You are on page 1of 9

249600.0000 249400.

0000

TRAMO Longitud Q b S y A T V E H
Z n F
DEL KM. AL KM. (m) (m) (m/m) (m) (m2) (m) (m/s) (m) (m) tipo

3 + 000.00 3 + 089.00 89.00 6.25875 1.80 1.00 0.00055 0.014 1.3899 4.4336 4.5798 1.4117 1.4915 0.4581 2.00 I
VISTA EN PLANTA DEL TRAMO:
Km. 3 + 000.00 - Km. 3 + 500.00 3 + 089.00 3 + 152.00 63.00 6.25875 1.80 1.00 0.00055 0.014 1.3899 4.4336 4.5798 1.4117 1.4915 0.4581 2.00 I

ESC. HORIZONTAL: 11000 3 + 152.00 3 + 174.00 22.00

8769000.0000
3 + 174.00 3 + 319.00 145.00 6.25875 1.80 1.00 0.00055 0.014 1.3899 4.4336 4.5798 1.4117 1.4915 0.4581 2.00 I

3 + 319.00 3 + 483.50 164.50 5.75625 1.80 1.00 0.00055 0.014 1.3309 4.1670 4.4618 1.3814 1.4282 0.4564 2.00 II

3 + 483.50 3 + 532.00 48.50 5.75625 1.80 1.00 0.00055 0.014 1.3309 4.1670 4.4618 1.3814 1.4282 0.4564 2.00 II
3 + 532.00 3 + 553.00 21.00
3 + 553.00 3 + 623.00 70.00 5.75625 1.80 1.00 0.00055 0.014 1.3309 4.1670 4.4618 1.3814 1.4282 0.4564 2.00 II

3 + 623.00 3 + 700.00 77.00 5.4995 1.80 1.00 0.00055 0.014 1.2997 4.0285 4.3993 1.3651 1.3947 0.4555 2.00 III

3 + 700.00 3 + 704.00 4.00 5.2525 1.70 1.00 0.00055 0.014 1.2973 3.8882 4.2945 1.3509 1.3903 0.4533 1.90 IV
3 + 704.00 3 + 722.50 18.50
3 + 722.50 3 + 800.00 77.50 5.2525 1.70 1.00 0.00055 0.014 1.2973 3.8882 4.2945 1.3509 1.3903 0.4533 1.90 IV
3 + 792.00 3 + 814.00 22.00
3 + 814.00 3 + 881.50 67.50 5.2525 1.7 1.00 0.00055 0.014 1.2973 3.8882 4.2945 1.3509 1.3903 0.4533 1.90 IV

3 + 881.50 3 + 893.00 11.50 5.0050 1.70 1.00 0.00055 0.014 1.2652 3.7516 4.2304 1.3341 1.3559 0.4523 1.90 V
3 + 893.00 3 + 911.60 18.60
3 + 911.60 3 + 933.00 21.40 5.0050 1.70 1.00 0.00055 0.014 1.2652 3.7516 4.2304 1.3341 1.3559 0.4523 1.90 V
3 + 933.00 3 + 951.60 18.60
3 + 951.60 4 + 000.00 48.40 5.0050 1.70 1.00 0.00055 0.014 1.2652 3.7516 4.2304 1.3341 1.3559 0.4523 1.90 V

249600.0000 249400.0000 KM. 3 + 000.00 - KM. 4 + 000.00

I.- PARA EL CONCRETO:


PERFIL LONGITUDINAL DEL TRAMO: Km. 3 + 000.00 - Km. 3 + 500.00
* Cemento Anti salitre MS.
ESC. HORIZONTAL: 11000 - ESC. VERTICAL: 1100
500.00 500.00
STA = Km. 3 + 160.00

STA = Km. 3 + 319.00


ELEV = 494.15 msnm

ELEV = 493.57 msnm


STA = Km. 3 + 000.00
ELEV = 494.24 msnm

2
.
INICIO DEL CANAL ENTREGA DE OBRA DE ARTE: CRUZA CANAL DE
499.00 (MARGEN IZQUIERDA) EXCEDENCIAS: 499.00 II.- DEL TIPO DE SUELO: ALUVIAL compuesto por Arena Limosa (SM), Grava Limosa (GM) y GP.
KM = 3 + 000.00 (MARGEN DERECHA)
CR = 494.24 m.s.n.m KM = 3 + 319.00
498.00 KM = 3 + 089.00
KM = 3+160.00
C.R = 493.57 m.s.n.m 498.00 2.1. (Z = 1.00)
H = 0.50 m KM = 3 + 483.50
C.R = 495.58 m.s.n.m M.R = 0.75 L/s/ha C.F.C = 493.48 m.s.n.m
C.R.I = 494.15 m.s.n.m
C.R.F = 493.65 m.s.n.m C.F C.I = 494.51 m.s.n.m 2.2. Debido a la presencia de estratos de arena limosa, gravo arenosos, cubiertos por capa de materiales arcillosos, se recomienda extraer dicho material, excavando de acuerdo a las
497.00 C.F C.S = 493.63 m.s.n.m 497.00
Q = 75.00 L/s

496.00 496.00
Terreno natural 3.1. Primeramente realizarse un con material de RELLENO y AFIRMADO, luego excavar de acuerdo a las dimensiones de las secciones en los 5 subtramos
495.00 495.00 (verificado que se llegue al 95% del Proctor Modificado). Desde la progresiva del Km. 3 + 000.00 al Km. 4 + 000.00, es decir todo el de canal, se revestirlo de concreto
Terreno natural simple con un espesor de revestimiento igual a 9.00 cm. Indicar que pudo haberse dejado al canal en tierra, sin embargo
disminuyendo consigo su eficiencia Asimismo se
se erosionar, causando de flujo debido a la
el criterio de revestirlo de concreto puesto que a lo largo del tramo existen obras de arte de manera consecutiva
494.00 494.00

493.00
Rasante proyectada 493.00 IV.- DE LA PENDIENTE:
Rasante proyectada Rasante proyectada 4.1. La pendiente de adoptada para los 5 subtramos en los que se el canal, se en al y al perfil longitudinal del terreno que se obtuvo luego
492.00 492.00
* Km. 3 + 000.00 - Km. 3 + 319.00 = 0.00055 m/m (0.55 %0).
* Km. 3 + 319.00 - Km. 3 + 623.00 = 0.00055 m/m (0.55 %0).
491.00 491.00 * Km. 3 + 623.00 - Km. 3 + 700.00 = 0.00055 m/m (0.55 %0).
* Km. 3 + 700.00 - Km. 3 + 881.50 = 0.00055 m/m (0.55 %0).
490.00 490.00 * Km. 3 + 881.50 - Km. 4 + 000.00 = 0.00055 m/m (0.55 %0).

V.- DE LA RUGOSIDAD:
3+000

3+020

3+040

3+060

3+080

3+100

3+120

3+140

3+160

3+180

3+200

3+220

3+240

3+260

3+280

3+300

3+320

3+340

3+360

3+380

3+400

3+420

3+440

3+460

3+480

3+500
PROGRESIVA 5.1. Tal como se en el punto ii (DE LA DEL TERRENO), desde la progresiva Km. 3 + 000.00 hasta el Km. 4 + 000.00, revestirse al canal con CONCRETO
SIMPLE, cuyo espesor ser e = 9.00 cm, por lo que valor de "n" adoptado fue el recomendado en la tabla 11 del libro "Trazo y de canales (Dr. Jose Ramos)", 34.
494.41
495.00

495.00

494.99

494.98

494.89

494.88

494.83

494.00

494.00

494.86

494.93

494.57

495.00

494.27

494.76

494.90

494.00

494.00

494.00

494.00

494.00

494.00

494.00

494.00

494.00
COTA DE * Tramo: Km. 3 + 000.00 - Km. 4 + 000.00 ===> Revestimiento de CONCRETO, n = 0.014
TERRENO
VI. DE LOS RADIOS DE CURVATURA:
494.21

493.61

493.51
494.24

494.23

494.22

494.20

494.18

494.17

494.16

494.15

493.65

493.64

493.62

493.60

493.59

493.58

493.57

493.56

493.55

493.54

493.53

493.50

493.49

493.48

493.47
COTA DE 6.1. Los radios de curvatura adoptados estan basados en la tabla 12 del libro "Trazo y de canales (Dr. Jose Ramos)", 36, en los que recomienda radios en
RASANTE al caudal de El otro criterio fue adoptar radios parecidos a los del alineamiento original, por lo que los radios dados al alineamiento horizontal del canal de fueron
los que se detallan en la tabla de elementos de curva, los cuales oscilan entre los 80.00 m y 150.00 m respectivamente.

PENDIENTE VII. DE LAS JUNTAS:


L = 160.00 m L = 159.00 m L = 221.00 m
7.1. En las obras de arte como son, las tomas laterales, alcantarilla, partidor, las juntas longitudinales, transversales de de estar espaciadas
ALTURA DE

0.51
1.31
0.76

0.77

0.77

0.77

0.70

0.69

0.66

0.24

0.96

0.68

0.44

0.46

0.47

0.49

0.50

0.52

0.53
0.35

0.45
1.22

1.39

1.18

1.33

CORTE

ALTURA DE
0.15

Camino de servicio Camino de servicio


RELLENO Berma Peatonal de 1.00 m (margen derecha). Berma Peatonal de 1.00 m (margen derecha).
de ancho (margen izquierda). de ancho (margen izquierda).

