Professional Documents
Culture Documents
2 To 4
CONSTRUCTION OF RCC SIDE DRAIN, CULVERTS, CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos
LAYING OF HDPE DUAL WATER SUPPLY PIPE LINE AT PROPOSED TEXTILE PARK AT KURSAPUR
SHIGGAON TALUK, HAVERI DISTRICT
ABSTRACT
ABSTRACT
39-42
43-50
51-54
55-57
58-60
61-66
67-76
77-78
79
80-128
129-131
132-143
144-151
152-153
154-158
LS
159-165
LS
LS
GLSR- 2.50 Lakh Liters
SL
Description of work No L B D Unit Qty Rate A W-8% Net Rate Amount
No
1)Earthwork in excavation for foundations of structures by Mechanical Means as per drawing and technical
specification, including setting out, construction of shoring , strutting, barricading, dsmger lighting, bracing, removal
1 of stumps and other deterious matter, dressing of sides and levelling the bottom of trench to the extent required,
utilising the available excavated earth locally for the work etc., complete. (KUWS 2018/19) PG NO - 9,ITEM NO 1 VII
KSRB 15.13.4: extra item over KSRB 15.13.3 for applying distemper primer over ceiling and / or sloping roof as per
specifications. SR (pg no-118, item no- 15.47.2)
same as Item No-9 Sqm 124.50 79 6.32 85.32 10622.43
Providing and fixing M.S ladder between landing 45 cms wide using angle iron of following size 65x65x8mm and
20mm M.S bars at 25cms. Center to center with necessary supports of same angle iron as directed including hand
14 railing on both sides with 25mm dia G.I pipe with angle iron props at 2.0mts, intervals and 0.5m , height including
fixing in ground with C.C 1:2:4 and two coats of non-poisonous anticorrosive bituminous paint with all lead and lift
etc...complete. (KUWS 2018/19) PG NO - 77, ITEM NO 10
65x65x8mm angle iron 5 Mtr. 5.00 1821 145.68 1966.68 9833.40
Providing and fixing PVC water stopper of suitable type of 230 mm width and 5 mm thickness for construction joints
15
as per detailed technical specifications and as directed by engineer-in-charge. (KUWS 2018/19) PG NO - 89, ITEM NO
13 5 Mtr. 5.00 392 31.36 423.36 2116.80
providing, fixing, applying of contraction joint with suitable type PVC water stopper of 230 mm width and 5 mm thick
sealed with 12mm x 25mm gun grade polysulphide elastomeric joint sealant of FOSROC make (NITO seal MS 600) over
a backer rod and high performance laminated closed cell polyethylene foam joint filler of suitable make (CAPCELL-
16 HD-100) in sheet foam having a density of 100kg/cum, non staining with less than 1% water absorption, having 97%
recovery at compression and as directed by engineer-in-charge.(KUWS 2018/19) PG NO - 89, ITEM NO 14
5 Mtr. 5.00 570.00 45.6 615.60 3078.00
Providing & fixing of aluminium ventilators of frame size 40x18mm of 1.3mm thick, 0933kg/m all aluminium sections
including cutting to required length, joints mitred subdiving the frame tenonned and riveted, in the assembled frame,
17 stiffened with end clips for corners, angles etc., and fixed to the walls, lintels, flor beams/cills as the case may be with
necessary steel screws, raul plugs or teak wook gatties including supply along with fixing of SS-304 mesh with
necessary required materials., complete (KUWS 2018/19) PG NO - 89, ITEM NO 15
5 Sqm 5.00 3028.00 242.24 3270.24 16351.20
1 Road 1 18 231.3
2 Road 2 15 1014.00
3 Road 3 15 68.00
4 Road 6 300.00
Total Length 1613.3
DETAILS OF ROADS
DETAILE ESTIMATE FOR SITE CLEARANCE, LEVELLING OF SITES, BOUNDARY STONE FIXING
Add area
SR
SN Description Units Nos L B D Qty Rate weightage- Net Rate Amount
8%
PG I.No.
