You are on page 1of 1

FOR REFERENCE ONLY

27 28 29 30 31 32

7500 7500 7500 7500 7500

VS SHAFT VE SHA

5000
600
600

600

600
2720

A
FLOAT VALVE
FLOAT VALVE FLOAT VALVE
01
8000
BFV
Ø200 SUCTION HEADER 8000
09
MEP
600 7000
01 FC FIRE PUMP (DUTY)
01 CUTOUT 645
1420 2000
ABOVE FLOAT VALVE

470
Ø200 01 09 PLENUM

4500
FIRE WATER TANK - 1 STR FIRE WATER TANK - 2 DOM. WATER TANK - 1
FC
5000

600

5000
1550

EFFECTIVE WATER DEPTH-2.45M BFV Ø150 EFFECTIVE WATER DEPTH-2.45M EFFECTIVE WATER DEPTH-2.4M FM DOM. WATER TANK - 2 FM
REQUIRED CAPACITY 98 m³ FC BFV REQUIRED CAPACITY 98 m³ REQUIRED CAPACITY 50 m³ EFFECTIVE WATER DEPTH-2.4M

3000
FM FM REQUIRED CAPACITY 50 m³
Ø20 BALL Ø20 BALL
20Ø BALL TAP
TAP TAP
Ø150 09
BFV
450

BFV 09 09
MH MH
500

20Ø BALL TAP 07 06 07 06


09 BFV STR BFV B
500
FC FC
GV GV GV GV
JOCKEY PUMP

1500
A
STR SUB-METER STR SUB-METER
825

FLOW METER GV GV
STR STR
Ø100
Ø100 CITY MAIN WATER SUPPLY PIPE RUN AT H/L BT GV GV GV GV

Ø100 CITY MAIN PIPE


BT FC FC

FIRE PUMP ROOM Ø100 DOMESTIC


MACHINE ROOM
+32.30 m 600 WATER MAIN HEADER MEP
ALARM GONG
DOMESTIC PUMP CUTOUT
Ø200 DISCHARGE HEADER MACHINE ROOM
Ø150 PUMP TEST CONNECTION PIPE Ø20 CWS
Ø20 CWS ABOVE
CUTOUT Ø100 CITY MAIN WATER SUPPLY PIPE RUN AT H/L Ø100 CITY MAIN WATER SUPPLY PIPE RUN AT H/L
FOR
MEP Ø100 WATER SUPPLY PIPE RUN AT H/L
Ø100 CITY MAIN WATER SUPPLY PIPE RUN AT H/L
Staircase 5 Ø100 CITY MAIN WATER SUPPLY PIPE RUN AT H/L

Ø65 WATER SUPPLY PIPE RUN AT H/L


Ø100 CITY MAIN WATER SUPPLY PIPE RUN AT H/L
Ø100 WATER SUPPLY PIPE RUN AT H/L
Ø100 CITY MAIN WATER SUPPLY PIPE RUN AT H/L
Ø65 WATER SUPPLY PIPE RUN AT H/L

Ø65 WATER SUPPLY PIPE RUN AT H/L

Ø65 WATER SUPPLY PIPE RUN AT H/L

EMPLOYER/OWNER ENGINEER CONTRACTOR DATE


VERSION DATE DESCRIPTION DRAWN POSITION NAME SIGNATURE METRO MANILA SUBWAY PROJECT DD_MON_YEAR
VER MM/DD/YY DESCRIPTION_1 DRAWN
PHASE 1 SCALE
PREPARED BY: PME DESIGNER SCALE
TWO UNDERGROUND STATIONS (ANONAS & CAMP AGUINALDO) and TUNNELS
VER MM/DD/YY DESCRIPTION_2 DRAWN REPUBLIC OF THE PHILIPPINES SHEET No.
SUMITOMO MITSUI CHECKED BY: DM/DPM K. MIMURA PACKAGE 103 SHT_NO
DRAWN
DEPARTMENT OF TRANSPORTATION
VER MM/DD/YY DESCRIPTION_3 CONSTRUCTION CO., LTD
DOTr RAILWAY SECTION DRG No.
DRAWN
NOTED BY: PM T. DATE LEVEL DWG_NO
VER MM/DD/YY DESCRIPTION_4
SYSTEM DRG S. REV. NO.
VER MM/DD/YY DESCRIPTION_5 DRAWN APPROVED BY: PD H. YAMAJI DRAWING DETAIL DWG_TYPE REV

You might also like