The document contains temperature and pressure readings taken every 2 minutes from 20:48 on July 19, 2008 to 22:04 on the same date. It records 143 readings in total, with the temperature starting at 14.56 degrees and rising gradually to 882.22 degrees by the end, and pressure starting at 78.07 kPa and gradually increasing to 230.99 kPa.
The document contains temperature and pressure readings taken every 2 minutes from 20:48 on July 19, 2008 to 22:04 on the same date. It records 143 readings in total, with the temperature starting at 14.56 degrees and rising gradually to 882.22 degrees by the end, and pressure starting at 78.07 kPa and gradually increasing to 230.99 kPa.
The document contains temperature and pressure readings taken every 2 minutes from 20:48 on July 19, 2008 to 22:04 on the same date. It records 143 readings in total, with the temperature starting at 14.56 degrees and rising gradually to 882.22 degrees by the end, and pressure starting at 78.07 kPa and gradually increasing to 230.99 kPa.
Pressure Rate Date: Time (psi) (M3/D) Description. 19/07/08 14:30 See on the Rigged up lubricator. 15:00 360 page 2. R.I.H. sinker with 1.8" gauge ring. 17:15 Sinker reached 1924.7 m,mku could not pass through - P.O.O.H 19:30 R/D sinker. 20:49 First data of SRO. 20:56 360 Open well to Lubricator. 21:01 R.I.H. for flowing gradients. On bean of 13mm. 21:16 Stop @ 200 m Mku. 21:21 R.I.H. for the next stop 21:30 Stop @ 400 m,Mku 21:35 R.I.H. for the next stop 21:44 Stop @ 600 m. Mku. 21:49 R.I.H. 21:58 Stop @ 800 m , Mku. 22:03 R.I.H. 22:11 Stop @ 1000 m, Mku. 22:16 R.I.H. 22:24 Stop @ 1200 m, Mku. 22:29 R.I.H 22:36 Stop @ 1400 m, Mku. 22:41 R.I.H. 22:50 Stop @ 1600 m. Mku. 22:55 R.I.H. 23:04 Stop @ 1800 m , Mku. 23:09 360 R.I.H. for the last stop. 23:16 Tool on depth of 1924.7 m, Mku, maximum depth could reach. 20/07/08 0:00 360 Test result Put the well on production test for 6 hours. 20/07/08 6:00 360 Shut in well for PBU. 21/07/08 13:18 730 see below.P.O.O.H for static gradients survey. 13:29 Stop @ 1800 m , Mku. 13:34 P.O.O.H 13:45 Sop @ 1600 m , Mku 13:50 P.O.O.H 14:00 Stop @ 1400 m, Mku. 14:05 P.O.O.H 14:14 Stop @ 1200 m, Mku. 14:19 P.O.O.H. 14:27 Stop @ 1000 m, Mku. 14:32 P.O.O.H 14:42 Stop @ 800 m, Mku. 21/07/08 14:47 P.O.O.H 14:58 730 see below.Stop @ 600 m Mku. 15:03 P.O.O.H 15:17 Stop @ 400 m, Mku. 15:22 P.O.O.H 15:33 Stop @ 200 m, Mku. 15:38 P.O.O.H 15:53 Tool inside lub. 15:58 730 Close Swab valve and Bleed off pressure.