KSRRB M200-10.2. Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removaL of stumps of trees cut
earlier and disposal of unserviceable materials and stacking of
1 139 18.14 serviceable material to be used or auctioned, including
removal and disposal of top organic soil not exceeding 150
mm in thickness complete as per specifications. I. By Manual
Means:B. In area of thorny jungle.(PWD SR 2018-19 Dharwad
Circle P-139, I- 18.14)
Total 196694.69
All type of soil at 75 % on total excavated qty 147521.02 180.12 6.862 186.98 27584058.02
Earth work in excavation by mechanical means (Hydraulic
excavator)/ manual means over areas (exceeding 30 cm in
DSR- depth, 1.5 m in width as well as 10 sqm on plan) including
3 2018- 2.7.1 getting out and disposal of excavated earth lead upto 50 m
19 and lift upto 1.5 m, as directed by Engineer-incharge.-
Ordinary Rock
Ordinary Rock at 10% on total excavated qty Cum 1 19669.47 19669.47 362.04 13.792 375.83 7392446.99
Earth work in excavation by mechanical means (Hydraulic
excavator)/ manual means over areas (exceeding 30 cm in
DSR- depth, 1.5 m in width as well as 10 sqm on plan) including
4 2018- 2.7.2 getting out and disposal of excavated earth lead upto 50 m
19 and lift upto 1.5 m, as directed by Engineer-incharge.- Hard
rock (requiring blasting)
Hard Rock at 15% on total excavated qty Cum 1 29504.20 29504.20 623.65 23.758 647.41 19101406.35
Cutting of trees girth from 300mm to 600mm including cutting
of trunks, branches and removal of stumps roots stacking of
serviceable materials earth filling in the depressions / pit,
4 138 18.20 labour charges complete as per specifications. MORTH
specification clause 201/Chapter 2
Girth from 600 to 900mm Each 50 50.00 922.00 73.76 995.76 49788.00
Total 76592093.70
FORMATION OF ASPHALTING ROADS 18m WIDE ROAD No.1&2 AND 15m WIDE ROAD NO.3 To 6, CONSTRUCTION OF RCC SIDE DRAIN, CULVERTS,
CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos.) AND LAYING OF HDPE DUAL WATER SUPPLY PIPE LINE AT PROPOSED TEXTILE PARK AT
KURSAPURA, SHIGGAON TALUK, HAVERI DISTRICT.
DETAILE ESTIMATE FOR ROAD WORKS
Carriage Total Road
Roads Length Road Area
width width
Area
Sl Pg. Item
Description Unit No. L B D Qty Rate in Rs. Weightage Net Rate Amount in Rs
No. No No
@8%
Excavation for roadwork in all types of soil by mechanical
means including cutting and loading to tippers, trimming
bottom and side slopes, in accordance with requirements
1.00 143 19.14 of lines, grades and cross section, and tranportation with a
lead of 1.00km and complete as per specifications.
All type of soil at 70% of total qty Cum 29928.46 41.00 3.28 44.28 1325232.12
Ordinary Rock at 10 % of total qty of item No. 1 Cum 1 4275.49 4275.49 56.00 4.48 60.48 258581.88
Earthwork excavation for roadway in hard rock (blasting
prohibited) including breaking rock, loading in tippers,
unloading, disposal with all lifts and lead upto
144 19.16 1000metres, trimming bottom and side slopes in
accordance with requirements of lines, grades and c ross
sections including all labour, hire charges of all
machineries ectc., complete
Hard Rock at 20 % of total qty of item No. 1 Cum 1 8550.99 8550.99 373.00 29.84 402.84 3444680.01
Area
Sl Pg. Item
Description Unit No. L B D Qty Rate in Rs. Weightage Net Rate Amount in Rs
No. No No
@8%
Earthern Shoulders
Total 35961466.94
FORMATION OF ASPHALTING ROADS 18m WIDE ROAD No.1&2 AND 15m WIDE ROAD NO.3 To 6, CONSTRUCTION OF RCC SIDE DRAIN,
CULVERTS, CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos.) AND LAYING OF HDPE DUAL WATER SUPPLY PIPE LINE AT PROPOSED TEXTILE
PARK AT KURSAPURA, SHIGGAON TALUK, HAVERI DISTRICT.
DETAILE ESTIMATE FOR NORTH APPROACH ROAD
Area
Sl Pg. Item
Description Unit No. L B D Qty Rate in Rs. Weightage Net Rate Amount in Rs
No. No No
@8%
Excavation for roadwork in all types of soil by
mechanical means including cutting and loading to
tippers, trimming bottom and side slopes, in
1.00 143 19.14 accordance with requirements of lines, grades and
cross section, and tranportation with a lead of 1.00km
and complete as per specifications.
All type of soil at 70% of total qty Cum 2680.30 41.00 3.28 44.28 118683.68
Ordinary Rock at 10 % of total qty of item No. 1 Cum 1 382.90 382.90 56.00 4.48 60.48 23157.79
Earthwork excavation for roadway in hard rock
(blasting prohibited) including breaking rock, loading
in tippers, unloading, disposal with all lifts and lead
upto 1000metres, trimming bottom and side slopes in
144 19.16 accordance with requirements of lines, grades and c
ross sections including all labour, hire charges of all
machineries ectc., complete
Ordinary Rock at 20 % of total qty of item No. 1 Cum 1 765.80 765.80 373.00 29.84 402.84 308494.87
Area
Sl Pg. Item
Description Unit No. L B D Qty Rate in Rs. Weightage Net Rate Amount in Rs
No. No No
@8%
Bituminous Concrete.
