FIRE EXTINGUISHER

INSPECTION REPORT

Project : Date Inspected Date :


Site : Make :

Item Model :

Month SL NO …………………TO……………….……….
(P) Inspected & Satisfactory (X) Required Re-filling/damage
Compone SL NO SL NO SL NO SL NO SL NO SL NO SL NO SL NO
nt
Condition/Fault to be checked
Pressure reading within green
Pressure

section
Gauge

Gauge clean & legible


Gauge free from damage
Free from damage
Hoses Contents Cylinder

Label clean & legible


Owner clearly identified
Weight within specifications

Cylinder inverted and ‘bumped’ to


loosen contents (dry chemical only)
Hose free from obstructions, end cap
in position (Where applicable)
Connections checked for tightness
Hose free of cracks and ultraviolet
light deterioration
Inspection Safety

Safety pin secured from accidental


Pin

displacement

Attached and marked by competent


Tag

person within last three months.

Attachment point secure & restrains


extinguisher
Attachment
Points and
Signage

Fire extinguisher sign in place &


correct type

Inspected by : Sign :
……TO……………….……….
g/damage
Remarks
TAKREER CARBO

No NAME POSITION COMPANY

1 ME RAJA AFZAL SUPERVISOR TAHTAN

2 MR.EHSAN KAUSHAR SUPERVISOR TAHTAN

3 MD.RASHID HSE TAHTAN

4 MD.SHAHID HSE TAHTAN

5 Mr Vidyanand HSE TAHTAN

6 Mr Jibin HSE TAHTAN

7 Mr Danish HSE TAHTAN

8 Mr Imran HSE TAHTAN

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24
25

26

27

28

29

30

31

32

33

34

35

36
TAKREER CARBON BLACK & DELAYED COKER PROJECT
FIRST AIDER REGISTER

CONTACT NO. PKG NO. TPC CERTIFICATE NO. EXPIRY DATE

563830769 2 SWS-BFA-270615-24 6/26/2016

2 SWS-BFA-270615-22 6/26/2016

501327105 2 SWS-BFA-270615-23 6/26/2016

567990450 2 SWS-BFA-270615-21 6/26/2016

4 SWS-BFA-270615-20 11/26/2016

4 SWS-BFA-270615-19 11/26/2016

4 SWS-BFA-270615-18 11/26/2016

4 SWS-BFA-270615-17 11/26/2016
STATUS REMARKS

On Site

On Site

On Site

On Site

On Site

On Site

On Site

On Site
CARBON BLACK AND DELAYED COKER PROJECT
GENERATOR SET DAILY CHECKLIST

LocatioDate Inspected Month:


Sr. No. Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Is the generator operated or started by
1 authorised personnel?
Is the generator was Color Coded issued by
2 Samsung Electrical Inspectors?
3 Is the generator physical are neat and clean?
Is sorrounding near generator area clean and
4 clear from obstruction?
Is the generator away from loose materials and
5 flammble chemicals?
6 Are safety sign in place?
Are all fighting equipment well place and easy
7 to access?
8 Are the air ducts clear and clean?
Are the radiators, engine and pipe work checked
9 for leaks?
10 Are belts and gurds checked?
11 Is the coolant heater operational?
12 Are the fans, pumps and controls checked?
Are batteries proper installed, filled and
13 connection?
Is the exhaust fan in the diesel generator in
14 condition?
15 Is engine oil change during maintenance period?
16 Is the diesel fuel storage facilities secured?
17 Is diesel tank filled as when required?
Are drip trays provided in order to control the
18 spillages of the diesel?
Is the earthing/grounding is installed in
19 properly?
20 Is manual operation for generator correct?
Are local stop/emegency stop switch control
21 checked and functional?
Inspected By: Electrical Foreman/Supervisor:
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Monthly Safety Harness Inspection Checklist
PROJECT:CBDC Contract No.: CBDC/SV
Company: TAHTAN Contracting L.L.C Job No.:

Activity

Harness Webbing Or Leather

Body Pad (if applicable)


All Stitching

D-Ring(s) Buckle(s) (Include


Manufacture's
Item Serial No. /
Date Inspected Location
No. Identification

Rivets and Eyelets


No.

Tongue)
1 2/9/2016 RRE PUMP 44411267
2 2/9/2016 RRE PUMP 2343123
3 2/9/2016 RRE PUMP 109867
4 2/9/2016 RRE PUMP 1567432
5 2/9/2016 RRE PUMP 1567878
6 2/9/2016 RRE PUMP 8976544
7 2/9/2016 RRE PUMP 5346724 0
8 2/9/2016 RRE PUMP 3223642
9 2/9/2016 RRE PUMP 7432739
10 2/9/2016 RRE PUMP 78379820
Inspected By: Additional Comments:
________________________________________
n Checklist
Contract No.: CBDC/SV/SP003
Month: August

