Quiz on (Testing and Commissioning)

Test I. Instruction: Material identification

1. _____________ 6. _____________

7. ______________
2. _____________

3. _____________ 8. ______________

4. _____________ 9.______________

5. _____________ 10.____________
Test II. Instruction: Provide the meaning for the following abbreviations:

1. ARI -
2. LEED –
3. SMACNA-
4. ASTM –
5. AHRI –
6. DQE –
7. BOM –
8. BOQ –

Test III. Instruction: Encircle the letter of the best answer.

1. It is a picture, likeness, diagram or representation, usually drawn on


paper.
a. Plans
b. Blueprint
c. Drawing

2. It is a drawing showing technical details of a building machine with


unwanted details omitted and often using symbols rather than
detailed drawing.
a. Plans
b. Blueprint
c. Drawing

3. Roadmap for construction and basis of all works


a. Plans
b. Construction Drawing
c. Shop Drawing

4. Proposal and revision which the basis are FCD


a. Construction Drawings
b. Drawings for Biddings
c. Shop Drawing

5. Drawings which are usually used for commercial purposes like cost
estimate
a. Drawings for biddings
b. Bidding Proposal
c. Construction Drawing

6. The process of breaking down the material list, quantity and


specification of a certain project to determine the most possible
cost.
a. Total Cost
b. Quantity Estimate
c. Specification

7. Details and specification of material, equipment needed


a. Total Cost
b. Quantity Estimate
c. Specification

8. Regulates, directs and control one flow by opening ,closing and


partially obstructing the flow passage
a. Valves
b. Fittings
c. Accessories

9. It is used in pipe systems to connect straight pipe or tubing sections


a. Valves
b. Accessories
c. Fittings