Total 8390341.48
FORMATION OF ASPHALTING ROADS 18m WIDE ROAD No.1&2 AND 15m WIDE ROAD NO.3 To 6, CONSTRUCTION OF RCC SIDE DRAIN, CULVERTS,
CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos.) AND LAYING OF HDPE DUAL WATER SUPPLY PIPE LINE AT PROPOSED TEXTILE PARK AT
KURSAPURA, SHIGGAON TALUK, HAVERI DISTRICT.
ROAD SIDE DRAIN WORKS
Length one Total
Roads Unit Sides
side Length
18m Wide Road Rmt 2 220.00 440.00
PG Item
SN Description Unit No. L B D Qty Rate in Rs. A.W 8% Net Rate Amount in Rs
No No
Excavation for roadwork in all types of soil by mecanical
means including cutting and loading to tippers, trimming
bottom and side slopes, in accordance with requirements
1.00 144 19.14 of lines, grades and cross sections, and transportion with a
lead of 1.00Km and complete as per specifications.
MORTH Specification No.301
Ordinary Rock at 20 % of total qty of item No. 2 Cum 1 1511.77 1511.77 56.00 4.48 60.48 91431.79
For Side Filling(AVG section) Cum 1 3620.50 0.20 1.35 977.54 121.00 9.68 130.68 127744.27
KSRB 4-1.3 : Providing and laying in position plain cement
concreteof Mix 1:4:8 with OPC @ 180kgs, with 40mm and
down size graded granite metal coarse aggregates
@0.85cum and fine aggregates @ 0.57cum machine mixed,
5.00 13 4.3 machine mixed, concrete laid in layers not exceeding 15
cms. thick, well compacted, in foundation, including cost
of all materials, labour, HOM curing complete as per
specifications. Specification No. KBS 4.1, 4.2
Bottom
Sides
PG Item
SN Description Unit No. L B D Qty Rate in Rs. A.W 8% Net Rate Amount in Rs
No No
Excavation for roadwork in all types of soil by mecanical
means including cutting and loading to tippers, trimming
bottom and side slopes, in accordance with requirements
1.00 144 19.14 of lines, grades and cross sections, and transportion with a
lead of 1.00Km and complete as per specifications.
MORTH Specification No.301
Ordinary Rock at 20 % of total qty of item No. 2 Cum 1 259.80 259.80 56.00 4.48 60.48 15712.70
Pg. Item
SN Description Unit No. L B D Qty Rate A.W 8% Net Rate Amount in Rs
No No
Earth work in excavation in all kind of ordinary rock/soft rock
nat reqiring blasting for foundation of bridge and allied works
as per drawing and technical specifications, including setting
out, construction of shoring and bracing, removal of stumps
1 256 34.15.2 and other deleterious matter, dressing of sides and bottom and
backfilling with approved material including cost of all
materials labour HOM complete as per specifications. by
mecanical means
10.80
Bottom
Sides
Deck Slab
Head Wall
MT 1 3279.02 3.279
Total 1380388.19
12% Tender premium 1546034.78
FORMATION OF ASPHALTING ROADS 18m WIDE ROAD No.1&2 AND 15m WIDE ROAD NO.3 To 6, CONSTRUCTION OF RCC SIDE DRAIN,
CULVERTS, CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos.) AND LAYING OF HDPE DUAL WATER SUPPLY PIPE LINE AT PROPOSED TEXTILE
PARK AT KURSAPURA, SHIGGAON TALUK, HAVERI DISTRICT.
RCC Culvert No.s 4 15.00
Pg. Item
SN Description Unit No. L B D Qty Rate A.W 8% Net Rate Amount in Rs
No No
Earth work in excavation in all kind of ordinary rock/soft rock
nat reqiring blasting for foundation of bridge and allied works
as per drawing and technical specifications, including setting
out, construction of shoring and bracing, removal of stumps
1 256 34.15.2 and other deleterious matter, dressing of sides and bottom and
backfilling with approved material including cost of all
materials labour HOM complete as per specifications. by
mecanical means
9.00
Bottom
Sides
Deck Slab
Head Wall
MT 1 2732.52 2.733
Total 2301986.53
12% Tender premium 2578224.92
FORMATION OF ASPHALTING ROADS 18m WIDE ROAD No.1&2 AND 15m WIDE ROAD NO.3 To 6, CONSTRUCTION OF RCC SIDE DRAIN,
CULVERTS, CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos.) AND LAYING OF HDPE DUAL WATER SUPPLY PIPE LINE AT PROPOSED TEXTILE
PARK AT KURSAPURA, SHIGGAON TALUK, HAVERI DISTRICT.