Activity

Engineered Anchor Points


Lanyard

Lifeline

Hook-Safety Latch

Remarks
Date Inspected
TYPE OF LIFTING
S / NO. COMPANY
EQUIPMENT

1 TAHTAN Contracting L.L.C Webbing Sling

2 TAHTAN Contracting L.L.C Webbing Sling

3 TAHTAN Contracting L.L.C Nut and Bolt Bow Shackle

4 TAHTAN Contracting L.L.C Screw Pin Bow Shackle

5 TAHTAN Contracting L.L.C Nut and Bolt Bow Shackle

6 TAHTAN Contracting L.L.C Nut and Bolt Bow Shackle

7 TAHTAN Contracting L.L.C Screw Pin Bow Shackle

8 TAHTAN Contracting L.L.C Webbing Sling

9 TAHTAN Contracting L.L.C Webbing Sling

10 TAHTAN Contracting L.L.C Webbing Sling

11 TAHTAN Contracting L.L.C Webbing Sling

12 TAHTAN Contracting L.L.C Webbing Sling

13 TAHTAN Contracting L.L.C Webbing Sling

14 TAHTAN Contracting L.L.C Webbing Sling

15 TAHTAN Contracting L.L.C Webbing Sling

16 TAHTAN Contracting L.L.C Webbing Sling


17 TAHTAN Contracting L.L.C Webbing Sling

18 TAHTAN Contracting L.L.C Webbing Sling

19 TAHTAN Contracting L.L.C Webbing Sling

20 TAHTAN Contracting L.L.C Webbing Sling

21 TAHTAN Contracting L.L.C Webbing Sling

22 TAHTAN Contracting L.L.C Webbing Sling

23 TAHTAN Contracting L.L.C Webbing Sling

210
211

212

213

214

215

216

217

218

219

220

221

222

223

224

225

226

227

228

229

230

231
232

233

234

235

236

237

238

239

240

241

242

243

244

245

246

247

248

249

250

251

252
253

254

255

256

257

258

259

260

261

262

263

264

265

266

267

268

269

270

271

272

273
274

275

276

277

278

279

280

281

282

283

284

285

286

287

288

289

290

291

292

293

294
295

296

297

298

299

300

301

302

303

304

305

306

307

308

309

310

311

312

313

314

315
316

317

318

319

320

321

322

323

324

325

326

327

328

329

330

331

332

333

334

335

336
337

338

339

340

341

342

343

344

345

346

347

348

349

350

351

352

353

354

355

356

357
358

359

360

361

362

363

364

365

366

367

368

369

370

371

372

373

374

375

376

377

378
379

380

381

382

383

384

385

386

387

388

389

390

391

392

393

394

395

396

397

398

399
400

401

402

403

404

405

406

407

408

409

410

411

412

413

414

415

416

417

418

419

420
421

422

423

424

425

426

427

428

429

430

431

432

433

434

435

436

437

438

439

440

441
442

443

444

445

446

447

448

449

450

451

452

453

454

455

456

457

458

459

460

461

462
463

464

465

466

467

468

469

470

471

472

473

474

475

476

477

478

479

480

481

482

483
484

485

486

487

488

489

490

491

492

493

494

495

496

497

498

499

500

501

502

503

504
505

506

507

508

509

510

511

512

513

514

515

516

517

518

519

520

521

522

523

524

525
526

527

528

529

530

531

532

533

534

535

536

537

538

539

540

541

542

543

544

545

546
547

548

549

550

551

552

553

554

555

556

557

558

559

560

561

562

563

564

565

566

567
568

569

570

571

572

573

574

575

576

577

578

579

580

581

582

583

584

585

586

587

588
589

590

591

592

593

594

595

596

597

598

599

600

601

602

603

604

605

606

607

608

609
610

611

612

613

614

615

616

617

618

619

620

621

622

623

624

625

626

627

628

629

630
631

632

633

634

635

636

637

638

639

640

641

642

643

644

645

646

647

648

649

650

651
652

653

654

655

656

657

658

659

660

661

662

663

664

665

666

667

668

669

670

671

672
673

674

675

676

677

678

679

680

681

682

683

684

685

686

687

688

689

690

691

692

693
694

695

696

697

698

699

700

701

702

703

704

705

706

707

708

709

710

711

712

713

714
715

716

717

718

719

720

721

722

723

724

725

726

727

728

729

730

731

732

733

734

735
736

737

738

739

740

741

742

743

744

745

746

747

748

749

750

751

752

753

754

755

756
757

758

759

760

761

762

763

764

765

766

767

768

769

770

771

772

773

774

775

776

777
778

779

780

781

782

783

784

785

786

787

788

789

790

791

792

793

794

795

796

797

798
799

800

801

802

803

804

805

806

807

808

809

810

811

812

813

814

815

816

817

818

819
820

821

822

823

824

825

826

827

828

829

830

831

832

833

834

835

836

837

838

839

840
841

842

843

844

845

846

847

848

849

850

851

852

853

854

855

856

857

858

859

860

861
862

863

864

865

866

867

868

869

870

871

872

873

874

875

876

877

878

879

880

881

882
883

884

885

886

887

888

889

890

891

892

893

894

895

896

897

898

899

900

901

902

903
904

905

906

907

908

909

910

911

912

913

914

915

916

917

918

919

920

921

922

923

924
925

926

927

928

929

930

931

932

933

934

935

936

937

938

939

940

941

942

943

944

945
946

947

948

949

950

951

952

953

954

955

956

957

958

959

960

961

962

963

964

965

966
967

968

969

970

971

972

973

974

975

976

977

978

979

980

981

982

983

984

985

986

987
988

989

990

991

992

993

994

995

996

997

998

999

1000

1001

1002

1003

1004

1005

1006

1007

1008
1009

1010

1011

1012

1013

1014

1015

1016

1017

1018

1019

1020

1021

1022

1023

1024

1025

1026

1027

1028

1029
1030

1031

1032

1033

1034

1035

1036

1037

1038

1039

1040

1041

1042

1043

1044

1045

1046

1047

1048

1049

1050
1051

1052

1053

1054

1055

1056

1057

1058

1059

1060

1061

1062

1063

1064

1065

1066

1067

1068

1069

1070

1071
1072

1073

1074

1075

1076

1077

1078

1079

1080

1081

1082

1083

1084

1085

1086

1087

1088

1089

1090

1091

1092
1093

1094

1095

1096

1097

1098

1099

1100

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1111

1112

1113
1114

1115

1116

1117

1118

1119

1120

1121

1122

1123

1124

1125

1126

1127

1128

1129

1130

1131

1132

1133

1134
1135

1136

1137

1138

1139

1140

1141

1142

1143

1144

1145

1146

1147

1148

1149

1150

1151

1152

1153

1154

1155
1156

1157

1158

1159

1160

1161

1162

1163

1164

1165

1166

1167

1168

1169

1170

1171

1172

1173

1174

1175

1176
1177

1178

1179

1180

1181

1182

1183

1184

1185

1186

1187

1188

1189

1190

1191

1192

1193

1194

1195

1196

1197
1198

1199

1200

1201

1202

1203

1204

1205

1206

1207

1208

1209

1210

1211

1212

1213

1214

1215

1216

1217

1218
1219

1220

1221

1222

1223

1224

1225

1226

1227

1228

1229

1230

1231

1232

1233

1234

1235

1236

1237

1238

1239
1240

1241

1242

1243

1244

1245

1246

1247

1248

1249

1250

1251

1252

1253

1254

1255

1256

1257

1258

1259

1260
1261

1262

1263

1264

1265

1266

1267

1268

1269

1270

1271

1272

1273

1274

1275

1276

1277

1278

1279

1280

1281
1282

1283

1284

1285

1286

1287

1288

1289

1290

1291

1292

1293

1294

1295

1296

1297

1298

1299

1300

1301

1302
1303

1304

1305

1306

1307

1308

1309

1310

1311

1312

1313

1314

1315

1316

1317

1318

1319

1320

1321

1322

1323
1324

1325

1326

1327

1328

1329

1330

1331

1332

1333

1334

1335

1336

1337

1338

1339

1340

1341

1342

1343

1344
1345

1346

1347

1348

1349

1350

1351

1352

1353

1354

1355

1356

1357

1358

1359

1360

1361

1362

1363

1364

1365
1366

1367

1368

1369

1370

1371

1372

1373

1374

1375

1376

1377

1378

1379

1380

1381

1382

1383

1384

1385

1386
1387

1388

1389

1390

1391

1392

1393

1394
Tahtan General Contracting
CARBON BLACK DELAYED COKE
HSE DEPARTMENT
LIFTING/RIGGING REGIST

REFERENCE NO. SIZE / DIAMETER SWL

L6-16117,16119 6mm/6mtr 6 Ton

15043052-3001 4mm/6mtr 4 Ton

SO1-2-3-4-5-6-7-8 7/8"' 6.5 Ton

VP-11-12-13-14 7/8"' 6.5 Ton

DC5403-01,02,03,04,05 1"' 8.5 Ton

BS BN-001,002,003,004 1"' 8.5 Ton

ZH01-01-02,DC1903,DC-4805 ,E188,BS005 1"' 8.5 Ton

01/15308,15314,15318,15321,15324,15320,15337,15310 1"'*1.5M 12/30/1899

01/15336,15333,15326,15330,15334,15323,15335,15313 1"'*1.5M 1 Ton

01/15331,15317,15315,15332,15311,15322,15309,15319 1"'*1.5M 1 Ton

01/15329,15312,15316 1"'*1.5M 1 Ton

02/50963,50965,50955,50950,50966,50957,50958,50968 2"'*1.5M 2 Ton

02/15336,15333,15326,15330,15334,15323,15335,15313 2"'*1.5M 2 Ton

02/50969,50962,50972,50971,50953,50967,50954,50952 2"'*1.5M 2 Ton

02/50959,50951,50956,50964 2"'*1.5M 2 Ton

03/50442,50443,50435,50433,50437,50434,50440 3"'*6.0 M 3 Ton


03/51135,51141,51144,51147,51138,51149,51136,51132 3"'*6.0 M 3 Ton

04/47394,47400,47411,47402,47401,47403,47428,474397 4"'*6.0 M 4 Ton

04/47613,47605,47610,47586,46571,47612,47587,47588 4"'*6.0 M 4 Ton

06/38366,38367,38346,38237,38331,38355,38369,38344 6"'*6.0 M 6 Ton

08/9743,9744,9745,9746 8"'*8.0 M 8 Ton

08/9747,9748,9749,9750 8"'*8.0 M 8 Ton

2014/16294 10"'*10.0 M 10 Ton


ral Contracting LLC
ELAYED COKER PROJECT
EPARTMENT
GGING REGISTER

THIRD PARTY THIRD PARTY


CERTIFICATE NO.
COMPANY CERTIFICATE VALIDITY

Euro Gulf TATN/LG/6758/07/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/08/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/01/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/01/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/02/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/02/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/01/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/03/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/03/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/03/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/03/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/04/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/04/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/04/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/04/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/05/IQ 6/Dec/16


Euro Gulf TATN/LG/6758/05/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/05/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/05/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/06/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/06/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/06/IQ 6/Dec/16

Euro Gulf TATN/LG/6758/06/IQ 6/Dec/16


INSPECTION DATE REMARK

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition


7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition

7/Jun/16 Good Condition


TAHTAN Medical Screening
CBDC PROJECT

GENERAL INFORMATION
Name: _____________________________________________________Age: ________________

Job Position: ________________________________________________ ID Number: ____________________

Any Work Experience in Construction before: ( ) YES ( ) NO If YES, how many years? _______________

MEDICAL INFORMATION
BP: __________ 0
Weight in Kg: _________ Urination at night: ( ) YES ( ) NO
Loss Weight within a year: __________ Increased thirst: ( ) YES ( ) NO
Gain Weight within a year: __________ BMI: ______________
Height: __________

PERSONAL INFORMATION
Vision: _________________________________________________________________________________________
Fear of heights, or confined spaces: ( ) YES ( ) NO

Past Medical History: ( ) Asthma ( ) Hypertension ( ) Joint problems


( ) Epilepsy ( ) Diabetes Mellitus ( ) Skin Problems
( ) Tuberculosis ( ) Jaundice ( ) Cardiac Problems
( ) Hepatitis B ( ) Malaria ( ) Allergies to Medicine or otherwise
Injection Tetanus Toxoid (TT): ( ) YES ( ) NO
Any Other Past Vaccinations? ( ) YES ( ) NO
Remarks: _________________________________________________________________________________________________
_
________________________________________________________________________________________________
________________________________________________________________________________________________

Taking Any Medicines: ( ) YES ( ) NO

If YES, please specify: _____________________________________________________________________________

Family history of any diseases: ( ) YES ( ) NO


Remarks: _______________________________________________________________________________________

Fit to Work: ( ) YES ( ) NO

Remarks: _______________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
_________________________________________________________________________________________________________

______________________________________________
Name of Physician or Nurse
ELECTRICAL/HANDTOOLS INSPECTION REGISTER
(TAHTAN)
■TAKREER RRE PACKAGE# 02 and 04
■INSPECTOR: Mr Regi (SIGN)
SUBCON
SL NO SECL NO. EQUIPMENTS NO. TYPE OF HANDTOOLS CAPACITY
NAME
1 WM-151 TAHTAN N/A Welding Machine 220V
2 OV-07 TAHTAN N/A ELECTRO HEAT RODE OVEN 220V,250 W
3 WM-08 TAHTAN N/A Welding Machine 220V
4 WM-14 TAHTAN N/A Welding Machine 220V
5 WM-151 TAHTAN N/A Welding Machine 220V
6 HEG-74 TAHTAN N/A HEAT GUN 230V,2000W
7 HEG-75 TAHTAN N/A HEAT GUN 230V,2000W
8 WM-12 TAHTAN N/A Welding Machine 220V
9 BOD-65 TAHTAN N/A BATTERY OPERATED DRILL.M
10 CSM-32 TAHTAN N/A CHOPPE SAW MACHINE
11 PF-03 TAHTAN N/A PEDESTAL FAN 3.6A,770 W RPM 2700
12 PF-04 TAHTAN N/A PEDESTAL FAN 3.6A,770 W RPM 2700
13 PF-05 TAHTAN N/A PEDESTAL FAN 3.6A,770 W RPM 2700
14 PF-06 TAHTAN N/A PEDESTAL FAN 3.6A,770 W RPM 2700
15 HDM-124 TAHTAN N/A HAMMER DRILL MACHINE 3.7A,850W
CTION REGISTER SEPT 2016
AN)
■INSPECTION DATE: 10/9/2016
■APPROVAL: (SIGN)
INSPECTED BY INSPECTED BY
MANUFACTURER REMARKS
SUBCON. SECL
MILLER TAHTAN OK
TECH WELD TAHTAN OK
MILLER TAHTAN OK
MILLER TAHTAN OK
MILLER TAHTAN OK
BLACK& DECKKER TAHTAN OK
BLACK& DECKKER TAHTAN OK
MILLER TAHTAN OK
DEWALT TAHTAN OK SS 015- SOUTH
DEWALT TAHTAN OK SS015-EAST
AL MANORD TAHTAN OK
AL MANORD TAHTAN OK
AL MANORD TAHTAN OK
AL MANORD TAHTAN OK
DEWALT TAHTAN OK
Refresh Training Request Card SECL Refresh Training Request Card SECL
1. Company : 1. Company :

2. Name / Job
Date Inspected 2. Name / Job Title :

3. Date : 3. Date :

4. Location : 4. Location :

5. Observations : 5. Observations :

0
6. Training (Every 18:00 PM ~ 19::00 PM) 6. Training (Every 18:00 PM ~ 19::00 PM)

Sat. Sun. Mon. Tue. Wed. Thur. Sat. Sun. Mon. Tue. Wed. Thur.
Safety PPE/ Working Lifting Defensive Safety PPE/ Working Lifting Defensive
Hot Work Hot Work
Leadership Basic Rule @ Height Safety Driving Leadership Basic Rule @ Height Safety Driving

7. Confirmed by 7. Confirmed by

7.1 SECL Area HSE 7.1 SECL Area HSE

8. Case Registered by 8. Case Registered by

8.2 SECL HSE Docu. 8.2 SECL HSE Docu.

Refresh Training Request Card SECL Refresh Training Request Card SECL
1. Company : 1. Company :

2. Name / Job Title : 2. Name / Job Title :

3. Date : 3. Date :

4. Location : 4. Location :

5. Observations : 5. Observations :

6. Training (Every 18:00 PM ~ 19::00 PM) 6. Training (Every 18:00 PM ~ 19::00 PM)

Sat. Sun. Mon. Tue. Wed. Thur. Sat. Sun. Mon. Tue. Wed. Thur.
Safety PPE/ Working Lifting Defensive Safety PPE/ Working Lifting Defensive
Hot Work Hot Work
Leadership Basic Rule @ Height Safety Driving Leadership Basic Rule @ Height Safety Driving

7. Confirmed by 7. Confirmed by

7.1 SECL Area HSE 7.1 SECL Area HSE

8. Case Registered by 8. Case Registered by

8.2 SECL HSE Docu. 8.2 SECL HSE Docu.


TAHT
HSE

SL No. Name Emp. ID Company Designation


1 Muhammad Rafique TAH-03 TAHTAN Fitter
2 Meer Alam TAH-04 TAHTAN Fitter
3 Muhammad Akhtar TAH-07 TAHTAN Fabricator
4 Nisar Ahmad TAH-10 TAHTAN Admin
5 Waseem Sarwar TAH-11 TAHTAN Accountant
6 Mushtaq Ahmad TAH-18 TAHTAN Helper
7 Ghulam Bari Saif TAH-44 TAHTAN Site Incharge
8 Sardar Ghani TAH-53 TAHTAN Admin Manager
9 Idress Ahmad TAH-63 TAHTAN Fitter
10 Zafar Iqbal TAH-65 TAHTAN Fitter
11 Gulzar TAH-69 TAHTAN Rigger