I II
LC = 4.43 m LC = 31.12 m
L = 61.47 m L = 126.25 m LC = 35.63 m L = 229.19 m LC = 13.73 m L = 19.52 m Canal revestido de CONCRETO, e = 9.00 cm Canal revestido de CONCRETO, e = 9.00 cm
ALINEAMIENTO R = 100.00 m R = 80.00 m
R = 80.00 m R = 80.00 m

ALUVIAL: Arena Limosa (SM), Grava Limosa (GM) y Grava Pobremente Graduada (GP).

TABLA DE ELEMENTOS DE CURVA ELEMENTOS DE CURVA LEYENDA


Caudales
COORDENADA LONGITUD DE LONGITUD DE L Toma lateral Cota de rasante Mar. y progresiva M.R.
derivados
Subtramos: Inicio - Fin Caudal por subtramo
PROGRESIVA - PC PROGRESIVA - PI PROGRESIVA - PT RADIO - R (m) TANGENTE - T (m) EXTERNA - E (m) (T.L) (msnm) de las tomas (Lts/ha) (ha)
UTM DEL "PI" CURVA - L (m) CUERDA - LC (m) Lts/s m3/s Qinicial: 6.25875 m3/s
PI T.L. 493.57 M.I: Km. 3 + 319.0 0.75 670.00 502.50 0.5025 Q: 5.75625 m3/s
Camino de servicio
Norte.: 8768723.43
Km.: 3+061.47 Km.: 3+063.69 Km.: 3+065.90 100.00 m 4.43 m 4.43 m 2.21 m 2.21 m T T.L. 492.97 M.I: Km. 3 + 623.0 0.65 395.00 256.75 0.2568 Q: 5.49950 m3/s Berma Peatonal de 1.00 m (margen derecha).
Este.: 249618.46 PC LC PT T.L. 492.93 M.I: Km. 3 + 700.0 0.95 260.00 247.00 0.2470 Q: 5.25250 m3/s
de ancho (margen izquierda).

Norte.: 8768849.66 T.L. 492.15 M.I: Km. 3 + 881.5 0.90 275.00 247.50 0.2475 Q: 5.00500 m3/s
Km.: 3+192.15 Km.: 3+210.27 Km.: 3+227.78 80.00 m 35.63 m 35.34 m 18.12 m 18.12 m T.L. 492.14 Canal continua... 1.10 4550.00 5005.00 5.0050 Q: 5.00500 m3/s PROYECTO INTEGRADOR:
Este.: 249543.95 ESCALA:
3
CAUDAL TOTAL A DERIVAR = Q = 6.25875 m /s INDICADA
Norte.: 8768991.53 "LA MISERICORDIA"
Este.: 249333.03
Km.: 3+456.98 Km.: 3+463.86 Km.: 3+470.71 80.00 m 13.73 m 13.72 m 6.88 m 6.88 m R PC: Inicio de curva. Canal revestido de CONCRETO, e = 9.00 cm
PT: Final de curva. PLANO: DEPARTAMENTO: FECHA:
PLANTA Y PERFIL LONGITUDINAL DEL CANAL
Norte.: 8769008.75 PI: Punto de Inflexion. LIMA
JUNIO, 2019
Km.: 3+490.23 Km.: 3+505.99 Km.: 3+521.36 80.00 m 31.12 m 30.93 m 15.76 m 15.76 m TRAMO: KM.: 3 + 000.00 - KM. 3 + 500.00
Este.: 249294.54 R: Radio de Curva.
Tramo Leyenda PROVINCIA:
L: Longitud de Curva.
LC: Longitud de Cuerda. Tramo: Km. 0 + 000.00 - 3 + 700.00 SM = Arena limosa. * Castro Farro, Katherin. HUAURA LAMINA:
Norte.: 8769175.97 * Cruz Linares, Nylen. * Oblitas Perez, Jhair.
Km.: 3+731.57 Km.: 3+736.59 Km.: 3+741.61 150.00 m 10.04 m 10.04 m 5.02 m 5.02 m T: Tangente. Tramo: Km. 2 + 130.00 - 5 + 580.00 Suelos arenosos, limosos y gravosos arenosos. SM, L, G
Este.: 249135.18 : Angulo de Deflexion. * Irigoin Tocas, Jose. * Zegarra Flores, Jair. DISTRITO:
Suelos del tipo arenoso y arenoso limoso con presencia de cantos
Norte.: 8769303.95
Km.: 3+918.69 Km.: 3+925.86 Km.: 3+933.02 150.00 m 14.33 m 14.32 m 7.17 m 7.17 m
Tramo: Km. 4 + 500 - hacia adelante SM = Arenoso limoso. DOCENTE: PP - 01
Este.: 248995.74 C Tramo: Km. 3 + 000.00 - 4 + 000.00 ALUVIAL: arena limosa, grava limosa y grava pobremente graduada. SM, GM, GP DR. LOCALIDAD:
QUIPICO
249200.0000 249000.0000

TRAMO Longitud Q b S y A T V E H
VISTA EN PLANTA DEL TRAMO: DEL KM. AL KM. (m) (m) Z (m/m) n (m) (m2) (m) (m/s) (m) F (m) tipo
Km. 3 + 500.00 - Km. 4 + 000.00 3 + 000.00 3 + 089.00 89.00 6.25875 1.80 1.00 0.00055 0.014 1.3899 4.4336 4.5798 1.4117 1.4915 0.4581 2.00 I
ESC. HORIZONTAL: 11000
3 + 089.00 3 + 152.00 63.00 6.25875 1.80 1.00 0.00055 0.014 1.3899 4.4336 4.5798 1.4117 1.4915 0.4581 2.00 I
3 + 152.00 3 + 174.00 22.00
3 + 174.00 3 + 319.00 145.00 6.25875 1.80 1.00 0.00055 0.014 1.3899 4.4336 4.5798 1.4117 1.4915 0.4581 2.00 I

3 + 319.00 3 + 483.50 164.50 5.75625 1.80 1.00 0.00055 0.014 1.3309 4.1670 4.4618 1.3814 1.4282 0.4564 2.00 II
8769000.0000

3 + 483.50 3 + 532.00 48.50 5.75625 1.80 1.00 0.00055 0.014 1.3309 4.1670 4.4618 1.3814 1.4282 0.4564 2.00 II
3 + 532.00 3 + 553.00 21.00
3 + 553.00 3 + 623.00 70.00 5.75625 1.80 1.00 0.00055 0.014 1.3309 4.1670 4.4618 1.3814 1.4282 0.4564 2.00 II

3 + 623.00 3 + 700.00 77.00 5.4995 1.80 1.00 0.00055 0.014 1.2997 4.0285 4.3993 1.3651 1.3947 0.4555 2.00 III

3 + 700.00 3 + 704.00 4.00 5.2525 1.70 1.00 0.00055 0.014 1.2973 3.8882 4.2945 1.3509 1.3903 0.4533 1.90 IV
3 + 704.00 3 + 722.50 18.50
3 + 722.50 3 + 800.00 77.50 5.2525 1.70 1.00 0.00055 0.014 1.2973 3.8882 4.2945 1.3509 1.3903 0.4533 1.90 IV
3 + 792.00 3 + 814.00 22.00
3 + 814.00 3 + 881.50 67.50 5.2525 1.7 1.00 0.00055 0.014 1.2973 3.8882 4.2945 1.3509 1.3903 0.4533 1.90 IV

8769400.0000
3 + 881.50 3 + 893.00 11.50 5.0050 1.70 1.00 0.00055 0.014 1.2652 3.7516 4.2304 1.3341 1.3559 0.4523 1.90 V
3 + 893.00 3 + 911.60 18.60
3 + 911.60 3 + 933.00 21.40 5.0050 1.70 1.00 0.00055 0.014 1.2652 3.7516 4.2304 1.3341 1.3559 0.4523 1.90 V
249200.0000 249000.0000
3 + 933.00 3 + 951.60 18.60
PERFIL LONGITUDINAL DEL TRAMO: Km. 3 + 500.00 - Km. 4 + 000.00
3 + 951.60 4 + 000.00 48.40 5.0050 1.70 1.00 0.00055 0.014 1.2652 3.7516 4.2304 1.3341 1.3559 0.4523 1.90 V
ESC. HORIZONTAL: 11000 - ESC. VERTICAL: 1100
500.00 500.00
STA = Km. 3 + 540.00

ELEV = 492.87 msnm


STA = Km. 3 + 808.30
ELEV = 493.45 msnm

STA = Km. 3 + 704.00

STA = Km. 3 + 800.00

STA = Km. 3 + 881.50

STA = Km. 3 + 900.00


STA = Km. 3 + 700.00
ELEV = 492.93 msnm

ELEV = 492.15 msnm

ELEV = 492.14 msnm

STA = Km. 4 + 000.00


ELEV = 494.40 msnm
ELEV = 492.93 msnm

ELEV = 490.62 msnm


STA = Km. 3 + 623.00
ELEV = 492.97 msnm

499.00 499.00 KM. 3 + 000.00 - KM. 4 + 000.00

498.00 498.00 I.- PARA EL CONCRETO:


CRUZA CAMINO DE LA OBRA DE ARTE: OBRA DE ARTE:
M.D A LA M.I: CAIDA VERTICAL 04
* Cemento Anti salitre MS.
497.00 KM = 3+808.30 KM = 3+900.00
497.00
KM = 3 + 704.00 C.I = 494.40 m.s.n.m H = 0.70 m
C.R = 492.93 m.s.n.m 2
496.00 C.R.I = 492.14 m.s.n.m
FIN DEL TRAMO 496.00 .
C.R.F = 491.44 m.s.n.m
(CANAL CONTINUA...)
II.- DEL TIPO DE SUELO: ALUVIAL compuesto por Arena Limosa (SM), Grava Limosa (GM) y GP.
495.00 KM = 4 + 000.00 495.00
CR = 490.62 m.s.n.m
2.1. (Z = 1.00)
494.00 Terreno natural 494.00 2.2. Debido a la presencia de estratos de arena limosa, gravo arenosos, cubiertos por capa de materiales arcillosos, se recomienda extraer dicho material, excavando de acuerdo a las
Terreno natural Terreno natural
493.00 493.00

492.00
Rasante proyectada Rasante proyectada 492.00 3.1. Primeramente realizarse un con material de RELLENO y AFIRMADO, luego excavar de acuerdo a las dimensiones de las secciones en los 5 subtramos
(verificado que se llegue al 95% del Proctor Modificado). Desde la progresiva del Km. 3 + 000.00 al Km. 4 + 000.00, es decir todo el de canal, se revestirlo de concreto
491.00 491.00 simple con un espesor de revestimiento igual a 9.00 cm. Indicar que pudo haberse dejado al canal en tierra, sin embargo se erosionar, causando de flujo debido a la
disminuyendo consigo su eficiencia Asimismo se el criterio de revestirlo de concreto puesto que a lo largo del tramo existen obras de arte de manera consecutiva
490.00 PARTIDOR
490.00
KM = 3 + 881.50 IV.- DE LA PENDIENTE:
C.R = 492.15 m.s.n.m 4.1. La pendiente de adoptada para los 5 subtramos en los que se el canal, se en al y al perfil longitudinal del terreno que se obtuvo luego
489.00 489.00
* Km. 3 + 000.00 - Km. 3 + 319.00 = 0.00055 m/m (0.55 %0).
488.00 488.00 * Km. 3 + 319.00 - Km. 3 + 623.00 = 0.00055 m/m (0.55 %0).
* Km. 3 + 623.00 - Km. 3 + 700.00 = 0.00055 m/m (0.55 %0).
487.00 487.00 * Km. 3 + 700.00 - Km. 3 + 881.50 = 0.00055 m/m (0.55 %0).
* Km. 3 + 881.50 - Km. 4 + 000.00 = 0.00055 m/m (0.55 %0).
486.00 486.00 V.- DE LA RUGOSIDAD:
5.1. Tal como se en el punto ii (DE LA DEL TERRENO), desde la progresiva Km. 3 + 000.00 hasta el Km. 4 + 000.00, revestirse al canal con CONCRETO

4+000
3+500

3+520

3+540

3+560

3+580

3+600

3+620

3+640

3+660

3+680

3+700

3+720

3+740

3+760

3+780

3+800

3+820

3+840

3+860

3+880

3+900

3+920

3+940

3+960

3+980
PROGRESIVA SIMPLE, cuyo espesor ser e = 9.00 cm, por lo que valor de "n" adoptado fue el recomendado en la tabla 11 del libro "Trazo y de canales (Dr. Jose Ramos)", 34.

* Tramo: Km. 3 + 000.00 - Km. 4 + 000.00 ===> Revestimiento de CONCRETO, n = 0.014

492.41

492.31
494.00

494.00

493.92

494.00

494.00

494.00

493.54

493.07

493.00

493.00

493.00

493.03

492.99

493.09

493.00

493.00

492.99

492.99

492.99

492.99

492.95

492.15

492.00

492.00
COTA DE
TERRENO VI. DE LOS RADIOS DE CURVATURA:
6.1. Los radios de curvatura adoptados estan basados en la tabla 12 del libro "Trazo y de canales (Dr. Jose Ramos)", 36, en los que recomienda radios en
al caudal de El otro criterio fue adoptar radios parecidos a los del alineamiento original, por lo que los radios dados al alineamiento horizontal del canal de fueron
492.91
493.47

493.46

493.45

493.00

492.99

492.98

492.97

492.96

492.95

492.94

492.93

492.92

492.89

492.88

492.87

492.18

492.17

492.16

492.15

492.14

491.43

491.42

490.64

490.63

490.62
COTA DE
RASANTE los que se detallan en la tabla de elementos de curva, los cuales oscilan entre los 80.00 m y 150.00 m respectivamente.

VII. DE LAS JUNTAS:


PENDIENTE 7.1. En las obras de arte como son, las tomas laterales, alcantarilla, partidor, las juntas longitudinales, transversales de de estar espaciadas
L = 83.00 m L = 77.00 m L = 100.00 m L = 81.50 m L = 18.50 m L = 40.00 m L = 60.00 m

ALTURA DE
0.11

0.11

0.81

0.81
1.01
0.53

0.54

0.47

0.57

0.06

0.07

0.09

0.20

0.12

0.12

0.80

0.83

0.84

0.98

0.73
0.05
1.02
1.00

1.67

1.37

1.38
CORTE

Camino de servicio Camino de servicio


ALTURA DE Berma Peatonal de 1.00 m (margen derecha). (margen izquierda). Berma Peatonal de 1.00 m
de ancho (margen izquierda). de ancho (margen derecha).
RELLENO

II III IV V
Canal revestido de CONCRETO, e = 9.00 cm Canal revestido de CONCRETO, e = 9.00 cm
LC = 31.12 m LC = 10.04 m LC = 14.33 m
L = 210.21 m L = 177.08 m L = 66.98 m
ALINEAMIENTO R = 80.00 m R = 150.00 m R = 150.00 m

ALUVIAL: Arena Limosa (SM), Grava Limosa (GM) y Grava Pobremente Graduada (GP).

TABLA DE ELEMENTOS DE CURVA ELEMENTOS DE CURVA LEYENDA


Caudales
COORDENADA LONGITUD DE LONGITUD DE L Toma lateral Cota de rasante Mar. y progresiva M.R.
derivados
Subtramos: Inicio - Fin Caudal por subtramo
PROGRESIVA - PC PROGRESIVA - PI PROGRESIVA - PT RADIO - R (m) TANGENTE - T (m) EXTERNA - E (m) (T.L) (msnm) de las tomas (Lts/ha) (ha)
UTM DEL "PI" CURVA - L (m) CUERDA - LC (m) Lts/s m3/s Qinicial: 6.25875 m3/s
PI T.L. 493.57 M.I: Km. 3 + 319.0 0.75 670.00 502.50 0.5025 Q: 5.75625 m3/s Camino de servicio
Norte.: 8768723.43
Km.: 3+061.47 Km.: 3+063.69 Km.: 3+065.90 100.00 m 4.43 m 4.43 m 2.21 m 2.21 m T T.L. 492.97 M.I: Km. 3 + 623.0 0.65 395.00 256.75 0.2568 Q: 5.49950 m3/s (margen izquierda). Berma Peatonal de 1.00 m

Este.: 249618.46 PC LC PT T.L. 492.93 M.I: Km. 3 + 700.0 0.95 260.00 247.00 0.2470 Q: 5.25250 m3/s
de ancho (margen derecha).

Norte.: 8768849.66 T.L. 492.15 M.I: Km. 3 + 881.5 0.90 275.00 247.50 0.2475 Q: 5.00500 m3/s PROYECTO INTEGRADOR: ESCALA:
Km.: 3+192.15 Km.: 3+210.27 Km.: 3+227.78 80.00 m 35.63 m 35.34 m 18.12 m 18.12 m T.L. 492.14 Canal continua... 1.10 4550.00 5005.00 5.0050 Q: 5.00500 m3/s
Este.: 249543.95 INDICADA
CAUDAL TOTAL A DERIVAR = Q = 6.25875 m3/s "LA MISERICORDIA"
Norte.: 8768991.53
Este.: 249333.03
Km.: 3+456.98 Km.: 3+463.86 Km.: 3+470.71 80.00 m 13.73 m 13.72 m 6.88 m 6.88 m R PC: Inicio de curva.
Canal revestido de CONCRETO, e = 9.00 cm PLANO: DEPARTAMENTO: FECHA:
PLANTA Y PERFIL LONGITUDINAL DEL CANAL
PT: Final de curva. LIMA
TRAMO: KM. 3 + 500.00 - KM. 4 + 000.00 JUNIO, 2019
Norte.: 8769008.75 PI: Punto de Inflexion.
Km.: 3+490.23 Km.: 3+505.99 Km.: 3+521.36 80.00 m 31.12 m 30.93 m 15.76 m 15.76 m R: Radio de Curva. PROVINCIA:
Este.: 249294.54 Tramo Leyenda * Castro Farro, Katherin. LAMINA:
L: Longitud de Curva. HUAURA
LC: Longitud de Cuerda. Tramo: Km. 0 + 000.00 - 3 + 700.00 SM = Arena limosa. * Cruz Linares, Nylen. * Oblitas Perez, Jhair.
Norte.: 8769175.97 * Irigoin Tocas, Jose. * Zegarra Flores, Jair. DISTRITO:
Km.: 3+731.57 Km.: 3+736.59 Km.: 3+741.61 150.00 m 10.04 m 10.04 m 5.02 m 5.02 m T: Tangente. Tramo: Km. 2 + 130.00 - 5 + 580.00 Suelos arenosos, limosos y gravosos arenosos. SM, L, G
Este.: 249135.18 : Angulo de Deflexion.
Tramo: Km. 4 + 500 - hacia adelante
Suelos del tipo arenoso y arenoso limoso con presencia de cantos
SM = Arenoso limoso.
DOCENTE: PP - 02
Norte.: 8769303.95 DR. LOCALIDAD:
Km.: 3+918.69 Km.: 3+925.86 Km.: 3+933.02 150.00 m 14.33 m 14.32 m 7.17 m 7.17 m
Este.: 248995.74 C Tramo: Km. 3 + 000.00 - 4 + 000.00 ALUVIAL: arena limosa, grava limosa y grava pobremente graduada. SM, GM, GP QUIPICO
500.00 500.00 500.00 500.00 500.00 500.00 497.50 497.50
KM.: 3+160 KM.: 3+320 KM.: 3+480 KM.: 3+640 AC = 0.42 m2
AC = 0.49 m2 AC = 4.15 m2 AC = 1.51 m2
AR = 14.06 m2 TABLA DE VOLUMENES (MOVIMIENTO DE TIERRAS)
AR = 2.93 m2 AR = 8.28 m2 AR = 13.67 m2
497.50 497.50 497.50 497.50 497.50 497.50 495.00 495.00
PROGRESIVA AREA DE AREA DE VOLUMEN DE VOLUMEN DE VOLUMEN DE CORTE VOLUMEN DE RELLENO
(KM) CORTE (M2) RELLENO (M2) CORTE (M3) RELLENO (M3) ACUMULADO (M3) ACUMULADO (M3)
495.00 495.00 495.00 495.00 495.00 495.00 492.50 492.50
3+000 2.53 5.19 0.00 0.00 0.00 0.00