RCC Culvert No.s 2 6.00
Pg. Item
SN Description Unit No. L B D Qty Rate A.W 8% Net Rate Amount in Rs
No No
Earth work in excavation in all kind of ordinary rock/soft rock
nat reqiring blasting for foundation of bridge and allied works
as per drawing and technical specifications, including setting
out, construction of shoring and bracing, removal of stumps
1 256 34.15.2 and other deleterious matter, dressing of sides and bottom and
backfilling with approved material including cost of all
materials labour HOM complete as per specifications. by
mecanical means
3.60
Bottom
Sides
Deck Slab
Head Wall
MT 1 1093.01 1.093
Total 462808.49
12% Tender premium 518345.51
FORMATION OF ASPHALTING ROADS 18m WIDE ROAD No.1&2 AND 15m WIDE ROAD NO.3 To 6, CONSTRUCTION OF RCC SIDE DRAIN,
CULVERTS, CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos.) AND LAYING OF HDPE DUAL WATER SUPPLY PIPE LINE AT PROPOSED
TEXTILE PARK AT KURSAPURA, SHIGGAON TALUK, HAVERI DISTRICT.
ESTIMATE FOR PROVIDING EXTERNAL WATER SUPPLY LINE
Total Length
No of Road Road
Roads Of Road
Crossings Width
Crossing
18m Wide Road 220.00 18 3960
15m Wide Road 1082.00 15 16230
6m Wide Road 300.00 6 1800
Total
Total water supply line length
1,602.00
Total
Total No. sites
10
Pg. Item
SN Description of Items Unit No L B D Qty Rate in Rs. A.w 8% Net Rate Amount(Rs)
No No
Earthwork excavation for pipeline trenches Upto
600 mm trench Width as per Drawing and
Technical Specification. including setting out,
Construction of shoring, Shutting, Barricading,
danger Lighting, Bracing, Using Sight Rails &
boning rods at every 100 metres wherever as
1 6 2.a directed, Removal of Stumps and other Deleterious
Matter, dressing of sides and leveling the bottom of
trench to the extent required, utilising the available
excavated earth locally for the work etc. complete
in the following strata
Total 5106.00
Pg. Item
SN Description of Items Unit No L B D Qty Rate in Rs. A.w 8% Net Rate Amount(Rs)
No No
40% -in all type of Soil Cum 1 2042.40 2042.40 130.00 10.40 140.40 286,752.96
Earthwork excavation for pipeline trenches Upto
600 mm trench Width as per Drawing and
Technical Specification. including setting out,
Construction of shoring, Shutting, Barricading,
danger Lighting, Bracing, Using Sight Rails &
boning rods at every 100 metres wherever as
2 6 2.b directed, Removal of Stumps and other Deleterious
Matter, dressing of sides and leveling the bottom of
trench to the extent required, utilising the available
excavated earth locally for the work etc. complete
in the following strata
KUWSDR 20%- Ordinary Rock Without Blasting Cum 1 1021.20 1021.2 174.00 13.92 187.92 191,903.90
Earthwork excavation for pipeline trenches Upto
600 mm trench Width as per Drawing and
Technical Specification. including setting out,
Construction of shoring, Shutting, Barricading,
danger Lighting, Bracing, Using Sight Rails &
boning rods at every 100 metres wherever as
2 6 2.C directed, Removal of Stumps and other Deleterious
Matter, dressing of sides and leveling the bottom of
trench to the extent required, utilising the available
excavated earth locally for the work etc. complete
in the following strata
KUWSDR Hard Rock-40% Cum 1 2042.40 2042.4 1,015.00 81.20 1,096.20 2,238,878.88
22 7.1 25mm dia -10 kg/sqcm (For House Connection) R.M 20 18.00 360 44.00 3.52 47.52 17,107.20
- -
Supply and delivery at site special moulded variety
25 mm dia PVC service saddles as per IS 7834/ 1987
5 15.46 and fabricated as per IG124/ 1984 with ISI mark - - -
with its latest amendments
KUWSDR total WS length Cum 2 1,602.00 1.00 0.30 961.200 259.00 20.72 279.72 268,866.86
KUWSDR
Supplying HDPE PIPES conforming to IS 4984-
2016, with latest amendments and conveying to
worksite including loading and unloading at both
destination and rollihng, lowering in toi trenches
laying true to line and jointing of pipes and specials
byelectrofusion welding as per standard procedure
and guidelines including encasing the pipes
around to a depth of not less than 15 cm with soft
gravel or selected earth avialble from the
9 57 47 excavation etc., complete. giving hydrailic test as
per relevant ISS with all lead and lift including
testing and commsissioning. The rate is exclusive of
required specials and fittings etc., complete.
