Professional Documents
Culture Documents
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
300 Lime Dozing
200
Dozing
650
250
MOTOR
ELEVATION + 450
P.G.L. ± 0.00
254
350
85
1465
30
E.G.L. - 300 E.G.L. - 300
254
1565
PVC ENCAPSULATED
FOOT REST
2550
2000
2550
300
1040 2000
1500
1485
1385
WATER TANK
2185
100
1000
250
1400
SEC A-A
250
300
250
250
250
250
0.8x2.25x2.55 1500
300 SEC A-A
600
1500 5.0x2.5x2.85
600
2.0x2.25x2.55 2.0x2.0x2.65
150
600
2.0x2.5x2.75
2.25x2.25x3.95
250
250
7400
5.0x2.5x2.85
3.5x4.0x3.75
1400
DATE REV NO DESCRIPTION
REVISION
1000
1130
300 PROJECT
Preparation of City Sanitation Plans, Feasibility Study Reports
3500 and Detailed Project Reports for Integrated Municipal Solid
1000
1000
MOTOR Waste Management, Comprehensive Wastewater Management,
HOUSING Crematoria and Riverfront Development Projects in Urban
Local Bodies of Bihar - Group 2 : Ara
400
300
CLIENT
3500 5250 Support Programme for Urban Reforms in Bihar (SPUR)
Urban Development & Housing Department, Govt. of Bihar
PLAN CONSULTANT
India office :
WBVHA Tower, 2nd Floor,580, Anandapur, Kolkata- 700 107
LAHMEYER Tel : 91 33 40176800/6826,Fax : 91 33 40176827
6021 E-mail : lahmeyer.kolkata@gmail.com
GKW CONSULT www.lahmeyer.com
SUB
TITLE:
TREATMENT PLANT DETAIL
LEGEND:-
100 mm ØVENT PIPE
DATE DRAWN CHECKED APPROVED SCALE
600X450 MM PRECAST RCC MANHOLE COVER 18.08.2014 AS DD SD 1:50
MOTOR DPR TENDER EXECUTION
DATE : DATE : DATE :
DRG NO : SPUR/BHR/ARA/FDPR/11 SHEET 1 OF 1 REV:01
JOB NO : 23-35-99002 SHEET A1