PP CO PS SD

PP and CO Highlevel Objects / Processes


Internal Procurement Strategy

MM03 OPPS Industry


MMR Strategy Discrete Process
Planned Indep Reqt(PIR) •Assemble to new Thing •Mix to new Stuff, Co-Prdt
•Easier to reverse •Difficult to reverse For Lean Manufacturing
Customer Indep Reqt (CIR) •Electronics, Aero/Auto •Chemical, F&B
OPP3
MTS – base on forecast ( ie PIR) MTO – base on S/O ( ie CIR) •BOM/Operation/WC •Recipe/Phase/Resource •Backflush
•Parts-number •Batch number Repetitive (REM) REM Prof •MovTyp
[10] Make-to-Stock (MTS) [20] Make-to-Order (MTO) AAC=E
•Tcode: CO01 •Tcode: COR1 •Discrete Ind. (typical) Assign at FG level
[11] MTS - Gross Reqt [21] MTO with PS (ETO) AAC=D •Period/Qty Base
OVZG
ReqClass [40] MTS net of PIR/CIR [25] MTO with VC AAC=M •Simple routing
•Periodic backflush KKF6N
•A/C Assign Cat •Order Type [70] Assembly-to-Stock [50] Assembly-to-Order AAC=M •Periodic cost control Product Cost
Collector
(Consupt Post, (either PP / PS) (selective list only) Assign at OrdTyp level
Spec.Stock) •Settle Prof
•RA Key

“Scenario” OME9
Forecasting
E: MTO, SD Cost, SD-Stk IBP SO&P Manual
M: MTO, PP Cost, SD-Stk Sales
B: MTS, SD Cost, Coll-Stk Flex Plan [MD61] Order MRP Prof
•MRP (PD)
•DDMRP (D1)
Q: ETO, PS Cost, PS-Stk •Reorder Point (VB)
D: ETO, PS Cost, SD-Stk •Forecast (VV)

CBP
G: MTS, PS Cost, Coll-Stk •Time-phased (R1)
PIR CIR
MRP Type
MD15 PR/SA
Demand Mgmt
Production Version Pln Order MD04
Adv Planning MRP (Classic) MD01N
CS03 (PP/DS) MRP Live MRP Run CO41 MF Order
BOM OPU3 •Fixed PO Receipt
•Firmed PlnOrd
OrdSchd
•Firmed PR CM21
Para •Lot Size Capacity Mgmt

CA03 OPL8 OPJH


Routing Ord/Plnt OrdTyp
•Oper Default MTO Shopfloor
VA01 •Order Level
•Ctrl Key Mat Staging Backflushing •MMR Level
•WC
•StdVal
Sales Order MD50
•MRP
•WC Level
OKO7 + Auto GR at Ctrl Key •OrdTyp Cnf [OPK4]
•Kanban
Sett_Prof
PREL DLV TECO
COR1 (PI) COOISPI (PI) KSB1 (CC)
CN08
KL03 KOB1 (IO)
CO01 QE51N MIGO CO11N MIGO COOIS KVBI (SOitm)
ActTyp CJ20N CJI3 (WBS)
MF Order QM GR CNF GI PP Reports CO Reports
MF Order Project/WBS MD51 InspTyp 03
QM Chk Back
ATP
•Capacity CR03 InspTyp 04 Flush
•Schedule Work
•Cost Center
(Formula) OPJ8
Operations Ctrl Key Costing
Plan
Prelim Cost
KS03 Cost
Cost Dir. Material Dir. Labour
Center

Direct Actual
Simul Cost
Cost Cost
KB21N
KGI2
Period
OH Sett Cost
Cost Settings
•DefRule Sett (PP1/2)
•RA Key (WIP) RA Key WIP KKAX WIP
•Def CostVar (Plan)
CO88
•Def CostVar (Act) OKV6
•Cost Collector Flag TCV VAR Period Sett Zero the WIP

Settings in OVZG will Scrap KKAX


supersede DefRule Sett if MTO
KSZ2 KKS2 VAR
CostSht OH
CO88 •MAT (if MTS)
•CO Objects
Final Sett (SOitm, W BS)
•COPA

VAR Key ‘MTO’: SOitm->COPA [KKA3+VA88]


‘ETO’: WBS->COPA [KKA2+CJ88]