150mm Oversite reinforced with 6mm

BRC wire mesh concrete ground slab


±0.000
on 300m well compacted hardcore
A B C O N M D E F 150
21830 300
-0.750

750
6000 5015 4815 6000

2300
6000 1800 1835 1380 1180 1835 1800 6000

1270
F10 F9 23Omm thick Masonry strip wall
F4 F11 -2.30 230
F4

230
C4 C2 C2 C2 C4 50
7 7

300
700
2000

2000
F8 F5 y8-300 mm c/c Y-12
F5
SECTION 1-1 Typical plinth beam section
C6 C2 C2 C4
C3 C3
6 6

2 2 150mm Oversite reinforced with 6mm


BRC wire mesh concrete ground slab
±0.000
on 300m well compacted hardcore
5600

5600
172°

750
-0.750
F7 Ground level
F5
F5 F5
F8

2300
1550
C5 C2 C2 C2 23Omm thick Masonry strip wall
C3 C3
5 5 230
50
700
5200
3600

3600
F5 SECTION 1-1
F6 F6 F6
F12
2

F3 F3
22000

22000
230
C5 C2 C1 C1 C2 C5
4 4 150mm Oversite reinforced with 6mm
BRC wire mesh concrete ground slab
2

±0.000
on 300m well compacted hardcore
3600

3600
150
F5 F6 F6 F6
9 9 -0.750

750
F3 F3 300
C5 C2 C1 C1 C2 C5 Ground level
3 3

1270
3600

3600
23Omm thick Masonry strip wall
2200 -2.30 230

F5

230
F6 F6 F6 50
2

F3 F3

300
C5 C2 C2
2400

2200
C1 C1 C5
2 2 700
2200

y8-300 mm c/c Y-12


c20 RC strip foundation Typical plinth beam section
SECTION 2-2
2

2200
2400
3600

3600
230
700
150mm Oversite reinforced with 6mm
230
700 BRC wire mesh concrete ground slab
F1 F1 F1
1 1000
F1 1 ±0.000
F2 F2 on 300m well compacted hardcore
C4 C2 C2 C4
1 1
1800

1800
700

230

C1 C1
-0.750

750
1 1
1800
1800 Ground level
6000 1800 1835 1380 1180 1835 1800 6000

2300
6000 1800 6230 1800 6000

1270
21830
23Omm thick Masonry strip wall
-2.30
A B C O N M D E F

230
50 SECTION 1-1

Region PWANI Drawing name Riverbed & Down stream Mr. Innocent Komba
Client
PROPOSED 1-STORE RESIDENTIAL HOUSE Municipality KISARAWE Drawing no. 00-A P.O. Box ...... ............., Tanzania
General Notes
TO BE BUILT ON PLOT NO. Street no. KISOPWA Date June 2022 1. All dimensions are in cm
Consultant
BLOCK ... AT KISOPWA STREET , Block no. Block no. Scale Not to scale 2. Depth of foundations may change due to subsoil condition
KILUVYA - KISARAWE PWANI REGION Plot no. Plot no. Drawn by Eng .Brightson Amon 3. For all stone masonry work the cement ratio is 1:3
Contractor
Checked by Eng..........