You are on page 1of 27

Tarikh Jenis Huruf Nom.

Indeks Kuatkuasa Gaji Perkhidmatan Kadar Kenaikan KGT Gred Gred Peringkat T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12 T13 T14 T15 T16 T17 T18 T19 T20 T21 T22 T23 T24 T25 T26 T27 T28 T29 T30 T31 T32 T33 T34 T35

C10 1/1/1976 - 01 Januari 1976 JKK Kejuruteraan C 10 - 435.00 460.00 485.00 535.00 560.00 585.00 610.00 635.00 660.00 710.00 735.00 760.00 785.00 815.00 845.00 905.00 945.00 985.00 1,025.00 1,065.00

C13-1 1/1/1976 - 01 Januari 1976 JKK Kejuruteraan C 13-1 - 435.00 460.00 485.00 510.00 560.00 585.00 610.00 635.00 660.00 710.00 735.00 760.00 785.00 815.00 845.00 905.00 935.00 995.00

C6 1/1/1976 - 01 Januari 1976 JKK C 6 - - - - - - - - - - - - - - 755.00 785.00 825.00 - 865.00 905.00 945.00 985.00 - -

-
C7 1/1/1976 - 01 Januari 1976 JKK Kejuruteraan C 7 - - - - - 605.00 635.00 665.00 695.00 725.00 755.00 785.00 815.00 845.00 905.00 945.00 985.00 1,025.00 1,065.00 1,105.00 1,145.00 1,185.00

