You are on page 1of 1

LIST OF DRAWINGS

(i) FOUNDATION LAYOUT PLAN /ST/01


(ii) SEMI RAFT FOUNDATION DETAILS /ST/02
(iii) STRIP FOOTINGS AND SEMI RAFT SECTION X-X DETAILS /ST/03
(iv) PLINTH/GROUND FLOOR SHUTTERING PLAN /ST/04
(v) COLUMNS DETAILS /ST/05
(vi) STAIR CASE DETAILS /ST/06
(vii) RAMP DETAILS /ST/07
(Viii) RAMP SECTION FX-FX DETAILS /ST/08
(ix) FIRST FLOOR SHUTTERING PLAN /ST/09
(x)FIRST FLOOR BEAMS ELEVATION DETAILS /ST/10
(xi)FIRST FLOOR SLAB REBARS DETAILS /ST/11
(xii)SERVICE FLOOR SHUTTERING PLAN /ST/12
(xiii)SERVICE FLOOR BEAMS ELEVATION DETAILS /ST/13
(xiv)SERVICE FLOOR SLAB REBARS DETAILS /ST/14
(xv)SERVICE ROOF SLAB REBARS DETAILS /ST/15
(xvi)ROOF BEAMS LAYOUT PLAN /ST/16
(xvii)ROOF BEAMS ELEVATION DETAILS /ST/17
(xviii)ROOF TRUSSES LAYOUT PLAN /ST/18
(xix)ROOF TRUSSES ELEVATION /ST/19
(xx)ROOF TRUSSES DETAILS /ST/20
(xxi)SLAB SHUTTERING PLAN AND
BEAMS ELEVATION DETAILS /ST/21
(xxii)SLAB REBABS DETAIL AT LEVEL 4.000M /ST/22
(XXiii)SERVICE ROOF SHUTTERING PLAN /ST/23
(XXiV)SERVICE ROOF BEAMS ELEVATION DETAILS /ST/24

DESIGNED RONGO CHARLES


DRG. TITLE NO REVISIONS D NO REVISIONS D NOTE
PROPOSED CONSTRUCTION OF KYELA DISTRICT HOSPITAL LIST OF DRAWINGS This drawing is the property of
.....................................DCONS DRAWN RONGO CHARLES

CHECKED SIMON MBOIVOI


TO BE BUILT AT KYELA DISTRICT MBEYA Tanzania Buildings Agency and may not .......................................CEB APPROVED C.ENG.LUGEMARILA SCALE 1:50
be copied or used without the prior DATE AUGUST, 2020

MINISTRY OF WORKS, TRANSPORT AND COMMS - TANZANIA BUILDINGS AGENCY permission of the Chief Executive .......................................CLIENT DRG No.
ST/00

You might also like