A. Chainage 53+300
The water stream remains 3-4 m from the right carriageway edge.
B. At chainage 57+600
C. At chainage 58+550
D. At chainage 58+900
E. At chainage 59+350
The balancing culvert at 49.400 is situated at built up area where the issue regarding the
section of covered drain may arise as the transfer of water needs to from drain to drain.
2.2.4 Existing Road Formation
The existing road from CH 48.600 km to 59.950 km is two lane with earthen shoulders on
both sides. The whole section has earthen shoulders of 1 m on either side of the road. The
following photographs shows the existing road formation from design chainage 52.300 to
57.800 at equal intervals.
2.2.5 Water Logged Area
The water logged areas around the alignment from design chainage 62+650 to chainage
63+950 are shown below:
The alignment at chainage KM 64+400 to KM 66+100 cannot be accessed at this moment.
Proctor test and CBR test results done on soil samples collected nearby design chainage KM
61+000 are attached as Annexure II.
3 Construction Materials
3.1 Distance
Quarry Distance from Chainage 48.5 KM Lead
Boitamara 20 km 30km
Chirang 53km 63km
Krishna Sand Bed 50km 40km
Choygaon 135km 125km
3.2 Rate
GSB
Chirang Quarry unit Rate
Rate in site @ 700/trip (16 cum) cum 43.75
Forest Royalty cum 226.00
Transit Pass per day/truck 600.0
Boulder
Baitamari Quarry unit Rate
Rate cum 1100.00
Forest Royalty cum 225.00
Transit Pass per day/truck 600.0
Sand
Krishnai River unit Rate
Rate cum 230.00
Forest Royalty cum 190.00
Transit Pass per day/truck 600.0
Other Stone Quarries available near the work site are :
1. Nakkati Quarry : 2 KM from from Tulungia, Near North Salmara .. Total Lead = 12
KM.. This Quarry was used by Gayetri earlier, however now not in operation. Quarry
allocation by the Govt is in process.
2. Bamuni Quarry : 12 KM from Jogigopa , Total lead 22 KM towards Rakhaldubi Bijni.
Quarry is in operation.. The material of the quarry
3. Silgghagri quarry : 17 KM from Tulungia , Total lead 27 KM on North Salmara
Chappar route. Quarry is in operation.
4. Sonamukhi Quarry : 45 KM from Tulungia : Toatl lead 55 KM on North Salmara
Bilasipara route.
5. Chaprakata Hill Stone Quarry : 17 KM From Tulungia : Total Lead 22 KM. Sufficient
Quantity Available
Earth : The earth for embankment is to be borrowed from private land. The royalty for earth
is Rs.30/- per Cum.
Annexure II
1.76
Dry Density
1.72
MAXIMUM DRY DENSITY (MDD) = 1.780gm/cc OPTIMUM MOISTURE CONTENT (OMC) = 14.20%
CALIFORNIA BEARING RATIO
IS 2720 PART XVI
Before Soaking Before Soaking Before Soaking After Soaking After Soaking After Soaking
Mould No. Unit
1 2 3 5 6 7
180.00
160.00
140.00
120.00
Load (Kg)
100.00
80.00
60.00
40.00
20.00
0.00
0 2 4 6 8 10 12 14
PENETRATION (mm)
75
19
4.75 0 100
2 0 100
0.425 2.58 2.58 0.52 99.48
0.075 41.36 43.94 8.79 91.21
Gravel (%) 0
Sand (%) 8.79
Silt & Clay (%) 91.21