HAZARD IDENTIFICATION & RISK ASSESSMENT

AE/HSE/FM-001 | Rev 00 | 6th April 2016

Date of assessment: 14th May 2017 Location: Salwa Resort Project Prepared by: Mr.Irfan Ahamad Approved by: Mr.Hassan
Painting With Airless Spray Gun / Paint
Work activity: Assessment team: Safety Officer, Project engineer etc.
roller / Paint brush

Task Risk Initial Controls Residual


Risk/Impact risk

Likelihood

Likelihood
Rating

Risk rating
Consequence

Consequence
Hazard
Sl.
Description task step/Activity description and Who May be Harmed Control measures
no.
effect

-Collision -Topple -Assigned trained forklift operator


1 Transporting painting Moving vehicle 5 1 5 5 2 10
equipment by forklift to -Fatality -Check and ensure green tag, proper
worksite maintenance, check list, follow speed
limit -Do not overload -Ensure
adequate lighting
Falling object 2 2 4 -Secure equipment’s properly 5 1 5
-Strike by falling spray
pump, hoses and paint
drum

-Strike by falling object


2 Lifting up equipment on Falling object 2 2 4 -Assigned trained signaler and rigger 5 1 5
-Struck by moving object
board vessel by crane -Assigned trained crane operator -Check
and inspect all lifting devices before use
-Materials secured properly -No
Page 1 of 4
HAZARD IDENTIFICATION & RISK ASSESSMENT
AE/HSE/FM-001 | Rev 00 | 6th April 2016

Task Risk Initial Controls Residual


Risk/Impact risk

Likelihood

Likelihood
Rating

Risk rating
Consequence

Consequence
Hazard
Sl.
Description task step/Activity description and Who May be Harmed Control measures
no.
effect

obstruction
-Oily surface -Poor
3 Setting and connection all Slip, trip and fall 1 2 2 -Proper housekeeping -All hoses and 1 3 3
housekeeping
equipment’s cable must be lay out properly
-Obstruction on
passageway
Sharp edges -Contact with sharp edges 1 2 2 -Use proper hand gloves 0 0 0
-High noise level -NID -Eye injury
4 Testing of equipment 1 3 3 -Use proper PPE 0 0 0
-Leakage and
splash
-Fire hazard due to hot
5 Mixing paints -Fire hazard 5 1 5 -Check and ensure no hot work at the 2 2 4
work -Smoking
-Explosion vicinity -Ban smoking -Barricade and
-Splashing display signboard
-Fire and explosion due to
6 Painting with airless -Fire hazard 6 3 18 -Check and ensure no incompatible hot 5 2 10
hot work -Smoking
gun/Paint roller/ Brush -Explosion work -Coordinate painting work -Must
-Inhalation of harmful
-Falling from use proper PPE -Proper lighting
vapor -Defect ladder
height (explosion proof light) -Entry permit
-Inhalation -Skin -Keep finger or body away from spray
Page 2 of 4
HAZARD IDENTIFICATION & RISK ASSESSMENT
AE/HSE/FM-001 | Rev 00 | 6th April 2016

Task Risk Initial Controls Residual


Risk/Impact risk

Likelihood

Likelihood
Rating

Risk rating
Consequence

Consequence
Hazard
Sl.
Description task step/Activity description and Who May be Harmed Control measures
no.
effect

irritation gun tip


-Electrocution
-Asphyxiation
-High pressure
injury
-Paint injects into hand
7 Demobilize -High pressure 3 2 6 -Released pressure from equipment’s 2 2 4
and body
injuries; paint and hoses -Use proper PPE -Clear all
inject empty paint drums and do
housekeeping upon completion of work

CATEGORY CONSEQUENCES
Page 3 of 4
HAZARD IDENTIFICATION & RISK ASSESSMENT
AE/HSE/FM-001 | Rev 00 | 6th April 2016