12 Muhammad Shafiq TAH-72 TAHTAN Fitter

13 Muhammad Asif TAH-73 TAHTAN Fitter

14 Sajid Ayoub TAH-75 TAHTAN Camp Boss


15 Khalid Javed TAH-85 TAHTAN Leadman
16 Sheikh Munair TAH-105 TAHTAN Helper
17 Ashiq Muhammad TAH-107 TAHTAN Site Incharge
18 Shehzad Ayoub Khurm TAH-108 TAHTAN Driver
19 Abdul Latif TAH-115 TAHTAN Leadman
20 Abid Hameed TAH-135 TAHTAN Site Manager
21 Rashid Mehmood TAH-137 TAHTAN HSE
22 Afzal Mehdi TAH-140 TAHTAN Supervisor
23 Muhammad Arshad TAH-142 TAHTAN Leadman
24 Fakhir Din TAH-145 TAHTAN Foreman
25 Khan Muhammad TAH-147 TAHTAN Leadman
26 Imran Ghafoor TAH-148 TAHTAN HSE
27 M.Ishaq TAH-151 TAHTAN Scaffolder
28 Hayat Muhammad TAH-152 TAHTAN Scaffolder
29 Farasat Hassan TAH-153 TAHTAN Planning Eng
30 Meer a Tasuf TAH-154 TAHTAN Permit Cordinator
31 Faheem Shehzad TAH-157 TAHTAN Mason
32 M.Shahid TAH-160 TAHTAN HSE
33 Muhammad Umar Iqbal TAH-161 TAHTAN QAQC
34 Shabbir Ahmad TAH-163 TAHTAN Fitter
35 Qabil Khan TAH-164 TAHTAN Welder
36 Sajjad Ahmad TAH-170 TAHTAN Transport Sup
37 Niaz Ahmed TAH-179 TAHTAN Fitter
38 Roman Ali TAH-185 TAHTAN Driver
39 Priya Panjan Panday TAH-186 TAHTAN HSE Manager
40 Muhammad Ashraf TAH-192 TAHTAN Helper
41 Muhammad Atif TAH-193 TAHTAN Helper
42 Muhammad Rizwan TAH-194 TAHTAN Helper
43 Muhammad Shabbir TAH-195 TAHTAN Helper
44 Javed Ahmad TAH-199 TAHTAN Fitter
45 Zeshan Zaheer TAH-200 TAHTAN Helper
46 Muhammad Farooq TAH-201 TAHTAN Rigger
47 Muhammad Danish TAH-202 TAHTAN HSE
48 Ghulam Shabbir TAH-216 TAHTAN Electrician
49 Muhammad Nasir TAH-219 TAHTAN Helper
50 Pervaiz Ahmed TAH-220 TAHTAN Fitter
51 Anoop Nair TAH-221 TAHTAN HSE
52 Din Muhammad TAH-222 TAHTAN Helper
53 Muhammad Ashraf TAH-226 TAHTAN Rigger
54 Muhammad Ajmal Juma TAH-228 TAHTAN Welder
55 Muhammad Farooq TAH-230 TAHTAN Scaffolder
56 Omprakash TAH-231 TAHTAN Scaffolder
57 Rabi Sahi TAH-232 TAHTAN Rigger
58 Adnan Khan TAH-234 TAHTAN Driver
59 Yasir Mehmood TAH-235 TAHTAN QAQC
60 Munir Ahmed TAH-236 TAHTAN Helper
61 Sohrab Khan TAH-237 TAHTAN Helper
62 Qaiser Mehmood TAH-240 TAHTAN Driver
63 Shamshair Khan TAH-243 TAHTAN Helper
64 Zeshan Akram TAH-253 TAHTAN Helper
65 Nand Aaal TAH-254 TAHTAN Helper
66 Gul Nawaz TAH-260 TAHTAN Scaffolder
67 Adnan Naseem TAH-262 TAHTAN Fabricator
68 Om Parkash TAH-263 TAHTAN Fabricator
69 Ajit Kumar TAH-264 TAHTAN Helper
70 Nikhil Kumar TAH-266 TAHTAN Helper
71
72
73
74
TAHTAN Contracting L.L.C
Takreer CBDC Project
HSE Induction List of New Employee
As of Date
Date of Training Nationality HSE Induction Working at height PTW
Pak Done Done

Pak Done Done


Pak Done Done

Pak Done Done


Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
0 Pak Done Done
Pak Done Done
Pak Done Done

Pak Done Done

Pak Done Done

Pak Done Done


Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done DONE
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Cordinator Pak Done Done DONE
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Indian Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Indian Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Nepal Done Done
Pak Done Done
Pak Done Done DD
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Indian Done Done
Indian Done Done
Indian Done Done
Defence Driving Heat Stress Confined Space Fire Watcher

Done
DONE
Sr. Serial
ID No. Model Number Manufacturer
No Number
1 BL-01 94361 AD 3CX SiteMaster JCB, England
2 TC-01 351913 MC235B J10-2C Potain by Manitowoc
3 TC-02 351565 MC205B-2C Potain by Manitowoc
4 TC-03 352919 MC310 K12-2C Potain by Manitowoc
5 TC-04 353199 MC205B-2C Potain by Manitowoc
6 HC-19 6210098 SR-700L KATO, JAPAN
7 G-01 15561 / 15568 ZLP 630 ZLP
8 G-02 15542 / 28365 ZLP 630 ZLP
9 G-03 15573 / 15570 ZLP 630 ZLP
10 15569 / 15543 ZLP 630 ZLP
11
12 G-04
13
14
15 TL-01 1840 1999 Mercedes
16 2/91031 AD AFT 110G-5 TADANO
EQUIPMENT TPI Record
Certificate No DESCRIPTION CAPACITY SWL

KCK-14-17199 Hydraulic Backhoe Loader 01 Ton


KCK-15-05242-JNB Tower Crane TC-01 12.5 Ton 10Ton
KCK-15-07611-JNB Tower Crane TC-02 12.5 Ton 10Ton
KCK-15-07612-JNB Tower Crane TC-03 16.5 Ton 12Ton
KCK-15-07613-JNB Tower Crane TC-04 12.5 Ton 10Ton
KCK-15-07010-JNB Mobile Crane 70Ton 70 Ton 70 Ton
KCK-15-07609-JNB Suspended Working Platform 945 Kgs 600 Kgs
KCK-15-07610-JNB Suspended Working Platform 945 Kgs 600 Kgs
JNB-15-07623-BK Suspended Working Platform 945 Kgs 600 Kgs
JNB-15-07624-BK Suspended Working Platform 945 Kgs 600 Kgs
KCK-15-05515-JNB Man Basket (1520 x 1020 x 2000)mm 600 Kgs 600 Kgs
FAF-15-06276-KCK Man Basket (1600 x 1000 x 2050)m 500 Kgs 500 Kgs
FAF-15-06277-KCK Material Bucket (1020 x 730 x 770 700 KgS 700 KgS
CCC-14-18070-JJ Concrete Bucket (1000 x 1000 x 1 3.4 Ton 3.4 Ton
Flat Trailer 40Ft with Unit 36 Ton MBH
JNB-14-18073-BK Mobile Crane 110 Ton 110 Ton 110 Ton
ord
THIRD PARTY TPI EXPIRY
TPI DATE
COMPANY DATE
TUV 19-Oct-14 18-Oct-15
TUV 16-Mar-15 14-Sep-15
TUV 11-Apr-15 10-Oct-15
TUV 11-Apr-15 10-Oct-15
TUV 11-Apr-15 10-Oct-15
TUV 8-Apr-15 7-Apr-16
TUV 11-Apr-15 10-Oct-15
TUV 11-Apr-15 10-Oct-15
TUV 13-Apr-15 12-Oct-15
TUV 13-Apr-15 12-Oct-15
TUV 18-Mar-15 16-Sep-15
TUV 1-Apr-15 30-Sep-15
TUV 1-Apr-15 30-Sep-15
TUV 3-Nov-15 3-May-16

TUV 5-Nov-13 3-Nov-15


REMARKS
TAHTAN GENERAL CONTRACTING CO
WATER COOLER CHECKING LOG SHEET

COOLER COOLER
FILTER WATER
COOLER NO. CAPACITY EARTHING AREA
CONDITION FILLING DATE
(USG) CLEANING

ANY OTHER COMMENTS :-


TRACTING CO.LLC
KING LOG SHEET

NAME SIGN REMARKS


TAHTAN Contract
Takreer
Training List
As of Date
SL No. Name of Employee Emp. ID Company Designation Date of Training
1 Om prakasah 231 TAHTAN Scaffolder 7/22/2015