C11 1/1/1976 - 01 Januari 1976 JKK C 11 - 435.00 460.00 485.00 510.00 535.00 560.00 585.00 610.00 635.00 660.00 685.00 710.00 735.00 760.00 785.00 815.00 845.00 - 905.00 945.00 985.00 1,025.00 1,065.00
C12 1/1/1976 - 01 Januari 1976 JKK C 12 - - 460.00 485.00 510.00 535.00 560.00 585.00 610.00 635.00 660.00 685.00 710.00 735.00 760.00 785.00 815.00 845.00 - 905.00 945.00 985.00 1,025.00 1,065.00
C14 1/1/1976 - 01 Januari 1976 JKK C 14 - - - - - - - - - 635.00 660.00 685.00 710.00 735.00 760.00 785.00 815.00 845.00 875.00 905.00 935.00 - - -
C15 1/1/1976 - 01 Januari 1976 JKK C 15 - - - - - 535.00 560.00 585.00 610.00 635.00 660.00 685.00 710.00 735.00 760.00 785.00 815.00 845.00 - - - - - -
D7 1/1/1976 - 01 Januari 1976 JKK D 7 - - - - - - - - - - - - - - - - - 620.00 645.00 670.00 695.00 720.00
D10 1/1/1976 - 01 Januari 1976 JKK D 10 - - 350.00 365.00 380.00 - 410.00 425.00 440.00 455.00 470.00 485.00 500.00 520.00 545.00 570.00 - 620.00 645.00 670.00 695.00 720.00
D11 1/1/1976 - 01 Januari 1976 JKK D 11 - - 350.00 365.00 380.00 395.00 410.00 425.00 440.00 455.00 470.00 485.00 500.00 520.00 545.00 570.00 - 620.00 645.00 670.00 695.00 720.00
D12 1/1/1976 - 01 Januari 1976 JKK D 12 - 335.00 350.00 365.00 380.00 395.00 410.00 425.00 440.00 455.00 470.00 - 495.00 520.00 545.00 570.00 595.00 620.00 645.00 670.00 695.00 720.00
D13 1/1/1976 - 01 Januari 1976 JKK D 13 - 335.00 350.00 365.00 380.00 395.00 410.00 425.00 440.00 455.00 470.00 485.00 500.00 520.00 545.00 570.00 - 620.00 645.00 670.00 695.00 720.00
D11 1/7/1985 - 01 Julai 1985 JKK D 11 - 335.00 350.00 365.00 330.00 395.00 410.00 425.00 440.00 455.00 470.00 485.00 505.00 530.00 555.00 605.00 630.00 655.00 680.00 705.00
D24 1/7/1985 - 01 Julai 1985 JKK D 24 - 315.00 325.00 335.00 350.00 365.00 380.00 395.00 410.00 425.00
D11 1/7/1986 - 01 Julai 1986 JKK D 11 - 350.00 365.00 380.00 395.00 410.00 425.00 440.00 455.00 470.00 485.00 500.00 520.00 545.00 570.00 620.00 645.00 670.00 695.00 720.00
C12 1/1/1989 - 01 Januari 1989 JKK C 12 - 460.00 435.00 510.00 535.00 560.00 585.00 610.00 635.00 660.00 685.00 710.00 735.00 760.00 785.00 815.00 845.00 905.00 945.00 985.00 1,025.00 1,065.00
B7 1/1/1992 P1 01 Januari 1992 SSB B 7 P1 475.00 503.00 531.00 559.00 587.00 615.00 643.00 671.00 699.00 727.00 755.00 783.00 811.00 839.00 867.00 900.00 933.00 966.00 999.00 1043.00 1087.00 1131.00 1175.00
B7 1/1/1992 P2 01 Januari 1992 SSB B 7 P2 504.00 533.00 562.00 591.00 620.00 649.00 678.00 707.00 736.00 765.00 794.00 823.00 852.00 881.00 915.00 949.00 983.00 1017.00 1063.00 1109.00 1155.00 1201.00 1247.00
B7 1/1/1992 P3 01 Januari 1992 SSB B 7 P3 534.00 564.00 594.00 624.00 654.00 684.00 714.00 744.00 774.00 804.00 834.00 864.00 894.00 929.00 964.00 999.00 1034.00 1082.00 1130.00 1178.00 1226.00 1274.00 1322.00
N5 1/1/1992 P1 01 Januari 1992 SSB N 5 P1 1,523.00 1,588.00 1,653.00 1,718.00 1,783.00 1,848.00 1,913.00 1,978.00 2,043.00 2,108.00
N5 1/1/1992 P2 01 Januari 1992 SSB N 5 P2 1,591.00 1,659.00 1,727.00 1,795.00 1,863.00 1,931.00 1,999.00 2,067.00 2,135.00 2,203.00
N5 1/1/1992 P3 01 Januari 1992 SSB N 5 P3 1,662.00 1,733.00 1,804.00 1,875.00 1,946.00 2,017.00 2,088.00 2,159.00 2,230.00 2,301.00
N9 1/1/1992 P1 01 Januari 1992 SSB N 9 P1 470.00 497.00 524.00 551.00 578.00 605.00 632.00 659.00 686.00 713.00 740.00 767.00 794.00 821.00 848.00 881.00 914.00 947.00 980.00 1,024.00 1,068.00 1,112.00 1,156.00
N9 1/1/1992 P2 01 Januari 1992 SSB N 9 P2 498.00 526.00 554.00 582.00 610.00 638.00 666.00 694.00 722.00 750.00 778.00 806.00 834.00 862.00 896.00 930.00 964.00 998.00 1,044.00 1,090.00 1,136.00 1,182.00 1,228.00
N9 1/1/1992 P3 01 Januari 1992 SSB N 9 P3 527.00 556.00 585.00 614.00 643.00 672.00 701.00 730.00 759.00 788.00 817.00 846.00 875.00 910.00 945.00 980.00 1,015.00 1,063.00 1,111.00 1,159.00 1,207.00 1,255.00 1,303.00
N12 1/1/1992 P1 01 Januari 1992 SSB N 12 P1 362.00 379.00 396.00 413.00 430.00 447.00 464.00 481.00 498.00 515.00 532.00 549.00 571.00 593.00 615.00 637.00 659.00
N12 1/1/1992 P2 01 Januari 1992 SSB N 12 P2 380.00 398.00 416.00 434.00 452.00 470.00 488.00 506.00 524.00 542.00 560.00 583.00 606.00 629.00 652.00 675.00 698.00
N12 1/1/1992 P3 01 Januari 1992 SSB N 12 P3 399.00 418.00 437.00 456.00 475.00 494.00 513.00 532.00 551.00 570.00 594.00 618.00 642.00 666.00 690.00 714.00 738.00
N13 1/1/1992 P1 01 Januari 1992 SSB N 13 P1 325.00 336.00 347.00 358.00 369.00 386.00 403.00 420.00 437.00 454.00 471.00 488.00 505.00 522.00 539.00 556.00 573.00 590.00 607.00 624.00 641.00
N13 1/1/1992 P2 01 Januari 1992 SSB N 13 P2 337.00 349.00 361.00 373.00 391.00 409.00 427.00 445.00 463.00 481.00 499.00 517.00 535.00 553.00 571.00 589.00 607.00 625.00 643.00 661.00 679.00
N13 1/1/1992 P3 01 Januari 1992 SSB N 13 P3 350.00 363.00 376.00 395.00 414.00 433.00 452.00 471.00 490.00 509.00 528.00 547.00 566.00 585.00 604.00 623.00 642.00 661.00 680.00 699.00 718.00
R10 1/1/1992 P1 01 Januari 1992 SSB R 10 P1 357.00 368.00 379.00 396.00 413.00 430.00 447.00 464.00 481.00 498.00 515.00 532.00 549.00 566.00 583.00 600.00
R10 1/1/1992 P2 01 Januari 1992 SSB R 10 P2 369.00 381.00 399.00 417.00 435.00 453.00 471.00 489.00 507.00 525.00 543.00 561.00 579.00 597.00 615.00 633.00
R10 1/1/1992 P3 01 Januari 1992 SSB R 10 P3 382.00 401.00 420.00 439.00 458.00 477.00 496.00 515.00 534.00 553.00 572.00 591.00 610.00 629.00 648.00 667.00
R11 1/1/1992 P1 01 Januari 1992 SSB R 11 P1 324.00 335.00 346.00 357.00 368.00 379.00 396.00 413.00 430.00 447.00 464.00 481.00 498.00
R11 1/1/1992 P2 01 Januari 1992 SSB R 11 P2 336.00 348.00 360.00 372.00 384.00 402.00 420.00 438.00 456.00 474.00 492.00 510.00 528.00
R11 1/1/1992 P3 01 Januari 1992 SSB R 11 P3 349.00 362.00 375.00 388.00 407.00 426.00 445.00 464.00 483.00 502.00 521.00 540.00 559.00
N11 1/1/1992 P1 01 Januari 1992 SSB N 11 P1 362.00 379.00 396.00 413.00 430.00 447.00 464.00 481.00 498.00 515.00 532.00 549.00 571.00 598.00 625.00 652.00 679.00 706.00 733.00 760.00 787.00
N11 1/1/1992 P2 01 Januari 1992 SSB N 11 P2 380.00 398.00 416.00 434.00 452.00 470.00 488.00 506.00 524.00 542.00 560.00 583.00 611.00 639.00 667.00 695.00 723.00 751.00 779.00 807.00 835.00
N11 1/1/1992 P3 01 Januari 1992 SSB N 11 P3 399.00 418.00 437.00 456.00 475.00 494.00 513.00 532.00 551.00 570.00 594.00 623.00 652.00 681.00 710.00 739.00 768.00 797.00 826.00 855.00 884.00
J3 1/1/1992 P1 01 Januari 1992 SSB KEJURUTERAAN J 3 P1 1,357.00 1,423.00 1,489.00 1,555.00 1,621.00 1,687.00 1,753.00 1,819.00 1,885.00 1,951.00 2,017.00 2,083.00 2,149.00 2,259.00 2,369.00 2,479.00 2,589.00 2,699.00 2,809.00 2,919.00 3,029.00
J3 1/1/1992 P2 01 Januari 1992 SSB KEJURUTERAAN J 3 P2 1,426.00 1,495.00 1,564.00 1,633.00 1,702.00 1,771.00 1,840.00 1,909.00 1,978.00 2,047.00 2,116.00 2,185.00 2,301.00 2,417.00 2,533.00 2,649.00 2,765.00 2,881.00 2,997.00 3,113.00 3,229.00
J3 1/1/1992 P3 01 Januari 1992 SSB KEJURUTERAAN J 3 P3 1,498.00 1,570.00 1,642.00 1,714.00 1,786.00 1,858.00 1,930.00 2,002.00 2,074.00 2,146.00 2,218.00 2,339.00 2,460.00 2,581.00 2,702.00 2,823.00 2,944.00 3,065.00 3,186.00 3,307.00 3,428.00
J5 1/1/1992 P1 01 Januari 1992 SSB KEJURUTERAAN J 5 P1 952.00 996.00 1,040.00 1,084.00 1,128.00 1,172.00 1,216.00 1,260.00 1,304.00 1,348.00 1,392.00 1,436.00 1,480.00 1,524.00 1,568.00 1,612.00 1,678.00 1,744.00
J5 1/1/1992 P2 01 Januari 1992 SSB KEJURUTERAAN J 5 P2 999.00 1,046.00 1,093.00 1,140.00 1,187.00 1,234.00 1,281.00 1,328.00 1,375.00 1,422.00 1,469.00 1,516.00 1,563.00 1,610.00 1,657.00 1,726.00 1,795.00 1,864.00
J5 1/1/1992 P3 01 Januari 1992 SSB KEJURUTERAAN J 5 P3 1,048.00 1,097.00 1,146.00 1,195.00 1,244.00 1,293.00 1,342.00 1,391.00 1,440.00 1,489.00 1,538.00 1,587.00 1,636.00 1,685.00 1,758.00 1,831.00 1,904.00 1,977.00
J6 1/1/1992 P1 01 Januari 1992 SSB KEJURUTERAAN J 6 P1 1,205.00 1,249.00 1,293.00 1,337.00 1,381.00 1,425.00 1,491.00 1,557.00 1,623.00
J6 1/1/1992 P2 01 Januari 1992 SSB KEJURUTERAAN J 6 P2 1,251.00 1,297.00 1,343.00 1,389.00 1,435.00 1,504.00 1,573.00 1,642.00 1,711.00
J6 1/1/1992 P3 01 Januari 1992 SSB KEJURUTERAAN J 6 P3 1,299.00 1,347.00 1,395.00 1,443.00 1,515.00 1,587.00 1,659.00 1,731.00 1,803.00
J7 1/1/1992 P1 01 Januari 1992 SSB KEJURUTERAAN J 7 P1 485.00 518.00 551.00 584.00 617.00 650.00 683.00 716.00 749.00 782.00 815.00 848.00 881.00 914.00 947.00 980.00 1,013.00 1,057.00 1,101.00 1,145.00 1,189.00 1,233.00 1,277.00 1,321.00
J7 1/1/1992 P2 01 Januari 1992 SSB KEJURUTERAAN J 7 P2 519.00 553.00 587.00 621.00 655.00 689.00 723.00 757.00 791.00 825.00 859.00 893.00 927.00 961.00 995.00 1,029.00 1,075.00 1,121.00 1,167.00 1,213.00 1,259.00 1,305.00 1,351.00 1,397.00
J7 1/1/1992 P3 01 Januari 1992 SSB KEJURUTERAAN J 7 P3 554.00 589.00 624.00 659.00 694.00 729.00 764.00 799.00 834.00 869.00 904.00 939.00 974.00 1,009.00 1,044.00 1,092.00 1,140.00 1,188.00 1,236.00 1,284.00 1,332.00 1,380.00 1,428.00 1,476.00
KP10 1/1/1992 P1 01 Januari 1992 SSB KP 10 P1 381.00 398.00 415.00 432.00 449.00 466.00 483.00 500.00 517.00 534.00 551.00 573.00 600.00 627.00 654.00 681.00 708.00 735.00 762.00 789.00
KP10 1/1/1992 P2 01 Januari 1992 SSB KP 10 P2 399.00 417.00 435.00 453.00 471.00 489.00 507.00 525.00 543.00 561.00 584.00 612.00 640.00 668.00 696.00 724.00 752.00 780.00 808.00 836.00
KP10 1/1/1992 P3 01 Januari 1992 SSB KP 10 P3 418.00 437.00 456.00 475.00 494.00 513.00 532.00 551.00 570.00 594.00 623.00 652.00 681.00 710.00 739.00 768.00 797.00 826.00 855.00 884.00
N10 1/1/1992 P1 01 Januari 1992 SSB N 10 P1 779.00 806.00 833.00 866.00 899.00 932.00 965.00 998.00 1,031.00
N10 1/1/1992 P2 01 Januari 1992 SSB N 10 P2 807.00 835.00 869.00 903.00 937.00 971.00 1,005.00 1,039.00 1,073.00
N10 1/1/1992 P3 01 Januari 1992 SSB N 10 P3 836.00 871.00 906.00 941.00 976.00 1,011.00 1,046.00 1,081.00 1,116.00
N3 1/1/1992 P1 01 Januari 1992 SSB N 3 P1 1,071.00 1,136.00 1,201.00 1,266.00 1,331.00 1,396.00 1,461.00 1,526.00 1,591.00 1,656.00 1,721.00 1,786.00 1,851.00 1,916.00 1,981.00 2,046.00 2,111.00 2,219.00 2,327.00 2,435.00 2,543.00 2,651.00 2,759.00 2,867.00 2,975.00
N3 1/1/1992 P2 01 Januari 1992 SSB N 3 P2 1,139.00 1,207.00 1,275.00 1,343.00 1,411.00 1,479.00 1,547.00 1,615.00 1,683.00 1,751.00 1,819.00 1,887.00 1,955.00 2,023.00 2,091.00 2,159.00 2,271.00 2,383.00 2,495.00 2,607.00 2,719.00 2,831.00 2,943.00 3,055.00 3,167.00
N3 1/1/1992 P3 01 Januari 1992 SSB N 3 P3 1,210.00 1,281.00 1,352.00 1,423.00 1,494.00 1,565.00 1,636.00 1,707.00 1,778.00 1,849.00 1,920.00 1,991.00 2,062.00 2,133.00 2,204.00 2,321.00 2,438.00 2,555.00 2,672.00 2,789.00 2,906.00 3,023.00 3,140.00 3,257.00 3,374.00
U1 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 1 P1 3,635.00 3,784.00 3,949.00 4,114.00 4,279.00 4,444.00
U1 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 1 P2 3,790.00 3,962.00 4,134.00 4,306.00 4,478.00 4,650.00
U1 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 1 P3 3,969.00 4,148.00 4,327.00 4,506.00 4,685.00 4,864.00
U2 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 2 P1 3,041.00 3,190.00 3,339.00 3,488.00 3,637.00 3,786.00
U2 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 2 P2 3,196.00 3,351.00 3,506.00 3,661.00 3,816.00 3,971.00
U2 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 2 P3 3,357.00 3,518.00 3,679.00 3,840.00 4,001.00 4,162.00
U3 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 3 P1 1,293.00 1,359.00 1,425.00 1,491.00 1,557.00 1,623.00 1,689.00 1,755.00 1,821.00 1,887.00 1,953.00 2,019.00 2,085.00 2,151.00 2,261.00 2,371.00 2,481.00 2,591.00 2,701.00 2,811.00 2,921.00 3,031.00
U3 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 3 P2 1,362.00 1,431.00 1,500.00 1,569.00 1,638.00 1,707.00 1,776.00 1,845.00 1,914.00 1,983.00 2,052.00 2,121.00 2,190.00 2,306.00 2,422.00 2,538.00 2,654.00 2,770.00 2,886.00 3,002.00 3,118.00 3,234.00
U3 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 3 P3 1,434.00 1,506.00 1,578.00 1,650.00 1,722.00 1,794.00 1,866.00 1,938.00 2,010.00 2,082.00 2,154.00 2,226.00 2,347.00 2,468.00 2,589.00 2,710.00 2,831.00 2,952.00 3,073.00 3,194.00 3,315.00 3,436.00
U4 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 4 P1 2,866.00 2,998.00 3,130.00 3,262.00
U4 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 4 P2 3,003.00 3,140.00 3,277.00 3,414.00
U4 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 4 P3 3,145.00 3,287.00 3,429.00 3,571.00
U5 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 5 P1 2,426.00 2,536.00 2,646.00 2,756.00 2,866.00
U5 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 5 P2 2,540.00 2,654.00 2,768.00 2,882.00 2,996.00
U5 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 5 P3 2,659.00 2,778.00 2,897.00 3,016.00 3,135.00
U6 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 6 P1 1,949.00 2,015.00 2,081.00 2,147.00 2,257.00 2,367.00 2,477.00 2,587.00
U6 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 6 P2 2,018.00 2,087.00 2,156.00 2,270.00 2,384.00 2,498.00 2,612.00 2,726.00
U6 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 6 P3 2,090.00 2,162.00 2,281.00 2,400.00 2,519.00 2,638.00 2,757.00 2,876.00
U7 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 7 P1 1,223.00 1,267.00 1,311.00 1,355.00 1,399.00 1,443.00 1,487.00 1,553.00 1,619.00 1,685.00 1,751.00 1,817.00 1,883.00 1,949.00 2,015.00 2,081.00 2,147.00
U7 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 7 P2 1,270.00 1,317.00 1,364.00 1,411.00 1,458.00 1,505.00 1,574.00 1,643.00 1,712.00 1,781.00 1,850.00 1,919.00 1,988.00 2,057.00 2,126.00 2,195.00 2,264.00
U7 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 7 P3 1,319.00 1,368.00 1,417.00 1,466.00 1,515.00 1,587.00 1,659.00 1,731.00 1,803.00 1,875.00 1,947.00 2,019.00 2,091.00 2,163.00 2,235.00 2,307.00 2,379.00
U8 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 8 P1 695.00 739.00 783.00 827.00 871.00 915.00 959.00 1,003.00 1,047.00 1,091.00 1,135.00 1,179.00 1,223.00 1,267.00 1,311.00 1,355.00 1,399.00 1,443.00 1,487.00 1,531.00 1,575.00 1,619.00 1,685.00 1,751.00
U8 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 8 P2 742.00 789.00 836.00 883.00 930.00 977.00 1,024.00 1,071.00 1,118.00 1,165.00 1,212.00 1,259.00 1,306.00 1,353.00 1,400.00 1,447.00 1,494.00 1,541.00 1,588.00 1,635.00 1,682.00 1,751.00 1,820.00 1,889.00
U8 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 8 P3 791.00 840.00 889.00 938.00 987.00 1,036.00 1,085.00 1,134.00 1,183.00 1,232.00 1,281.00 1,330.00 1,379.00 1,428.00 1,477.00 1,526.00 1,575.00 1,624.00 1,673.00 1,722.00 1,794.00 1,866.00 1,938.00 2,010.00
U9 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 9 P1 1,205.00 1,249.00 1,293.00 1,337.00 1,381.00 1,425.00 1,491.00 1,557.00 1,623.00
U9 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 9 P2 1,251.00 1,297.00 1,343.00 1,389.00 1,435.00 1,504.00 1,573.00 1,642.00 1,711.00
U9 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 9 P3 1,299.00 1,347.00 1,395.00 1,443.00 1,515.00 1,587.00 1,659.00 1,731.00 1,803.00
U10 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 10 P1 475.00 503.00 531.00 559.00 587.00 615.00 643.00 671.00 699.00 727.00 755.00 783.00 811.00 839.00 867.00 900.00 933.00 966.00 999.00 1,043.00 1,087.00 1,131.00 1,175.00
U10 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 10 P2 504.00 533.00 562.00 591.00 620.00 649.00 678.00 707.00 736.00 765.00 794.00 823.00 852.00 881.00 915.00 949.00 983.00 1,017.00 1,063.00 1,109.00 1,155.00 1,201.00 1,247.00
U10 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 10 P3 534.00 564.00 594.00 624.00 654.00 684.00 714.00 744.00 774.00 804.00 834.00 864.00 894.00 929.00 964.00 999.00 1,034.00 1,082.00 1,130.00 1,178.00 1,226.00 1,274.00 1,322.00
U11 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 11 P1 741.00 768.00 795.00 822.00 849.00 882.00 915.00 948.00 981.00 1,025.00 1,069.00
U11 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 11 P2 769.00 797.00 825.00 853.00 887.00 921.00 955.00 989.00 1,035.00 1,081.00 1,127.00
U11 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 11 P3 798.00 827.00 856.00 891.00 926.00 961.00 996.00 1,044.00 1,092.00 1,140.00 1,188.00
U12 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 12 P1 498.00 525.00 552.00 579.00 606.00 633.00 660.00 687.00 714.00 741.00 768.00 795.00 822.00 849.00 882.00 915.00
U12 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 12 P2 526.00 554.00 582.00 610.00 638.00 666.00 694.00 722.00 750.00 778.00 806.00 834.00 862.00 896.00 930.00 964.00
U12 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 12 P3 555.00 584.00 613.00 642.00 671.00 700.00 729.00 758.00 787.00 816.00 845.00 874.00 909.00 944.00 979.00 1,014.00
U13 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 13 P1 780.00 807.00 834.00 867.00 900.00 933.00 966.00 999.00 1,032.00
U13 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 13 P2 808.00 836.00 870.00 904.00 938.00 972.00 1,006.00 1,040.00 1,074.00
U13 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 13 P3 837.00 872.00 907.00 942.00 977.00 1,012.00 1,047.00 1,082.00 1,117.00
U14 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 14 P1 380.00 397.00 414.00 431.00 448.00 470.00 492.00 514.00 536.00 558.00 580.00 602.00 629.00 656.00 683.00 710.00 737.00 764.00 791.00 818.00 845.00
U14 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 14 P2 398.00 416.00 434.00 452.00 475.00 498.00 521.00 544.00 567.00 590.00 613.00 641.00 669.00 697.00 725.00 753.00 781.00 809.00 837.00 865.00 893.00
U14 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 14 P3 417.00 436.00 455.00 479.00 503.00 527.00 551.00 575.00 599.00 623.00 652.00 681.00 710.00 739.00 768.00 797.00 826.00 855.00 884.00 913.00 942.00
U15 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 15 P1 362.00 379.00 396.00 413.00 430.00 447.00 464.00 481.00 498.00 515.00 532.00 549.00 576.00 603.00 630.00 657.00 684.00
U15 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 15 P2 380.00 398.00 416.00 434.00 452.00 470.00 488.00 506.00 524.00 542.00 560.00 588.00 616.00 644.00 672.00 700.00 728.00
U15 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 15 P3 399.00 418.00 437.00 456.00 475.00 494.00 513.00 532.00 551.00 570.00 599.00 628.00 657.00 686.00 715.00 744.00 773.00
U16 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 16 P1 324.00 335.00 346.00 357.00 368.00 385.00 402.00 419.00 436.00 453.00 470.00 487.00 504.00 521.00 538.00
U16 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 16 P2 336.00 348.00 360.00 372.00 390.00 408.00 426.00 444.00 462.00 480.00 498.00 516.00 534.00 552.00 570.00
U16 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN U 16 P3 349.00 362.00 375.00 394.00 413.00 432.00 451.00 470.00 489.00 508.00 527.00 546.00 565.00 584.00 603.00
UB1 1/1/1992 P1 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN UB 1 P1 470.00 497.00 524.00 551.00 578.00 605.00 632.00 659.00 686.00
UB1 1/1/1992 P2 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN UB 1 P2 498.00 526.00 554.00 582.00 610.00 638.00 666.00 694.00 722.00
UB1 1/1/1992 P3 01 Januari 1992 SSB PERUBATAN DAN KESIHATAN UB 1 P3 527.00 556.00 585.00 614.00 643.00 672.00 701.00 730.00 759.00
U4 1/1/1995 P1 01 Januari 1995 SSB U 4 P1 2,926.00 3,058.00 3,190.00 3,322.00 3,454.00 3,586.00
U4 1/1/1995 P2 01 Januari 1995 SSB U 4 P2 3,063.00 3,200.00 3,337.00 3,474.00 3,611.00 3,748.00
U4 1/1/1995 P3 01 Januari 1995 SSB U 4 P3 3,205.00 3,347.00 3,489.00 3,631.00 3,773.00 3,915.00
U11 1/1/1995 P1 01 Januari 1995 SSB U 11 P1 801.00 834.00 867.00 900.00 933.00 966.00 999.00 1,032.00 1,076.00 1,120.00 1,164.00 1,208.00 1,252.00
U11 1/1/1995 P2 01 Januari 1995 SSB U 11 P2 835.00 869.00 903.00 937.00 971.00 1,005.00 1,039.00 1,085.00 1,131.00 1,177.00 1,223.00 1,269.00 1,315.00
U11 1/1/1995 P3 01 Januari 1995 SSB U 11 P3 870.00 905.00 940.00 975.00 1,010.00 1,045.00 1,093.00 1,141.00 1,189.00 1,237.00 1,285.00 1,333.00 1,381.00
U12 1/1/1995 P1 01 Januari 1995 SSB U 12 P1 558.00 591.00 624.00 657.00 690.00 723.00 756.00 789.00 822.00 855.00 921.00 954.00 987.00 1,031.00 1,075.00
U12 1/1/1995 P2 01 Januari 1995 SSB U 12 P2 592.00 626.00 660.00 694.00 728.00 762.00 796.00 830.00 864.00 898.00 966.00 1,000.00 1,046.00 1,092.00 1,138.00
U12 1/1/1995 P3 01 Januari 1995 SSB U 12 P3 627.00 662.00 697.00 732.00 767.00 802.00 837.00 872.00 907.00 942.00 1,012.00 1,060.00 1,108.00 1,156.00 1,204.00
U13 1/1/1995 P1 01 Januari 1995 SSB U 13 P1 840.00 873.00 906.00 950.00 994.00 1,038.00 1,082.00 1,126.00 1,170.00
U13 1/1/1995 P2 01 Januari 1995 SSB U 13 P2 874.00 908.00 954.00 1,000.00 1,046.00 1,092.00 1,138.00 1,184.00 1,230.00
U13 1/1/1995 P3 01 Januari 1995 SSB U 13 P3 909.00 957.00 1,005.00 1,053.00 1,101.00 1,149.00 1,197.00 1,245.00 1,293.00
B7 1/1/1995 P1 01 Januari 1995 SSB B 7 P1 535.00 569.00 603.00 637.00 671.00 705.00 739.00 773.00 807.00 841.00 875.00 909.00 943.00 987.00 1,031.00 1,075.00 1,119.00 1,163.00 1,207.00 1,251.00 1,295.00 1,339.00 1,383.00
B7 1/1/1995 P2 01 Januari 1995 SSB B 7 P2 570.00 605.00 640.00 675.00 710.00 745.00 780.00 815.00 850.00 885.00 920.00 955.00 1,001.00 1,047.00 1,093.00 1,139.00 1,185.00 1,231.00 1,277.00 1,323.00 1,369.00 1,415.00 1,461.00
B7 1/1/1995 P3 01 Januari 1995 SSB B 7 P3 606.00 642.00 678.00 714.00 750.00 786.00 822.00 858.00 894.00 930.00 966.00 1,014.00 1,062.00 1,110.00 1,158.00 1,206.00 1,254.00 1,302.00 1,350.00 1,398.00 1,446.00 1,494.00 1,542.00
J5 1/1/1995 P1 01 Januari 1995 SSB J 5 P1 1,012.00 1,056.00 1,100.00 1,144.00 1,188.00 1,232.00 1,276.00 1,320.00 1,364.00 1,408.00 1,452.00 1,496.00 1,540.00 1,584.00 1,628.00 1,672.00 1,738.00 1,804.00 1,870.00 1,936.00
J5 1/1/1995 P2 01 Januari 1995 SSB J 5 P2 1,059.00 1,106.00 1,153.00 1,200.00 1,247.00 1,294.00 1,341.00 1,388.00 1,435.00 1,482.00 1,529.00 1,576.00 1,623.00 1,670.00 1,717.00 1,786.00 1,855.00 1,924.00 1,993.00 2,062.00
J5 1/1/1995 P3 01 Januari 1995 SSB J 5 P3 1,108.00 1,157.00 1,206.00 1,255.00 1,304.00 1,353.00 1,402.00 1,451.00 1,500.00 1,549.00 1,598.00 1,647.00 1,696.00 1,745.00 1,818.00 1,891.00 1,964.00 2,037.00 2,110.00 2,183.00
J6 1/1/1995 P1 01 Januari 1995 SSB J 6 P1 1,265.00 1,309.00 1,353.00 1,397.00 1,441.00 1,485.00 1,551.00 1,617.00 1,683.00 1,749.00 1,815.00
J6 1/1/1995 P2 01 Januari 1995 SSB J 6 P2 1,311.00 1,357.00 1,403.00 1,449.00 1,495.00 1,564.00 1,633.00 1,702.00 1,771.00 1,840.00 1,909.00
J6 1/1/1995 P3 01 Januari 1995 SSB J 6 P3 1,359.00 1,407.00 1,455.00 1,503.00 1,575.00 1,647.00 1,719.00 1,791.00 1,863.00 1,935.00 2,007.00
J7 1/1/1995 P1 01 Januari 1995 SSB J 7 P1 545.00 579.00 613.00 647.00 681.00 715.00 749.00 783.00 817.00 851.00 885.00 919.00 953.00 997.00 1,041.00 1,085.00 1,129.00 1,173.00 1,217.00 1,261.00 1,305.00 1,349.00 1,393.00 1,437.00 1,481.00
J7 1/1/1995 P2 01 Januari 1995 SSB J 7 P2 580.00 615.00 650.00 685.00 720.00 755.00 790.00 825.00 860.00 895.00 930.00 965.00 1,011.00 1,057.00 1,103.00 1,149.00 1,195.00 1,241.00 1,287.00 1,333.00 1,379.00 1,425.00 1,471.00 1,517.00 1,563.00
J7 1/1/1995 P3 01 Januari 1995 SSB J 7 P3 616.00 652.00 688.00 724.00 760.00 796.00 832.00 868.00 904.00 940.00 976.00 1,024.00 1,072.00 1,120.00 1,168.00 1,216.00 1,264.00 1,312.00 1,360.00 1,408.00 1,456.00 1,504.00 1,552.00 1,600.00 1,648.00
J3 1/1/1995 P1 01 Januari 1995 SSB J 3 P1 1,447.00 1,513.00 1,579.00 1,645.00 1,711.00 1,777.00 1,843.00 1,909.00 1,975.00 2,041.00 2,107.00 2,173.00 2,239.00 2,349.00 2,459.00 2,569.00 2,679.00 2,789.00 2,899.00 3,009.00 3,119.00 3,229.00
J3 1/1/1995 P2 01 Januari 1995 SSB J 3 P2 1,516.00 1,585.00 1,654.00 1,723.00 1,792.00 1,861.00 1,930.00 1,999.00 2,068.00 2,137.00 2,206.00 2,275.00 2,391.00 2,507.00 2,623.00 2,739.00 2,855.00 2,971.00 3,087.00 3,203.00 3,319.00 3,435.00
J3 1/1/1995 P3 01 Januari 1995 SSB J 3 P3 1,588.00 1,660.00 1,732.00 1,804.00 1,876.00 1,948.00 2,020.00 2,092.00 2,164.00 2,236.00 2,308.00 2,429.00 2,550.00 2,671.00 2,792.00 2,913.00 3,034.00 3,155.00 3,276.00 3,397.00 3,518.00 3,639.00
N9 1/1/1995 P1 01 Januari 1995 SSB N 9 P1 530.00 563.00 596.00 629.00 662.00 695.00 728.00 761.00 794.00 827.00 860.00 893.00 926.00 970.00 1,014.00 1,058.00 1,102.00 1,146.00 1,190.00 1,234.00 1,278.00 1,322.00 1,366.00
N9 1/1/1995 P2 01 Januari 1995 SSB N 9 P2 564.00 598.00 632.00 666.00 700.00 734.00 768.00 802.00 836.00 870.00 904.00 938.00 984.00 1,030.00 1,076.00 1,122.00 1,168.00 1,214.00 1,260.00 1,306.00 1,352.00 1,398.00 1,444.00
N9 1/1/1995 P3 01 Januari 1995 SSB N 9 P3 599.00 634.00 669.00 704.00 739.00 774.00 809.00 844.00 879.00 914.00 949.00 997.00 1,045.00 1,093.00 1,141.00 1,189.00 1,237.00 1,285.00 1,333.00 1,381.00 1,429.00 1,477.00 1,525.00
N11 1/1/1995 P1 01 Januari 1995 SSB N 11 P1 442.00 447.00 472.00 497.00 522.00 547.00 572.00 597.00 630.00 663.00 696.00 729.00 762.00 795.00 828.00 861.00 894.00 927.00 960.00 993.00 1,026.00
N11 1/1/1995 P2 01 Januari 1995 SSB N 11 P2 448.00 474.00 500.00 526.00 552.00 578.00 604.00 638.00 672.00 706.00 740.00 774.00 808.00 842.00 876.00 910.00 944.00 978.00 1,012.00 1,046.00 1,080.00
N11 1/1/1995 P3 01 Januari 1995 SSB N 11 P3 475.00 502.00 529.00 556.00 583.00 610.00 645.00 680.00 715.00 750.00 785.00 820.00 855.00 890.00 925.00 960.00 995.00 1,030.00 1,065.00 1,100.00 1,135.00
N12 1/1/1995 P1 01 Januari 1995 SSB N 12 P1 422.00 447.00 472.00 497.00 522.00 547.00 572.00 597.00 630.00 663.00 696.00 729.00 762.00 795.00 828.00 861.00 894.00
N12 1/1/1995 P2 01 Januari 1995 SSB N 12 P2 448.00 474.00 500.00 526.00 552.00 578.00 604.00 638.00 672.00 706.00 740.00 774.00 808.00 842.00 876.00 910.00 944.00
N12 1/1/1995 P3 01 Januari 1995 SSB N 12 P3 475.00 502.00 529.00 556.00 583.00 610.00 645.00 680.00 715.00 750.00 785.00 820.00 855.00 890.00 925.00 960.00 995.00
N13 1/1/1995 P1 01 Januari 1995 SSB N 13 P1 385.00 410.00 435.00 460.00 485.00 510.00 535.00 560.00 585.00 610.00 635.00 660.00 685.00 710.00 735.00 760.00 785.00 810.00 835.00 860.00 885.00
N13 1/1/1995 P2 01 Januari 1995 SSB N 13 P2 411.00 437.00 463.00 489.00 515.00 541.00 567.00 593.00 619.00 645.00 671.00 697.00 723.00 749.00 775.00 801.00 827.00 853.00 879.00 905.00 931.00
N13 1/1/1995 P3 01 Januari 1995 SSB N 13 P3 438.00 465.00 492.00 519.00 546.00 573.00 600.00 627.00 654.00 681.00 708.00 735.00 762.00 789.00 816.00 843.00 870.00 897.00 924.00 951.00 978.00
N1 1/1/1995 P1 01 Januari 1995 SSB N 1 P1 3,655.00 3,801.00 3,963.00 4,125.00 4,287.00 4,449.00 4,611.00
N1 1/1/1995 P2 01 Januari 1995 SSB N 1 P2 3,807.00 3,976.00 4,145.00 4,314.00 4,483.00 4,652.00 4,821.00
N1 1/1/1995 P3 01 Januari 1995 SSB N 1 P3 3,983.00 4,159.00 4,335.00 4,511.00 4,687.00 4,863.00 5,039.00
N2 1/1/1995 P1 01 Januari 1995 SSB N 2 P1 3,072.00 3,218.00 3,364.00 3,510.00 3,656.00 3,802.00 3,948.00
N2 1/1/1995 P2 01 Januari 1995 SSB N 2 P2 3,224.00 3,376.00 3,528.00 3,680.00 3,832.00 3,984.00 4,136.00
N2 1/1/1995 P3 01 Januari 1995 SSB N 2 P3 3,382.00 3,540.00 3,698.00 3,856.00 4,014.00 4,172.00 4,330.00
N3 1/1/1995 P1 01 Januari 1995 SSB N 3 P1 1,161.00 1,226.00 1,291.00 1,356.00 1,421.00 1,486.00 1,551.00 1,616.00 1,681.00 1,746.00 1,811.00 1,876.00 1,941.00 2,006.00 2,071.00 2,136.00 2,201.00 2,309.00 2,417.00 2,525.00 2,633.00 2,741.00 2,849.00 2,957.00 3,065.00 3,173.00
N3 1/1/1995 P2 01 Januari 1995 SSB N 3 P2 1,229.00 1,297.00 1,365.00 1,433.00 1,501.00 1,569.00 1,637.00 1,705.00 1,773.00 1,841.00 1,909.00 1,977.00 2,045.00 2,113.00 2,181.00 2,249.00 2,361.00 2,473.00 2,585.00 2,697.00 2,809.00 2,921.00 3,033.00 3,145.00 3,257.00 3,369.00
N3 1/1/1995 P3 01 Januari 1995 SSB N 3 P3 1,300.00 1,371.00 1,442.00 1,513.00 1,584.00 1,655.00 1,726.00 1,797.00 1,868.00 1,939.00 2,010.00 2,081.00 2,152.00 2,223.00 2,294.00 2,411.00 2,528.00 2,645.00 2,762.00 2,879.00 2,996.00 3,113.00 3,230.00 3,347.00 3,464.00 3,581.00
N4 1/1/1995 P1 01 Januari 1995 SSB N 4 P1 1,972.00 2,037.00 2,102.00 2,167.00 2,275.00 2,383.00 2,491.00 2,599.00 2,707.00 2,815.00
N4 1/1/1995 P2 01 Januari 1995 SSB N 4 P2 2,040.00 2,108.00 2,176.00 2,288.00 2,400.00 2,512.00 2,624.00 2,736.00 2,848.00 2,960.00
N4 1/1/1995 P3 01 Januari 1995 SSB N 4 P3 2,111.00 2,182.00 2,299.00 2,416.00 2,533.00 2,650.00 2,767.00 2,884.00 3,001.00 3,118.00
N5 1/1/1995 P1 01 Januari 1995 SSB N 5 P1 1,583.00 1,648.00 1,713.00 1,778.00 1,843.00 1,908.00 1,973.00 2,038.00 2,103.00 2,168.00 2,233.00 2,298.00
N5 1/1/1995 P2 01 Januari 1995 SSB N 5 P2 1,651.00 1,719.00 1,787.00 1,855.00 1,923.00 1,991.00 2,059.00 2,127.00 2,195.00 2,263.00 2,331.00 2,399.00
N5 1/1/1995 P3 01 Januari 1995 SSB N 5 P3 1,722.00 1,793.00 1,864.00 1,935.00 2,006.00 2,077.00 2,148.00 2,219.00 2,290.00 2,361.00 2,432.00 2,503.00
N10 1/1/1995 P1 01 Januari 1995 SSB N 10 P1 839.00 872.00 905.00 949.00 993.00 1,037.00 1,081.00 1,125.00 1,169.00
N10 1/1/1995 P2 01 Januari 1995 SSB N 10 P2 873.00 907.00 953.00 999.00 1,045.00 1,091.00 1,137.00 1,183.00 1,229.00
N10 1/1/1995 P3 01 Januari 1995 SSB N 10 P3 908.00 956.00 1,004.00 1,052.00 1,100.00 1,148.00 1,196.00 1,244.00 1,292.00
R10 1/1/1995 P1 01 Januari 1995 SSB R 10 P1 417.00 442.00 467.00 492.00 517.00 542.00 567.00 592.00 617.00 642.00 667.00 692.00 717.00 742.00 767.00 792.00
R10 1/1/1995 P2 01 Januari 1995 SSB R 10 P2 443.00 469.00 495.00 521.00 547.00 573.00 599.00 625.00 651.00 677.00 703.00 729.00 755.00 781.00 807.00 833.00
R10 1/1/1995 P3 01 Januari 1995 SSB R 10 P3 470.00 497.00 524.00 551.00 578.00 605.00 632.00 659.00 686.00 713.00 740.00 767.00 794.00 821.00 848.00 875.00
S5 1/1/1995 P1 01 Januari 1995 SSB S 5 P1 784.00 828.00 872.00 916.00 960.00 1,004.00 1,048.00 1,092.00 1,136.00 1,180.00 1,224.00 1,268.00 1,312.00 1,356.00 1,400.00 1,444.00 1,488.00 1,532.00 1,576.00 1,620.00 1,664.00 1,729.00 1,794.00 1,859.00 1,924.00
S5 1/1/1995 P2 01 Januari 1995 SSB S 5 P2 830.00 876.00 922.00 968.00 1,014.00 1,060.00 1,106.00 1,152.00 1,198.00 1,244.00 1,290.00 1,336.00 1,382.00 1,428.00 1,474.00 1,520.00 1,566.00 1,612.00 1,658.00 1,704.00 1,772.00 1,840.00 1,908.00 1,976.00 2,044.00
S5 1/1/1995 P3 01 Januari 1995 SSB S 5 P3 878.00 926.00 974.00 1,022.00 1,070.00 1,118.00 1,166.00 1,214.00 1,262.00 1,310.00 1,358.00 1,406.00 1,454.00 1,502.00 1,550.00 1,598.00 1,646.00 1,694.00 1,742.00 1,813.00 1,884.00 1,955.00 2,026.00 2,097.00 2,168.00
U1 1/1/1995 P1 01 Januari 1995 SSB U 1 P1 3,725.00 3,874.00 4,039.00 4,204.00 4,369.00 4,534.00 4,699.00
U1 1/1/1995 P2 01 Januari 1995 SSB U 1 P2 3,880.00 4,052.00 4,224.00 4,396.00 4,568.00 4,740.00 4,912.00
U1 1/1/1995 P3 01 Januari 1995 SSB U 1 P3 4,059.00 4,238.00 4,417.00 4,596.00 4,775.00 4,954.00 5,133.00
U2 1/1/1995 P1 01 Januari 1995 SSB U 2 P1 3,131.00 3,280.00 3,429.00 3,578.00 3,727.00 3,876.00 4,025.00
U2 1/1/1995 P2 01 Januari 1995 SSB U 2 P2 3,286.00 3,441.00 3,596.00 3,751.00 3,906.00 4,061.00 4,216.00
U2 1/1/1995 P3 01 Januari 1995 SSB U 2 P3 3,447.00 3,608.00 3,769.00 3,930.00 4,091.00 4,252.00 4,413.00
U3 1/1/1995 P1 01 Januari 1995 SSB U 3 P1 1,383.00 1,449.00 1,515.00 1,581.00 1,647.00 1,713.00 1,779.00 1,845.00 1,911.00 1,977.00 2,043.00 2,109.00 2,175.00 2,241.00 2,351.00 2,461.00 2,571.00 2,681.00 2,791.00 2,901.00 3,011.00 3,121.00 3,231.00
U3 1/1/1995 P2 01 Januari 1995 SSB U 3 P2 1,452.00 1,521.00 1,590.00 1,659.00 1,728.00 1,797.00 1,866.00 1,935.00 2,004.00 2,073.00 2,142.00 2,211.00 2,280.00 2,396.00 2,512.00 2,628.00 2,744.00 2,860.00 2,976.00 3,092.00 3,208.00 3,324.00 3,440.00
U3 1/1/1995 P3 01 Januari 1995 SSB U 3 P3 1,524.00 1,596.00 1,668.00 1,740.00 1,812.00 1,884.00 1,956.00 2,028.00 2,100.00 2,172.00 2,244.00 2,316.00 2,437.00 2,558.00 2,679.00 2,800.00 2,921.00 3,042.00 3,163.00 3,284.00 3,405.00 3,526.00 3,647.00
U5 1/1/1995 P1 01 Januari 1995 SSB U 5 P1 2,486.00 2,596.00 2,706.00 2,816.00 2,926.00 3,036.00 3,146.00
U5 1/1/1995 P2 01 Januari 1995 SSB U 5 P2 2,600.00 2,714.00 2,828.00 2,942.00 3,056.00 3,170.00 3,284.00
U5 1/1/1995 P3 01 Januari 1995 SSB U 5 P3 2,719.00 2,838.00 2,957.00 3,076.00 3,195.00 3,314.00 3,433.00
U6 1/1/1995 P1 01 Januari 1995 SSB U 6 P1 2,009.00 2,075.00 2,141.00 2,207.00 2,317.00 2,427.00 2,537.00 2,647.00 2,757.00 2,867.00
U6 1/1/1995 P2 01 Januari 1995 SSB U 6 P2 2,078.00 2,147.00 2,216.00 2,330.00 2,444.00 2,558.00 2,672.00 2,786.00 2,900.00 3,014.00
U6 1/1/1995 P3 01 Januari 1995 SSB U 6 P3 2,150.00 2,222.00 2,341.00 2,460.00 2,579.00 2,698.00 2,817.00 2,936.00 3,055.00 3,174.00
U7 1/1/1995 P1 01 Januari 1995 SSB U 7 P1 1,283.00 1,327.00 1,371.00 1,415.00 1,459.00 1,503.00 1,547.00 1,613.00 1,679.00 1,745.00 1,811.00 1,877.00 1,943.00 2,009.00 2,075.00 2,141.00 2,207.00 2,273.00 2,339.00
