This document outlines the steps taken to clear a virgin site and construct a quay wall, including excavating soil from the installed quay wall, erecting precast concrete forms for capping beams, and casting the capping beams.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
142 views4 pages
Bush Clearing and Soil Excavation
This document outlines the steps taken to clear a virgin site and construct a quay wall, including excavating soil from the installed quay wall, erecting precast concrete forms for capping beams, and casting the capping beams.