492.50 492.50 492.50 492.50 492.50 492.50 490.00 490.00 3+020 2.35 6.51 48.82 117.05 48.82 117.05
CT = 494.00 msnm CT = 494.90 msnm CT = 494.00 msnm CT = 493.07 msnm
CSR = 494.06 msnm CSR = 493.48 msnm CSR = 493.39 msnm CSR = 492.87 msnm 3+040 2.40 5.59 47.47 121.06 96.29 238.10
490.00 490.00 490.00 490.00 490.00 490.00 487.50 487.50
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00
3+060 2.43 6.49 48.25 120.83 144.54 358.94
KM.: 3+140 KM.: 3+300 KM.: 3+470 KM.: 3+620
500.00 500.00 500.00 500.00 500.00 500.00 497.50 497.50 3+080 2.27 8.01 46.94 144.09 191.48 503.03
AC = 1.91 m2
AC = 1.34 m2 AC = 3.64 m2 AC = 1.49 m2 AR = 11.19 m2
AR = 5.80 m2 AR = 8.22 m2 AR = 14.43 m2
3+100 2.67 4.57 49.39 125.75 240.87 628.78
497.50 497.50 497.50 497.50 497.50 497.50 495.00 495.00
3+120 3.35 5.53 60.21 100.96 301.08 729.74
495.00 495.00 495.00 495.00 495.00 495.00 492.50 492.50
3+140 1.34 5.80 46.93 113.33 348.01 843.07

492.50 492.50 492.50 492.50 492.50 492.50 490.00 490.00


3+160 0.49 2.93 18.33 87.37 366.34 930.45
CT = 494.41 msnm CT = 494.76 msnm CT = 494.00 msnm CT = 493.54 msnm
CSR = 494.07 msnm CSR = 493.49 msnm CSR = 493.40 msnm CSR = 492.88 msnm 3+180 2.48 1.20 29.68 41.36 396.03 971.80
490.00 490.00 490.00 490.00 490.00 490.00 487.50 487.50
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 3+200 4.20 3.83 66.83 49.53 462.86 1021.33
KM.: 3+120 KM.: 3+280 KM.: 3+460 KM.: 3+600
500.00 500.00 500.00 500.00 500.00 500.00 497.50 497.50 3+210 4.21 5.79 42.01 47.15 504.87 1068.48
AC = 3.30 m2
AC = 3.35 m2 AC = 2.36 m2 AC = 1.48 m2 AR = 9.08 m2
AR = 5.53 m2 AR = 7.12 m2 AR = 14.50 m2 3+220 3.87 6.26 40.43 60.55 545.30 1129.03
497.50 497.50 497.50 497.50 497.50 497.50 495.00 495.00
3+240 2.77 7.45 66.49 138.68 611.79 1267.71

495.00 495.00 495.00 495.00 495.00 495.00 492.50 492.50 3+260 3.45 6.29 62.18 137.47 673.97 1405.18

3+280 2.36 7.12 58.04 134.10 732.01 1539.28


492.50 492.50 492.50 492.50 492.50 492.50 490.00 490.00
CT = 494.83 msnm CT = 494.27 msnm CT = 494.00 msnm CT = 494.00 msnm 3+300 3.64 8.22 60.00 153.34 792.01 1692.62
CSR = 494.08 msnm CSR = 493.50 msnm CSR = 493.40 msnm CSR = 492.89 msnm
490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50
490.00
10.00
490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50
490.00
10.00
490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50
490.00
10.00
487.50
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50
487.50
10.00
3+320 4.15 8.28 77.94 164.96 869.95 1857.58

KM.: 3+100 KM.: 3+260 KM.: 3+440 KM.: 3+580 3+340 1.28 14.45 54.31 227.25 924.26 2084.83
500.00 500.00 500.00 500.00 500.00 500.00 497.50 497.50
AC = 2.67 m2 AC = 3.45 m2 AC = 1.44 m2 AC = 3.18 m2
AR = 9.58 m2 3+360 1.31 13.81 25.90 282.58 950.16 2367.41
AR = 4.57 m2 AR = 6.29 m2 AR = 13.69 m2
497.50 497.50 497.50 497.50 497.50 497.50 495.00 495.00 3+380 1.34 13.47 26.56 272.81 976.72 2640.21

3+400 1.39 12.27 27.32 257.37 1004.04 2897.58


495.00 495.00 495.00 495.00 495.00 495.00 492.50 492.50
3+420 1.41 12.51 27.99 247.78 1032.03 3145.36
492.50 492.50 492.50 492.50 492.50 492.50 490.00 490.00
CT = 494.88 msnm CT = 495.00 msnm CT = 494.00 msnm CT = 494.00 msnm
3+440 1.44 13.69 28.55 262.03 1060.58 3407.39
CSR = 494.10 msnm CSR = 493.51 msnm CSR = 493.41 msnm CSR = 492.90 msnm
490.00 490.00 490.00 490.00 490.00 490.00 487.50 487.50
3+460 1.48 14.50 29.21 283.62 1089.79 3691.01
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00
3+470 1.49 14.43 14.85 150.16 1104.64 3841.18
KM.: 3+080 KM.: 3+240 KM.: 3+420 KM.: 3+560
500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00
AC = 2.27 m2 AC = 2.77 m2 AC = 1.41 m2 AC = 2.99 m2 3+480 1.51 13.67 15.02 140.49 1119.66 3981.66
AR = 8.01 m2 AR = 7.45 m2 AR = 12.51 m2 AR = 9.45 m2
497.50 497.50 497.50 497.50 497.50 497.50 497.50 497.50 3+500 1.54 13.01 30.53 260.89 1150.20 4242.55

3+510 1.56 13.49 15.51 126.50 1165.71 4369.05


495.00 495.00 495.00 495.00 495.00 495.00 495.00 495.00
3+520 1.57 14.11 15.66 132.34 1181.37 4501.39

492.50 492.50 492.50 492.50 492.50 492.50 492.50 492.50 3+540 1.46 14.15 30.38 282.56 1211.75 4783.95
CT = 494.89 msnm CT = 494.57 msnm CT = 494.00 msnm CT = 494.00 msnm
CSR = 494.11 msnm CSR = 493.52 msnm CSR = 493.42 msnm CSR = 492.91 msnm 3+560 2.99 9.45 44.51 236.02 1256.27 5019.97
490.00 490.00 490.00 490.00 490.00 490.00 490.00 490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00
3+580 3.18 9.58 61.69 190.29 1317.96 5210.26
KM.: 3+060 KM.: 3+220 KM.: 3+400 KM.: 3+540
500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 3+600 3.30 9.08 64.85 186.52 1382.81 5396.78
AC = 2.43 m2 AC = 3.87 m2 AC = 1.39 m2 AC = 1.46 m2
AR = 6.49 m2 AR = 6.26 m2 AR = 12.27 m2 AR = 14.15 m2
3+620 1.91 11.19 52.13 202.70 1434.94 5599.48
497.50 497.50 497.50 497.50 497.50 497.50 497.50 497.50
3+640 0.42 14.06 23.30 252.57 1458.24 5852.04
495.00 495.00 495.00 495.00 495.00 495.00 495.00 495.00
3+660 0.29 10.85 7.09 249.10 1465.33 6101.14

3+680 0.67 8.35 9.62 192.01 1474.95 6293.14


492.50 492.50 492.50 492.50 492.50 492.50 492.50 492.50
CT = 494.98 msnm CT = 494.93 msnm CT = 494.00 msnm CT = 493.92 msnm
CSR = 494.12 msnm CSR = 493.53 msnm CSR = 493.44 msnm CSR = 493.36 msnm 3+700 0.33 10.58 10.00 189.36 1484.95 6482.51
490.00 490.00 490.00 490.00 490.00 490.00 490.00 490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00