U7 1/1/1995 P2 01 Januari 1995 SSB U 7 P2 1,330.00 1,377.00 1,424.00 1,471.00 1,518.00 1,565.00 1,634.00 1,703.00 1,772.00 1,841.00 1,910.00 1,979.00 2,048.00 2,117.00 2,186.00 2,255.00 2,324.00 2,393.00 2,462.00
U7 1/1/1995 P3 01 Januari 1995 SSB U 7 P3 1,379.00 1,428.00 1,477.00 1,526.00 1,575.00 1,647.00 1,719.00 1,791.00 1,863.00 1,935.00 2,007.00 2,079.00 2,151.00 2,223.00 2,295.00 2,367.00 2,439.00 2,511.00 2,583.00
U8 1/1/1995 P1 01 Januari 1995 SSB U 8 P1 755.00 799.00 843.00 887.00 931.00 975.00 1,019.00 1,063.00 1,107.00 1,151.00 1,195.00 1,239.00 1,283.00 1,327.00 1,371.00 1,415.00 1,459.00 1,503.00 1,547.00 1,591.00 1,635.00 1,679.00 1,745.00 1,811.00 1,877.00 1,943.00
U8 1/1/1995 P2 01 Januari 1995 SSB U 8 P2 802.00 849.00 896.00 943.00 990.00 1,037.00 1,084.00 1,131.00 1,178.00 1,225.00 1,272.00 1,319.00 1,366.00 1,413.00 1,460.00 1,507.00 1,554.00 1,601.00 1,648.00 1,695.00 1,742.00 1,811.00 1,880.00 1,949.00 2,018.00 2,087.00
U8 1/1/1995 P3 01 Januari 1995 SSB U 8 P3 851.00 900.00 949.00 998.00 1,047.00 1,096.00 1,145.00 1,194.00 1,243.00 1,292.00 1,341.00 1,390.00 1,439.00 1,488.00 1,537.00 1,586.00 1,635.00 1,684.00 1,733.00 1,782.00 1,854.00 1,926.00 1,998.00 2,070.00 2,142.00 2,214.00
U9 1/1/1995 P1 01 Januari 1995 SSB U 9 P1 1,265.00 1,309.00 1,353.00 1,397.00 1,441.00 1,485.00 1,551.00 1,617.00 1,683.00 1,749.00 1,815.00
U9 1/1/1995 P2 01 Januari 1995 SSB U 9 P2 1,311.00 1,357.00 1,403.00 1,449.00 1,495.00 1,564.00 1,633.00 1,702.00 1,771.00 1,840.00 1,909.00
U9 1/1/1995 P3 01 Januari 1995 SSB U 9 P3 1,359.00 1,407.00 1,455.00 1,503.00 1,575.00 1,647.00 1,719.00 1,791.00 1,863.00 1,935.00 2,007.00
U10 1/1/1995 P1 01 Januari 1995 SSB U 10 P1 535.00 569.00 603.00 637.00 671.00 705.00 739.00 773.00 807.00 841.00 875.00 909.00 943.00 987.00 1,031.00 1,075.00 1,119.00 1,163.00 1,207.00 1,251.00 1,295.00 1,339.00 1,383.00
U10 1/1/1995 P2 01 Januari 1995 SSB U 10 P2 570.00 605.00 640.00 675.00 710.00 745.00 780.00 815.00 850.00 885.00 920.00 955.00 1,001.00 1,047.00 1,093.00 1,139.00 1,185.00 1,231.00 1,277.00 1,323.00 1,369.00 1,415.00 1,461.00
U10 1/1/1995 P3 01 Januari 1995 SSB U 10 P3 606.00 642.00 678.00 714.00 750.00 786.00 822.00 858.00 894.00 930.00 966.00 1,014.00 1,062.00 1,110.00 1,158.00 1,206.00 1,254.00 1,302.00 1,350.00 1,398.00 1,446.00 1,494.00 1,542.00
U14 1/1/1995 P1 01 Januari 1995 SSB U 14 P1 440.00 465.00 490.00 515.00 540.00 565.00 590.00 615.00 640.00 673.00 706.00 739.00 772.00 805.00 838.00 871.00 904.00 937.00 970.00 1,003.00 1,036.00
U14 1/1/1995 P2 01 Januari 1995 SSB U 14 P2 466.00 492.00 518.00 544.00 570.00 596.00 622.00 648.00 682.00 716.00 750.00 784.00 818.00 852.00 886.00 920.00 954.00 988.00 1,022.00 1,056.00 1,090.00
U14 1/1/1995 P3 01 Januari 1995 SSB U 14 P3 493.00 520.00 547.00 574.00 601.00 626.00 655.00 690.00 725.00 760.00 795.00 830.00 865.00 900.00 935.00 970.00 1,005.00 1,040.00 1,075.00 1,110.00 145.00
U15 1/1/1995 P1 01 Januari 1995 SSB U 15 P1 422.00 447.00 472.00 497.00 522.00 547.00 572.00 597.00 622.00 649.00 676.00 703.00 730.00 757.00 787.00 817.00 847.00
U15 1/1/1995 P2 01 Januari 1995 SSB U 15 P2 448.00 474.00 500.00 526.00 552.00 578.00 604.00 630.00 658.00 686.00 714.00 742.00 770.00 801.00 832.00 863.00 894.00
U15 1/1/1995 P3 01 Januari 1995 SSB U 15 P3 475.00 502.00 529.00 556.00 583.00 610.00 637.00 666.00 695.00 724.00 753.00 782.00 814.00 846.00 878.00 910.00 942.00
U16 1/1/1995 P1 01 Januari 1995 SSB U 16 P1 384.00 409.00 434.00 459.00 484.00 509.00 534.00 559.00 584.00 609.00 634.00 659.00 684.00 709.00 734.00
U16 1/1/1995 P2 01 Januari 1995 SSB U 16 P2 410.00 436.00 462.00 488.00 514.00 540.00 566.00 592.00 618.00 644.00 670.00 696.00 722.00 748.00 774.00
U16 1/1/1995 P3 01 Januari 1995 SSB U 16 P3 437.00 464.00 491.00 518.00 545.00 572.00 599.00 626.00 653.00 680.00 707.00 734.00 761.00 788.00 815.00
VK7 1/1/1995 P1 01 Januari 1995 SSB VK 7 P1 4,980.00 5,470.00 5,790.00 6,020.00
VK6 1/1/1995 P1 01 Januari 1995 SSB VK 6 P1 5,340.00 5,860.00 6,210.00 6,460.00
VK5 1/1/1995 P1 01 Januari 1995 SSB VK 5 P1 5,880.00 6,460.00 6,840.00 7,110.00
W4 1/1/1995 P1 01 Januari 1995 SSB W 4 P1 1,975.00 2,040.00 2,105.00 2,170.00 2,278.00 2,386.00 2,494.00 2,602.00 2,710.00 2,818.00
W4 1/1/1995 P2 01 Januari 1995 SSB W 4 P2 2,043.00 2,111.00 2,179.00 2,291.00 2,403.00 2,515.00 2,627.00 2,739.00 2,851.00 2,963.00
W4 1/1/1995 P3 01 Januari 1995 SSB W 4 P3 2,114.00 2,185.00 2,302.00 2,419.00 2,536.00 2,653.00 2,770.00 2,887.00 3,004.00 3,121.00
W5 1/1/1995 P1 01 Januari 1995 SSB W 5 P1 1,585.00 1,650.00 1,715.00 1,780.00 1,845.00 1,910.00 1,975.00 2,040.00 2,105.00 2,170.00 2,235.00 2,300.00
W5 1/1/1995 P2 01 Januari 1995 SSB W 5 P2 1,653.00 1,721.00 1,789.00 1,857.00 1,925.00 1,993.00 2,061.00 2,129.00 2,197.00 2,265.00 2,333.00 2,401.00
W5 1/1/1995 P3 01 Januari 1995 SSB W 5 P3 1,724.00 1,795.00 1,866.00 1,937.00 2,008.00 2,079.00 2,150.00 2,221.00 2,292.00 2,363.00 2,434.00 2,505.00
W6 1/1/1995 P1 01 Januari 1995 SSB W 6 P1 787.00 831.00 875.00 919.00 963.00 1,007.00 1,051.00 1,095.00 1,139.00 1,183.00 1,227.00 1,271.00 1,315.00 1,359.00 1,403.00 1,447.00 1,491.00 1,535.00 1,579.00 1,623.00 1,667.00 1,732.00 1,797.00 1,862.00 1,927.00
W6 1/1/1995 P2 01 Januari 1995 SSB W 6 P2 833.00 879.00 925.00 971.00 1,017.00 1,063.00 1,109.00 1,155.00 1,201.00 1,247.00 1,293.00 1,339.00 1,385.00 1,431.00 1,477.00 1,523.00 1,569.00 1,615.00 1,661.00 1,707.00 1,775.00 1,843.00 1,911.00 1,979.00 2,047.00
W6 1/1/1995 P3 01 Januari 1995 SSB W 6 P3 881.00 929.00 977.00 1,025.00 1,073.00 1,121.00 1,169.00 1,217.00 1,265.00 1,313.00 1,361.00 1,409.00 1,457.00 1,505.00 1,553.00 1,601.00 1,649.00 1,697.00 1,745.00 1,816.00 1,887.00 1,958.00 2,029.00 2,100.00 2,171.00
W7 1/1/1995 P1 01 Januari 1995 SSB W 7 P1 1,255.00 1,299.00 1,343.00 1,387.00 1,431.00 1,475.00 1,540.00 1,605.00 1,670.00 1,735.00 1,800.00
W7 1/1/1995 P2 01 Januari 1995 SSB W 7 P2 1,301.00 1,347.00 1,393.00 1,439.00 1,485.00 1,553.00 1,621.00 1,689.00 1,757.00 1,825.00 1,893.00
W7 1/1/1995 P3 01 Januari 1995 SSB W 7 P3 1,349.00 1,397.00 1,445.00 1,493.00 1,564.00 1,635.00 1,706.00 1,777.00 1,848.00 1,919.00 1,990.00
W8 1/1/1995 P1 01 Januari 1995 SSB W 8 P1 531.00 564.00 597.00 630.00 663.00 696.00 729.00 762.00 795.00 828.00 861.00 894.00 927.00 971.00 1,015.00 1,059.00 1,103.00 1,147.00 1,191.00 1,235.00 1,279.00 1,323.00 1,367.00
W8 1/1/1995 P2 01 Januari 1995 SSB W 8 P2 565.00 599.00 633.00 667.00 701.00 735.00 769.00 803.00 837.00 871.00 905.00 939.00 985.00 1,031.00 1,077.00 1,123.00 1,169.00 1,215.00 1,261.00 1,307.00 1,353.00 1,399.00 1,445.00
W8 1/1/1995 P3 01 Januari 1995 SSB W 8 P3 600.00 635.00 670.00 705.00 740.00 775.00 810.00 845.00 880.00 915.00 950.00 998.00 1,046.00 1,094.00 1,142.00 1,190.00 1,238.00 1,286.00 1,334.00 1,382.00 1,430.00 1,478.00 1,526.00
W9 1/1/1995 P1 01 Januari 1995 SSB W 9 P1 839.00 872.00 905.00 949.00 993.00 1,037.00 1,081.00 1,125.00 1,169.00
W9 1/1/1995 P2 01 Januari 1995 SSB W 9 P2 873.00 907.00 953.00 999.00 1,045.00 1,091.00 1,137.00 1,183.00 1,229.00
W9 1/1/1995 P3 01 Januari 1995 SSB W 9 P3 906.00 956.00 1,004.00 1,052.00 1,100.00 1,148.00 1,196.00 1,244.00 1,292.00
W10 1/1/1995 P1 01 Januari 1995 SSB W 10 P1 439.00 464.00 489.00 514.00 539.00 564.00 589.00 614.00 639.00 672.00 705.00 738.00 771.00 804.00 837.00 B70 903.00 936.00 969.00 1,002.00
W10 1/1/1995 P2 01 Januari 1995 SSB W 10 P2 465.00 491.00 517.00 543.00 569.00 595.00 621.00 647.00 681.00 715.00 749.00 783.00 817.00 851.00 885.00 919.00 953.00 987.00 1,021.00 1,055.00
W10 1/1/1995 P3 01 Januari 1995 SSB W 10 P3 492.00 519.00 546.00 573.00 600.00 627.00 654.00 689.00 724.00 759.00 794.00 829.00 864.00 899.00 934.00 969.00 1,004.00 1,039.00 1,074.00 1,109.00
W3 1/1/1995 P1 01 Januari 1995 SSB W 3 P1 1,170.00 1,236.00 1,302.00 1,368.00 1,434.00 1,500.00 1,566.00 1,632.00 1,698.00 1,764.00 1,830.00 1,896.00 1,962.00 2,028.00 2,094.00 2,160.00 2,226.00 2,335.00 2,444.00 2,553.00 2,662.00 2,771.00 2,880.00 2,989.00 3,098.00 3,207.00
W3 1/1/1995 P2 01 Januari 1995 SSB W 3 P2 1,239.00 1,308.00 1,377.00 1,446.00 1,515.00 1,584.00 1,653.00 1,722.00 1,791.00 1,860.00 1,929.00 1,998.00 2,067.00 2,136.00 2,205.00 2,274.00 2,387.00 2,500.00 2,613.00 2,726.00 2,839.00 2,952.00 3,065.00 3,178.00 3,291.00 3,404.00
W3 1/1/1995 P3 01 Januari 1995 SSB W 3 P3 1,311.00 1,383.00 1,455.00 1,527.00 1,599.00 1,671.00 1,743.00 1,815.00 1,887.00 1,959.00 2,031.00 2,103.00 2,175.00 2,247.00 2,319.00 2,436.00 2,553.00 2,670.00 2,787.00 2,904.00 3,021.00 3,138.00 3,255.00 3,372.00 3,489.00 3,606.00
W2 1/1/1995 P1 01 Januari 1995 SSB W 2 P1 3,099.00 3,246.00 3,393.00 3,540.00 3,687.00 3,834.00 3,981.00
W2 1/1/1995 P2 01 Januari 1995 SSB W 2 P2 3,252.00 3,405.00 3,558.00 3,711.00 3,864.00 4,017.00 4,170.00
W2 1/1/1995 P3 01 Januari 1995 SSB W 2 P3 3,411.00 3,570.00 3,729.00 3,888.00 4,047.00 4,206.00 4,365.00
W1 1/1/1995 P1 01 Januari 1995 SSB W 1 P1 3,687.00 3,834.00 3,998.00 4,162.00 4,326.00 4,490.00 4,654.00
W1 1/1/1995 P2 01 Januari 1995 SSB W 1 P2 3,840.00 4,011.00 4,182.00 4,353.00 4,524.00 4,695.00 4,866.00
W1 1/1/1995 P3 01 Januari 1995 SSB W 1 P3 4,018.00 4,196.00 4,374.00 4,552.00 4,730.00 4,908.00 5,086.00
UB1 KUP 1/1/1995 P1 01 Januari 1995 SSB UB 1 KUP P1 530.00 563.00 596.00 629.00 662.00 695.00 728.00 761.00 794.00 827.00
UB1 KUP 1/1/1995 P2 01 Januari 1995 SSB UB 1 KUP P2 564.00 598.00 632.00 666.00 700.00 734.00 768.00 802.00 836.00 870.00
UB1 KUP 1/1/1995 P3 01 Januari 1995 SSB UB 1 KUP P3 599.00 634.00 669.00 704.00 739.00 774.00 809.00 844.00 879.00 914.00
VU7 1/1/1995 P1 01 Januari 1995 SSB VU 7 P1 4,980.00 5,470.00 5,790.00 6,020.00
VU6 1/1/1995 P1 01 Januari 1995 SSB VU 6 P1 5,340.00 5,860.00 6,210.00 6,460.00
VU4 1/1/1995 P1 01 Januari 1995 SSB VU 4 P1 6,540.00 7,180.00 7,890.00 8,670.00
VU3 1/1/1995 P1 01 Januari 1995 SSB VU 3 P1 7,200.00 7,910.00 8,690.00 9,550.00
VU2 1/1/1995 P1 01 Januari 1995 SSB VU 2 P1 7,560.00 8,310.00 9,130.00 10,030.00
VU1 1/1/1995 P1 01 Januari 1995 SSB VU 1 P1 7,910.00 8,690.00 9,550.00 10,490.00
R11 1/1/1995 P1 01 Januari 1995 SSB R 11 P1 384.00 409.00 434.00 459.00 484.00 509.00 534.00 559.00 584.00 609.00 634.00 659.00 684.00
R11 1/1/1995 P2 01 Januari 1995 SSB R 11 P2 410.00 436.00 462.00 488.00 514.00 540.00 566.00 592.00 618.00 644.00 670.00 696.00 722.00
R11 1/1/1995 P3 01 Januari 1995 SSB R 11 P3 437.00 464.00 491.00 518.00 545.00 572.00 599.00 626.00 653.00 680.00 707.00 734.00 761.00
KP10 1/1/1995 P1 01 Januari 1995 SSB KP 10 P1 441.00 466.00 491.00 516.00 541.00 566.00 591.00 616.00 641.00 674.00 707.00 740.00 773.00 806.00 839.00 872.00 905.00 938.00 971.00 1,004.00
KP10 1/1/1995 P2 01 Januari 1995 SSB KP 10 P2 467.00 493.00 519.00 545.00 571.00 597.00 623.00 649.00 683.00 717.00 751.00 785.00 819.00 853.00 887.00 921.00 955.00 989.00 1,023.00 1,057.00
KP10 1/1/1995 P3 01 Januari 1995 SSB KP 10 P3 494.00 521.00 548.00 575.00 602.00 629.00 656.00 691.00 726.00 761.00 796.00 831.00 866.00 901.00 936.00 971.00 1,006.00 1,041.00 1,076.00 1,111.00
U11 1/1/2000 P1 01 Januari 2000 SSB 10% U 11 P1 881.10 917.40 953.70 990.00 1,026.30 1,062.60 1,098.90 1,135.20 1,183.60 1,232.00 1,280.40 1,328.80 1,377.20
U11 1/1/2000 P2 01 Januari 2000 SSB 10% U 11 P2 918.50 955.90 993.30 1,030.70 1,068.10 1,105.50 1,142.90 1,193.50 1,244.10 1,294.70 1,345.30 1,395.90 1,446.50
U11 1/1/2000 P3 01 Januari 2000 SSB 10% U 11 P3 957.00 995.50 1,034.00 1,072.50 1,111.00 1,149.50 1,202.30 1,255.10 1,307.90 1,360.70 1,413.50 1,466.30 1,519.10
U12 1/1/2000 P1 01 Januari 2000 SSB 10% U 12 P1 613.80 650.10 686.40 722.70 759.00 795.30 831.60 867.90 904.20 940.50 976.80 1,013.10 1,049.40 1,085.70 1,134.10 1,182.50
U12 1/1/2000 P2 01 Januari 2000 SSB 10% U 12 P2 651.20 688.60 726.00 763.40 800.80 838.20 875.60 913.00 950.40 987.80 1,025.20 1,062.60 1,100.00 1,150.60 1,201.20 1,251.80
U12 1/1/2000 P3 01 Januari 2000 SSB 10% U 12 P3 689.70 728.20 766.70 805.20 843.70 882.20 920.70 959.20 997.70 1,036.20 1,074.70 1,113.20 1,166.00 1,218.80 1,271.60 1,324.40
U13 1/1/2000 P1 01 Januari 2000 SSB 10% U 13 P1 924.00 960.30 996.60 1,045.00 1,093.40 1,141.80 1,190.20 1,238.60 1,287.00
U13 1/1/2000 P2 01 Januari 2000 SSB 10% U 13 P2 961.40 998.80 1,049.40 1,100.00 1,150.60 1,201.20 1,251.80 1,302.40 1,353.00
U13 1/1/2000 P3 01 Januari 2000 SSB 10% U 13 P3 999.90 1,052.70 1,105.50 1,158.30 1,211.10 1,263.90 1,316.70 1,369.50 1,422.30
S5 1/1/2000 P1 01 Januari 2000 SSB 10% S 5 P1 784.00 828.00 872.00 916.00 960.00 1,004.00 1,048.00 1,092.00 1,136.00 1,180.00 1,224.00 1,268.00 1,312.00 1,356.00 1,400.00 1,444.00 1,488.00 1,532.00 1,576.00 1,620.00 1,664.00 1,729.00 1,794.00 1,859.00 1,924.00
S5 1/1/2000 P2 01 Januari 2000 SSB 10% S 5 P2 830.00 876.00 922.00 968.00 1,014.00 1,060.00 1,106.00 1,152.00 1,198.00 1,244.00 1,290.00 1,336.00 1,382.00 1,428.00 1,474.00 1,520.00 1,566.00 1,612.00 1,658.00 1,704.00 1,772.00 1,840.00 1,908.00 1,976.00 2,044.00
S5 1/1/2000 P3 01 Januari 2000 SSB 10% S 5 P3 878.00 926.00 974.00 1,022.00 1,070.00 1,118.00 1,166.00 1,214.00 1,262.00 1,310.00 1,358.00 1,406.00 1,454.00 1,502.00 1,550.00 1,598.00 1,646.00 1,694.00 1,742.00 1,813.00 1,884.00 1,955.00 2,026.00 2,097.00 2,168.00
U1 1/1/2000 P1 01 Januari 2000 SSB 10% U 1 P1 4,097.50 4,261.40 4,442.90 4,624.40 4,805.90 4,987.40 5,168.90
U1 1/1/2000 P2 01 Januari 2000 SSB 10% U 1 P2 4,268.00 4,457.20 4,646.40 4,835.60 5,024.80 5,214.00 5,403.20
U1 1/1/2000 P3 01 Januari 2000 SSB 10% U 1 P3 4,464.90 4,661.80 4,858.70 5,055.60 5,252.50 5,449.40 5,646.30
U2 1/1/2000 P1 01 Januari 2000 SSB 10% U 2 P1 3,444.10 3,608.00 3,771.90 3,935.80 4,099.70 4,263.60 4,427.50
U2 1/1/2000 P2 01 Januari 2000 SSB 10% U 2 P2 3,614.60 3,785.10 3,955.60 4,126.10 4,296.60 4,467.10 4,637.60
U2 1/1/2000 P3 01 Januari 2000 SSB 10% U 2 P3 3,791.70 3,968.80 4,145.90 4,323.00 4,500.10 4,677.20 4,854.30
J3 1/1/2000 P1 01 Januari 2000 SSB 10% J 3 P1 1,591.70 1,664.30 1,736.90 1,809.50 1,882.10 1,954.70 2,027.30 2,099.90 2,172.50 2,245.10 2,317.70 2,390.30 2,462.90 2,583.90 2,704.90 2,825.90 2,946.90 3,067.90 3,188.90 3,309.90 3,430.90 3,551.90
J3 1/1/2000 P2 01 Januari 2000 SSB 10% J 3 P2 1,667.60 1,743.50 1,819.40 1,895.30 1,971.20 2,047.10 2,123.00 2,198.90 2,274.80 2,350.70 2,426.60 2,502.50 2,630.10 2,757.70 2,885.30 3,012.90 3,140.50 3,268.10 3,395.70 3,523.30 3,650.90 3,778.50
J3 1/1/2000 P3 01 Januari 2000 SSB 10% J 3 P3 1,746.80 1,826.00 1,905.20 1,984.40 2,063.60 2,142.80 2,222.00 2,301.20 2,380.40 2,459.60 2,538.80 2,671.90 2,805.00 2,938.10 3,071.20 3,204.30 3,337.40 3,470.50 3,603.60 3,736.70 3,869.80 4,002.90
J6 1/1/2000 P1 01 Januari 2000 SSB 10% J 6 P1 1,391.50 1,439.90 1,488.30 1,536.70 1,585.10 1,633.50 1,706.10 1,778.70 1,851.30 1,923.90 1,996.50
J6 1/1/2000 P2 01 Januari 2000 SSB 10% J 6 P2 1,442.10 1,492.70 1,543.30 1,593.90 1,644.50 1,720.40 1,796.30 1,872.20 1,948.10 2,024.00 2,099.90
J6 1/1/2000 P3 01 Januari 2000 SSB 10% J 6 P3 1,494.90 1,547.70 1,600.50 1,653.30 1,732.50 1,811.70 1,890.90 1,970.10 2,049.30 2,128.50 2,207.70
J7 1/1/2000 P1 01 Januari 2000 SSB 10% J 7 P1 599.50 636.90 674.30 711.70 749.10 786.50 823.90 861.30 898.70 936.10 973.50 1,010.90 1,048.30 1,096.70 1,145.10
J7 1/1/2000 P2 01 Januari 2000 SSB 10% J 7 P2 638.00 676.50 715.00 753.50 792.00 830.50 869.00 907.50 946.00 984.50 1,023.00 1,061.50 1,112.10 1,162.70 1,213.30
J7 1/1/2000 P3 01 Januari 2000 SSB 10% J 7 P3 677.60 717.20 756.80 796.40 836.00 875.60 915.20 954.80 994.40 1,034.00 1,073.60 1,126.40 1,179.20 1,232.00 1,284.80
KP10 1/1/2000 P1 01 Januari 2000 SSB 10% KP 10 P1 485.10 512.60 540.10 567.60 595.10 622.60 650.10 677.60 705.10 741.40 777.70 814.00 850.30 886.60 922.90 959.20 995.50 1,031.80 1,068.10 1,104.40
KP10 1/1/2000 P2 01 Januari 2000 SSB 10% KP 10 P2 513.70 542.30 570.90 599.50 628.10 656.70 685.30 713.90 751.30 788.70 826.10 863.50 900.90 938.30 975.70 1,013.10 1,050.50 1,087.90 1,125.30 1,162.70
KP10 1/1/2000 P3 01 Januari 2000 SSB 10% KP 10 P3 543.40 573.10 602.80 632.50 662.20 691.90 721.60 760.10 798.60 837.10 875.60 914.10 952.60 991.10 1,029.60 1,068.10 1,106.60 1,145.10 1,183.60 1,222.10
N9 1/1/2000 P1 01 Januari 2000 SSB 10% N 9 P1 583.00 619.30 655.60 691.90 728.20 764.50 800.80 837.10 873.40 909.70 946.00 982.30 1,018.60 1,067.00 1,115.40 1,163.80 1,212.20 1,260.60 1,309.00 1,357.40 1,405.80 1,454.20 1,502.60
N9 1/1/2000 P2 01 Januari 2000 SSB 10% N 9 P2 620.40 657.80 695.20 732.60 770.00 807.40 844.80 882.20 919.60 957.00 994.40 1,031.80 1,082.40 1,133.00 1,183.60 1,234.20 1,284.80 1,335.40 1,386.00 1,436.60 1,487.20 1,537.80 1,588.40
N9 1/1/2000 P3 01 Januari 2000 SSB 10% N 9 P3 658.90 697.40 735.90 774.40 812.90 851.40 889.90 928.40 966.90 1,005.40 1,043.90 1,096.70 1,149.50 1,202.30 1,255.10 1,307.90 1,360.70 1,413.50 1,466.30 1,519.10 1,571.90 1,624.70 1,677.50
N11 1/1/2000 P1 01 Januari 2000 SSB 10% N 11 P1 464.20 491.70 519.20 546.70 574.20 601.70 629.20 656.70 693.00 729.30 765.60 801.90 838.20 874.50 910.80 947.10 983.40 1,019.70 1,056.00 1,092.30 1,128.60
N11 1/1/2000 P2 01 Januari 2000 SSB 10% N 11 P2 492.80 521.40 550.00 578.60 607.20 635.80 664.40 701.80 739,20 776.60 814.00 851.40 888.80 926.20 963.60 1,001.00 1,038.40 1,075.80 1,113.20 1,150.60 1,188.00
N11 1/1/2000 P3 01 Januari 2000 SSB 10% N 11 P3 522.50 552.20 581.90 611.60 641.30 671.00 709.50 748.00 786.50 825.00 863.50 902.00 940.50 979.00 1,017.50 1,056.00 1,094.50 1,133.00 1,171.50 1,210.00 1,248.50
N12 1/1/2000 P1 01 Januari 2000 SSB 10% N 12 P1 464.20 491.70 519.20 546.70 574.20 601.70 629.20 656.70 693.00 729.30 765.60 801.90 838.20 874.50 910.80 947.10 983.40
N12 1/1/2000 P2 01 Januari 2000 SSB 10% N 12 P2 492.80 521.40 550.00 578.60 607.20 635.80 664.40 701.80 739.20 776.60 814.00 851.40 888.80 926.20 963.60 1,001.00 1,038.40
N12 1/1/2000 P3 01 Januari 2000 SSB 10% N 12 P3 522.50 552.20 581.90 611.60 641.30 671.00 709.50 748.00 786.50 825.00 863.50 902.00 940.50 979.00 1,017.50 1,056.00 1,094.50
N13 1/1/2000 P1 01 Januari 2000 SSB 10% N 13 P1 423.50 451.00 478.50 506.00 533.50 561.00 588.50 616.00 643.50 671.00 698.50 726.00 753.50 781.00
N13 1/1/2000 P2 01 Januari 2000 SSB 10% N 13 P2 452.10 480.70 509.30 537.90 566.50 595.10 623.70 652.30 680.90 709.50 738.10 766.70 795.30 823.90
N13 1/1/2000 P3 01 Januari 2000 SSB 10% N 13 P3 481.80 511.50 541.20 570.90 600.60 630.30 660.00 689.70 719.40 749.10 778.80 808.50 838.20 867.90
N5 1/1/2000 P1 01 Januari 2000 SSB 10% N 5 P1 2,216.41 2316.24 2416.07 2515.9 2615.73 2715.56 2815.39 2915.22 3015.05
N5 1/1/2000 P2 01 Januari 2000 SSB 10% N 5 P2 2,429.67 2538.57 2647.47 2756.37 2865.27 2974.17 3083.07 3191.97 3300.87
R10 1/1/2000 P1 01 Januari 2000 SSB 10% R 10 P1 458.70 486.20 513.70 541.20 568.70 596.20 623.70 651.20 678.70 706.20 733.70 761.20 788.70 816.20 843.70 871.20
R10 1/1/2000 P2 01 Januari 2000 SSB 10% R 10 P2 487.30 515.90 544.50 573.10 601.70 630.30 658.90 687.50 716.10 744.70 773.30 801.90 830.50 859.10 887.70 916.30
R10 1/1/2000 P3 01 Januari 2000 SSB 10% R 10 P3 517.00 546.70 576.40 606.10 635.80 665.50 695.20 724.90 754.60 784.30 814.00 843.70 873.40 903.10 932.80 962.50
R11 1/1/2000 P1 01 Januari 2000 SSB 10% R 11 P1 422.40 449.90 477.40 504.90 532.40 559.90 587.40 614.90 642.40 669.90 697.40 724.90 752.40
R11 1/1/2000 P2 01 Januari 2000 SSB 10% R 11 P2 451.00 479.60 508.20 536.80 565.40 594.00 622.60 651.20 679.80 708.40 737.00 765.60 794.20
R11 1/1/2000 P3 01 Januari 2000 SSB 10% R 11 P3 480.70 510.40 540.10 569.80 599.50 629.20 658.90 688.60 718.30 748.00 777.70 807.40 837.10
U3 1/1/2000 P1 01 Januari 2000 SSB 10% U 3 P1 1,521.30 1,593.90 1,666.50 1,739.10 1,811.70 1,884.30 1,956.90 2,029.50 2,102.10 2,174.70 2,247.30 2,319.90 2,392.50 2,465.10 2,586.10 2,707.10 2,828.10 2,949.10 3,070.10 3,191.10 3,312.10 3,433.10 3,554.10
U3 1/1/2000 P2 01 Januari 2000 SSB 10% U 3 P2 1,597.20 1,673.10 1,749.00 1,824.90 1,900.80 1,976.70 2,052.60 2,128.50 2,204.40 2,280.30 2,356.20 2,432.10 2,508.00 2,635.60 2,763.20 2,890.80 3,018.40 3,146.00 3,273.60 3,401.20 3,528.80 3,656.40 3,784.00
U3 1/1/2000 P3 01 Januari 2000 SSB 10% U 3 P3 1,676.40 1,755.60 1,834.80 1,914.00 1,993.20 2,072.40 2,151.60 2,230.80 2,310.00 2,389.20 2,468.40 2,547.60 2,680.70 2,813.80 2,946.90 3,080.00 3,213.10 3,346.20 3,479.30 3,612.40 3,745.50 3,878.60 4,011.70
U4 1/1/2000 P1 01 Januari 2000 SSB 10% U 4 P1 3,218.60 3,363.80 3,509.00 3,654.20 3,799.40 3,944.60
U4 1/1/2000 P2 01 Januari 2000 SSB 10% U 4 P2 3,369.30 3,520.00 3,670.70 3,821.40 3,972.10 4,122.80
U4 1/1/2000 P3 01 Januari 2000 SSB 10% U 4 P3 3,525.50 3,681.70 3,837.90 3,994.10 4,150.30 4,306.50
U5 1/1/2000 P1 01 Januari 2000 SSB 10% U 5 P1 2,734.60 2,855.60 2,976.60 3,097.60 3,218.60 3,339.60 3,460.60
U5 1/1/2000 P2 01 Januari 2000 SSB 10% U 5 P2 2,860.00 2,985.40 3,110.80 3,236.20 3,361.60 3,487.00 3,612.40
U5 1/1/2000 P3 01 Januari 2000 SSB 10% U 5 P3 2,990.90 3,121.80 3,252.70 3,383.60 3,514.50 3,645.40 3,776.30
U6 1/1/2000 P1 01 Januari 2000 SSB 10% U 6 P1 2,209.90 2,282.50 2,355.10 2,427.70 2,548.70 2,669.70 2,790.70 2,911.70 3,032.70 3,153.70
U6 1/1/2000 P2 01 Januari 2000 SSB 10% U 6 P2 2,285.80 2,361.70 2,437.60 2,563.00 2,688.40 2,813.80 2,939.20 3,064.60 3,190.00 3,315.40
U6 1/1/2000 P3 01 Januari 2000 SSB 10% U 6 P3 2,365.00 2,444.20 2,575.10 2,706.00 2,836.90 2,967.80 3,098.70 3,229.60 3,360.50 3,491.40
U7 1/1/2000 P1 01 Januari 2000 SSB 10% U 7 P1 1,411.30 1,459.70 1,508.10 1,556.50 1,604.90 1,653.30 1,701.70 1,774.30 1,846.90 1,919.50 1,992.10 2,064.70 2,137.30 2,209.90 2,282.50 2,355.10 2,427.70 2,500.30 2,572.90
U7 1/1/2000 P2 01 Januari 2000 SSB 10% U 7 P2 1,463.00 1,514.70 1,566.40 1,618.10 1,669.80 1,721.50 1,797.40 1,873.30 1,949.20 2,025.10 2,101.00 2,176.90 2,252.80 2,328.70 2,404.60 2,480.50 2,556.40 2,632.30 2,708.20
U7 1/1/2000 P3 01 Januari 2000 SSB 10% U 7 P3 1,516.90 1,570.80 1,624.70 1,678.60 1,732.50 1,811.70 1,890.90 1,970.10 2,049.30 2,128.50 2,207.70 2,286.90 2,366.10 2,445.30 2,524.50 2,603.70 2,682.90 2,762.10 2,841.30
U8 1/1/2000 P1 01 Januari 2000 SSB 10% U 8 P1 830.50 878.90 927.30 975.70 1,024.10 1,072.50 1,120.90 1,169.30 1,217.70 1,266.10 1,314.50 1,362.90 1,411.30 1,459.70 1,508.10 1,556.50 1,604.90 1,653.30 1,701.70 1,750.10 1,798.50 1,846.90 1,919.50 1,992.10 2,064.70 2,137.30
U8 1/1/2000 P2 01 Januari 2000 SSB 10% U 8 P2 852.20 933.90 985.60 1,037.30 1,069.00 1,140.70 1,192.40 1,244.10 1,295.80 1,347.50 1,399.20 1,450.90 1,502.60 1,554.30 1,606.00 1,657.70 1,709.40 1,761.10 1,812.80 1,864.50 1,916.20 1,992.10 2,068.00 2,143.90 2,219.80 2,295.70
U8 1/1/2000 P3 01 Januari 2000 SSB 10% U 8 P3 936.10 990.00 1,043.90 1,097.80 1,151.70 1,205.60 1,259.50 1,313.40 1,367.30 1,421.20 1,475.10 1,529.00 1,582.90 1,636.80 1,690.70 1,744.60 1,798.50 1,852.40 1,906.30 1,960.20 2,039.40 2,118.60 2,197.80 2,277.00 2,356.20 2,435.40
U9 1/1/2000 P1 01 Januari 2000 SSB 10% U 9 P1 1,391.50 1,439.90 1,488.30 1,536.70 1,585.10 1,633.50 1,706.10 1,778.70 1,851.30 1,923.90 1,996.50
U9 1/1/2000 P2 01 Januari 2000 SSB 10% U 9 P2 1,442.10 1,492.70 1,543.30 1,593.90 1,644.50 1,720.40 1,796.30 1,872.20 1,948.10 2,024.00 2,099.90
U9 1/1/2000 P3 01 Januari 2000 SSB 10% U 9 P3 1,494.90 1,547.70 1,600.50 1,653.30 1,732.50 1,811.70 1,890.90 1,970.10 2,049.30 2,128.50 2,207.70
U10 1/1/2000 P1 01 Januari 2000 SSB 10% U 10 P1 588.50 625.90 663.30 700.70 738.10 775.50 812.90 850.30 887.70 925.10 962.50 999.90 1,037.30 1,085.70 1,134.10 1,162.50 1,230.90 1,279.30 1,327.70 1,376.10 1,424.50 1,472.90 1,521.30
U10 1/1/2000 P2 01 Januari 2000 SSB 10% U 10 P2 627.00 665.50 704.00 742.50 781.00 819.50 858.00 896.50 935.00 973.50 1,012.00 1,050.50 1,101.10 1,151.70 1,202.30 1,252.90 1,303.50 1,354.10 1,404.70 1,455.30 1,505.90 1,556.50 1,607.10
U10 1/1/2000 P3 01 Januari 2000 SSB 10% U 10 P3 666.60 706.20 745.80 785.40 825.00 864.60 904.20 943.80 983.40 1,023.00 1,062.60 1,115.40 1,168.20 1,221.00 1,273.80 1,326.60 1,379.40 1,432.20 1,485.00 1,537.80 1,590.60 1,643.40 1,696.20
U14 1/1/2000 P1 01 Januari 2000 SSB 10% U 14 P1 484.00 511.50 539.00 566.50 594.00 621.50 649.00 676.50 704.00 740.30 776.60 812.90 849.20 885.50 921.80 958.10 994.40 1,030.70 1,067.00 1,103.30 1,139.60
U14 1/1/2000 P2 01 Januari 2000 SSB 10% U 14 P2 512.60 541.20 569.80 598.40 627.00 655.60 684.20 712.80 750.20 787.60 825.00 862.40 899.80 937.20 974.60 1,012.00 1,049.40 1,086.80 1,124.20 1,161.60 1,199.00
U14 1/1/2000 P3 01 Januari 2000 SSB 10% U 14 P3 542.30 572.00 601.70 631.40 661.10 690.80 720.50 759.00 797.50 836.00 874.50 913.00 951.50 990.00 1,028.50 1,067.00 1,105.50 1,144.00 1,182.50 1,221.00 1,259.50
U15 1/1/2000 P1 01 Januari 2000 SSB 10% U 15 P1 464.20 491.70 519.20 546.70 574.20 601.70 629.20 656.70 684.20 713.90 743.60 773.30 803.00 832.70 865.70 898.70 931.70
U15 1/1/2000 P2 01 Januari 2000 SSB 10% U 15 P2 492.80 521.40 550.00 578.60 607.20 635.80 664.40 693.00 723.80 754.60 785.40 816.20 847.00 881.10 915.20 949.30 983.40
U15 1/1/2000 P3 01 Januari 2000 SSB 10% U 15 P3 522.50 552.20 581.90 611.60 641.30 671.00 700.70 732.60 764.50 796.40 828.30 860.20 895.40 930.60 965.80 1,001.00 1,036.20
U16 1/1/2000 P1 01 Januari 2000 SSB 10% U 16 P1 422.40 449.90 477.40 504.90 532.40 559.90 587.40 614.90 642.40 669.90 697.40 724.90 752.40 779.90 807.40
U16 1/1/2000 P2 01 Januari 2000 SSB 10% U 16 P2 451.00 479.60 508.20 536.80 565.40 594.00 622.60 651.20 679.80 708.40 737.00 765.60 794.20 822.80 851.40
U16 1/1/2000 P3 01 Januari 2000 SSB 10% U 16 P3 480.70 510.40 540.10 569.80 599.50 629.20 658.90 688.60 718.30 748.00 777.70 807.40 837.10 866.80 896.50
VK7 1/1/2000 P1 01 Januari 2000 SSB 10% VK 7 P1 5,478.00 6,017.00 6,369.00 6,622.00
VK6 1/1/2000 P1 01 Januari 2000 SSB 10% VK 6 P1 5,874.00 6,446.00 6,831.00 7,106.00
VK5 1/1/2000 P1 01 Januari 2000 SSB 10% VK 5 P1 6,468.00 7,106.00 7,524.00 7,821.00
W4 1/1/2000 P1 01 Januari 2000 SSB 10% W 4 P1 2,172.50 2,244.00 2,315.50 2,387.00 2,505.80 2,624.60 2,743.40 2,862.20 2,981.00 3,099.80
W4 1/1/2000 P2 01 Januari 2000 SSB 10% W 4 P2 2,247.30 2,322.10 2,396.90 2,520.10 2,643.30 2,766.50 2,889.70 3,012.90 3,136.10 3,259.30
W4 1/1/2000 P3 01 Januari 2000 SSB 10% W 4 P3 2,325.40 2,403.50 2,532.20 2,660.90 2,789.60 2,918.30 3,047.00 3,175.70 3,304.40 3,433.10
W5 1/1/2000 P1 01 Januari 2000 SSB W 5 P1 1,743.50 1,815.00 1,886.50 1,958.00 2,029.50 2,101.00 2,172.50 2,244.00 2,315.50 2,387.00 2,458.50 2,530.00
W5 1/1/2000 P2 01 Januari 2000 SSB W 5 P2 1,818.30 1,893.10 1,967.90 2,042.70 2,117.50 2,192.30 2,267.10 2,341.90 2,416.70 2,491.50 2,566.30 2,641.10
W5 1/1/2000 P3 01 Januari 2000 SSB W 5 P3 1,896.40 1,974.50 2,052.60 2,130.70 2,208.80 2,286.90 2,365.00 2,443.10 2,521.20 2,599.30 2,677.40 2,755.50
W6 1/1/2000 P1 01 Januari 2000 SSB 10% W 6 P1 865.70 914.10 962.50 1,010.90 1,059.30 1,107.70 1,156.10 1,204.50 1,252.90 1,301.30 1,349.70 1,398.10 1,446.50 1,494.90 1,543.30 1,591.70 1,640.10 1,688.50 1,736.90 1,785.30 1,833.70 1,905.20 1,976.70 2,048.20 2,119.70
W6 1/1/2000 P2 01 Januari 2000 SSB 10% W 6 P2 916.30 966.90 1,017.50 1,068.10 1,118.70 1,169.30 1,219.90 1,270.50 1,321.10 1,371.70 1,422.30 1,472.90 1,523.50 1,574.10 1,624.70 1,675.30 1,725.90 1,776.50 1,827.10 1,877.70 1,952.50 2,027.30 2,102.10 2,176.90 2,251.70
W6 1/1/2000 P3 01 Januari 2000 SSB 10% W 6 P3 969.10 1,021.90 1,074.70 1,127.50 1,180.30 1,233.10 1,285.90 1,338.70 1,391.50 1,444.30 1,497.10 1,549.90 1,602.70 1,655.50 1,708.30 1,761.10 1,813.90 1,868.70 1,919.50 1,997.60 2,075.70 2,153.80 2,231.90 2,310.00 2,388.10
W7 1/1/2000 P1 01 Januari 2000 SSB 10% W 7 P1 1,380.50 1,428.90 1,477.30 1,525.70 1,574.10 1,622.50 1,694.00 1,765.50 1,837.00 1,908.50 1,980.00
W7 1/1/2000 P2 01 Januari 2000 SSB 10% W 7 P2 1,431.10 1,481.70 1,532.30 1,582.90 1,633.50 1,708.30 1,783.10 1,857.90 1,932.70 2,007.50 2,082.30
W7 1/1/2000 P3 01 Januari 2000 SSB 10% W 7 P3 1,483.90 1,536.70 1,589.50 1,642.30 1,720.40 1,798.50 1,876.60 1,954.70 2,032.80 2,110.90 2,189.00
W8 1/1/2000 P1 01 Januari 2000 SSB 10% W 8 P1 584.10 620.40 656.70 693.00 729.30 765.60 801.90 838.20 874.50 910.80 947.10 983.40 1,019.70 1,068.10 1,116.50 1,164.90 1,213.30 1,261.70 1,310.10 1,358.50 1,406.90 1,455.30 1,503.70
W8 1/1/2000 P2 01 Januari 2000 SSB 10% W 8 P2 621.50 658.90 696.30 733.70 771.10 808.50 845.90 883.30 920.70 958.10 995.50 1,032.90 1,083.50 1,134.10 1,184.70 1,235.30 1,285.90 1,336.50 1,387.10 1,437.70 1,488.30 1,538.90 1,589.50
W8 1/1/2000 P3 01 Januari 2000 SSB 10% W 8 P3 660.00 698.50 737.00 775.50 814.00 852.50 891.00 929.50 968.00 1,006.50 1,045.00 1,097.80 1,150.60 1,203.40 1,256.20 1,309.00 1,361.80 1,414.60 1,467.40 1,520.20 1,573.00 1,625.80 1,678.60
W9 1/1/2000 P1 01 Januari 2000 SSB 10% W 9 P1 922.90 959.20 995.50 1,043.90 1,092.30 1,140.70 1,189.10 1,237.50 1,285.90
W9 1/1/2000 P2 01 Januari 2000 SSB 10% W 9 P2 960.30 997.70 1,048.30 1,098.90 1,149.50 1,200.10 1,250.70 1,301.30 1,351.90
W9 1/1/2000 P3 01 Januari 2000 SSB 10% W 9 P3 998.80 1,051.60 1,104.40 1,157.20 1,210.00 1,262.80 1,315.60 1,368.40 1,421.20
W10 1/1/2000 P1 01 Januari 2000 SSB 10% W 10 P1 482.90 510.40 537.90 565.40 592.90 620.40 647.90 675.40 702.90 739.20 775.50 811.80 848.10 884.40 920.70 957.00 993.30 1,029.60 1,065.90 1,102.20
W10 1/1/2000 P2 01 Januari 2000 SSB 10% W 10 P2 511.50 540.10 568.70 597.30 625.90 654.50 683.10 711.70 749.10 786.50 823.90 861.30 898.70 936.10 973.50 1,010.90 1,048.30 1,085.70 1,123.10 1,160.50
W10 1/1/2000 P3 01 Januari 2000 SSB 10% W 10 P3 541.20 570.90 600.60 630.30 660.00 689.70 719.40 757.90 796.40 834.90 873.40 911.90 950.40 988.90 1,027.40 1,065.90 1,104.40 1,142.90 1,181.40 1,219.90
UB1 1/1/2000 P1 01 Januari 2000 SSB 10% UB 1 P1 583.00 619.30 655.60 691.90 728.20 764.50 800.80 837.10 873.40 909.70
UB1 1/1/2000 P2 01 Januari 2000 SSB 10% UB 1 P2 620.40 657.80 695.20 732.60 770.00 807.40 844.80 882.20 919.60 957.00
UB1 1/1/2000 P3 01 Januari 2000 SSB 10% UB 1 P3 658.90 697.40 735.90 774.40 812.90 851.40 889.90 928.40 966.90 1,005.40
VU4 1/1/2000 P1 01 Januari 2000 SSB 10% VU 4 P1 7,194.00 7,898.00 8,679.00 9,537.00
VU3 1/1/2000 P1 01 Januari 2000 SSB 10% VU 3 P1 7,920.00 8,701.00 9,559.00 10,505.00
VU2 1/1/2000 P1 01 Januari 2000 SSB 10% VU 2 P1 8,316.00 9,141.00 10,043.00 11,033.00
VU1 1/1/2000 P1 01 Januari 2000 SSB 10% VU 1 P1 8,701.00 9,559.00 10,505.00 11,539.00
J5 1/1/2000 P1 01 Januari 2000 SSB 10% J 5 P1 2,171.95 2,251.81 2,331.67 2,411.53 2,491.39 2,571.25 2,651.11 2,783.00 2,914.89 3,046.78 3,178.67 3,310.56 3,442.45
J5 1/1/2000 P2 01 Januari 2000 SSB 10% J 5 P2 2,255.44 2,338.93 2,422.42 2,505.91 2,589.40 2,672.89 2,809.62 2,946.35 3,083.08 3,219.81 3,356.54 3,493.27 3,630.00
J5 1/1/2000 P3 01 Januari 2000 SSB 10% J 5 P3 2,342.56 2,429.68 2,516.80 2,603.92 2,691.04 2,833.82 2,976.60 3,119.38 3,262.16 3,404.94 3,547.72 3,690.50 3,833.28
N8 1/1/2002 P1 01 Januari 2002 SSB 10% N 8 P1 785.29 825.22 865.15 905.08 945.01 984.94 1,024.87 1,064.80 1,104.73 1,144.66 1,184.59 1,237.83 1,291.07 1,344.31 1,397.55 1,450.79 1,504.03 1,557.27 1,610.51 1,663.75 1,716.99 1,770.23
N8 1/1/2002 P2 01 Januari 2002 SSB 10% N 8 P2 826.43 867.57 908.71 949.85 990.99 1,032.13 1,073.27 1,114.41 1,155.55 1,196.69 1,252.35 1,308.01 1,363.67 1,419.33 1,474.99 1,530.65 1,586.31 1,641.97 1,697.63 1,753.29 1,808.95 1,864.61
N8 1/1/2002 P3 01 Januari 2002 SSB 10% N 8 P3 868.78 911.13 953.48 995.83 1,038.18 1,080.53 1,122.88 1,165.23 1,207.58 1,265.66 1,323.74 1,381.82 1,439.90 1,497.98 1,556.06 1,614.14 1,672.22 1,730.30 1,788.38 1,846.46 1,904.54 1,962.62
NT5 1/1/2002 P1 01 Januari 2002 SSB 10% NT 5 P1 1,915.43 1,994.08 2,072.73 2,151.38 2,230.03 2,308.68 2,387.33 2,465.98 2,544.63 2,623.28 2,701.93 2,780.58
NT5 1/1/2002 P2 01 Januari 2002 SSB 10% NT 5 P2 1,997.71 2,079.99 2,162.27 2,244.55 2,326.83 2,409.11 2,491.39 2,573.67 2,655.95 2,738.23 2,820.51 2,902.79
NT5 1/1/2002 P3 01 Januari 2002 SSB 10% NT 5 P3 2,083.62 2,169.53 2,255.44 2,341.35 2,427.26 2,513.17 2,599.08 2,684.99 2,770.90 2,856.81 2,942.72 3,028.63
R4 1/1/2002 P1 01 Januari 2002 SSB 10% R 4 P1 519.57 549.82 580.07 610.32 640.57 670.82 701.07 731.32 761.57 791.82 822.07 852.32 882.57 912.82 943.07 973.32 1,003.57
R4 1/1/2002 P2 01 Januari 2002 SSB 10% R 4 P2 583.70 616.37 649.04 681.71 714.38 747.05 779.72 812.39 845.06 877.73 910.40 943.07 975.74 1,008.41 1,041.08 1,073.75 1,106.42
VU6 1/1/2002 P1 01 Januari 2002 SSB GRED UTAMA B 10% VU 6 P1 6,461.40 7,090.60 7,514.10 7,816.60