2 Rabi Shai 232 TAHTAN Rigger 7/22/2015

3 M.Asharf 192 TAHTAN Helper 7/22/2015

4 Shaukat Ali 218 TAHTAN Scaffolder 7/22/2015

5 Irshad Ahmed 126 TAHTAN Steel Fixer 7/22/2015

6 Faheem shajad 157 TAHTAN Fitter 7/22/2015

7 Fizaan 162 TAHTAN Fitter 7/22/2015


8 Zammer hussain 169 TAHTAN Operator 7/22/2015
9 Khurram shazad 204 TAHTAN Steel Fixer 7/22/2015

10 M Qasim 172 TAHTAN Steel Fixer 7/22/2015

11 Luqaman 129 TAHTAN Steel Fixer 7/22/2015

12 Faruq 230 TAHTAN Scaffolder 7/22/2015

13 M.Asharf 226 TAHTAN Rigger 7/22/2015

14 M.Arshad 142 TAHTAN Lead man 7/22/2015

15 Abdul latif 115 TAHTAN Lead man 7/22/2015

16 Tanver Ahmed 127 TAHTAN Helper 7/22/2015

17 Shabbir 163 TAHTAN Fitter 7/22/2015


18 Javed 199 TAHTAN Fitter 7/22/2015
19 Perviz 220 TAHTAN Fitter 7/22/2015
20 Deen.M 222 TAHTAN Fitter 7/22/2015
21 Malik did 224 TAHTAN Helper 7/22/2015
22 Rifaq 103 TAHTAN Helper 7/22/2015
23 Johnson 241 TAHTAN Lead man 7/10/2015
24 M.Raifique 212 TAHTAN Painter 7/10/2015
25 Sohail Parvez 242 TAHTAN Painter 7/10/2015
26 Shamsheer khan 243 TAHTAN Painter 7/10/2015
27 Bhutto Khan 239 TAHTAN Painter 7/10/2015
28 S.K.Tiwari 238 TAHTAN Painter 7/10/2015
29 M.Rizwan 194 TAHTAN Electrician 7/10/2015
30 Irshad Ahmed 126 TAHTAN Fitter 7/2/2015
31 Allah Baksh 124 TAHTAN Fitter 7/2/2015
32 M.Asharf 192 TAHTAN Fitter 7/2/2015
33 Qabil Khan 164 TAHTAN Fitter 7/2/2015
34 Munir Ahmed 236 TAHTAN Helper 7/2/2015
35 Niaz 179 TAHTAN Fitter 7/2/2015
36 Khan M 147 TAHTAN Fitter 7/2/2015
37 Ashagr Ali 203 TAHTAN Welder 7/2/2015
38 Atef 193 TAHTAN Fitter 7/2/2015
39 Iftaqar Haider 217 TAHTAN Fitter 7/2/2015
40 Faheem shajad 157 TAHTAN Welder 7/2/2015
41 Gulam Bari Saif 44 TAHTAN I/C Incharge 6/15/2015
42 Khalid Javed 85 TAHTAN Lead man 2/11/2015
43 Md.Akhtar 7 TAHTAN Fabricator 2/11/2015
44 Angad kumar 59 TAHTAN Fabricator 2/11/2015
45 Idressh Khan 63 TAHTAN Fitter 2/11/2015
46 Zafar Iqbal 65 TAHTAN Fitter 2/11/2015
47 Md.Ashif 73 TAHTAN Fitter 2/11/2015
48 Mugeesh Ahmed 103 TAHTAN Welder 2/11/2015
49 Barkat kahn 118 TAHTAN Fitter 2/11/2015
50 Naveed Ahmed 176 TAHTAN Fitter 2/11/2015
51 Md Nasir 219 TAHTAN Fitter 2/11/2015
52 Md Akmal 228 TAHTAN Welder 2/11/2015
53 Feroz Khan N7 TAHTAN Welder 2/11/2015
54 Mukesh sha N2 TAHTAN Welder 2/11/2015
55 Chintamani N3 TAHTAN Welder 2/11/2015
56 Akhilesh Singh N129 TAHTAN Welder 2/11/2015
57 Baniu Bkaht 183 TAHTAN Helper 2/11/2015
58 Azmat Hayat 191 TAHTAN Helper 2/11/2015
59 M.Farooq 201 TAHTAN Rigger 2/11/2015
60 Guatam Chwan 283 TAHTAN Rigger 4/19/2016
61 Daya Shankar 292 TAHTAN Rigger 4/19/2016
62 Nirmal Singh 327 TAHTAN Rigger 4/19/2016
63 Tasrseem Singh 332 TAHTAN Rigger 4/19/2016
64 M.Sajjad 333 TAHTAN Rigger 4/19/2016
65 Surinder Singh 334 TAHTAN Rigger 4/19/2016
66 Jagjeet Singh 339 TAHTAN Rigger 4/19/2016
67 Hiraman Chwan 341 TAHTAN Rigger 4/19/2016
68 Konahya chwan 342 TAHTAN Rigger 4/19/2016
69 Niraj Kumar 349 TAHTAN Rigger 4/19/2016
70 Purusottam Bassi 372 TAHTAN Rigger 6/20/2016
71 Bashir khan 374 TAHTAN Rigger 6/20/2016
72 Buseer Khan 212 TAHTAN Rigger 6/20/2016
73 B Purushottam 122 TAHTAN Rigger 6/20/2016
74 Md Haneef 22 TAHTAN Helper 6/20/2016
75 Md Jassimuddin 212 TAHTAN Fitter 6/20/2016
76 Afzal Hossan Joshim 290 TAHTAN Fitter 6/20/2016
77 Md Iqram 265 TAHTAN Welder 6/20/2016
78 Md Shafir 276 TAHTAN Fitter 6/20/2016
79 Md Saddam Hussain 101 TAHTAN Helper 6/20/2016
80 Nilkanth 198 TAHTAN Helper 6/20/2016
81 Saddakat Ali 77 TAHTAN Helper 6/20/2016
82 Md Irfan Alam 193 TAHTAN Helper 6/20/2016
Scaffolding
83 Shahwaiz Majeed TAH-40 TAHTAN
Inspector 7/2/2016
Scaffolding
84 Farsat Hassan TAH-153 TAHTAN
Supervisor 7/2/2016
85 Zafar Iqbal Ahsan ST TAHTAN Operator 7/2/2016
86 Gurjinder Singh Sarwan Singh NFT TAHTAN Operator 7/2/2016
87 Azmat Hayat TAH-150 TAHTAN Rigger 7/2/2016
88 Fakhar Din TAH-145 TAHTAN Rigger 7/2/2016
89 Muhammad Ishaq TAH-151 TAHTAN Rigger 7/2/2016
90 Hayat Mohammad TAH-152 TAHTAN Rigger 7/2/2016
91 Rahib Ali Khawand TAH-117 TAHTAN Rigger 7/2/2016
92 Muhammad Riaz Amir TAH-32 TAHTAN Rigger 7/2/2016
93 Touqeer Ahmed Tat TAH-10 TAHTAN Scaffolder 7/2/2016
94 Muhammad Asif TAH-149 TAHTAN Scaffolder 7/2/2016
95 Khan Muhammad TAH-147 TAHTAN Scaffolder 7/2/2016
96 Gulzar Shah Sarwar Tah-69 TAHTAN Scaffolder 7/2/2016
97 Aziz Abbas Ghulam TAH-35 TAHTAN Scaffolder 7/2/2016
98 Nawab Khan Noor TAH-02 TAHTAN Scaffolder 7/2/2016
99 Ghulam Shabbir Khan TAH-91 TAHTAN Scaffolder 7/2/2016
100 Muhammad Asif TAH-149 TAHTAN Scaffolder 7/2/2016
101 Azmat Hayat TAH-150 TAHTAN Scaffolder 7/2/2016
102 Khan Muhammad TAH-147 TAHTAN Scaffolder 7/2/2016
103 Muhammad Ishaq TAH-151 TAHTAN Scaffolder 7/2/2016
104 Shahzad ayoub 67 TAHTAN Driver 3/12/2016
105 Kaisher 154 TAHTAN Driver 3/12/2016
106 Adnan Mir Khan 189 TAHTAN Driver 3/12/2016
107 Roman Ali 176 TAHTAN Driver 3/12/2016
108 Abid Hameed 159 TAHTAN Driver 3/12/2016
109 Munsif Ali 161 TAHTAN Driver 3/12/2016
110 Amjad Ali 121 TAHTAN Driver 3/12/2016
111 Shala Mir 98 TAHTAN Driver 3/12/2016
112 Muqarab Khan 203 TAHTAN Driver 3/12/2016
113 Md.Afzal 56 TAHTAN Driver 3/12/2016
AHTAN Contracting L.L.C
Takreer CBDC Project
Training List of Employee

Nationality Hot work Working at height Lifting & Rigging Defence Driving Heat Stress
Indian Done Done

Indian Done Done Done

Indian Done Done

Pak Done Done

Pak Done Done

Pak Done Done Done

Pak Done Done Done


Pak Done Done
Pak Done Done

Pak Done Done

Pak Done Done

Pak Done Done

Pak Done Done Done

Pak Done Done Done

Pak Done Done Done

Pak Done Done

Pak Done Done Done


Pak Done Done Done
Pak Done Done Done
Pak Done Done Done
Pak Done Done Done
Pak Done Done Done
Pak Done Done
Pak Done
Pak Done
Pak Done
Pak Done
Indian Done
Pak Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Indian Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done

Pak Done Done

Pak Done Done

Pak Done Done

Pak Done Done

Indian Done Done

Indian Done Done

Indian Done Done

Pak Done

Pak Done
Pak Done Done Done
Indian Done Done Done
Indian Done Done Done
Indian Done Done Done
Indian Done Done Done
Pak Done Done Done
Indian Done Done Done
Indian Done Done Done
Indian Done Done Done
Indian Done Done Done
Indian Done Done Done
Indian Done Done Done
Pak Done Done Done

Indian Done Done Done

Indian Done Done Done

Indian Done Done


Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Indian Done
Pak Done
Pak Done

Done Done
Pak

Done Done
Pak
Pak Done Done
Pak Done Done
Pak Done Done Done
Pak Done Done Done
Pak Done Done Done
Pak Done Done Done
Pak Done Done Done
Pak Done Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Pak Done Done
Confined Space Fire Watcher Flag Man

Done

Done

Done

Done

Done
Done
Done Done

Done Done

Done Done

Done

Done

Done

Done Done

Done
Done
Done
Done
Done Done
Done Done
Done
Done

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done

Done
Done
Done
Done
Done
Tahtan
TAKREER CARB

SCAF
Scaffold Usage
Company Tag/Ref. No
(Type of Activities)

TAHTAN 26 PIPING

TAHTAN 24 PIPING

TAHTAN 30 PIPING

TAHTAN 17 PIPING

TAHTAN 40 PIPING

TAHTAN 14 PIPING

TAHTAN 13 PIPING

TAHTAN 22 PIPING

TAHTAN 1 PIPING

TAHTAN 34 PIPING

TAHTAN 50 PIPING

TAHTAN 51 PIPING

TAHTAN 52 PIPING

TAHTAN 19 PIPING

TAHTAN 15 PIPING

TAHTAN 14 PIPING

TAHTAN 53 PIPING

TAHTAN 44 PIPING

TAHTAN 45 PIPING
TAHTAN 18 PIPING

TAHTAN 34 PIPING

TAHTAN 43 PIPING

TAHTAN 54 PIPING

TAHTAN 55 PIPING

TAHTAN 56 PIPING

TAHTAN 57 PIPING

TAHTAN 58 PIPING

TAHTAN 59 PIPING

TAHTAN 60 PIPING

TAHTAN 61 PIPING

TAHTAN 62 PIPING

TAHTAN 42 PIPING

TAHTAN 41 PIPING

TAHTAN 40 PIPING

TAHTAN 39 PIPING

TAHTAN 38 PIPING

TAHTAN 34 PIPING

TAHTAN 33 PIPING

TAHTAN 32 PIPING

TAHTAN 31 PIPING

TAHTAN 30 PIPING

TAHTAN 29 PIPING
TAHTAN 28 PIPING

TAHTAN 27 PIPING

TAHTAN 37 PIPING

TAHTAN 36 PIPING

TAHTAN 35 PIPING

TAHTAN 1 PIPING

TAHTAN 2 PIPING

TAHTAN 3 PIPING

TAHTAN 26 PIPING

TAHTAN 24 PIPING

TAHTAN 23 PIPING

TAHTAN 22 PIPING

TAHTAN 20 PIPING

TAHTAN 11 PIPING

TAHTAN 7 PIPING

TAHTAN 30 PIPING

TAHTAN 5 PIPING

TAHTAN 25 PIPING

TAHTAN 27 PIPING

TAHTAN 23 PIPING

TAHTAN 29 PIPING

TAHTAN 50 PIPING

TAHTAN 51 PIPING
TAHTAN 52 PIPING

TAHTAN
Tahtan General Contracting LLC
TAKREER CARBON BLACK & DELAYED COKER PROJECT

SCAFFOLD REGISTRY
Scaffold Dimension
Scaffold Type Scaffold Duty (L x W x H)
Location / Area

