DISASTER RESILIENCE OF PUBLIC SCHOOL

INFRASTRUCTURE AND COMMUNITY (DR-PSIC)

TOILET BLOCK
1-T12
ARCHITECTURAL DRAWINGS
A B X C
13400

6500 6500

550 400 2575 950 2575 400 2575 950 2575 400 550

250
900

INCINERATOR

750
V1 V1 V1 V1

1
400

400
Changing
1

300 750 425 750 425 750 425 750 425 750
250

250
350 750 425 750 425 750

300 750 425 750 425 750 425 750 425 750
D3 D3 D3 Room

125 1050 125 1050

Urinal

1175 125 1050


1575
1300 1300 125 1300

Urinal
600
1325 1335 1335

Urinal
D3 600125600 D3

3450
D3
250 250 250

6250 6250
MALE FEMALE
D3
6000

5600

5600

6000
D3

1050 125 1050 125 1050


D3

5750

5750
1050

1300
F3 F3
Water Trough

1300
125 1050 125

Water Trough
125
125
D3 D3
8800

8800
F3 F3
1300 250 250 250 1300

2175

2175
2550
2650 2650

D3 D3
1050

250
250

250
250
D2 D2 1300
1300
D1 D1
400

400
2 2
2375 V2 900 250 1575 V1 1000 400 1000 1575 V1 250 900 V2 2375
1150

1150
1225 MM WIDE CORRIDOR Cement 1225 MM WIDE CORRIDOR Cement
Up Punning Finish F1 F1 Punning Finish Up
2500

2500
± 00.00 Lvl. ± 00.00 Lvl.
1200 1200
1025

1025
950

950
Up Up
RAMP RAMP
3
400

400
3
225 225
400 300
300 400 6100 400 6100

6500 6500

13400 FINISHING DETAILS:


X F1 38 mm PCC (1:2:4) with 1:1 cement punning with floor

A B C hardener (Dreitop FH, mapetop, Sika Chapdur or equivalent)

50 mm PCC (1:2:4) with 1:1 cement punning with floor


F2
GROUND FLOOR PLAN hardener (Dreitop FH, mapetop, Sika Chapdur or equivalent)
and water proffing (safe-crete or equivalent)
Area = 119.26 Sq. M. F3 Non-glazed Tile finish with 1:4 cement sand mortar

SHEET NO.
CLIENT PROJECT TITLE SHEET TITLE CONSULTANT PLANNING DESIGN TEAM AR-01
ENGINEER: Er. SALIN SHRESTHA STRUCTURE ER: Er. DEEPAK THAPA
GovenrmeN onftepal C ERMC S
Disaster Resilience of Public School GROUND FLOOR PLAN DESIGN & SUPERVISION CONSULTANT(DSC-1) A B
A
D
YC
IA
H
AR
Y
.A
rA
R
C
T
E
HT
:I CHECKED: DWG CODE:
NoianR
taleconurosticnAuhytoir Infrastructure and Community (DR-PSIC) ERMC/ SILT/ PACE/ CAGE JV JV I
G L DRAWN : Ar. SRISHTI PAUDEL APPROVED: 1-T12
CL
enarltevPem
oIrlcjtpem
l eoniaU
tE-dntuiociant E PACE T SCALE : 1:100 PAPER SIZE : A3 DATE: MAY 2018
A B X C
14300
6500 6500
450 6500 400 6100 400
450mm PROJECTION

400450
1 3

400
Ø110 RW Ø110 RW
DOWNPIPE DOWNPIPE

TERRACE
+3000.00 Lvl.
9800
8500

8100

8100
8500

9800
F2

3 3
450400

400
450400 6100 400 6100 400450
6500 6500

14300 FINISHING DETAILS:

X F1 38 mm PCC (1:2:4) with 1:1 cement punning with floor


hardener (Dreitop FH, mapetop, Sika Chapdur or equivalent)

