You are on page 1of 5

CURRICULUM VITAE

Address;
154,Sardar Patel Township
Vijalpore road,Navsari
Near railway station
Gujarat State, India – 396445
Contact No.: +91-7016113901/+91-9426618074
Email: patelfenil63@gmail.com

CAREER OBJECTIVE
I am a Degree Holder With Instrumentation Field Experience On Oil /Gas,Petrochemical,Refineries & Power Plant.
These Projects Have Been Located Onshore and Offshore in The Various India and GCC Countries.Work Thought
Mechanical Completion Commissioning Operation and Maintenance.To be The Part of an organization which uses my
Skill and Expertise in Its Process of Growth and Change while giving me Opportunities To Learn and Enrich my
Competencies. Always Think Safety before Starting any job, work in full Compliance with The Health Safety and
Environment Procedures of The Organization.
EDUCATION & TECHNICAL QUALIFICATION

EXAM PASSED UNIVERSITY CLASS/YEAR


B.E (INSTRUMENTETION AND CONTROL) GUJARAT TECHNOLOGICAL 1ST CLASS/2013
UNIVERSITY
INDUSTRY RELATED TRAINING AND COURSES

 SMART PLANT INSTRUMENTATION(SPI)


 BASIC H2S /BA Training (QP APPROVED)
 FIRE PREVENTION and FIRE FIGHTING Training
 HUET & SEA SURVIVAL Training( ENERTECH QATAR, QP APPROVED)
 PTW CERTIFIED ( QP AND TAKREER)
 PERSONNEL BASKET SWING ROPE

CAREER SUMMARY

Having 6 years Experience In Designing ,Construction & commissioning,Preventive and Corrective Maintenance of
Field Instruments and Control Systems,Shut down Plant Maintenance. Very well Aware about Safety in Oil and Gas
Industry,Knowledge Of Hazardous Zone Classifications, ISO Standards, Familiar in HART Application, I have Experience
in Loop Checking & Trouble Shooting in Yokogawa CS 1000 DCS, Honeywell TDC 3000 DCS , Emerson Delta-v DCS,
F&G System Triconex, Bently Nevada 3500 series Vibration Monitoring System, Mark V,Mark VI,GE Frame 6 Gas
Turbines, I have Fair Knowledge in Sap and Maximo System, I am Able To Read Drawings as like P&ID, Loop Drawings,
Schematic Diagrams, Logic Diagrams,Cause and Effects Sheet, Cable Schedule, JB & Panel Wiring Diagrams, Instrument
Hook Up Drawings Etc.
DESIGN ENGINEERING EXPERIENCE

 SMART PLANT INSTRUMENTATION(SPI)


 Preparation of instrument index
 Instrument data/specification sheet
 I/O List,cable schedule,JB schedule,Wiring diagram,loop diagram
 Calculation and sizing
 Standard symbol and instruments legends.
 Hook -up diagram and detail specification.

Page 1
CONSTRUCTION AND COMMISSIOING PROJECT EXPERIENCE
 Having Good Knowledge Of Plant Sefety Rules & Regulations.
 Good Knowledge About Permit To Work Systems(PWS) and Several kinds of Permits Like Cold Work
Permits,HotWork Permits,Limited Space Entry Permits.
 Co-ordinate with commissioning Lead engineer and commissioning team leader regarding construction.
 Reviews Vendor Operating Manuals / Start-Up Procedures and provides comments as appropriate
 Pre-Commissioning and Commissioning Activities like a Checking DCS and ESD Loops.
 Testing and Commissioning of Local Panel and Packages Instruments.
 FAT and SAT procedure before commissioning.
 Filling Up ITR For Completed Loops and Co-ordinate with Client witness and signing up document.
 Smart Series & Field bus all Transmitters, Control Valves Calibrated using by HART-275/375/475.
 Quality Checks for I & C Systems During Erection and Commissioning /Loop checks.