SLUNG L 14*2*4 UTILITY

SLUNG L 8*2*6 UTILITY

SLUNG L 3*1.5*5 UTILITY

SLUNG L 3*1.5*11 UTILITY

SLUNG L 3*1,5*11 UTILITY

SLUNG L 3*1,5*11 UTILITY

SLUNG L 3*1,5*11 UTILITY

SLUNG L 0 UTILITY

SLUNG L 3*1,5*3 UTILITY

SLUNG L 3*1,5*3 UTILITY

SLUNG L 4*1*3 UTILITY

SLUNG L 3*1.5*11 UTILITY

SLUNG L 3*1.5*11 UTILITY

SLUNG L 4*4*11 UTILITY

SLUNG L 30*3*7 UTILITY

SLUNG L 30*3*7 UTILITY

SLUNG L 30*3*7 UTILITY

SLUNG L 30*2*7 UTILITY

SLUNG L 30*2*7 UTILITY


SLUNG L 18*2*2 OIL MOVEMENT

SLUNG L 3*3*7 UTILITY

SLUNG L 3*2*6 UTILITY

SLUNG L 3*2*6 UTILITY

SLUNG L 3*1.5*11 UTILITY

SLUNG L 3*1.5*11 UTILITY

SLUNG L 3*1.5*11 UTILITY

SLUNG L 3*1.5*11 UTILITY

SLUNG L 3*1.5*11 UTILITY

SLUNG L 3*1.5*11 UTILITY

SLUNG L 3*1.5*11 OIL MOVEMENT

SLUNG L 3*1.5*11 UTILITY

SLUNG L 30*2*6 OIL MOVEMENT

SLUNG L 30*2*6 OIL MOVEMENT

SLUNG L 30*2*6 OIL MOVEMENT

SLUNG L 40*1.5*10 OIL MOVEMENT

SLUNG L 5*1.5*6 OIL MOVEMENT

SLUNG L 30*2*6 OIL MOVEMENT

SLUNG L 15*2*3 OIL MOVEMENT

SLUNG L 20*2*3 OIL MOVEMENT

SLUNG L 18*2*6 OIL MOVEMENT

SLUNG L 18*2*6 OIL MOVEMENT

SLUNG L 30*2*6 OIL MOVEMENT


SLUNG L 18*6*7 OIL MOVEMENT

SLUNG L 24*2.5*10 OIL MOVEMENT

SLUNG L 30*2*3 OIL MOVEMENT

SLUNG L 30*2*3 OIL MOVEMENT

SLUNG L 30*2*3 OIL MOVEMENT

SLUNG L 30*2*7 EASMENT

SLUNG L 30*2*7 EASMENT

SLUNG L 30*2*7 EASMENT

SLUNG L 2.5*1.5*7 EASMENT

SLUNG L 2.8*1.5*7 EASMENT

SLUNG L 30*2*3 EASMENT

SLUNG L 2.5*1.5*7 EASMENT

SLUNG L 20*1.5*7 EASMENT

SLUNG L 30*2*7 EASMENT

SLUNG L 30*2*7 EASMENT

SLUNG L 30*2*7 EASMENT

SLUNG L 25*2*7 EASMENT

SLUNG L 30*2*7 EASMENT

SLUNG L 30*2*7 EASMENT

SLUNG L 30*2*3 EASMENT

SLUNG L 30*2*7 EASMENT

SLUNG L 30*2*7 EASMENT

SLUNG L 30*2*7 EASMENT


SLUNG L 30*2*7 EASMENT
T

Tag
Status
Issuance Inspector
(Active/Dismantled/Date)
Date

20-Mar-16 DANISH ACTIVE


17-Mar-16 DANISH ACTIVE
3-May-16 DANISH ACTIVE
9-Feb-16 DANISH ACTIVE
4-Feb-16 DANISH ACTIVE
9-Feb-16 DANISH ACTIVE
19-Feb-16 DANISH ACTIVE
16-May-16 DANISH ACTIVE

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG


12-Mar-16 DANISH ACTIVE
19-Apr-16 DANISH ACTIVE
19-Apr-16 DANISH ACTIVE
19-Apr-16 DANISH ACTIVE

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG


17-Apr-16 DANISH ACTIVE
17-Apr-16 DANISH ACTIVE
17-Apr-16 DANISH ACTIVE
10-Apr-16 DANISH ACTIVE
10-Apr-16 DANISH ACTIVE
10-Apr-16 DANISH ACTIVE
10-Apr-16 DANISH ACTIVE

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG

DANISH RED TAG


16-Jan-16 DANISH ACTIVE
16-Jan-16 DANISH ACTIVE
16-Jan-16 DANISH ACTIVE
21-Mar-16 DANISH ACTIVE
10-Mar-16 DANISH ACTIVE
5-Mar-16 DANISH ACTIVE
28-Feb-16 DANISH ACTIVE
15-Feb-16 DANISH ACTIVE
4-Feb-16 DANISH ACTIVE
31-Jan-16 DANISH ACTIVE
25-Feb-16 DANISH ACTIVE
25-Jan-16 DANISH ACTIVE
21-Mar-16 DANISH ACTIVE
31-Mar-16 DANISH ACTIVE
7-Apr-16 DANISH ACTIVE
1-May-16 DANISH ACTIVE
9-May-16 DANISH ACTIVE
9-May-16 DANISH ACTIVE
11-May-16 DANISH ACTIVE
Health Safety and Enviro
Weekly HSE Report
Date Inspected

Client: Samsung Project Name: CBDC PKG # 04


Month Accrued Man-
123,100
hours
Lost Time Injuries (LTI) 0
LTI Days 0
Restricted Work Injuries (RWI) 0
RWI Days 0
Medical Treatment Injuries 0
First Aid Cases 0
Accident / Incidents 0
Property Damage 0
Near Miss 0
Safety Meeting 1
Tool Box Talk Conducted 35
Safety Induction 9
Indirect 36
Number of Manpower on Site: Direct 160
Others 0
TOTAL 196

Number of Vehicle on Site: 3


Total kilometers run for this week: 2295
1) Hot work 2) Work at height 3) Use of proper ppe 3) How to use ladder 4
Electrical Safety 7) Emeregncy Procedure 8) Housekeeping 9) Manual Ha

Toolbox Talk Topics:

Name
Mr Anoop
Mr Vidyanand
Nos. of HSE (06) Mr Imran
Mr Rashid
Mr Sahid
Mr Danish
Number of Construction Equipments
Capacity Operator Name
Crane 70 Ton Razzak
Crane 70 Ton Khurshid
Crane 50 Ton Jahagir
Crane 50 Ton Mujjafar
Boom Truck 10 Ton Afzal
Trailor 25 Ton Ali
Trailor 25 Ton Mukarab
Prepared By:
Name: P.Pandey
Designation: HSEM
Date: 8/17/2016
Signature
PAGE
fety and Environment 1
Weekly HSE Report REV
Date Inspected 0
CBDC PKG # 04 Month Ending : Sep 2016
Cumulative Man-
Overall Total Cumulative to Date 123,100
hours to Date
Lost Time Injuries (LTI) 0
LTI Days 0
Restricted Work Injuries (RWI) 0
RWI Days 0
Medical Treatment Injuries 0
First Aid Cases 0
Accident / Incidents 0
Property Damage 0
Near Miss 0
Safety Meeting 17
Tool Box Talk Conducted 1145
Safety Induction 196
Indirect 36
Number of Manpower on Site: Direct 160
Other 0
TOTAL 196

Overall Number of Vehicle on Site: 15


Overall Total kilometers runs up to Date: 422637
per ppe 3) How to use ladder 4) General Safety 5) Lifting , Loading un loading activities 6)
8) Housekeeping 9) Manual Handling 10) Fire extinguisher 11) Hand safety

Location RRE RRW


Utility ¨
Easement ¨
Laydown ¨
Crude ¨
Neptha ¨
SK ¨

Operator Name Type Comments


Razzak Mobile
Khurshid Mobile
Jahagir Alterrain
Mujjafar Alterrain
Afzal
Ali
Mukarab
Checked By:
Name: Mubashar Ahmad Khan
Designation: A/CM
Date:
Signature:
1
Toilet Cleaning Checklist (Oct. 2016) Toilet Cleaning Checklist (Nov. 2016)
Toilet No. Toilet No.
SR # Time SIGNATURE SR # Time SIGNATURE
1 Date Inspected 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10 12/30/1899
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31

Toilet Cleaning Checklist (Dec. 2016) Toilet Cleaning Checklist (Jan 2017)
Toilet No. Toilet No.
SR # Time SIGNATURE SR # Time SIGNATURE
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
FRIDAY/HOLIDAY WO
Date Inspected

▣ SUBCONTRACTOR:

S/N Area Work Description

▣ PROJECT NAME-

S/N Area Work Description

2
2

※ Role and Responsibilities


1. TBM Participation & Working Area Inspection Befire Starting Work
4. Full Time Management of Workers in Working Area
AY/HOLIDAY WORK PLAN (Date : . )

Site Manager :

Working Time
Position Name
In Out
Manager
Engineer
Supervisor
HSE
Manager 0
Engineer
Supervisor
HSE

Working Time
Position Name
In Out
Manager
Engineer
Supervisor
QA/QC
HSE
Manager
Engineer
Supervisor
QA/QC
HSE

2. Check All Workers PPE


5. Housingkeeping Control

TAHTAN CM/Manager :__________________________________


.

e Manager : (sign)

Total No. of Total No. of


Mobile No. Workers Equipment

Mobile No. Remarks


3. Inspecting Equipment & Tools

____________________________________(Sign)
TOOL BOX TALK FORM

DATE TOPIC:
PERMIT NUMBER
PERMIT TYPE
PROJECT TITLE CBDC
AREA LOCATION
CREW MEMBERS DETAIL
S/N NAME DESIG. EMPL. NO. COMPANY
1 Mr.Asiq I/C Incharge T-107 Tahatn
2 Abdul Latif Lead Man T-113 Tahatn
3 Rufiquee Fitter T-03 Tahatn
4 Niaz Fitter T-179 Tahatn
5 Javeed Fitter T-199 Tahatn
6 Luqman Fitter T-120 Tahatn
7 Tanveer Helper T-127 Tahatn
8 Malik dad Helper T-224 Tahatn
9 Din.M Helper T-222 Tahatn
10 M.Sahid Helper T-109 Tahatn
11 M.Farooq Scaffolder T-230 Tahatn
12 Om Prakash Scaffolder T-231 Tahatn
13 Virendra Ram Rigger T-348 Tahatn
14 M.Asger Helper T-225 Tahatn
15
16
17
18
19
20
21
22
23
24
25
26
GENERAL REMARKS:
JP NAME & SIGNATURE HSE SITE INCHARGE SIGNATURE

(The TOOLBOX shall be conducted by the Job Performer/ Site Supervisor/ or Site in-charge
presence of TAHTAN Safety officer. All TOOL BOX reports will be recorded and submitted fo
and monitoring.)
TALK FORM

SIGNATURE

0
ARGE SIGNATURE

or Site in-charge in
d and submitted for review
TAHTAN GENERAL CONTRACTING LLC
CARBON BLACK & DELAYED COKER PROJECT

DAILY CHECKLIST - DISMANTLING OF SLIPFORMS

Status
Sr. Description
Satisfactory Unsatisfactory

1 TBT done
2 Crane daily inspection done
3 Proper tools available
4 Inspection of tools (if required)
5 Colour coding of tools
6 Area barricaded
7 Workers are using full body harness
8 Workers are Third Party Certified (if necessary)
9 No loose material at deck
10 No loose tools at deck
11 Tools are latched
12 No unauthorized person at site
13 Wind Speed ≤ 32km/hr