(Contractor will make his own arraqngements for
procusing water for testing). PN8
Pg. Item
SN Description of Items Unit No L B D Qty Rate in Rs. A.w 8% Net Rate Amount(Rs)
No No
KUWSDR
47.2.3 a) 90mm Rmt 2 1602.00 3204 271.00 21.68 292.68 937,746.72
Below Wall Cum 12 1.36 0.23 1.20 4.50 7,039.00 563.12 7,602.12 34,242.38
Providing and laying in position reinforced cement
concrete of design mix M20 with OPC cement @
320 kgs with 20mm and down size graded granite
metal, coarse aggreagts @ 0.69 cum & fine
aggreagtes @ 0.46 cum with superplastisisers at 3 lts
conforming to IS: 9103, 1999 reaffirmed -2008,
machine mixed concrete laid in layers not
exceeding 15 cms thick, vibrated for all works in
ground floor level for roof slabs, staircase, lintels
14 14 4.13 and beams retaining walls, return walls(any
thickness) including attached pilasters, columns,
piers, abutments, pillars, posts, struts, buttresses,
string or lacing courses, parapets, coping, bed
blocks, anchor blocks, plain window cills, fillets
etc., including cost of all materials, labour, HOM of
machinery, curing, complete as per specifications.
Chamber Covers Cum 12 1.36 1.36 0.15 3.33 6,287.00 502.96 6,789.96 22,605.68
Providing 18 mm thick cement plaster in single coat
with cement mortar 1:6, to brick masonry including
rounding off corners wherever required smooth
15 116 15.17
rendering, : Providing and removing scaffolding,
including cost of materials, labour, curing complete
as per specifications
Plastering
Centering
Slab Cover Sqm 12 1.36 1.36 22.20 258.00 20.64 278.64 6,184.47
TOTAL 6550391.96
FORMATION OF ASPHALTING ROADS 18m WIDE ROAD No.1&2 AND 15m WIDE ROAD NO.3 To 6, CONSTRUCTION OF RCC
SIDE DRAIN, CULVERTS, CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos.) AND LAYING OF HDPE DUAL WATER SUPPLY
PIPE LINE AT PROPOSED TEXTILE PARK AT KURSAPURA, SHIGGAON TALUK, HAVERI DISTRICT.
Sand Piling
Total 1,243,885.01
FORMATION OF ASPHALTING ROADS 18m WIDE ROAD No.1&2 AND 15m WIDE ROAD NO.3 To 6, CONSTRUCTION OF RCC SIDE DRAIN,
CULVERTS, CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos.) AND LAYING OF HDPE DUAL WATER SUPPLY PIPE LINE AT PROPOSED
TEXTILE PARK AT KURSAPURA, SHIGGAON TALUK, HAVERI DISTRICT.
Estimate for Bore well 3 No.s
SN P.No It. No Description of work Unit No L B D Qty Rate A.W-8% Net Rate Amount
- - -
B Raising Main from Bore well to Sump - - -
Earthwork excavation for pipeline trenches Upto 600 mm
trench Width as per Drawing and Technical Specification.
including setting out, Construction of shoring, Shutting,
Barricading, danger Lighting, Bracing, Using Sight Rails &
5 6 2.a boning rods at every 100 metres wherever as directed, Removal
of Stumps and other Deleterious Matter, dressing of sides and
leveling the bottom of trench to the extent required, utilising the
available excavated earth locally for the work etc. complete in
the following strata
KUWSDR Raising Main from Bore well to Sump - Excavation cum 3 534.00 1.00 1.50 2,403.00
Raising Main to GLSR from Sump cum 2 800.00 1.00 1.50 2,400.00
4,803.00 130.00 10.40 140.40 674,341.20
SN P.No It. No Description of work Unit No L B D Qty Rate A.W-8% Net Rate Amount
12.02.5 g) 7.50 HP - 90 LPM @ 165 m = 15 STG Outlet Dia - 2.00" nos. 3 3.00 55,387.00 4,430.96 59,817.96 179,453.88
- - -
Supplying, Laying, jointing, testing and commissioning fo GI
pipe confirimng to IS 1239:1990 with latest amendments
incuding fixing collars, elbows, tees bends, gland cocks and
other fittings (excluding cost of specials) with cuts and threads
8 14 2, 1.4 wherever necessary including conveying the materials to
workspot including testing for water tightness, with all lead &
lifts (contractor will make his own arrangements for procuring
water testing).
