CE – OJT DEFENSE

Asia Pacific College of Advanced Studies


BSCE - 4
COMPANY:

ARKAY ENERGY & INDUSTRIAL


CORPORATION

TASK:

• Design of Mix-Commercial
Building .

• Design of Steel/Concrete
Warehouse
PROCEDURE OF WORK:

• ARCHITECTURAL PLAN
• ANALYSIS
• STRUCTURAL PLAN
• ESTIMATE

Structural Analysis using Staad Pro.


STRUCTURAL ANALYSIS:

The category of the structure is IV


and the located in Taytay, Rizal.

Strength and Serviceability

Reaction of Truss to be applied in roof beams.


STRUCTURAL ANALYSIS:

The category of the structure is IV


and the located in Taytay, Rizal.
EXCAVATION:
Is the process of removing earth
to form a cavity in the ground.

NOTE:
Excavation depth depends on the
given Plan (Structural Plan).
FOUNDATION:
The lowest load-bearing part of a
building, typically below ground
level.

• FOOTING:
Is a type of foundation. Typically
made of concrete with rebar that
has been poured into an
excavated trench.

FOOTING
FOUNDATION:
The lowest load-bearing part of a
building, typically below ground
level.
75 mm

• Reinforcement of the foundation must be prepared


according to the structural schedule.
FOUNDATION:
The lowest load-bearing part of a
building, typically below ground
level.
COLUMNS AND BEAMS
Beams and Columns are two
important types of structural
elements that play a key role in
creating a safe load path to transfer
the weight and forces on a
structure to the foundation and
into the ground.
COLUMNS AND BEAMS
Reinforcement for Beams and
Columns must be prepared
according to the structural
plan/schedule.
COLUMNS AND BEAMS GOOD PRACTICE IN COLUMNS AND BEAMS:

Reinforcement for Beams and


Columns must be prepared
according to the structural
plan/schedule.

Column First

135 ° bent
COLUMNS AND BEAMS BAD PRACTICE IN COLUMNS AND BEAMS:

Reinforcement for Beams and


Columns must be prepared
according to the structural
plan/schedule.

Poor Column
BEAMS AND SLAB
Most often , Beams and Slab are
casted together.
WALLS:
Continues vertical brick or stone
structure that defines an area.

Proper Laying of CHB


WALLS:
Reinforcement for wall must be
prepared according to the
structural plan/schedule.

Metal Reinforcement Spacing in CHB


WALLS: GOOD PRACTICE IN WALL REINFORCEMENT

Reinforcement for wall must be


prepared according to the
structural plan/schedule.

Vertical bars.

Wall tied into Column


WALLS: BAD PRACTICE IN WALL REINFORCEMENT

Reinforcement for wall must be


prepared according to the
structural plan/schedule.
MATERIALS FOR ROOF FRAMING MUST BE PREPARED
ROOFING: ACCORDING TO THE STRUCTURAL PLAN/SCHEDULE.

Process for constructing a


building’s roof.
GOOD PRACTICE IN ROOFING
ROOFING:
Materials for roof framing must be
prepared according to the
structural plan/schedule.

Steel bent over roof truss Roof was strongly Connected


BAD PRACTICE IN ROOFING
ROOFING:
Materials for roof framing must be
prepared according to the
structural plan/schedule.

Truss is not column


centered.
Roof structure joined near mid span
ROUGH-IN:
EXHAUST DUCT
Is the stage of a construction
project when the various
mechanical, electrical and
plumbing lines are brought in.

Drainage Pipe

PLUMBING

Cold-water pipe
ELECTRICAL WIRING
MATERIALS MUST BE PREPARED ACCORDING TO THEIR
ROUGH-IN: RESPECTIVE PLAN/SCHEDULE.

Is the stage of a construction


project when the various
mechanical, electrical and
plumbing lines are brought in.
FINISHES
PHASE:
FINISHES PHASE :

Interior/Exterior components are


installed in this phase.

INTERIOR FINISHES APPLIED:


• WALL
• FLOORING
• CEILINGS
• FIXTURES
• APPLIANCES
• CABINETS
• ETC.

EXTERIOR FINISHES APPLIED:


• LANDSCAPING PLANTINGS
• DRIVES
• WALKS
• ETC.
FINISHES PHASE :

Interior/Exterior components are


installed in this phase.

INTERIOR FINISHES APPLIED:


• WALL
• FLOORING
• CEILINGS
• FIXTURES
• APPLIANCES
• CABINETS
• ETC.

EXTERIOR FINISHES APPLIED:


• LANDSCAPING PLANTINGS
• DRIVES
• WALKS
• ETC.
POST
CONSTRUCTION:
POST CONSTRUCTION:

• CONDUCT FINAL INSPECTION:


 HOMEOWNER
 BUILDING INSPECTOR
• SECURE CERTIFICATE OF
OCCUPANCY
• ESTABLISH MOVE-IN DATE.
SUMMARY
CONSTRUCTION
PROCSS OF ROAD
THANK YOU !