J5 1/1/2002 P1 01 Januari 2002 SSB 10% J 5 P1 1,224.52 1,277.76 1,331.00 1,384.24 1,437.48 1,490.72 1,543.96 1,597.20 1,650.44 1,703.68 1,756.92 1,810.16 1,863.40 1,916.64 1,969.88 2,023.12 2,102.98 2,182.84 2,262.70 2,342.56 2,422.42
J5 1/1/2002 P2 01 Januari 2002 SSB 10% J 5 P2 1,281.39 1,338.26 1,395.13 1,452.00 1,508.87 1,565.74 1,622.61 1,679.48 1,736.35 1,793.22 1,850.09 1,906.96 1,963.83 2,020.70 2,077.57 2,161.06 2,244.55 2,328.04 2,411.53 2,495.02 2,578.51
J5 1/1/2002 P3 01 Januari 2002 SSB 10% J 5 P3 1,340.68 1,399.97 1,459.26 1,518.55 1,577.84 1,637.13 1,696.42 1,755.71 1,815.00 1,874.29 1,933.58 1,992.87 2,052.16 2,111.45 2,199.78 2,288.11 2,376.44 2,464.77 2,553.10 2,641.43 2,729.76
A10-1 1/1/2002 P1 01 Januari 2002 SSB 10% A 10-1 P1 726.00 756.25 786.50 816.75 856.68 896.61 936.54 976.47 1,016.40 1,056.33 1,096.26 1,136.19 1,176.12 1,216.05
A10-1 1/1/2002 P2 01 Januari 2002 SSB 10% A 10-1 P2 757.46 788.92 820.38 861.52 902.66 943.80 984.94 1,026.08 1,067.22 1,108.36 1,149.50 1,190.64 1,231.78 1,272.92
A10-1 1/1/2002 P3 01 Januari 2002 SSB 10% A 10-1 P3 790.13 822.80 865.15 907.50 949.85 992.20 1,034.55 1,076.90 1,119.25 1,161.60 1,203.95 1,246.30 1,288.65 1,331.00
A9-1 1/1/2002 P1 01 Januari 2002 SSB 10% A 9-1 P1 533.61 563.86 594.11 634.04 673.97 713.90 753.83 793.76 833.69 873.62 913.55 953.48 993.41 1,033.34 1,073.27 1,113.20 1,153.13 1,193.06 1,232.99
A9-1 1/1/2002 P2 01 Januari 2002 SSB 10% A 9-1 P2 565.07 596.53 637.67 678.81 719.95 761.09 802.23 843.37 884.51 925.65 966.79 1,007.93 1,049.07 1,090.21 1,131.35 1,172.49 1,213.63 1,254.77 1,295.91
A9-1 1/1/2002 P3 01 Januari 2002 SSB 10% A 9-1 P3 597.74 640.09 682.44 724.79 767.14 809.49 851.84 894.19 936.54 978.89 1,021.24 1,063.59 1,105.94 1,148.29 1,190.64 1,232.99 1,275.34 1,317.69 1,360.04
DS2-1 1/1/2002 P1 01 Januari 2002 SSB 10% DS 2-1 P1 2,148.96 2,228.82 2,308.68 2,388.54 2,468.40 2,548.26 2,681.36 2,814.46 2,947.56 3,080.66 3,213.76 3,346.86 3,479.96 3,613.06 3,746.16 3,905.88 4,065.60 4,225.32 4,385.04 4,544.76 4,704.48
DS2-1 1/1/2002 P2 01 Januari 2002 SSB 10% DS 2-1 P2 2,232.45 2,315.94 2,399.43 2,482.92 2,566.41 2,704.35 2,842.29 2,980.23 3,118.17 3,256.11 3,394.05 3,531.99 3,669.93 3,807.87 3,973.64 4,139.41 4,305.18 4,470.95 4,636.72 4,802.49 4,968.26
DS2-1 1/1/2002 P3 01 Januari 2002 SSB 10% DS 2-1 P3 2,319.57 2,406.69 2,493.81 2,580.93 2,724.92 2,868.91 3,012.90 3,156.89 3,300.88 3,444.87 3,588.86 3,732.85 3,876.84 4,048.66 4,220.48 4,392.30 4,564.12 4,735.94 4,907.76 5,079.58 5,251.40
F9 1/1/2002 P1 01 Januari 2002 SSB 10% F 9 P1 533.61 563.86 594.11 624.36 654.61 684.86 715.11 745.36 775.61 815.54 855.47 895.40 935.33 975.26 1,015.19 1,055.12 1,095.05 1,134.98 1,174.91 1,214.84
F9 1/1/2002 P2 01 Januari 2002 SSB 10% F 9 P2 565.07 596.53 627.99 659.45 690.91 722.37 753.83 785.29 826.43 867.57 908.71 949.85 990.99 1,032.13 1,073.27 1,114.41 1,155.55 1,196.69 1,237.83 1,278.97
F9 1/1/2002 P3 01 Januari 2002 SSB 10% F 9 P3 597.74 630.41 663.08 695.75 728.42 761.09 793.76 836.11 878.46 920.81 963.16 1,005.51 1,047.86 1,090.21 1,132.56 1,174.91 1,217.26 1,259.61 1,301.96 1,344.31
F8 1/1/2002 P1 01 Januari 2002 SSB 10% F 8 P1 1,017.61 1,057.54 1,097.47 1,150.71 1,203.95 1,257.19 1,310.43 1,363.67 1,416.91
F8 1/1/2002 P2 01 Januari 2002 SSB 10% F 8 P2 1,058.75 1,099.89 1,155.55 1,211.21 1,266.87 1,322.53 1,378.19 1,433.85 1,489.51
F8 1/1/2002 P3 01 Januari 2002 SSB 10% F 8 P3 1,101.10 1,159.18 1,217.26 1,275.34 1,333.42 1,391.50 1,449.58 1,507.66 1,565.74
F7 1/1/2002 P1 01 Januari 2002 SSB 10% F 7 P1 646.14 686.07 726.00 765.93 805.86 845.79 885.72 925.65 965.58 1,005.51 1,045.44 1,085.37 1,125.30 1,178.54 1,231.78 1,285.02 1,338.26 1,391.50 1,444.74 1,497.98 1,551.22 1,604.46 1,657.70
F7 1/1/2002 P2 01 Januari 2002 SSB 10% F 7 P2 687.28 728.42 769.56 810.70 851.84 892.98 934.12 975.26 1,016.40 1,057.54 1,098.68 1,139.82 1,195.48 1,251.14 1,306.80 1,362.46 1,418.12 1,473.78 1,529.44 1,585.10 1,640.76 1,696.42 1,752.08
F7 1/1/2002 P3 01 Januari 2002 SSB 10% F 7 P3 729.63 771.98 814.33 856.68 899.03 941.38 983.73 1,026.08 1,068.43 1,110.78 1,153.13 1,211.21 1,269.29 1,327.37 1,385.45 1,443.53 1,501.61 1,559.69 1,617.77 1,675.85 1,733.93 1,792.01 1,850.09
F6 1/1/2002 P1 01 Januari 2002 SSB 10% F 6 P1 1,522.18 1,575.42 1,628.66 1,681.90 1,735.14 1,788.38 1,867.03 1,945.68 2,024.33 2,102.98 2,181.63
F6 1/1/2002 P2 01 Januari 2002 SSB 10% F 6 P2 1,577.84 1,633.50 1,689.16 1,744.82 1,800.48 1,882.76 1,965.04 2,047.32 2,129.60 2,211.88 2,294.16
F6 1/1/2002 P3 01 Januari 2002 SSB 10% F 6 P3 1,635.92 1,694.00 1,752.08 1,810.16 1,896.07 1,981.98 2,067.89 2,153.80 2,239.71 2,325.62 2,411.53
F11 1/1/2002 P1 01 Januari 2002 SSB 10% F 11 P1 953.48 1,006.72 1,059.96 1,113.20 1,166.44 1,219.68 1,272.92 1,326.16 1,379.40 1,432.64 1,485.88 1,539.12 1,592.36 1,645.60 1,698.84 1,752.08 1,805.32 1,858.56 1,911.80 1,965.04 2,018.28 2,096.93 2,175.58 2,254.23
F11 1/1/2002 P2 01 Januari 2002 SSB 10% F 11 P2 1,009.14 1,064.80 1,120.46 1,176.12 1,231.78 1,287.44 1,343.10 1,398.76 1,454.42 1,510.08 1,565.74 1,621.40 1,677.06 1,732.72 1,788.38 1,844.04 1,899.70 1,955.36 2,011.02 2,066.68 2,148.96 2,231.24 2,313.52 2,395.80
F11 1/1/2002 P3 01 Januari 2002 SSB 10% F 11 P3 1,067.22 1,125.30 1,183.38 1,241.46 1,299.54 1,357.62 1,415.70 1,473.78 1,531.86 1,589.94 1,648.02 1,706.10 1,764.18 1,822.26 1,880.34 1,938.42 1,996.50 2,054.58 2,112.66 2,198.57 2,284.48 2,370.39 2,456.30 2,542.21
F10 1/1/2002 P1 01 Januari 2002 SSB 10% F 10 P1 1,920.27 1,998.92 2,077.57 2,156.22 2,234.87 2,313.52 2,392.17 2,470.82 2,549.47 2,628.12
F10 1/1/2002 P2 01 Januari 2002 SSB 10% F 10 P2 2,002.55 2,084.83 2,167.11 2,249.39 2,331.67 2,413.95 2,496.23 2,578.51 2,660.79 2,743.07
F10 1/1/2002 P3 01 Januari 2002 SSB 10% F 10 P3 2,088.46 2,174.37 2,260.28 2,346.19 2,432.10 2,518.01 2,603.92 2,689.83 2,775.74 2,861.65
F5 1/1/2002 P1 01 Januari 2002 SSB 10% F 5 P1 1,220.89 1,274.13 1,327.37 1,380.61 1,433.85 1,487.09 1,540.33 1,593.57 1,646.81 1,700.05 1,753.29 1,806.53 1,859.77 1,913.01 1,966.25 2,019.49 2,098.14 2,176.79 2,255.44 2,334.09
F5 1/1/2002 P2 01 Januari 2002 SSB 10% F 5 P2 1,277.76 1,334.63 1,391.50 1,448.37 1,505.24 1,562.11 1,618.98 1,675.85 1,732.72 1,789.59 1,846.46 1,903.33 1,960.20 2,017.07 2,073.94 2,157.43 2,240.92 2,324.41 2,407.90 2,491.39
F5 1/1/2002 P3 01 Januari 2002 SSB 10% F 5 P3 1,337.05 1,396.34 1,455.63 1,514.92 1,574.21 1,633.50 1,692.79 1,752.08 1,811.37 1,870.66 1,929.95 1,989.24 2,048.53 2,107.82 2,194.94 2,282.06 2,369.18 2,456.30 2,543.42 2,630.54
F4 1/1/2002 P1 01 Januari 2002 SSB 10% F 4 P1 2,156.22 2,234.87 2,313.52 2,392.17 2,470.82 2,549.47 2,628.12 2,706.77 2,785.42
F4 1/1/2002 P2 01 Januari 2002 SSB 10% F 4 P2 2,238.50 2,320.78 2,403.06 2,485.34 2,567.62 2,649.90 2,732.18 2,814.46 2,896.74
F4 1/1/2002 P3 01 Januari 2002 SSB 10% F 4 P3 2,324.41 2,410.32 2,496.23 2,582.14 2,668.05 2,753.96 2,839.87 2,925.78 3,011.69
F3 1/1/2002 P1 01 Januari 2002 SSB 10% F 3 P1 1,586.31 1,666.17 1,746.03 1,825.89 1,905.75 1,985.61 2,065.47 2,145.33 2,225.19 2,305.05 2,384.91 2,464.77 2,544.63 2,624.49 2,704.35 2,837.45 2,970.55 3,103.65 3,236.75 3,369.85 3,502.95 3,636.05 3,769.15 3,902.25
F3 1/1/2002 P2 01 Januari 2002 SSB 10% F 3 P2 1,669.80 1,753.29 1,836.78 1,920.27 2,003.76 2,087.25 2,170.74 2,254.23 2,337.72 2,421.21 2,504.70 2,588.19 2,671.68 2,755.17 2,893.11 3,031.05 3,168.99 3,306.93 3,444.87 3,582.81 3,720.75 3,858.69 3,996.63 4,134.57
F3 1/1/2002 P3 01 Januari 2002 SSB 10% F 3 P3 1,756.92 1,844.04 1,931.16 2,018.28 2,105.40 2,192.52 2,279.64 2,366.76 2,453.88 2,541.00 2,628.12 2,715.24 2,802.36 2,946.35 3,090.34 3,234.33 3,378.32 3,522.31 3,666.30 3,810.29 3,954.28 4,098.27 4,242.26 4,386.25
F2 1/1/2002 P1 01 Januari 2002 SSB 10% F 2 P1 3,782.46 3,962.75 4,143.04 4,323.33 4,503.62 4,683.91 4,864.20
F2 1/1/2002 P2 01 Januari 2002 SSB 10% F 2 P2 3,970.01 4,157.56 4,345.11 4,532.66 4,720.21 4,907.76 5,095.31
F2 1/1/2002 P3 01 Januari 2002 SSB 10% F 2 P3 4,164.82 4,359.63 4,554.44 4,749.25 4,944.06 5,138.87 5,333.68
F1 1/1/2002 P1 01 Januari 2002 SSB 10% F 1 P1 4,501.20 4,681.49 4,881.14 5,080.79 5,280.44 5,480.09 5,679.74
F1 1/1/2002 P2 01 Januari 2002 SSB 10% F 1 P2 4,688.75 4,896.87 5,104.99 5,313.11 5,521.23 5,729.35 5,937.47
F1 1/1/2002 P3 01 Januari 2002 SSB 10% F 1 P3 4,905.34 5,121.93 5,338.52 5,555.11 5,771.70 5,988.29 6,204.88
FT7 1/1/2002 P1 01 Januari 2002 SSB 10% FT 7 P1 659.45 700.59 741.73 782.87 824.01 865.15 906.29 947.43 988.57 1,029.71 1,070.85 1,111.99 1,153.13 1,206.37 1,259.61 1,312.85 1,366.09 1,419.33 1,472.57 1,525.81 1,579.05 1,632.29 1,685.53 1,738.77 1,792.01
FT7 1/1/2002 P2 01 Januari 2002 SSB 10% FT 7 P2 701.80 744.15 786.50 828.85 871.20 913.55 955.90 998.25 1,040.60 1,082.95 1,125.30 1,167.65 1,223.31 1,278.97 1,334.63 1,390.29 1,445.95 1,501.61 1,557.27 1,612.93 1,668.59 1,724.25 1,779.91 1,835.57 1,891.23
FT7 1/1/2002 P3 01 Januari 2002 SSB 10% FT 7 P3 745.36 788.92 832.48 876.04 919.60 963.16 1,006.72 1,050.28 1,093.84 1,137.40 1,180.96 1,239.04 1,297.12 1,355.20 1,413.28 1,471.36 1,529.44 1,587.52 1,645.60 1,703.68 1,761.76 1,819.84 1,877.92 1,936.00 1,994.08
FT6 1/1/2002 P1 01 Januari 2002 SSB 10% FT 6 P1 1,530.65 1,583.89 1,637.13 1,690.37 1,743.61 1,796.85 1,876.71 1,956.57 2,036.43 2,116.29 2,196.15
FT6 1/1/2002 P2 01 Januari 2002 SSB 10% FT 6 P2 1,586.31 1,641.97 1,697.63 1,753.29 1,808.95 1,892.44 1,975.93 2,059.42 2,142.91 2,226.40 2,309.89
FT6 1/1/2002 P3 01 Januari 2002 SSB 10% FT 6 P3 1,644.39 1,702.47 1,760.55 1,818.63 1,905.75 1,992.87 2,079.99 2,167.11 2,254.23 2,341.35 2,428.47
J6 1/1/2002 P1 01 Januari 2002 SSB 10% J 6 P1 1,530.65 1,583.89 1,637.13 1,690.37 1,743.61 1,796.85 1,876.71 1,956.57 2,036.43 2,116.29 2,196.15
J6 1/1/2002 P2 01 Januari 2002 SSB 10% J 6 P2 1,586.31 1,641.97 1,697.63 1,753.29 1,808.95 1,892.44 1,975.93 2,059.42 2,142.91 2,226.40 2,309.89
J6 1/1/2002 P3 01 Januari 2002 SSB 10% J 6 P3 1,644.39 1,702.47 1,760.55 1,818.63 1,905.75 1,992.87 2,079.99 2,167.11 2,254.23 2,341.35 2,428.47
J5-1 1/1/2002 P1 01 Januari 2002 SSB 10% J 5-1 P1 1,224.52 1,277.76 1,331.00 1,384.24 1,437.48 1,490.72 1,543.96 1,597.20 1,650.44 1,703.68 1,756.92 1,810.16 1,863.40 1,916.64 1,969.88 2,023.12 2,102.98 2,182.84 2,262.70 2,342.56 2,422.42
J5-1 1/1/2002 P2 01 Januari 2002 SSB 10% J 5-1 P2 1,281.39 1,338.26 1,395.13 1,452.00 1,508.87 1,565.74 1,622.61 1,679.48 1,736.35 1,793.22 1,850.09 1,906.96 1,963.83 2,020.70 2,077.57 2,161.06 2,244.55 2,328.04 2,411.53 2,495.02 2,578.51
J5-1 1/1/2002 P3 01 Januari 2002 SSB 10% J 5-1 P3 1,340.68 1,399.97 1,459.26 1,518.55 1,577.84 1,637.13 1,696.42 1,755.71 1,815.00 1,874.29 1,933.58 1,992.87 2,052.16 2,111.45 2,199.78 2,288.11 2,376.44 2,464.77 2,553.10 2,641.43 2,729.76
J7-1 1/1/2002 P1 01 Januari 2002 SSB 10% J 7-1 P1 659.45 700.59 741.73 782.87 824.01 865.15 906.29 947.43 988.57 1,029.71 1,070.85 1,111.99 1,153.13 1,206.37 1,259.61 1,312.85 1,366.09 1,419.33 1,472.57 1,525.81 1,579.05 1,632.29 1,685.53 1,738.77 1,792.01 1,845.25
J7-1 1/1/2002 P2 01 Januari 2002 SSB 10% J 7-1 P2 701.80 744.15 786.50 828.85 871.20 913.55 955.90 998.25 1,040.60 1,082.95 1,125.30 1,167.65 1,223.31 1,278.97 1,334.63 1,390.29 1,445.95 1,501.61 1,557.27 1,612.93 1,668.59 1,724.25 1,779.91 1,835.57 1,891.23 1,946.89
J7-1 1/1/2002 P3 01 Januari 2002 SSB 10% J 7-1 P3 745.36 788.92 832.48 876.04 919.60 963.16 1,006.72 1,050.28 1,093.84 1,137.40 1,180.96 1,239.04 1,297.12 1,355.20 1,413.28 1,471.36 1,529.44 1,587.52 1,645.60 1,703.68 1,761.76 1,819.84 1,877.92 1,936.00 1,994.08 2,052.16
KP10 1/1/2002 P1 01 Januari 2002 SSB 10% KP 10 P1 533.61 563.86 594.11 624.36 654.61 684.86 715.11 745.36 775.61 815.54 855.47 895.40 935.33 975.26 1,015.19 1,055.12 1,095.05 1,134.98 1,174.91 1,214.84
KP10 1/1/2002 P2 01 Januari 2002 SSB 10% KP 10 P2 565.07 596.53 627.99 659.45 690.91 722.37 753.83 785.29 826.43 867.57 908.71 949.85 990.99 1,032.13 1,073.27 1,114.41 1,155.55 1,196.69 1,237.83 1,278.97
KP10 1/1/2002 P3 01 Januari 2002 SSB 10% KP 10 P3 597.74 630.41 663.08 695.75 728.42 761.09 793.76 836.11 878.46 920.81 963.16 1,005.51 1,047.86 1,090.21 1,132.56 1,174.91 1,217.26 1,259.61 1,301.96 1,344.31
L5-1 1/1/2002 P1 01 Januari 2002 SSB 10% L 5-1 P1 1,162.81 1,216.05 1,269.29 1,322.53 1,375.77 1,429.01 1,482.25 1,535.49 1,588.73 1,641.97 1,695.21 1,748.45 1,801.69 1,854.93 1,908.17 1,961.41 2,014.65 2,093.30 2,171.95 2,250.60 2,329.25 2,407.90
L5-1 1/1/2002 P2 01 Januari 2002 SSB 10% L 5-1 P2 1,219.68 1,276.55 1,333.42 1,390.29 1,447.16 1,504.03 1,560.90 1,617.77 1,674.64 1,731.51 1,788.38 1,845.25 1,902.12 1,958.99 2,015.86 2,072.73 2,155.01 2,237.29 2,319.57 2,401.85 2,484.13 2,566.41
L5-1 1/1/2002 P3 01 Januari 2002 SSB 10% L 5-1 P3 1,278.97 1,338.26 1,397.55 1,456.84 1,516.13 1,575.42 1,634.71 1,694.00 1,753.29 1,812.58 1,871.87 1,931.16 1,990.45 2,049.74 2,109.03 2,194.94 2,280.85 2,366.76 2,452.67 2,538.58 2,624.49 2,710.40
N1 1/1/2002 P1 01 Januari 2002 SSB 10% N 1 P1 4,422.55 4,599.21 4,795.23 4,991.25 5,187.27 5,383.29 5,579.31
N1 1/1/2002 P2 01 Januari 2002 SSB 10% N 1 P2 4,606.47 4,810.96 5,015.45 5,219.94 5,424.43 5,628.92 5,833.41
N1 1/1/2002 P3 01 Januari 2002 SSB 10% N 1 P3 4,819.43 5,032.39 5,245.35 5,458.31 5,671.27 5,884.23 6,097.19
N2 1/1/2002 P1 01 Januari 2002 SSB 10% N 2 P1 3,717.12 3893.78 4070.44 4247.1 4423.76 4600.42 4777.08
N2 1/1/2002 P2 01 Januari 2002 SSB 10% N 2 P2 3,901.04 4084.96 4268.88 4452.8 4636.72 4820.64 5004.56
N2 1/1/2002 P3 01 Januari 2002 SSB 10% N 2 P3 4,092.22 4283.4 4474.58 4665.76 4856.94 5048.12 5239.3
N3 1/1/2002 P1 01 Januari 2002 SSB 10% N 3 P1 1,404.81 1,483.46 1,562.11 1,640.76 1,719.41 1,798.06 1,876.71 1,955.36 2,034.01 2,112.66 2,191.31 2,269.96 2,348.61 2,427.26 2,505.91 2,584.56 2,663.21 2,793.89 2,924.57 3,055.25 3,185.93 3,316.61 3,447.29 3,577.97 3,708.65 3,839.33
N3 1/1/2002 P2 01 Januari 2002 SSB 10% N 3 P2 1,487.09 1,569.37 1,651.65 1,733.93 1,816.21 1,898.49 1,980.77 2,063.05 2,145.33 2,227.61 2,309.89 2,392.17 2,474.45 2,556.73 2,639.01 2,721.29 2,856.81 2,992.33 3,127.85 3,263.37 3,398.89 3,534.41 3,669.93 3,805.45 3,940.97 4,076.49
N3 1/1/2002 P3 01 Januari 2002 SSB 10% N 3 P3 1,573.00 1,658.91 1,744.82 1,830.73 1,916.64 2,002.55 2,088.46 2,174.37 2,260.28 2,346.19 2,432.10 2,518.01 2,603.92 2,689.83 2,775.74 2,917.31 3,058.88 3,200.45 3,342.02 3,483.59 3,625.16 3,766.73 3,908.30 4,049.87 4,191.44 4,333.01
N4 1/1/2002 P1 01 Januari 2002 SSB 10% N 4 P1 2,386.12 2,464.77 2,543.42 2,622.07 2,752.75 2,883.43 3,014.11 3,144.79 3,275.47 3,406.15
N4 1/1/2002 P2 01 Januari 2002 SSB 10% N 4 P2 2,468.40 2,550.68 2,632.96 2,768.48 2,904.00 3,039.52 3,175.04 3,310.56 3,446.08 3,581.60
N4 1/1/2002 P3 01 Januari 2002 SSB 10% N 4 P3 2,554.31 2,640.22 2,781.79 2,923.36 3,064.93 3,206.50 3,348.07 3,489.64 3,631.21 3,772.78
N5 1/1/2002 P1 01 Januari 2002 SSB 10% N 5 P1 1,915.43 1,994.08 2,072.73 2,151.38 2,230.03 2,308.68 2,387.33 2,465.98 2,544.63 2,623.28 2,701.93 2,780.58
N5 1/1/2002 P2 01 Januari 2002 SSB 10% N 5 P2 1,997.71 2,079.99 2,162.27 2,244.55 2,326.83 2,409.11 2,491.39 2,573.67 2,655.95 2,738.23 2,820.51 2,902.79
N5 1/1/2002 P3 01 Januari 2002 SSB 10% N 5 P3 2,083.62 2,169.53 2,255.44 2,341.35 2,427.26 2,513.17 2,599.08 2,684.99 2,770.90 2,856.81 2,942.72 3,028.63
N6 1/1/2002 P1 01 Januari 2002 SSB 10% N 6 P1 948.64 1,001.88 1,055.12 1,108.36 1,161.60 1,214.84 1,268.08 1,321.32 1,374.56 1,427.80 1,481.04 1,534.28 1,587.52 1,640.76 1,694.00 1,747.24 1,800.48 1,853.72 1,906.96 1,960.20 2,013.44 2,092.09 2,170.74 2,249.39 2,328.04
N6 1/1/2002 P2 01 Januari 2002 SSB 10% N 6 P2 1,004.30 1,059.96 1,115.62 1,171.28 1,226.94 1,282.60 1,338.26 1,393.92 1,449.58 1,505.24 1,560.90 1,616.56 1,672.22 1,727.88 1,783.54 1,839.20 1,894.86 1,950.52 2,006.18 2,061.84 2,144.12 2,226.40 2,308.68 2,390.96 2,473.24
N6 1/1/2002 P3 01 Januari 2002 SSB 10% N 6 P3 1,062.38 1,120.46 1,178.54 1,236.62 1,294.70 1,352.78 1,410.86 1,468.94 1,527.02 1,585.10 1,643.18 1,701.26 1,759.34 1,817.42 1,875.50 1,933.58 1,991.66 2,049.74 2,107.82 2,193.73 2,279.64 2,365.55 2,451.46 2,537.37 2,623.28
N7 1/1/2002 P1 01 Januari 2002 SSB 10% N 7 P1 1,517.34 1,570.58 1,623.82 1,677.06 1,730.30 1,783.54 1,862.19 1,940.84 2,019.49 2,098.14 2,176.79
N7 1/1/2002 P2 01 Januari 2002 SSB 10% N 7 P2 1,573.00 1,628.66 1,684.32 1,739.98 1,795.64 1,877.92 1,960.20 2,042.48 2,124.76 2,207.04 2,289.32
N7 1/1/2002 P3 01 Januari 2002 SSB 10% N 7 P3 1,631.08 1,689.16 1,747.24 1,805.32 1,891.23 1,977.14 2,063.05 2,148.96 2,234.87 2,320.78 2,406.69
N9 1/1/2002 P1 01 Januari 2002 SSB 10% N 9 P1 641.30 681.23 721.16 761.09 801.02 840.95 880.88 920.81 960.74 1,000.67 1,040.60 1,080.53 1,120.46 1,173.70 1,226.94 1,280.18 1,333.42 1,386.66 1,439.90 1,493.14 1,546.38 1,599.62 1,652.86
N9 1/1/2002 P2 01 Januari 2002 SSB 10% N 9 P2 682.44 723.58 764.72 805.86 847.00 888.14 929.28 970.42 1,011.56 1,052.70 1,093.84 1,134.98 1,190.64 1,246.30 1,301.96 1,357.62 1,413.28 1,468.94 1,524.60 1,580.26 1,635.92 1,691.58 1,747.24
N9 1/1/2002 P3 01 Januari 2002 SSB 10% N 9 P3 724.79 767.14 809.49 851.84 894.19 936.54 978.89 1,021.24 1,063.59 1,105.94 1,148.29 1,206.37 1,264.45 1,322.53 1,380.61 1,438.69 1,496.77 1,554.85 1,612.93 1,671.01 1,729.09 1,787.17 1,845.25
N10 1/1/2002 P1 01 Januari 2002 SSB 10% N 10 P1 1,015.19 1,055.12 1,095.05 1,148.29 1,201.53 1,254.77 1,308.01 1,361.25 1,414.49
N10 1/1/2002 P2 01 Januari 2002 SSB 10% N 10 P2 1,056.33 1,097.47 1,153.13 1,208.79 1,264.45 1,320.11 1,375.77 1,431.43 1,487.09
N10 1/1/2002 P3 01 Januari 2002 SSB 10% N 10 P3 1,098.68 1,156.76 1,214.84 1,272.92 1,331.00 1,389.08 1,447.16 1,505.24 1,563.32
N11 1/1/2002 P1 01 Januari 2002 SSB 10% N 11 P1 510.62 540.87 571.12 601.37 631.62 661.87 692.12 722.37 762.30 802.23 842.16 882.09 922.02 961.95 1,001.88 1,041.81 1,081.74 1,121.67 1,161.60 1,201.53 1,241.46
N11 1/1/2002 P2 01 Januari 2002 SSB 10% N 11 P2 542.08 573.54 605.00 636.46 667.92 699.38 730.84 771.98 813.12 854.26 895.40 936.54 977.68 1,018.82 1,059.96 1,101.10 1,142.24 1,183.38 1,224.52 1,265.66 1,306.80
N11 1/1/2002 P3 01 Januari 2002 SSB 10% N 11 P3 574.75 607.42 640.09 672.76 705.43 738.10 780.45 822.80 865.15 907.50 949.85 992.20 1,034.55 1,076.90 1,119.25 1,161.60 1,203.95 1,246.30 1,288.65 1,331.00 1,373.35
NT7 1/1/2002 P1 01 Januari 2002 SSB 10% NT 7 P1 1,517.34 1,570.58 1,623.82 1,677.06 1,730.30 1,783.54 1,862.19 1,940.84 2,019.49 2,098.14 2,176.79
NT7 1/1/2002 P2 01 Januari 2002 SSB 10% NT 7 P2 1,573.00 1,628.66 1,684.32 1,739.98 1,795.64 1,877.92 1,960.20 2,042.48 2,124.76 2,207.04 2,289.32
NT7 1/1/2002 P3 01 Januari 2002 SSB 10% NT 7 P3 1,631.08 1,689.16 1,747.24 1,805.32 1,891.23 1,977.14 2,063.05 2,148.96 2,234.87 2,320.78 2,406.69
NT9 1/1/2002 P1 01 Januari 2002 SSB 10% NT 9 P1 641.30 681.23 721.16 761.09 801.02 840.95 880.88 920.81 960.74 1,000.67 1,040.60 1,080.53 1,120.46 1,173.70 1,226.94 1,280.18 1,333.42 1,386.66 1,439.90 1,493.14 1,546.38 1,599.62 1,652.86
NT9 1/1/2002 P2 01 Januari 2002 SSB 10% NT 9 P2 682.44 723.58 764.72 805.86 847.00 888.14 929.28 970.42 1,011.56 1,052.70 1,093.84 1,134.98 1,190.64 1,246.30 1,301.96 1,357.62 1,413.28 1,468.94 1,524.60 1,580.26 1,635.92 1,691.58 1,747.24
NT9 1/1/2002 P3 01 Januari 2002 SSB 10% NT 9 P3 724.79 767.14 809.49 851.84 894.19 936.54 978.89 1,021.24 1,063.59 1,105.94 1,148.29 1,206.37 1,264.45 1,322.53 1,380.61 1,438.69 1,496.77 1,554.85 1,612.93 1,671.01 1,729.09 1,787.17 1,845.25
R3 1/1/2002 P1 01 Januari 2002 SSB 10% R 3 P1 519.57 549.82 580.07 610.32 640.57 670.82 701.07 731.32 761.57 791.82 822.07 852.32 882.57 912.82 943.07 973.32 1,003.57
R3 1/1/2002 P2 01 Januari 2002 SSB 10% R 3 P2 551.03 582.49 613.95 645.41 676.87 708.33 739.79 771.25 802.71 834.17 865.63 897.09 928.55 960.01 991.47 1,022.93 1,054.39
R3 1/1/2002 P3 01 Januari 2002 SSB 10% R 3 P3 583.70 616.37 649.04 681.71 714.38 747.05 779.72 812.39 845.06 877.73 910.40 943.07 975.74 1,008.41 1,041.08 1,073.75 1,106.42
R6 1/1/2002 P1 01 Januari 2002 SSB 10% R 6 P1 642.99 673.24 703.49 733.74 763.99 794.24 824.49 854.74 884.99 915.24 945.49 975.74 1,005.99 1,036.24 1,066.49
R6 1/1/2002 P2 01 Januari 2002 SSB 10% R 6 P2 707.12 739.79 772.46 805.13 837.80 870.47 903.14 935.81 968.48 1,001.15 1,033.82 1,066.49 1,099.16 1,131.83 1,164.50
R8 1/1/2002 P1 01 Januari 2002 SSB 10% R 8 P1 800.29 830.54 860.79 891.04 921.29 951.54 987.84 1,024.14 1,060.44 1,096.74
R8 1/1/2002 P2 01 Januari 2002 SSB 10% R 8 P2 864.42 897.09 929.76 962.43 1,001.15 1,039.87 1,078.59 1,117.31 1,156.03 1,194.75
R9 1/1/2002 P1 01 Januari 2002 SSB 10% R 9 P1 534.09 564.34 594.59 624.84 655.09 685.34 715.59 749.47 783.35 817.23 851.11 884.99 918.87 952.75 986.63 1,022.93 1,059.23 1,095.53 1,131.83 1,168.13 1,204.43
R9 1/1/2002 P2 01 Januari 2002 SSB 10% R 9 P2 565.55 597.01 628.47 659.93 691.39 722.85 757.94 793.03 828.12 863.21 898.30 933.39 968.48 1,003.57 1,041.08 1,078.59 1,116.10 1,153.61 1,191.12 1,228.63 1,266.14
R9 1/1/2002 P3 01 Januari 2002 SSB 10% R 9 P3 598.22 630.89 663.56 696.23 728.90 765.20 801.50 837.80 874.10 910.40 946.70 983.00 1,019.30 1,058.02 1,096.74 1,135.46 1,174.18 1,212.90 1,251.62 1,290.34 1,329.06
R10 1/1/2002 P1 01 Januari 2002 SSB 10% R 10 P1 504.57 534.82 565.07 595.32 625.57 655.82 686.07 716.32 746.57 776.82 807.07 837.32 867.57 897.82 928.07 958.32
R10 1/1/2002 P2 01 Januari 2002 SSB 10% R 10 P2 536.03 567.49 598.95 630.41 661.87 693.33 724.79 756.25 787.71 819.17 850.63 882.09 913.55 945.01 976.47 1,007.93
R10 1/1/2002 P3 01 Januari 2002 SSB 10% R 10 P3 568.70 601.37 634.04 666.71 699.38 732.05 764.72 797.39 830.06 862.73 895.40 928.07 960.74 993.41 1,026.08 1,058.75
S48 1/1/2002 P1 01 Januari 2002 SSB 10% S 48 P1 3,780.91 3,957.57 4,134.23 4,310.89 4,487.55 4,664.21 4,840.87 5,017.53
S48 1/1/2002 P2 01 Januari 2002 SSB 10% S 48 P2 4,156.01 4,347.19 4,538.37 4,729.55 4,920.73 5,111.91 5,303.09 5,494.27
U12-1 1/1/2002 P1 01 Januari 2002 SSB 10% U 12-1 P1 675.18 675.18 675.18 675.18 675.18 675.18 675.18 675.18 675.18 675.18 675.18 675.18 675.18 675.18 675.18 675.18 675.18
U12-1 1/1/2002 P2 01 Januari 2002 SSB 10% U 12-1 P2 716.32 716.32 716.32 716.32 716.32 716.32 716.32 716.32 716.32 716.32 716.32 716.32 716.32 716.32 716.32 716.32 716.32
U12-1 1/1/2002 P3 01 Januari 2002 SSB 10% U 12-1 P3 758.67 758.67 758.67 758.67 758.67 758.67 758.67 758.67 758.67 758.67 758.67 758.67 758.67 758.67 758.67 758.67 758.67
VK7-1 1/1/2002 - 01 Januari 2002 SSB 10% VK 7-1 - 6,025.80 6,618.70 7,005.90 7,284.20 7,562.50
VK7 1/1/2002 - 01 Januari 2002 SSB 10% VK 7 - 6,135.80 6,728.70 7,115.90 7,394.20 7,672.50
W6 1/1/2002 P1 01 Januari 2002 SSB 10% W 6 P1 952.27 1,005.51 1,058.75 1,111.99 1,165.23 1,218.47 1,271.71 1,324.95 1,378.19 1,431.43 1,484.67 1,537.91 1,591.15 1,644.39 1,697.63 1,750.87 1,804.11 1,857.35 1,910.59 1,963.83 2,017.07 2,095.72 2,174.37 2,253.02 2,331.67
W6 1/1/2002 P2 01 Januari 2002 SSB 10% W 6 P2 1,007.93 1,063.59 1,119.25 1,174.91 1,230.57 1,286.23 1,341.89 1,397.55 1,453.21 1,508.87 1,564.53 1,620.19 1,675.85 1,731.51 1,787.17 1,842.83 1,898.49 1,954.15 2,009.81 2,065.47 2,147.75 2,230.03 2,312.31 2,394.59 2,476.87
W6 1/1/2002 P3 01 Januari 2002 SSB 10% W 6 P3 1,066.01 1,124.09 1,182.17 1,240.25 1,298.33 1,356.41 1,414.49 1,472.57 1,530.65 1,588.73 1,646.81 1,704.89 1,762.97 1,821.05 1,879.13 1,937.21 1,995.29 2,053.37 2,111.45 2,197.36 2,283.27 2,369.18 2,455.09 2,541.00 2,626.91
W6-1 1/1/2002 P1 01 Januari 2002 SSB 10% W 6-1 P1 952.27 1,005.51 1,058.75 1,111.99 1,165.23 1,218.47 1,271.71 1,324.95 1,378.19 1,431.43 1,484.67 1,537.91 1,591.15 1,644.39 1,697.63 1,750.87 1,804.11 1,857.35 1,910.59 1,963.83 2,017.07 2,095.72 2,174.37 2,253.02 2,331.67 2,410.32
W6-1 1/1/2002 P2 01 Januari 2002 SSB 10% W 6-1 P2 1,007.93 1,063.59 1,119.25 1,174.91 1,230.57 1,286.23 1,341.89 1,397.55 1,453.21 1,508.87 1,564.53 1,620.19 1,675.85 1,731.51 1,787.17 1,842.83 1,898.49 1,954.15 2,009.81 2,065.47 2,147.75 2,230.03 2,312.31 2,394.59 2,476.87 2,559.15
W6-1 1/1/2002 P3 01 Januari 2002 SSB 10% W 6-1 P3 1,066.01 1,124.09 1,182.17 1,240.25 1,298.33 1,356.41 1,414.49 1,472.57 1,530.65 1,588.73 1,646.81 1,704.89 1,762.97 1,821.05 1,879.13 1,937.21 1,995.29 2,053.37 2,111.45 2,197.36 2,283.27 2,369.18 2,455.09 2,541.00 2,626.91 2,712.82
W3 1/1/2002 P1 01 Januari 2002 SSB 10% W 3 P1 1,287.00 1,359.60 1,432.20 1,504.80 1,577.40 1,650.00 1,722.60 1,795.20 1,867.80 1,940.40 2,013.00 2,085.60 2,158.20 2,230.80 2,303.40 2,376.00 2,448.60 2,568.50 2,668.40 2,808.30 2,928.20 3,048.10 3,168.00 3,287.90 3,407.80 3,527.70
W3 1/1/2002 P2 01 Januari 2002 SSB 10% W 3 P2 1,362.90 1,438.80 1,514.70 1,590.60 1,666.50 1,742.40 1,818.30 1,894.20 1,970.10 2,046.00 2,121.90 2,197.80 2,273.70 2,349.60 2,425.50 2,501.40 2,625.70 2,750.00 2,874.30 2,998.60 3,122.90 3,247.20 3,371.50 3,495.80 3,620.10 3,744.40
W3 1/1/2002 P3 01 Januari 2002 SSB 10% W 3 P3 1,442.10 1,521.30 1,600.50 1,679.70 1,758.90 1,836.10 1,917.30 1,996.50 2,075.70 2,154.90 2,234.10 2,313.30 2,392.50 2,471.70 2,550.90 2,679.60 2,808.30 2,937.00 3,065.70 3,194.40 3,323.10 3,451.80 3,580.50 3,709.20 3,837.90 3,966.60
W2 1/1/2002 P1 01 Januari 2002 SSB 10% W 2 P1 3,408.90 3,570.60 3,732.30 3,894.00 4,055.70 4,217.40 4,379.10
W2 1/1/2002 P2 01 Januari 2002 SSB 10% W 2 P2 3,577.20 3,745.50 3,913.80 4,082.10 4,250.40 4,418.70 4,587.00
W2 1/1/2002 P3 01 Januari 2002 SSB 10% W 2 P3 3,752.10 3,927.00 4,101.90 4,276.80 4,451.70 4,626.60 4,801.50
W1 1/1/2002 P1 01 Januari 2002 SSB 10% W 1 P1 4,055.70 4,217.40 4,397.80 4,578.20 4,758.60 4,939.00 5,119.40
W1 1/1/2002 P2 01 Januari 2002 SSB 10% W 1 P2 4,224.00 4,412.10 4,600.20 4,788.30 4,976.40 5,164.50 5,352.60
W1 1/1/2002 P3 01 Januari 2002 SSB 10% W 1 P3 4,419.80 4,615.60 4,811.40 5,007.20 5,203.00 5,398.80 5,594.60
W8 1/1/2002 P1 01 Januari 2002 SSB 10% W 8 P1 642.51 682.44 722.37 762.30 802.23 842.16 882.09 922.02 961.95 1,001.88 1,041.81 1,081.74 1,121.67 1,174.91 1,228.15 1,281.39 1,334.63 1,387.87 1,441.11 1,494.35 1,547.59 1,600.83 1,654.07
W8 1/1/2002 P2 01 Januari 2002 SSB 10% W 8 P2 683.65 724.79 765.93 807.07 848.21 889.35 930.49 971.63 1,012.77 1,053.91 1,095.05 1,136.19 1,191.85 1,247.51 1,303.17 1,358.83 1,414.49 1,470.15 1,525.81 1,581.47 1,637.13 1,692.79 1,748.45
W8 1/1/2002 P3 01 Januari 2002 SSB 10% W 8 P3 726.00 768.35 810.70 853.05 895.40 937.75 980.10 1,022.45 1,064.80 1,107.15 1,149.50 1,207.58 1,265.66 1,323.74 1,381.82 1,439.90 1,497.98 1,556.06 1,614.14 1,672.22 1,730.30 1,788.38 1,846.46
N12 1/1/2002 P1 01 Januari 2002 SSB N 12 P1 510.62 540.87 571.12 601.37 631.62 661.87 692.12 722.37 762.30 802.23 842.16 882.09 922.02 961.95 1,001.88 1,041.81 1,081.74
N12 1/1/2002 P2 01 Januari 2002 SSB N 12 P2 542.08 573.54 605.00 636.46 667.92 699.38 730.84 771.98 813.12 854.26 895.40 936.54 977.68 1,018.82 1,059.96 1,101.10 1,142.24
N12 1/1/2002 P3 01 Januari 2002 SSB N 12 P3 574.75 607.42 640.09 672.76 705.43 738.10 780.45 822.80 865.15 907.50 949.85 992.20 1,034.55 1,076.90 1,119.25 1,161.60 1,203.95
J7 1/1/2002 P1 01 Januari 2002 SSB J 7 P1 659.45 700.59 741.73 782.87 824.01 865.15 906.29 947.43 988.57 1,029.71 1,070.85 1,111.99 1,153.13 1,206.37 1,259.61 1,312.85 1,366.09 1,419.33 1,472.57 1,525.81 1,579.05 1,632.29 1,685.53 1,738.77 1,792.01
J7 1/1/2002 P2 01 Januari 2002 SSB J 7 P2 701.80 744.15 786.50 828.85 871.20 913.55 955.90 998.25 1,040.60 1,082.95 1,125.30 1,167.65 1,223.31 1,278.97 1,334.63 1,390.29 1,445.95 1,501.61 1,557.27 1,612.93 1,668.59 1,724.25 1,779.91 1,835.57 1,891.23
J7 1/1/2002 P3 01 Januari 2002 SSB J 7 P3 745.36 788.92 832.48 876.04 919.60 963.16 1,006.72 1,050.28 1,093.84 1,137.40 1,180.96 1,239.04 1,297.12 1,355.20 1,413.28 1,471.36 1,529.44 1,587.52 1,645.60 1,703.68 1,761.76 1,819.84 1,877.92 1,936.00 1,994.08
N13 1/1/2002 P1 01 Januari 2002 SSB N 13 P1 465.85 496.10 526.35 556.60 586.85 617.10 647.35 677.60 707.85 738.10 768.35 798.60 828.85 859.10
N13 1/1/2002 P2 01 Januari 2002 SSB N 13 P2 497.31 528.77 560.23 591.69 623.15 654.61 686.07 717.53 748.99 780.45 811.91 843.37 874.83 906.29
N13 1/1/2002 P3 01 Januari 2002 SSB N 13 P3 529.98 562.65 595.32 627.99 660.66 693.33 726.00 758.67 791.34 824.01 856.68 889.35 922.02 954.69
VU7 1/1/2002 P1 01 Januari 2002 SSB 10% VU 7 P1 5,478.00 6,017.00 6,369.00 6,622.00
R11 1/1/2002 P1 01 Januari 2002 SSB 10% R 11 P1 464.64 494.89 525.14 555.39 585.64 615.89 646.14 676.39 706.64 736.89 767.14 797.39 827.64
R11 1/1/2002 P2 01 Januari 2002 SSB 10% R 11 P2 496.10 527.56 559.02 590.48 621.94 653.40 684.86 716.32 747.78 779.24 810.70 842.16 873.62
R11 1/1/2002 P3 01 Januari 2002 SSB 10% R 11 P3 528.77 561.44 594.11 626.78 659.45 692.12 724.79 757.46 790.13 822.80 855.47 888.14 920.81
U14 1/1/2002 P1 01 Januari 2002 SSB U 14 P1 532.40 562.65 592.90 623.15 653.40 683.65 713.90 744.15 774.40 814.33 854.26 894.19 934.12 974.05 1,013.98 1,053.91 1,093.84 1,133.77 1,173.70 1,213.63 1,253.56
U14 1/1/2002 P2 01 Januari 2002 SSB U 14 P2 563.86 595.32 626.78 658.24 689.70 721.16 752.62 784.08 825.22 866.36 907.50 948.64 989.78 1,030.92 1,072.06 1,113.20 1,154.34 1,195.48 1,236.62 1,277.76 1,318.90
U14 1/1/2002 P3 01 Januari 2002 SSB U 14 P3 596.53 629.20 661.87 694.54 727.21 759.88 792.55 834.90 877.25 919.60 961.95 1,004.30 1,046.65 1,089.00 1,131.35 1,173.70 1,216.05 1,258.40 1,300.75 1,343.10 1,385.45
N22 1/11/2002 P1 01 November 2002 SSM N 22 P1 1,532.34 1,585.58 1,638.82 1,692.06 1,745.30 1,798.54 1,877.19 1,955.84 2,034.49 2,113.14 2,191.79 2,270.44
N22 1/11/2002 P2 01 November 2002 SSM N 22 P2 1,646.08 1,704.16 1,762.24 1,820.32 1,906.23 1,992.14 2,078.05 2,163.96 2,249.87 2,335.78 2,421.69 2,507.60
N27 1/11/2002 P1 01 November 2002 SSM N 27 P1 963.64 1,016.88 1,070.12 1,123.36 1,176.60 1,229.84 1,283.08 1,336.32 1,389.56 1,442.80 1,496.04 1,549.28 1,602.52 1,655.76 1,709.00 1,762.24 1,815.48 1,868.72 1,921.96 1,975.20 2,028.44 2,107.09 2,185.74 2,264.39 2,343.04 2,421.69
N27 1/11/2002 P2 01 November 2002 SSM N 27 P2 1,019.30 1,074.96 1,130.62 1,186.28 1,241.94 1,297.60 1,353.26 1,408.92 1,464.58 1,520.24 1,575.90 1,631.56 1,687.22 1,742.88 1,798.54 1,854.20 1,909.86 1,965.52 2,021.18 2,076.84 2,159.12 2,241.40 2,323.68 2,405.96 2,488.24 2,570.52
N27 1/11/2002 P3 01 November 2002 SSM N 27 P3 1,077.38 1,135.46 1,193.54 1,251.62 1,309.70 1,367.78 1,425.86 1,483.94 1,542.02 1,600.10 1,658.18 1,716.26 1,774.34 1,832.42 1,890.50 1,948.58 2,006.66 2,064.74 2,122.82 2,208.73 2,294.64 2,380.55 2,466.46 2,552.37 2,638.28 2,724.19
R1 1/11/2002 P1 01 November 2002 SSM R 1 P1 479.64 509.89 540.14 570.39 600.64 630.89 661.14 691.39 721.64 751.89 782.14 812.39 842.64 872.89
R1 1/11/2002 P2 01 November 2002 SSM R 1 P2 511.10 542.56 574.02 605.48 636.94 668.40 699.86 731.32 762.78 794.24 825.70 857.16 888.62 920.08
R1 1/11/2002 P3 01 November 2002 SSM R 1 P3 543.77 576.44 609.11 641.78 674.45 707.12 739.79 772.46 805.13 837.80 870.47 903.14 935.81 968.48
N17 1/11/2002 P1 01 November 2002 SSM N 17 P1 656.30 696.23 736.16 776.09 816.02 855.95 895.88 935.81 975.74 1,015.67 1,055.60 1,095.53 1,135.46 1,188.70 1,241.94 1,295.18 1,348.42 1,401.66 1,454.90 1,508.14 1,561.38 1,614.62 1,667.86 1,721.10
N17 1/11/2002 P2 01 November 2002 SSM N 17 P2 697.44 738.58 779.72 820.86 862.00 903.14 944.28 985.42 1,026.56 1,067.70 1,108.84 1,149.98 1,205.64 1,261.30 1,316.96 1,372.62 1,428.28 1,483.94 1,539.60 1,595.26 1,650.92 1,706.58 1,762.24 1,817.90
N17 1/11/2002 P3 01 November 2002 SSM N 17 P3 739.79 782.14 824.49 866.84 909.19 951.54 993.89 1,036.24 1,078.59 1,120.94 1,163.29 1,221.37 1,279.45 1,337.53 1,395.61 1,453.69 1,511.77 1,569.85 1,627.93 1,686.01 1,744.09 1,802.17 1,860.25 1,918.33
N1 1/11/2002 P1 01 November 2002 SSM N 1 P1 480.85 511.10 541.35 571.60 601.85 632.10 662.35 692.60 722.85 753.10 783.35 813.60 843.85 874.10 904.35 934.60 964.85 995.10 1,025.35 1,055.60 1,085.85 1,116.10
N1 1/11/2002 P2 01 November 2002 SSM N 1 P2 512.31 543.77 575.23 606.69 638.15 669.61 701.07 732.53 763.99 795.45 826.91 858.37 889.83 921.29 952.75 984.21 1,015.67 1,047.13 1,078.59 1,110.05 1,141.51 1,172.97
N1 1/11/2002 P3 01 November 2002 SSM N 1 P3 544.98 577.65 610.32 642.99 675.66 708.33 741.00 773.67 806.34 839.01 871.68 904.35 937.02 969.69 1,002.36 1,035.03 1,067.70 1,100.37 1,133.04 1,165.71 1,198.38 1,231.05
N4 1/11/2002 P1 01 November 2002 SSM N 4 P1 525.62 555.87 586.12 616.37 646.62 676.87 707.12 737.37 777.30 817.23 857.16 897.09 937.02 976.95 1,016.88 1,056.81 1,096.74 1,136.67