KM.: 3+040 KM.: 3+210 KM.: 3+380 KM.: 3+520 KM.: 3+700
500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00
AC = 2.40 m2 AC = 4.21 m2 AC = 1.34 m2 AC = 1.57 m2 AC = 0.33 m2 LEYENDA
AR = 5.59 m2 AR = 5.79 m2 AR = 13.47 m2 AR = 14.11 m2 AR = 10.58 m2
497.50 497.50 497.50 497.50 497.50 497.50 497.50 497.50 497.50 497.50

495.00 495.00 495.00 495.00 495.00 495.00 495.00 495.00 495.00 495.00 Terreno natural

492.50 492.50 492.50 492.50 492.50 492.50 492.50 492.50 492.50 492.50 Caja de canal
CT = 494.99 msnm CT = 494.86 msnm CT = 494.00 msnm CT = 494.00 msnm CT = 493.00 msnm
CSR = 494.13 msnm CSR = 493.54 msnm CSR = 493.45 msnm CSR = 493.37 msnm CSR = 492.84 msnm Cota de terreno
CT
490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50
490.00
10.00
490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50
490.00
10.00
490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50
490.00
10.00
490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50
490.00
10.00
490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50
490.00
10.00
natural
KM.: 3+020 KM.: 3+200 KM.: 3+360 KM.: 3+510 KM.: 3+680
Cota de rasante CR
500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00
AC = 2.35 m2 AC = 4.20 m2 AC = 1.31 m2 AC = 1.56 m2 AC = 0.67 m2
AR = 6.51 m2 AR = 3.83 m2 AR = 13.81 m2 AR = 13.49 m2 AR = 8.35 m2
497.50 497.50 497.50 497.50 497.50 497.50 497.50 497.50 497.50 497.50

495.00 495.00 495.00 495.00 495.00 495.00 495.00 495.00 495.00 495.00 Progresiva KM

492.50 492.50 492.50 492.50 492.50 492.50 492.50 492.50 492.50 492.50
CT = 495.00 msnm CT = 494.86 msnm CT = 494.00 msnm CT = 494.00 msnm CT = 493.00 msnm
CSR = 494.14 msnm CSR = 493.55 msnm CSR = 493.46 msnm CSR = 493.37 msnm CSR = 492.85 msnm
490.00 490.00 490.00 490.00 490.00 490.00 490.00 490.00 490.00 490.00
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00

KM.: 3+000 KM.: 3+180 KM.: 3+340 KM.: 3+500 KM.: 3+660
500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 497.50 497.50
AC = 2.53 m2 AC = 2.48 m2 AC = 1.28 m2 AC = 1.54 m2 AC = 0.29 m2
AR = 5.19 m2 AR = 1.20 m2 AR = 14.45 m2 AR = 13.01 m2 AR = 10.85 m2 PROYECTO INTEGRADOR: ESCALA:
ESC. H.: 1200
497.50 497.50 497.50 497.50 497.50 497.50 497.50 497.50 495.00 495.00 "LA MISERICORDIA" ESC. V.: 1 200

PLANO: DEPARTAMENTO: FECHA:


SECCIONES TRANSVERSALES DEL CANAL LIMA
495.00 495.00 495.00 495.00 495.00 495.00 495.00 495.00 492.50 492.50 TRAMO: KM. 3 + 000.00 - KM. 3 + 700.00 JUNIO, 2019

PROVINCIA:
* Castro Farro, Katherin. HUAURA LAMINA:
* Cruz Linares, Nylen. * Oblitas Perez, Jhair.
492.50 492.50 492.50 492.50 492.50 492.50 492.50 492.50 490.00 490.00 * Irigoin Tocas, Jose. * Zegarra Flores, Jair. DISTRITO:
CT = 495.00 msnm
CSR = 494.15 msnm
CT = 494.00 msnm
CSR = 493.56 msnm
CT = 494.00 msnm
CSR = 493.47 msnm
CT = 494.00 msnm
CSR = 493.38 msnm
CT = 493.00 msnm
CSR = 492.86 msnm
DOCENTE: ST - 01
DR. LOCALIDAD:
490.00 490.00 490.00 490.00 490.00 490.00 490.00 490.00 487.50 487.50 QUIPICO
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00
497.50 497.50
KM.: 3+880 AC = 3.46 m2 TABLA DE VOLUMENES (MOVIMIENTO DE TIERRAS)
AR = 6.04 m2
495.00 495.00
PROGRESIVA AREA DE AREA DE VOLUMEN DE VOLUMEN DE VOLUMEN DE CORTE VOLUMEN DE RELLENO
LEYENDA
(KM) CORTE (M2) RELLENO (M2) CORTE (M3) RELLENO (M3) ACUMULADO (M3) ACUMULADO (M3)
492.50 492.50
3+000 2.53 5.19 0.00 0.00 0.00 0.00

490.00 490.00 Terreno natural 3+020 2.35 6.51 48.82 117.05 48.82 117.05
CT = 492.99 msnm
CSR = 492.06 msnm
3+040 2.40 5.59 47.47 121.06 96.29 238.10
487.50 487.50 Caja de canal
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00
Cota de terreno 3+060 2.43 6.49 48.25 120.83 144.54 358.94
KM.: 3+860 CT
497.50 497.50 natural 3+080 2.27 8.01 46.94 144.09 191.48 503.03
AC = 4.14 m2
AR = 2.83 m2 Cota de rasante CR 3+100 2.67 4.57 49.39 125.75 240.87 628.78
495.00 495.00
3+120 3.35 5.53 60.21 100.96 301.08 729.74
492.50 492.50
3+140 1.34 5.80 46.93 113.33 348.01 843.07

3+160 0.49 2.93 18.33 87.37 366.34 930.45


490.00 490.00 Progresiva KM
CT = 492.99 msnm
CSR = 492.07 msnm 3+180 2.48 1.20 29.68 41.36 396.03 971.80
487.50 487.50
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 3+200 4.20 3.83 66.83 49.53 462.86 1021.33
KM.: 4+000
KM.: 3+840 497.50 497.50
497.50 AC = 5.31 m2
3+210 4.21 5.79 42.01 47.15 504.87 1068.48
AC = 4.27 m2 AR = 3.63 m2
AR = 1.39 m2
495.00 495.00 3+220 3.87 6.26 40.43 60.55 545.30 1129.03
495.00 495.00
3+240 2.77 7.45 66.49 138.68 611.79 1267.71
492.50 492.50
492.50 492.50 3+260 3.45 6.29 62.18 137.47 673.97 1405.18

490.00 490.00 3+280 2.36 7.12 58.04 134.10 732.01 1539.28


490.00 490.00 CT = 492.00 msnm
CT = 492.99 msnm CSR = 490.53 msnm 3+300 3.64 8.22 60.00 153.34 792.01 1692.62
CSR = 492.08 msnm
487.50 487.50
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00
487.50
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50
487.50
10.00
3+320 4.15 8.28 77.94 164.96 869.95 1857.58

KM.: 3+820 KM.: 3+980 3+340 1.28 14.45 54.31 227.25 924.26 2084.83
497.50 497.50 497.50 497.50
AC = 3.94 m2 AC = 5.69 m2 3+360 1.31 13.81 25.90 282.58 950.16 2367.41
AR = 1.45 m2 AR = 3.52 m2
495.00 495.00 495.00 495.00 3+380 1.34 13.47 26.56 272.81 976.72 2640.21

3+400 1.39 12.27 27.32 257.37 1004.04 2897.58


492.50 492.50 492.50 492.50
3+420 1.41 12.51 27.99 247.78 1032.03 3145.36
490.00 490.00 490.00 490.00
CT = 492.99 msnm CT = 492.00 msnm
3+440 1.44 13.69 28.55 262.03 1060.58 3407.39
CSR = 492.09 msnm CSR = 490.54 msnm
487.50 487.50 487.50 487.50
3+460 1.48 14.50 29.21 283.62 1089.79 3691.01
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00
3+470 1.49 14.43 14.85 150.16 1104.64 3841.18
KM.: 3+800 KM.: 3+960
500.00 500.00 497.50 497.50
AC = 1.91 m2 AC = 7.89 m2 3+480 1.51 13.67 15.02 140.49 1119.66 3981.66
AR = 5.53 m2 AR = 0.45 m2
497.50 497.50 495.00 495.00 3+500 1.54 13.01 30.53 260.89 1150.20 4242.55

3+510 1.56 13.49 15.51 126.50 1165.71 4369.05


495.00 495.00 492.50 492.50
3+520 1.57 14.11 15.66 132.34 1181.37 4501.39

492.50 492.50 490.00 490.00 3+540 1.46 14.15 30.38 282.56 1211.75 4783.95
CT = 493.00 msnm CT = 492.31 msnm
CSR = 492.78 msnm CSR = 490.55 msnm 3+560 2.99 9.45 44.51 236.02 1256.27 5019.97
490.00 490.00 487.50 487.50
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00
3+580 3.18 9.58 61.69 190.29 1317.96 5210.26
KM.: 3+780 KM.: 3+940
500.00 500.00 497.50 497.50 3+600 3.30 9.08 64.85 186.52 1382.81 5396.78
AC = 1.54 m2 AC = 3.71 m2
AR = 6.33 m2 AR = 2.65 m2
3+620 1.91 11.19 52.13 202.70 1434.94 5599.48
497.50 497.50 495.00 495.00
3+640 0.42 14.06 23.30 252.57 1458.24 5852.04
495.00 495.00 492.50 492.50
3+660 0.29 10.85 7.09 249.10 1465.33 6101.14