FOUR POLE
1.Group A
5.14.1)100Amps 25kA Each 1 6400 6,400.00
APFCR PANEL
Supplying and fixing miniature circuit breakers on existing MCB
distribution boards using necessary fixing materials and 'C'
24 27 5.17 Type curve,indicator ON/OFF,energy cross-3 with short circuit
breaking capacity of 10K and complete wiring as required
confirming to IEC 60898.
1 Group 'A'
SN P.No It. No Description of work Unit No L B D Qty Rate A.W-8% Net Rate Amount
5.17.8)40Amps TPN Each 1 2374 2,374.00
5.17.7)6-32Amps TPN Each 2 1715 3,430.00
BESC
77.22) Supply & fixing of Caution/Danger name board as per
41 OM Each 1 194 194.00
drawing( BESCOM SR . CDS-1)
SR
Copper strip
6.18.6)8SWG copper wire Mtr 20 105.0 2,100.00
PG Item
SN Description Unit No. L B D Qty Rate in Rs. A.W 8% Net Rate Amount in Rs
No No
Providing and fixing RCC precast fencing pole
of size 0 15m x 0 15m x 2.0m casted in CC 1:1.5:3
with 20mm downsize aggregate making holes
for drawing barbed wire at 30cm etc using 10
mm dia vertical 4 TMT steel rods and Smm dia
stirrups at 15cm c/c fixed 1.5m above ground
level using steel moulding, curing,
1.00 270 37.64
transportation to work spot including
excavation in hard soil fixing in plain cement
concrete 1:2:4 using 20mm downsize aggregate
including aligning to plumb and line providing
including cost of all materials, labour, hire
charge of machineries lead, lift loading &
unloading etc.,Complete.
SN SR Description of Items Unit No. L B D Qty Rate A.W- 8% Net Rate Amount
- - -
Refilling pipeline trenches and foundation with
selected available earth from trench excavation and
foundation including watering, consolidation layers
5 7 2.11 of 15 cms., thickness with Vibro Rollers including
disposing off the surplus earth with all lead and lift.
Below GLSR tank ((22/7)*10*10)/4=78.57 Cum 1 78.57 0.25 19.64 469.00 37.52 506.52 9,949.50
KUWSDB - - -
Lettering for GLSR Capacity cm 1 2500 2500 0.70 0.06 0.76 1,890.00
Total 6,807,471.69
FORMATION OF ASPHALTING ROADS 18m WIDE ROAD No.1&2 AN
CULVERTS, CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos.) AND LAY
PARK AT KURSAPURA, SHIGGA
DETAILE ESTIMATE FOR
Roads
Sl Pg. Item
Description Unit
No. No No
Total Cum
All type of soil at 70% of total qty Cum
Total as per Annexure enclosed Earth work Filling Quantity All Roads
Bituminous Concrete.
For Layout Roads
18 m wide Roads Cum
Total Cum
KSRRB M800-2. Retro-Reflectorised Traffic Signs:-
Providing and fixing of retro-reflectorised cautionary,
mandatory and informatory sign as per IRC:67 made
of high intensity grade sheeting vide clause 800-1.3,
fixed over Aliminium sheeting, 1.5mm thick
supported on a mild steel angle iron post 75mm x
75mm x 6mm, firmly fixed to the ground by means of
180 24.2.6 properly designed foundation with M-15 grade
cement concrete 45cm x 45cm x 60cm, 60cm below
ground level as per approved drawing complete as
per specifications. 60cm x 60cm square MORTH
specification No.801 (PWD SR 2018-19 Dharwad
Circle P-180, I- 24.2.6)
Area
No. L B D Qty Rate in Rs. Weightage Net Rate
@8%
5487.75
3841.43 41.00 3.28 44.28
1 4878.00
1 5487.75 2743.88
2743.88 95.00 7.60 102.60
4878.00
1 2743.88
1 2134.13 2134.13
2134.13 469.00 37.52 506.52
2 813.00 4.80 0.25 1951.20
8 8.00
8.00 5146.00 411.68 5557.68
4 0.90 3.60
3.60 7136.00 570.88 7706.88
Total
18 813.00 5203.20
15 #REF! #REF!
#REF! #REF! 1117.00 1237.64 #REF!
#REF!
#REF! #REF! 421.00 466.47 #REF!