N4 1/11/2002 P2 01 November 2002 SSM N 4 P2 589.75 622.42 655.09 687.76 720.43 753.10 795.45 837.80 880.15 922.50 964.85 1,007.20 1,049.55 1,091.90 1,134.25 1,176.60 1,218.95 1,261.30
N3 1/11/2002 P1 01 November 2002 SSM N 3 P1 525.62 555.87 586.12 616.37 646.62 676.87 707.12 737.37 777.30 817.23 857.16 897.09 937.02 976.95 1,016.88 1,056.81 1,096.74 1,136.67
N3 1/11/2002 P2 01 November 2002 SSM N 3 P2 557.08 588.54 620.00 651.46 682.92 714.38 745.84 786.98 828.12 869.26 910.40 951.54 992.68 1,033.82 1,074.96 1,116.10 1,157.24 1,198.38
N3 1/11/2002 P3 01 November 2002 SSM N 3 P3 589.75 622.42 655.09 687.76 720.43 753.10 795.45 837.80 880.15 922.50 964.85 1,007.20 1,049.55 1,091.90 1,134.25 1,176.60 1,218.95 1,261.30
R12 1/11/2002 P1 01 November 2002 SSM 10% R 12 P1 661.14 701.07 741.00 780.93 820.86 860.79 900.72 940.65 980.58 1,020.51 1,060.44 1,100.37 1,140.30 1,180.23 1,220.16
R12 1/11/2002 P2 01 November 2002 SSM 10% R 12 P2 744.63 786.98 829.33 871.68 914.03 956.38 998.73 1,041.08 1,083.43 1,125.78 1,168.13 1,210.48 1,252.83 1,295.18 1,337.53
R14 1/11/2002 P1 01 November 2002 SSM R 14 P1 946.70 999.94 1,053.18 1,106.42 1,159.66 1,212.90 1,266.14
R14 1/11/2002 P2 01 November 2002 SSM R 14 P2 1,060.44 1,118.52 1,176.60 1,234.68 1,292.76 1,350.84 1,408.92
R16 1/11/2002 P1 01 November 2002 SSM R 16 P1 1,045.92 1,099.16 1,152.40 1,205.64 1,258.88 1,312.12 1,365.36 1,418.60 1,471.84
R16 1/11/2002 P2 01 November 2002 SSM R 16 P2 1,159.66 1,217.74 1,275.82 1,333.90 1,391.98 1,450.06 1,508.14 1,566.22 1,624.30
R3 1/11/2002 P1 01 November 2002 SSM R 3 P1 519.57 549.82 580.07 610.32 640.57 670.82 701.07 731.32 761.57 791.82 822.07 852.32 882.57 912.82 943.07 973.32 1,003.57
R3 1/11/2002 P2 01 November 2002 SSM R 3 P2 551.03 582.49 613.95 645.41 676.87 708.33 739.79 771.25 802.71 834.17 865.63 897.09 928.55 960.01 991.47 1,022.93 1,054.39
R3 1/11/2002 P3 01 November 2002 SSM R 3 P3 583.70 616.37 649.04 681.71 714.38 747.05 779.72 812.39 845.06 877.73 910.40 943.07 975.74 1,008.41 1,041.08 1,073.75 1,106.42
R17 1/11/2002 P1 01 November 2002 SSM R 17 P1 933.39 973.32 1,013.25 1,053.18 1,093.11 1,133.04 1,172.97 1,212.90 1,266.14 1,319.38 1,372.62 1,425.86 1,479.10 1,532.34 1,585.58
R17 1/11/2002 P2 01 November 2002 SSM R 17 P2 974.53 1,015.67 1,056.81 1,097.95 1,139.09 1,180.23 1,221.37 1,277.03 1,332.69 1,388.35 1,444.01 1,499.67 1,555.33 1,610.99 1,666.65
R17 1/11/2002 P3 01 November 2002 SSM R 17 P3 1,016.88 1,059.23 1,101.58 1,143.93 1,186.28 1,228.63 1,286.71 1,344.79 1,402.87 1,460.95 1,519.03 1,577.11 1,635.19 1,693.27 1,751.35
R22 1/11/2002 P1 01 November 2002 SSM R 22 P1 1,045.92 1,085.85 1,125.78 1,165.71 1,205.64 1,245.57 1,285.50 1,325.43 1,365.36 1,405.29 1,458.53 1,511.77 1,565.01 1,618.25 1,671.49 1,724.73 1,777.97 1,831.21 1,884.45 1,937.69 1,990.93 2,044.17
R22 1/11/2002 P2 01 November 2002 SSM R 22 P2 1,129.41 1,171.76 1,214.11 1,256.46 1,298.81 1,341.16 1,383.51 1,425.86 1,483.94 1,542.02 1,600.10 1,658.18 1,716.26 1,774.34 1,832.42 1,890.50 1,948.58 2,006.66 2,064.74 2,122.82 2,180.90 2,238.98
R24 1/11/2002 P1 01 November 2002 SSM 10% R 24 P1 1,399.24 1,452.48 1,505.72 1,558.96 1,612.20 1,665.44 1,718.68 1,771.92 1,825.16 1,878.40 1,958.26 2,038.12 2,117.98 2,197.84 2,277.70 2,357.56
R24 1/11/2002 P2 01 November 2002 SSM 10% R 24 P2 1,512.98 1,571.06 1,629.14 1,687.22 1,745.30 1,803.38 1,861.46 1,919.54 2,006.66 2,093.78 2,180.90 2,268.02 2,355.14 2,442.26 2,529.38 2,616.50
A3 1/11/2002 P1 01 November 2002 SSM A 3 P1 741.00 771.25 801.50 831.75 871.68 911.61 951.54 991.47 1,031.40 1,071.33 1,111.26 1,151.19 1,191.12 1,231.05
A3 1/11/2002 P2 01 November 2002 SSM A 3 P2 772.46 803.92 835.38 876.52 917.66 958.80 999.94 1,041.08 1,082.22 1,123.36 1,164.50 1,205.64 1,246.78 1,287.92
A3 1/11/2002 P3 01 November 2002 SSM A 3 P3 805.13 837.80 880.15 922.50 964.85 1,007.20 1,049.55 1,091.90 1,134.25 1,176.60 1,218.95 1,261.30 1,303.65 1,346.00
A4 1/11/2002 P1 01 November 2002 SSM A 4 P1 741.00 771.25 801.50 831.75 871.68 911.61 951.54 991.47 1,031.40 1,071.33 1,111.26 1,151.19 1,191.12 1,231.05
A4 1/11/2002 P2 01 November 2002 SSM A 4 P2 805.13 837.80 880.15 922.50 964.85 1,007.20 1,049.55 1,091.90 1,134.25 1,176.60 1,218.95 1,261.30 1,303.65 1,346.00
A11 1/11/2002 P1 01 November 2002 SSM A 11 P1 548.61 578.86 609.11 649.04 688.97 728.90 768.83 808.76 848.69 888.62 928.55 968.48 1,008.41 1,048.34 1,088.27 1,128.20 1,168.13 1,208.06 1,247.99
A11 1/11/2002 P2 01 November 2002 SSM A 11 P2 580.07 611.53 652.67 693.81 734.95 776.09 817.23 858.37 899.51 940.65 981.79 1,022.93 1,064.07 1,105.21 1,146.35 1,187.49 1,228.63 1,269.77 1,310.91
A11 1/11/2002 P3 01 November 2002 SSM A 11 P3 612.74 655.09 697.44 739.79 782.14 824.49 866.84 909.19 951.54 993.89 1,036.24 1,078.59 1,120.94 1,163.29 1,205.64 1,247.99 1,290.34 1,332.69 1,375.04
A12 1/11/2002 P1 01 November 2002 SSM A 12 P1 548.61 578.86 609.11 649.04 688.97 728.90 768.83 808.76 848.69 888.62 928.55 968.48 1,008.41 1,048.34 1,088.27 1,128.20 1,168.13 1,208.06 1,247.99
A12 1/11/2002 P2 01 November 2002 SSM A 12 P2 612.74 655.09 697.44 739.79 782.14 824.49 866.84 909.19 951.54 993.89 1,036.24 1,078.59 1,120.94 1,163.29 1,205.64 1,247.99 1,290.34 1,332.69 1,375.04
A17 1/11/2002 P1 01 November 2002 SSM A 17 P1 663.56 704.70 745.84 786.98 828.12 869.26 910.40 951.54 992.68 1,033.82 1,074.96 1,116.10 1,157.24 1,210.48 1,263.72 1,316.96 1,370.20 1,423.44 1,476.68 1,529.92 1,583.16 1,636.40 1,689.64 1,742.88
A17 1/11/2002 P2 01 November 2002 SSM A 17 P2 705.91 748.26 790.61 832.96 875.31 917.66 960.01 1,002.36 1,044.71 1,087.06 1,129.41 1,171.76 1,227.42 1,283.08 1,338.74 1,394.40 1,450.06 1,505.72 1,561.38 1,617.04 1,672.70 1,728.36 1,784.02 1,839.68
A17 1/11/2002 P3 01 November 2002 SSM A 17 P3 749.47 793.03 836.59 880.15 923.71 967.27 1,010.83 1,054.39 1,097.95 1,141.51 1,185.07 1,243.15 1,301.23 1,359.31 1,417.39 1,475.47 1,533.55 1,591.63 1,649.71 1,707.79 1,765.87 1,823.95 1,882.03 1,940.11
A18 1/11/2002 P1 01 November 2002 SSM A 18 P1 663.56 704.70 745.84 786.98 828.12 869.26 910.40 951.54 992.68 1,033.82 1,074.96 1,116.10 1,157.24 1,210.48 1,263.72 1,316.96 1,370.20 1,423.44 1,476.68 1,529.92 1,583.16 1,636.40 1,689.64 1,742.88
A18 1/11/2002 P2 01 November 2002 SSM A 18 P2 749.47 793.03 836.59 880.15 923.71 967.27 1,010.83 1,054.39 1,097.95 1,141.51 1,185.07 1,243.15 1,301.23 1,359.31 1,417.39 1,475.47 1,533.55 1,591.63 1,649.71 1,707.79 1,765.87 1,823.95 1,882.03 1,940.11
A21 1/11/2002 P1 01 November 2002 SSM A 21 P1 1,388.35 1,441.59 1,494.83 1,548.07 1,601.31 1,654.55 1,707.79 1,761.03 1,814.27 1,894.13 1,973.99 2,053.85 2,133.71 2,213.57 2,293.43
A21 1/11/2002 P2 01 November 2002 SSM A 21 P2 1,444.01 1,499.67 1,555.33 1,610.99 1,666.65 1,722.31 1,777.97 1,833.63 1,917.12 2,000.61 2,084.10 2,167.59 2,251.08 2,334.57 2,418.06
A21 1/11/2002 P3 01 November 2002 SSM A 21 P3 1,502.09 1,560.17 1,618.25 1,676.33 1,734.41 1,792.49 1,850.57 1,937.69 2,024.81 2,111.93 2,199.05 2,286.17 2,373.29 2,460.41 2,547.53
A29 1/11/2002 P1 01 November 2002 SSM A 29 P1 1,192.33 1,245.57 1,298.81 1,352.05 1,405.29 1,458.53 1,511.77 1,565.01 1,618.25 1,671.49 1,724.73 1,777.97 1,831.21 1,884.45 1,937.69 1,990.93 2,044.17 2,124.03 2,203.89 2,283.75 2,363.61 2,443.47
A29 1/11/2002 P2 01 November 2002 SSM A 29 P2 1,249.20 1,306.07 1,362.94 1,419.81 1,476.68 1,533.55 1,590.42 1,647.29 1,704.16 1,761.03 1,817.90 1,874.77 1,931.64 1,988.51 2,045.38 2,102.25 2,185.74 2,269.23 2,352.72 2,436.21 2,519.70 2,603.19
A29 1/11/2002 P3 01 November 2002 SSM A 29 P3 1,308.49 1,367.78 1,427.07 1,486.36 1,545.65 1,604.94 1,664.23 1,723.52 1,782.81 1,842.10 1,901.39 1,960.68 2,019.97 2,079.26 2,138.55 2,225.67 2,312.79 2,399.91 2,487.03 2,574.15 2,661.27 2,748.39
DS45 1/11/2002 P1 01 November 2002 SSM DS 45 P1 2,213.96 2,293.82 2,373.68 2,453.54 2,533.40 2,613.26 2,746.36 2,879.46 3,012.56 3,145.66 3,278.76 3,411.86 3,544.96 3,678.06 3,811.16 3,970.88 4,130.60 4,290.32 4,450.04 4,609.76 4,769.48
DS45 1/11/2002 P2 01 November 2002 SSM DS 45 P2 2,297.45 2,380.94 2,464.43 2,547.92 2,631.41 2,769.35 2,907.29 3,045.23 3,183.17 3,321.11 3,459.05 3,596.99 3,734.93 3,872.87 4,038.64 4,204.41 4,370.18 4,535.95 4,701.72 4,867.49 5,033.26
DS45 1/11/2002 P3 01 November 2002 SSM DS 45 P3 2,384.57 2,471.69 2,558.81 2,645.93 2,789.92 2,933.91 3,077.90 3,221.89 3,365.88 3,509.87 3,653.86 3,797.85 3,941.84 4,113.66 4,285.48 4,457.30 4,629.12 4,800.94 4,972.76 5,144.58 5,316.40
F17 1/11/2002 P1 01 November 2002 SSM F 17 P1 661.14 701.07 741.00 780.93 820.86 860.79 900.72 940.65 980.58 1,020.51 1,060.44 1,100.37 1,140.30 1,193.54 1,246.78 1,300.02 1,353.26 1,406.50 1,459.74 1,512.98 1,566.22 1,619.46 1,672.70 1,725.94
F17 1/11/2002 P2 01 November 2002 SSM F 17 P2 702.28 743.42 784.56 825.70 866.84 907.98 949.12 990.26 1,031.40 1,072.54 1,113.68 1,154.82 1,210.48 1,266.14 1,321.80 1,377.46 1,433.12 1,488.78 1,544.44 1,600.10 1,655.76 1,711.42 1,767.08 1,822.74
F17 1/11/2002 P3 01 November 2002 SSM F 17 P3 744.63 786.98 829.33 871.68 914.03 956.38 998.73 1,041.08 1,083.43 1,125.78 1,168.13 1,226.21 1,284.29 1,342.37 1,400.45 1,458.53 1,516.61 1,574.69 1,632.77 1,690.85 1,748.93 1,807.01 1,865.09 1,923.17
F14 1/11/2002 P1 01 November 2002 SSM F 14 P1 1,032.61 1,072.54 1,112.47 1,165.71 1,218.95 1,272.19 1,325.43 1,378.67 1,431.91 1,485.15
F14 1/11/2002 P2 01 November 2002 SSM F 14 P2 1,116.10 1,174.18 1,232.26 1,290.34 1,348.42 1,406.50 1,464.58 1,522.66 1,580.74 1,638.82
F11 1/11/2002 P1 01 November 2002 SSM F 11 P1 548.61 578.86 609.11 639.36 669.61 699.86 730.11 760.36 790.61 830.54 870.47 910.40 950.33 990.26 1,030.19 1,070.12 1,110.05 1,149.98 1,189.91 1,229.84 1,269.77
F11 1/11/2002 P2 01 November 2002 SSM F 11 P2 580.07 611.53 642.99 674.45 705.91 737.37 768.83 800.29 841.43 882.57 923.71 964.85 1,005.99 1,047.13 1,088.27 1,129.41 1,170.55 1,211.69 1,252.83 1,293.97 1,335.11
F11 1/11/2002 P3 01 November 2002 SSM F 11 P3 612.74 645.41 678.08 710.75 743.42 776.09 808.76 851.11 893.46 935.81 978.16 1,020.51 1,062.86 1,105.21 1,147.56 1,189.91 1,232.26 1,274.61 1,316.96 1,359.31 1,401.66
F22 1/11/2002 P1 01 November 2002 SSM F 22 P1 1,545.65 1,598.89 1,652.13 1,705.37 1,758.61 1,811.85 1,891.71 1,971.57 2,051.43 2,131.29 2,211.15 2,291.01
F22 1/11/2002 P2 01 November 2002 SSM F 22 P2 1,659.39 1,717.47 1,775.55 1,833.63 1,920.75 2,007.87 2,094.99 2,182.11 2,269.23 2,356.35 2,443.47 2,530.59
FM32 1/11/2002 P1 01 November 2002 SSM FM 32 P1 1,935.27 2,013.92 2,092.57 2,171.22 2,249.87 2,328.52 2,407.17 2,485.82 2,564.47 2,643.12 2,721.77
FM32 1/11/2002 P2 01 November 2002 SSM FM 32 P2 2,103.46 2,189.37 2,275.28 2,361.19 2,447.10 2,533.01 2,618.92 2,704.83 2,790.74 2,876.65 2,962.56
FT17 1/11/2002 P1 01 November 2002 SSM FT 17 P1 674.45 715.59 756.73 797.87 839.01 880.15 921.29 962.43 1,003.57 1,044.71 1,085.85 1,126.99 1,168.13 1,221.37 1,274.61 1,327.85 1,381.09 1,434.33 1,487.57 1,540.81 1,594.05 1,647.29 1,700.53 1,753.77 1,807.01 1,860.25
FT17 1/11/2002 P2 01 November 2002 SSM FT 17 P2 716.80 759.15 801.50 843.85 886.20 928.55 970.90 1,013.25 1,055.60 1,097.95 1,140.30 1,182.65 1,238.31 1,293.97 1,349.63 1,405.29 1,460.95 1,516.61 1,572.27 1,627.93 1,683.59 1,739.25 1,794.91 1,850.57 1,906.23 1,961.89
FT17 1/11/2002 P3 01 November 2002 SSM FT 17 P3 760.36 803.92 847.48 891.04 934.60 978.16 1,021.72 1,065.28 1,108.84 1,152.40 1,195.96 1,254.04 1,312.12 1,370.20 1,428.28 1,486.36 1,544.44 1,602.52 1,660.60 1,718.68 1,776.76 1,834.84 1,892.92 1,951.00 2,009.08 2,067.16
J7 1/11/2002 P1 01 November 2002 SSM J 7 P1 674.45 715.59 756.73 797.87 839.01 880.15 921.29 962.43 1,003.57 1,044.71 1,085.85 1,126.99 1,168.13 1,221.37 1,274.61 1,327.85 1,381.09 1,434.33 1,487.57 1,540.81 1,594.05 1,647.29 1,700.53 1,753.77 1,807.01 1,860.25
J7 1/11/2002 P2 01 November 2002 SSM J 7 P2 716.80 759.15 801.50 843.85 886.20 928.55 970.90 1,013.25 1,055.60 1,097.95 1,140.30 1,182.65 1,238.31 1,293.97 1,349.63 1,405.29 1,460.95 1,516.61 1,572.27 1,627.93 1,683.59 1,739.25 1,794.91 1,850.57 1,906.23 1,961.89
J7 1/11/2002 P3 01 November 2002 SSM J 7 P3 760.36 803.92 847.48 891.04 934.60 978.16 1,021.72 1,065.28 1,108.84 1,152.40 1,195.96 1,254.04 1,312.12 1,370.20 1,428.28 1,486.36 1,544.44 1,602.52 1,660.60 1,718.68 1,776.76 1,834.84 1,892.92 1,951.00 2,009.08 2,067.16
J17 1/11/2002 P1 01 November 2002 SSM J 17 P1 674.45 715.59 756.73 797.87 839.01 880.15 921.29 962.43 1,003.57 1,044.71 1,085.85 1,126.99 1,168.13 1,221.37 1,274.61 1,327.85 1,381.09 1,434.33 1,487.57 1,540.81 1,594.05 1,647.29 1,700.53 1,753.77 1,807.01 1,860.25
J17 1/11/2002 P2 01 November 2002 SSM J 17 P2 716.80 759.15 801.50 843.85 886.20 928.55 970.90 1,013.25 1,055.60 1,097.95 1,140.30 1,182.65 1,238.31 1,293.97 1,349.63 1,405.29 1,460.95 1,516.61 1,572.27 1,627.93 1,683.59 1,739.25 1,794.91 1,850.57 1,906.23 1,961.89
J17 1/11/2002 P3 01 November 2002 SSM J 17 P3 760.36 803.92 847.48 891.04 934.60 978.16 1,021.72 1,065.28 1,108.84 1,152.40 1,195.96 1,254.04 1,312.12 1,370.20 1,428.28 1,486.36 1,544.44 1,602.52 1,660.60 1,718.68 1,776.76 1,834.84 1,892.92 1,951.00 2,009.08 2,067.16
J22 1/11/2002 P1 01 November 2002 SSM J 22 P1 1,545.65 1,598.89 1,652.13 1,705.37 1,758.61 1,811.85 1,891.71 1,971.57 2,051.43 2,131.29 2,211.15 2,291.01
J22 1/11/2002 P2 01 November 2002 SSM J 22 P2 1,659.39 1,717.47 1,775.55 1,833.63 1,920.75 2,007.87 2,094.99 2,182.11 2,269.23 2,356.35 2,443.47 2,530.59
J26 1/11/2002 P1 01 November 2002 SSM J 26 P1 1,773.13 1,852.99 1,932.85 2,012.71 2,092.57 2,172.43 2,252.29 2,332.15 2,412.01
J26 1/11/2002 P2 01 November 2002 SSM J 26 P2 1,943.74 2,030.86 2,117.98 2,205.10 2,292.22 2,379.34 2,466.46 2,553.58 2,640.70
J29 1/11/2002 P1 01 November 2002 SSM J 29 P1 1,239.52 1,292.76 1,346.00 1,399.24 1,452.48 1,505.72 1,558.96 1,612.20 1,665.44 1,718.68 1,771.92 1,825.16 1,878.40 1,931.64 1,984.88 2,038.12 2,117.98 2,197.84 2,277.70 2,357.56 2,437.42
J29 1/11/2002 P2 01 November 2002 SSM J 29 P2 1,296.39 1,353.26 1,410.13 1,467.00 1,523.87 1,580.74 1,637.61 1,694.48 1,751.35 1,808.22 1,865.09 1,921.96 1,978.83 2,035.70 2,092.57 2,176.06 2,259.55 2,343.04 2,426.53 2,510.02 2,593.51
J29 1/11/2002 P3 01 November 2002 SSM J 29 P3 1,355.68 1,414.97 1,474.26 1,533.55 1,592.84 1,652.13 1,711.42 1,770.71 1,830.00 1,889.29 1,948.58 2,007.87 2,067.16 2,126.45 2,214.78 2,303.11 2,391.44 2,479.77 2,568.10 2,656.43 2,744.76
J30 1/11/2002 P1 01 November 2002 SSM J 30 P1 1,239.52 1,292.76 1,346.00 1,399.24 1,452.48 1,505.72 1,558.96 1,612.20 1,665.44 1,718.68 1,771.92 1,825.16 1,878.40 1,931.64 1,984.88 2,038.12 2,117.98 2,197.84 2,277.70 2,357.56 2,437.42
J30 1/11/2002 P2 01 November 2002 SSM J 30 P2 1,355.68 1,414.97 1,474.26 1,533.55 1,592.84 1,652.13 1,711.42 1,770.71 1,830.00 1,889.29 1,948.58 2,007.87 2,067.16 2,126.45 2,214.78 2,303.11 2,391.44 2,479.77 2,568.10 2,656.43 2,744.76
L29 1/11/2002 P1 01 November 2002 SSM L 29 P1 1,177.81 1,231.05 1,284.29 1,337.53 1,390.77 1,444.01 1,497.25 1,550.49 1,603.73 1,656.97 1,710.21 1,763.45 1,816.69 1,869.93 1,923.17 1,976.41 2,029.65 2,108.30 2,186.95 2,265.60 2,344.25 2,422.90
L29 1/11/2002 P2 01 November 2002 SSM L 29 P2 1,234.68 1,291.55 1,348.42 1,405.29 1,462.16 1,519.03 1,575.90 1,632.77 1,689.64 1,746.51 1,803.38 1,860.25 1,917.12 1,973.99 2,030.86 2,087.73 2,170.01 2,252.29 2,334.57 2,416.85 2,499.13 2,581.41
L29 1/11/2002 P3 01 November 2002 SSM L 29 P3 1,293.97 1,353.26 1,412.55 1,471.84 1,531.13 1,590.42 1,649.71 1,709.00 1,768.29 1,827.58 1,886.87 1,946.16 2,005.45 2,064.74 2,124.03 2,209.94 2,295.85 2,381.76 2,467.67 2,553.58 2,639.49 2,725.40
M54 1/11/2002 P1 01 November 2002 SSM M 54 P1 4,568.62 4,748.91 4,948.56 5,148.21 5,347.86 5,547.51 5,747.16 5,946.81
M54 1/11/2002 P2 01 November 2002 SSM M 54 P2 4,972.76 5,189.35 5,405.94 5,622.53 5,839.12 6,055.71 6,272.30 6,488.89
N11 1/11/2002 P1 01 November 2002 SSM N 11 P1 525.62 555.87 586.12 616.37 646.62 676.87 707.12 737.37 777.30 817.23 857.16 897.09 937.02 976.95 1,016.88 1,056.81 1,096.74 1,136.67 1,176.60 1,216.53 1,256.46 1,296.39
N11 1/11/2002 P2 01 November 2002 SSM N 11 P2 557.08 588.54 620.00 651.46 682.92 714.38 745.84 786.98 828.12 869.26 910.40 951.54 992.68 1,033.82 1,074.96 1,116.10 1,157.24 1,198.38 1,239.52 1,280.66 1,321.80 1,362.94
N11 1/11/2002 P3 01 November 2002 SSM N 11 P3 589.75 622.42 655.09 687.76 720.43 753.10 795.45 837.80 880.15 922.50 964.85 1,007.20 1,049.55 1,091.90 1,134.25 1,176.60 1,218.95 1,261.30 1,303.65 1,346.00 1,388.35 1,430.70
N12 1/11/2002 P1 01 November 2002 SSM N 12 P1 525.62 555.87 586.12 616.37 646.62 676.87 707.12 737.37 777.30 817.23 857.16 897.09 937.02 976.95 1,016.88 1,056.81 1,096.74 1,136.67 1,176.60 1,216.53 1,256.46 1,296.39
N12 1/11/2002 P2 01 November 2002 SSM N 12 P2 589.75 622.42 655.09 687.76 720.43 753.10 795.45 837.80 880.15 922.50 964.85 1,007.20 1,049.55 1,091.90 1,134.25 1,176.60 1,218.95 1,261.30 1,303.65 1,346.00 1,388.35 1,430.70
N14 1/11/2002 P1 01 November 2002 SSM N 14 P1 1,030.19 1,070.12 1,110.05 1,163.29 1,216.53 1,269.77 1,323.01 1,376.25 1,429.49 1,482.73
N14 1/11/2002 P2 01 November 2002 SSM N 14 P2 1,113.68 1,171.76 1,229.84 1,287.92 1,346.00 1,404.08 1,462.16 1,520.24 1,578.32 1,636.40
N19 1/11/2002 P1 01 November 2002 SSM N 19 P1 800.29 840.22 880.15 920.08 960.01 999.94 1,039.87 1,079.80 1,119.73 1,159.66 1,199.59 1,252.83 1,306.07 1,359.31 1,412.55 1,465.79 1,519.03 1,572.27 1,625.51 1,678.75 1,731.99 1,785.23 1,838.47
N19 1/11/2002 P2 01 November 2002 SSM N 19 P2 841.43 882.57 923.71 964.85 1,005.99 1,047.13 1,088.27 1,129.41 1,170.55 1,211.69 1,267.35 1,323.01 1,378.67 1,434.33 1,489.99 1,545.65 1,601.31 1,656.97 1,712.63 1,768.29 1,823.95 1,879.61 1,935.27
N19 1/11/2002 P3 01 November 2002 SSM N 19 P3 883.78 926.13 968.48 1,010.83 1,053.18 1,095.53 1,137.88 1,180.23 1,222.58 1,280.66 1,338.74 1,396.82 1,454.90 1,512.98 1,571.06 1,629.14 1,687.22 1,745.30 1,803.38 1,861.46 1,919.54 1,977.62 2,035.70
N20 1/11/2002 P1 01 November 2002 SSM N 20 P1 800.29 840.22 880.15 920.08 960.01 999.94 1,039.87 1,079.80 1,119.73 1,159.66 1,199.59 1,252.83 1,306.07 1,359.31 1,412.55 1,465.79 1,519.03 1,572.27 1,625.51 1,678.75 1,731.99 1,785.23 1,838.47
N20 1/11/2002 P2 01 November 2002 SSM N 20 P2 883.78 926.13 968.48 1,010.83 1,053.18 1,095.53 1,137.88 1,180.23 1,222.58 1,280.66 1,338.74 1,396.82 1,454.90 1,512.98 1,571.06 1,629.14 1,687.22 1,745.30 1,803.38 1,861.46 1,919.54 1,977.62 2,035.70
N26 1/11/2002 P1 01 November 2002 SSM N 26 P1 1,757.40 1,836.05 1,914.70 1,993.35 2,072.00 2,150.65 2,229.30 2,307.95 2,386.60
N26 1/11/2002 P2 01 November 2002 SSM N 26 P2 1,925.59 2,011.50 2,097.41 2,183.32 2,269.23 2,355.14 2,441.05 2,526.96 2,612.87
N32 1/11/2002 P1 01 November 2002 SSM N 32 P1 1,930.43 2,009.08 2,087.73 2,166.38 2,245.03 2,323.68 2,402.33 2,480.98 2,559.63 2,638.28 2,716.93 2,795.58 2,874.23
N32 1/11/2002 P2 01 November 2002 SSM N 32 P2 2,098.62 2,184.53 2,270.44 2,356.35 2,442.26 2,528.17 2,614.08 2,699.99 2,785.90 2,871.81 2,957.72 3,043.63 3,129.54
N36 1/11/2002 P1 01 November 2002 SSM N 36 P1 2,401.12 2,479.77 2,558.42 2,637.07 2,767.75 2,898.43 3,029.11 3,159.79 3,290.47 3,421.15 3,551.83
N36 1/11/2002 P2 01 November 2002 SSM N 36 P2 2,569.31 2,655.22 2,796.79 2,938.36 3,079.93 3,221.50 3,363.07 3,504.64 3,646.21 3,787.78 3,929.35
N41 1/11/2002 P1 01 November 2002 SSM N 41 P1 1,469.81 1,548.46 1,627.11 1,705.76 1,784.41 1,863.06 1,941.71 2,020.36 2,099.01 2,177.66 2,256.31 2,334.96 2,413.61 2,492.26 2,570.91 2,649.56 2,728.21 2,858.89 2,989.57 3,120.25 3,250.93 3,381.61 3,512.29 3,642.97 3,773.65 3,904.33 4,035.01
N41 1/11/2002 P2 01 November 2002 SSM N 41 P2 1,552.09 1,634.37 1,716.65 1,798.93 1,881.21 1,963.49 2,045.77 2,128.05 2,210.33 2,292.61 2,374.89 2,457.17 2,539.45 2,621.73 2,704.01 2,786.29 2,921.81 3,057.33 3,192.85 3,328.37 3,463.89 3,599.41 3,734.93 3,870.45 4,005.97 4,141.49 4,277.01
N41 1/11/2002 P3 01 November 2002 SSM N 41 P3 1,638.00 1,723.91 1,809.82 1,895.73 1,981.64 2,067.55 2,153.46 2,239.37 2,325.28 2,411.19 2,497.10 2,583.01 2,668.92 2,754.83 2,840.74 2,982.31 3,123.88 3,265.45 3,407.02 3,548.59 3,690.16 3,831.73 3,973.30 4,114.87 4,256.44 4,398.01 4,539.58
N44 1/11/2002 P1 01 November 2002 SSM N 44 P1 2,587.85 2,718.53 2,849.21 2,979.89 3,110.57 3,241.25 3,371.93 3,502.61 3,633.29 3,763.97 3,894.65 4,025.33 4,156.01 4,286.69
N44 1/11/2002 P2 01 November 2002 SSM N 44 P2 2,864.94 3,006.51 3,148.08 3,289.65 3,431.22 3,572.79 3,714.36 3,855.93 3,997.50 4,139.07 4,280.64 4,422.21 4,563.78 4,705.35
N48 1/11/2002 P1 01 November 2002 SSM N 48 P1 3,782.12 3,958.78 4,135.44 4,312.10 4,488.76 4,665.42 4,842.08 5,018.74
N48 1/11/2002 P2 01 November 2002 SSM N 48 P2 4,157.22 4,348.40 4,539.58 4,730.76 4,921.94 5,113.12 5,304.30 5,495.48
N52 1/11/2002 P1 01 November 2002 SSM N 52 P1 4,256.44 4,433.10 4,609.76 4,786.42 4,963.08 5,139.74 5,316.40 5,493.06
N52 1/11/2002 P2 01 November 2002 SSM N 52 P2 4,660.58 4,851.76 5,042.94 5,234.12 5,425.30 5,616.48 5,807.66 5,998.84
N54 1/11/2002 P1 01 November 2002 SSM N 54 P1 4,487.55 4,664.21 4,860.23 5,056.25 5,252.27 5,448.29 5,644.31 5,840.33
N54 1/11/2002 P2 01 November 2002 SSM N 54 P2 4,884.43 5,097.39 5,310.35 5,523.31 5,736.27 5,949.23 6,162.19 6,375.15
NT32 1/11/2002 P1 01 November 2002 SSM NT 32 P1 1,930.43 2,009.08 2,087.73 2,166.38 2,245.03 2,323.68 2,402.33 2,480.98 2,559.63 2,638.28 2,716.93 2,795.58 2,874.23
NT32 1/11/2002 P2 01 November 2002 SSM NT 32 P2 2,098.62 2,184.53 2,270.44 2,356.35 2,442.26 2,528.17 2,614.08 2,699.99 2,785.90 2,871.81 2,957.72 3,043.63 3,129.54
NT31 1/11/2002 P1 01 November 2002 SSM NT 31 P1 1,930.43 2,009.08 2,087.73 2,166.38 2,245.03 2,323.68 2,402.33 2,480.98 2,559.63 2,638.28 2,716.93 2,795.58 2,874.23
NT31 1/11/2002 P2 01 November 2002 SSM NT 31 P2 2,012.71 2,094.99 2,177.27 2,259.55 2,341.83 2,424.11 2,506.39 2,588.67 2,670.95 2,753.23 2,835.51 2,917.79 3,000.07
NT31 1/11/2002 P3 01 November 2002 SSM NT 31 P3 2,098.62 2,184.53 2,270.44 2,356.35 2,442.26 2,528.17 2,614.08 2,699.99 2,785.90 2,871.81 2,957.72 3,043.63 3,129.54
NT22 1/11/2002 P1 01 November 2002 SSM NT 22 P1 1,532.34 1,585.58 1,638.82 1,692.06 1,745.30 1,798.54 1,877.19 1,955.84 2,034.49 2,113.14 2,191.79 2,270.44
NT22 1/11/2002 P2 01 November 2002 SSM NT 22 P2 1,646.08 1,704.16 1,762.24 1,820.32 1,906.23 1,992.14 2,078.05 2,163.96 2,249.87 2,335.78 2,421.69 2,507.60
NT17 1/11/2002 P1 01 November 2002 SSM NT 17 P1 656.30 696.23 736.16 776.09 816.02 855.95 895.88 935.81 975.74 1,015.67 1,055.60 1,095.53 1,135.46 1,188.70 1,241.94 1,295.18 1,348.42 1,401.66 1,454.90 1,508.14 1,561.38 1,614.62 1,667.86 1,721.10
NT17 1/11/2002 P2 01 November 2002 SSM NT 17 P2 697.44 738.58 779.72 820.86 862.00 903.14 944.28 985.42 1,026.56 1,067.70 1,108.84 1,149.98 1,205.64 1,261.30 1,316.96 1,372.62 1,428.28 1,483.94 1,539.60 1,595.26 1,650.92 1,706.58 1,762.24 1,817.90
NT17 1/11/2002 P3 01 November 2002 SSM NT 17 P3 739.79 782.14 824.49 866.84 909.19 951.54 993.89 1,036.24 1,078.59 1,120.94 1,163.29 1,221.37 1,279.45 1,337.53 1,395.61 1,453.69 1,511.77 1,569.85 1,627.93 1,686.01 1,744.09 1,802.17 1,860.25 1,918.33
U17 1/11/2002 P1 01 November 2002 SSM U 17 P1 690.18 690.18 690.18 690.18 690.18 690.18 690.18 690.18 690.18 690.18 690.18 690.18 690.18 690.18 690.18 690.18 690.18
U17 1/11/2002 P2 01 November 2002 SSM U 17 P2 731.32 731.32 731.32 731.32 731.32 731.32 731.32 731.32 731.32 731.32 731.32 731.32 731.32 731.32 731.32 731.32 731.32
U17 1/11/2002 P3 01 November 2002 SSM U 17 P3 773.67 773.67 773.67 773.67 773.67 773.67 773.67 773.67 773.67 773.67 773.67 773.67 773.67 773.67 773.67 773.67 773.67
U36 1/11/2002 P1 01 November 2002 SSM U 36 P1 2,445.89 2,525.75 2,605.61 2,685.47 2,818.57 2,951.67 3,084.77 3,217.87 3,350.97 3,484.07 3,617.17
U36 1/11/2002 P2 01 November 2002 SSM U 36 P2 2,616.50 2,703.62 2,847.61 2,991.60 3,135.59 3,279.58 3,423.57 3,567.56 3,711.55 3,855.54 3,999.53
U32 1/11/2002 P1 01 November 2002 SSM U 32 P1 1,567.43 1,620.67 1,673.91 1,727.15 1,780.39 1,833.63 1,886.87 1,966.73 2,046.59 2,126.45 2,206.31 2,286.17 2,366.03 2,445.89 2,525.75 2,605.61 2,685.47 2,765.33 2,845.19 2,925.05
U32 1/11/2002 P2 01 November 2002 SSM U 32 P2 1,683.59 1,742.88 1,802.17 1,861.46 1,920.75 2,007.87 2,094.99 2,182.11 2,269.23 2,356.35 2,443.47 2,530.59 2,617.71 2,704.83 2,791.95 2,879.07 2,966.19 3,053.31 3,140.43 3,227.55
U29 1/11/2002 P1 01 November 2002 SSM U 29 P1 928.55 981.79 1,035.03 1,088.27 1,141.51 1,194.75 1,247.99 1,301.23 1,354.47 1,407.71 1,460.95 1,514.19 1,567.43 1,620.67 1,673.91 1,727.15 1,780.39 1,833.63 1,886.87 1,940.11 1,993.35 2,046.59 2,126.45 2,206.31 2,286.17 2,366.03 2,445.89
U29 1/11/2002 P2 01 November 2002 SSM U 29 P2 985.42 1,042.29 1,099.16 1,156.03 1,212.90 1,269.77 1,326.64 1,383.51 1,440.38 1,497.25 1,554.12 1,610.99 1,667.86 1,724.73 1,781.60 1,838.47 1,895.34 1,952.21 2,009.08 2,065.95 2,122.82 2,206.31 2,289.80 2,373.29 2,456.78 2,540.27 2,623.76
U29 1/11/2002 P3 01 November 2002 SSM U 29 P3 1,044.71 1,104.00 1,163.29 1,222.58 1,281.87 1,341.16 1,400.45 1,459.74 1,519.03 1,578.32 1,637.61 1,696.90 1,756.19 1,815.48 1,874.77 1,934.06 1,993.35 2,052.64 2,111.93 2,171.22 2,258.34 2,345.46 2,432.58 2,519.70 2,605.82 2,693.94 2,781.06
U48 1/11/2002 P1 01 November 2002 SSM U 48 P1 3,853.51 4,033.80 4,214.09 4,394.38 4,574.67 4,754.96 4,935.25 5,115.54
U48 1/11/2002 P2 01 November 2002 SSM U 48 P2 4,235.87 4,430.68 4,625.49 4,820.30 5,015.11 5,209.92 5,404.73 5,599.54
U44 1/11/2002 P1 01 November 2002 SSM U 44 P1 2,633.83 2,766.93 2,900.03 3,033.13 3,166.23 3,299.33 3,432.43 3,565.53 3,698.63 3,831.73 3,964.83 4,097.93 4,231.03 4,364.13
U44 1/11/2002 P2 01 November 2002 SSM U 44 P2 2,920.60 3,067.01 3,213.42 3,359.83 3,506.24 3,652.65 3,799.06 3,945.47 4,091.88 4,238.29 4,384.70 4,531.11 4,677.52 4,823.93
U42 1/11/2002 P1 01 November 2002 SSM U 42 P1 1,738.43 1,818.29 1,898.15 1,978.01 2,057.87 2,137.73 2,217.59 2,297.45 2,377.31 2,457.17 2,537.03 2,616.89 2,696.75 2,776.61 2,909.71 3,042.81 3,175.91 3,309.01 3,442.11 3,575.21 3,708.31 3,841.41 3,974.51 4,107.61
U42 1/11/2002 P2 01 November 2002 SSM U 42 P2 1,909.04 1,996.16 2,083.28 2,170.40 2,257.52 2,344.64 2,431.76 2,518.88 2,606.00 2,693.12 2,780.24 2,867.36 3,013.77 3,160.18 3,306.59 3,453.00 3,599.41 3,745.82 3,892.23 4,038.64 4,185.05 4,331.46 4,477.87 4,624.28
U41 1/11/2002 P1 01 November 2002 SSM U 41 P1 1,738.43 1,818.29 1,898.15 1,978.01 2,057.87 2,137.73 2,217.59 2,297.45 2,377.31 2,457.17 2,537.03 2,616.89 2,696.75 2,776.61 2,909.71 3,042.81 3,175.91 3,309.01 3,442.11 3,575.21 3,708.31 3,841.41 3,974.51 4,107.61
U41 1/11/2002 P2 01 November 2002 SSM U 41 P2 1,821.92 1,905.41 1,988.90 2,072.39 2,155.88 2,239.37 2,322.86 2,406.35 2,489.84 2,573.33 2,656.82 2,740.31 2,823.80 2,964.16 3,104.52 3,244.88 3,385.24 3,525.60 3,665.96 3,806.32 3,946.68 4,087.04 4,227.40 4,367.76
U41 1/11/2002 P3 01 November 2002 SSM U 41 P3 1,909.04 1,996.16 2,083.28 2,170.40 2,257.52 2,344.64 2,431.76 2,518.88 2,606.00 2,693.12 2,780.24 2,867.36 3,013.77 3,160.18 3,306.59 3,453.00 3,599.41 3,745.82 3,892.23 4,038.64 4,185.05 4,331.46 4,477.87 4,624.28
W27 1/11/2002 P1 01 November 2002 SSM W 27 P1 967.27 1,020.51 1,073.75 1,126.99 1,180.23 1,233.47 1,286.71 1,339.95 1,393.19 1,446.43 1,499.67 1,552.91 1,606.15 1,659.39 1,712.63 1,765.87 1,819.11 1,872.35 1,925.59 1,978.83 2,032.07 2,110.72 2,189.37 2,268.02 2,346.67 2,425.32
W27 1/11/2002 P2 01 November 2002 SSM W 27 P2 1,022.93 1,078.59 1,134.25 1,189.91 1,245.57 1,301.23 1,356.89 1,412.55 1,468.21 1,523.87 1,579.53 1,635.19 1,690.85 1,746.51 1,802.17 1,857.83 1,913.49 1,969.15 2,024.81 2,080.47 2,162.75 2,245.03 2,327.31 2,409.59 2,491.87 2,574.15
W27 1/11/2002 P3 01 November 2002 SSM W 27 P3 1,081.01 1,139.09 1,197.17 1,255.25 1,313.33 1,371.41 1,429.49 1,487.57 1,545.65 1,603.73 1,661.81 1,719.89 1,777.97 1,836.05 1,894.13 1,952.21 2,010.29 2,068.37 2,126.45 2,212.36 2,298.27 2,384.18 2,470.09 2,556.00 2,641.91 2,727.82
R11 1/11/2002 P1 01 November 2002 SSM R 11 P1 661.14 701.07 741.00 780.93 820.86 860.79 900.72 940.65 980.58 1,020.51 1,060.44 1,100.37 1,140.30 1,180.23 1,220.16
R11 1/11/2002 P2 01 November 2002 SSM R 11 P2 702.28 743.42 784.56 825.70 866.84 907.98 949.12 990.26 1,031.40 1,072.54 1,113.68 1,154.82 1,195.96 1,237.10 1,278.24
R11 1/11/2002 P3 01 November 2002 SSM R 11 P3 744.63 786.98 829.33 871.68 914.03 956.38 998.73 1,041.08 1,083.43 1,125.78 1,168.13 1,210.48 1,252.83 1,295.18 1,337.53
W17 1/11/2002 P1 01 November 2002 SSM W 17 P1 657.51 697.44 737.37 777.30 817.23 857.16 897.09 937.02 976.95 1,016.88 1,056.81 1,096.74 1,136.67 1,189.91 1,243.15 1,296.39 1,349.63 1,402.87 1,456.11 1,509.35 1,562.59 1,615.83 1,669.07 1,722.31
W17 1/11/2002 P2 01 November 2002 SSM W 17 P2 698.65 739.79 780.93 822.07 863.21 904.35 945.49 986.63 1,027.77 1,068.91 1,110.05 1,151.19 1,206.85 1,262.51 1,318.17 1,373.83 1,429.49 1,485.15 1,540.81 1,596.47 1,652.13 1,707.79 1,763.45 1,819.11
W17 1/11/2002 P3 01 November 2002 SSM W 17 P3 741.00 783.35 825.70 868.05 910.40 952.75 995.10 1,037.45 1,079.80 1,122.15 1,164.50 1,222.58 1,280.66 1,338.74 1,396.82 1,454.90 1,512.98 1,571.06 1,629.14 1,687.22 1,745.30 1,803.38 1,861.46 1,919.54
U14 1/11/2002 P1 01 November 2002 SSM U 14 P1 1,031.40 1,071.33 1,111.26 1,164.50 1,217.74 1,270.98 1,324.22 1,377.46 1,430.70 1,483.94
U14 1/11/2002 P2 01 November 2002 SSM U 14 P2 1,114.89 1,172.97 1,231.05 1,289.13 1,347.21 1,405.29 1,463.37 1,521.45 1,579.53 1,637.61
J41 1/11/2002 P1 01 November 2002 SSM J 41 P1 1,815.87 1,895.73 1,975.59 2,055.45 2,135.31 2,215.17 2,295.03 2,374.89 2,454.75 2,534.61 2,614.47 2,694.33 2,774.19 2,907.29 3,040.39 3,173.49 3,306.59 3,439.69 3,572.79 3,705.89 3,838.99 3,972.09 4,105.19
J41 1/11/2002 P2 01 November 2002 SSM J 41 P2 1,899.36 1,982.85 2,066.34 2,149.83 2,233.32 2,316.81 2,400.30 2,483.79 2,567.28 2,650.77 2,734.26 2,817.75 2,958.11 3,098.47 3,238.83 3,379.19 3,519.55 3,659.91 3,800.27 3,940.63 4,080.99 4,221.35 4,361.71
J41 1/11/2002 P3 01 November 2002 SSM J 41 P3 1,986.48 2,073.60 2,160.72 2,247.84 2,334.96 2,422.08 2,509.20 2,596.32 2,683.44 2,770.56 2,857.68 3,004.09 3,150.50 3,296.91 3,443.32 3,589.73 3,736.14 3,882.55 4,028.96 4,175.37 4,321.78 4,468.19 4,614.60
KP11 1/11/2002 P1 01 November 2002 SSM KP 11 P1 548.61 578.86 609.11 639.36 669.61 699.86 730.11 760.36 790.61 830.54 870.47 910.40 950.33 990.26 1,030.19 1,070.12 1,110.05 1,149.98 1,189.91 1,229.84 1,269.77
KP11 1/11/2002 P2 01 November 2002 SSM KP 11 P2 580.07 611.53 642.99 674.45 705.91 737.37 768.83 800.29 841.43 882.57 923.71 964.85 1,005.99 1,047.13 1,088.27 1,129.41 1,170.55 1,211.69 1,252.83 1,293.97 1,335.11
KP11 1/11/2002 P3 01 November 2002 SSM KP 11 P3 612.74 645.41 678.08 710.75 743.42 776.09 808.76 851.11 893.46 935.81 978.16 1,020.51 1,062.86 1,105.21 1,147.56 1,189.91 1,232.26 1,274.61 1,316.96 1,359.31 1,401.66
W41 1/11/2002 P1 01 November 2002 SSM W 41 P1 1,480.70 1,560.56 1,640.42 1,720.28 1,800.14 1,880.00 1,959.86 2,039.72 2,119.58 2,199.44 2,279.30 2,359.16 2,439.02 2,518.88 2,598.74 2,678.60 2,758.46 2,890.35 3,022.24 3,154.13 3,286.02 3,417.91 3,549.80 3,681.69 3,813.58 3,945.47 4,077.36
W41 1/11/2002 P2 01 November 2002 SSM W 41 P2 1,564.19 1,647.68 1,731.17 1,814.66 1,898.15 1,981.64 2,065.13 2,148.62 2,232.11 2,315.60 2,399.09 2,482.58 2,566.07 2,649.56 2,733.05 2,816.54 2,953.27 3,090.00 3,226.73 3,363.46 3,500.19 3,636.92 3,773.65 3,910.38 4,047.11 4,183.84 4,320.57
W41 1/11/2002 P3 01 November 2002 SSM W 41 P3 1,651.31 1,738.43 1,825.55 1,912.67 1,999.79 2,086.91 2,174.03 2,261.15 2,348.27 2,435.39 2,522.51 2,609.63 2,696.75 2,783.87 2,870.99 3,012.56 3,154.13 3,295.70 3,437.27 3,578.84 3,720.41 3,861.98 4,003.55 4,145.12 4,286.69 4,428.26 4,569.83
FT22 1/1/2007 P1 01 Januari 2007 SSM FT 22 P1 1,545.65 1,598.89 1,652.13 1,705.37 1,758.61 1,811.85 1,891.71 1,971.57 2,051.43 2,131.29 2,211.15 2,291.01
FT22 1/1/2007 P2 01 Januari 2007 SSM FT 22 P2 1,659.39 1,717.47 1,775.55 1,833.63 1,920.75 2,007.87 2,094.99 2,182.11 2,269.23 2,356.35 2,443.47 2,530.59
FT26 1/1/2007 P1 01 Januari 2007 SSM FT 26 P1 1,773.13 1,852.99 1,932.85 2,012.71 2,092.57 2,172.43 2,252.29 2,332.15 2,412.01
FT26 1/1/2007 P2 01 Januari 2007 SSM FT 26 P2 1,943.74 2,030.86 2,117.98 2,205.10 2,292.22 2,379.34 2,466.46 2,553.58 2,640.70
FT29 1/1/2007 P1 01 Januari 2007 SSM FT 29 P1 1,235.89 1,289.13 1,342.37 1,395.61 1,448.85 1,502.09 1,555.33 1,608.57 1,661.81 1,715.05 1,768.29 1,821.53 1,874.77 1,928.01 1,981.25 2,034.49 2,113.14 2,191.79 2,270.44 2,349.09 2,427.74
