Professional Documents
Culture Documents
17.50
3 Free Swelling Index [%] [ ( Vd -Vk)/Vk]x100
=
Remarks:
Contractor Représehtative
Consultant Representative
GRAIN SIZE ANALYSIS
(AS PER IS 2720 PART 4)
KSTP Package IV-Road 8- Rehablitatlon and Up-gradatlon of Veeyapuram-Edathua-Puthukkary
Road (Length 21.457
Name Of Project |Mambarhakkary-Kldangra-KunnamagarryKumarangary-Valady-Mulakkamthuruthy
Km) in Alappuzha District.
Name Of Client Project Director, Kerela State Transport Project
Name Of Consultant SAI Systra Consulting Engineer Pvt. Ltd- ORION, Infra Consulting Pvt. Ltd (JV)
100.0 100
75.0 100
Gravel
19.0 195 5195 23.61 76.39
4.75 6995 12190 55.41 44.59
Pan 60 Slit&Clay
Remarks:
(
Contractor Repfésëntative Consultent Representative
KSTT Tackage 1V-Road 8- Rehabilitation and Up-gradation of Veeyapuram-Edathua-Puthukkary-
Name of the
Project
|Mambazhakkary-Kidangra-Kunnamagarry-Kumarangary-Valady-Mulakkamthuruthy Road
(Length 21.457 Km) in Alappuzha District.
Agreement No 34.3/KSTT/PMT/TWD/2021 Dated 03.03.2021
Name of the Client Kerala State Transport Project
Name of the Consultant SAI Consulting Engineers P'vt. Ltd.-Orion Infra Consulting Pvt. Ltd. (V)
Name of the Contractor M/S SREEDHANYA CONSTRUCTION COMPANY
LIQUID & PLASTIC LIMITS
(As per 1S 2720 part- V)
Date ot Sampling 21-02-2022 Dale of Testing 22-02-2022
100
30
20 0 50 50 70 80 0
No. of Blows
Container No. 2 3
Wt. of container, Ws (gm) 50.45 50.39 50.00 48.97 44.24
162.97
Wt. of wet material +container, Wo (gm) 154.98 161.35 162.77 163.81
Wt. of dry material+ container, W: (gm) 148.21 152.98 152.32 151.47 149.25
Wt. of water, Ws (gm) 6.77 8.37 10.45 12.34 13.72
Wt. of dr material, W (gm) 97.76 102.59 102.32 .50 105.01
Water Content, w (%) 6.93 8.16 10.21 12.04 13.07
Dry Density. ya (gm/cc) I.648 1.748 1.819 1.740 1.641
1.950
1.900
1.850
1.800
1.750
1.700
1.650
1.600
1.550
6.00 7.00 8.00 9,00 10.00 11.00 12.00 13.00 14.00
Moisture Content
Layers: 5 no. No. of Blows 55 no. MDD 1.819(gm/cc) OMC: 10.21 (%)|
Remarks
ContractorRCprësentative ConsltanRepresentative
KSTP Package V-Rond 8- Rehabilitation and p-gradation of Veeyapuram-
Fdathua-P'uthukkary Mambazhakkary-Kidangra-Kunnamagarry-
Name of Project (l.ength 21.457 Km) in
Kumarangary-Valady-Mulakkamthuruthy Road
Alappurha Distriet.
Agreement No. 343/KSTPrMIPWD/2021 Dated 03.03.2021
onsutant
SAI Consnlting Engineers Pvt. Ltd.- Orion Infra Consulting Pvt. Ltd. (VV
16 17 18 19 20 21
Container No.
Blows 30 65
CBR Value@97% 13.00%
2.5 mm 9.33 12.13 14.4 Compaction
CBR (%)
5.0 mm 902 1.8214.31
Remarks:
Consultant Repfesentative
Contractor Répresentative
Name of ackage IV-Road 8- Rehabilitation and Up-gradation of Veeyapuram
'roject|dathua-Puthukkary-Mambazhakkary-Kidangra-Kunnamaga
ay-ulakkamthuruthy Road (length 21457 Km) in Alappuzha Ditriet DINE
|Agreement No.
343/KSTPPMTPWD/2021 Dated 03.03.2021
Client Kerala State Transport Projeet
Consultant ATCOnsulting Engineers Pvt. Ltd.-Orion Infra Consulting Pvt. Ltd.(JV)
Contractor M/S SREEDHANYA CoNSTRUCTION COMPANY
1.00 63.93
1.50 89.50
2.00 17 108.68
2.50 20 127.86
3.00 140. 55
4.00 25 159.83
5.00 29 185.40
6 7 8 9 10 11 12 13
7.50 36 230.15 O 3 4 5
Remarks
No of Blows 30
PToving Ring (50KN)
Conversion factor 6.393
Mould No 5
Penetratio Dial 500
Load in
n gauge
Kg
in m m reading
0 0.00
0.50 9 57.54
1.00 95.90
1.50 121.47
2.00 Z2 140.65
2.50 26 166.22
3.00 179.00
4.00 223.76
5.00 38 242.93
89 10 11 12 13
7.50 +6 294.08 3 4 6 7
10.00 9 313.26
Penetration (mm))
12.50 49 313.26
CBR CALCULATIONS
Remarks