Amount in Rs
170098.30
33189.91
442137.04
79023.60
281521.58
1080977.00
1644920.14
5027165.34
3101456.79
196680.96
73755.36
3167331.74
73755.36
2216348.57
44461.44
27744.77
17660567.88
FORMATION OF ASPHALTING ROADS 18m WIDE ROAD No.1&2 AND 15m WIDE ROAD NO.3 To 6, CONSTRUCTION OF RCC SIDE DRAIN,
CULVERTS, CONSTRUCTION OF 2ML CAPACITY GLSR (1Nos.) AND LAYING OF HDPE DUAL WATER SUPPLY PIPE LINE AT PROPOSED TEXTILE
PARK AT KURSAPURA, SHIGGAON TALUK, HAVERI DISTRICT.
SUMP TANK 50KLD
PG Item
SN Description Unit No. L B D Qty Rate in Rs. A.W 8% Net Rate Amount in Rs
No No
Excavation for roadwork in all types of soil by mecanical
means including cutting and loading to tippers, trimming
bottom and side slopes, in accordance with requirements
1.00 144 19.14 of lines, grades and cross sections, and transportion with a
lead of 1.00Km and complete as per specifications.
MORTH Specification No.301
Ordinary Rock at 20 % of total qty of item No. 2 Cum 1 23.96 23.96 56.00 4.48 60.48 1448.98
For Side Filling(AVG section) Cum 4 6.60 0.40 2.75 29.04 121.00 9.68 130.68 3794.95
QUANTIT
SL.NO DESCRIPTION UNIT
Y
SN 4 - Self Fit
c) 250mm dia 820 Rmt
d) 315mm dia 1002 Rmt
MANHOLE CHAMBERS
3420.65 Cum
KSRB 12-8.1: Constructing brick masonry inspection
chamber600x600mm and 450mm depth ( clear inside
dimension) for single pipeline, using table moulded non-
modular bricks of class designation 50 in cement mortar
1:5, C.I cover withframe ( light duty ) 600x600mm internal
dimensions, total weight of cover with frame to be not less
than 38 kg ( weight of cover 23kg and weight of frame
15kg ). RCC top slab with cement concrete M15 with
5 20mm and down size granite metal, foudation concrete M
% with 40mm and downsize granite metal inside
plastering 12mm thick with cement mortar 1:3, finish
smooth with a floating coat of cement as per standard
design including cost of materials, labour charges, curing
complete as per specifications. 18/19 SR (pg no-75, item
no-11.50.2)
12 Nos
AND MAIN SEWER PIPE LINES FOR
SAPURA.
SR Rate
(2018- AW 5% AMOUNT
19)
TOTAL 7,729,186
COMMON EFFLUENT TREATMENT PIPE LINES FOR PROPOSED SHIGGA
SL.NO Description Unit nos L
Earth work excavation for foundations of structures by Mechanical Means as per drawing and technical s
1 setting out, construction of shoring, strutting,barricading, danger lighting,bracing, removal of stumps and
extent required, utilising the available excavated earth locally for the work etc.., complete(KUWS 2018/1
1 VII
250mm dia pipe line 1 1865
200mm dia pipe line 1 850
2715
In ordinary / all soils / hard soil. 0 to 3m depth 55%
Supplying UPVC FOAM CORE pipes conforming to IS 16098 P-I 2013 with amendments ended with inte
mark and conveying to work site, rolling and lowering into trenches, laying true to line and level and perf
testing and commissioning, including loading and unloading at both destinations and cuts of pipes where
2 including jointing of UPVC pipes (with cost elastomeric sealing rings) and specials (excluding cost of spe
approved type with all labour, lead and lifts, including encasing the pipes alround to a depth of not less t
gravel or selected earth available from the excavation etc., complete and giving necessary hydrulic test t
pressure as per ISS (Contractor will make his own arrangement for procuring water for testing). (As per
Pg. No 107 )
250mm dia pipe line (SN 4 - Self Fit) 1 1865
200mm dia pipe line (SN 4 - Self Fit) 1 950
Cost of required specials and fittings wherever necessary like Saddle tee, stub ends, flanged sets, bend
complete. As per the Direction of engineer in charge.
Refilling pipeline trenches and foundation with selected available earth from trench excavation and found
watering , consolidation in layers of 15 cms, thickness including disposing off the surplus earth with all le
3 2018/19 SR< pg no-15, item no-2.
CUM.
Constructing brick masonry Inspection chamber 600x850mm , and depth, (clear inside dimension ) for p
more inlets , using table moulded non modular bricks of class designation 50 in cement mortar 1:5 CI Co
duty ) 450x 610mm intearnaldimension , total weight of cover with frame to be not less than 38kg (wt of c
4 frame 15kg) R.C.C top slab with cement concrete M15 with 20mm down size granitr metal, foundation co
down size granite metal inside plastering 12mm thick with cement mortar 1:3 finished smooth with a floa
walls and bed concrete complete as per standard design including cost of materials, labour charges, cur
specificaions . specification No KBS (pg.no-76 it.no-11.54, PWD SR -18-19)
60
kSRB 12-8.3.1 Extra for item no. KSRB 12-8.3 depth beyound 450mm and brick masonary chamber with
modular bricks for class designation 50i in cement mortar 1:5 for every 150mm depth of part there of inc
5 labour charges, curing complte as per specificaions . specification No KBS (pg.no-77 it.no-11.55, PWD S
340
OR PROPOSED SHIGGAON TEXTILE PARK,KURSAPURA.