3+680 0.67 8.35 9.62 192.01 1474.95 6293.14


492.50 492.50 490.00 490.00
CT = 493.00 msnm CT = 492.15 msnm
CSR = 492.79 msnm CSR = 491.33 msnm 3+700 0.33 10.58 10.00 189.36 1484.95 6482.51
490.00 490.00 487.50 487.50
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 3+720 1.50 8.55 18.23 191.30 1503.18 6673.81
KM.: 3+760 KM.: 3+930
500.00 500.00 497.50 497.50 3+740 0.96 6.54 24.49 149.68 1527.67 6823.49
AC = 1.63 m2 AC = 4.82 m2
AR = 6.94 m2 AR = 2.92 m2 3+760 1.63 6.94 25.86 134.81 1553.53 6958.30
497.50 497.50 495.00 495.00
3+780 1.54 6.33 31.69 132.64 1585.22 7090.94

495.00 495.00 492.50 492.50 3+800 1.91 5.53 34.46 118.59 1619.68 7209.54

3+820 3.94 1.45 58.51 69.84 1678.19 7279.38


492.50 492.50 490.00 490.00
CT = 493.09 msnm CT = 492.75 msnm 3+840 4.27 1.39 82.09 28.44 1760.28 7307.81
CSR = 492.80 msnm CSR = 491.33 msnm
490.00 490.00 487.50 487.50 3+860 4.14 2.83 84.06 42.28 1844.35 7350.10
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00

KM.: 3+740 KM.: 3+920 3+880 3.46 6.04 76.03 88.72 1920.37 7438.82
500.00 500.00 497.50 497.50
AC = 0.96 m2 AC = 4.41 m2 3+900 2.47 7.69 59.36 137.32 1979.73 7576.14
AR = 6.54 m2 AR = 3.14 m2
497.50 497.50 495.00 495.00 3+920 4.41 3.14 68.80 108.31 2048.53 7684.45

3+930 4.82 2.92 46.36 29.26 2094.88 7713.71


495.00 495.00 492.50 492.50
3+940 3.71 2.65 42.72 27.55 2137.60 7741.26
492.50 492.50 490.00 490.00
3+960 7.89 0.45 115.99 30.97 2253.59 7772.22
CT = 492.99 msnm CT = 492.41 msnm
CSR = 492.82 msnm CSR = 491.34 msnm
490.00 490.00 487.50 487.50
3+980 5.69 3.52 135.78 39.69 2389.37 7811.91
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00
4+000 5.31 3.63 109.98 71.55 2499.36 7883.46
KM.: 3+720 KM.: 3+900
500.00 500.00 497.50 497.50
AC = 1.50 m2 AC = 2.47 m2
AR = 8.55 m2 AR = 7.69 m2
497.50 497.50 495.00 495.00

PROYECTO INTEGRADOR: ESCALA:


ESC. H.: 1 200
495.00 495.00 492.50 492.50 "LA MISERICORDIA" ESC. V.: 1200

PLANO: DEPARTAMENTO: FECHA:


SECCIONES TRANSVERSALES DEL CANAL
LIMA
TRAMO: KM. 3 + 720.00 - KM. 4 + 000.00 JUNIO, 2019

PROVINCIA:
492.50 492.50 490.00 490.00 * Castro Farro, Katherin. HUAURA LAMINA:
* Cruz Linares, Nylen. * Oblitas Perez, Jhair.
CT = 493.03 msnm CT = 492.95 msnm * Irigoin Tocas, Jose. * Zegarra Flores, Jair. DISTRITO:
CSR = 492.83 msnm CSR = 492.05 msnm DOCENTE: ST - 02
DR. LOCALIDAD:
490.00 490.00 487.50 487.50 QUIPICO
-10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00 -10.00 -7.50 -5.00 -2.50 0.00 2.50 5.00 7.50 10.00
0,35

.0
0,35

9
A
D 1
0,20

K
0,20

Zd
:1

J
.0
.3
0
Concreto f'c = 210 kg/cm2 0,05

0.15
.0
0.50

9
C
Junta Water Stop L 2"x2"x1/4" 0
PLANCHA 3/8"x6"x6" 1.5

Zd
0.6

:1
0

.0
0.20
LOSA DE OPERACIONES PANTALLA FRONTAL

G
B D ESC.: 1/20

.1
0.20

.3
50

0
Compuerta de 2.
1.00 1.00

.1
5

5
.1
C PERNOS DEL
S
U RC RC
@ 0.20

1
V
D

0.5

0.5 :
:1
U

.15
L 2"x2"x1/4"
.09

V Solado
e = 5 cm.
0,05
SOLDADURA .50 .15 E .15 .50
P

CORTE "B - B"


ESC.: 1/20
L 2"x2"x1/4"
0.15 0.15
L 2"x2"x1/4" L 3"x3"x3/8" VARIABLE VARIABLE VARIABLE
M

PLANCHA DE
N

COMPUERTA, e= 1/4" 2
e = 1" a
PERNOS
L 2"x2"x1/4" SOLDADURA PL 3"x3"x3/8"
a
VARIABLE
P
.09

VARIABLE PROYECCION
A 1
1 1
1
PERNOS DEL PERNOS DEL
PLANTA DE TOMA LATERAL 0.15
ESC.: 1/20 3.50
CORTE "C - C"
1 ESC.: 1/20
FLUJO
EJE DEL CANAL PRINCIPAL DETALLE DE LA COMPUERTA
COMPUERTA
ESCALA.: 1/5
SOLDADURA
ARMCO Continua
2.50 M S 2.50 D 3.00
Camino de servicio
1.50 0.300.500.20 P N P 1.20 1.00 0.30 JUNTA
Berma Peatonal de 1.00 m (margen derecha).
L 2"x2"x1/4"
de ancho (margen izquierda).
1
EB' 2"
ED'
0.09 0.20
EA' SECCION 1 - 1
ESCALA.: 1/5

Zd : 1.0
1
EC' ESC.: /451 Canal revestido de CONCRETO, e = 9.00 cm

u 0.20
:1
Za

.0 Ha 2
V Hd
Za Y1 Qd y b H Z Q B A P R V S(%O) n F B.L
0.09 Qd Qd
EA y2 0.50 2.70 m 0.54 2.01 m 0.27 m 0.94
Ranura para 0.46 m 0.70 m 1.00 m 1.00 2 1.00 0.014 0.52 0.54 m CONCRETOS :
Sa = 0.55 %0
STOP LOG m3/s m m/s
a EC Sd = 1.00 %0 ED
CANAL 0.09 EB
PRINCIPAL
Solado e = 5 cm 0.80 0.15
0.10 CEMENTO :
f'c = 100.00 kg/cm2 0.60 1: 0.60
Solado = 5 cm 0.10 1 Camino de servicio
f'c = 100.00 kg/cm2 0.05 Berma Peatonal de 1.00 m RELACION AGUA CEMENTO :
0.20 1.10 2 de ancho (margen izquierda).
(margen derecha).
210.00 kg/cm 0.20 210.00 kg/cm2 RELLENO COMPACTADO :
0.05
0.20 Continua
P N P S C D 3.00 ESC.: 1/45 Canal revestido de CONCRETO, e = 9.00 cm

PERFIL DE LA TOMA LATERAL: CORTE "A - A"


ESC.: 1/20 RECUBRIMIENTOS :
y b H Z Q B A P R V S(%O) n F B.L

0.37 m 0.50 m 0.80 m 1.00 0.26 2.10 m 0.32 1.55 m 0.21 m 0.80 1.00 0.014 0.50 0.43 m
2
m3/s m m/s

Camino de servicio Camino de servicio Camino de servicio


Berma Peatonal de 1.00 m (margen derecha). Berma Peatonal de 1.00 m (margen derecha). Berma Peatonal de 1.00 m (margen derecha).
de ancho (margen izquierda). de ancho (margen izquierda). de ancho (margen izquierda).
Camino de servicio
Berma Peatonal de 1.00 m (margen derecha).
TRASLAPES:
de ancho (margen izquierda).

Canal revestido de CONCRETO, e = 9.00 cm Canal revestido de CONCRETO, e = 9.00 cm Canal revestido de CONCRETO, e = 9.00 cm
ESC.: 1/45 ESC.: 1/45 ESC.: 1/45
Canal revestido de CONCRETO, e = 9.00 cm
ESC.: 1/45
RADIO DE DOBLES: GANCHOS:

y b H Z Q B A P R V S(%O) n F B.L y b H Z Q B A P R V S(%O) n F B.L y b H Z Q B A P R V S(%O) n F B.L

1.39 m 1.80 m 2.00 m 1.00 6.26 5.80 m 4.43 5.73 m 0.77 m 1.41 0.55 0.014 0.46 0.61 m 1.33 m 1.80 m 2.00 m 1.00 5.76 5.80 m 4.17 5.56 m 0.75 m 1.38 0.55 0.014 0.46 0.67 m 1.30 m 1.80 m 2.00 m 1.00 5.50 5.80 m 4.03 5.48 m 0.74 m 1.37 0.55 0.014 0.46 0.70 m
y b H Z Q B A P R V S(%O) n F B.L
m3/s m2 m/s m3/s m2 m/s m3/s m2 m/s
0.36 m 0.50 m 0.80 m 1.00 0.25 2.10 m 0.31 1.53 m 0.21 m 0.79 1.00 0.014 0.50 0.44 m
2
m3/s m m/s