TAHTAN S/V TAHTAN HSE


G LLC
PROJECT

SLIPFORMS

Remarks

SECL HSE
Summary of First Aider and Authorized Gas Tester for RREast Area and RRWest Area
RRE RRW
Location Remarks
First Aider AGT First Aider AGT
Utility Area Anoop S Nair Anoop S Nair
Easement Mahendra Singh
Crude Area Md Rashid Md Rashid
Naptha Area Md Sahid Iqbal Md Sahid Iqbal

Oil Movement
Md Danish
/Pump House Area

Summary of Trained AGT & First Aider


3rd Party
Sr. No. Employee Name Training Date ID No.
Name

1 Anoop S Nair RRE Basic First Aid 2/20/2016 Euro Gulf 5071352-6

2 Md Arshad RRE Basic First Aid 2/20/2016 Euro Gulf 2421908-3

Authorized Gas Safe World SWS-AGT-


3 Marshal CBDC 2/3/2016
Tester Specialists 030216-121

Authorized Gas Safe World SWS-AGT-


4 Anoop S Nair RRE 2/3/2016
Tester Specialists 030216-120

Authorized Gas Safe World SWS-AGT-


5 Md Rashid RRW 2/3/2016
Tester Specialists 030216-119

Authorized Gas Safe World SWS-AGT-


6 Md Danish RRE 2/3/2016
Tester Specialists 030216-118

Authorized Gas Safe World SWS-AGT-


7 Md Khalid RRW 12/7/2015
Tester Specialists 071215-84

Authorized Gas Safe World SWS-AGT-


8 Mahendra Singh RRE 12/7/2015
Tester Specialists 071215-82

Authorized Gas Safe World SWS-AGT-


9 Md Sahid RRW 12/7/2015
Tester Specialists 071215-85

Safe World SWS-BFA-


10 Mr. Raja Afzal RRW First Aider 6/27/2015
Specialists 2706115-24

Safe World SWS-BFA-


11 Md Ehshan CBDC First Aider 6/27/2015
Specialists 2706115-22

Safe World SWS-BFA-


12 d Rashid RRW First Aider 6/27/2015
Specialists 2706115-23

Safe World SWS-BFA-


13 Md Sahid RRW First Aider 6/27/2015
Specialists 2706115-21
No Week Date Area Subcontractor

1 143 22-Sep-16 CCU SILO TAHTAN Contracting L.L.C

2 143 22-Sep-16 CCU SILO TAHTAN Contracting L.L.C

3 143 22-Sep-16 CCU SILO TAHTAN Contracting L.L.C

4 143 22-Sep-16 SITE OFFICE TAHTAN Contracting L.L.C

5 143 22-Sep-16 CCU SILO TAHTAN Contracting L.L.C

6 143 22-Sep-16 CCU SILO TAHTAN Contracting L.L.C

7 143 22-Sep-16 CCU SILO TAHTAN Contracting L.L.C

8 143 22-Sep-16 CCU SILO TAHTAN Contracting L.L.C

9 143 22-Sep-16 CCU SILO TAHTAN Contracting L.L.C

10 143 22-Sep-16 CCC SILO TAHTAN Contracting L.L.C

11 143 22-Sep-16 WORKSHOP TAHTAN Contracting L.L.C

12 143 22-Sep-16 WORKSHOP TAHTAN Contracting L.L.C


13 143 22-Sep-16 WORKSHOP TAHTAN Contracting L.L.C
14 143 22-Sep-16 OFFICE AREA TAHTAN Contracting L.L.C
15 143 22-Sep-16 CCU SILO TAHTAN Contracting L.L.C

16 143 22-Sep-16 OFFICE AREA TAHTAN Contracting L.L.C

17 143 22-Sep-16 Silo TAHTAN Contracting L.L.C

18 143 22-Sep-16 Fabrication TAHTAN Contracting L.L.C


19 143 22-Sep-16 site offices TAHTAN Contracting L.L.C

20 143 22-Sep-16 RRE Easement TAHTAN Contracting L.L.C

21 143 24-Sep-16 RRE Utility TAHTAN Contracting L.L.C

22 143 24-Sep-16 CCU SILO TAHTAN Contracting L.L.C

23 143 24-Sep-16 CCU SILO TAHTAN Contracting L.L.C

24 143 24-Sep-16 CCU SILO TAHTAN Contracting L.L.C

25 143 24-Sep-16 CCU SILO TAHTAN Contracting L.L.C

26 143 24-Sep-16 CCU SILO TAHTAN Contracting L.L.C

27 143 24-Sep-16 CCU SILO TAHTAN Contracting L.L.C

28 143 24-Sep-16 OFFICE AREA TAHTAN Contracting L.L.C

29 143 24-Sep-16 STEEL STORAGE TAHTAN Contracting L.L.C

30 143 24-Sep-16 OFFICE AREA TAHTAN Contracting L.L.C

31 143 24-Sep-16 CCU SILO TAHTAN Contracting L.L.C

32 143 24-Sep-16 CCU SILO TAHTAN Contracting L.L.C

33 143 24-Sep-16 Fabrication TAHTAN Contracting L.L.C

34 143 24-Sep-16 CCU SILO TAHTAN Contracting L.L.C

35 143 24-Sep-16 Steel stroge TAHTAN Contracting L.L.C

36 143 24-Sep-16 site offices TAHTAN Contracting L.L.C


37 143 24-Sep-16 WORKSHOP TAHTAN Contracting L.L.C

38 143 24-Sep-16 CCU SILO TAHTAN Contracting L.L.C

39 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C

40 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C

41 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C

42 143 25-Sep-16 WORKSHOP TAHTAN Contracting L.L.C

43 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C

44 143 25-Sep-16 WORKSHOP TAHTAN Contracting L.L.C

45 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C

46 143 25-Sep-16 work shop TAHTAN Contracting L.L.C

47 143 25-Sep-16 Silo TAHTAN Contracting L.L.C

48 143 25-Sep-16 RRE Utility TAHTAN Contracting L.L.C

49 143 25-Sep-16 RRE Easement TAHTAN Contracting L.L.C

50 143 25-Sep-16 work shop TAHTAN Contracting L.L.C

51 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C


52 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C

53 143 25-Sep-16 site offices TAHTAN Contracting L.L.C

54 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C

55 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C

56 143 25-Sep-16 Silo TAHTAN Contracting L.L.C

57 143 25-Sep-16 Back side office TAHTAN Contracting L.L.C

58 143 25-Sep-16 Silo TAHTAN Contracting L.L.C

59 143 25-Sep-16 Silo TAHTAN Contracting L.L.C

60 143 25-Sep-16 Silo TAHTAN Contracting L.L.C

61 143 25-Sep-16 Silo TAHTAN Contracting L.L.C

62 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C

63 143 25-Sep-16 CCU SILO TAHTAN Contracting L.L.C

64 143 26-Sep-16 Silo TAHTAN Contracting L.L.C

65 143 26-Sep-16 Silo TAHTAN Contracting L.L.C

66 143 26-Sep-16 work shop TAHTAN Contracting L.L.C

67 143 26-Sep-16 Fabrication TAHTAN Contracting L.L.C

68 143 26-Sep-16 CCU SILO TAHTAN Contracting L.L.C

69 143 26-Sep-16 office area TAHTAN Contracting L.L.C


70 143 26-Sep-16 CCU SILO TAHTAN Contracting L.L.C

71 143 26-Sep-16 CCU SILO TAHTAN Contracting L.L.C

72 143 26-Sep-16 CCU SILO TAHTAN Contracting L.L.C

73 143 26-Sep-16 OFFICE AREA TAHTAN Contracting L.L.C

74 143 26-Sep-16 Silo TAHTAN Contracting L.L.C

75 143 26-Sep-16 Silo TAHTAN Contracting L.L.C

76 143 26-Sep-16 Silo TAHTAN Contracting L.L.C


77 143 26-Sep-16 Fabrication TAHTAN Contracting L.L.C
78 143 26-Sep-16 RRE Laydown TAHTAN Contracting L.L.C

79 143 26-Sep-16 RRE Easement TAHTAN Contracting L.L.C

80 143 26-Sep-16 RRE Easement TAHTAN Contracting L.L.C

81 143 26-Sep-16 CCU SILO TAHTAN Contracting L.L.C

82 143 26-Sep-16 CCU SILO TAHTAN Contracting L.L.C

83 143 26-Sep-16 CCU SILO TAHTAN Contracting L.L.C

84 143 26-Sep-16 CCU SILO TAHTAN Contracting L.L.C

85 143 26-Sep-16 CCU SILO TAHTAN Contracting L.L.C

86 143 26-Sep-16 CCU SILO TAHTAN Contracting L.L.C

87 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

88 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

89 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

90 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

91 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C


92 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

93 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

94 143 27-Sep-16 chamical stroge area TAHTAN Contracting L.L.C

95 143 27-Sep-16 office area TAHTAN Contracting L.L.C

96 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

97 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

98 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

99 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

100 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

101 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

102 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

103 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

104 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

105 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

106 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

107 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

108 143 27-Sep-16 CCU SILO TAHTAN Contracting L.L.C

109 143 27-Sep-16 work shop TAHTAN Contracting L.L.C

110 143 27-Sep-16 Silo TAHTAN Contracting L.L.C


111 143 27-Sep-16 CCC SILO TAHTAN Contracting L.L.C

112 143 28-Sep-16 WORKSHOP TAHTAN Contracting L.L.C

113 143 28-Sep-16 WORKSHOP TAHTAN Contracting L.L.C


114 143 28-Sep-16 WORKSHOP TAHTAN Contracting L.L.C

115 143 28-Sep-16 CCU SILO TAHTAN Contracting L.L.C

116 143 28-Sep-16 CCC SILO TAHTAN Contracting L.L.C

117 143 28-Sep-16 WORKSHOP TAHTAN Contracting L.L.C

118 143 28-Sep-16 WORKSHOP TAHTAN Contracting L.L.C


119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
HSE OBSERVATION REPORT
Observation Type of HAZARD Risk Level

One skip found overflowing need to remove ENVIRONMENT LOW

Concrete debries lying in area need to remove HOUSEKEEPING LOW

welding activite going and fire watch man not SLIPS & TRIPS LOW
present

Poor housekeeping observed area the store SLIPS & TRIPS LOW

Light bulb is damaged SLIPS & TRIPS LOW

Off loading matierials of scaffolding tube sling not SLIPS & TRIPS LOW
properly use load unbalance

cable management not good west site silo SLIPS & TRIPS LOW

Rigger give tha signal of tower crane opprater SLIPS & TRIPS LOW
catch tha bucket at a time no usr tha tag line

found many loose material on working platform HOUSEKEEPING LOW

Electrical distribution board without fire FIRE PROTECTION LOW


extenguisher Co2

Concreet waste area not baricate HOUSEKEEPING LOW

0 SLIPS & TRIPS LOW


De-shackles witout color code COLOR CODE LOW
Genertor without barricade WORK PERMIT LOW
Helper without reflective jacket PPE LOW

Crane checklist ot availbe at site WORK PERMIT LOW

Extension cable found multipal connection FIRE PROTECTION LOW

Poor cable managments SLIPS & TRIPS MEDIUM


found during hot work activity not good
Housekeeping and Fire Protection protection SUPERVISION LOW
system

Improper cable management in scaffold platform. SLIPS & TRIPS LOW

Scaffolding materials need to be stacked SLIPS & TRIPS LOW


properly.