A B C F2 50 mm PCC (1:2:4) with 1:1 cement punning with floor


hardener (Dreitop FH, mapetop, Sika Chapdur or equivalent)
and water proffing (safe-crete or equivalent)
ROOF PLAN F3 Non-glazed Tile finish with 1:4 cement sand mortar

SHEET NO.
CLIENT PROJECT TITLE SHEET TITLE CONSULTANT PLANNING DESIGN TEAM
AR-02
ENGINEER: Er. SALIN SHRESTHA STRUCTURE ER: Er. DEEPAK THAPA
GovenrmeN onftepal C ERMC S
Disaster Resilience of Public School FIRST FLOOR PLAN DESIGN & SUPERVISION CONSULTANT(DSC-1) A B
A
D
YC
IA
H
AR
Y
.A
rA
R
C
T
E
HT
:I CHECKED: DWG CODE:
NoianR
taleconurosticnAuhytoir Infrastructure and Community (DR-PSIC) ERMC/ SILT/ PACE/ CAGE JV JV I
G L DRAWN : Ar. SRISHTI PAUDEL APPROVED: 1-T12
CL
enarltevPem
oIrlcjtpem
l eoniaU
tE-dntuiociant E PACE T SCALE : 1:100 PAPER SIZE : A3 DATE: MAY 2018
+3450 TOP
LEVEL +3450 TOP
+3000 TOP LEVEL
LEVEL +3000 TOP
LEVEL
V2 V1 V1 V2

D2 D1 D1 D2

±000 PLINTH
LEVEL ±000 PLINTH
-450 GROUND LEVEL
LEVEL -450 GROUND
FRONT ELEVATION LEVEL
SIDE ELEVATION 2

+3450 TOP +3450 TOP


LEVEL LEVEL
+3000 TOP +3000 TOP
LEVEL LEVEL

V1 V1 V1 V1

±000 PLINTH ±000 PLINTH


LEVEL LEVEL
-450 GROUND -450 GROUND
LEVEL LEVEL

BACK ELEVATION SIDE ELEVATION 1

COLOR DETAILS
DESCRIPTION COLOR TYPE
A. WALL

Interior Cream or Ivory Distemper

Exterior Light Yellow Weather Coat


B. CEILING
Interior White Distemper
Exterior White Weather Coat
C. PROJECTION Grey Weather Coat
D. DOORS &
Dark Brown Powder Coated
WINDOWS
E. PLINTH BAND Grey Weather Coat
SHEET NO.
CLIENT PROJECT TITLE SHEET TITLE CONSULTANT PLANNING DESIGN TEAM AR-03
ENGINEER: Er. SALIN SHRESTHA STRUCTURE ER: Er. DEEPAK THAPA
GovenrmeN onftepal C ERMC S
Disaster Resilience of Public School SECOND FLOOR PLAN DESIGN & SUPERVISION CONSULTANT(DSC-1) A B
A
D
YC
IA
H
AR
Y
.A
rA
R
C
T
E
HT
:I CHECKED: DWG CODE:
NoianR
taleconurosticnAuhytoir Infrastructure and Community (DR-PSIC) ERMC/ SILT/ PACE/ CAGE JV JV I
G L DRAWN : Ar. SRISHTI PAUDEL APPROVED: 1-T12
CL
enarltevPem
oIrlcjtpem
l eoniaU
tE-dntuiociant E PACE T SCALE :
1:100 PAPER SIZE : A3 DATE: MAY 2018
2 1