MAINTENANCE EXPERIENCE

 Online preventative and corrective maintenance of field instruments and systems, breakdown maintenance,
shut down maintenance
 Worked as Instrument Maintenance engineer in 655 MW of Naphtha Oil & Natural Gas Fired Gas turbine,
HRSG Boiler & Steam Turbine in a Combined Cycle Power Plant (CCPP).
 Skilled in PLC, DCS, ESD Plant Automation Control System.
 Routine Calibration of Instruments ( Calibration Shop / Field/online/offline)
 Calibration and repair various kind of electronics and pneumatic instruments related flow, pressure, level,
temperature, fire and gas, vibration, speed sensor.
 Skilled at performing and documenting completion of maintenance, calibration, installation, fault location,
and repair of electric, electronic, mechanical and pneumatic instruments and systems.
 Small modification work according to process requirements.
 Trouble shooting, fault finding, and route cause failure analysis.
 Lead a team of technicians during Plant shut down and break down maintenance.

EMPLOYMENT HISTORY
Designation : Instrument engineer
Company : Sinclus engg & const PVT.LTD
Client/Project : Reliance Industries LTD.,Hazira,India
Date : 1st Aug,2018 to Present.
Job Discription:
 Pre-commissioning activities of process and utility systems using Inspection Test Records (ITR’s)
under a Completions system.
 Assist vendor for Pre commissioning and commissioning on Gas Turbines.
 Conducting ESD and Fire& Gas cause and effect testing
 Involved in F&G system upgradation ,replacement Of F &G detector For different gases.
 Loop check with new Upgraded system and line up all detector with OWS.
 Performing walkdowns and punch listing of systems for handover purposes.
 Involve in Site Acceptance Test, loop checking and function test of ICSS.

Page 2
Designation : Instrument engineer
Company : SAIPEM, Saudi Arebia
Client/Project : SAUDI ARAMCO( KHURAISH P1 SETTELITE GOSHIP & WIP)
Date : 14 th oct,2017 To 9 th July,2018.
Job Discription:
 Provide Field Supervision of Instrument Commissioning Technicians.
 Assist the Commissioning Engineers in Planning Development and Reporting.
 Assist in Developing sub-system Definition and Pre-Commissioning/ Commissioning certification
and Documentation.
 Liaise with Construction/ Mechanical Completion Groups on a daily basis.
 Supervise The Commissioning Technicians Ensuring Technical Integrity of work Carried out.
 Assist Construction with Inspection and Punch out of Installation and Vendor Packages. Punch out
of offered Sub-systems / Systems. Verification of Pre-Commissioning Certification.
 Liaise with Equipment Vendors on site Ensure Technicians work is Carried out in a Safe and
Controlled manner in Accordance with Site Procedures and PTW System.
 Produce and Maintain As-built drawings and Documentation.
 Execution of Pre Commissioning, FunctionTesting, Completion of ITRs, Assist during Dynamic
Commissioning, Punch list identification, Verification and Clearance.

Designation : Instrument Engineer


Company : Ani instruments PVT LTD
Client/Project : Takreer oil refinery And Reliance Industries Ltd
Date : 21 st Jan,2017 To 10 th Oct,2017
Job Discription:
 Engage in loop checking, functional test, trouble shooting, commissioning and start up activities in
utilities instruments (Foundation Field bus& smart hart instruments) also fire and gas system and
Yokogawa DCS System.
 Review of Hookup Drawing, P&ID, Instrument Loop Diagram (ILD), Logic Diagram, Location
Drawing and Cause & Effect.

Designation : Instrument engineer


Company : Vedant Chloro Chem, India
Client/Project : Vedant Chloro Chem
Date : 5 th May,2015 To 15 th Jan,2017
Job Discription :
 Maintenance of existing Instrumentation and Controls systems and commissioning of capital
upgrade projects.
 Loop Checking and Functional Check of Different Kind of Transmitter Such as Pressure,
Temperature, Level, Control Valve, On/Off Valve(ESDV,SDV and MOV),Switches, RTD and
Thermocouples,Knowledge and Understand Drawings on Actual Construction and Handle all
Installation Activities.
 Assist Vendor for Pre Commissioning and Commissioning on Gas and Steam Turbines.
Witnessed The Final Loop Checking and Parepration Of Logic Folder During Loop Checking.
 Assist operation during Start-up.Ensure That all Instrument Assets in The Area are Maintained in a
Safe.Calibration of all Type Instrument.I was Involved Foundation Field Bus (F.F) System.

