a
AED
@ MATERIAL INSPECTION “
memati tat io REPORT Rese
coe: [OWAN GAS COMPANY HOC [aR Re TAR-ELE-GOA
[ConTRACT: ——|EPC WORK FOR PERMANENT STAFF ACCOMMODATION [nas ef. Tro
[CONTRACT No. [OGC/14/2017 [Specs/Drwg. Ref
|Description of Material for Inspection
Manufacturer! Supplier] Size/Capacity/Duty| Standard Rt. Color/Finish
PVC CONDUIT & ASSESSORIES | HOTACET
|NATIONAL PLASTIC 20,25mm BLOCK
Factory
inspection
Location: ie
Detivery Date: fort2/2018
Guatity
ST Bet sno nos
Cconwenrs
ror aL RAFAA LLCs ature: ate:
Bin Gakuen, ae ae 6 | Jao
Enciosures etvery Note [A~ ——|eopy or mas Eat Yyfaecoricate [=] as
Further test required: Yes Wo
For 06 Comments 7
al Gan Lot pO
Leap aan wank
o
AN pepe Ste
Cl (Ay Approved THY“Tol approved os Nenad 1 [c]Not Approved
ICSR NAME = mM ine) eee [RECEIVED BY: (Stamp, date, Sign and Time)
sionaTure: ny fare: 6 Fe59
L T I = T T I t 4 aes I z I
"AL RAFAA L.L.G, P.O. Box: 2606, Ruwi, Post Code: 112, Sultanate of Oman, Phone: 24619100
4142-FRM-042 Rev. 00