+ 3450 PARAPET LEVEL


+ 3000 TOP LEVEL
275125 450

375 275125 450


TERRACE

125 MM THICK RCC SLAB 300x400


RCC BEAM 450
125 375
V2 V1
1100

250x125
RCC LINTEL
20 MM CEMENT
3900

3000
TILE FINISH

2875
PLASTER (INSIDE)
125

UPTO 1200 MM HEIGHT SS PARTITION


D2
250x125

2225
2100

2100
RCC LINTEL
1375

1200
RCC SILL
CORRIDOR TILE FLOORING FEMALE
SQUAT
± 0.00 PLINTH LEVEL
± 00.00 Lvl. ± 00.00 Lvl.

- 450 GROUND LEVEL


150 300

450
750

-450 Lvl.
FLOOR FINISH - F3
SCREEDING
75MM THICK P.C.C. (1:2:4)
200MM THICK BOULDER SOLING
COMPACTED EARTH

SECTION AT X-X

SHEET NO.
CLIENT PROJECT TITLE SHEET TITLE CONSULTANT PLANNING DESIGN TEAM
AR-04
ENGINEER: Er. SALIN SHRESTHA STRUCTURE ER: Er. DEEPAK THAPA
GovenrmeN onftepal C ERMC S
Disaster Resilience of Public School DESIGN & SUPERVISION CONSULTANT(DSC-1) A B
A
D
YC
IA
H
AR
Y
.A
rA
R
C
T
E
HT
:I CHECKED: DWG CODE:
NoianR
taleconurosticnAuhytoir Infrastructure and Community (DR-PSIC)
SECTION
ERMC/ SILT/ PACE/ CAGE JV JV I
G L DRAWN : Ar. SRISHTI PAUDEL APPROVED: 1-T12
CL
enarltevPem
oIrlcjtpem
l eoniaU
tE-dntuiociant E PACE T SCALE : 1:50 PAPER SIZE : A3 DATE: MAY 2018
3 2 1

750 900 1000


53 644 53 53 794 53 53 894 53

53

53

53
METAL PLATE METAL PLATE METAL PLATE

METAL PLATE METAL PLATE METAL PLATE


2102

2102

2102
2100

2100

2100
2049

2049

2049
METAL PLATE METAL PLATE METAL PLATE

12mm CLEARANCE 12mm CLEARANCE 12mm CLEARANCE

3 2 1

DOOR-D3 (13 Nos.) SECTION AT 3-3 DOOR-D2 (2 Nos.) SECTION AT 2-2 DOOR-D1 (2 Nos.) SECTION AT 1-1

3275
DOORS & WINDOWS SCHEDULE:
S.N. SYMBOL SIZES NOS. REMARKS
375

1. V1 2575 x 375 6 MS Frame


2. V2 3275 x 375 2 MS Frame
VENTILATION V2 (2 NOS.) 3. D1 2
1000 x 2100 Powder Coated Door
(Scale= 1:25)
4. D2 900 x 2100 2 Powder Coated Door
5. D3 750 x 2100 13 Powder Coated Door

TOTAL 25
2575
375

VENTILATION V1 (6 NOS.)
(Scale= 1:25)

SHEET NO.
CLIENT PROJECT TITLE SHEET TITLE CONSULTANT PLANNING DESIGN TEAM AR-05
ENGINEER: Er. SALIN SHRESTHA STRUCTURE ER: Er. DEEPAK THAPA
GovenrmeN onftepal C ERMC S
Disaster Resilience of Public School DOOR WINDOW DETAILS DESIGN & SUPERVISION CONSULTANT(DSC-1) A B
A
D
YC
IA
H
AR
Y
.A
rA
R
C
T
E
HT
:I CHECKED: DWG CODE:
NoianR
taleconurosticnAuhytoir Infrastructure and Community (DR-PSIC) ERMC/ SILT/ PACE/ CAGE JV JV I
G L DRAWN : Ar. SRISHTI PAUDEL APPROVED: 1-T12
CL
enarltevPem
oIrlcjtpem
l eoniaU
tE-dntuiociant E PACE T SCALE : PAPER SIZE : A3 DATE: MAY 2018
5100

Up

1025
RAMP

RAMP PLAN

6500

Cement Punning Finish


250

1200 5100
LVL ±000
450

450
Lvl -450

38 MM SCREED WITH CEMENT PUNNING

675
75 THICK P.C.C. (1:2:4) 250x675 TIE BEAM

1200
200 THICK GRAVEL SOLING AT - 525 LVL.
COMPACTED EARTH

TYPICAL RAMP SECTION


(Scale= 1:25)