FT29 1/1/2007 P2 01 Januari 2007 SSM FT 29 P2 1,292.76 1,349.63 1,406.50 1,463.37 1,520.24 1,577.11 1,633.98 1,690.85 1,747.72 1,804.59 1,861.46 1,918.33 1,975.20 2,032.07 2,088.94 2,172.43 2,255.92 2,339.41 2,422.90 2,506.39 2,589.88
FT29 1/1/2007 P3 01 Januari 2007 SSM FT 29 P3 1,352.05 1,411.34 1,470.63 1,529.92 1,589.21 1,648.50 1,707.79 1,767.08 1,826.37 1,885.66 1,944.95 2,004.24 2,063.53 2,122.82 2,209.94 2,297.06 2,384.18 2,471.30 2,558.42 2,645.54 2,732.66
FT32 1/1/2007 P1 01 Januari 2007 SSM FT 32 P1 2,171.22 2,249.87 2,328.52 2,407.17 2,485.82 2,564.47 2,643.12 2,721.77 2,800.42 2,879.07
FT32 1/1/2007 P2 01 Januari 2007 SSM FT 32 P2 2,339.41 2,425.32 2,511.23 2,597.14 2,683.05 2,768.96 2,854.87 2,940.78 3,026.69 3,112.60
FT38 1/1/2007 P1 01 Januari 2007 SSM FT 38 P1 2,427.74 2,506.39 2,585.04 2,663.69 2,794.37 2,925.05 3,055.73 3,186.41 3,317.09 3,447.77 3,578.45 3,709.13
FT38 1/1/2007 P2 01 Januari 2007 SSM FT 38 P2 2,595.93 2,681.84 2,823.41 2,964.98 3,106.55 3,248.12 3,389.69 3,531.26 3,672.83 3,814.40 3,955.97 4,097.54
FT41 1/1/2007 P1 01 Januari 2007 SSM FT 41 P1 1,651.31 1,731.17 1,811.03 1,890.89 1,970.75 2,050.61 2,130.47 2,210.33 2,290.19 2,370.05 2,449.91 2,529.77 2,609.63 2,689.49 2,769.35 2,902.45 3,035.55 3,168.65 3,301.75 3,434.85 3,567.95 3,701.05 3,834.15 3,967.25 4,100.35
FT41 1/1/2007 P2 01 Januari 2007 SSM FT 41 P2 1,734.80 1,818.29 1,901.78 1,985.27 2,068.76 2,152.25 2,235.74 2,319.23 2,402.72 2,486.21 2,569.70 2,653.19 2,736.68 2,820.17 2,958.11 3,096.05 3,233.99 3,371.93 3,509.87 3,647.81 3,785.75 3,923.69 4,061.63 4,199.57 4,337.51
FT41 1/1/2007 P3 01 Januari 2007 SSM FT 41 P3 1,821.92 1,909.04 1,996.16 2,083.28 2,170.40 2,257.52 2,344.64 2,431.76 2,518.88 2,606.00 2,693.12 2,780.24 2,867.36 3,011.35 3,155.34 3,299.33 3,443.32 3,587.31 3,731.30 3,875.29 4,019.28 4,163.27 4,307.26 4,451.25 4,595.24
FT44 1/1/2007 P1 01 Januari 2007 SSM FT 44 P1 2,626.57 2,759.67 2,892.77 3,025.87 3,158.97 3,292.07 3,425.17 3,558.27 3,691.37 3,824.47 3,957.57 4,090.67 4,223.77 4,356.87
FT44 1/1/2007 P2 01 Januari 2007 SSM FT 44 P2 2,908.50 3,052.49 3,196.48 3,340.47 3,484.46 3,628.45 3,772.44 3,916.43 4,060.42 4,204.41 4,348.40 4,492.39 4,636.38 4,780.37
FT48 1/1/2007 P1 01 Januari 2007 SSM FT 48 P1 3,847.46 4,027.75 4,208.04 4,388.33 4,568.62 4,748.91 4,929.20 5,109.49
FT48 1/1/2007 P2 01 Januari 2007 SSM FT 48 P2 4,229.82 4,424.63 4,619.44 4,814.25 5,009.06 5,203.87 5,398.68 5,593.49
FT52 1/1/2007 P1 01 Januari 2007 SSM FT 52 P1 4,329.04 4,509.33 4,689.62 4,869.91 5,050.20 5,230.49 5,410.78 5,591.07
FT52 1/1/2007 P2 01 Januari 2007 SSM FT 52 P2 4,740.44 4,935.25 5,130.06 5,324.87 5,519.68 5,714.49 5,909.30 6,104.11
FT54 1/1/2007 P1 01 Januari 2007 SSM FT 54 P1 4,566.20 4,746.49 4,946.14 5,145.79 5,345.44 5,545.09 5,744.74 5,944.39
FT54 1/1/2007 P2 01 Januari 2007 SSM FT 54 P2 4,970.34 5,186.93 5,403.52 5,620.11 5,836.70 6,053.29 6,269.88 6,486.47
FT17 1/1/2007 P1 01 Januari 2007 SSM FT 17 P1 674.45 715.59 756.73 797.87 839.01 880.15 921.29 962.43 1,003.57 1,044.71 1,085.85 1,126.99 1,168.13 1,221.37 1,274.61 1,327.85 1,381.09 1,434.33 1,487.57 1,540.81 1,594.05 1,647.29 1,700.53 1,753.77 1,807.01 1,860.25
FT17 1/1/2007 P2 01 Januari 2007 SSM FT 17 P2 716.80 759.15 801.50 843.85 886.20 928.55 970.90 1,013.25 1,055.60 1,097.95 1,140.30 1,182.65 1,238.31 1,293.97 1,349.63 1,405.29 1,460.95 1,516.61 1,572.27 1,627.93 1,683.59 1,739.25 1,794.91 1,850.57 1,906.23 1,961.89
FT17 1/1/2007 P3 01 Januari 2007 SSM FT 17 P3 760.36 803.92 847.48 891.04 934.60 978.16 1,021.72 1,065.28 1,108.84 1,152.40 1,195.96 1,254.04 1,312.12 1,370.20 1,428.28 1,486.36 1,544.44 1,602.52 1,660.60 1,718.68 1,776.76 1,834.84 1,892.92 1,951.00 2,009.08 2,067.16
N36 1/1/2007 P1 01 Januari 2007 SSM N 36 P1 2,401.12 2,479.77 2,558.42 2,637.07 2,767.75 2,898.43 3,029.11 3,159.79 3,290.47 3,421.15 3,551.83
N36 1/1/2007 P2 01 Januari 2007 SSM N 36 P2 2,569.31 2,655.22 2,796.79 2,938.36 3,079.93 3,221.50 3,363.07 3,504.64 3,646.21 3,787.78 3,929.35
N27 1/1/2007 P1 01 Januari 2007 SSM N 27 P1 963.64 1,016.88 1,070.12 1,123.36 1,176.60 1,229.84 1,283.08 1,336.32 1,389.56 1,442.80 1,496.04 1,549.28 1,602.52 1,655.76 1,709.00 1,762.24 1,815.48 1,868.72 1,921.96 1,975.20 2,028.44 2,107.09 2,185.74 2,264.39 2,343.04 2,421.69
N27 1/1/2007 P2 01 Januari 2007 SSM N 27 P2 1,019.30 1,074.96 1,130.62 1,186.28 1,241.94 1,297.60 1,353.26 1,408.92 1,464.58 1,520.24 1,575.90 1,631.56 1,687.22 1,742.88 1,798.54 1,854.20 1,909.86 1,965.52 2,021.18 2,076.84 2,159.12 2,241.40 2,323.68 2,405.96 2,488.24 2,570.52
N27 1/1/2007 P3 01 Januari 2007 SSM N 27 P3 1,077.38 1,135.46 1,193.54 1,251.62 1,309.70 1,367.78 1,425.86 1,483.94 1,542.02 1,600.10 1,658.18 1,716.26 1,774.34 1,832.42 1,890.50 1,948.58 2,006.66 2,064.74 2,122.82 2,208.73 2,294.64 2,380.55 2,466.46 2,552.37 2,638.28 2,724.19
N32 1/1/2007 P1 01 Januari 2007 SSM N 32 P1 1,930.43 2,009.08 2,087.73 2,166.38 2,245.03 2,323.68 2,402.33 2,480.98 2,559.63 2,638.28 2,716.93 2,795.58 2,874.23
N32 1/1/2007 P2 01 Januari 2007 SSM N 32 P2 2,098.62 2,184.53 2,270.44 2,356.35 2,442.26 2,528.17 2,614.08 2,699.99 2,785.90 2,871.81 2,957.72 3,043.63 3,129.54
F44 1/7/2007 P1 01 Julai 2007 SSM F 44 P1 3,020.56 3,173.63 3,326.70 3,479.77 3,632.84 3,785.91 3,938.98 4,092.05 4,245.12 4,398.19 4,551.26 4,704.33 4,857.40 5,010.47
F44 1/7/2007 P2 01 Julai 2007 SSM F 44 P2 3,344.78 3,510.37 3,675.96 3,841.55 4,007.14 4,172.73 4,338.32 4,503.91 4,669.50 4,835.09 5,000.68 5,166.27 5,331.86 5,497.45
F41 1/7/2007 P1 01 Julai 2007 SSM F 41 P1 1,899.01 1,990.85 2,082.69 2,174.53 2,266.37 2,358.21 2,450.05 2,541.89 2,633.73 2,725.57 2,817.41 2,909.25 3,001.09 3,092.93 3,184.77 3,337.84 3,490.91 3,643.98 3,797.05 3,950.12 4,103.19 4,256.26 4,409.33 4,562.40 4,715.47
F41 1/7/2007 P2 01 Julai 2007 SSM F 41 P2 1,995.02 2,091.03 2,187.04 2,283.05 2,379.06 2,475.07 2,571.08 2,667.09 2,763.10 2,859.11 2,955.12 3,051.13 3,147.14 3,243.15 3,401.78 3,560.41 3,719.04 3,877.67 4,036.30 4,194.93 4,353.56 4,512.19 4,670.82 4,829.45 4,988.08
F41 1/7/2007 P3 01 Julai 2007 SSM F 41 P3 2,095.21 2,195.40 2,295.59 2,395.78 2,495.97 2,596.16 2,696.35 2,796.54 2,896.73 2,996.92 3,097.11 3,197.30 3,297.49 3,463.08 3,628.67 3,794.26 3,959.85 4,125.44 4,291.03 4,456.62 4,622.21 4,787.80 4,953.39 5,118.98 5,284.57
F48 1/7/2007 P1 01 Julai 2007 SSM F 48 P1 4,424.58 4,631.91 4,839.24 5,046.57 5,253.90 5,461.23 5,668.56 5,875.89
F48 1/7/2007 P2 01 Julai 2007 SSM F 48 P2 4,864.29 5,088.32 5,312.35 5,536.38 5,760.41 5,984.44 6,208.47 6,432.50
F52 1/7/2007 P1 01 Julai 2007 SSM F 52 P1 4,978.40 5,185.73 5,393.06 5,600.39 5,807.72 6,015.05 6,222.38 6,429.71
F52 1/7/2007 P2 01 Julai 2007 SSM F 52 P2 5,451.51 5,675.54 5,899.57 6,123.60 6,347.63 6,571.66 6,795.69 7,019.72
F54 1/7/2007 P1 01 Julai 2007 SSM F 54 P1 5,251.13 5,458.46 5,688.06 5,917.66 6,147.26 6,376.86 6,606.46 6,836.06
F54 1/7/2007 P2 01 Julai 2007 SSM F 54 P2 5,715.89 5,964.97 6,214.05 6,463.13 6,712.21 6,961.29 7,210.37 7,459.45
J17 1/7/2007 P1 01 Julai 2007 SSM J 17 P1 843.06 894.49 945.92 997.35 1,048.78 1,100.21 1,151.64 1,203.07 1,254.50 1,305.93 1,357.36 1,408.79 1,460.22 1,526.77 1,593.32 1,659.87 1,726.42 1,792.97 1,859.52 1,926.07 1,992.62 2,059.17 2,125.72 2,192.27 2,258.82 2,325.37
J17 1/7/2007 P2 01 Julai 2007 SSM J 17 P2 896.00 948.94 1,001.88 1,054.82 1,107.76 1,160.70 1,213.64 1,266.58 1,319.52 1,372.46 1,425.40 1,478.34 1,547.92 1,617.50 1,687.08 1,756.66 1,826.24 1,895.82 1,965.40 2,034.98 2,104.56 2,174.14 2,243.72 2,313.30 2,382.88 2,452.46
J17 1/7/2007 P3 01 Julai 2007 SSM J 17 P3 950.45 1,004.90 1,059.35 1,113.80 1,168.25 1,222.70 1,277.15 1,331.60 1,386.05 1,440.50 1,494.95 1,567.55 1,640.15 1,712.75 1,785.35 1,857.95 1,930.55 2,003.15 2,075.75 2,148.35 2,220.95 2,293.55 2,366.15 2,438.75 2,511.35 2,583.95
R4 1/7/2007 P1 01 Julai 2007 SSM R 4 P1 701.42 742.26 783.10 823.94 864.78 905.62 946.46 987.30 1,028.14 1,068.98 1,109.82 1,150.66 1,191.50 1,232.34 1,273.18 1,314.02 1,354.86
R4 1/7/2007 P2 01 Julai 2007 SSM R 4 P2 787.99 832.09 876.19 920.29 964.39 1,008.49 1,052.59 1,096.69 1,140.79 1,184.89 1,228.99 1,273.09 1,317.19 1,361.29 1,405.39 1,449.49 1,493.59
F11 1/7/2007 P1 01 Julai 2007 SSM F 11 P1 740.62 781.46 822.30 863.14 903.98 944.82 985.66 1,026.50 1,067.34 1,121.25 1,175.16 1,229.07 1,282.98 1,336.89 1,390.80 1,444.71 1,498.62 1,552.53 1,606.44 1,660.35 1,714.26
F11 1/7/2007 P2 01 Julai 2007 SSM F 11 P2 783.09 825.56 868.03 910.50 952.97 995.44 1,037.91 1,080.38 1,135.92 1,191.46 1,247.00 1,302.54 1,358.08 1,413.62 1,469.16 1,524.70 1,580.24 1,635.78 1,691.32 1,746.86 1,802.40
F11 1/7/2007 P3 01 Julai 2007 SSM F 11 P3 827.19 871.29 915.39 959.49 1,003.59 1,047.69 1,091.79 1,148.96 1,206.13 1,263.30 1,320.47 1,377.64 1,434.81 1,491.98 1,549.15 1,606.32 1,663.49 1,720.66 1,777.83 1,835.00 1,892.17
F14 1/7/2007 P1 01 Julai 2007 SSM F 14 P1 1,394.02 1,447.93 1,501.84 1,573.71 1,645.58 1,717.45 1,789.32 1,861.19 1,933.06 2,004.93
F14 1/7/2007 P2 01 Julai 2007 SSM F 14 P2 1,506.73 1,585.14 1,663.55 1,741.96 1,820.37 1,898.78 1,977.19 2,055.60 2,134.01 2,212.42
F29 1/7/2007 P1 01 Julai 2007 SSM F 29 P1 1,544.86 1,611.41 1,677.96 1,744.51 1,811.06 1,877.61 1,944.16 2,010.71 2,077.26 2,143.81 2,210.36 2,276.91 2,343.46 2,410.01 2,476.56 2,543.11 2,641.42 2,739.73 2,838.04 2,936.35 3,034.66
F29 1/7/2007 P2 01 Julai 2007 SSM F 29 P2 1,615.95 1,687.04 1,758.13 1,829.22 1,900.31 1,971.40 2,042.49 2,113.58 2,184.67 2,255.76 2,326.85 2,397.94 2,469.03 2,540.12 2,611.21 2,715.57 2,819.93 2,924.29 3,028.65 3,133.01 3,237.37
F29 1/7/2007 P3 01 Julai 2007 SSM F 29 P3 1,690.06 1,764.17 1,838.28 1,912.39 1,986.50 2,060.61 2,134.72 2,208.83 2,282.94 2,357.05 2,431.16 2,505.27 2,579.38 2,653.49 2,762.39 2,871.29 2,980.19 3,089.09 3,197.99 3,306.89 3,415.79
F32 1/7/2007 P1 01 Julai 2007 SSM F 32 P1 2,714.03 2,812.34 2,910.65 3,008.96 3,107.27 3,205.58 3,303.89 3,402.20 3,500.51 3,598.82
F32 1/7/2007 P2 01 Julai 2007 SSM F 32 P2 2,924.27 3,031.66 3,139.05 3,246.44 3,353.83 3,461.22 3,568.61 3,676.00 3,783.39 3,890.78
F38 1/7/2007 P1 01 Julai 2007 SSM F 38 P1 3,034.68 3,132.99 3,231.30 3,329.61 3,492.96 3,656.31 3,819.66 3,983.01 4,146.36 4,309.71 4,473.06 4,636.41
F38 1/7/2007 P2 01 Julai 2007 SSM F 38 P2 3,244.92 3,352.31 3,529.27 3,706.23 3,883.19 4,060.15 4,237.11 4,414.07 4,591.03 4,767.99 4,944.95 5,121.91
FT17 1/7/2007 P1 01 Julai 2007 SSM FT 17 P1 843.06 94.49 945.92 997.35 1,048.78 1,100.21 1,151.64 1,203.07 1,254.50 1,305.93 1,357.36 1,408.79 1,460.22 1,526.77 1,593.32 1,659.87 1,726.42 1,792.97 1,659.52 1,926.07 1,992.62 2,059.17 2,125.72 2,192.27 2,258.82 2,325.37
FT17 1/7/2007 P2 01 Julai 2007 SSM FT 17 P2 896.00 946.94 1,001.88 1,054.82 1,107.76 1,160.70 1,213.64 1,266.58 1,319.52 1,372.46 1,425.40 1,478.34 1,547.92 1,617.50 1,687.08 1,756.66 1,826.24 1,895.02 1,965.40 2,034.98 2,104.56 2,174.14 2,243.72 2,313.30 2,382.68 2,452.46
FT17 1/7/2007 P3 01 Julai 2007 SSM FT 17 P3 950.45 1,004.90 1,059.35 1,113.00 1,168.25 1,222.70 1,277.15 1,331.60 1,386.05 1,440.50 1,494.95 1,567.55 1,640.15 1,712.75 1,785.35 1,657.95 1,930.55 2,003.15 2,075.75 2,148.35 2,220.95 2,293.55 2,366.15 2,438.75 2,511.35 2,583.95
FT22 1/7/2007 P1 01 Julai 2007 SSM FT 22 P1 1,932.06 1,998.61 2,065.16 2,131.71 2,198.26 2,264.81 2,364.64 2,464.47 2,564.30 2,664.13 2,763.96 2,863.79
FT22 1/7/2007 P2 01 Julai 2007 SSM FT 22 P2 2,074.24 2,146.84 2,219.44 2,292.04 2,400.94 2,509.84 2,618.74 2,727.64 2,836.54 2,945.44 3,054.34 3,163.24
FT26 1/7/2007 P1 01 Julai 2007 SSM FT 26 P1 2,216.41 2,316.24 2,416.07 2,515.90 2,615.73 2,715.56 2,815.39 2,915.22 3,015.05
FT26 1/7/2007 P2 01 Julai 2007 SSM FT 26 P2 2,429.67 2,538.57 2,647.47 2,756.37 2,865.27 2,974.17 3,083.07 3,191.97 3,300.87
J21 1/7/2007 P1 01 Julai 2007 SSM J 21 P1 1,932.06 1,998.61 2,065.16 2,131.71 2,198.26 2,264.81 2,364.64 2,464.47 2,564.30 2,664.13 2,763.96 2,863.79
J21 1/7/2007 P2 01 Julai 2007 SSM J 21 P2 2,001.64 2,071.22 2,140.80 2,210.38 2,279.96 2,384.32 2,488.68 2,593.04 2,697.40 2,801.76 2,906.12 3,010.48
J21 1/7/2007 P3 01 Julai 2007 SSM J 21 P3 2,074.24 2,146.84 2,219.44 2,292.04 2,400.94 2,509.84 2,618.74 2,727.64 2,836.54 2,945.44 3,054.34 3,163.24
J25 1/7/2007 P1 01 Julai 2007 SSM J 25 P1 2,216.41 2,316.24 2,416.07 2,515.90 2,615.73 2,715.56 2,815.39 2,915.22 3,015.05
J25 1/7/2007 P2 01 Julai 2007 SSM J 25 P2 2,320.77 2,425.13 2,529.49 2,633.85 2,738.21 2,842.57 2,946.93 3,051.29 3,155.65
J25 1/7/2007 P3 01 Julai 2007 SSM J 25 P3 2,429.67 2,538.57 2,647.47 2,756.37 2,865.27 2,974.17 3,083.07 3,191.97 3,300.87
J22 1/7/2007 P1 01 Julai 2007 SSM J 22 P1 1,932.06 1,998.61 2,065.16 2,131.71 2,198.26 2,264.81 2,364.64 2,464.47 2,564.30 2,664.13 2,763.96 2,863.79
J26 1/7/2007 P1 01 Julai 2007 SSM J 26 P1 2,216.41 2,316.24 2,416.07 2,515.90 2,615.73 2,715.56 2,815.39 2,915.22 3,015.05
J26 1/7/2007 P2 01 Julai 2007 SSM J 26 P2 2,429.67 2,538.57 2,647.47 2,756.37 2,865.27 2,974.17 3,083.07 3,191.97 3,300.87
J29 1/7/2007 P2 01 Julai 2007 SSM J 29 P2 1,620.49 1,691.58 1,762.67 1,833.76 1,904.85 1,975.94 2,047.03 2,118.12 2,189.21 2,260.30 2,331.39 2,402.48 2,473.57 2,544.66 2,615.75 2,720.11 2,824.47 2,928.83 3,033.19 3,137.55 3,241.91
J29 1/7/2007 P3 01 Julai 2007 SSM J 29 P3 1,694.60 1,768.71 1,842.82 1,916.93 1,991.04 2,065.15 2,139.26 2,213.37 2,287.48 2,361.59 2,435.70 2,509.81 2,583.92 2,658.03 2,768.44 2,878.85 2,989.26 3,099.67 3,210.08 3,320.49 3,430.90
J30 1/7/2007 P1 01 Julai 2007 SSM J 30 P1 1,549.40 1,615.95 1,682.50 1,749.05 1,815.60 1,882.15 1,948.70 2,015.25 2,081.80 2,148.35 2,214.90 2,281.45 2,348.00 2,414.55 2,481.10 2,547.65 2,647.48 2,747.31 2,847.14 2,946.97 3,046.80
J30 1/7/2007 P2 01 Julai 2007 SSM J 30 P2 1,694.60 1,768.71 1,842.82 1,916.93 1,991.04 2,065.15 2,139.26 2,213.37 2,287.48 2,361.59 2,435.70 2,509.81 2,583.92 2,658.03 2,768.44 2,878.85 2,989.26 3,099.67 3,210.08 3,320.49 3,430.90
J35 1/7/2007 P1 01 Julai 2007 SSM J 35 P1 2,733.69 2,833.52 2,933.35 3,033.18 3,133.01 3,232.84 3,332.67 3,497.53 3,662.39 3,827.25 3,992.11 4,156.97 4,321.83 4,486.69
J35 1/7/2007 P2 01 Julai 2007 SSM J 35 P2 2,838.05 2,942.41 3,046.77 3,151.13 3,255.49 3,359.85 3,530.76 3,701.67 3,872.58 4,043.49 4,214.40 4,385.31 4,556.22 4,727.13
J35 1/7/2007 P3 01 Julai 2007 SSM J 35 P3 2,946.95 3,055.85 3,164.75 3,273.65 3,382.55 3,561.03 3,739.51 3,917.99 4,096.47 4,274.95 4,453.43 4,631.91 4,810.39 4,988.87
J36 1/7/2007 P1 01 Julai 2007 SSM J 36 P1 2,733.69 2,833.52 2,933.35 3,033.18 3,133.01 3,232.84 3,332.67 3,497.53 3,662.39 3,827.25 3,992.11 4,156.97 4,321.83 4,486.69
J36 1/7/2007 P2 01 Julai 2007 SSM J 36 P2 2,946.95 3,055.85 3,164.75 3,273.65 3,382.55 3,561.03 3,739.51 3,917.99 4,096.47 4,274.95 4,453.43 4,631.91 4,810.39 4,988.87
J29 1/7/2007 P1 01 Julai 2007 SSM J 29 P1 1,549.40 1,615.95 1,682.50 1,749.05 1,815.60 1,882.15 1,948.70 2,015.25 2,081.80 2,148.35 2,214.90 2,281.45 2,348.00 2,414.55 2,481.10 2,547.65 2,647.48 2,747.31 2,847.14 2,946.97 3,046.80
J22 1/7/2007 P2 01 Julai 2007 SSM J 22 P2 2,074.24 2,146.84 2,219.44 2,292.04 2,400.94 2,509.84 2,618.74 2,727.64 2,836.54 2,945.44 3,054.34 3,163.24
KP11 1/7/2007 P1 01 Julai 2007 SSM KP 11 P1 740.62 781.46 822.3 863.14 903.98 944.82 985.66 1026.5 1067.34 1121.25 1175.16 1229.07 1282.98 1336.89 1390.8 1444.71 1498.62 1552.53 1606.44 1660.35 1714.26
KP11 1/7/2007 P2 01 Julai 2007 SSM KP 11 P2 783.09 825.56 868.03 910.5 952.97 995.44 1037.91 1080.38 1135.92 1191.46 1247 1302.54 1358.08 1413.62 1469.16 1524.7 1580.24 1635.78 1691.32 1746.86 1802.4
KP11 1/7/2007 P3 01 Julai 2007 SSM KP 11 P3 827.19 871.29 915.39 959.49 1003.59 1047.69 1091.79 1148.96 1206.13 1263.3 1320.47 1377.64 1434.81 1491.98 1549.15 1606.32 1663.49 1720.66 1777.83 1835 1892.17
KP14 1/7/2007 P1 01 Julai 2007 SSM KP 14 P1 1,394.02 1,447.93 1,501.84 1,573.71 1,645.58 1,717.45 1,789.32 1,861.19 1,933.06 2,004.93
KP14 1/7/2007 P2 01 Julai 2007 SSM KP 14 P2 1,506.73 1,585.14 1,663.55 1,741.96 1,820.37 1,898.78 1,977.19 2,055.60 2,134.01 2,212.42
KP17 1/7/2007 P1 01 Julai 2007 SSM KP 17 P1 820.38 870.29 920.2 970.11 1020.02 1069.93 1119.84 1169.75 1219.66 1269.57 1319.48 1369.39 1419.3 1485.85 1552.4 1618.95 1685.5 1752.05 1818.6 1885.15 1951.7 2018.25 2084.8 2151.35
KP17 1/7/2007 P2 01 Julai 2007 SSM KP 17 P2 871.81 923.24 974.67 1026.1 1077.53 1128.96 1180.39 1231.82 1283.25 1334.68 1386.11 1437.54 1507.12 1576.7 1646.28 1715.86 1785.44 1855.02 1924.6 1994.18 2063.76 2133.34 2202.92 2272.5
KP17 1/7/2007 P3 01 Julai 2007 SSM KP 17 P3 924.75 977.69 1030.53 1083.57 1136.51 1189.45 1242.39 1295.33 1348.27 1401.21 1454.15 1526.75 1599.35 1671.95 1744.55 1817.15 1889.75 1962.35 2034.95 2107.55 2180.15 2252.75 2325.35 2397.95
KP19 1/7/2007 P1 01 Julai 2007 SSM KP 19 P1 1,147.08 1,196.99 1,246.90 1,296.81 1,346.72 1,396.63 1,446.54 1,496.45 1,563.00 1,629.55 1,696.10 1,762.65 1,829.20 1,895.75 1,962.30 2,028.85 2,095.40 2,161.95 2,228.50 2,295.05
KP19 1/7/2007 P2 01 Julai 2007 SSM KP 19 P2 1,198.51 1,249.94 1,301.37 1,352.80 1,404.23 1,455.66 1,507.09 1,576.67 1,646.25 1,715.83 1,785.41 1,854.99 1,924.57 1,994.15 2,063.73 2,133.31 2,202.89 2,272.47 2,342.05 2,411.63
KP19 1/7/2007 P3 01 Julai 2007 SSM KP 19 P3 1,251.45 1,304.39 1,357.33 1,410.27 1,463.21 1,516.15 1,588.75 1,661.35 1,733.95 1,806.55 1,879.15 1,951.75 2,024.35 2,096.95 2,169.55 2,242.15 2,314.75 2,387.35 2,459.95 2,532.55
KP22 1/7/2007 P1 01 Julai 2007 SSM KP 22 P1 1,915.43 1,981.98 2,048.53 2,115.08 2,181.63 2,248.18 2,346.49 2,444.80 2,543.11 2,641.42 2,739.73 2,838.04
KP22 1/7/2007 P2 01 Julai 2007 SSM KP 22 P2 2,057.61 2,130.21 2,202.81 2,275.41 2,382.80 2,490.19 2,597.58 2,704.97 2,812.36 2,919.75 3,027.14 3,134.53
KP26 1/7/2007 P1 01 Julai 2007 SSM KP 26 P1 2,196.75 2,295.06 2,393.37 2,491.68 2,589.99 2,688.30 2,786.61 2,884.92 2,983.23
KP26 1/7/2007 P2 01 Julai 2007 SSM KP 26 P2 2,406.99 2,514.38 2,621.77 2,729.16 2,836.55 2,943.94 3,051.33 3,158.72 3,266.11
KP27 1/7/2007 P1 01 Julai 2007 SSM KP 27 P1 1,204.55 1,271.10 1,337.65 1,404.20 1,470.75 1,537.30 1,603.85 1,670.40 1,736.95 1,803.50 1,870.05 1,936.60 2,003.15 2,069.70 2,136.25 2,202.80 2,269.35 2,335.90 2,402.45 2,469.00 2,535.55 2,633.86 2,732.17 2,830.48 2,928.79
KP27 1/7/2007 P2 01 Julai 2007 SSM KP 27 P2 1,274.13 1,343.71 1,413.29 1,482.87 1,552.45 1,622.03 1,691.61 1,761.19 1,830.77 1,900.35 1,969.93 2,039.51 2,109.09 2,178.67 2,248.25 2,317.83 2,387.41 2,456.99 2,526.57 2,596.15 2,699.00 2,801.85 2,904.70 3,007.55 3,110.40
KP27 1/7/2007 P3 01 Julai 2007 SSM KP 27 P3 1,346.73 1,419.33 1,491.93 1,564.53 1,637.13 1,709.73 1,782.33 1,854.93 1,927.53 2,000.13 2,072.73 2,145.33 2,217.93 2,290.53 2,363.13 2,435.73 2,508.33 2,580.93 2,653.53 2,760.92 2,868.31 2,975.70 3,083.09 3,190.48 3,297.87
KP32 1/7/2007 P1 01 Julai 2007 SSM KP 32 P1 2,413.04 2,511.35 2,609.66 2,707.97 2,806.28 2,904.59 3,002.90 3,101.21 3,199.52 3,297.83 3,396.14
KP32 1/7/2007 P2 01 Julai 2007 SSM KP 32 P2 2,623.28 2,730.67 2,838.06 2,945.45 3,052.84 3,160.23 3,267.62 3,375.01 3,482.40 3,589.79 3,697.18
KP38 1/7/2007 P1 01 Julai 2007 SSM KP 38 P1 3,001.40 3,099.71 3,198.02 3,296.33 3,459.68 3,623.03 3,786.38 3,949.73 4,113.08 4,276.43 4,439.78
KP38 1/7/2007 P2 01 Julai 2007 SSM KP 38 P2 3,211.64 3,319.03 3,495.99 3,672.95 3,849.91 4,026.87 4,203.83 4,380.79 4,557.75 4,734.71 4,911.67
KP41 1/7/2007 P1 01 Julai 2007 SSM KP 41 P1 1,691.67 1,782.12 1,872.57 1,963.02 2,053.47 2,143.92 2,234.37 2,324.82 2,415.27 2,505.72 2,596.17 2,686.62 2,777.07 2,867.52 2,957.97 3,048.42 3,138.87 3,289.15 3,439.43 3,589.71 3,739.99 3,890.27 4,040.55 4,190.83 4,341.11 4,491.39 4,641.67
KP41 1/7/2007 P2 01 Julai 2007 SSM KP 41 P2 1,786.29 1,880.91 1,975.53 2,070.15 2,164.77 2,259.39 2,354.01 2,448.63 2,543.25 2,637.87 2,732.49 2,827.11 2,921.73 3,016.35 3,110.97 3,205.59 3,361.44 3,517.29 3,673.14 3,828.99 3,984.84 4,140.69 4,296.54 4,452.39 4,608.24 4,764.09 4,919.94
KP41 1/7/2007 P3 01 Julai 2007 SSM KP 41 P3 1,885.09 1,983.89 2,082.69 2,181.49 2,280.29 2,379.09 2,477.89 2,576.69 2,675.49 2,774.29 2,873.09 2,971.89 3,070.69 3,169.49 3,268.29 3,431.10 3,593.91 3,756.72 3,919.53 4,082.34 4,245.15 4,407.96 4,570.77 4,733.58 4,896.39 5,059.20 5,222.01
KP42 1/7/2007 P1 01 Julai 2007 SSM KP 42 P1 1,691.87 1,782.12 1,872.57 1,963.02 2,053.47 2,143.92 2,234.37 2,324.82 2,415.27 2,505.72 2,596.17 2,686.62 2,777.07 2,867.52 2,957.97 3,048.42 3,138.87 3,289.15 3,439.43 3,589.71 3,739.99 3,890.27 4,040.55 4,190.83 4,341.11 4,491.39 4,641.67
KP42 1/7/2007 P2 01 Julai 2007 SSM KP 42 P2 1,885.09 1,983.89 2,082.69 2,181.49 2,280.29 2,379.09 2,477.89 2,576.69 2,675.49 2,774.29 2,873.09 2,971.89 3,070.69 3,169.49 3,268.29 3,431.10 3,593.91 3,756.72 3,919.53 4,082.34 4,245.15 4,407.96 4,570.77 4,733.58 4,896.39 5,059.20 5,222.01
KP44 1/7/2007 P1 01 Julai 2007 SSM KP 44 P1 2,978.81 3,129.09 3,279.37 3,429.65 3,579.93 3,730.21 3,880.49 4,030.77 4,181.05 4,331.33 4,481.61 4,631.89 4,782.17 4,932.45
KP44 1/7/2007 P2 01 Julai 2007 SSM KP 44 P2 3,297.47 3,460.28 3,623.09 3,785.90 3,948.71 4,111.52 4,274.33 4,437.14 4,599.95 4,762.76 4,925.57 5,088.38 5,251.19 5,414.00
KP48 1/7/2007 P1 01 Julai 2007 SSM KP 48 P1 4,350.83 4,553.99 4,757.15 4,960.31 5,163.47 5,366.63 5,569.79 5,772.95
KP48 1/7/2007 P2 01 Julai 2007 SSM KP 48 P2 4,782.20 5,002.06 5,221.92 5,441.78 5,661.64 5,881.50 6,101.36 6,321.22
KP52 1/7/2007 P1 01 Julai 2007 SSM KP 52 P1 4,896.30 5,099.46 5,302.62 5,505.78 5,708.94 5,912.10 6,115.26 6,318.42
KP52 1/7/2007 P2 01 Julai 2007 SSM KP 52 P2 5,361.06 5,580.92 5,800.78 6,020.64 6,240.50 6,460.36 6,680.22 6,900.08
KP54 1/7/2007 P1 01 Julai 2007 SSM KP 54 P1 5,163.47 5,366.63 5,592.05 5,817.47 6,042.89 6,268.31 6,493.73 6,719.15
KP54 1/7/2007 P2 01 Julai 2007 SSM KP 54 P2 5,619.88 5,864.78 6,109.68 6,354.58 6,599.48 6,844.38 7,089.28 7,334.18
N1 1/7/2007 P1 01 Julai 2007 SSM N 1 P1 649.15 689.99 730.83 771.67 812.51 853.35 894.19 935.03 975.87 1,016.71 1,057.55 1,098.39 1,139.23 1,180.07 1,220.91 1,261.75 1,302.59 1,343.43 1,384.27 1,425.11 1,465.95 1,506.79
N1 1/7/2007 P2 01 Julai 2007 SSM N 1 P2 691.62 734.09 776.56 819.03 861.50 903.97 946.44 988.91 1,031.38 1,073.85 1,116.32 1,158.79 1,201.26 1,243.73 1,286.20 1,328.67 1,371.14 1,413.61 1,456.08 1,498.55 1,541.02 1,583.49
N1 1/7/2007 P3 01 Julai 2007 SSM N 1 P3 735.72 779.82 823.92 868.02 912.12 956.22 1,000.32 1,044.42 1,088.52 1,132.62 1,176.72 1,220.82 1,264.92 1,309.02 1,353.12 1,397.22 1,441.32 1,485.42 1,529.52 1,573.62 1,617.72 1,661.82
N4 1/7/2007 P1 01 Julai 2007 SSM N 4 P1 709.59 750.43 791.27 832.11 872.95 913.79 954.63 995.47 1,049.38 1,103.29 1,157.20 1,211.11 1,265.02 1,318.93 1,372.84 1,426.75 1,480.66 1,534.57
N4 1/7/2007 P2 01 Julai 2007 SSM N 4 P2 796.16 840.26 884.36 928.46 972.56 1,016.66 1,073.83 1,131.00 1,188.17 1,245.34 1,302.51 1,359.68 1,416.85 1,474.02 1,531.19 1,588.36 1,645.53 1,702.70
N11 1/7/2007 P1 01 Julai 2007 SSM N 11 P1 709.59 750.43 791.27 832.11 872.95 913.79 954.63 995.47 1,049.38 1,103.29 1,157.20 1,211.11 1,265.02 1,318.93 1,372.84 1,426.75 1,480.66 1,534.57 1,588.48 1,642.39 1,696.30 1,750.21
N11 1/7/2007 P2 01 Julai 2007 SSM N 11 P2 752.06 794.53 837.00 879.47 921.94 964.41 1,006.88 1,062.42 1,117.96 1,173.50 1,229.04 1,284.58 1,340.12 1,395.66 1,451.20 1,506.74 1,562.28 1,617.82 1,673.36 1,728.90 1,784.44 1,839.98
N11 1/7/2007 P3 01 Julai 2007 SSM N 11 P3 796.16 840.26 884.36 928.46 972.56 1,016.66 1,073.83 1,131.00 1,188.17 1,245.34 1,302.51 1,359.68 1,416.85 1,474.02 1,531.19 1,588.36 1,645.53 1,702.70 1,759.87 1,817.04 1,874.21 1,931.38
N17 1/7/2007 P1 01 Julai 2007 SSM N 17 P1 820.38 870.29 920.20 970.11 1,020.02 1,069.93 1,119.84 1,169.75 1,219.66 1,269.57 1,319.48 1,369.39 1,419.30 1,485.85 1,552.40 1,618.95 1,685.50 1,752.05 1,818.60 1,885.15 1,951.70 2,018.25 2,084.80 2,151.35
N17 1/7/2007 P2 01 Julai 2007 SSM N 17 P2 871.81 923.24 974.67 1,026.10 1,077.53 1,128.96 1,180.39 1,231.82 1,283.25 1,334.68 1,386.11 1,437.54 1,507.12 1,576.70 1,646.28 1,715.86 1,785.44 1,855.02 1,924.60 1,994.18 2,063.76 2,133.34 2,202.92 2,272.50
N17 1/7/2007 P3 01 Julai 2007 SSM N 17 P3 924.75 977.69 1,030.63 1,083.57 1,136.51 1,189.45 1,242.39 1,295.33 1,348.27 1,401.21 1,454.15 1,526.75 1,599.35 1,671.95 1,744.55 1,817.15 1,889.75 1,962.35 2,034.95 2,107.55 2,180.15 2,252.75 2,325.35 2,397.95
N22 1/7/2007 P1 01 Julai 2007 SSM N 22 P1 1,915.43 1,981.98 2,048.53 2,115.08 2,181.63 2,248.18 2,346.49 2,444.80 2,543.11 2,641.42 2,739.73 2,838.04
N22 1/7/2007 P2 01 Julai 2007 SSM N 22 P2 2,057.61 2,130.21 2,202.81 2,275.41 2,382.80 2,490.19 2,597.58 2,704.97 2,812.36 2,919.75 3,027.14 3,134.53
N27 1/7/2007 P1 01 Julai 2007 SSM N 27 P1 1,204.55 1,271.10 1,337.65 1,404.20 1,470.75 1,537.30 1,603.85 1,670.40 1,736.95 1,803.50 1,870.05 1,936.60 2,003.15 2,069.70 2,136.25 2,202.80 2,269.35 2,335.90 2,402.45 2,469.00 2,535.55 2,633.86 2,732.17 2,830.48 2,928.79 3,027.10
N27 1/7/2007 P2 01 Julai 2007 SSM N 27 P2 1,274.13 1,343.71 1,413.29 1,482.87 1,552.45 1,622.03 1,691.61 1,761.19 1,830.77 1,900.35 1,969.93 2,039.51 2,109.09 2,178.67 2,248.25 2,317.83 2,387.41 2,456.99 2,526.57 2,596.15 2,699.00 2,801.85 2,904.70 3,007.55 3,110.40 3,213.25
N27 1/7/2007 P3 01 Julai 2007 SSM N 27 P3 1,346.73 1,419.33 1,491.93 1,564.53 1,637.13 1,709.73 1,782.33 1,854.93 1,927.53 2,000.13 2,072.73 2,145.33 2,217.93 2,290.53 2,363.13 2,435.73 2,508.33 2,580.93 2,653.53 2,760.92 2,868.31 2,975.70 3,083.09 3,190.48 3,297.87 3,405.26
R1 1/7/2007 P1 01 Julai 2007 SSM R 1 P1 647.51 688.35 729.19 770.03 810.87 851.71 892.55 933.39 974.23 1,015.07 1,055.91 1,096.75 1,137.59 1,178.43
R1 1/7/2007 P2 01 Julai 2007 SSM R 1 P2 689.98 732.45 774.92 817.39 859.86 902.33 944.80 987.27 1,029.74 1,072.21 1,114.68 1,157.15 1,199.62 1,242.09
R1 1/7/2007 P3 01 Julai 2007 SSM R 1 P3 734.08 778.18 822.28 866.38 910.48 954.58 998.68 1,042.78 1,086.88 1,130.98 1,175.08 1,219.18 1,263.28 1,307.38
R3 1/7/2007 P1 01 Julai 2007 SSM R 3 P1 701.42 742.26 783.10 823.94 864.78 905.62 946.46 987.30 1,028.14 1,068.98 1,109.82 1,150.66 1,191.50 1,232.34 1,273.18 1,314.02 1,354.86
R3 1/7/2007 P2 01 Julai 2007 SSM R 3 P2 743.89 786.36 828.83 871.30 913.77 956.24 998.71 1,041.18 1,083.65 1,126.12 1,168.59 1,211.06 1,253.53 1,296.00 1,338.47 1,380.94 1,423.41
R3 1/7/2007 P3 01 Julai 2007 SSM R 3 P3 787.99 832.09 876.19 920.29 964.39 1,008.49 1,052.59 1,096.69 1,140.79 1,184.89 1,228.99 1,273.09 1,317.19 1,361.29 1,405.39 1,449.49 1,493.59
R6 1/7/2007 P1 01 Julai 2007 SSM R 6 P1 868.04 908.88 949.72 990.56 1,031.40 1,072.24 1,113.08 1,153.92 1,194.76 1,235.60 1,276.44 1,317.28 1,358.12 1,398.96 1,439.80
R6 1/7/2007 P2 01 Julai 2007 SSM R 6 P2 954.61 998.71 1,042.81 1,086.91 1,131.01 1,175.11 1,219.21 1,263.31 1,307.41 1,351.51 1,395.61 1,439.71 1,483.81 1,527.91 1,572.01
R8 1/7/2007 P1 01 Julai 2007 SSM R 8 P1 1,080.39 1,121.23 1,162.07 1,202.91 1,243.75 1,284.59 1,333.60 1,382.61 1,431.62 1,480.63
R8 1/7/2007 P2 01 Julai 2007 SSM R 8 P2 1,166.96 1,211.06 1,255.16 1,299.26 1,351.53 1,403.80 1,456.07 1,508.34 1,560.61 1,612.88
R9 1/7/2007 P1 01 Julai 2007 SSM R 9 P1 721.02 761.86 802.70 843.54 884.38 925.22 966.06 1,011.80 1,057.54 1,103.28 1,149.02 1,194.76 1,240.50 1,286.24 1,331.98 1,380.99 1,430.00 1,479.01 1,528.02 1,577.03 1,626.04
R9 1/7/2007 P2 01 Julai 2007 SSM R 9 P2 763.49 805.96 848.43 890.90 933.37 975.84 1,023.21 1,070.58 1,117.95 1,165.32 1,212.69 1,260.06 1,307.43 1,354.80 1,405.44 1,456.08 1,506.72 1,557.36 1,608.00 1,658.64 1,709.28
R9 1/7/2007 P3 01 Julai 2007 SSM R 9 P3 807.59 851.69 895.79 939.89 983.99 1,033.00 1,082.01 1,131.02 1,180.03 1,229.04 1,278.05 1,327.06 1,376.07 1,428.34 1,480.61 1,532.88 1,585.15 1,637.42 1,689.69 1,741.96 1,794.23
R11 1/7/2007 P1 01 Julai 2007 SSM R 11 P1 892.54 946.45 1,000.36 1,054.27 1,108.18 1,162.09 1,216.00 1,269.91 1,323.82 1,377.73 1,431.64 1,485.55 1,539.46 1,593.37 1,647.28
R11 1/7/2007 P2 01 Julai 2007 SSM R 11 P2 948.08 1,003.62 1,059.16 1,114.70 1,170.24 1,225.78 1,281.32 1,336.86 1,392.40 1,447.94 1,503.48 1,559.02 1,614.56 1,670.10 1,725.64
R11 1/7/2007 P3 01 Julai 2007 SSM R 11 P3 1,005.25 1,062.42 1,119.59 1,176.76 1,233.93 1,291.10 1,348.27 1,405.44 1,462.61 1,519.78 1,576.95 1,634.12 1,691.29 1,748.46 1,805.63
R12 1/7/2007 P1 01 Julai 2007 SSM R 12 P1 892.54 946.45 1,000.36 1,054.27 1,108.18 1,162.09 1,216.00 1,269.91 1,323.82 1,377.73 1,431.64 1,485.55 1,539.46 1,593.37 1,647.28
R12 1/7/2007 P2 01 Julai 2007 SSM R 12 P2 1,005.25 1,062.42 1,119.59 1,176.76 1,233.93 1,291.10 1,348.27 1,405.44 1,462.61 1,519.78 1,576.95 1,634.12 1,691.29 1,748.46 1,805.63
R14 1/7/2007 P1 01 Julai 2007 SSM R 14 P1 1,278.05 1,349.92 1,421.79 1,493.66 1,565.53 1,637.40 1,709.27
R14 1/7/2007 P2 01 Julai 2007 SSM R 14 P2 1,431.60 1,510.01 1,588.42 1,666.83 1,745.24 1,823.65 1,902.06
R16 1/7/2007 P1 01 Julai 2007 SSM R 16 P1 1,411.99 1,483.86 1,555.73 1,627.60 1,699.47 1,771.34 1,843.21 1,915.08 1,986.95
R16 1/7/2007 P2 01 Julai 2007 SSM R 16 P2 1,565.54 1,643.95 1,722.36 1,800.77 1,879.18 1,957.59 2,036.00 2,114.41 2,192.82
R17 1/7/2007 P1 01 Julai 2007 SSM R 17 P1 1,166.74 1,216.65 1,266.56 1,316.47 1,366.38 1,416.29 1,466.20 1,516.11 1,582.66 1,649.21 1,715.76 1,782.31 1,848.86 1,915.41 1,981.96
R17 1/7/2007 P2 01 Julai 2007 SSM R 17 P2 1,218.17 1,269.60 1,321.03 1,372.46 1,423.89 1,475.32 1,526.75 1,596.33 1,665.91 1,735.49 1,805.07 1,874.65 1,944.23 2,013.81 2,083.39
R17 1/7/2007 P3 01 Julai 2007 SSM R 17 P3 1,271.11 1,324.05 1,376.99 1,429.93 1,482.87 1,535.81 1,608.41 1,681.01 1,753.61 1,826.21 1,898.81 1,971.41 2,044.01 2,116.61 2,189.21
R22 1/7/2007 P1 01 Julai 2007 SSM R 22 P1 1,307.40 1,357.31 1,407.22 1,457.13 1,507.04 1,556.95 1,606.86 1,656.77 1,706.68 1,756.59 1,823.14 1,889.69 1,956.24 2,022.79 2,089.34 2,155.89 2,222.44 2,288.99 2,355.54 2,422.09 2,488.64 2,555.19
R22 1/7/2007 P2 01 Julai 2007 SSM R 22 P2 1,411.77 1,464.71 1,517.65 1,570.59 1,623.53 1,676.47 1,729.41 1,782.35 1,854.95 1,927.55 2,000.15 2,072.75 2,145.35 2,217.95 2,290.55 2,363.15 2,435.75 2,508.35 2,580.95 2,653.55 2,726.15 2,798.75
R24 1/7/2007 P1 01 Julai 2007 SSM R 24 P1 1,749.05 1,815.60 1,882.15 1,948.70 2,015.25 2,081.80 2,148.35 2,214.90 2,281.45 2,348.00 2,447.83 2,547.66 2,647.49 2,747.32 2,847.15 2,946.98
R24 1/7/2007 P2 01 Julai 2007 SSM R 24 P2 1,891.23 1,963.83 2,036.43 2,109.03 2,181.63 2,254.23 2,326.83 2,399.43 2,508.33 2,617.23 2,726.13 2,835.03 2,943.93 3,052.83 3,161.73 3,270.63
W27 1/7/2007 P1 01 Julai 2007 SSM W 27 P1 1,209.09 1,275.64 1,342.19 1,408.74 1,475.29 1,541.84 1,608.39 1,674.94 1,741.49 1,808.04 1,874.59 1,941.14 2,007.69 2,074.24 2,140.79 2,207.34 2,273.89 2,340.44 2,406.99 2,473.54 2,540.09 2,638.40 2,736.71 2,835.02 2,933.33 3,031.64
W27 1/7/2007 P2 01 Julai 2007 SSM W 27 P2 1,278.67 1,348.25 1,417.83 1,487.41 1,556.99 1,626.57 1,696.15 1,765.73 1,835.31 1,904.89 1,974.47 2,044.05 2,113.63 2,183.21 2,252.79 2,322.37 2,391.95 2,461.53 2,531.11 2,600.69 2,703.54 2,806.39 2,909.24 3,012.09 3,114.94 3,217.79
W27 1/7/2007 P3 01 Julai 2007 SSM W 27 P3 1,351.27 1,423.87 1,496.47 1,569.07 1,641.67 1,714.27 1,786.87 1,859.47 1,932.07 2,004.67 2,077.27 2,149.87 2,222.47 2,295.07 2,367.67 2,440.27 2,512.87 2,585.47 2,658.07 2,765.46 2,872.85 2,980.24 3,087.63 3,195.02 3,302.41 3,409.80
W17 1/7/2007 P1 01 Julai 2007 SSM W 17 P1 821.89 871.80 921.71 971.62 1,021.53 1,071.44 1,121.35 1,171.26 1,221.17 1,271.08 1,320.99 1,370.90 1,420.81 1,487.36 1,553.91 1,620.46 1,687.01 1,753.56 1,820.11 1,886.66 1,953.21 2,019.76 2,086.31 2,152.86
W17 1/7/2007 P2 01 Julai 2007 SSM W 17 P2 873.32 924.75 976.18 1,027.61 1,079.04 1,130.47 1,181.90 1,233.33 1,284.76 1,336.19 1,387.62 1,439.05 1,508.63 1,578.21 1,647.79 1,717.37 1,786.95 1,856.53 1,926.11 1,995.69 2,065.27 2,134.85 2,204.43 2,274.01
W17 1/7/2007 P3 01 Julai 2007 SSM W 17 P3 926.26 979.20 1,032.14 1,085.08 1,138.02 1,190.96 1,243.90 1,296.84 1,349.78 1,402.72 1,455.66 1,528.26 1,600.86 1,673.46 1,746.06 1,818.66 1,891.26 1,963.86 2,036.46 2,109.06 2,181.66 2,254.26 2,326.86 2,399.46
W22 1/7/2007 P1 01 Julai 2007 SSM W 22 P1 1,916.94 1,983.49 2,050.04 2,116.59 2,183.14 2,249.69 2,348.00 2,446.31 2,544.62 2,642.93 2,741.24 2,839.55
W22 1/7/2007 P2 01 Julai 2007 SSM W 22 P2 2,059.12 2,131.72 2,204.32 2,276.92 2,384.31 2,491.70 2,599.09 2,706.48 2,813.87 2,921.26 3,028.65 3,136.04