Observed unwanted scaffolding materials SLIPS & TRIPS LOW


scattered on the scaffolding platforms.
FALL PROTECTION LOW
Scaffolding tag was not updated in some ladder

Drinking water not available on Product silo HEALTH LOW

Found safety harness with damage hook FALL PROTECTION MEDIUM

Power cable lying on ground and not burried ELECTRICAL LOW

Scaffolding errection was in progress without FALL PROTECTION LOW


putting red tag on iit

Bus was parked on the road that block the ACCESS LOW
access

Errection of scaffold was in progress while no FALL PROTECTION LOW


barrication of area
Genertor without barricade WORK PERMIT LOW

Broken electric socket FIRE PROTECTION LOW

Found good cable mangment system WORK PERMIT LOW

Poor lighting in west side of stairs WORK PERMIT LOW

Temprory hand rail is partially miss FALL PROTECTION LOW

found during hot work activity good POSITIVE LOW


Housekeeping and Fire Protection system
found during hot work activity not good
Housekeeping and Fire Protection protection SUPERVISION LOW
system
Face shield not using during steel plate cutting. SLIPS & TRIPS LOW

concreet bucket not mension SWL . SLIPS & TRIPS LOW

scaffolding plateform wooden planks fising SLIPS & TRIPS LOW


banding wear wear damage

vibrater not insepction and not color code SLIPS & TRIPS LOW

Some wokers not using chin strip while working SLIPS & TRIPS LOW
at height

drinking water botal use chemical SLIPS & TRIPS LOW

tower crane hook not color code SLIPS & TRIPS LOW

silo up side D.P no singe for DANGER and SLIPS & TRIPS LOW
electrion phone no

scaffolding matiral not proper arange and SLIPS & TRIPS LOW
barication missing

silo up side D.P no singe for DANGER and FIRE PROTECTION LOW
electrion phone no

Fall Protection matiral not proper arange and HOUSEKEEPING LOW


barication missing

Poor cable management in ground level, PWHT SLIPS & TRIPS LOW
cable laying ground improperly.
Grinding machine used without guard CUT LOW

Lifting was going on without barrication LIFTING LOW

One worker observed taking tea in the working SUPERVISION LOW


area
Fall Protection material properly segregated and HOUSEKEEPING LOW
stacked

found during hot work activity good houskeeping POSITIVE LOW


and fire protection system

I observe lose matiral (bollts) shefting old vist SLIPS & TRIPS LOW

Material lying in area not properly stacked SLIPS & TRIPS LOW

welding activite going and Fire Protection watch FIRE PROTECTION LOW
man not present

Poor housekeeping observed area the store HOUSEKEEPING LOW

Light bulb is damaged FIRE PROTECTION LOW

Off loading matierials of Fall Protection tube sling


FALLING OBJECTS MEDIUM
not properly use load unbalance

During the painting silo no 1 down side area not HOUSEKEEPING LOW
barricated

Rigger give tha signal of tower crane opprater FALLING OBJECTS LOW
catch tha bucket at a time no usr tha tag line

Worker found not using safety goggle with face PPE LOW
sheild
I observe lose matiral (bollts) shefting old vist FALL PROTECTION LOW

Material lying in area not properly stacked HOUSEKEEPING LOW

Found receptical damage with drill machine HOUSEKEEPING LOW

Face shield not using during steel plate cutting. PPE MEDIUM

Falling Objects work was carried out without tag FALL PROTECTION LOW
line

Bus was parked on the road that block the STRUCK / HIT LOW
access
Sharp edges found at the access to main deck at ACCESS LOW
silo no. 2
Good Housekeeping in workshop POSITIVE

During tha welding activity not use proper fire FIRE PROTECTION LOW
blanket welding sports fell down

Not signaller is available with JCB SUPERVISION LOW

Bus was not parked on designated place STRUCK / HIT LOW

found many loose material on working platform HOUSEKEEPING LOW

Toe board found in a scaffold not properly tied FALL PROTECTION LOW

Accumulated Metal scrap was ideal on site HOUSEKEEPING LOW


Welding area found satisfactory POSITIVE

Toilet condition is very poor and smeel WELFARE FACILITIES LOW

Some people were taking breakfast on pipe rack WELFARE FACILITIES LOW

Toilet checklist not updated WELFARE FACILITIES LOW

acces to the office area found blocked SLIPS & TRIPS LOW

No hand wash liquid or soap in the toilet HEALTH LOW

Falling Objects of material with sharp edges FALLING OBJECTS MEDIUM


without using softener
One grander found without inspecton at silo no. 3 FIRE PROTECTION LOW

upside silo avalible first add box and eye washers SUPERVISION LOW

steel rebar storage area sign installed SUPERVISION LOW

Some worker standing under suspending load FALLING OBJECTS MEDIUM

observed the rigger Falling Objects steel box FALLING OBJECTS MEDIUM
with out using softner

found one websling in very poor condition FALLING OBJECTS MEDIUM

Electrical cable in proper at site ELECTRICAL LOW

Two worker working wit out gloves PPE LOW


Found one worker not using safety glasses PPE LOW

Some food items found lying in the area ENVIRONMENT LOW

Some chemical found in the area with no proper ENVIRONMENT LOW


identification
One worker observed taking tea in the working ENVIRONMENT LOW
area
Scaffolding material properly segregated and SUPERVISION LOW
stacked
One skip found overflowing need to remove HOUSEKEEPING LOW

Found good cable management in silo POSITIVE LOW

Rebar storage area not properly barricaded SLIPS & TRIPS LOW

Patrol cain was found near welding plant and HOUSEKEEPING LOW
Electrical D B

Some worker observed taking breakfast at site HOUSEKEEPING LOW

One worker observed wearing damage safety HOUSEKEEPING LOW


helmet
found barrication not propery concreet wast yard HOUSEKEEPING LOW
and no signs

Signal man doing the job with out flags SUPERVISION LOW

Updated color code for lifting equipments COLOR CODE LOW

FALLING OBJECTS LOW


I observe lose matiral (bollts) shefting old vist
PPE LOW
found one worker not using proper PPE
HOUSEKEEPING LOW
found some concrete and debris waste at work place

drinking water botal use chemical ENVIRONMENT LOW

tower crane hook not color code COLOR CODE LOW


Electrical distribution board without fire FIRE PROTECTION LOW
extenguisher Co2

Concreet waste area not baricate HOUSEKEEPING LOW

Unprotected cable lying across the way SLIPS & TRIPS LOW
De-shackles witout color code COLOR CODE LOW

found many loose material on working platform HOUSEKEEPING LOW

Electrical distribution board without fire FIRE PROTECTION LOW


extenguisher Co2

Concreet waste area not baricate HOUSEKEEPING LOW

Unprotected cable lying across the way SLIPS & TRIPS LOW
EPORT
Status Closed Date Observer Corrective Action

Close informed to the admin to


22-Sep-16 Vidyanand
arrange for the removal of skip

Close informed to area supervisor to


22-Sep-16 Vidyanand
clear the debries from area

stop tha work and infome area


Close 22-Sep-16 Vidyanand superviseor arange tha fire
watch man then start tha work

informed to store supervisor for


Close 22-Sep-16 IMRAN housekeeping the area around
the store
Close informed o electrician to
22-Sep-16 IMRAN
change the bulb

Close RASHID
22-Sep-16 MAHMOOD Adviced to rigger on tha sports
should be load balance
Close 22-Sep-16
RASHID Informed to welding supervisor
MAHMOOD proper arangment

RASHID I infome tha rigger to use tha


Close 22-Sep-16 tagline not catch by hand any
MAHMOOD
load
informed engg/ foreman to
Close 22-Sep-16 Vidyanand remove all loose material from
working material
informed the foreman to
Close 22-Sep-16 IMRAN immediately provide tah fire
estengusher Co2
Close 22-Sep-16 Vidyanand informed foreman to
immediately barricated
Close 22-Sep-16 Vidyanand Need to be fix
Close 22-Sep-16 Marshal Need to update
Close 22-Sep-16 Vidyanand To be provide barricade
Close 22-Sep-16 Vidyanand To be provide barricade
Close Ensure to be provide daily
22-Sep-16 Marshal
basis
Close Provide more extension
22-Sep-16 Vidyanand
connection
Close 22-Sep-16 Vidyanand To be arrange cable
Close 22-Sep-16 Marshal Informed to supervisor to be
amaintin 100% safe activity
infomed tha workers use tha
Close 22-Sep-16 DANISH face sheet cutting & granding
time.
informed to tha rigging
Close 24-Sep-16 DANISH supervisor SWL past in
concreet basket
Close informed to tha scaffolding
24-Sep-16 IMRAN
superviser wear proper fixing
Close informed to electrician for the
24-Sep-16 DANISH
inpectoion of DB

Close informed the admin to arrange


24-Sep-16 IMRAN
the drinking water at site

Close Removed the harness and


24-Sep-16 Vidyanand
mark it as rejected
Close informed the elctrician to
24-Sep-16 DANISH
burried the cable
Close informed the scaffolding
24-Sep-16 DANISH
supervisor to put red tag

Close informed the driver to be park


24-Sep-16 ANOOP
only designated area of parking

Close informed the scaffold


24-Sep-16 ANOOP
supervisor to provide barricade
Close 24-Sep-16 IMRAN To be provide barricade
Close informed to electrician to be
24-Sep-16 IMRAN
removed from site
Close informed to supervisor to be
24-Sep-16 IMRAN
maintain daily basis
advise to electrican to be
Close 24-Sep-16 IMRAN provide extra light during night
work activity
Close advise to supervisor to be fix
24-Sep-16 IMRAN
hand rail
Close Infomed tha supervisor to be
24-Sep-16 IMRAN
maintian

Close 24-Sep-16 Marshal Informed to supervisor to be


amaintin 100% safe activity
infomed tha workers use tha
Close 24-Sep-16 IMRAN face sheet cutting & granding
time.
informed to tha rigging
Close 24-Sep-16 IMRAN supervisor SWL past in
concreet basket
Close informed to tha scaffolding
25-Sep-16 IMRAN
superviser wear proper fixing
infomed tha Electrical
Close 25-Sep-16 Vidyanand supervisor insepction tha
vibrater
Close informed to all workers to use
25-Sep-16 Vidyanand
chin strip all time at height

Close infomed tha all workers do not


25-Sep-16 Vidyanand
use water botal in camicals

informed to rigger supervisor to


Close RASHID
25-Sep-16 MAHMOOD
chak tha all rirring tools
insepction and couler code
infome tha electrical depart
Close RASHID
25-Sep-16 MAHMOOD
post tha singe and phone no
day and night sheft
informed to scaffolding
Close RASHID supervisor to arange tha
25-Sep-16 MAHMOOD scaffolding matiral properly and
barication
infome tha Electrical depart
Close 25-Sep-16 ANOOP post tha singe and phone no
day and night sheft
informed to Fall Protection
Close supervisor to arange tha Fall
25-Sep-16 IMRAN
Protection matiral properly and
barication
Close informed to area engineer to
25-Sep-16 IMRAN
clear the access
Close Informed and provide the guard
25-Sep-16 Vidyanand
immediately