SHEET NO.
CLIENT PROJECT TITLE SHEET TITLE CONSULTANT PLANNING DESIGN TEAM AR-06
ENGINEER: Er. SALIN SHRESTHA STRUCTURE ER: Er. DEEPAK THAPA
GovenrmeN onftepal C ERMC S
Disaster Resilience of Public School RAMP DETAILS DESIGN & SUPERVISION CONSULTANT(DSC-1) A B
A
D
YC
IA
H
AR
Y
.A
rA
R
C
T
E
HT
:I CHECKED: DWG CODE:
NoianR
taleconurosticnAuhytoir Infrastructure and Community (DR-PSIC) ERMC/ SILT/ PACE/ CAGE JV JV I
G L DRAWN : Ar. SRISHTI PAUDEL APPROVED: 1-T12
CL
enarltevPem
oIrlcjtpem
l eoniaU
tE-dntuiociant E PACE T SCALE : PAPER SIZE : A3 DATE: MAY 2018
SECTION

350

2650
500

300x400
Grab Bar
RCC BEAM
Non-glaze Tile

125 325
V1
500

2175

Flip-up Grab Bar


575

Flip-up Grab bar


Wash Basin Grab Bar

Wash Basin 150 450 575 487 513


D2
450

2100
1575 1000
150

1200

1000
750

638
D1

SECTION
TOILET FOR DIFFERENTLY-ABLED
SECTION AT 1-1
TOILET FOR DIFFERENTLY-ABLED
PLAN

SHEET NO.
CLIENT PROJECT TITLE SHEET TITLE CONSULTANT PLANNING DESIGN TEAM AR-08
ENGINEER: Er. SALIN SHRESTHA STRUCTURE ER: Er. DEEPAK THAPA
GovenrmeN onftepal C ERMC S
Disaster Resilience of Public School DESIGN & SUPERVISION CONSULTANT(DSC-1) A B
A
D
YC
IA
H
AR
Y
.A
rA
R
C
T
E
HT
:I CHECKED: DWG CODE:
NoianR
taleconurosticnAuhytoir Infrastructure and Community (DR-PSIC) TOILET FOR DIFFERENTLY-ABLED DETAILS ERMC/ SILT/ PACE/ CAGE JV JV I
G L DRAWN : Ar. SRISHTI PAUDEL APPROVED: 1-T12
CL
enarltevPem
oIrlcjtpem
l eoniaU
tE-dntuiociant E PACE T SCALE : PAPER SIZE : A3 DATE: MAY 2018
300x400
RCC BEAM

SECTION
V1
750

Hanger
V1 450
Wash Basin

275 570 180

375

287
Non-glaze Tile

75
D3
750

75

1200

1065
1300

400
550

750
Wash Basin

800
Incinerator

150
Hanger
300

212

625

600
75
350 505 445

350

275
Ground Level

SECTION

CHANGING ROOM FOR FEMALE CHANGING ROOM FOR FEMALE


PLAN SECTION AT 2-2

SHEET NO.
CLIENT PROJECT TITLE SHEET TITLE CONSULTANT PLANNING DESIGN TEAM AR-09
ENGINEER: Er. SALIN SHRESTHA STRUCTURE ER: Er. DEEPAK THAPA
GovenrmeN onftepal C ERMC S
Disaster Resilience of Public School DESIGN & SUPERVISION CONSULTANT(DSC-1) A B
A
D
YC
IA
H
AR
Y
.A
rA
R
C
T
E
HT
:I CHECKED: DWG CODE:
NoianR
taleconurosticnAuhytoir Infrastructure and Community (DR-PSIC) CHANGING ROOM FOR FEMALE DETAILS ERMC/ SILT/ PACE/ CAGE JV JV I
G L DRAWN : Ar. SRISHTI PAUDEL APPROVED: 1-T12
CL
enarltevPem
oIrlcjtpem
l eoniaU
tE-dntuiociant E PACE T SCALE : PAPER SIZE : A3 DATE: MAY 2018
900
110 110