CAUDALES COTAS
MARGEN PROGRESIVAS Qa Qd EA EB EC ED EA' EB' EC' ED' 1 2
Y1 Y2 a b C D E F G Ha Hd J K M N P S U V TIPO DE TIPO DE FLUJO PROYECTO INTEGRADOR:
(KM) 3 3
(m /s) (m /s) (msnm) (msnm) (msnm) (msnm) (msnm) (msnm) (msnm) (msnm) (m) (m) Sa = %0 Sd = %0 Za Zd (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) COMPUERTA
"LA MISERICORDIA"
TIPO TARJETA
1 IZQUIERDA 3 + 319.00 6.26 0.50 493.570 493.420 493.520 493.517 495.0615 495.570 494.026 494.517 0.1016 0.0448 0.55 %0 1.0 %0 1:1 1:1 1.39 0.46 0.50 0.70 1.90 3.00 0.70 0.70 1.00 2.00 1.00 2.70 2.88 5.68 1.80 2.00 0.88 1.65 2.15 PLANO:
TOMAS LATERALES:
TIPO TARJETA
2 IZQUIERDA 3 + 623.00 5.76 0.26 492.970 492.820 492.920 492.917 494.3982 494.970 493.323 493.717 0.0973 0.0322 0.55 %0 1.0 %0 1:1 1:1 1.33 0.37 0.40 0.50 1.90 3.00 0.50 0.50 0.80 2.00 0.80 2.10 2.28 5.68 1.80 2.00 0.70 1.75 2.15
* Castro Farro, Katherin.
TIPO TARJETA
3 IZQUIERDA 3 + 700.00 5.50 0.25 492.930 492.780 492.880 492.877 494.2297 494.930 493.275 493.677 0.0950 0.0316 0.55 %0 1.0 %0 1:1 1:1 1.30 0.36 0.40 0.50 1.70 3.00 0.50 0.50 0.80 2.00 0.80 2.10 2.28 5.68 1.80 2.00 0.68 1.75 2.15 * Cruz Linares, Nylen. * Oblitas Perez, Jhair.
* Irigoin Tocas, Jose. * Zegarra Flores, Jair.
4 IZQUIERDA 3 + 881.00 5.25 0.25 492.150 --- --- ---- 493.5403 --- --- --- 0.0930 0.0316 0.55 %0 1.0 %0 1:1 1:1 1.30 0.36 0.40 0.50 1.70 3.00 0.50 0.50 0.80 1.90 0.80 2.10 2.28 5.68 1.70 1.90 0.68 1.75 2.15 TIPO TARJETA
DOCENTE: TL-01
DR.
EJE DE CANAL
PRINCIPAL
0.25 0.25

0.30 0.30 0.30

0.25 0.25

EJE DE CANAL
PRINCIPAL
.20 .20

2.00 6.94 5.00 3.34 2.00

ESC.: 1/45

EJE DE CANAL PRINCIPAL


ESC.: 1/45

1.00
1.00

0.25 m CONCRETOS :
1 6
2 5
0.05 CEMENTO :
RELACION AGUA CEMENTO :
3 4
RELLENO COMPACTADO :

2.00 6.94 5.00 3.34 2.00

RECUBRIMIENTOS :

TRASLAPES:

Escala: 1/50
Codo de FG
al tubo de fierro

Escala: 1/50 RADIO DE DOBLES: GANCHOS:

Corte A-A A
Vars de 0.95 (83") @
Cople e=1" 0.30 en los dos
sentidos
Cople
Eje del tubo Junta Giboult para
0.1:1

PROYECTO INTEGRADOR:

"LA MISERICORDIA"

Varillas de 0.95 (38")


Vars de 0.95 (38")@
A @ 0.30 en los dos
PLANO:

A LA ALTURA DEL KM. 3 + 483.50


0.30 en los dos sentidos
* Castro Farro, Katherin.
sentidos ESC.: 1/50 * Cruz Linares, Nylen. * Oblitas Perez, Jhair.
ESC.: 1/50 * Irigoin Tocas, Jose. * Zegarra Flores, Jair.
DOCENTE: SI-01
DR.
CAMINO QUE CRUZA
B B
0.20 0.20 CONCRETOS:
0.20 C C 0.20
0.45 0.45
0.09 0.20
Junta water stop 6" CEMENTO:
D Junta water stop 6"

1:1
1:1
1.90 1.90
0.20 RELLENO COMPACTADO:
1.00
A 0.20 A
Eje de alcantarilla Eje de alcantarilla
5.50 1.70 1.00 3.40 1.70 5.50
0.20 ACERO DE (GRADO 60):
1.00
0.20 RECUBRIMIENTOS:
1.90 1.90
1:1

1:1
0.20 D 0.20
0.09 0.20
0.45 0.45
0.20 0.20
C PLANTA - ALCANTARILLA C
0.20 0.20
B 0.025 ESCALA: 1/50 0.025 B
TRASLAPES:
Canal aguas arriba 3.00 10.70 3.00 CANAL AGUAS ABAJO

3 + 704.00 3 + 707.00 3 + 717.70 3 + 720.70

16.70

RADIO DE DOBLES: GANCHOS:

3 + 704.00 3 + 707.00 3 + 712.35 3 + 717.70 3 + 720.70

0.025 0.025
CANAL AGUAS ARRIBA 3.00 10.70 3.00 CANAL AGUAS ABAJO
1"

3.50 Junta water stop 6"


1"

495.3273 msnm
0.20 0.20 Tecnoport
1 1.5
1.5 : :1
0.225
0.07
0.15

0.60 0.60

RELLENO = 0.60 0.90

0.45 0.45 0.15

Junta water stop 6" 494.7273 msnm Junta water stop 6"
Solado Tecnoport
0.20 Solado e = 10 cm.

0.60

494.2273 msnm 0.30 Junta water stop 6" Concreto f'c = 210 kg/cm2
0.60 494.2181 msnm 494.2181 msnm 0.6 0.90

0.09 0.09
1.60 0.09
DETALLE "A" DETALLE "B"
1.90 1.90 ESCALA 1 / 20
1.30 1.30 ESCALA 1 / 20
1.30
492.9300 msnm 492.9273 msnm 492.9124 msnm 492.9208 msnm
0.09 0.20 0.30 0.09 Fondo de
0.60 0.60 0.45 CUBIERTO CON MEMBRANA
Solado e = 5 cm 0.45 Solado e = 5 cm Solado e = 5 cm
Alcantarilla
F'c: 100 kg/cm2 Ver DETALLE "B" F'c: 100 kg/cm2 Ver DETALLE "A"
Solado e = 5 cm
F'c: 100 kg/cm2 Tubo de
F'c: 100 kg/cm2
0.30 0.20
0.20 0.20
0.20
Ver DETALLE " C " Ver DETALLE " C "
0.05
0.60
CORTE "A - A"
ESCALA: 1/50 X X
Filtro de
Filtro de
0.60 0.60
0.15 0.15
VARIABLE VARIABLE VARIABLE DETALLE "C" CORTE X-X
Camino de servicio
(margen izquierda). Berma Peatonal de 1.00 m
de ancho (margen derecha). 1 1
1 1

CORTE: "B - B"


ESC.: 1/15 Canal revestido de CONCRETO, e = 9.00 cm

VARIABLE
CORTE "D - D"
ESCALA.: 1/50

y b H Z Q B A P R V S(%0) n F B.L
1 1
VARIABLE 5.25 5.50 m 3.89 5.37 m 0.72 m 1.35
1 1 1.30 m 1.70 m 1.90 m 1.00 2 0.55 0.014 0.45 0.60 m
m3/s m m/s PROYECTO INTEGRADOR:

"LA MISERICORDIA"
0.15 PLANO:
KM. 3 + 704.00

* Castro Farro, Katherin.


* Cruz Linares, Nylen. * Oblitas Perez, Jhair.
* Irigoin Tocas, Jose. * Zegarra Flores, Jair.

ESC.: 1/20 DOCENTE:


DR.
AL-01
H
L

Camino de servicio Camino de servicio Camino de servicio


Berma Peatonal de 1.00 m (margen derecha). Berma Peatonal de 1.00 m (margen derecha). (margen izquierda). Berma Peatonal de 1.00 m
de ancho (margen izquierda). de ancho (margen izquierda). de ancho (margen derecha).