Page 3
 Responcible for Checking stsrt-up Procedure of Turbine &Compressor.Able To Interpret and
Understand Logic base on Control Builder and Fail Safe Control of Honeywell System. Assigned in
Checking all Instrument Cableing, Termination, Earting works if Conforms To Project Specification.
 Assigned in calibration Testing,Installation of Different Types of Equipment like Process
Transmitters Switches,RTD, Thermocoples,Combustible gas and H2S Detectors,UV Flame
Detectors,Smoke and Heat Detectors.
 Having a good experience on maintenance, calibration of control valves, Have a good
understanding of Vibration monitors (3300 & 3500 Series)
 Carried out Loop Checking on SCADA system and calibration of Displacer LT .

Designation : Instrument Supervisor


Company : DOPET OCC ,Qatar
Client/Project : Qafco Fertilizer & And Qatar Petroleum
Date : 1st Feb,2015 to 25th Aplril,2015.
Job Discription :
 Pre-shutdown and shutdown activities, shutdown of Qafco-3 and QP-NFA-PS4 gas station
maintenance Shutdown.
 Replacement of all Faulty instruments and Control Valve with New One.
 Loop check of new upgradetion system and take all instruments in line.

Designation : Instrument foreman


Company : KCCEC ,Kuwait
Client/Project : KNPC MAA Refinery Shutdown
Date : 1st Dec, 2014 To 10th Jan, 2015.
Job Discription :
 New panel installation, valve serviceing in workshop, Dropout Valve,Replacement Of Old
instruments with new one.
 Assist Vendor For Commissioning of Solar Turbines with The output Capacity of 19.5KVA.
Confirm all Loop Details are Correct Against all Project.Vendor Information,P&ID,I/O Schedule,Data
Sheets,Instrument Index on data base alarms And Trips Schedule Including Rack,Slot,Channel
Location for I/O Devices Check.
Designation : Instrument engineer
Company : Tapi pigments,India
Client/Project : Tapi Pigments
Date : 20th May,2013 To 20th Nov,2014
Job Discription :
 Engages in Plant Erection, Maintenance Work, Calibration, Loop Checking, Functional test, Trouble
shooting, Commissioning and Start up activates in Utilities and Process areas Instruments also Fire
and Gas MARK VI and Yokogawa DCS Systems
 Involved in Calibration of all kind of field Instrument such as Rosemount, Foxboro, Yokogawa
Transmitter by Using HART-275,375 Communicator, Fisher and Masoneilan Control Valves with
Electro Pneumatic Positioner also Neles, BIFFIS on-off Valves, Indicators, Thermocouples, RTD, and
Skin Thermocouples
 Carried out unit wise (condensate friction and stabilization unit, process Gas Train, propane
Refrigeration unit and Nitrogen unit) Gas turbines, Boilers, Water Treatment units, Gas generators,
Oil/Gas separators, Strippers, storage tank Instruments
 Hans on Experience in Compressor, Anti surge control system, Bently Nevada 3500 series Vibration
system and Compressor speed controlling system.

Page 4
PERSONAL DETAILS
Name : Fenilkumar Shingala
Date of birth : 10th Nov,1991
Nationality/Gender : Indian/male
Marital Status : Married
Language known : Gujarati, English, Hindi
Passport No. : T3087623
Date and Place of Issue : 27/05/2019 at Surat
Date of expiere : 26/05/2029
Skype ID : kitesforfly

I Hope That You Will Consider My Application Favorably and Send Me a Reply As Soon As Possible I Further Declare
That If I Shall Be Selected, I will Try my Level Best To Increase The Reputation To Your Organization.

With Favorable Hopes,

Fenilkumar Shingala

DATE :

Page 5

You might also like