700
'h' Varies to
450
suit road camber.
h=75~230
2457
9000 C-C B-B
300 8700
C
4074
185 Curtain wall
Profile of seat for approach slab. Ballast wall 700
155
B B
450
1695
1200
300 300 300 300
2295
300
300
300
300
10 chamfer
C 280x280x52
thick bearing pad
600
1000
PLAN Drg. No. MSL/B/136
R.L 95.55m Bearing plinth
9000
1955 5090 1955
Seat for approach slab
300 300
Ballast wall
400
300
shoulder
955
955
All bored cast in situ piles All bored cast in situ piles 150
655
shall be end socketed shall be end socketed Rubble paving in 1:3 cement
minimum of 1000 mm minimum of 1000 mm sand mortar. Paving to be done with 1.5
into hard rock. into hard rock. selected rubble having a flat top surface.
Bearing plinth Centre line of Bearing. 1
Curtain wall
450
ELEVATION OF ABUTMENT ELEVATION OF WINGWALL 450
3000 3000
300 300
300 300
800
800
300
300
600 600
4000
4000
9600
9600
8400
9600
9600
8400
7800
7800
4000
4000
600 600
300
300
800
800
300 300
700 1600 700 700 1600 700 300 300
3000 3000
PLAN OF ABUTMENT
SHOWING ARRANGEMENT OF BORED PILE
Remarks:
Drawing NO: Drawing TITLE Drawn By: Checked By: Designed By:
ACCESS ROAD TO THE MACHINERY YARD OF RR CONSTRUCTION GENERAL DETAILS Ganga Umesh U.L.ALUTHAPALA,
Senior Design Engineer,
RR/WP/K/2 ABUTMENT & B Sc Eng., M Eng.(Structural),C Eng., MIESL,
BRIDGE ACROSS IRRIGATION CANAL WING WALL
Scale:
AS SHOWN
Date:
10/03/2017
Mob No- +94 773056425,+94714491029
u_aluthapala@yahoo.co.uk