You are on page 1of 16

Validate

Item Rate BoQ

Help

Print

Tender Inviting Authority: Executive Engineer,Minor Irrigation Division,Khunti


Name of Work: Construction of Series of Check Dam at Chiddi Nala,Under Karra Block, Dist.-Khunti
Contract No: WRD/MID/KHUNTI/IFB-56 /2015-16
Bidder
Name :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liabl
Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #

TEXT #

NUMBER #

TEXT #

NUMBER

NUMBER #

Sl.
No.

Item Description

Quantity

Units

Estimated Rate

BASIC RATE In
Figures To be
entered by the
Bidder
Rs.
P

1
1

2
Jungle clearance in borrow area, building premises,
flanks and slopes on the roads, canals and
embankment by removing the grass and jungle
bushes from the top including weeding out shrubs
including roots and levelling etc. complete as per
direction of E/I.(specification revised in the meeting
of regional Co-ordinators held on 11.01.84 in the
office of T.E.C) ( 5.1.3.1)

3
3620.0000

5
2.0000

E/W in excavation of foundation trenches as per


designed section in all kinds of soil, including
moorum soil, soil mixed with kanker, pebbles and
boulders up to 300mm size and disposal of the
same (beyond 50m away from the toe of dam in the
country side) within initial lead of 150M and initial
lift off 1.5M all lifts as per specification and direction
of E/I (5.1.8)

11357.8500

M3

121.0000

E/W in excavation of foundation trenches of toe wall,


spillway, head regulator, intake well and out let et.
as per design sectioned in soft rock or ordinary rock
(where blasting is not needed) (Vide classification of
soil item-C) with disposal of spoil (beyond 50M away
from the edge of the trenches) with initial lead of
150M and lift of 15M as per specification and
direction of E/I.(5.1.15.2)

2749.4700

M3

333.0000

Extra for wet earth all complete as per specification and


direction of E/I.(7.1.22)

1135.7900

M3

8.0000

Providing and laying P.C.C. or R.C.C. M-150 with nominal


mix of (1:2:4) in various component of dam foundation with
approved quality of 20mm graded coarse aggregate of
required grade as per design and approved quality of sand
of requisite F.M. (2.5 to3.0) washed and screened excluding
cost of shuttering or form work as well of reinforcement, its
cutting, bending, binding and placing but including
necessary tools and plants and vibrating, curing, royalty all
taxes etc. complete job as per specification and direction of
E/I.(5.3.6)

2094.7300

M3

5038.0000

Providing rough dressed random rubble stone masonry in


cement mortar (1:4) in foundation with approved quality of
coarse sand of requisite F.M. (2.5 to 3.0) washed and
screened with raking out joints, curing, scaffolding and its
removal wherever required including royalty and all taxes
etc. complete job as per specification and direction of E/I.
(5.4.8)

765.2100

M3

2270.0000

Providing rough dressed random rubble stone masonry in


cement mortar (1:4) in superstructure, with approved quality
of coarse sand of requisite F.M. (2.5 to 3.0) washed and
screened with raking out joints, curing, scaffolding and its
removal wherever required including royalty and all taxes
etc. complete job as per specification and direction of E/I.
(5.4.11)

1538.8200

M3

2369.0000

Providing and laying P.C.C. or R.C.C. M-200 with nominal


mix of (1:1.5:3) in various components of dam super
structure with approved quality of 20mm graded coarse
aggregate of required grade as per design and approved
quality of sand of requisite F.M. (2.5 to 3.0) washed and
screened excluding cost of shuttering or form work as well
of reinforcement its cutting, bending, binding and placing
but including necessary tools and plants and vibrating,
curing, royalty all taxes etc. complete job as per
specification and direction of E/I.(5.3.11)

139.8100

M3

5673.0000

Providing T.M.T. reinforcement (tor steel) as per approved


design drawing ,removal of rust, cutting ,bending, binding
including supplying annealed wire, placing M.S rods in
position all complete as per specification and direction of
E/I.(5.3.15i)(only valid for TISCON or SAIL)

6.1700

MT

64300.0000

10

Providing shuttering including strutting, proping etc. and its


removal after use in foundation work as per specification
and direction of E/I.(5.3.17)

1592.6500

M2

312.0000

11

Providing shuttering including strutting, proping etc.and its


removal after use in super structure portion of various
components of dam work as per specification and direction
of E/I.(5.3.18)

1239.9600

M2

329.0000

12

Supplying,laying boulder in rock toe,heel trenches of the


dam as per design, drawing including the cost of materials,
royalty and all taxes etc. but excluding the cost of carriage
all complete as per specification and direction of E/I.(5.6.4)

390.0000

M3

877.0000

13

Providing weep hole with dry graded stone filter of 20mm to


40mm size in abutment and wing wall as per specification
and direction of E/I.(6.7.6)

150.0000

Each

115.0000

14

Providing 25mm thick cement plaster (1:4) with approved


quality of sand of requisite F.M. (2.5 to 3.0) washed and
screened including curing, scaffolding wherever required
and its removal royalty and all taxes etc. complete job as
per specification and direction of E/I. (5.5.5)

1049.4800

M2

205.0000

15

Earth work in filling foundation trenches or back filling of


masonry structures with suitable earth in layers not
exceeding 150mm thick well watered, rammed and fully
compacted and finally dressed with earth obtained from
excavation of foundation trenches and kept at a lead of 30m
and initial lift of 1.5m complete as per specification and
direction of E/I.(6.1.16)

1111.7700

M3

69.0000

16

Providing for dewatering from 5 H.P. diesel pump set during


execution of foundation work all complete (SRP -51 sl.no.12)

480.0000

HR

184.9800

17

Carriage of material by mechanical transport including


loading unloading and stacking etc all

18

Cement (lead- 18km P + 2km K)

1101.1200

MT

302.0100

19

Sand (lead 18km K + 2km P)

1954.1100

M3

483.1500

20

Stone Chips (lead-18km K + 2km K)

2004.7100

M3

483.1500

21

Stone Boulder(lead-18km +2km K)

2694.0300

M3

503.2600

22

Steel(lead- 18km P+ 2km K)

6.1700

MT

302.0100

23

Supplying and laying 5 H.P.Diesel engine


Pump set Portable 2600 R.P.M. with accessories (Kirloskar)
( Sl. No. 171)

8.0000

each

53872.5000

24

75 mm dia H.D.P.E. Pipe Coupler clamp with Lashes


Pressure 2.5 Kg/cm2 coil ( S.O.R. Page 13,M-144)

4800.0000

190.1900

25

75 mm dia H.D.P.E. P.C.N.(Sl.no.177 approved rate)

8.0000

each

458.7000

26

Commissoning charge of complete work at site

8.0000

Per Job

900.0000

27

Carriage of materials to work site pipe fitting and diesel


engine (Page -51, Sl No. 1a )

4.0000

Per Day

5499.1700

28

Add 1% Labour cess

1.0000

260562.6500

Total in Figures

Quoted Rate in Words

#VALUE!

s, else the bidder is liable to be rejected for this tender.


NUMBER #
TOTAL AMOUNT Without
Taxes

7
#VALUE!

TEXT #
TOTAL AMOUNT
In Words

8
#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

E!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

Please Enable Macros to View BoQ

s to View BoQ information

You might also like