SIGNIFICANT
Significantly degraded unit readyness or capability, sever (H) 3
injury, illness, loss, or damage
MODERATE
Somewhat degraded unit readiness or capability, minor (M) 2
injury, illness, loss, or damage
MINOR
Litle impact to unit readiness or capability, minimal injury, (L) 1
loss, or damage
LIMITED
Very little impact to unit readiness or capability, very minimal (VL) 0
injury, loss, loss or damage
4 5 6 7 8
3 4 5 6 7
2 3 4 5 6
1 2 3 4 5
0 1 2 3 4
0 1 2 3 4
VERY LOW LOW MEDIUM HIGH VERY HIGH
possible Infrequent Sporadic or Several or Continous,
occurances but occurences intermitten numerous regular, or
improbable occurences occurences inevitable
occurences
Severity
Process
Owner
No Process Failure Mode Failure Effect
Occurance
Respond
Accept
Causes Current Controls
Additional Action Timing PIC
SEVERITY
VL L M H
0 1 2 3
VH 4 4 5 6
H 3 3 4 5
OCCURANCE
M 2 2 3 4
L 1 1 2 3
VL 0 0 1 2
VH < 6 hoursThe system is very time-critical and may be inaccessible for no more than 12 hours
H 12 hours.The system is time-critical and may be inaccessible for no more than 24 hours
OUTAGE
M 2 day It is possible to work without the system for a short period, but no more than 2 days
L 1 week It is possible to work without the system for a period of time, but no more than one
VL 1 week The system is not time-critical and can be inaccessible for more than one week
H VH RISK SCORE NOTE
3 4