1500
1405
1345
B - WASH BASINS W.C HER TOILET 17.72 M2
FHC - FIRE HOSE CABINET 1050 800 1590
26
STAIR-3
HK STORE - HOUSE KEEPING STORE BOARD ROOM
CLUB
OPENING
6595
1200
DN 5550 AS PER LIFT 74.70 M2
TREAD -300 MM
OPENING SCHEDULE SPECIFICATION
FHC
1980 RISER -150 MM
4542 03 NOS. OF RISER-25
02 TOTAL RISING HT.-
2000 3750 MM CLUB STAIR & 11485
750 UP LIFT LOBBY
3765
TD1 01
4245
LVL+19600
1500C89 E-DUCT
AT SLAB C88 C91 1800 C92
1500
TOP DISH WASH
7167
GD
LOBBY
HALLS & PERSONAL THEATRE
OPENING ONLY
107.07 M2
2925
HT.2400 MM OR AS PER INTERIOR D
2000
4147
2000 2000
900 1500
D2
C83 D 2059
AT SLAB GD
TOP KITCHEN C84 C86 C87
184.01 M2
KITCHEN COLD
2850
STEWARDING FOOD
TD STORE DISPENCE
5.68 SQ MT AREA
THEATER1-2 & PERSONAL 10.80 SQ MT
THEATER 731 900 700 2500 1500
OPENING ONLY D2
CHEF 'S
1665 OFFICE D2
5.1 SQ MT
1800
2100
POT WASH
2834
1200
5.67 SQ MT
14000
C76 C77
MAIN HALL PRE - FUNCTIONAL HALL C81
TDA C79
214.17 M2 164.28 M2
THEATER 3
HOT FOOD HOLDING CART AND SET UP
23565
HOT FOOD COOKING
18915
HOT FOOD COOKING
8400
1200
2100
AT SLAB TOP
SD1 BANQUET
C70
150
KITCHEN C74
SERVICE PASSAGE C68 C72
D
OPENING ONLY FHC FIRE DUCT AC DUCT
1500
2115
1583
BEVERAGE
230 230
BANQUET
1515
REFER PICK-UP
7.43 SQ MT
LIFT
4297
950
E. DUCT OP3
4340
3000
2100
01 13 1400
AT SLAB TOP 1500 2646
1600
BANQUET
1800 2000 GUEST
1050
FREEZER UP E. ROOM
2000
6.53 SQ MT
1500 STAIRS-2 D1 230
SERVICE
2300
2300
SERVICE
LIFT-4
LIFT
D 3985 150
1500 9600 26 14 SERVICE
2000
BANQUET KITCHEN & HALL 1
2100
D1 AREA
DN
2550
OPENING ONLY D
320
UP
1200
320
230
2140
1500
LVL+19600
1050
2140
1540
C61 C66
C62
C64 C65
1050
STAIR & CLEAN LINEN 1200 650
26 LIFT LOBBY
900
C55
LVL+19600
2000
14
SERVICE DN
STAIR -1 22.392
RAMP
2400
3150
D1 1200 900
01
ELECTRICAL ROOM & 13 W1 W1
2000
DRY WET
DUCT DUCT
1200
SOILED LINEN
900 C54A 1305
C54 1800
DUCT DUCT
FIRE
FIRE
FHC
4925
1950
MALL CURTAIN
LIFT-3
2400 5000
AC
2100
1409
1695
PROJECTOR
LOBBY C48
3740
4300
13645
ROOM
900
1500
PASSAGE
6120
D2 2550
DISH WASH, POT WASH ,CHEF'S OFFICE LVL+19975 LIFT-2 AS PER LIFT C52
SPECIFICATION 207
1297
LIFT-1
1200
SD1
2000
2500 2000
TD
2100
3450
D3 2500 900
2697
TD
TOILET DOOR
GRANITE FRAME
PERSONAL THEATER
750 WITH FOOD
7880
C40
C39 LVL+19975 C42 C44
FIRE ESCAPE ROUTE
AT SLAB TOP
2725
10965
3150
2393
TD1
ELECTRIC PANEL M.S. LADDER TO REACH 900
ROOM TRAP DOOR PROJECTOR ROOM 850
2000
1200
230
900
TD
D2
550 UP 4925
694 1000
OP2 5000
TH
3310
PROJECTOR
1200 900
1500
7773 900
2100
PROJECTOR
ROOM
230
AT SLAB TOP
4300
ROOM
13600
750
450
150 350
C29 C31 SCREEN-2 C35
W1
GARBAGE CHUTE 2551 207
2400
2000
2400
2650
1200
4350
AT BEAM
2500 BOTTOM
1950
2000
1050
750
3775
3450
230
2400
1000
OP1 OP2
TOILET (MALE) 1050 TDA
230
D1 C21
AT BEAM C19
1800
250
SMOKING
2100
3000
750
900
3450
6950
OP2 2400
SMOKING AREA 1050
D1
AT BEAM
1200
2320
950 BOTTOM
750 1761
750
1070
900
OP3 C11 C15
PROJECTOR
13300
1500
3840
4300
SERVICE AREA
ROOM
2395 5000
21300
4925
1200
4174
SCREEN-4
5000
4290
160+8
3150
900
600
750
1420
C1 C2 C3 C5 C6 C7
2500
TH