U11 1/7/2007 P1 01 Julai 2007 SSM U 11 P1 738.99 779.83 820.67 861.51 902.35 943.19 984.03 1,024.87 1,065.71 1,119.62 1,173.53 1,227.44 1,281.35 1,335.26 1,389.17 1,443.08 1,496.99 1,550.90 1,604.81 1,658.72 1,712.63 1,766.54
U11 1/7/2007 P2 01 Julai 2007 SSM U 11 P2 781.46 823.93 866.40 908.87 951.34 993.81 1,036.28 1,078.75 1,134.29 1,189.83 1,245.37 1,300.91 1,356.45 1,411.99 1,467.53 1,523.07 1,578.61 1,634.15 1,689.69 1,745.23 1,800.77 1,856.31
U11 1/7/2007 P3 01 Julai 2007 SSM U 11 P3 825.56 869.66 913.76 957.86 1,001.96 1,046.06 1,090.16 1,147.33 1,204.50 1,261.67 1,318.84 1,376.01 1,433.18 1,490.35 1,547.52 1,604.69 1,661.86 1,719.03 1,776.20 1,833.37 1,890.54 1,947.71
N41 1/7/2007 P1 01 Julai 2007 SSM N 41 P1 1,690.28 1,780.73 1,871.18 1,961.63 2,052.08 2,142.53 2,232.98 2,323.43 2,413.88 2,504.33 2,594.78 2,685.23 2,775.68 2,866.13 2,956.58 3,047.03 3,137.48 3,287.76 3,438.04 3,588.32 3,738.60 3,888.88 4,039.16 4,189.44 4,339.72 4,490.00 4,640.28
N41 1/7/2007 P2 01 Julai 2007 SSM N 41 P2 1,784.90 1,879.52 1,974.14 2,068.76 2,163.38 2,258.00 2,352.62 2,447.24 2,541.86 2,636.48 2,731.10 2,825.72 2,920.34 3,014.96 3,109.58 3,204.20 3,360.05 3,515.90 3,671.75 3,827.60 3,983.45 4,139.30 4,295.15 4,451.00 4,606.85 4,762.70 4,918.55
N41 1/7/2007 P3 01 Julai 2007 SSM N 41 P3 1,883.70 1,982.50 2,081.30 2,180.10 2,278.90 2,377.70 2,476.50 2,575.30 2,674.10 2,772.90 2,871.70 2,970.50 3,069.30 3,168.10 3,266.90 3,429.71 3,592.52 3,755.33 3,918.14 4,080.95 4,243.76 4,406.57 4,569.38 4,732.19 4,895.00 5,057.81 5,220.62
N44 1/7/2007 P1 01 Julai 2007 SSM N 44 P1 2,976.03 3,126.31 3,276.59 3,426.87 3,577.15 3,727.43 3,877.71 4,027.99 4,178.27 4,328.55 4,478.83 4,629.11 4,779.39 4,929.67
N44 1/7/2007 P2 01 Julai 2007 SSM N 44 P2 3,294.69 3,457.50 3,620.31 3,783.12 3,945.93 4,108.74 4,271.55 4,434.36 4,597.17 4,759.98 4,922.79 5,085.60 5,248.41 5,411.22
N48 1/7/2007 P1 01 Julai 2007 SSM N 48 P1 4,349.44 4,552.60 4,755.76 4,958.92 5,162.08 5,365.24 5,568.40 5,771.56
N48 1/7/2007 P2 01 Julai 2007 SSM N 48 P2 4,780.81 5,000.67 5,220.53 5,440.39 5,660.25 5,880.11 6,099.97 6,319.83
U32 1/7/2007 P1 01 Julai 2007 SSM U 32 P1 1,959.29 2,025.84 2,092.39 2,158.94 2,225.49 2,292.04 2,358.59 2,458.42 2,558.25 2,658.08 2,757.91 2,857.74 2,957.57 3,057.40 3,157.23 3,257.06 3,356.89 3,456.72 3,556.55 3,656.38
U32 1/7/2007 P2 01 Julai 2007 SSM U 32 P2 2,104.49 2,178.60 2,252.71 2,326.82 2,400.93 2,509.83 2,618.73 2,727.63 2,836.53 2,945.43 3,054.33 3,163.23 3,272.13 3,381.03 3,489.93 3,598.83 3,707.73 3,816.63 3,925.53 4,034.43
J41 1/7/2007 P1 01 Julai 2007 SSM J 41 P1 2,088.25 2,180.09 2,271.93 2,363.77 2,455.61 2,547.45 2,639.29 2,731.13 2,822.97 2,914.81 3,006.65 3,098.49 3,190.33 3,343.40 3,496.47 3,649.54 3,802.61 3,955.68 4,108.75 4,261.82 4,414.89 4,567.96 4,721.03
J41 1/7/2007 P2 01 Julai 2007 SSM J 41 P2 2,184.26 2,280.27 2,376.28 2,472.29 2,568.30 2,664.31 2,760.32 2,856.33 2,952.34 3,048.35 3,144.36 3,240.37 3,401.78 3,583.19 3,724.60 3,886.01 4,047.42 4,208.83 4,370.24 4,531.65 4,693.06 4,854.47 5,015.88
J41 1/7/2007 P3 01 Julai 2007 SSM J 41 P3 2,284.45 2,384.64 2,484.83 2,585.02 2,685.21 2,785.40 2,885.59 2,985.78 3,085.97 3,186.16 3,286.35 3,454.72 3,623.09 3,791.46 3,959.83 4,128.20 4,296.57 4,464.94 4,633.31 4,801.68 4,970.05 5,138.42 5,306.79
J44 1/7/2007 P1 01 Julai 2007 SSM J 44 P1 3,026.12 3,179.19 3,332.26 3,485.33 3,638.40 3,791.47 3,944.54 4,097.61 4,250.68 4,403.75 4,556.82 4,709.89 4,862.96 5,016.03
J44 1/7/2007 P2 01 Julai 2007 SSM J 44 P2 3,355.90 3,524.27 3,692.64 3,861.01 4,029.38 4,197.75 4,366.12 4,534.49 4,702.86 4,871.23 5,039.60 5,207.97 5,376.34 5,544.71
VU6 1/11/2002 P1 01 November 2002 SSM VU 6 P1 6,571.40 7,200.60 7,624.10 7,926.60 8,229.10
U29 1/7/2007 P1 01 Julai 2007 SSM U 29 P1 1,160.69 1,227.24 1,293.79 1,360.34 1,426.89 1,493.44 1,559.99 1,626.54 1,693.09 1,759.64 1,826.19 1,892.74 1,959.29 2,025.84 2,092.39 2,158.94 2,225.49 2,292.04 2,358.59 2,425.14 2,491.69 2,558.24 2,658.07 2,757.90 2,857.73 2,957.56 3,057.39
U29 1/7/2007 P2 01 Julai 2007 SSM U 29 P2 1,231.78 1,302.87 1,373.96 1,445.05 1,516.14 1,587.23 1,658.32 1,729.41 1,800.50 1,871.59 1,942.68 2,013.77 2,084.86 2,155.95 2,227.04 2,298.13 2,369.22 2,440.31 2,511.40 2,582.49 2,653.58 2,757.94 2,862.30 2,966.66 3,071.02 3,175.38 3,279.74
U29 1/7/2007 P3 01 Julai 2007 SSM U 29 P3 1,305.89 1,380.00 1,454.11 1,528.22 1,602.33 1,676.44 1,750.55 1,824.66 1,898.77 1,972.88 2,046.99 2,121.10 2,195.21 2,269.32 2,343.43 2,417.54 2,491.65 2,565.76 2,639.87 2,713.98 2,822.88 2,931.78 3,040.68 3,149.58 3,258.48 3,367.38 3,476.28
U41 1/7/2007 P1 01 Julai 2007 SSM U 41 P1 1,999.19 2,091.03 2,182.87 2,274.71 2,366.55 2,458.39 2,550.23 2,642.07 2,733.91 2,825.75 2,917.59 3,009.43 3,101.27 3,193.11 3,346.18 3,499.25 3,652.32 3,805.39 3,958.46 4,111.53 4,264.60 4,417.67 4,570.74 4,723.81
U41 1/7/2007 P2 01 Julai 2007 SSM U 41 P2 2,095.20 2,191.21 2,287.22 2,383.23 2,479.24 2,575.25 2,671.26 2,767.27 2,863.28 2,959.29 3,055.30 3,151.31 3,247.32 3,408.73 3,570.14 3,731.55 3,892.96 4,054.37 4,215.78 4,377.19 4,538.60 4,700.01 4,861.42 5,022.83
U41 1/7/2007 P3 01 Julai 2007 SSM U 41 P3 2,195.39 2,295.58 2,395.77 2,495.96 2,596.15 2,696.34 2,796.53 2,896.72 2,996.91 3,097.10 3,197.29 3,297.48 3,465.85 3,634.22 3,802.59 3,970.96 4,139.33 4,307.70 4,476.07 4,644.44 4,812.81 4,981.18 5,149.55 5,317.92
U17 1/7/2007 P1 01 Julai 2007 SSM U 17 P1 862.73 912.64 962.55 1,012.46 1,062.37 1,112.28 1,162.19 1,212.10 1,262.01 1,311.92 1,361.83 1,411.74 1,461.65 1,511.56 1,578.11 1,644.66 1,711.21
U17 1/7/2007 P2 01 Julai 2007 SSM U 17 P2 914.16 965.59 1,017.02 1,068.45 1,119.88 1,171.31 1,222.74 1,274.17 1,325.60 1,377.03 1,428.46 1,479.89 1,531.32 1,600.90 1,670.48 1,740.06 1,809.64
U17 1/7/2007 P3 01 Julai 2007 SSM U 17 P3 967.10 1,020.04 1,072.98 1,125.92 1,178.86 1,231.80 1,284.74 1,337.68 1,390.62 1,443.56 1,496.50 1,549.44 1,622.04 1,694.64 1,767.24 1,839.84 1,912.44
U19 1/7/2007 P1 01 Julai 2007 SSM U 19 P1 827.94 879.37 930.80 982.23 1,033.66 1,085.09 1,136.52 1,187.95 1,239.38 1,290.81 1,342.24 1,393.67 1,445.10 1,511.65 1,578.20 1,644.75 1,711.30 1,777.85 1,844.40 1,910.95 1,977.50 2,044.05 2,110.60 2,177.15
U19 1/7/2007 P2 01 Julai 2007 SSM U 19 P2 880.88 933.82 986.76 1,039.70 1,092.64 1,145.58 1,198.52 1,251.46 1,304.40 1,357.34 1,410.28 1,463.22 1,532.80 1,602.38 1,671.96 1,741.54 1,811.12 1,880.70 1,950.28 2,019.86 2,089.44 2,159.02 2,228.60 2,298.18
U19 1/7/2007 P3 01 Julai 2007 SSM U 19 P3 935.33 989.78 1,044.23 1,098.68 1,153.13 1,207.58 1,262.03 1,316.48 1,370.93 1,425.38 1,479.83 1,552.43 1,625.03 1,697.63 1,770.23 1,842.83 1,915.43 1,988.03 2,060.63 2,133.23 2,205.83 2,278.43 2,351.03 2,423.63
U24 1/7/2007 P1 01 Julai 2007 SSM U 24 P1 1,932.06 1,998.61 2,065.16 2,131.71 2,198.26 2,264.81 2,364.64 2,464.47 2,564.30 2,664.13 2,763.96 2,863.79
U24 1/7/2007 P2 01 Julai 2007 SSM U 24 P2 2,074.24 2,146.84 2,219.44 2,292.04 2,400.94 2,509.84 2,618.74 2,727.64 2,836.54 2,945.44 3,054.34 3,163.24
U22 1/7/2007 P1 01 Julai 2007 SSM U 22 P1 1,230.26 1,280.17 1,330.08 1,379.99 1,429.90 1,479.81 1,529.72 1,579.63 1,646.18 1,712.73 1,779.28 1,845.83 1,912.38 1,978.93
U22 1/7/2007 P2 01 Julai 2007 SSM U 22 P2 1,334.63 1,387.57 1,440.51 1,493.45 1,546.39 1,599.33 1,671.93 1,744.53 1,817.13 1,889.73 1,962.33 2,034.93 2,107.53 2,180.13
L29 1/7/2007 P1 01 Julai 2007 SSM L 29 P1 1,472.26 1,538.81 1,605.36 1,671.91 1,738.46 1,805.01 1,871.56 1,938.11 2,004.66 2,071.21 2,137.76 2,204.31 2,270.86 2,337.41 2,403.96 2,470.51 2,537.06 2,635.37 2,733.68 2,831.99 2,930.30 3,028.61
L29 1/7/2007 P2 01 Julai 2007 SSM L 29 P2 1,543.35 1,614.44 1,685.53 1,756.62 1,827.71 1,898.80 1,969.89 2,040.98 2,112.07 2,183.16 2,254.25 2,325.34 2,396.43 2,467.52 2,538.61 2,609.70 2,712.55 2,815.40 2,918.25 3,021.10 3,123.95 3,226.80
L29 1/7/2007 P3 01 Julai 2007 SSM L 29 P3 1,617.46 1,691.57 1,765.68 1,839.79 1,913.90 1,988.01 2,062.12 2,136.23 2,210.34 2,284.45 2,358.56 2,432.67 2,506.78 2,580.89 2,655.00 2,762.39 2,869.78 2,977.17 3,084.56 3,191.95 3,299.34 3,406.73
L26 1/7/2007 P1 01 Julai 2007 SSM L 26 P1 2,199.78 2,298.09 2,396.40 2,494.71 2,593.02 2,691.33 2,789.64 2,887.95 2,986.26
L26 1/7/2007 P2 01 Julai 2007 SSM L 26 P2 2,410.02 2,517.41 2,624.80 2,732.19 2,839.58 2,946.97 3,054.36 3,161.75 3,269.14
L22 1/7/2007 P1 01 Julai 2007 SSM L 22 P1 1,918.45 1,985.00 2,051.55 2,118.10 2,184.65 2,251.20 2,349.51 2,447.82 2,546.13 2,644.44 2,742.75 2,841.06
L22 1/7/2007 P2 01 Julai 2007 SSM L 22 P2 2,060.63 2,133.23 2,205.83 2,278.43 2,385.82 2,493.21 2,600.60 2,707.99 2,815.38 2,922.77 3,030.16 3,137.55
L17 1/7/2007 P1 01 Julai 2007 SSM L 17 P1 823.40 873.31 923.22 973.13 1,023.04 1,072.95 1,122.86 1,172.77 1,222.68 1,272.59 1,322.50 1,372.41 1,422.32 1,488.87 1,555.42 1,621.97 1,688.52 1,755.07 1,821.62 1,888.17 1,954.72 2,021.27 2,087.82 2,154.37
L17 1/7/2007 P2 01 Julai 2007 SSM L 17 P2 874.83 926.26 977.69 1,029.12 1,080.55 1,131.98 1,183.41 1,234.84 1,286.27 1,337.70 1,389.13 1,440.56 1,510.14 1,579.72 1,649.30 1,718.88 1,788.46 1,858.04 1,927.62 1,997.20 2,066.78 2,136.36 2,205.94 2,275.52
L17 1/7/2007 P3 01 Julai 2007 SSM L 17 P3 927.77 980.71 1,033.65 1,086.59 1,139.53 1,192.47 1,245.41 1,298.35 1,351.29 1,404.23 1,457.17 1,529.77 1,602.37 1,674.97 1,747.57 1,820.17 1,892.77 1,965.37 2,037.97 2,110.57 2,183.17 2,255.77 2,328.37 2,400.97
L32 1/7/2007 P1 01 Julai 2007 SSM L 32 P1 2,709.49 2,807.80 2,906.11 3,004.42 3,102.73 3,201.04 3,299.35 3,397.66 3,495.97 3,594.28
L32 1/7/2007 P2 01 Julai 2007 SSM L 32 P2 2,919.73 3,027.12 3,134.51 3,241.90 3,349.29 3,456.68 3,564.07 3,671.46 3,778.85 3,886.24
L38 1/7/2007 P1 01 Julai 2007 SSM L 38 P1 3,002.91 3,101.22 3,199.53 3,297.84 3,461.19 3,624.54 3,787.89 3,951.24 4,114.59 4,277.94 4,441.29
L38 1/7/2007 P2 01 Julai 2007 SSM L 38 P2 3,213.15 3,320.54 3,497.50 3,674.46 3,851.42 4,028.38 4,205.34 4,382.30 4,559.26 4,736.22 4,913.18
L41 1/7/2007 P1 01 Julai 2007 SSM L 41 P1 1,989.45 2,081.29 2,173.13 2,264.97 2,356.81 2,448.65 2,540.49 2,632.33 2,724.17 2,816.01 2,907.85 2,999.69 3,091.53 3,183.37 3,335.04 3,486.71 3,638.38 3,790.05 3,941.72 4,093.39 4,245.06 4,396.73 4,548.40 4,700.07
L41 1/7/2007 P2 01 Julai 2007 SSM L 41 P2 2,085.46 2,181.47 2,277.48 2,373.49 2,469.50 2,565.51 2,661.52 2,757.53 2,853.54 2,949.55 3,045.56 3,141.57 3,237.58 3,396.21 3,554.84 3,713.47 3,872.10 4,030.73 4,189.36 4,347.99 4,506.62 4,665.25 4,823.88 4,982.51
L41 1/7/2007 P3 01 Julai 2007 SSM L 41 P3 2,185.65 2,285.84 2,386.03 2,486.22 2,586.41 2,686.60 2,786.79 2,886.98 2,987.17 3,087.36 3,187.55 3,287.74 3,453.33 3,618.92 3,784.51 3,950.10 4,115.69 4,281.28 4,446.87 4,612.46 4,778.05 4,943.64 5,109.23 5,274.82
L44 1/7/2007 P1 01 Julai 2007 SSM L 44 P1 3,019.16 3,170.83 3,322.50 3,474.17 3,625.84 3,777.51 3,929.18 4,080.85 4,232.52 4,384.19 4,535.86 4,687.53 4,839.20 4,990.87
L44 1/7/2007 P2 01 Julai 2007 SSM L 44 P2 3,343.38 3,508.97 3,674.56 3,840.15 4,005.74 4,171.33 4,336.92 4,502.51 4,668.10 4,833.69 4,999.28 5,164.87 5,330.46 5,496.05
L48 1/7/2007 P1 01 Julai 2007 SSM L 48 P1 4,391.18 4,595.73 4,800.28 5,004.83 5,209.38 5,413.93 5,618.48 5,823.03
L48 1/7/2007 P2 01 Julai 2007 SSM L 48 P2 4,825.33 5,046.58 5,267.83 5,489.08 5,710.33 5,931.58 6,152.83 6,374.08
L52 1/7/2007 P1 01 Julai 2007 SSM L 52 P1 4,939.43 5,143.98 5,348.53 5,553.08 5,757.63 5,962.18 6,166.73 6,371.28
L52 1/7/2007 P2 01 Julai 2007 SSM L 52 P2 5,406.98 5,628.23 5,849.48 6,070.73 6,291.98 6,513.23 6,734.48 6,955.73
L54 1/7/2007 P1 01 Julai 2007 SSM L 54 P1 5,209.39 5,413.94 5,642.15 5,870.36 6,098.57 6,326.78 6,554.99 6,783.20
L54 1/7/2007 P2 01 Julai 2007 SSM L 54 P2 5,669.98 5,917.67 6,165.36 6,413.05 6,660.74 6,908.43 7,156.12 7,403.81
S17 1/7/2007 P1 01 Julai 2007 SSM S 17 P1 820.38 870.29 920.20 970.11 1,020.02 1,069.93 1,119.84 1,169.75 1,219.66 1,269.57 1,319.48 1,369.39 1,419.30 1,485.85 1,552.40 1,618.95 1,685.50 1,752.05 1,818.60 1,885.15 1,951.70 2,018.25 2,084.80 2,151.35
S17 1/7/2007 P2 01 Julai 2007 SSM S 17 P2 871.81 923.24 974.67 1,026.10 1,077.53 1,128.96 1,180.39 1,231.82 1,283.25 1,334.68 1,386.11 1,437.54 1,507.12 1,576.70 1,646.28 1,715.86 1,785.44 1,855.02 1,924.60 1,994.18 2,063.76 2,133.34 2,202.92 2,272.50
S17 1/7/2007 P3 01 Julai 2007 SSM S 17 P3 924.75 977.69 1,030.63 1,083.57 1,136.51 1,189.45 1,242.39 1,295.33 1,348.27 1,401.21 1,454.15 1,526.75 1,599.35 1,671.95 1,744.55 1,817.15 1,889.75 1,962.35 2,034.95 2,107.55 2,180.15 2,252.75 2,325.35 2,397.95
S22 1/7/2007 P1 01 Julai 2007 SSM S 22 P1 1,915.43 1,981.98 2,048.53 2,115.08 2,181.63 2,248.18 2,346.49 2,444.80 2,543.11 2,641.42 2,739.73 2,838.04
S22 1/7/2007 P2 01 Julai 2007 SSM S 22 P2 2,057.61 2,130.21 2,202.81 2,275.41 2,382.80 2,490.19 2,597.58 2,704.97 2,812.36 2,919.75 3,027.14 3,134.53
S26 1/7/2007 P1 01 Julai 2007 SSM S 26 P1 2,195.24 2,293.55 2,391.86 2,490.17 2,588.48 2,686.79 2,785.10 2,883.41 2,981.72
S26 1/7/2007 P2 01 Julai 2007 SSM S 26 P2 2,405.48 2,512.87 2,620.26 2,727.65 2,835.04 2,942.43 3,049.82 3,157.21 3,264.60
S27 1/7/2007 P1 01 Julai 2007 SSM S 27 P1 1,204.55 1,271.10 1,337.65 1,404.20 1,470.75 1,537.30 1,603.85 1,670.40 1,736.95 1,803.50 1,870.05 1,936.60 2,003.15 2,069.70 2,136.25 2,202.80 2,269.35 2,335.90 2,402.45 2,469.00 2,535.55 2,633.86 2,732.17 2,830.48 2,928.79 3,027.10
S27 1/7/2007 P2 01 Julai 2007 SSM S 27 P2 1,274.13 1,343.71 1,413.29 1,482.87 1,552.45 1,622.03 1,691.61 1,761.19 1,830.77 1,900.35 1,969.93 2,039.51 2,109.09 2,178.67 2,248.25 2,317.83 2,387.41 2,456.99 2,526.57 2,596.15 2,699.00 2,801.85 2,904.70 3,007.55 3,110.40 3,213.25
S27 1/7/2007 P3 01 Julai 2007 SSM S 27 P3 1,346.73 1,419.33 1,491.93 1,564.53 1,637.13 1,709.73 1,782.33 1,854.93 1,927.53 2,000.13 2,072.73 2,145.33 2,217.93 2,290.53 2,363.13 2,435.73 2,508.33 2,580.93 2,653.53 2,760.92 2,868.31 2,975.70 3,083.09 3,190.48 3,297.87 3,405.26
S28 1/7/2007 P1 01 Julai 2007 SSM S 28 P1 1,204.55 1,271.10 1,337.65 1,404.20 1,470.75 1,537.30 1,603.85 1,670.40 1,736.95 1,803.50 1,870.05 1,936.60 2,003.15 2,069.70 2,136.25 2,202.80 2,269.35 2,335.90 2,402.45 2,469.00 2,535.55 2,633.86 2,732.17 2,830.48 2,928.79 3,027.10
S28 1/7/2007 P2 01 Julai 2007 SSM S 28 P2 1,346.73 1,419.33 1,491.93 1,564.53 1,637.13 1,709.73 1,782.33 1,854.93 1,927.53 2,000.13 2,072.73 2,145.33 2,217.93 2,290.53 2,363.13 2,435.73 2,508.33 2,580.93 2,653.53 2,760.92 2,868.31 2,975.70 3,083.09 3,190.48 3,297.87 3,405.26
S32 1/7/2007 P1 01 Julai 2007 SSM S 32 P1 2,413.04 2,511.35 2,609.66 2,707.97 2,806.28 2,904.59 3,002.90 3,101.21 3,199.52 3,297.83 3,396.14 3,494.45 3,592.76
S32 1/7/2007 P2 01 Julai 2007 SSM S 32 P2 2,623.28 2,730.67 2,838.06 2,945.45 3,052.84 3,160.23 3,267.62 3,375.01 3,482.40 3,589.79 3,697.18 3,804.57 3,911.96
S38 1/7/2007 P1 01 Julai 2007 SSM S 38 P1 3,001.40 3,099.71 3,198.02 3,296.33 3,459.68 3,623.03 3,786.38 3,949.73 4,113.08 4,276.43 4,439.78
S38 1/7/2007 P2 01 Julai 2007 SSM S 38 P2 3,211.64 3,319.03 3,495.99 3,672.95 3,849.91 4,026.87 4,203.83 4,380.79 4,557.75 4,734.71 4,911.67
S41 1/7/2007 P1 01 Julai 2007 SSM S 41 P1 1,688.89 1,779.34 1,869.79 1,960.24 2,050.69 2,141.14 2,231.59 2,322.04 2,412.49 2,502.94 2,593.39 2,683.84 2,774.29 2,864.74 2,955.19 3,045.64 3,136.09 3,286.37 3,436.65 3,586.93 3,737.21 3,887.49 4,037.77 4,188.05 4,338.33 4,488.61 4,638.89
S41 1/7/2007 P2 01 Julai 2007 SSM S 41 P2 1,783.51 1,878.13 1,972.75 2,067.37 2,161.99 2,256.61 2,351.23 2,445.85 2,540.47 2,635.09 2,729.71 2,824.33 2,918.95 3,013.57 3,108.19 3,202.81 3,358.66 3,514.51 3,670.36 3,826.21 3,982.06 4,137.91 4,293.76 4,449.61 4,605.46 4,761.31 4,917.16
S41 1/7/2007 P3 01 Julai 2007 SSM S 41 P3 1,882.31 1,981.11 2,079.91 2,178.71 2,277.51 2,376.31 2,475.11 2,573.91 2,672.71 2,771.51 2,870.31 2,969.11 3,067.91 3,166.71 3,265.51 3,428.32 3,591.13 3,753.94 3,916.75 4,079.56 4,242.37 4,405.18 4,567.99 4,730.80 4,893.61 5,056.42 5,219.23
S44 1/7/2007 P1 01 Julai 2007 SSM S 44 P1 2,976.03 3,126.31 3,276.59 3,426.87 3,577.15 3,727.43 3,877.71 4,027.99 4,178.27 4,328.55 4,478.83 4,629.11 4,779.39 4,929.67
S44 1/7/2007 P2 01 Julai 2007 SSM S 44 P2 3,294.69 3,457.50 3,620.31 3,783.12 3,945.93 4,108.74 4,271.55 4,434.36 4,597.17 4,759.98 4,922.79 5,085.60 5,248.41 5,411.22
S48 1/7/2007 P1 01 Julai 2007 SSM S 48 P1 4,348.05 4,551.21 4,754.37 4,957.53 5,160.69 5,363.85 5,567.01 5,770.17
S48 1/7/2007 P2 01 Julai 2007 SSM S 48 P2 4,779.42 4,999.28 5,219.14 5,439.00 5,658.86 5,878.72 6,098.58 6,318.44
S52 1/7/2007 P1 01 Julai 2007 SSM S 52 P1 4,894.91 5,098.07 5,301.23 5,504.39 5,707.55 5,910.71 6,113.87 6,317.03
S52 1/7/2007 P2 01 Julai 2007 SSM S 52 P2 5,359.67 5,579.53 5,799.39 6,019.25 6,239.11 6,458.97 6,678.83 6,898.69
S54 1/7/2007 P1 01 Julai 2007 SSM S 54 P1 5,159.29 5,362.45 5,587.87 5,813.29 6,038.71 6,264.13 6,489.55 6,714.97
S54 1/7/2007 P2 01 Julai 2007 SSM S 54 P2 5,615.70 5,860.60 6,105.50 6,350.40 6,595.30 6,840.20 7,085.10 7,330.00
U26 1/7/2007 P1 01 Julai 2007 SSM U 26 P1 2,216.41 2,316.24 2,416.07 2,515.90 2,615.73 2,715.56 2,815.39 2,915.22 3,015.05
U26 1/7/2007 P2 01 Julai 2007 SSM U 26 P2 2,429.67 2,538.57 2,647.47 2,756.37 2,865.27 2,974.17 3,083.07 3,191.97 3,300.87
U36 1/7/2007 P1 01 Julai 2007 SSM U 36 P1 3,057.36 3,157.19 3,257.02 3,356.85 3,523.23 3,689.61 3,855.99 4,022.37 4,188.75 4,355.13 4,521.51
U36 1/7/2007 P2 01 Julai 2007 SSM U 36 P2 3,270.62 3,379.52 3,559.51 3,739.50 3,919.49 4,099.48 4,279.47 4,459.46 4,639.45 4,819.44 4,999.43
U37 1/7/2007 P1 01 Julai 2007 SSM U 37 P1 3,778.83 3,945.21 4,111.59 4,277.97 4,444.35 4,610.73 4,777.11 4,943.49
U37 1/7/2007 P2 01 Julai 2007 SSM U 37 P2 3,951.26 4,123.69 4,296.12 4,468.55 4,640.98 4,813.41 4,985.84 5,158.27
U37 1/7/2007 P3 01 Julai 2007 SSM U 37 P3 4,131.25 4,311.24 4,491.23 4,671.22 4,851.21 5,031.20 5,211.19 5,391.18
U38 1/7/2007 P1 01 Julai 2007 SSM U 38 P1 3,778.83 3,945.21 4,111.59 4,277.97 4,444.35 4,610.73 4,777.11 4,943.49
U38 1/7/2007 P2 01 Julai 2007 SSM U 38 P2 4,131.25 4,311.24 4,491.23 4,671.22 4,851.21 5,031.20 5,211.19 5,391.18
U39 1/7/2007 P1 01 Julai 2007 SSM U 39 P1 4,444.33 4,643.98 4,843.63 5,043.28 5,242.93 5,442.58 5,642.23
U39 1/7/2007 P2 01 Julai 2007 SSM U 39 P2 4,651.54 4,858.75 5,065.96 5,273.17 5,480.38 5,687.59 5,894.80
U39 1/7/2007 P3 01 Julai 2007 SSM U 39 P3 4,866.32 5,081.10 5,295.88 5,510.66 5,725.44 5,940.22 6,155.00
U40 1/7/2007 P1 01 Julai 2007 SSM U 40 P1 4,444.33 4,643.98 4,843.63 5,043.28 5,242.93 5,442.58 5,642.23
U40 1/7/2007 P2 01 Julai 2007 SSM U 40 P2 4,866.32 5,081.10 5,295.88 5,510.66 5,725.44 5,940.22 6,155.00
U42 1/7/2007 P1 01 Julai 2007 SSM U 42 P1 1,999.19 2,091.03 2,182.87 2,274.71 2,366.55 2,458.39 2,550.23 2,642.07 2,733.91 2,825.75 2,917.59 3,009.43 3,101.27 3,193.11 3,346.18 3,499.25 3,652.32 3,805.39 3,958.46 4,111.53 4,264.60 4,417.67 4,570.74 4,723.81
U42 1/7/2007 P2 01 Julai 2007 SSM U 42 P2 2,195.39 2,295.58 2,395.77 2,495.96 2,596.15 2,696.34 2,796.53 2,896.72 2,996.91 3,097.10 3,197.29 3,297.48 3,465.85 3,634.22 3,802.59 3,970.96 4,139.33 4,307.70 4,476.07 4,644.44 4,812.81 4,981.18 5,149.55 5,317.92
U43 1/7/2007 P1 01 Julai 2007 SSM U 43 P1 3,028.90 3,181.97 3,335.04 3,488.11 3,641.18 3,794.25 3,947.32 4,100.39 4,253.46 4,406.53 4,559.60 4,712.67 4,865.74 5,018.81
U43 1/7/2007 P2 01 Julai 2007 SSM U 43 P2 3,190.31 3,351.72 3,513.13 3,674.54 3,835.95 3,997.36 4,158.77 4,320.18 4,481.59 4,643.00 4,804.41 4,965.82 5,127.23 5,288.64
U43 1/7/2007 P3 01 Julai 2007 SSM U 43 P3 3,358.68 3,527.05 3,695.42 3,863.79 4,032.16 4,200.53 4,368.90 4,537.27 4,705.64 4,874.01 5,042.38 5,210.75 5,379.12 5,547.49
U44 1/7/2007 P1 01 Julai 2007 SSM U 44 P1 3,028.90 3,181.97 3,335.04 3,488.11 3,641.18 3,794.25 3,947.32 4,100.39 4,253.46 4,406.53 4,559.60 4,712.67 4,865.74 5,018.81
U44 1/7/2007 P2 01 Julai 2007 SSM U 44 P2 3,358.68 3,527.05 3,695.42 3,863.79 4,032.16 4,200.53 4,368.90 4,537.27 4,705.64 4,874.01 5,042.38 5,210.75 5,379.12 5,547.49
U47 1/7/2007 P1 01 Julai 2007 SSM U 47 P1 4,431.54 4,638.87 4,846.20 5,053.53 5,260.86 5,468.19 5,675.52 5,882.85
U47 1/7/2007 P2 01 Julai 2007 SSM U 47 P2 4,647.22 4,862.90 5,078.58 5,294.26 5,509.94 5,725.62 5,941.30 6,156.98
U47 1/7/2007 P3 01 Julai 2007 SSM U 47 P3 4,871.25 5,095.28 5,319.31 5,543.34 5,767.37 5,991.40 6,215.43 6,439.46
U48 1/7/2007 P1 01 Julai 2007 SSM U 48 P1 4,431.54 4,638.87 4,846.20 5,053.53 5,260.86 5,468.19 5,675.52 5,882.85
U48 1/7/2007 P2 01 Julai 2007 SSM U 48 P2 4,871.25 5,095.28 5,319.31 5,543.34 5,767.37 5,991.40 6,215.43 6,439.46
U51 1/7/2007 P1 01 Julai 2007 SSM U 51 P1 4,992.31 5,199.64 5,406.97 5,614.30 5,821.63 6,028.96 6,236.29 6,443.62
U51 1/7/2007 P2 01 Julai 2007 SSM U 51 P2 5,224.69 5,440.37 5,656.05 5,871.73 6,087.41 6,303.09 6,518.77 6,734.45
U51 1/7/2007 P3 01 Julai 2007 SSM U 51 P3 5,465.42 5,689.45 5,913.48 6,137.51 6,361.54 6,585.57 6,809.60 7,033.63
U52 1/7/2007 P1 01 Julai 2007 SSM U 52 P1 4,992.31 5,199.64 5,406.97 5,614.30 5,821.63 6,028.96 6,236.29 6,443.62
U52 1/7/2007 P2 01 Julai 2007 SSM U 52 P2 5,465.42 5,689.45 5,913.48 6,137.51 6,361.54 6,585.57 6,809.60 7,033.63
U53 1/7/2007 P1 01 Julai 2007 SSM U 53 P1 5,258.09 5,465.42 5,695.02 5,924.62 6,154.22 6,383.82 6,613.42 6,843.02
U53 1/7/2007 P2 01 Julai 2007 SSM U 53 P2 5,473.77 5,713.11 5,952.45 6,191.79 6,431.13 6,670.47 6,909.81 7,149.15
U53 1/7/2007 P3 01 Julai 2007 SSM U 53 P3 5,722.85 5,971.93 6,221.01 6,470.09 6,719.17 6,968.25 7,217.33 7,466.41
U54 1/7/2007 P1 01 Julai 2007 SSM U 54 P1 5,258.09 5,465.42 5,695.02 5,924.62 6,154.22 6,383.82 6,613.42 6,843.02
U54 1/7/2007 P2 01 Julai 2007 SSM U 54 P2 5,722.85 5,971.93 6,221.01 6,470.09 6,719.17 6,968.25 7,217.33 7,466.41
W41 1/7/2007 P1 01 Julai 2007 SSM W 41 P1 1,702.81 1,794.65 1,886.49 1,978.33 2,070.17 2,162.01 2,253.85 2,345.69 2,437.53 2,529.37 2,621.21 2,713.05 2,804.89 2,896.73 2,988.57 3,080.41 3,172.25 3,323.92 3,475.59 3,627.26 3,778.93 3,930.60 4,082.27 4,233.94 4,385.61 4,537.28 4,688.95
W41 1/7/2007 P2 01 Julai 2007 SSM W 41 P2 1,798.82 1,894.83 1,990.84 2,086.85 2,182.86 2,278.87 2,374.88 2,470.89 2,566.90 2,662.91 2,758.92 2,854.93 2,950.94 3,046.95 3,142.96 3,238.97 3,396.21 3,553.45 3,710.69 3,867.93 4,025.17 4,182.41 4,339.65 4,496.89 4,654.13 4,811.37 4,968.61
W41 1/7/2007 P3 01 Julai 2007 SSM W 41 P3 1,899.01 1,999.20 2,099.39 2,199.58 2,299.77 2,399.96 2,500.15 2,600.34 2,700.53 2,800.72 2,900.91 3,001.10 3,101.29 3,201.48 3,301.67 3,464.48 3,627.29 3,790.10 3,952.91 4,115.72 4,278.53 4,441.34 4,604.15 4,766.96 4,929.77 5,092.58 5,255.39
W44 1/7/2007 P1 01 Julai 2007 SSM W 44 P1 3,019.16 3,170.83 3,322.50 3,474.17 3,625.84 3,777.51 3,929.18 4,080.85 4,232.52 4,384.19 4,535.86 4,687.53 4,839.20 4,990.87
W44 1/7/2007 P2 01 Julai 2007 SSM W 44 P2 3,339.21 3,502.02 3,664.83 3,827.64 3,990.45 4,153.26 4,316.07 4,478.88 4,641.69 4,804.50 4,967.31 5,130.12 5,292.93 5,455.74
W48 1/7/2007 P1 01 Julai 2007 SSM W 48 P1 4,387.01 4,591.56 4,796.11 5,000.66 5,205.21 5,409.76 5,614.31 5,818.86
W48 1/7/2007 P2 01 Julai 2007 SSM W 48 P2 4,821.16 5,042.41 5,263.66 5,484.91 5,706.16 5,927.41 6,148.66 6,369.91
W52 1/7/2007 P1 01 Julai 2007 SSM W 52 P1 4,935.26 5,139.81 5,344.36 5,548.91 5,753.46 5,958.01 6,162.56 6,367.11
W52 1/7/2007 P2 01 Julai 2007 SSM W 52 P2 5,402.80 5,624.05 5,845.30 6,066.55 6,287.80 6,509.05 6,730.30 6,951.55
W54 1/7/2007 P1 01 Julai 2007 SSM W 54 P1 5,205.21 5,409.76 5,637.97 5,866.18 6,094.39 6,322.60 6,550.81 6,779.02
W54 1/7/2007 P2 01 Julai 2007 SSM W 54 P2 5,665.80 5,913.49 6,161.18 6,408.87 6,656.56 6,904.25 7,151.94 7,399.63
W36 1/7/2007 P1 01 Julai 2007 SSM W 36 P1 3,005.94 3,104.25 3,202.56 3,300.87 3,464.22 3,627.57 3,790.92 3,954.27 4,117.62 4,280.97 4,444.32
W36 1/7/2007 P2 01 Julai 2007 SSM W 36 P2 3,216.18 3,323.57 3,500.53 3,677.49 3,854.45 4,031.41 4,208.37 4,385.33 4,562.29 4,739.25 4,916.21
W32 1/7/2007 P1 01 Julai 2007 SSM W 32 P1 2,416.06 2,514.37 2,612.68 2,710.99 2,809.30 2,907.61 3,005.92 3,104.23 3,202.54 3,300.85 3,399.16 3,497.47 3,595.78
W32 1/7/2007 P2 01 Julai 2007 SSM W 32 P2 2,626.30 2,733.69 2,841.08 2,948.47 3,055.86 3,163.25 3,270.64 3,378.03 3,485.42 3,592.81 3,700.20 3,807.59 3,914.98
W26 1/7/2007 P1 01 Julai 2007 SSM W 26 P1 2,198.26 2,296.57 2,394.88 2,493.19 2,591.50 2,689.81 2,788.12 2,886.43 2,984.74
W26 1/7/2007 P2 01 Julai 2007 SSM W 26 P2 2,408.50 2,515.89 2,623.28 2,730.67 2,838.06 2,945.45 3,052.84 3,160.23 3,267.62
W17-2 1/7/2007 P1 01 Julai 2007 SSM W 17-2 P1 821.89 871.80 921.71 971.62 1,021.53 1,071.44 1,121.35 1,171.26 1,221.17 1,271.08 1,320.99 1,370.90 1,420.81 1,487.36 1,553.91 1,620.46 1,687.01 1,753.56 1,820.11 1,886.66 1,953.21 2,019.76 2,086.31 2,152.86 2,219.41 2,285.96
W17-2 1/7/2007 P2 01 Julai 2007 SSM W 17-2 P2 873.32 924.75 976.18 1,027.61 1,079.04 1,130.47 1,181.90 1,233.33 1,284.76 1,336.19 1,387.62 1,439.05 1,508.63 1,578.21 1,647.79 1,717.37 1,786.95 1,856.53 1,926.11 1,995.69 2,065.27 2,134.85 2,204.43 2,274.01 2,343.59 2,413.17
W17-2 1/7/2007 P3 01 Julai 2007 SSM W 17-2 P3 926.26 979.20 1,032.14 1,085.08 1,138.02 1,190.96 1,243.90 1,296.84 1,349.78 1,402.72 1,455.66 1,528.26 1,600.86 1,673.46 1,746.06 1,818.66 1,891.26 1,963.86 2,036.46 2,109.06 2,181.66 2,254.26 2,326.86 2,399.46 2,472.06 2,544.66
W44 1/11/2002 P1 01 November 2002 SSM W 44 P1 2,625.36 2,757.25 2,889.14 3,021.03 3,152.92 3,284.81 3,416.70 3,548.59 3,680.48 3,812.37 3,944.26 4,076.15 4,208.04 4,339.93
W44 1/11/2002 P2 01 November 2002 SSM W 44 P2 2,903.66 3,045.23 3,186.80 3,328.37 3,469.94 3,611.51 3,753.08 3,894.65 4,036.22 4,177.79 4,319.36 4,460.93 4,602.50 4,744.07
W22 1/11/2002 P1 01 November 2002 SSM W 22 P1 1,533.55 1,586.79 1,640.03 1,693.27 1,746.51 1,799.75 1,878.40 1,957.05 2,035.70 2,114.35 2,193.00 2,271.65
W22 1/11/2002 P2 01 November 2002 SSM W 22 P2 1,647.29 1,705.37 1,763.45 1,821.53 1,907.44 1,993.35 2,079.26 2,165.17 2,251.08 2,336.99 2,422.90 2,508.81
W11 1/11/2002 P1 01 November 2002 SSM W 11 P1 546.19 576.44 606.69 636.94 667.19 697.44 727.69 757.94 788.19 828.12 868.05 907.98 947.91 987.84 1,027.77 1,067.70 1,107.63 1,147.56 1,187.49 1,227.42 1,267.35 1,615.83 1,669.07 1,722.31
W11 1/11/2002 P2 01 November 2002 SSM W 11 P2 577.65 609.11 640.57 672.03 703.49 734.95 766.41 797.87 839.01 880.15 921.29 962.43 1,003.57 1,044.71 1,085.85 1,126.99 1,168.13 1,209.27 1,250.41 1,291.55 1,332.69 1,707.79 1,763.45 1,819.11
W11 1/11/2002 P3 01 November 2002 SSM W 11 P3 610.32 642.99 675.66 708.33 741.00 773.67 806.34 848.69 891.04 933.39 975.74 1,018.09 1,060.44 1,102.79 1,145.14 1,187.49 1,229.84 1,272.19 1,314.54 1,356.89 1,399.24 1,803.38 1,861.46 1,919.54
W14 1/11/2002 P1 01 November 2002 SSM W 14 P1 1,030.19 1,070.12 1,110.05 1,163.29 1,216.53 1,269.77 1,323.01 1,376.25 1,429.49 1,482.73
W14 1/11/2002 P2 01 November 2002 SSM W 14 P2 1,113.68 1,171.76 1,229.84 1,287.92 1,346.00 1,404.08 1,462.16 1,520.24 1,578.32 1,636.40
VK5 1/11/2002 P1 01 November 2002 SSM VK 5 P1 7,224.80 7,926.60 8,386.40 8,713.10 9,039.80
VK6 1/11/2002 P1 01 November 2002 SSM VK 6 P1 6,571.40 7,200.60 7,624.10 7,926.60 8,229.10
VK7 1/11/2002 P1 01 November 2002 SSM VK 7 P1 6,135.80 6,728.70 7,115.90 7,394.20 7,672.50
VU1 1/11/2002 P1 01 November 2002 SSM VU 1 P1 9,681.10 10,624.90 11,665.50 12,802.90 13,940.30
VU2 1/11/2002 P1 01 November 2002 SSM VU 2 P1 9,257.60 10,165.10 11,157.30 12,246.30 13,335.30
VU3 1/11/2002 P1 01 November 2002 SSM VU 3 P1 8,822.00 9,681.10 10,624.90 11,665.50 12,706.10
VU4 1/11/2002 P1 01 November 2002 SSM VU 4 P1 8,023.40 8,797.80 9,656.90 10,600.70 11,544.50
VU5 1/11/2002 P1 01 November 2002 SSM VU 5 P1 7,224.80 7,926.60 8,386.40 8,713.10 9,039.80
W36 1/11/2002 P1 01 November 2002 SSM W 36 P1 2,404.75 2,483.40 2,562.05 2,640.70 2,771.38 2,902.06 3,032.74 3,163.42 3,294.10 3,424.78 3,555.46 2,359.16 2,439.02 2,518.88 2,598.74 2,678.60 2,758.46 2,890.35 3,022.24 3,154.13 3,286.02 3,417.91 3,549.80 3,681.69 3,813.58 3,945.47 4,077.36
W36 1/11/2002 P2 01 November 2002 SSM W 36 P2 2,572.94 2,658.85 2,800.42 2,941.99 3,083.56 3,225.13 3,366.70 3,508.27 3,649.84 3,791.41 3,932.98 2,482.58 2,566.07 2,649.56 2,733.05 2,816.54 2,953.27 3,090.00 3,226.73 3,363.46 3,500.19 3,636.92 3,773.65 3,910.38 4,047.11 4,183.84 4,320.57
W32 1/11/2002 P1 01 November 2002 SSM W 32 P1 1,932.85 2,011.50 2,090.15 2,168.80 2,247.45 2,326.10 2,404.75 2,483.40 2,562.05 2,640.70 2,719.35 2,798.00 2,876.65
W32 1/11/2002 P2 01 November 2002 SSM W 32 P2 2,101.04 2,186.95 2,272.86 2,358.77 2,444.68 2,530.59 2,616.50 2,702.41 2,788.32 2,874.23 2,960.14 3,046.05 3,131.96
W26 1/11/2002 P1 01 November 2002 SSM W 26 P1 1,758.61 1,837.26 1,915.91 1,994.56 2,073.21 2,151.86 2,230.51 2,309.16 2,387.81
W26 1/11/2002 P2 01 November 2002 SSM W 26 P2 1,926.80 2,012.71 2,098.62 2,184.53 2,270.44 2,356.35 2,442.26 2,528.17 2,614.08
W52 1/11/2002 P1 01 November 2002 SSM W 52 P1 4,291.53 4,469.40 4,647.27 4,825.14 5,003.01 5,180.88 5,358.75 5,536.62
W52 1/11/2002 P2 01 November 2002 SSM W 52 P2 4,698.09 4,890.48 5,082.87 5,275.26 5,467.65 5,660.04 5,852.43 6,044.82
W48 1/11/2002 P1 01 November 2002 SSM W 48 P1 3,814.79 3,992.66 4,170.53 4,348.40 4,526.27 4,704.14 4,882.01 5,059.88
W48 1/11/2002 P2 01 November 2002 SSM W 48 P2 4,192.31 4,384.70 4,577.09 4,769.48 4,961.87 5,154.26 5,346.65 5,539.04
J54 1/11/2002 P1 01 November 2002 SSM J 54 P1 4,569.83 4,750.12 4,949.77 5,149.42 5,349.07 5,548.72 5,748.37 5,948.02
J54 1/11/2002 P2 01 November 2002 SSM J 54 P2 4,973.97 5,190.56 5,407.15 5,623.74 5,840.33 6,056.92 6,273.51 6,490.10
J52 1/11/2002 P1 01 November 2002 SSM J 52 P1 4,338.72 4,519.01 4,699.30 4,879.59 5,059.88 5,240.17 5,420.46 5,600.75
J52 1/11/2002 P2 01 November 2002 SSM J 52 P2 4,750.12 4,944.93 5,139.74 5,334.55 5,529.36 5,724.17 5,918.98 6,113.79
J51 1/11/2002 P1 01 November 2002 SSM J 51 P1 4,338.72 4,519.01 4,699.30 4,879.59 5,059.88 5,240.17 5,420.46 5,600.75
J51 1/11/2002 P2 01 November 2002 SSM J 51 P2 4,540.79 4,728.34 4,915.89 5,103.44 5,290.99 5,478.54 5,666.09 5,853.64
J51 1/11/2002 P3 01 November 2002 SSM J 51 P3 4,750.12 4,944.93 5,139.74 5,334.55 5,529.36 5,724.17 5,918.98 6,113.79
J48 1/11/2002 P1 01 November 2002 SSM J 48 P1 3,851.09 4,031.38 4,211.67 4,391.96 4,572.25 4,752.54 4,932.83 5,113.12
J48 1/11/2002 P2 01 November 2002 SSM J 48 P2 4,233.45 4,428.26 4,623.07 4,817.88 5,012.69 5,207.50 5,402.31 5,597.12
J47 1/11/2002 P1 01 November 2002 SSM J 47 P1 3,851.09 4,031.38 4,211.67 4,391.96 4,572.25 4,752.54 4,932.83 5,113.12
J47 1/11/2002 P2 01 November 2002 SSM J 47 P2 4,038.64 4,226.19 4,413.74 4,601.29 4,788.84 4,976.39 5,163.94 5,351.49
J47 1/11/2002 P3 01 November 2002 SSM J 47 P3 4,233.45 4,428.26 4,623.07 4,817.88 5,012.69 5,207.50 5,402.31 5,597.12
J43 1/11/2002 P1 01 November 2002 SSM J 43 P1 2,631.41 2,764.51 2,897.61 3,030.71 3,163.81 3,296.91 3,430.01 3,563.11 3,696.21 3,829.31 3,962.41 4,095.51 4,228.61 4,361.71
J43 1/11/2002 P2 01 November 2002 SSM J 43 P2 2,771.77 2,912.13 3,052.49 3,192.85 3,333.21 3,473.57 3,613.93 3,754.29 3,894.65 4,035.01 4,175.37 4,315.73 4,456.09 4,596.45
J43 1/11/2002 P3 01 November 2002 SSM J 43 P3 2,918.18 3,064.59 3,211.00 3,357.41 3,503.82 3,650.23 3,796.64 3,943.05 4,089.46 4,235.87 4,382.28 4,528.69 4,675.10 4,821.51
J42 1/11/2002 P1 01 November 2002 SSM J 42 P1 1,815.87 1,895.73 1,975.59 2,055.45 2,135.31 2,215.17 2,295.03 2,374.89 2,454.75 2,534.61 2,614.47 2,694.33 2,774.19 2,907.29 3,040.39 3,173.49 3,306.59 3,439.69 3,572.79 3,705.89 3,838.99 3,972.09 4,105.19
J42 1/11/2002 P2 01 November 2002 SSM J 42 P2 1,986.48 2,073.60 2,160.72 2,247.84 2,334.96 2,422.08 2,509.20 2,596.32 2,683.44 2,770.56 2,857.68 3,004.09 3,150.50 3,296.91 3,443.32 3,589.73 3,736.14 3,882.55 4,028.96 4,175.37 4,321.78 4,468.19 4,614.60
DGA29 1/11/2002 P1 01 November 2002 SSM DGA 29 P1 1,124.57 1,176.60 1,228.63 1,280.66 1,332.69 1,384.72 1,436.75 1,488.78 1,540.81 1,592.84 1,644.87 1,696.90 1,748.93 1,800.96 1,852.99 1,905.02 1,957.05 2,035.70 2,114.35 2,193.00 2,271.65 2,350.30 2,428.95
DGA29 1/11/2002 P2 01 November 2002 SSM DGA 29 P2 1,195.96 1,250.41 1,304.86 1,359.31 1,413.76 1,468.21 1,522.66 1,577.11 1,631.56 1,686.01 1,740.46 1,794.91 1,849.36 1,903.81 1,958.26 2,012.71 2,094.99 2,177.27 2,259.55 2,341.83 2,424.11 2,506.39 2,588.67
DGA29 1/11/2002 P3 01 November 2002 SSM DGA 29 P3 1,269.77 1,326.64 1,383.51 1,440.38 1,497.25 1,554.12 1,610.99 1,667.86 1,724.73 1,781.60 1,838.47 1,895.34 1,952.21 2,009.08 2,065.95 2,151.86 2,237.77 2,323.68 2,409.59 2,495.50 2,581.41 2,667.32 2,753.23
T1 T2 T3 T4 T5 T6
4387.01 4591.56 4796.11 5000.66 5205.21 5409.76

