Total Rs.
Amount
203160.38
1502636.72
1275902.03
4291354.03
30000.00
7303053.17
Executive Engineer
Water & Power Division
Hunza
ABSTRACT OF COST.
Sub Head: Power Channel
Total Rs.
Total Rs.
3678.84
29774.48
68653.60
50000.00
152106.92
51053.46
203,160.38
cutive Engineer
& Power Division
Hunza
ABSTRACT OF COST.
Sub Head: Forebay
Total Rs.
Total Rs.
Sub Divisional Officer Executive Engineer
Sub Division (Civil) Hunza Water & Power Division
W&P Division Hunza Hunza
Amount
5932.13
38874.96
11638.83
32379.75
47975.29
166420.30
531869.89
250000.00
1085091.15
417545.57
###
cutive Engineer
& Power Division
Hunza
ABSTRACT OF COST.
Sub Head: Penstock Pipe Pillars and Anchor Blocks
Total Rs.
Total Rs.
34489.13
108488.25
20300.29
46715.63
353004.96
111917.48
175685.63
850601.35
425300.68
###
cutive Engineer
& Power Division
Hunza
ABSTRACT OF COST.
Sub Head: Power House, Generator Foundation and Tail Race
Total Rs.
Total Rs.
22992.75
72325.50
13533.53
39864.00
217349.93
8978.14
4826.22
33704.25
21344.14
89533.98
19654.44
73938.81
62882.90
46720.12
432542.09
59178.00
661248.07
55207.75
45079.00
30532.50
14868.17
500000.00
95298.44
14286.60
100000.00
6953.36
5444.74
12615.26
100000.00
300000.00
3160902.69
1130451.34
###
cutive Engineer
& Power Division
Hunza