Size of Johnson table is

A 600x750mm
B 200x600mm
C 1000x1200mm
D 750x900mm
Which process of levelling in which the
elevations of points are computed from the
vertical angles and horizontal distances
measured in the field?

A. Barometric levelling
B. Trigonometric levelling
C. Spirit levelling
D. Traverse leveling
The horizontal angle between true and
magnetic meridian at a place is

A. pitch
B. Dip
C. Azimuth
D. Declination
In an internal focussing telescope the type of
lens provided is

A. Plano convex
B. Convex
C. Concave
D. Plano concave
The volume of a trapezoidal prism is given
by

A. V=L/2 (sum of parallel edges) x


Height

B. V=L/6 (sum of parallel edges) x


Height

C. V=L/3 (sum of parallel edges) x


Height

D. None of the above


Bowditch rule is applied to

A. an open traverse for graphical


adjustment

B. a closed traverse for adjustment of


closing error

C. determine the effect of local attraction

D. none of the above


In working profile of a longitudinal section,
the depth of cuttings are written in

A. Red

B. Green

C. Blue

D. Black
8. Isogonic charts are prepared by

A. Meteorological departent

B. Pwd

C. Survey of india dept

D. Any of these
9. Error which is not completely eliminated
in reciprocal levelling is

A. Error due to curvature

B. Error due to refraction

C. Error due to non adjustment of line of


collimation

D. Error due to non adjustment of


bubble tube
10. The method of levelling in which the
height of mountain are found by observing
the temperature at which water boils is
known as

A. Barometric levelling

B. Reciprocal levelling

C. Longitudinal levelling/

D. Hypsometry
200 sq.m is

A. 240 sq.yard

B. 2000 sq.yard

C. 2400 sq.yard

D. 200 sq.yard
Plumb lines in two different places in plane
surveying are

A. Parallel

B. Perpendicular to each other

C. Cut at centre of earth

D. Inclined
When the bed level of the canal is higher than
the highest flood level of the drainage, the
cross drainage work is :

A. Aqueduct

B. Super passage

C. Cause way

D. Level crossing
A contour canal

A. Is most suitable in hilly areas

B. Irrigates only on one side

C. Is aligned parallel to the contour of a


country

D. All of the above


If the excavated soil is insufficient for the
for bank and road ways construction , the
earth is obtained from

A. Spoil bank

B. Berm

C. Dowel

D. Burrow pit