T1 T2 T3 T4 T5 T6
W48 1/7/2007 P1
T1 T8
4,387.01 5,818.86

T7 T8 T9 T10 T11 T12


5614.31 5818.86 0.00 0.00 0.00 0.00

T7 T8 T9 T10 T11 T12


Gaji bagi Tahun Indeks Tahun

T1 2011
2009
2010
4,387.01 2011
2012
2013
Gred Gred Tahun Peringkat 2014
W 48 1/7/2007 P1 2015

T13 T14 T15 T16 T17 T18 T19


0.00 0.00 0.00 0.00 0.00 0.00 0.00

T13 T14 T15 T16 T17 T18 T19


Tingkat Gaji Tahun Peratus Jumlah KGT
T-1 Err:504 2012 13% 4,957.32 270
T0 Err:504 270
T1 4387.01 270
T2 270
T3 2002 10% 270
T4 2000 10% 270
T5 270
270
270
270

T20 T21 T22 T23 T24 T25 T26


0.00 0.00 0.00 0.00 0.00 0.00 0.00

T20 T21 T22 T23 T24 T25 T26


KGT Tahun Tambah KGT
5,227.32 2012
5,497.32 2013
5,767.32 2013
6,037.32 2014
6,307.32 2015
6,577.32 2016
6,847.32 2016
7,117.32 2017
7,387.32 2018
7,657.32 2019

T27
0.00

T27
Tarikh Jenis Kadar Kenaikan Huruf Nom.
Indeks KGT
Kuatkuasa Gaji Gred Gred
W44 1/1/2012 P1 01 Januari 2012 Min-Mak 250.00 W 44
W44 1/1/2012 P2 01 Januari 2012 Min-Mak 250.00 W 44
W44 1/7/2013 01 Julai 2013 Min-Mak 250.00 W 44
W44 1/7/2013 01 Julai 2013 Min-Mak 250.00 W 44
W44 1/7/2016 P1 01 Julai 2016 Min-Mak 250 W 44
Peringkat Min Mak

P1 3,411.65 5,889.68
P2 3,773.31 6,414.99
3,411.65 7,164.99
3,411.65 7,164.99
P1 3,600.00 10,456.00
GRED
MINIMUM MAKSIMUM KGT
JAWATAN
B19 1,360.00 4,032.00 100
B19 1,360.00 4,032.00 100
B19 1,360.00 4,032.00 100
B21 2,047.00 4,747.00 115
B21 2,047.00 4,747.00 115
B21 2,047.00 4,747.00 115
B22 2,047.00 4,747.00 115
B22 2,047.00 4,747.00 115
B22 2,047.00 4,747.00 115
B27 2,726.00 5,564.00 130
B27 2,726.00 5,564.00 130
B27 2,726.00 5,564.00 130
B29 1,499.00 5,679.00 145
B29 1,499.00 5,679.00 145
B29 1,499.00 5,679.00 145
B31 2,851.00 6,263.00 155
B31 2,851.00 6,263.00 155
B31 2,851.00 6,263.00 155
B37 3,565.00 7,588.00 180
B37 3,565.00 7,588.00 180
B37 3,565.00 7,588.00 180
B41 2,095.00 9,587.00 225
B41 2,095.00 9,587.00 225
B41 2,095.00 9,587.00 225
B47 5,162.00 11,692.00 270
B47 5,162.00 11,692.00 270
B47 5,162.00 11,692.00 270
C19 1,357.00 4,008.00 100
C19 1,357.00 4,008.00 100
C19 1,357.00 4,008.00 100
C22 2,257.00 4,698.00 115
C22 2,257.00 4,698.00 115
C22 2,257.00 4,698.00 115
C29 1,505.00 5,696.00 145
C29 1,505.00 5,696.00 145
C29 1,505.00 5,696.00 145
C32 2,866.00 6,302.00 155
C32 2,866.00 6,302.00 155
C32 2,866.00 6,302.00 155
C38 3,573.00 7,619.00 180
C38 3,573.00 7,619.00 180
C38 3,573.00 7,619.00 180
C41 2,317.00 9,620.00 225
C41 2,317.00 9,620.00 225
C41 2,317.00 9,620.00 225
C44 3,605.00 10,485.00 250
C44 3,605.00 10,485.00 250
C44 3,605.00 10,485.00 250
C48 5,205.00 11,763.00 270
C48 5,205.00 11,763.00 270
C48 5,205.00 11,763.00 270
C54 6,176.00 13,249.00 320
C54 6,176.00 13,249.00 320
C54 6,176.00 13,249.00 320
F41 2,315.00 9,618.00 225
F41 2,315.00 9,618.00 225
F41 2,315.00 9,618.00 225
F44 3,602.00 10,504.00 250
F44 3,602.00 10,504.00 250
F44 3,602.00 10,504.00 250
F48 5,203.00 11,761.00 270
F48 5,203.00 11,761.00 270
F48 5,203.00 11,761.00 270
F52 5,844.00 12,441.00 290
F52 5,844.00 12,441.00 290
F52 5,844.00 12,441.00 290
F54 6,174.00 13,248.00 320
F54 6,174.00 13,248.00 320
F54 6,174.00 13,248.00 320
FA29 1,549.00 5,684.00 145
FA29 1,549.00 5,684.00 145
FA29 1,549.00 5,684.00 145
FA32 3,184.00 6,232.00 155
FA32 3,184.00 6,232.00 155
FA32 3,184.00 6,232.00 155
FA38 3,577.00 7,848.00 195
FA38 3,577.00 7,848.00 195
FA38 3,577.00 7,848.00 195
FT19 1,377.00 4,052.00 100
FT19 1,377.00 4,052.00 100
FT19 1,377.00 4,052.00 100
FT22 2,271.00 4,725.00 115
FT22 2,271.00 4,725.00 115
FT22 2,271.00 4,725.00 115
G17 1,218.00 3,380.00 95
G17 1,218.00 3,380.00 95
G17 1,218.00 3,380.00 95
G19 1,357.00 4,008.00 100
G19 1,357.00 4,008.00 100
G19 1,357.00 4,008.00 100
G29 1,494.00 5,674.00 145
G29 1,494.00 5,674.00 145
G29 1,494.00 5,674.00 145
G32 2,846.00 6,258.00 155
G32 2,846.00 6,258.00 155
G32 2,846.00 6,258.00 155
G36 3,531.00 7,509.00 180
G36 3,531.00 7,509.00 180
G36 3,531.00 7,509.00 180
G41 2,084.00 9,551.00 225
G41 2,084.00 9,551.00 225
G41 2,084.00 9,551.00 225
G44 3,559.00 10,414.00 250
G44 3,559.00 10,414.00 250
G44 3,559.00 10,414.00 250
G48 5,123.00 11,639.00 270
G48 5,123.00 11,639.00 270
G48 5,123.00 11,639.00 270
H11 1,218.00 2,939.00 80
H11 1,218.00 2,939.00 80
H11 1,218.00 2,939.00 80
H14 1,644.00 3,401.00 90
H14 1,644.00 3,401.00 90
H14 1,644.00 3,401.00 90
H16 1,734.00 3,616.00 95
H16 1,734.00 3,616.00 95
H16 1,734.00 3,616.00 95
H19 1,377.00 4,052.00 100
H19 1,377.00 4,052.00 100
H19 1,377.00 4,052.00 100
H22 2,271.00 4,725.00 115
H22 2,271.00 4,725.00 115
H22 2,271.00 4,725.00 115
J17 1,218.00 3,299.86 95
J17 1,218.00 3,299.86 95
J17 1,218.00 3,299.86 95
J19 1,377.00 4,052.00 100
J19 1,377.00 4,052.00 100
J19 1,377.00 4,052.00 100
J22 2,271.00 4,725.00 115
J22 2,271.00 4,725.00 115
J22 2,271.00 4,725.00 115
J26 2,599.00 5,290.00 125
J26 2,599.00 5,290.00 125
J26 2,599.00 5,290.00 125
J29 1,860.00 5,701.00 145
J29 1,860.00 5,701.00 145
J29 1,860.00 5,701.00 145
J36 3,225.00 7,438.00 180
J36 3,225.00 7,438.00 180
J36 3,225.00 7,438.00 180
J38 3,630.00 7,924.00 195
J38 3,630.00 7,924.00 195
J38 3,630.00 7,924.00 195
J41 2,529.00 9,643.00 225
J41 2,529.00 9,643.00 225
J41 2,529.00 9,643.00 225
J44 3,608.00 10,557.00 250
J44 3,608.00 10,557.00 250
J44 3,608.00 10,557.00 250
J48 5,208.00 11,766.00 270
J48 5,208.00 11,766.00 270
J48 5,208.00 11,766.00 270
J52 5,857.00 12,446.00 290
J52 5,857.00 12,446.00 290
J52 5,857.00 12,446.00 290
J54 6,179.00 13,252.00 320
J54 6,179.00 13,252.00 320
J54 6,179.00 13,252.00 320
JA19 1,377.00 4,052.00 100
JA19 1,377.00 4,052.00 100
JA19 1,377.00 4,052.00 100
JA22 2,271.00 4,725.00 115
JA22 2,271.00 4,725.00 115
JA22 2,271.00 4,725.00 115
JA26 2,599.00 5,290.00 125
JA26 2,599.00 5,290.00 125
JA26 2,599.00 5,290.00 125
JA29 1,549.00 5,701.00 145
JA29 1,549.00 5,701.00 145
JA29 1,549.00 5,701.00 145
JA36 3,225.00 7,438.00 180
JA36 3,225.00 7,438.00 180
JA36 3,225.00 7,438.00 180
JA38 3,630.00 7,924.00 195
JA38 3,630.00 7,924.00 195
JA38 3,630.00 7,924.00 195
KP11 1,205.00 2,939.00 80
KP11 1,205.00 2,939.00 80
KP11 1,205.00 2,939.00 80
KP14 1,644.00 3,401.00 90
KP14 1,644.00 3,401.00 90
KP14 1,644.00 3,401.00 90
KP19 1,360.00 4,052.00 100
KP19 1,360.00 4,052.00 100
KP19 1,360.00 4,052.00 100
KP22 2,252.00 4,749.00 115
KP22 2,252.00 4,749.00 115
KP22 2,252.00 4,749.00 115
KP26 2,577.00 5,290.00 125
KP26 2,577.00 5,290.00 125
KP26 2,577.00 5,290.00 125
KP28 2,706.00 5,565.00 130
KP28 2,706.00 5,565.00 130
KP28 2,706.00 5,565.00 130
KP29 1,493.00 5,696.00 145
KP29 1,493.00 5,696.00 145
KP29 1,493.00 5,696.00 145
KP32 2,844.00 6,271.00 155
KP32 2,844.00 6,271.00 155
KP32 2,844.00 6,271.00 155
KP38 3,527.00 7,619.00 180
KP38 3,527.00 7,619.00 180
KP38 3,527.00 7,619.00 180
KP41 2,081.00 9,547.00 225
KP41 2,081.00 9,547.00 225
KP41 2,081.00 9,547.00 225
KP44 3,555.00 10,409.00 250
KP44 3,555.00 10,409.00 250
KP44 3,555.00 10,409.00 250
KP48 5,120.00 11,635.00 270
KP48 5,120.00 11,635.00 270
KP48 5,120.00 11,635.00 270
KP52 5,751.00 12,350.00 290
KP52 5,751.00 12,350.00 290
KP52 5,751.00 12,350.00 290
KP54 6,075.00 13,140.00 320
KP54 6,075.00 13,140.00 320
KP54 6,075.00 13,140.00 320
L29 1,773.00 5,674.00 145
L29 1,773.00 5,674.00 145
L29 1,773.00 5,674.00 145
L32 3,179.00 6,227.00 155
L32 3,179.00 6,227.00 155
L32 3,179.00 6,227.00 155
L38 3,541.00 7,752.00 195
L38 3,541.00 7,752.00 195
L38 3,541.00 7,752.00 195
L41 4,988.00 8,974.00 225
L41 4,988.00 8,974.00 225
L41 4,988.00 8,974.00 225
L44 3,600.00 10,502.00 250
L44 3,600.00 10,502.00 250
L44 3,600.00 10,502.00 250
L48 5,166.00 11,695.00 270
L48 5,166.00 11,695.00 270
L48 5,166.00 11,695.00 270
L52 5,800.00 12,375.00 290
L52 5,800.00 12,375.00 290
L52 5,800.00 12,375.00 290
L54 6,127.00 13,185.00 320
L54 6,127.00 13,185.00 320
L54 6,127.00 13,185.00 320
LA22 2,255.00 4,696.00 115
LA22 2,255.00 4,696.00 115
LA22 2,255.00 4,696.00 115
LA29 1,773.00 5,674.00 145
LA29 1,773.00 5,674.00 145
LA29 1,773.00 5,674.00 145
N1 1,218.00 2,197.86 80
N1 1,218.00 2,197.86 80
N1 1,218.00 2,197.86 80
N11 1,216.00 2,983.00 80
N11 1,216.00 2,983.00 80
N11 1,216.00 2,983.00 80
N12 1,216.00 2,983.00 80
N12 1,216.00 2,983.00 80
N12 1,216.00 2,983.00 80
N14 1,640.00 3,397.00 90
N14 1,640.00 3,397.00 90
N14 1,640.00 3,397.00 90
N19 1,352.00 4,003.00 100
N19 1,352.00 4,003.00 100
N19 1,352.00 4,003.00 100
N22 2,252.00 4,693.00 115
N22 2,252.00 4,693.00 115
N22 2,252.00 4,693.00 115
N26 2,577.00 5,251.00 125
N26 2,577.00 5,251.00 125
N26 2,577.00 5,251.00 125
N28 2,706.00 5,526.00 130
N28 2,706.00 5,526.00 130
N28 2,706.00 5,526.00 130
N29 1,493.00 5,672.00 145
N29 1,493.00 5,672.00 145
N29 1,493.00 5,672.00 145
N3 1,218.00 2,277.86 80
N3 1,218.00 2,277.86 80
N3 1,218.00 2,277.86 80
N30 1,493.00 5,672.00 145
N30 1,493.00 5,672.00 145
N30 1,493.00 5,672.00 145
N32 2,844.00 6,256.00 155
N32 2,844.00 6,256.00 155
N32 2,844.00 6,256.00 155
N36 3,527.00 7,506.00 180
N36 3,527.00 7,506.00 180
N36 3,527.00 7,506.00 180
N41 2,080.00 9,546.00 225
N41 2,080.00 9,546.00 225
N41 2,080.00 9,546.00 225
N44 3,551.00 10,406.00 250
N44 3,551.00 10,406.00 250
N44 3,551.00 10,406.00 250
N48 5,118.00 11,634.00 270
N48 5,118.00 11,634.00 270
N48 5,118.00 11,634.00 270
N52 5,750.00 12,348.00 290
N52 5,750.00 12,348.00 290
N52 5,750.00 12,348.00 290
N54 6,072.00 13,138.00 320
N54 6,072.00 13,138.00 320
N54 6,072.00 13,138.00 320
R1 1,218.00 1,797.34 80
R1 1,218.00 1,797.34 80
R1 1,218.00 1,797.34 80
R11 1,218.00 2,360.36 80
R11 1,218.00 2,360.36 80
R11 1,218.00 2,360.36 80
R17 1,318.42 2,853.81 95
R17 1,318.42 2,853.81 95
R17 1,318.42 2,853.81 95
R3 1,218.00 2,007.76 80
R3 1,218.00 2,007.76 80
R3 1,218.00 2,007.76 80
R9 1,218.00 2,347.48 80
R9 1,218.00 2,347.48 80
R9 1,218.00 2,347.48 80
S19 1,352.00 4,003.00 100
S19 1,352.00 4,003.00 100
S19 1,352.00 4,003.00 100
S29 1,493.00 5,672.00 145
S29 1,493.00 5,672.00 145
S29 1,493.00 5,672.00 145
S32 2,844.00 6,256.00 155
S32 2,844.00 6,256.00 155
S32 2,844.00 6,256.00 155
S38 3,527.00 7,506.00 180
S38 3,527.00 7,506.00 180
S38 3,527.00 7,506.00 180
S41 2,078.00 9,544.00 225
S41 2,078.00 9,544.00 225
S41 2,078.00 9,544.00 225
S44 3,551.00 10,406.00 250
S44 3,551.00 10,406.00 250
S44 3,551.00 10,406.00 250
S48 5,117.00 11,632.00 270
S48 5,117.00 11,632.00 270
S48 5,117.00 11,632.00 270
U11 1,204.00 3,001.00 80
U11 1,204.00 3,001.00 80
U11 1,204.00 3,001.00 80
U14 1,642.00 3,399.00 90
U14 1,642.00 3,399.00 90
U14 1,642.00 3,399.00 90
U19 1,360.00 4,052.00 100
U19 1,360.00 4,052.00 100
U19 1,360.00 4,052.00 100
U24 2,356.00 5,014.00 120
U24 2,356.00 5,014.00 120
U24 2,356.00 5,014.00 120
U29 1,797.00 5,753.00 145
U29 1,797.00 5,753.00 145
U29 1,797.00 5,753.00 145
U32 2,331.00 6,394.00 155
U32 2,331.00 6,394.00 155
U32 2,331.00 6,394.00 155
U36 3,590.00 7,605.00 180
U36 3,590.00 7,605.00 180
U36 3,590.00 7,605.00 180
U42 2,429.00 9,656.00 225
U42 2,429.00 9,656.00 225
U42 2,429.00 9,656.00 225
U44 3,611.00 10,560.00 250
U44 3,611.00 10,560.00 250
U44 3,611.00 10,560.00 250
U52 5,860.00 12,449.00 290
U52 5,860.00 12,449.00 290
U52 5,860.00 12,449.00 290
UD41 2,947.00 9,656.00 225
UD41 2,947.00 9,656.00 225
UD41 2,947.00 9,656.00 225
UD44 3,611.00 10,560.00 250
UD44 3,611.00 10,560.00 250
UD44 3,611.00 10,560.00 250
UD48 5,211.00 11,769.00 270
UD48 5,211.00 11,769.00 270
UD48 5,211.00 11,769.00 270
UD52 5,860.00 12,449.00 290
UD52 5,860.00 12,449.00 290
UD52 5,860.00 12,449.00 290
UD54 6,182.00 13,256.00 320
UD54 6,182.00 13,256.00 320
UD54 6,182.00 13,256.00 320
VU4 9,315.17 18,891.29 8%
VU4 9,315.17 18,891.29 0.08
VU4 9,315.17 18,891.29 0.08
VU5 8,465.66 17,331.46 9%
VU5 8,465.66 17,331.46 0.09
VU5 8,465.66 17,331.46 0.09
VU6 7,788.05 15,900.42 9%
VU6 7,788.05 15,900.42 0.09
VU6 7,788.05 15,900.42 0.09
VU7 7,189.63 14,587.54 9%
VU7 7,189.63 14,587.54 0.09
VU7 7,189.63 14,587.54 0.09
W19 1,353.00 4,005.00 100
W19 1,353.00 4,005.00 100
W19 1,353.00 4,005.00 100
W22 2,254.00 4,694.00 115
W22 2,254.00 4,694.00 115
W22 2,254.00 4,694.00 115
W26 2,579.00 5,253.00 125
W26 2,579.00 5,253.00 125
W26 2,579.00 5,253.00 125
W29 1,498.00 5,678.00 145
W29 1,498.00 5,678.00 145
W29 1,498.00 5,678.00 145
W32 2,848.00 6,259.00 155
W32 2,848.00 6,259.00 155
W32 2,848.00 6,259.00 155
W36 3,532.00 7,511.00 180
W36 3,532.00 7,511.00 180
W36 3,532.00 7,511.00 180
W41 2,094.00 9,585.00 225
W41 2,094.00 9,585.00 225
W41 2,094.00 9,585.00 225
W44 3,600.00 10,456.00 250
W44 3,600.00 10,456.00 250
W44 3,600.00 10,456.00 250
W48 5,161.00 11,690.00 270
W48 5,161.00 11,690.00 270
W48 5,161.00 11,690.00 270
W52 5,795.00 12,370.00 290
W52 5,795.00 12,370.00 290
W52 5,795.00 12,370.00 290
W54 6,122.00 13,180.00 320
W54 6,122.00 13,180.00 320
W54 6,122.00 13,180.00 320
WA41 2,820.00 9,585.00 225
WA41 2,820.00 9,585.00 225
WA41 2,820.00 9,585.00 225
WA44 3,600.00 10,456.00 250
WA44 3,600.00 10,456.00 250
WA44 3,600.00 10,456.00 250
WA48 5,161.00 11,690.00 270
WA48 5,161.00 11,690.00 270
WA48 5,161.00 11,690.00 270
WA52 5,795.00 12,370.00 290
WA52 5,795.00 12,370.00 290
WA52 5,795.00 12,370.00 290
WA54 6,122.00 13,180.00 320
WA54 6,122.00 13,180.00 320
WA54 6,122.00 13,180.00 320
UD54 6,182.00 13,256.00 320
UD53 6,182.00 13,256.00 320
UD52 5,860.00 12,449.00 290
UD51 5,860.00 12,449.00 290
UD48 5,211.00 11,769.00 270
UD47 5,211.00 11,769.00 270
UD44 3,611.00 10,560.00 250
UD43 3,611.00 10,560.00 250
UD43 2,947.00 9,656.00 225
Tahun Gaji
2009 Err:504
2010 Err:504
2011 4387.01
2012
2013
2014
2015
Kenaikan Gaji bukan KGT 2012 4957.32
2012 5,227.32
Pemindahan Gaji 1 KGT 2013 5,497.32
2013 5,767.32
2014 6,037.32
2015 6,307.32
2016 6,577.32
Pemindahan Gaji 1 KGT 2016 6,847.32
2017 7,117.32
2018 7,387.32
2019 7,657.32
2007 Peratus
1 35%
2 35%
3 35%
4 35%
5 35%
6 35%
7 35%
8 35%
9 35%
10 35%
11 35%
12 35%
13 35%
14 35%
15 35%
16 35%
17 25%
18 25%
19 25%
20 25%
21 25%
22 25%
23 25%
24 25%
25 25%
26 25%
27 25%
28 25%
29 25%
30 25%
31 25%
32 25%
33 25%
34 25%
35 25%
36 25%
37 25%
38 25%
39 25%
40 25%
41 15%
42 15%
43 15%
44 15%
45 15%
46 15%
47 15%
48 15%
49 15%
50 15%
51 15%
52 15%
53 15%
54 15%

You might also like