MATERIAL INSPECTION REPORT fh (CLENT: [OMAN GAS COMPANY SAOC [MIR Ref. TMIRELE-OOD |CONTRACT: EPC WORK FOR PERMANENT STAFF ACCOMMODATION-Nyjm&_|MAS Ref. (001-T7-4-0 JCONTRACT No. |OGC/14/2017 [Specs/Drwg. Ref_ |Description of Material for Inspection |Manufacturer/ Supplier| Size/Capacity/Duty_ Standard Ref. Color/Finish ‘6x6 PVC JUNCTION BOX ]HOTACE/ INATIONAL PLASTIC oxe BLOCK [Factory inspection Location: pe __ fwperantcroori9 Delivery Date: |aoeg - 19/03/18 Quantity Delivered: jz NOs COMMENTS For AL RAFAA Lic: C Auger signature: vate: | orbs For TARGET LLC: M. Kaman Signature: y. to YS Enctosures Detivery Note |Copy of MAS [Test Certificate [I~ pas [Further test required: Yes No (OGC Comments bb Mas Agepoed 7 2 TA wipe ated 1 [B] Approved as Noted 1 [CINot Approved RECEIVED 8%; (Stamp, date, Sign and Time) Sukesttesmage F f_ brarely T oor I T I T ooo ‘AL RAFAAL.L.G, P.O. Box: 2606, Ruwi, Post Code: 112, Sultanate of Oman, Phone: 24619100 41142-FRM-042 Rev. 00