CORTE: "B - B"


1
ESC.: /100 Canal revestido de CONCRETO, e = 9.00 cm
ESC.: /1001 Canal revestido de CONCRETO, e = 9.00 cm ESC.: 1/100 Canal revestido de CONCRETO, e = 9.00 cm

y b H Z Q B A P R V S(%O) n F B.L y b H Z Q B A P R V S(%O) n F B.L y b H Z Q B A P R V S(%0) n F B.L

1.39 m 1.80 m 2.00 m 1.00 6.26 5.80 m 4.43 5.73 m 0.77 m 1.41 0.55 0.014 0.46 0.61 m 1.33 m 1.80 m 2.00 m 1.00 5.76 5.80 m 4.17 5.56 m 0.75 m 1.38 0.55 0.014 0.46 0.67 m 1.30 m 1.70 m 1.90 m 1.00 5.25 5.50 m 3.89 5.37 m 0.72 m 1.35 0.55 0.014 0.45 0.60 m
2
m3/s m2 m/s m3/s m2 m/s m3/s m m/s

.30

1"

Junta water stop 6"

Camino de servicio
(margen izquierda). Berma Peatonal de 1.00 m
I.- PARA EL CONCRETO:

.20
de ancho (margen derecha).
0.60

* Cemento Anti salitre MS. 0.90

CONCRETOS:
Solado Tecnoport

e
2
.
CORTE: "B - B"
ESC.: 1/100 Canal revestido de CONCRETO, e = 9.00 cm DETALLE DE UMBRAL
0.90

II.- DEL TIPO DE SUELO: ALUVIAL compuesto por Arena Limosa (SM), Grava Limosa (GM) y GP. CEMENTO: ESCALA: 1/10
1"

2.1. (Z = 1.00)
ELASTOMERICO DE POLIURETANO
Tecnoport DE 1"x1"
2.2. Debido a la presencia de estratos de arena limosa, gravo arenosos, cubiertos por capa de materiales arcillosos, se recomienda extraer dicho material, excavando de acuerdo a las RELLENO COMPACTADO: 0.225
0.15
0.07
IMPRIMANTE IMPRIMANTE

y b H Z Q B A P R V S(%0) n F B.L
0.60

0.15 FONDO DE POZA


f'c= 210 kg/cm2

1.27 m 1.70 m 1.90 m 1.00 5.05 5.50 m 3.75 5.28 m 0.71 m 1.33 0.55 0.014 0.45 0.63 m Solado e = 10 cm.
2
m3/s m m/s 0.60

3.1. Primeramente realizarse un con material de RELLENO y AFIRMADO, luego excavar de acuerdo a las dimensiones de las secciones en los 5 subtramos Water Stop 6"
(verificado que se llegue al 95% del Proctor Modificado). Desde la progresiva del Km. 3 + 000.00 al Km. 4 + 000.00, es decir todo el de canal, se revestirlo de concreto ACERO DE (GRADO 60):
simple con un espesor de revestimiento igual a 9.00 cm. Indicar que pudo haberse dejado al canal en tierra, sin embargo se erosionar, causando de flujo debido a la .25
disminuyendo consigo su eficiencia Asimismo se el criterio de revestirlo de concreto puesto que a lo largo del tramo existen obras de arte de manera consecutiva
RECUBRIMIENTOS: 0.20 0.20
IV.- DE LA PENDIENTE: VARIABLE VARIABLE VARIABLE
TECKNOPOR
4.1. La pendiente de adoptada para los 5 subtramos en los que se el canal, se en al y al perfil longitudinal del terreno que se obtuvo luego
DETALLE DE JUNTA WATER
* Km. 3 + 000.00 - Km. 3 + 319.00 = 0.00055 m/m (0.55 %0). STOP 6"
* Km. 3 + 319.00 - Km. 3 + 623.00 = 0.00055 m/m (0.55 %0).
* Km. 3 + 623.00 - Km. 3 + 700.00 = 0.00055 m/m (0.55 %0).
* Km. 3 + 700.00 - Km. 3 + 881.50 = 0.00055 m/m (0.55 %0). VARIABLE
* Km. 3 + 881.50 - Km. 4 + 000.00 = 0.00055 m/m (0.55 %0).
TRASLAPES:
V.- DE LA RUGOSIDAD:
5.1. Tal como se en el punto ii (DE LA DEL TERRENO), desde la progresiva Km. 3 + 000.00 hasta el Km. 4 + 000.00, revestirse al canal con CONCRETO
SIMPLE, cuyo espesor ser e = 9.00 cm, por lo que valor de "n" adoptado fue el recomendado en la tabla 11 del libro "Trazo y de canales (Dr. Jose Ramos)", 34. PROYECTO INTEGRADOR:

1 1
VARIABLE
* Tramo: Km. 3 + 000.00 - Km. 4 + 000.00 ===> Revestimiento de CONCRETO, n = 0.014 "LA MISERICORDIA"
1 1
PLANO:
VI. DE LOS RADIOS DE CURVATURA:
6.1. Los radios de curvatura adoptados estan basados en la tabla 12 del libro "Trazo y de canales (Dr. Jose Ramos)", 36, en los que recomienda radios en RADIO DE DOBLES: GANCHOS: 0.20
al caudal de El otro criterio fue adoptar radios parecidos a los del alineamiento original, por lo que los radios dados al alineamiento horizontal del canal de fueron
los que se detallan en la tabla de elementos de curva, los cuales oscilan entre los 80.00 m y 150.00 m respectivamente. * Castro Farro, Katherin.
* Cruz Linares, Nylen. * Oblitas Perez, Jhair.
VII. DE LAS JUNTAS: * Irigoin Tocas, Jose. * Zegarra Flores, Jair.
7.1. En las obras de arte como son, las tomas laterales, alcantarilla, partidor, las juntas longitudinales, transversales de de estar espaciadas ESC.: 1/30 DOCENTE: CV-01
DR.
3,00 1,60 0,50 0,50 3,00 2,00 3,00
3,00 1,60 1,00 3,00 2,00 3,00
Baranda de tubo de Compuerta de ramal (2) modelo
1
2"

0,90
0,90 494.048 msnm
4 0,15

1.0 : 1

1.0 : 1
0,50 10 3
0,80 1.90 1,90

1.0 : 1
S = 1.00%0 492.13 msnm 0,20
492.148 msnm S = 0.55%0 492.15 msnm

1.0 : 1
0,30
0,05 0,75
1,90 1,90 R 1 1
R 0,30

9 5 C1
1
2 - 2 1

G
G
0,30 0,20 0,30 Esc. 1:50 0,30 0,20 0,30 C1

1 2 1

1,70 1,70 C
L C
L
CANAL QUE PASA (AGUAS 0,30 CANAL DE LLEGADA (AGUAS 1,90 0,85 0,85 1,90 0,20 Variable 0,85 0,85 1,90 0,50
ABAJO DEL PARTIDOR) 1,00 ARRIBA DEL PARTIDOR)
494.048 msnm 494.048 msnm

9 5 1.0 1.0
1.0 : 1

1.0 : 1
1.5
1/4 1 1,90 1
1.0
1,90
1,90 1,90 C1 1
1

6
492.150 msnm R 492.148 msnm
R
R
0,50 0.20 R 0,20
4 G 0,30
0,05 0,75
7

10 3

6
3 - 3 4 - 4
Esc. 1:50 Esc. 1:50
8

0,20 1,25 0.90 0,20


0,80
C
L
0,50 0,80 0,25 0,25
Variable 0,20
7
0,90 0,90
0,50
0,15
494.048 msnm
0,15
494.048 msnm E
0,80
R R 1.0

1
1,90 1
R 1,90 R
1
1,90 1.0
1
1 1 1 1 1
492.148 msnm 492.148 msnm
L

R
MA

0,20 0,20 0,20 R


0,05 0,05 0,05
RA

0,75

0,5 0,2 1,70 0,20 0,50 B2


0,50 0,20 0,20 0,50
2
5 - 5 6 - 6 7 - 7
8

Esc. 1:50 Esc. 1:50 Esc. 1:50

PLANTA PARTIDOR.: KM. 3 + 881.50


Esc.: 1/ 50
C
L Baranda de tubo
0,80 0,25 0,25 0,80 1
2" 0,90
1.- Concreto f'c=210 kg/cm2 E 494.048 msnm
2.- Concreto Simple f'c=100 kg/cm2, Solado e=0.10 m 0,15

3.- Acero de Refuerzo fy=4200 kg/cm2


b
Q (m3/s) n S (m/m) (S1/2/n) TALUD b (m)
1.0

1 0,80 1
1.0

1/4
1

1
1
R
1,90
R
1
1

C1
3 3 0.014 R 492.148 msnm
CANAL DE LLEGADA 5.25 m /s - 4.00 m /s (Concreto) 0.00055m/m 1.68 1.30 m 1.0 : 1 1.70 m 1.70 m R
0,20
0,20
0.014 7.- Relleno compactado con material propio. 0,05
CANAL DE SALIDA 5.01 m3/s - 3.80 m3/s (Concreto) 0.00055m/m 1.68 1.27 m 1.0 : 1 1.70 m 1.62 m 0,30 G

0.014 8.- Usar cemento Portland Tipo I. 0,50 0,20 1,70 0,20 0,50
RAMAL 3 3
0.25 m /s - 0.20 m /s (Concreto) 0.00055m/m 2.26 0.36 m 1.0 : 1 0.50 m 0.08 m
8 - 8 9 - 9
Esc. 1:50 Esc. 1:50
C
L
3,00 1,60 0,50 0,50 3,00 2,00 3,00
1,90 0,85 0,85 Variable 0,20
Baranda de tubo de Compuerta de ramal (2) modelo LEYENDA :
1
2" 494.048 msnm
C1
0,90
0,90 494.048 msnm 1.0 1.0
C1 Concreto
1 1 1
0,15 1/4 1,90
R
R
1.0 : 1

1.0 : 1

PROYECTO INTEGRADOR:
0,30 G Grava arenosa
1,90 1.90 1,90 0,20 "LA MISERICORDIA"
S = 0.55%0 492.13 msnm 0,20
492.148 msnm S = 0.55%0 492.15 msnm
R PLANO:
0,30 R Relleno compactado con material PARTIDOR UBICADO A LA ALTURA DEL
0,30 KM. 3 + 881.50
propio.
0,05 0,75
R R 0,30
1 1
* Castro Farro, Katherin.
C1
1
1 - 1 1

G 10 - 10 * Cruz Linares, Nylen. * Oblitas Perez, Jhair.


0,30 0,20 0,30 0,30 0,20 0,30 C1 * Irigoin Tocas, Jose. * Zegarra Flores, Jair.
G Esc. 1:50
Esc. 1:50 DOCENTE: PT-01
DR.