Organ/ Parts of a Building Structure
• Foundation/Footing • Lintel
• Column • Under Ground Water Reservoir
- Short Column • Septic Tank
- Long Column • Soak Well
• Beam • House Top Water Tank
- Grade Beam
- Floor Beam • Wall
- Roof Beam - 10″ Wall
• Slab - 5″ Wall
- Roof Slab - 3″ Wall
- Floor Slab - Cavity Wall
• Type of Slab
- One Way
- Two Way
- Flat Plate
- Flat Slab
- Waffle Slab
• Foundation/Footing • Column • Beam
• Slab
• Lintel
• Wall
Selection of Land
Topography:
• Hilly Land Shape of Land
• Ditch/Pond
Rectangular
Plane Land
Square
• Trapezoidal
p
Location
L ti off L
Land
d • Triangular
Service Facilities Available:
Water Supply
Electric Supply
Sewerageg Lines
Communication Facilities
Near by Primary School
Pre-construction Stage
Pre- Professional Responsible
Planning of the house An Architect or a group
(A hit t l d
(Architectural design)
i )
Structural design
Site Preparation
• Selection of Contractors / Working Gang
• Labor Shed / Temporary Site Office
• A
Arrangement t off Water
W t andd Electric
El t i Supply
S l
• Arrangement of Construction Material
• Arrangement of Equipments
• Arrangement for Disposal of Waste Material
Construction Start
• Giving layout
• Trench cutting
• Foundation casting
• Column casting up to grade beam
• UG Reservoir casting
• Grade beam casting
• Stair casting
• Column casting (ground floor)
• Floor
oo bea
beam and
a d sslab
ab cast
casting
g
Giving layout Foundation casting
Trench cutting
Construction of Lintels
Construction of Beams and Slab Monolithically