100
680

100
Conical Cap Conical Cap
Y
50Ø Hole On Two Sides

300
300
110

4
8Ø MS Grill mesh at

61
750

25mm Spacing For

433
V1

433
640

Burning Waste

X X

°
135
MS Clamp Secured
To Wall
150x150 Opening ISNB 135 MS Pipe
Y On Wall To Drop Waste ISNB 135
MS Pipe

1402
1402
200x200 Metal Door ISNB 135 MS
To Prevent Smoke 450 Pipe
Entering Latrine
MS Clamp Secured
To Wall
Handrail
INCINERATOR PLAN 75 mm Thick Precast
75 mm Thick Precast Slab Cover
Slab Cover
375

75
75

75
75

400
300 150

800
200x200 Metal Door To

900
Prevent Smoke Entering

1300

1250
150
150x150 Opening 150x150 Opening With
Latrine On Wall To Drop Waste 200x200 Metal Flap On
Latrine Side
8Ø MS Grill mesh
625 At 25mm Spacing For 630
600

350 75
Burning Waste
75mm RCC Band 75mm RCC Band

275
180 180

275
Brick On Edge
Ground Level Ground Level

75 mm Thick P.C.C. (1:2:4)


SECTION AT Y-Y 100 mm Gravel Soiling
Compacted Earth

SECTION AT X-X

SHEET NO.
CLIENT PROJECT TITLE SHEET TITLE CONSULTANT PLANNING DESIGN TEAM AR-07
ENGINEER: Er. SALIN SHRESTHA STRUCTURE ER: Er. DEEPAK THAPA
GovenrmeN onftepal C ERMC S
Disaster Resilience of Public School INCINERATOR DETAILS DESIGN & SUPERVISION CONSULTANT(DSC-1) A B
A
D
YC
IA
H
AR
Y
.A
rA
R
C
T
E
HT
:I CHECKED: DWG CODE:
NoianR
taleconurosticnAuhytoir Infrastructure and Community (DR-PSIC) ERMC/ SILT/ PACE/ CAGE JV JV I
G L DRAWN : Ar. SRISHTI PAUDEL APPROVED: 1-T12
CL
enarltevPem
oIrlcjtpem
l eoniaU
tE-dntuiociant E PACE T SCALE : PAPER SIZE : A3 DATE: MAY 2018
887 887 887 887 Tile Upto 800mm Height
600 From Slab Level

800
150
300
300
3125 3125 Cement Punning Over Screed
100mm Thick RCC Slab
6250 Cement Plaster

WATER TROUGH WATER TROUGH


PLAN SECTION AT Z

Tile Upto 650mm Height


600 From Slab Level

650
150
Y

300
Z
100mm Thick RCC Slab

Cement Punning Over Screed

450
100mm Thick RCC Slab

300
Cement Plaster
300

450
300

250mm Thick Cross Wall 125mm Thick Cross Wall 250mm Thick Cross Wall
WATER TROUGH
SECTION AT Y
WATER TROUGH
ELEVATION

SHEET NO.
CLIENT PROJECT TITLE SHEET TITLE CONSULTANT PLANNING DESIGN TEAM AR-10
ENGINEER: Er. SALIN SHRESTHA STRUCTURE ER: Er. DEEPAK THAPA
GovenrmeN onftepal C ERMC S
Disaster Resilience of Public School DESIGN & SUPERVISION CONSULTANT(DSC-1) A B
A
D
YC
IA
H
AR
Y
.A
rA
R
C
T
E
HT
:I CHECKED: DWG CODE:
NoianR
taleconurosticnAuhytoir Infrastructure and Community (DR-PSIC) WATER TROUGH DETAILS ERMC/ SILT/ PACE/ CAGE JV JV I
G L DRAWN : Ar. SRISHTI PAUDEL APPROVED: 1-T12
CL
enarltevPem
oIrlcjtpem
l eoniaU
tE-dntuiociant E PACE T SCALE : PAPER SIZE : A3 DATE: MAY 2018

You might also like