You are on page 1of 1

Stairwell Pressurization

OUTSIDE DESIGN TEMPRATURE To (46 c) 319 K


BUILDING DESIGN TEMPRATURE Tb (22 c) 295 K
TEMPRATURE FACTOR (B) -0.882418575 Pa/m

NO. OF STORY 7
HEIGHT PER STORY 5 m

Total Area of Exterior Building Wall Per Story 800 m2


Leakage Area of Building with Exterior Tight Wall 0.00007 area ratio

TOTAL AREA OF STAIRWELL PER STORY 130 m2


Leakage Area of Stairwell With Average Wall 0.000014 area ratio
Area of the Gap Around each Stairwell Door 0.048 m2

Area Between Building & Outlet (Abo) 0.028 m2


Area Between Stair & Building (Asb) 0.04982 m2

minimum pressure diffrence at the top of the stair(dP sbt) 20 Pa


maximum pressure diffrence at the bottom of the stair(dP sbb) 54 Pa

Q(Volumetric Flow Rate) 1.76 m3/s


Q(Volumetric Flow Rate)+10% Safety 1.94 m3/s

In Case Of exterior Door Open


Velocity Through The Door 2.16 m/s
Area Of The Door 2.20 m2
Q(Volumetric Flow Rate) 4.75 m3/s

Q(Volumetric Flow Rate) 6.69 m3/s