Close informed to the welder to wear


25-Sep-16 IMRAN
properly the welder hood

Close informed to the worker not to


25-Sep-16 Vidyanand
bring the food stuf at site area
appriciation given to the Fall
Close 25-Sep-16 Vidyanand Protection team in next
morning TBM
Close 25-Sep-16 IMRAN Informed to supervisor to be
amaintin 100% safe activity
Close 25-Sep-16 IMRAN not allow matiral shifting only
lifting bag
Close informed to supervisor to
25-Sep-16 IMRAN
arrange the material
stop tha work and infome area
Close superviseor arange tha Fire
25-Sep-16 IMRAN
Protection watch man then
start tha work
informed to store supervisor for
Close 25-Sep-16 IMRAN housekeeping the area around
the store
Close informed o electrician to
25-Sep-16 IMRAN
change the bulb

Close 25-Sep-16 Marshal Adviced to rigger on tha sports


should be load balance
Close 25-Sep-16 IMRAN Informed to supervisor
barricated the area
I infome tha rigger to use tha
Close 25-Sep-16 Akhtar tagline not catch by hand any
load
Close advice given to worker to wear
25-Sep-16 Akhtar
safety goggle
Close 25-Sep-16 Vidyanand not allow matiral shifting only
Falling Objects bag
Close informed to supervisor to
26-Sep-16 Vidyanand
arrange the material

Close informed to electrician to


26-Sep-16 DANISH
replace the damage receptical

infomed tha workers use tha


Close 26-Sep-16 IMRAN face sheet cutting & granding
time.
Close 26-Sep-16 Marshal strictly instructed the rigger to use
tag line

Close 26-Sep-16 IMRAN informed the driver to be park


only designated area of parking
Close 26-Sep-16 IMRAN informed the foremanto remove
the debris workplace
Close 26-Sep-16 IMRAN To be maintained

Close informed to welding superviser


26-Sep-16 IMRAN
propre fixing tha fire blanket

Close 26-Sep-16 IMRAN Informed and depute the signaller

Close Informed to driver and parked at


26-Sep-16 IMRAN
designated place
informed engg/ foreman to
Close 26-Sep-16 IMRAN remove all loose material from
working material

Close informed to scaffold supervisor


26-Sep-16 IMRAN
to tie the toe board properly
Close 26-Sep-16 IMRAN Need to remove
Close 26-Sep-16 IMRAN To be maintained
Informed to assigned person and
Close 26-Sep-16 IMRAN
cleaning done
Informed not eating outside of rest
Close 26-Sep-16 IMRAN
shelter
Close 26-Sep-16 IMRAN Update the checklist

Close informed to area engineer to


26-Sep-16 IMRAN
clear the access
Close informed to admin to arrange
26-Sep-16 ANOOP
the soap or hand wash liquid
Close informed to rigging foreman
26-Sep-16 Marshal
and riggers to use sotner
Close informed to electrician for the
26-Sep-16 ANOOP
inspection of the grander
Close 26-Sep-16 ANOOP hse area supervisor

informed to the rebar


Close 26-Sep-16 IMRAN supervisor sign rebar stroge
area
Close 27-Sep-16 IMRAN remove tha workers and
morning diskis to TBM
Close 27-Sep-16 IMRAN instructed him nicely to use
softner
Close 27-Sep-16 Marshal informed the rigger and the
crane operator to avoid using
Close 27-Sep-16 Vidyanand Infomed tha electrion make it
propely
Close 27-Sep-16 Vidyanand Infomed to supervisor provide
working gloves
Close informed him to use safety
27-Sep-16 Vidyanand
glasses

Close informed to supervisor any kind


27-Sep-16 IMRAN
of food ia not allow to site

Close informe the supervisor to be put


27-Sep-16 IMRAN
proper identification
Close Infomed tha superviosr to be
27-Sep-16 IMRAN
stop this kind of activity
Close Informed to be maintian good
27-Sep-16 DANISH
practice
Close 27-Sep-16 DANISH keep it maintained
Close Infomed tha supervisor to be
27-Sep-16 DANISH
maintian
Close informed to area supervisor to
27-Sep-16 DANISH
provide proper barricades
informed tha area superviser
Close imegetly remove tha patrol cain
27-Sep-16 DANISH
and sheft tha chamical stroge
area
informed to that worker that no
Close 27-Sep-16 ANOOP food stuff allowed to bring at
site
Close informed to worker to replace
27-Sep-16 ANOOP
the damage helmet
Close 27-Sep-16 IMRAN informed the fore man to install
the barricate properly
Close 27-Sep-16 IMRAN Provide and advise him to work
with flags
Close Informed to be maintian good
27-Sep-16 Vidyanand
practice
Close 27-Sep-16 Vidyanand not allow matiral shifting only
Falling Objects bag
Close 27-Sep-16 Vidyanand
instructed him to wear proper PPE
Close 27-Sep-16 ANOOP
removed it by HSE helpers

Close infomed tha all workers do not


27-Sep-16 ANOOP
use water botal in camicals

informed to rigger supervisor to


Close 27-Sep-16 ANOOP chak tha all rirring tools
insepction and couler code
informed the foreman to
Close 27-Sep-16 ANOOP immediately provide tah fire
estengusher Co2
Close 28-Sep-16 ANOOP informed foreman to
immediately barricated
Close 28-Sep-16 ANOOP Need to be fix
Close 28-Sep-16 IMRAN Need to update
informed engg/ foreman to
Close 28-Sep-16 Vidyanand remove all loose material from
working material
informed the foreman to
Close 28-Sep-16 IMRAN immediately provide tah fire
estengusher Co2
Close 28-Sep-16 Vidyanand informed foreman to
immediately barricated
Close 28-Sep-16 Vidyanand Need to be fix
Preventive Measures

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision
TBT and Close Supervision
TBT and Close Supervision
TBT and Close Supervision
TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision
TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision
TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision
TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision
TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision

TBT and Close Supervision


TBT and Close Supervision
SAMSUNG ENGINEERING CO., LTD.
TAKREER CARBON BLACK & DELAYED COKER (CBDC) PROJECT, AL RUWAIS, A
CONFINED SPACE SIGN-IN / SIGN-OUT FOR
Supervisor Name: Sign: Hole Watchman Name:
Confined Space Permit No: Area: Date: Other Permit No:
COMPANY NAME ID# TIME IN TIME OUT TIME IN TIME OUT TIME IN TIME OUT TIME IN

Gas Test H2S


CO <25ppm 19.5% < LEL <1% Time Name
In case of emergency <1ppm
O2
please contact me:
Mr.praveen Mishra
052-733-9526
CO., LTD.
) PROJECT, AL RUWAIS, ABU DHABI
SIGN-OUT FORM
Sign:
o:
TIME OUT TIME IN TIME OUT TIME IN TIME OUT SIGNATURE

Name Sign
CARBON BLACK A

Contracto
S.NO. Date Time Observer Location Area/Dept r/Compa
ny
Name

4066 ### 09:00 AM P.Harris COLD FLARE HSE AJES


4067 ### 09:15 AM P.Harris
LAYDOWN YARD HSE MGS
4068 ### 09:26 AM P.Harris TAHTAN HSE TAHTAN
4069 ### 09:41 AM P.Harris
LAYDOWN YARD HSE NSH
4070 ### 09:45 AM P.Harris
COMMUTING ROUTE HSE SECL
4071 ### 08:34 AM P.Harris SS 105 HSE MGS
4072 ### 08:58 AM P.HarrisLAYDOWN #2 HSE SECL
4073 ### 09:05 AM P.HarrisLAYDOWN #2 HSE SECL
4074 ### 09:28 AM P.Harris
LAYDOWN (RRE) HSE AMB HERTEL
4075 ### 09:44 AM P.Harris
BLAST YARD (RRE)HSE XERVON
CARBON BLACK AND DELAYED COKER PROJ
SOR REGISTER

Action
Observation Positive/Negative Status
(Yes/No)

Housekeeping Required : Rubbish pile and loose material need removal Negative Y OPEN
Concrete and Wood scrap need removal Negative Y OPEN
Metal @ concrete waste need removal Negative Y OPEN
Great Progress on Cleaning Waste / Debris Pile Positive N CLOSED
Good traffic flow during peak times Positive N CLOSED
Worker without safety glasses Negative Y OPEN
SE Corner - Cable drums ans wood scrap need removal - FIRE HAZARD Negative Y OPEN
SE Corner - Rebar, metal scrap and paint cans need removal Negative Y OPEN
GENERAL HOUSEKEEPING needed Wood scrap, cable trays,etc Negative Y OPEN
BLAST AREA - Need Housekeeping against South Fence Negative Y OPEN
KER PROJECT

Lack of Resources
Lack of Training

Lack of Belief
SOR

Others
SOR
escribe Immediate
Describe Action
Corrective
toDescribe
Prevent
ActionIndirect
Recurrence
Cause Remarks Reported (Closed
Date Date)

N/A N/A N/A ###


N/A N/A N/A ###
N/A N/A N/A ###
N/A N/A N/A ###
N/A N/A N/A ###
N/A N/A N/A ###
N/A N/A N/A ###
N/A N/A N/A ###
N/A N/A N/A ###
N/A N/A N/A ###
Note
TAKREER Carbon Black & Delayed Coker (CBDC) Project

GAS MONITORING REPORT


Date Inspected
Flammable Oxygen To
Location Time
(%LEL) O2(%) AMMONIA

Date : Model:

Prepared By: Position:


Coker (CBDC) Project

G REPORT

Toxic
Remarks
H2S(PPM) SO2(PPM) CO(PPM)

Serial No:

Signature:
CARBON BLACK & DELAYED COKER PROJECT

TAHTAN Contracting L.L.C


WRITTEN WARNING LETTER
Date Inspected SR.NO./СЕР.№:
NAME OF OFFENDER : EMPLOYEE №:
DESIGNATION : SEX
AGE :
Supervisor :
YEARS OF EXPERIENCE :
DATE OF ISSUE :

LOCATION OF OFFENCE :

DESCRIPTION OF OFFENCE :
:

ISSUED BY : NAME

DESIGNATION : SIGNATURE

SIGNATURE OF OFFENDER DATE-

NOTE:

ISSUE OF WARNING LETTER FIRST TIME

ISSUE OF 2ND WARNING LETTER OFFENDER WILL BE SENT FOR RE-ORIENTATION


ISSUE OF 3RD WARNING LETTER OFFENDER WILL BE REMOVED FROM SITE
PROJECT

GNATURE
Indent Request Form
Indent No. _____________________

Quantity
Sr. No. Material Description Unit
Requested Approved
1 FILE CABINET Nos 1
2 OFFICE CALCULATER Nos 1
3 WHITE BOARD Nos 1
4 MARKER (BLACK ) Nos 2
5 MARKER (RED ) Nos 2
6 DUSTER Nos 1
7 PRINTER CATRIDGES (BLACK & WHITE) Nos 2
8 PRINTER CATRIDGES (COLOUR) Nos 2
9 FILE FOLDER Nos 10
10 GLUE STICK Nos 1
11 PLASTIC COVER FOR FILLING PKT 2
12 FILE DIVIDER PKT 2
13 HIGHLIGHTER (GREEN,RED,YELLOW) PC 2E
14 WHITNER PC 1
15
16
17
18
19
20

P.PANDEY
Requested By Recommended By
Name: PRIYARANJAN PANDEY Name:
DesignatLEAD HSE Designation:
nt Request Form
Date: _____06-01-2016____

Requirement Purchase Location Remarks


Date

mmended By Approved By