Professional Documents
Culture Documents
Peter’s College
Iligan City
College of Engineering
Submitted to:
Submitted by:
Kim S. Deygabi
TABLE OF CONTENTS
Title Page i
I. INTRODUCTION 2
III. CALCULATION
B. GENERATOR EFFICIENCY 7
C. FRICTION LOSS 7
D. TURBINE EFFICIENCY 7
E. PRESSURE EXTRACTION 8
V. BOILER 18
IX. TS DIAGRAM 21
COAL FIRE POWER PLANT
Peak Demand: 63 MW
Design Load: 59 MW
Base Load: 25 MW