B D Qty RATE AW 5% Amount
TOTAL 5,112,651.00
SITE CONNECTIONS FOR UGD/SEWERAGE SYSTEM FOR PROPOSED SHIGGAON TEXT
BREADT
SL.NO DESCRIPTION NO'S LENGTH H
Earth work excavation for foundations of structures by Mechanical Means as per drawing and
technical specification, including setting out, construction of shoring, strutting,barricading,
danger lighting,bracing, removal of stumps and other of trench to the extent required, utilising
the available excavated earth locally for the work etc.., complete(KUWS 2015/16) PG NO -
1 9,ITEM NO 1 VII
18 M road
Connection away from the site 4 20 0.6
Connection
Supplying Unplasticised PVC pipes conforming to IS 15328:2003 with latest 0.6
TOWARDS the site 4 4 amendments
15 M road
ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into
trenches,
Connection laying
awaytrue
fromto the
linesite
and level and perfect linking2at joints, 17
testing and0.6commissioning,
including
Connection loading
TOWARDSand unloading
the site at both destinations and2 cuts of pipes
4 wherever 0.6 necessary
including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials
In all the soils mixed with boulders
(excluding cost of specials) with jointing of approved type, with all labour, with all lead & lift
2 Refilling
includingpipeline
encasing trenches
the pipeand foundation
alround with selected
to a depth available
of not less earthwith
than 15cms fromsoft
trench
gravel excavation
or
Quantity
and of
foundationitem no-1 can
including be considered.
watering, consolidation in layers of 15 cms, thickness
selected earth available from the excavation etc. complete and giving necessary hydraulic testincluding
disposing off the
to the required surplus as
pressure earth
perwiyh all lead andwill
ISS (contractor lift.make
(KUWShis 2018/19) PG NO - 5,ITEM
own arrangements NO 1
for procuring
3 VII (KUWS
water for 2018/19)
testing) (AsPG
per NO
KUWS- 8, ITEM
&DB NO 2
2018-2019 Pg. No 51,Part-V,Item No. 4b )
110mm dia
18 M road
Connection away from the site 4 20
Connection TOWARDS the site 4 4
15 M road
Connection away from the site 2 17
Connection TOWARDS the site 2 4
SITE CONNECTIONS FORCOMMON EFFLUENT TREATMENT PIPE LINES FOR PROPOSED SHIGG
BREADT
SL.NO DESCRIPTION NO'S
the available excavated earth locally for the work LENGTH
etc.., complete H 2015/16) PG NO -
(KUWS
1 9,ITEM NO 1 VII
18 M road
Connection away from the site 4 20 0.6
Connection TOWARDS the site 4 4 0.6
15 M road
Connection away from the site 2 17 0.6
Connection TOWARDS the site 2 4 0.6
In all the soils mixed with boulders
2 Refilling pipeline trenches and foundation with selected available earth from trench excavation
Quantity of item no-1 can be considered.
3 water for testing) (As per KUWS &DB 2018-2019 Pg. No 51,Part-V,Item No. 4b )
110mm dia
18 M road
Connection away from the site 4 20
Connection TOWARDS the site 4 4
15 M road
Connection away from the site 2 17
Connection TOWARDS the site 2 4
QUANTIT
DEPTH Y UNIT RATE AW 5% AMOUNT
1.4 67.2
th latest amendments 1.4 13.44
rolling and lowering into
sting and commissioning, 1.4 28.56
es wherever necessary 1.4 6.72
gs) and specials
115.92 cum 87.00 4.35 10589.29
bour, with all lead & lift
rthwith
ms fromsoft
trench excavation
gravel or
thickness including
g necessary hydraulic test
9) PG NO - 5,ITEM
angements NO 1
for procuring 115.92 Cum 103.00 5.15 12536.75
tem No. 4b )
80
16
34
8
138 Rmt 243.00 33534.00
TOTAL 67,296.04
1.4 67.2
1.4 13.44
1.4 28.56
1.4 6.72
115.92 cum 87.00 4.35 10589.29
rth from trench excavation
80
16
34
8
138 Rmt 243.00 33534.00
TOTAL 67,296.04