AGENDA RESPONSIBLE
1.0 Review and confirmation of previous meeting minutes ALL
2.0 Design
a. Chapel side design study on enclosure ALU
b. Air Ducts from GSC1 to Lifestyle ALU/DCI
3.0 Schedule Management
a. Revised Detailed Schedule ALU
b. S-Curve ALU
c. Permit status ALU
d. Submittal schedule ALU
e. Material Delivery schedule ALU
f. Manpower loading ALU
g. Equipment list with utilization schedule ALU
h. Detailed shop drawings
4.0 Contract Management
a. Updated List of sub-contractors ALU
b. Bonds & Insurances ALU
AGENDA RESPONSIBLE
5.0 Construction Management
a. Proposed Temfacil Plan ALU
b. Soil Treatment ALU
c. MEPF Equipment Procurement Status ALU